Architecture Portfolio_Manasvi Samani

Page 1


01

Urban Contextual Studio

02

Carving Identity

03

Building Material and Construction

04

Environmental Science and Services

05

Internship

06

Professional

Work Projects

C O N T E N T


01 Urban Contextual Studio Academic Project: 5th Year of B.Arch (9th Sem) | Year 2019 Duration: 6 Months | Site Location: Rajkot, Gujarat, India

Individual Project: From generating program to designing it.

Rajkot, Gujarat

Site Images - ‘Kothi’ Compund; Campus of Government Buildings

Brief: The project had been proposed in the old campus of Government buildings which is known as ‘Kothi Compound’ and is on the banks of ‘Aji River’ from where the Rajkot city started flourishing. Britishers developed the campus in the 1800s for their administrative purposes, which later was taken over by the Indian Government. Since the campus needs redevelopment, a lot of proposals have been designed for that. We, as a group of students, proposed an Agriculture Department for the farmers of the Saurashtra region as Rajkot is the centre. This department would focus on various activities that would increase the agricultural efficiency of the country. The department proposed had been given an area of 1.2 Hectare from the whole campus of 4 Hectares where a few old buildings will be restored. Design Approach: “The architectural character of this department should be a reflection of Past-Present and Future of the city, and becomes a Landmark for the city” was the core idea for the design of this institution. And, it was achieved by studying the works of Joseph Allen Stein and James Stirling in the historical context.

Existing Campus Buildings 3


Conceptual Ideas: What type of spaces can be given to the city? What is the need of the neighbourhood? • Market spaces • Public Gardens • Cycle-Jogger’s Tracks, Walkways • More plantation • Historical Element like Bird Feeder

How historical references can be taken into the new built? Through its: • Scale-proportion • Elements • Spatial Organisation • Structure and Material • Architectural Language

Conceptual Ideas and Sketches for the built environment

Few detail out Spaces according to its Functional requirements and Character

Massing Model

Conceptual Layout for the Institution and Campus Planning 4


LVL -4.5 MT

WAL LVL -1.5 MT

KWA

WALKWAY / CYCLE TRACK

LVL -2.0 MT

LVL -2.5 MT

LVL -3.0 MT

LVL -3.5 MT

LVL -4.0 MT

LVL -4.5 MT

NURSERY PANTRY

EXTRA STAFF AREA REGISTRATION OFFICE WAITING AREA

DEPARTMENTAL OFFICE

CLERK'S ROOM

COMPUTER SPACE POST DISTRIBUTION CHAMBER

DORMITORY

DORMITORY

WORKSHOP AREA

FOYER LVL +0.10 MT

MAIN OFFICE FOYER

LVL -0.90 MT

DEMONSTRATION AREA

RECORD ROOM TOILETS

LVL -1.0 MT LVL -1.0 MT ADMINISTRATIVE BLOCK

ENTRY

DORMITORY LVL -0.20 MT

LVL -0.20 MT

ENTRY

LVL -1.65 MT

CANTEEN

LVL -0.75 MT

ACCOUNTANT OFFICE

MAIN OFFICE

KITCHEN

DEMONSTRATION AREA FOR MACHINES

ADMIN OFFICE DINING

LVL -4.5 MT WASH AREA

STAFF ROOM DINING FOYER LVL +0.10 MT

PUBLIC TOILETS

PANTRY

SEMINAR ROOM WAITING AREA

RECORD ROOM

MACHINE LAB (CANNING MACHINES)

PUBLIC TOILETS

STAFF AREA

RECORD ROOM

DRINKING WATER

ENTRY LVL -0.50 MT

K

WAITING AREA

WALKWAY / CYCLE TRAC

PANTRY

LVL -0.75 MT

PEDESTRIAN WAY

PEDESTRIAN WAY

ETS

DRINKING WATER

SERVICE ROOM

LVL -1.0 MT

INFORMATION RE

A'

FUTURE EXPANSION BLOCK

VEHICULAR ACCESS

5

ARMING WALLS

Ground Floor Plan of the Institution DIRECTOR OF FISHIERY

Y/C

YC

LVL -7.5

LVL -0.75 MT

TOILETS LVL +0.10 MT

VERTICAL FARMING WALLS

ENTRY


A PARKING

PARKING

LVL -2.0 MT

Open Spaces for the above floors (Accessible Terraces)

PUBLIC UTILITY FACILITY

PUBLIC UTILITY FACILITY

LVL -4.5 MT ENTRY

WALKWAY / CYCLE TRACK

WAL

ENTRY

LVL -1.5 MT

WALKWAY / CYCLE TRACK

LVL -2.0 MT

KWAY

LVL -2.5 MT

LVL -3.0 MT

LVL -3.5 MT

LVL -4.0 MT

LVL -4.5 MT

/ CY

CLE

TRAC

K LVL

IRS, SPORTS ANY OTHER EVENT

PARKING

PARKING

PUBLIC UTILITY FACILITY

LVL -4.5 MT

VEHICULAR ACCESS

ENTRY

ADMIN OFFICE

WAITING AREA

PARKING

WAL KW ON EX AY / CY CL ISTI NG PEE TRAC DEST K CONT RIAN IN BRID UES GE

LVL -7.5 MT

TERRACE PANTRY

UND FOR

-4.5 MT

ENTRY

LVL -1.5 MT

WALKWAY / CYCLE TRACK

LVL -2.0 MT

LVL -2.5 MT

LVL -3.0 MT

LVL -3.5 MT

LVL -4.0 MT

LVL

LVL -4.5 MT

-4.5

MT

WALKW

STAFF AREA

AY /

LVL -8.0 MT

50 MT

CYC

LE TRA

CK LVL

TERRACE

DORMITORY

STAFF AREA

EXTRA STAFF AREA

EXHIBITION / FAIRS, SPORTS ACTIVITY OR ANY OTHER SMALL EVENT

REGISTRATION OFFICE WAITING AREA

LVL -0.50 MT

LVL -0.75 MT

STAFF AREA

LVL -9.0 MT LVL -0.90 MT

DEPARTMENTAL OFFICE

LVL -8.5 MT LVL -9.5 MT

WAL KWA ON EXISY / CYC TING LE TRA CK CON PED EST TINU RIAN BRID ES GE

CLERK'S ROOM

COMPUTER SPACE

LVL -8.0 MT

POST DISTRIBUTION CHAMBER

DORMITORY

DORMITORY

WORKSHOP AREA

FOYER LVL +0.10 MT

MAIN OFFICE

LVL -8.5 MT

LVL -0.75 MT

TOILETS LVL +0.10 MT

FOYER

LVL -10.0 MT

DEMONSTRATION AREA

LVL -9.5 MT

LVL -9.0 MT LVL -0.90 MT

LVL -10.0 MT

DEMONSTRATION AREA

RECORD ROOM

LVL -11.0 MT

TOILETS

LVL -1.0 MT LVL -1.0 MT

ENTRY

ADMINISTRATIVE BLOCK

LVL -0.20 MT

LVL -0.20 MT

FOOD HAWKER'S ZONE

LVL -1.65 MT

MAIN OFFICE

LVL -10.5 MT

ENTRY

LVL -11.5 MT

LVL -0.75 MT

LVL -12.0 MT

KITCHEN

LVL -12.5 MT

DINING

LVL -4.5 MT WASH AREA

STAFF ROOM PANTRY

WAITING AREA

DINING FOYER LVL +0.10 MT

PUBLIC TOILETS

PANTRY

SEMINAR ROOM WAITING AREA

ER'S ZONE RECORD ROOM

MACHINE LAB (CANNING MACHINES)

PUBLIC TOILETS

STAFF AREA

TERRACE STAFF AREA

RECORD ROOM

DRINKING WATER

LVL -4.5 MT

OFFICE

ENTRY ENTRY

LVL -0.50 MT

PEDESTRIAN WAY

LVL -0.75 MT

PEDESTRIAN WAY

PEDESTRIAN WAY

WAITING AREA

WALKWAY / CYCLE TRACK

CANTEEN

PANTRY

FUTURE EXPANSION BLOCK

TERRACE

RECORD ROOM

PUBLIC TOILETS

LVL 0.00 MT

PLANT INFO CENTRE

LVL -0.50 MT

SERVICE ROOM

LVL -1.0 MT

PLANT INFORMATION CENTRE

FUTURE EXPANSION BLOCK PRODUCT SHOP

WAITING AREA

DIRECTOR OF FISHIERY

LVL 0.00 MT

VEHICULAR ACCESS STATIONARY

ENTRY

DRINKING WATER

WAITING AREA

C'

WALKWAY / CYCLE TRACK

WAY

PRINTING SHOP

LVL 0.00 MT

LVL -0.75 MT

PEDESTRIAN WAY

FUTURE EXPANSION BLOCK

SUB REGISTRAR OFFICE

PEDESTRIAN WAY ENTRY

LVL -0.50 MT

PEDESTRIAN WAY

LVL -0.50 MT

WEST HOSPITAL

TOWARDS MAIN BUILDING

PARKING

LVL -1.0 MT

AY / CYCLE

TRACK

A PARKING

LVL -13.0 MT

DEMONSTRATION AREA FOR MACHINES

ADMIN OFFICE

B'

LVL -0.75 MT

LVL -0.20 MT

LVL -0.20 MT

CANTEEN

LVL -10.5 MT

ENTRY

ADMINISTRATIVE BLOCK

ENTRY

LVL -1.65 MT

WALKWAY / CYCLE TRACK

WAY

PEDESTRIAN WAY

ENTRY

LVL -1.0 MT

DORMITORY

ACCOUNTANT OFFICE

TERRACE

LVL -1.0 MT

-4.5 MT

LVL -7.5 MT

NURSERY PANTRY

OPEN GROUND FOR

PARKING

WALKW

PLANT INFORMATION CENTRE AGRICULTURE COURT

Second Floor Plan of the Institution

A'

VEHICULAR ACCESS PARKING

FUTURE EXPANSION BLOCK

PUBLIC UTILITY FACILITY

BALCONY

DIRECTOR OF FISHIERY

LVL -4.5 MT

VEHICULAR ACCESS ENTRY

LVL -1.5 MT

WALKWAY / CYCLE TRACK

LVL -2.0 MT

LVL 0.00 MT

LVL -2.5 MT

LVL -3.0 MT

LVL -3.5 MT

WAL

KWAY

LVL -4.0 MT

LVL -4.5 MT

CONSUMER COURT

/ CY

CLE

TRAC

K VEHICULAR ACCESS

LVL

FUTURE EXPANSION BLOCK

SUB REGISTRAR OFFICE

VEHICULAR ACCESS

-4.5 MT DIRECTOR OF FISHIERY

WAL KW ENTRY ON EX AY / CY CL ISTI NG PEE TRAC DEST K CONT RIAN IN BRID UES GE SUB REGISTRAR OFFICE

WEST HOSPITAL

VEHICULAR ACCESS

PUBLIC UTILITY FACILITY

AGRICULTURE COURT

CONSUMER COURT

MAMLATDAR OFFICE

DEPUTY COLLECTOR'S OFFICE

REGISTRAR OFFICE

LVL -7.5 MT

UDIO

50 MT

MAMLATDAR OFFICE

Family Court

UND FOR IRS, SPORTS ANY OTHER EVENT

XI

TERRACE

LVL -8.0 MT

FACULTY: SR,DP,PU,PK,RP,SM

SECOND FLOOR PLAN

SCALE 1:200

DORMITORY

TERRACE

18TH OCTOBER'19

LVL -12.50 MT LVL -11.50 MT

INDUBHAI PAREKH SCHOOL OF ARCHITECTURE, RAJKOT

KEY DRAWING

LVL -12.0 MT

NTS

LVL -11.0 MT

DEPUTY COLLECTOR'S OFFICE

LVL -8.50 MT

LVL -8.5 MT

LVL -8.0 MT

LVL -9.0 MT LVL -0.90 MT

LVL -13.50 MT

PUBLIC OPEN SPACE

REGISTRAR OFFICE

LVL -0.75 MT

LVL -13.0 MT

MAMLATDAR OFFICE LVL -1.0 MT

LVL -9.5 MT

LVL -10.50 MT

LVL -7.50 MT

LVL -10.0 MT

DEMONSTRATION AREA

FOR PLAYING SPORTS

LVL -10.0 MT LVL -9.50 MT

LVL -7.0 MT

LVL -9.0 MT

LVL -1.0 MT LVL -0.20 MT

LVL -0.20 MT

ENTRY

LVL -6.50 MT

TR

AC

K

LVL -10.5 MT YC

LE

MAMLATDAR OFFICE

LVL -1.65 MT

LVL -6.0 MT

/C

ADMINISTRATIVE BLOCK

PARKING

B'

LVL -0.75 MT

KW AY

ENTRY

W AL

LVL -1.0 MT

WAY

ER'S ZONE LVL -5.50 MT

Family Court

PARKING

VEHICULAR ACCESS

LVL -5.0 MT

LVL -4.5 MT

TERRACE

LVL -4.0 MT

LVL -4.50 MT

E

CANTEEN

WALKWAY / CYCLE TRACK

WALKWAY / CYCLE TRACK

TERRACE

ET PLAC Y MARK ORAR -2.75 MT LVL

TEMP

PARKING

FUTURE EXPANSION BLOCK

PARKING

C'

ING

PARK

LVL -3.50 MT

Y

ENTR

ING

PARK

ENTRY ENTRY

LVL -3.0 MT

ENTRY

LVL -0.75 MT LVL -2.50 MT

LVL -0.50 MT

WAY

PEDESTRIAN WAY

RDS

TOWA

I HIND

KESAR

E

BRIDG

PEDESTRIAN WAY LVL -2.0 MT

LVL -1.50 MT

TOWARDS KESARI

HIND BRIDGE

LVL -1.0 MT

PLANT INFORMATION CENTRE TERRACE

A'

Master Plan of the Site, where amenities for the neighbourhood is designed

Fourth Floor Plan of the Institution FUTURE EXPANSION BLOCK

DIRECTOR OF FISHIERY

6

VEHICULAR ACCESS

LVL 0.00 MT

SUB REGISTRAR OFFICE

FUTURE EXPANSION BLOCK

DIRECTOR OF FISHIERY

SUB REGISTRAR OFFICE

WEST HOSPITAL

AGRICULTURE COURT

CONSUMER COURT


Cycle Track

Passage

Administrative Block

Public Plaza

Formal Open Space

Agriculture Administrative Block

Front Elevation & Plaza of the Institution; a reference with its History

Administrative Block

Passage

Formal Open Space

Existing Historical Building to be preserved

Dormitory

Passage

Demonstration area for farmers

Detailed Physical Model of the whole institution to see the scale and character of the spaces

Walkway/ Cycle Track

Low-Income Settlements

Court for Formal Meetings and Gatherings 7


02 C a r v i n g

I d e n t i t y

Reinvigorating the culture of Dhrangadhra through its Built Environment Thesis Project: 5th Year of B.Arch (10th Sem) | Year 2020

Duration: 6 Months | Site Location: Dhrangadhra, Gujarat, India Individual Project: From thinking about inquiry till answering the hypothesis and prooving it right or wrong.

The inquiry of the thesis was to understand the role of architecture in the changing scenarios, how to preserve the originality of the place in the new built environment and would also reflect the cultural and social values of the town. Brief: The project had been proposed near the old stone quarry of the small town of Dhrangadhra in Surendranagar District for the stone artisans and people of the town. The town’s development has been stagnant for years affecting the identity of the town. For this, an Institution was proposed which would reflect the identity of the town through its architectural language and the functional spaces which will incorporate current needs and requirements of the town . Design Approach: “The institution should be a reflection of the town’s culture and lifestyle with which people can associate themselves” was the core idea for the design of this institution. And, it was achieved by studying the town through various layers and understanding them.

Illustration explaining “What is Identity of the place? What are the factors affecting it?”

AIM To reinvigorate the identity of Dhrangadhra by reinterpretation of the cultural and social values of the town into the present built environment. OBJECTIVES • To understand the town in terms of its culture, society, current scenario and development. • To identify the needs or issue of the town and do the appropriate intervention. • To bring back the lost virtue of the town and enrich it with life. • To explore the most important elements or ways to create the architecture which is local to the place. • To create a blend which would balance the past and future of the town; generating a sense of belonging. • To demonstrate a new built typology which preserves the essence of the town. 8


Opportunities present in the town

Understanding the site through sketches

Houses of Stone Artisans

Stone Manufacturing and carving units

SAPTI Part 1 and 2

Selected Site

Other old stone quarries

Exploring site through interesting exercises 9


Conceptual Ideas

Two major axis to enter the site

Open space surrounded by Colonnade, Tower and Plinths

P roposed S patial O rganisation

View of Quarry from the open space

Built is facing the Quarry

Bold enough to make a statement but with subtleness; having 5 towers as a symbol of the Gates of the Town

Dividing the open space into two parts: Public and Private Respecting the existing natural terrain

Evolution of spatial organisation in Section

Closed spaces

Semi open spaces Height: Two storey

Semi open spaces Height: One storey

Semi open spaces With roof as pergolas

Generates curiosity as the next space is not seen directly

Making series of small and big courtyards, dividing the masses.

Evolution of spatial organisation and layout

Market area and Public square

Exhibition area with its surrounding open spaces

Central Courtyard 10


11


Open Spaces for the above floors (Accessible and Non-Accessible Terraces)

Isometric View of the Institution showing various functional spaces, its scale and its character 12


13


The whole essence of the thesis is based on the experiences that built character invokes. The results of the thesis showed the significant influence of culture in the built environment and how it affects the perception of viewers; the way they see it, understand it and relate it with themselves. “In the absence of cultural influences; architecture becomes lifeless, monotonous and does not make complete sense”. Architecture should communicate with the people or narrate the story to the people. Hence, it is the duty of an architect to have cultural influences in their work along with fulfilling the needs of current times. The Cultural influences can be achieved through scale and proportion of the spaces, the way it is constructed, use of materials, textures or colours, use of certain architectural elements, character of the built , having familiar activities; which gives essence of the place.

Exhibition Court

Entrance Court

Amphi-theatre

Market Area and Public Sqaure

Central Court for all Activities

Community Court

View of Quarry from Exhibition Gallery

Workshop Court

View of Quarry from Exhibtion Bridge 14


03 Building Material and Construction

Conceptual Diagrams of various construction and structural systems that can be used for Indoor Stadium

Academic Project: 5th Year of B.Arch (9th Sem) | Year 2019 Duration: 6 Months | Site Location: Rajkot, Gujarat, India Group Project (3 people): From thinking about advanced

construction system to its application to buildings and designing it.

Curved Roof System with Cable Suspension

Brief: We had to select one project related to advance building construction system and had to work on it throughout the semester. We selected large span structures and specifically stadiums because it requires complex construction system. After a lot of research, we went with Cable Suspension system to support the roof as we wanted the interior of the stadium clear and all the structural members should be in the exterior. Other reasons for using this system was to have a light weight structure and to respond the climate of the region. With the system that we derived, Primary system became Cable Suspension while Secondary system was Double Cable due to the curvature of the roof and cables. The stadium designed was 5500 sq mt area huge and 18 mt in height where number of sports can be played. Design Approach: The stadium should be simple in planning to avoid other complexities and the structural system would be exposed so all the members would be seen from exterior and we get clear interior space to use.

15


Load Trasnfer of the Stadium’s Structural System

3D Model Views representing the overall system and form of Indoor Stadium; designed for a specific context 16


DETAIL A

DETAIL C

KEY SECTION

DETAIL B

DETAIL E

DETAIL F DETAIL D

Physical Model of the whole Indoor Stadium

Physical Detailed Model 17


activities. -Fire pump at bottom level tank. Water tank should be in 100000 excess to domestic water tank. - 1 Unit of CO2 of 4.5kgs and 1 unit of DCP of 4kgs at each floors. One hose reel at each floor. - Fire Alarms with manual call points, escape route auto glow. - Power supply to emergency to be provided in case of power cut also. - Hydrant system: 900Lts/min to be discharged at 3 bar.

Case study: Hyatt Regency, Pune Site Area: 1.17 Hectares

Twelfth - Fifteenth Floor 473 Sq.Mt of Each Floor

6 Rooms on Each Floor - 45 sq.mt/room

8m

4 Rooms on Each Floor - 45 sq.mt/room

Twenyth - Twenty Third Floor 253 Sq.Mt of Each Floor

2 Rooms on Each Floor - 45 sq.mt/room

uva Nana Mak Chow

Basement - 2 Times of Podium Built Up 2 x 1350sq.mt. = 2700 sq.mt x 2 floors = Total 5400 sq.mt

20x

70%

Generator Room Control Room Fire Safety - 12 sq.mts Water Treatment Laundry - 40 sq.mts HVAC Plant Gas Cylinder Storage - 9 sq.mts Electrical Room Water Tank - Pump Room - 30 sq.mts Map showing Nana Mauva Circle

Towards Raj

8m

wk

Nagar Cho

ights Silver He

Eighth Floor Eleventh Floor

According to Fire Act, 2016

Typical Floor Plan

For buildings more than 45 meters in height,

Scale 1:1000

Major Landmark: Silver Heights Residential Towers

Podium - 30% of Total Built Up - Secondary: 7M (Service Site Selection Road) 15M (Vehicular Road) 1350 sq. mt / floor x 3 Floors = +Total 4050 sq.mt Nana Mauva Chowk

3x 2x

6x

Typical Room Plan

Understanding Requirements

- Building has been placed on the South-West Side so that we can block majority of the sun rays.

- The Surface area has been increased to maximize the shaded area on the amenities at the ground level and the podium level.

Podium

30%

3x

- 8m width to be left on 3 sides - 9m width to be left on the front side.

+ 2M (Footpath) • Commercial Area as per • Site Area: 1.15 Hectare Kitchen – 500sq.m. - 1mSq.m. per development seat plan 2031. Mini Theater - 60sq. m. for 60pax • F.S.I: 1 Preparation area, Staff dining room, Staff kitchen, Bakery • Total Built: 13500 Sq. Mt. Cold storage, Pantry, Washing area Spa - 230sq. m. • Road Width: RUDA Development Plan Scale N.T.S - Primary: 9.5M (Service Dining - 1.85sq. m. per person - 925 sq.mt for 500 pax Indoor Game Zones - 120Sq. m. Road Commercial Road) + 24M(Vehicular Table tennis, Board game, Foosball, Roads) + 9.5M (Service Road) Public Zone Residential Banquet with meeting & conference- 0.9sq.m./ person Air hokey, Pool table Banquet kitchen - 0.2Sq. m./seat Industrial Jacuzzi - 14sq. m. for 9-10pax Admin – 1 to 2%, 150 to 200sq.m. Swimming Pool - 200Sq. m. for 50pax Maintenance and repair area- 4 to 7%, 500 to 700sq.m. Parking – 100 cars Gym- 60sq.m. Treadmill, Cross trainers, Rowing Machine, Exercise Bikes, Machines for arm/back, Dumbbells, Water Dispenser

Forth Floor Seventh Floor

Design Approach: We thought to have a building with stepped floors so we can give open space at higher level and these open spaces can act as Urban Farming; reducing the temperature of the surroundings. The design was an outcome of studying various rules and regulations of different organisations.

8m

9m

Sixteenth - Nineteenth Floor 363 Sq.Mt of Each Floor

x

understanding building rules and addressing them till designing the project and resolving its servies in detail.

Private

Public

Road

8 Rooms on Each Floor - 45 sq.mt/room

Group Project (6 people): From thinking about program,

Ground Floor Plan

NTS

Dissecting the programmatic requirements and rules to evovle an appropriate design solution for the Luxurious Hotel 12.5.5 building Restriction on Development in GDCR ACT (2031) ESS VI

mts wide circulation around the building Podium Ground Floor Admin office/road Reception areaplot. and·approach to the

Administration Offices

10.2 Zonning : Hospitality 2 Permissible in City Area B, Commercial Zone, Building Height-70 mt (If road Width Hospitality 2

slab. 9m Podium First Floor

10.3 Location of the Building : Building Height-70 mt (If road Width is 30 mt), Road Side margins is 9 mt.

-

Chowk

11.1 Development of the land : The general level of the building unit shall not

Road Side margins

than the crown of the road in front. Map showing Nana Mauva 11.5.1 Internal RoadCircle Approach in Layout Major Landmark: Silver Heights Residential Towers

Level Scale of the building 1:1000

:Site Up to 15 mt Road width- should be7M 4.5 mt Secondary: (Service Selection

Road) + 15M (Vehicular Road)

Nana Mauva Chowk and it’s road curvature should be 3 mt. + 2M (Footpath)

• Commercial Area as per • Site Area: 1.15 Hectare development plan 2031. • F.S.I: 1 • Total Built: 13500 Sq.Plot Mt. for Layout and 11.5.2 Common • Road Width: RUDA Development Plan Scale N.T.S - Primary: 9.5M (Service Building unit : 10% of the building unit Road Commercial Road) + 24M(Vehicular Roads) 9.5Mminimum (Service Road) Public Zone area is+the requiredResidential area of

common plot.

Industrial

· Gymnasium, home theatre

high-rise : Building height 40 mt · Indoor building Sport · · · ·

Jacuzzi Spa Toilet Refugee room

12.2 Permissible Uses by Area of the Building-Unit : 15 mt. minimum frontage of

Common plot minimum size

Shops and Bakery

Dormitories 15.5.2 Minimum Margin between Buildings : BuildingStaff height

40 mt above - Required Margins is 12 mt. 15.5.2.1 Margins from common plot for high-rise building :

15.9.1.1 Margin : No Basement shall be marginal space, ramps of the basement shall not be placed in margin spaces.

Laundry

Banquet and Banquet and Building height 40 mt above - Required Margins is 6 mt. Conference Room Conference Room Dining Banquet (Hotel Guests)

Gym

Mini-Theatre

Treatment Plant, no habitable use is allowed.

Conceptualising the Programmatic requirements

SERVICE INTEGRATED DESIGN DEVELOPMENT HOTEL

permitted in the required Road side

Banquet and Conference Room

shall be permitted up to 0.60 Mts. at the height of 2.0 Mts.

and Beauty Care - Building has been placed on the Dining - 1.85sq. m. per person - 925 sq.mt for 500 pax plot. South-West Side so that we can Banquet with meeting & conference- 0.9sq.m./ person Balcony block :majority of the sun rays. 15.9.1 Permissible Uses in Basement Jacuzzi and Admin – 1 to 2%, 150 to 200sq.m. Spa Maintenance and repair area- 4 to 7%, 500 parking, to 700sq.m. - The Surface area has been Permitted uses in Basement are: 15.9.1 Permissible Uses in Basement : Permitted uses in increased to maximize the shaded Wellness area- 2 to 10%, 500 to 1000sq.m. safe deposit vault, A.C. Plant, storage other area on the amenities at the ground Parking – 100 cars Basement are: parking, safe deposit vault, A.C. Plant, level and the podium level. Podium Second Floor 1050 sq.mt Typical Hotel Room Plan than inflammable material, Sewage storage Floor Area: 350 other sq. mts than inflammable material, Sewage

IPSA, RAJKOT

2. Public purpose

Waiting Lounge

12.5.6 Projection in Margins : weather sheds projections

above - Required Margins is 6 mt. For buildings more than 45 meters in 15.5.2.2 Internal open to sky spaceheight, : Areas Building - 8m width to be left on Common 3 sides Kitchen –height 400sq.m.40 mt above - Required 11.5.2 Plot for Layout and Building unit : 10% ofIndoor the Games - 9m width to be left on the front side. Preparation area, Staff dining room, Staff kitchen, Bakery Margins is 6 mt. Health Care building unit area is the minimum required area of common Cold storage, Pantry, Washing area

Site and Context Understandingallowed. ESS VI

Land (PPL) Up to 35% of site area.

Reception Area andmargin Common plot

Sleeping Space According to Fire Act, 2016 15.5.2.2 Internal open to sky space 40 mt Podium: -Building First Floor -height 1050 sq.mt

Treatment Plant, no habitable use is

11.8 Amenity Space : 1. Road

the plot.

Podium Second ightsFloor 15.5.2.1 Margins Silver He from common plot for · Beauty & health care above - Required Margins is 6 mt.

be lower than the level of which is lower

Margin between building

Podium - Ground Floor - 1050 sq.mt from the floor level. But not in continuation with floor slab.

8m

· Banquet (2 room) · Banquet dining (hotel user) 15.5.2 Minimum · Conference roomMargin between · Staff dormitory Buildings : Building height 40 mt above · Toilet Required MarginsRaj is8m 12armt. · Laundry Chowk Nag a Towards · uv Refugee room Nana Ma

Kitchen Restaurant 300 pax.

Corridor

Passage

Road

· Restaurant (Dining and kitchen) · Bakery and souvenir shop · Waiting lounge 12.5.6 Projection in Margins : Weather · commend Toilet sheds projections · Banquet (2 room) shall be permitted up to Conference 8m room 0.60· Mts. at the height of 2.0 Mts. from the · Refugee room SecurityBut control floor· level. notroom in continuation with floor

Wardrobe

area more than 2000 sq.m.

Washroom and Toilet

Units with

is 9 mt.

SCALE: DATE: 04/11/2019

entire marginal space left after keeping 4.5

Hotel, Motel, Service Apartment in building

is 30 mt), Road Side margins

A0615, A1015, A1515, A2715 B3215, B3315, B4615

SERVICE INTEGRATED DESIGN DEVELOPMENT

HOTEL Margin: Parking shall be allowed in the IPSA, RAJKOT

10.1 Building Use: Hospitality 2

150 Ft. Ring

Brief: A developer needs the Hotel of 100 rooms with double bed in each room, dining area for 500 pax, conference rooms, spa, swimming pool, theatre, meeting area, outdoor lawns and banquets. There should be a podium for 2-3 floors and it should cover 30% area of the total area and then other 20 floors in the tower structure which should cover 70% area of the total. Height of the building should be 70 meters and FSI of the area should be considered as 1. Selection of site should be done based on the development plan by urban authorities and it should fall under the category of Commercial or Hospitality. All the rules related to buildings should be studied before designing like GRIHA, GDCR, LEED, Fire Protection, etc. and should be seen in the final outcome. All the building services should be implemented and resolved in detail. And, a working set was to be generated.

Parking

Twelfth Fifteenth Floor

· Developer needs 100 rooms of 2 bed occupancy (It is not suit, cottage and single occupancy). · Dining room for 500 people · Developer requires conference rooms, banquet and meeting rooms. · Hotel includes wellness area which has gym, Jacuzzi, spa, beauty care, health care, swimming pool, sports area etc. · Back office, back house, services, control room are mandatory in hotel structure.

Sixteenth Nineteenth Floor

Academic Project: 5th Year of B.Arch (9th Sem) | Year 2019 Duration: 6 Months | Site Location: Rajkot, Gujarat, India

Functional Need

Total no. of rooms: Total Built222 Up Carpet Area + 35% (Structure + Wall + Circulation) Total plot area: 15224.11Sq.m. 10000 sq.mt.(F.S.I -1) + 3500 Sq.Mt FSI: 2 13500 sq.mt - Built Up Total built up area: 55574.6Sq.m. Built Up Break Up No. of floors: G+9 Total height: 40m Tower - 70% of Total Built-up No. of basements: 2 472.5 sq.mt./floor x 20 Floors = Total 9450 sq.mt Area of basement: 18533.2Sq.m. Room - 45 Sq. m. for double bed including Balcony No. of parking: 353 cars (1.2 cars/room) Forth Floor - Seventh Floor Parking area: 11929Sq.m. 693 Sq.Mt46% of Each Floor Longitudinal Section Ground Coverage: 10 Rooms on Each Floor - 45 sq.mt/room Open Space – 10% Amenity Space: Eighth 15% Floor - Eleventh Floor 583 Sq.Mt of Each Floor

Twenyth Twenty Third Floor

Environmental Science and Services

· Height: 70m-22 to 23 floors 2 to 3 basement floors 3 to 4 floor podium 20 floors tower · 30% area of F.S.I. will be podium floors · 70% of F.S.I. area in 20 floors tower · Podium footprint is 3 to 4 times larger than tower footprint

150 Ft. Ring

Programme for Hotel

04

- Hallways and floor service, should occupy 50-60% of the floor area. - Public guest rooms, reception area, hall and lounges required 4-7%. - Hospitality areas, restaurants, and bars for guests and visitor 4-8%. - Banqueting area with meeting and conference rooms 4-12%. - Domestic areas, kitchens, personnel room and stores 9-14%. - Administration, management and secretarial 1-2%. - Maintenance and repair 4-7%. - Leisure, sport, shops and A hairdressing salon 2-10%.

A0615, A1015, A1515, A2715 B3215, B3315, B4615

15.9.1.1 Margin : No Basement shall be permitted in the

required Road side marginal space, ramps of the basement shall not be placed in margin spaces. 15.9.1.3 Height of Basement : Maximum Height - 3.8 mts and minimum height - 2.8 mts.

SCALE: DATE: 04/11/2019

18


Site Layout of the Hotel

19


S

S

DUCT

PLAN AT FLOOR-4

DUCT

FIRE SAFETY LIFT

DUCT

S

S

S

S

W

S

S S S S

S

S

LIFT

S

S

S

S

S

S S S S

S

S

S

BEDROOM TYPE 2 40 SQ MT.

BAKERY LIFT

S

S

LIFT

UP

FIRE SAFETY STAIRCASE W

S

S

S

S

S

FIRE EXIT DOOR

S

S

S

S

S

S

S

S

S

BEDROOM TYPE 2

S

UP

BEDROOM TYPE 2 40 SQ MT.

BEDROOM TYPE 2 40 SQ MT.

S

DUCT

FIRE SAFETY LIFT

S

FIRE SAFETY REFUGEE ROOM

DUCT

S

ELECTRICAL AC CONTROL PANEL

S

S

S

WAITING LOUNGE 40 SQ MT.

S

S

S

S

FIRE SAFETY REFUGEE ROOM

PANTRY AREA HOUSEKEEPING

BEDROOM TYPE 2 40 SQ MT.

S

S

S

UP

S

S

S

FIRE SAFETY

STAIRCASE UP W

UP

S

S

S

S

DUCT

S

BEDROOM TYPE 1 40 SQ MT.

LIFT

S

LIFT

S

S

S

W

S

S

S

DUCT

S

S

S

S

S

S

DUCT

DUCT BEDROOM TYPE 2 40 SQ MT.

S

S

S

S

CORRIDOR CORRIDOR 2 MT WIDTH

S

S

CORRIDOR

DUCT

S

S

S

S

S

W

S

FIRE EXIT DOOR

S

S

FIRE EXIT DOOR S

S

S

DUCT

S

S

S

S

FIRE EXIT DOOR

S

FIRE S SAFETY STAIRCASE

LIFT

W

FIRE SAFETY LIFT FIRE CORRIDOR SAFETY STAIRCASE STAIRCASE

S

S

S

S

S

S

S

S

S

S

S

S

LIFT

S

S

PLAN AT FLOOR-16

DUCT

S

S

S

S

S S

S

S

S

BEDROOM TYPE 2 40 SQ MT.

S

PLAN AT FLOOR-12

PLAN AT FLOOR-16

Legends

Fire Extinguisher (Dry powder)

S

S

S

S

S

CORRIDOR

BEDROOM TYPE 2 40 SQ MT.

S

Duct For Service Braker

MANUAL CALL POINT

CO₂ SPRINKLERS WITH PLAN AT FLOOR-16 FIRE EXTINGUISHER SMOKE DETECTORS

BELL FIRE ALARM

MANUAL CALL POINT

ACTIVE FIRE FIGHTING DEVICES INSTALLED

Fire Extinguisher (Dry powder)

Duct For Service Braker

MAIN FIRE HYDRANT BELL CO₂ DRY POWDER MANUAL CALL HOSE REEL PLANFIREAT FLOOR-FIRE 10 (MECHANICAL FLOOR) EXTINGUISHER EXTINGUISHER POINT CONTROL PANELFIRE ALARM

Fire Extinguisher (Carbon dioxide)

Laundry

AC Plant Room

FIRST FLOOR PLAN

DRY POWDER FIRE EXTINGUISHER

Legends

Laundry

HOSE REEL

Smoke detector

BELL FIRE ALARM

Meter Room

HOSE REEL

Generator Room

Fire Extinguisher (Carbon dioxide)

Legends

Manual call point box

AC Plant Room

Warning equipment (Bell)

Meter Room

Warning equipment (Bell) Emergency lighting (Self contained)

Generator Room

Plumbing Water Tank S Fire Water Tank

Smoke detector

Manual call point box

Fire Water Tank Fire Control Room

Fire Extinguisher (Carbon dioxide)

Laundry

Plumbing Water Tank Fire Pump Room

Fire Extinguisher (Dry powder)

Smoke detector

Duct For Service Braker

Hose Reel

Emergency lighting (Self contained)

Hose Reel Sprinkler points with Smoke Detect

C P Control Fire Pump Room

Fire Control Room Fire

panel

S C P

Hydrant

Sprinkler points with Smoke Detect

Control panel

Refuge Room and Fire Staircase Refuge Room and Fire Staircase PLANAT ATFLOORFLOOR-12 Wet Riser(Pipe Dia.150mm) PLAN 10 (MECHANICAL FLOOR) Wet Riser(Pipe Dia.150mm)

AC Plant Room FIRE WET RISER CONTROL MAIN HYDRANTPANEL SAND WETBUCKET RISER ELECTRIC CONTROL PANEL SAND BUCKET ELECTRIC Manual call point box PER FLOOR AND PUMP ROOMS PER FLOOR CONTROL PANEL AND PUMP ROOMS Meter Room Warning equipment (Bell) Generator Room Emergency lighting (Self contained) Plumbing Water Tank Hose Reel Fire Water Tank S Sprinkler points with Smoke Detect Fire Pump Room Control panel Fire Control Room

ACTIVE FIRE FIGHTING DEVICES INSTALLED

C P

AJKOT

PLAN AT FLOOR-12

DRY POWDER FIRE EXTINGUISHER

VI

CO₂ FIRE EXTINGUISHER

SERVICE INTEGRATED DESIGN DEVELOPMENT HOTEL

DUCT

ACTIVE FIRE FIGHTING DEVICES INSTALLED

S

DUCT

PLAN AT FLOOR-8

P P

Wet Riser(P

S

S

S

S

S

LIFT

S

Fire Hydran

DUCT

PLAN AT FLOOR- 10 (MECHANICAL FLOOR)

SPRINKLERS WITH SMOKE DETECTORS

S

W

S

S

S

GROUND FLOOR PLAN

S

OFFICE

W

Fire Hydrant

W

20

ESS VI

S

S

S

ACTIVE FIRE FIGHTING DEVICES INSTALLED

SPRINKLERS WITH SMOKE DETECTORS

Sprinkler po

Control pan

S

SERVICE AREA

DUCT

PLAN AT FLOOR- 10 (MECHANICAL FLOOR)

S

S

S S

S

S

RESTAURANT (250 PAX)

BEDROOM TYPE 2 40 SQ MT.

A0615, A1015, A1515, A2715,

S S S

S

S S

S

BEDROOM TYPE 2

S

W

S

S

S

S

DUCT

S S

S S S S

S

S S S S S

DUCT

ELECTRICAL AC CONTROL PANEL

S

LIFT LIFT DUCT

S

S

DUCT

S

S

DUCT

S

DUCT

S

S

LIFT

S C P

FIRE EXIT DOOR S

CORRIDOR

ACTIVE FIRE FIGHTING DEVICES INSTALLED

BEDROOM TYPE 2 40 SQ MT.

BEDROOM TYPE 1 FIRE SAFETY 40 SQ MT. REFUGEE ROOM

PLAN AT FLOOR-12 FIRE SAFETY STAIRCASE W

W

S

BEDROOM TYPE 1 40 SQ MT.

DUCT

S

S

S

S

S

S

S

S

W

S

W

S

DUCT

BEDROOM TYPE 2 40 SQ MT.

S

S

UP

S

FIRE EXIT DOOR S

S

Refuge Room and Fire Staircase FIRE SAFETY REFUGEE ROOM

W

LIFT

S

LIFT

ELECTRICAL AC CONTROL PANEL

S

S

W

PANTRY AREA HOUSEKEEPING

PLAN AT FLOOR- 10 (MECHANICAL FLOOR) BEDROOM TYPE 1 40 SQ MT.

LIFT

S

PANTRY/ HOUSE KEEPING

S

S

S

SERVICE INTEGRATED DESIGN DEVELOPMENT

DUCT

LIFT

S

ELECTRICAL AC CONTROL PANEL

S

S

S

S

S

S

S

S

BEDROOM TYPE 1 40 SQ MT.

S

S

BEDROOM TYPE 2 40 SQ MT.

DUCT

S

S

S

S

DUCT

FIRE SAFETY LIFT

FIRE SAFETY REFUGEE ROOM

S

S

FIRE SAFETY STAIRCASE

S

S

S

DUCT

W

S

S

ELECTRICAL AC CONTROL PANEL

Fire Control Room

S

S

S

S

FIRE SAFETY LIFT

ELECTRICAL ELECTRICALDUCT DUCT FIRE SAFETY AC CONTROL ACLIFTCONTROL PANEL PANEL

S

BEDROOM TYPE 1 FIRE 40 SQ MT. WATER TANK (26,000L)

S

DUCT

S

S

CORRIDOR 2 MT WIDTH

Hose Ree

S S

CORRIDOR

PANTRY AREA HOUSEKEEPING

DUCT

W

DUCT

S

S S

S S S

S

S S

S S

DUCT

S S

S

S

FIRE SAFETY REFUGEE ROOM

S

S

S

S

S

DUCT

S

S

S S S

S

S

W

PLAN AT FLOOR-8

DUCT

S

DUCT

S

S

S S

W

CORRIDOR 2 MT WIDTH

S

S

S

SCALE: 1:200 DATE: 04/11/2019

S

S

S S S

S

S

BEDROOM TYPE 2 40 SQ MT.

UP

FIRE SAFETY STAIRCASE

SERVICE AREA

WAITING LOUNGE

UP

DUCT

S

S

S

S

S

S

S

S

S

S

S S

S S

LIFT

S

S S S

S

DUCT

LIFT

S

S

MALE TOILET

DUCT

BEDROOM TYPE 2

S

FEMALE TOILET

PANTRY/ HOUSE KEEPING

PLAN AT FLOOR-4

PANTRY AREA HOUSEKEEPING

SERVICE AREA

S

DUCT PANTRY AREA WATER HOUSEKEEPING TANK ELECTRIC (16,000L) GENERATOR

DUCT

ELECTRICAL AC CONTROL PANEL

S

S

S

DUCT

DUCT

S

Fire Pump Room

S

S

S

S

FIRE WATER TANK (26,000L)

S

PANTRY AREA HOUSEKEEPING

S

DUCT

DUCT DUCT AT FLOOR-4

S

S

S

FIRE SAFETY FIRE SAFETY LIFTPLAN LIFT

W

S

W

S

S

CORRIDOR

S

DUCT

S

S

DUCT

S

S

S

S

S

FIRE EXIT DOOR

S

DUCT

S

FIRE EXIT DOOR

S

S

S

S

S

S

S

S

S

S

S

S

S

S

DUCT

FIRE SAFETY LIFT S

BEDROOM TYPE 2

S

DUCT

WATER TANK (10,000L)

S

S

FIRE SAFETY STAIRCASE

S

W

S

S

LIFT

S

FIRE SAFETY STAIRCASE

LIFT

S

S

S

SERVICE AREA

ELECTRICAL AC CONTROL PANEL

LIFT

S

UP

MALE TOILET

CORRIDOR 2 MT WIDTH

UP

FIRE WATER TANK (26,000L)

ELECTRIC GENERATOR

S

S

DUCT

S

DUCT

ELECTRIC GENERATOR

PANTRY/ HOUSE KEEPING

S

LIFT

S

S

DUCT

DUCT

S

DUCT WATER TANK (16,000L)

DUCT

FIRE SAFETY LIFT

FIRE SAFETY STAIRCASE W

PLAN AT TOWER FLOOR 1 MECHANICAL FLOOR WATER TANK (10,000L)

S

S

S

LIFT

S

S

S

S

LIFT

S

S

S

BEDROOM TYPE 2

PANTRY/ HOUSE KEEPING

FIRE WATER TANK (26,000L)

S

S

CORRIDOR

BEDROOM TYPE 1 40 SQ MT.

S

S

UP

S

S

Changing Room For Male

FIRE SAFETY LIFT

WATER TANK (16,000L)

S

S

WATER TANK (10,000L)

DUCT

S

PLAN AT FLOOR-8

BEDROOM TYPE 2 40 SQ MT.

DUCT

S

PLAN AT TOWER FLOOR 1 MECHANICAL FLOOR

SERVICE AREA

S

S

S

S

S

S

S

S

S

S

S

S

Changing Room For Male

S

S S

LUGGAGE

A0615, A1015, A1515, A2715, B3215, B3315, B4615

S

S

DUCT

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

W

S

S

DUCT

ELECTRICAL AC CONTROL PANEL

W

W

S

S

DUCT

W

S

W

S

S

FEMALE TOILET

S

S

FIRE SAFETY STAIRCASE

S

ELECTRICAL AC CONTROL PANEL

DUCT

DUCT

S

S

S

DUCT

WATER

S

S S

S

W

CORRIDOR 2 MT WIDTH

BANQUET HALL ELECTRIC TANK (16,000L) GENERATOR (300 PAX)

Changing Room For Female

S S S

S

S

S

S

FIRE SAFETY S STAIRCASE

S

RECEPTION

S

LIFT

S

S

S

S

S

S

S

S

LIFT

LIFT

EXIT DOOR PANTRY FIRE AREA HOUSEKEEPING

FIRE SAFETY STAIRCASE

LIFT

W

S

S

S

S

S

DUCT

LIFT

Fire Water Tank

S

DUCT

FIRE SAFETY REFUGEE ROOM

S

PANTRY/ HOUSE KEEPING

S

BEDROOM TYPE 2

S

S

ELECTRIC GENERATOR

BUSINESS LOUNGE S

LIFT

S

DUCT

FIRE WATER TANK (26,000L)

S

FIRE TANK (25,000L)

S

S

FIRE TANK (25,000L)

DUCT

FIRE SAFETY LIFT

S

S

WATER TANK (24,000L)

WATER TANK (10,000L)

S

DUCT

FIRE SAFETY LIFT

UP

BEDROOM TYPE 1

DUCT

DUCT

S

S

S

S

DUCT

S

S

DUCT

DUCT S

S

Emergency

S

BEDROOM TYPE 1

CONTROL PANEL SAND BUCKET ELECTRIC KITCHEN PLANAT ATTOWER FLOOR-4 PER FLOOR PUMP ROOMS PLAN FLOORAND 1 MECHANICAL FLOOR S

S

S S

WET RISER

S

S

S

S

S

ELECTRICAL AC CONTROL PANEL

S

S

S

S

S

FIRE SAFETY REFUGEE ROOM

DUCT

S

S

W

BEDROOM TYPE 2 FIRE EXIT DOOR

CORRIDOR

DUCT

S

S

S

S

DUCT

S

STAIRCASE ELECTRICAL AC CONTROL PANEL FIRE EXIT DOOR

S

S

PANTRY AREA HOUSEKEEPING

FIRE SAFETY

LIFT

UP

S

S

FIRE SAFETY LIFT

FIRE HYDRANT

S

Warning eq

BEDROOM TYPE 2 S

S

DORMITORIES Plumbing Water Tank UP

DUCT

S

LIFT

DUCT

WATER TANK (16,000L)

DUCT

S

S

S

S

S

S

Changing Room For Female

DUCT

UP

S

S

S

S

RECEPTION

S

DUCT

FIRE SAFETY LIFT

BEDROOM TYPE 1 S

S

S

S

S

S

MAIN OFFICE CONTROL PANEL BEDROOM TYPE 2

S

C P

S

S

S

S

W

S

S

S

ELECTRICAL AC CONTROL PANEL

Generator Room

DUCT

PLAN AT FLOOR-4 S

S

S

ELECTRICAL AC CONTROL PANEL

S

LIFT

FIRE EXIT DOOR

S

Changing Room For Male

S

S

DUCT

S

S

SPA

S

SERVICE AREA

S

S

S

S

S

DUCT

FIRE TANK (25,000L)

PANTRY AREA HOUSEKEEPING

S

S

LIFT

DUCT

S

S

FIRE SAFETY LIFT

PANTRY AREA HOUSEKEEPING

WATER TANK (10,000L)

FIRE EXIT DOOR

WATER TANK (24,000L)

S

S

S S

S S

S

S

S S

S

S

DUCT

FIRE TANK S (25,000L)

S

S

S

S

S

S

S

S

S

S

Smoke dete

Manual call

FIRE SAFETY REFUGEE ROOM

Meter Room DUCT

W

S

S S

S

S

S

BEDROOM TYPE 1

S S

BEDROOM TYPE 2

WATER TANK (24,000L)

WATER TANK (24,000L)

AC Plant Room

FIRE SAFETY LIFT

W

S

S

S

S S

S

FIRE SAFETY STAIRCASE

S

W

S

S S

S

BEDROOM TYPE 2

S

S

SPA BEDROOM TYPE 2

S

S

FIRE SAFETY STAIRCASE

S

W

S

S

S

LIFT

S

S

W

S S

S

S

S

S

UP

FIRE EXIT DOOR S

S

HOSE REEL

S

S

S

S

LIFT

ELECTRICAL AC CONTROL PANEL

S

C P

WAITING AREA W

S

SERVICE AREA

UP

FIRE SAFETY REFUGEE ROOM

S

S S

LIFT

Fire Extingu

W

S

WATER TANK (24,000L)

S

LIFT

BELL FIRE ALARM

DUCT

PEDICURE AREA

W

PANTRY/ HOUSE KEEPING

PANTRY AREA HOUSEKEEPING

S

LUXURY SPA

Fire Extingu

S

W

S

DUCT

FIRE SAFETY LIFT

W

S

S

SHAMPOO AREA

S

FIRE SAFETY STAIRCASE

S

S

S

S

TOILET

DUCT

HAIRDRESSER AREA S

STYLING AREA

C P

S

Laundry

S

ELECTRICAL AC CONTROL PANEL

DUCT

S

S

S

MANUAL CALL POINT

S

S

Duct For Service Braker

S

S

S

S

S

S

S

S

S

DUCT

Legends

S

W

S

S

S

S

S

S

DRY POWDER Changing Room For Female FIRE EXTINGUISHER PANTRY

S

S

S

C P

S

S

S

DUCT

S

CORRIDOR DUCT

W

S S

FIRE SAFETY STAIRCASE

LIFT

S

ELECTRICAL AC CONTROL PANEL

S

S

S

S

S

WAITING AREA W

S

S

S S

S

PEDICURE AREA

FIRE SAFETY STAIRCASE

LIFT

S

S

S

W

DUCT

LIFT

FIRE EXIT DOOR

S

S

S

S

TOILET

LIFT

S

S

S

PLAN AT TOWER FLOOR 1 MECHANICAL FLOOR

LUXURY SPA

UP

PANTRY/ HOUSE KEEPING

WATER TANK (24,000L)

S

S

S

S

S

S

DUCT

BEDROOM TYPE 1

DUCT

W

S

S

PANTRY S

SHAMPOO AREA S

DUCT

S

S

S

LIFT

DUCT

S

S

S S

S

BEDROOM TYPE 2 S

S

S

S

S

FIRE SAFETY S ROOM REFUGEE

S

S

S

FIRE TANK (25,000L)

S

S

S

ELECTRICAL AC CONTROL PANEL

S

S

S

S

S

PLAN AT FLOOR-16

FIRE SAFETY REFUGEE ROOM

DUCT

S

PANTRY AREA HOUSEKEEPING

S

FIRE FIRE EXIT DOOR TANK (25,000L) W

S

S

S

HAIRDRESSER AREA

S

S

S S

S

S

DUCT

FIRE SAFETY LIFT

S

S

LIFT

S

S

S S

STYLING AREA

C P

S

S

LIFT

WATER TANK (24,000L)

S

S

DUCT

S

S

BAKERY

CO₂ FIRE EXTINGUISHER

FIRE SAFETY LIFT

ELECTRIC GENERATOR

KITCHEN PLAN AT TOWER FLOOR 1 MECHANICAL FLOOR ELECTRICAL AC CONTROL PANEL

S

S

BEDROOM TYPE 1

S

W

S

S

DUCT

S

S

S

SPA

S

SPRINKLERS WITH SMOKE DETECTORS

Changing Room For Male

S

DUCT

ELECTRIC GENERATOR

S

W

S

S

S

S

S

UP

S

S

S

S

S

FIRE SAFETY STAIRCASE

S

S

S

S

S

S

S

S

S

S

Changing Room For Male

S

S

S

S

UP

FIRE EXIT DOOR

S

S

S

S

S

S

S

S

FIRE SAFETY LIFT WATER TANK (26,000L)

S

S

S

S

STAFF DINING

S

S

S

S

Changing Room For Female

S

S

S

S

S

WATER TANK (26,000L)

S W

DUCT

SPA

S

S

WAITING AREA

S

FIRE SAFETY STAIRCASE

S

DUCT

S

LIFT

UP

S

LIFT

S

S

C P

S

LIFT

FIRE TANK (25,000L)

S

S

BEDROOM TYPE 2 S

PEDICURE AREA

S

S

S

S

PANTRY AREA HOUSEKEEPING

S

S

S

LUXURY SPA

STYLING AREA FIRE SAFETY STAIRCASE

S

FIRE TANK (25,000L)

S

S

S

S

DRY STORAGE

COLD STORAGE

S

S

S

PLAN AT FLOOR-12

FIRE SAFETY REFUGEE ROOM

DUCT

ELECTRICAL AC CONTROL PANEL

C P

WATER TANK (24,000L)

BEDROOM TYPE 2 40 SQ MT.

S

SHAMPOO AREA

DUCT

UP

S

S

SCALE: 1:200

FIRE SAFETY LIFT

S

ACTIVE FIRE FIGHTING DEVICES INSTALLED

S

W

S

Changing Room For Female

S

S

S

LIFT

S

S

S

S

S S

FIRE EXIT DOOR

WATER TANK (24,000L)

S

S S

S

S

S

S

HAIRDRESSER AREA

C P

SERVICE AREA

S

DUCT

S

PEDICURE AREA S

DUCT

S

S

S

S

S

S

S

S

S

S

CORRIDOR

LUXURY SPA

WAITING AREA

FIRE EXIT DOOR FIRE EXIT DOOR

S

S

S

WATER TANK (24,000L) DUCT

S

S

S

S

PANTRY/ HOUSE KEEPING

W

S

S

S

S

S

WATER TANK (24,000L)

ELECTRICAL AC CONTROL PANEL

W

S

DUCT

S

S

S

ELECTRICAL AC CONTROL PANEL

DUCT

S

S

FIRE SAFETY STAIRCASE

LIFT

FIRE EXIT DOOR

S

BEDROOM TYPE 2

SHAMPOO AREA

S

FIRE SAFETY FIRE SAFETY LIFT STAIRCASE STAIRCASE

S

PLAN AT FLOOR- 10 (MECHANICAL FLOOR) TOILET

S

FIRE TANK (25,000L)

LIFT

LIFT

S

S

S

S

S

S

DISH WASH AREA

LIFT

PANTRY

S

S

S

UP

FIRE TANK (25,000L)

LIFT

LIFT

S

S

S

S

DUCT

ELECTRIC GENERATOR

S

S

S

S

S

PANTRY

DUCT

FIRE SAFETY LIFT WATER TANK (26,000L)

S

HAIRDRESSER AREA

S

UP S

WATER TANK (24,000L)

FIRE SAFETY REFUGEE ROOM

WATER TANK (24,000L)

S

S

S

S S

S

S

S

W

SERVICE AREA

Fire Safety Layout WATER TANK (24,000L)

PANTRY/ HOUSE KEEPING

W

S

S

W

S

S

S

STYLING AREA

C P

W

S

S

S

S

S

S

S

W

BEDROOM TYPE 1

SPA

S

S

S

S

DUCT TOILET

C P

S

DUCT

S

SERVICE AREA

S

S

UP

S

FIRE EXIT DOOR S

S

S

S

S

WAITING AREA W

S

ELECTRICAL AC CONTROL ELECTRICAL PANEL AC CONTROL PANEL

BEDROOM TYPE 2 40 SQ MT. S

LIFT

S

BEDROOM TYPE 1 40 SQ MT.

DUCT

FIRE EXIT DOOR

S

CORRIDOR

S

LIFT

FIRE SAFETY STAIRCASE

DUCT

ELECTRIC GENERATOR

PEDICURE AREA

UP

PANTRY/ HOUSE KEEPING

S

LUXURY SPA

W

W

S

FIRE SAFETY STAIRCASE

LIFT

DUCT DUCT

DUCT

S

S

STYLING AREA

C P

WATER TANK PANTRY AREA (26,000L) HOUSEKEEPING

LIFT

DUCT

DUCT

S

S

SERVICE AREA

SHAMPOO AREA

S

S

ELECTRIC GENERATOR

HAIRDRESSER AREA

BEDROOM TYPE 1 40 SQ MT.

S

FIRE SAFETY LIFT FIRE SAFETY LIFT S

ELECTRICAL AC CONTROL PANEL

DUCT

WATER TANK (24,000L)

DUCT

CORRIDOR

S

WATER TANK (26,000L)

DUCT

S

TOILET 2 MT WIDTH

S

FIRE SAFETY STAIRCASE

LIFT

S

S

S

S

DUCT

BEDROOM TYPE 40 SQ MT. S

UP

W

PANTRY LIFT

W

S

S

FIRE WATER TANK (26,000L)

S

ELECTRICAL AC CONTROL PANEL

S

S

FIRE SAFETY REFUGEE ROOM

S

S

S

PANTRY AREA HOUSEKEEPING

S

S

S

S

S

S

S

S

DUCT

BEDROOM TYPE 2 40 SQ MT.

S

S

UP

S

DUCT

PANTRY/ HOUSE KEEPING

FIRE SAFETY REFUGEE ROOM

DUCT

S

S

S

S

PANTRY AREA HOUSEKEEPING

ELECTRIC GENERATOR

ELECTRICAL AC CONTROL PANEL

UP

FIRE SAFETY LIFT

DUCT

FIRE SAFETY LIFT

S

S

DUCT

ELECTRICAL AC CONTROL PANEL

DUCT

S

DUCT

FIRE SAFETY LIFT

WATER TANK (16,000L)

S

WATER TANK (10,000L)

PLAN AT FLOOR-8 FIRE SAFETY REFUGEE ROOM

S

PLAN AT TOWER FLOOR 1 MECHANICAL FLOOR

P P


B

B

B

B

8th Floo

10th Floor

Detail A Detail B

Water Trough

Metal Fountain

Metal Fountain

Corridor

A

A

Plumbing

Shrubs

Plan at Lvl. + 1.65M from Floor

Scale 1:50

Section BB

7th F Terr Section AA Fountain

Green Wall

Plumbing

Shrubs

Scale 1:50

Scale 1:20

ScaleGreen 1:50 Wall

Fountain

Green Wall

Section BB Fountain

Scale 1:50

A

Corridor

Section AA

Detail B

8th Floor Green Wall

Green Wall

A

Scale 1:20

9th Floor

Water Trough

Service Corridor

Service Corridor

Detail A

B 7th FloorTerrace

Scale 1:50

Plan at Lvl. + 3.75M from Floor

Elevation

Scale 1:50

B

Key Plan - 7th Floor Plan with Terrace

B

Scale 1:50

NTS

Detail B

Detail A

INTERNAL PLASTER 10MM

B

B

BOLTS ARE WELDED TO I- SECTION ACTING AS REINFORCEMENT

HAT CHANNEL LOCATED AT THE END LAP OF PANEL

GREY WATER DRAIN PIPE Ø 75MM FILTERED SOIL/GREY WATER SUPPLY PIPE Ø 35MM

HEAVY BEAM M.S I-SECTION

Metal Fountain

Service Corridor

B

Water Trough

RCC FILLING

DetailSIZE: A 450MM X 250MM Scale 1:20 Detail B FASTENER Water Trough

Water Trough

Metal Fountain

Metal Fountain

Service Corridor

Service Corridor

Detail A

A

A

Duct Piping Detail C Corridor

ESS VI

IPSA, RAJKOT

Acoustic Wall Detail

Plumbing

SERVICE INTEGRATED DESIGN DEVELOPMENT Shrubs HOTEL Scale 1:50

Scale 1:10

Scale 1:50

GREY WATER DRAIN PIPE Ø 75MM

CORNER COLUMN Plan at Lvl. + 1.65MJUNCTION from Floor DETAIL Scale 1:50

Scale 1:10 Plan at Lvl. + 3.75M

SCALE: DATE: 04/11/2019

Key Plan - 7th Floor Plan with Terrace

1" THICK NOMIN

NTS

HOT WATER RETURN PIPE Ø 35MM HOT WATER SUPPLY PIPE Ø 35MM COLD WATER SUPPLY PIPE Ø 35MM SOIL WATER DRAIN PIPE Ø 100MM

INTERNAL PLASTER 10MM

1" THICK NOMINAL PANEL

FILTERED SOIL/GREY WATER SUPPLY PIPE Ø 35MM

Shrubs

A0615, A1015, A1515, A2715, B3215, B3315, B4615

Shrubs

Plan at Lvl. + 3.75M from Floor

HOT WATER RETURN PIPE Ø 35MM HOT WATER SUPPLY PIPE Ø 35MM COLD WATER SUPPLY PIPE Ø 35MM SOIL WATER DRAIN PIPE Ø 100MM

Plumbing

Corridor

Shrubs

A

Plumbing

Corridor

A

BRICK WALL 230MM

A

Scale 1:20

Plumbing

Plan at Lvl. + 1.65M from Floor

EXTERNAL PLASTER 20MM

Corridor

Scale 1:20

A

A

M.S ANGLE AT THE END Green Wall LAP OF PANEL

Green Wall

Detail B

Green Wall

Service Corridor

1" THICK NOMINAL PANEL HOT WATER RETURN PIPE Ø 35MM HOT WATER SUPPLYBPIPE Ø 35MM COLD WATER SUPPLY PIPE Ø 35MM SOIL WATER DRAIN PIPE Ø 100MM

GREY WATER DRAIN PIPE Ø 75MM FILTERED SOIL/GREY WATER SUPPLY PIPE Ø 35MM

RCC FILLING

HAT CHANNEL AT THE END LA PANEL

BOLTS ARE WELDED TO I- SECTION ACTING AS REINFORCEMENT

HAT CHANNEL LOCATED AT THE END LAP OF PANEL

F

HEAVY BEAM M.S I-SECTION SIZE: 450MM X 250MM FASTENER EXTERNAL PLASTER 20MM

BRICK WALL 230MM

M.S ANGLE AT LAP OF PANEL

M.S ANGLE AT THE END LAP OF PANEL

Duct Piping Detail C

ESS VI

IPSA, RAJKOT

Scale 1:20

Acoustic Wall Detail

SERVICE INTEGRATED DESIGN DEVELOPMENT HOTEL

Scale 1:10

DuctCOLUMN Piping Detail C DETAIL CORNER JUNCTION A0615, A1015, A1515, A2715, B3215, B3315, B4615

ESS VI

IPSA, RAJKOT

Scale 1:10

Scale 1:20

Acoustic Wall

21 SERVICEDATE: INTEGRATED 04/11/2019 DESIGN DEVELOPMENT HOTEL SCALE:


6MM THK MIRROR FIXED TO OLD WOODEN FRAME OLD WOODEN FRAME FOR BLOUSE DISPLAY

40MM WIDE,4MM THK COPPER FLAT BEND AT 90° ON BOTH SIDES

HANGER 40MM WIDE,10MM THK COPPER FLAT

KEY PLAN DUSTUDIO PROJECT NO. DRAWING NO. 181019-TA-SX-FD-BLOUSE DISPLAY-R1

05 I n t e r n s h i p

DRAWN BY

MANASVI

SCALE

NTS

CHECKED BY

TEJASWI

DATE

19-10-2018

APPROVED BY

ARCHITECT

BRACING 40MM WIDE,4MM THK COPPER FLAT FIXED WITH SHELF

20MM THK TEAK WOOD PLANK POLISHED IN CLEAR MATTE PU MRF

W o r k

20MM THK TEAK WOOD PLANK POLISHED IN CLEAR MATTE PU MRF

Internship Period: 4th Year of B.Arch (7th Sem) | Year 2018 Duration: 6 Months Office: Dustudio, Auroville, Pondicherry, India Brief: At Dustudio, a wide range of works were being done; from designing a small fixture to large scale institutions. Along with this they worked with various materials and explored their horizons. I was majorly working for a very big project who had chain stores of saree in different cities of India where certain amount of architectural design was done and larger part was the interior designing. My role for this project was to work with my Junior Architect in terms of designing, making working drawings and few execution related works. Another project I had worked on was the institution and it was an architectural project. Drawings of the same cannot be shared here as it was confidential. Learnings: I acquired skills of many new construction techniques, how to bring the past in the present and how can we respect our culture and tradition was the most important lesson learnt from this office experience. 40MM WIDE,10MM THK COPPER FLAT FIXED TO WOODEN FRAME

ELEVATION

40MM WIDE,10MM THK COPPER FLAT FIXED TO WOODEN FRAME

20X20X3MM M.S HOLLOW SECTION POWDER COATED IN BLACK TO SUPPORT THE SHELF

SECTION

8MM DIA COPPER ROD WITH 10MM THREADING

GENERAL NOTES 1. THE ARCHITECT/ARCHITECTURAL CONSULTANT NEEDS TO BE NOTIFIED IN CASE OF ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE CONDITION ON SITE. 2. FOR ALL SPECIALIST WORKS & DETAILS THE CONTRACTOR / SUB-CONTRACTOR ARE TO PROVIDE DETAILED SHOP DRAWINGS FOR ARCHITECT'S / ARCHITECTURAL CONSULTANT'S / ENGINEER'S APPROVAL PRIOR TO CONSTRUCTION. 3. THERE SHALL BE NO DEVIATION FROM THE APPROVED DRAWINGS WITHOUT PRIOR CONSENT OF THE ARCHITECT / ARCHITECTURAL CONSULTANT / ENGINEER. 4. THIS DRAWING SHOULD BE READ AND NOT MEASURED. 5. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS STATED OTHERWISE. 6. ALL DRAWINGS MUST BE CROSS-REFERENCED IN CASE OF ANY DOUBT / DISCREPANCY. 7. TOC REPRESENTS TOP OF CONCRETE & FFL REPRESENTS FINISHED FLOOR LEVEL. ALL DIMENSIONS SHOWN IN THE DRAWINGS ARE STRUCTURAL / MASONRY DIMENSIONS. 8. ALL ARCHITECTURAL DRAWINGS MUST BE REFERRED IN COORDINATION WITH STRUCTURAL DRAWINGS.

REV. NO.

25MM WIDE,10MM THK COPPER FLAT

19/10/2018

DRAWING TITLE DETAIL A

DATE

REVISION DESCRIPTION

R1

NORTH

BLOUSE DISPLAY 01 (BLOUSE BOUTIQUE)

PLAN THROUGH FRAME 75X40MM TEAK WOOD SECTION POLISHED IN SIDE ELEVATION CLEAR MATTE PU MRF

40MM WIDE,10MM THK COPPER FLAT FIXED TO WOODEN FRAME

8MM DIA COPPER ROD WITH 10MM THREADING

40MM WIDE,10MM THK COPPER 25MM WIDE,10MM THK FLAT FIXED TO WOODEN FRAME COPPER FLAT

OF HANGER

8MM DIA COPPER ROD 25MM WIDE,10MM THK KEY PLAN PROJECT NAME 3D VIEW OF THE COPPER HANGER WITH 10MM THREADING COPPER FLAT HANDLOOMDUSTUDIO SAREEPROJECT NO. DRAWING STORE NO. 181019-TA-SX-FD-BLOUSE DISPLAY-R1 3D VIEW OF BLOUSE DISPLAY

60X40MM TEAK WOOD 40MM WIDE,10MM THK SECTION POLISHED IN COPPER FLAT CLEAR MATTE PU MRF

FRONT ELEVATION OF HANGER

OLD WOODEN FRAME

HANGER 40MM WIDE,10 MM THK COPPER FLAT

3D EXPLODED VIEW OF THE COPPER HANGER

40MM WIDE,10MM THK COPPER FLAT

APP WITHOUT PRIOR CONSENT OF THE ARCHITECT / ARCHITECTURAL DATE 19-10-2018 CONSULTANT / ENGINEER. 4. THIS DRAWING SHOULD BE READ AND NOT MEASURED. NOTESARE IN METERS 5. ALL DIMENSIONS ARE IN MILLIMETERS GENERAL AND LEVELS 1. THE ARCHITECT/ARCHITECTURAL CONSU UNLESS STATED OTHERWISE. CASE OF ANY DISCREPANCY BETWEEN THE D 6. ALL DRAWINGS MUST BE CROSS-REFERENCED ON SITE. IN CASE OF ANY DOUBT / DISCREPANCY. 2. FOR ALL SPECIALIST WORKS & DETAILS T AREFINISHED TO PROVIDEFLOOR DETAILE 7. TOC REPRESENTS TOP OF CONCRETE &SUB-CONTRACTOR FFL REPRESENTS ARCHITECT'SARE / ARCHITECTURAL CONSULTAN LEVEL. ALL DIMENSIONS SHOWN IN THE DRAWINGS STRUCTURAL / PRIOR TO CONSTRUCTION. MASONRY DIMENSIONS. 3. THERE SHALL BE NO DEVIATION FROM TH 8. ALL ARCHITECTURAL DRAWINGS MUST WITHOUT BE REFERRED IN COORDINATION PRIOR CONSENT OF THE ARCHITEC WITH STRUCTURAL DRAWINGS. CONSULTANT / ENGINEER.

REV. NO.

PLAN OF HANGER 40MM WIDE,4MM THK COPPER FLAT BEND AT 90° ON BOTH SIDES FIXED WITH COPPER HANGER AND WALL

TEJASWI

19-10-2018

NEEDS TO BENO. NOTIFIED IN DUSTUDIO PROJECT D U S T U1. DTHE I OARCHITECT/ARCHITECTURAL CONSULTANT CASE OF ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE CONDITION FORMERLY BUILDAUR DRAWING NO. 181019-TA-SX-FD-BL ON SITE. S W A Y 2. AM FOR ALL SPECIALIST WORKS & DETAILS THE CONTRACTOR / SUB-CONTRACTOR ARE TO PROVIDE DETAILED SHOP DRAWINGS FOR DRA ARCHITECT AUROVILLE - 605 101 Ph : 0413ARCHITECT'S 262 3553/ ARCHITECTURAL CONSULTANT'S / ENGINEER'S APPROVAL CH PRIOR TO CONSTRUCTION. NTS SCALE e-mail : dustudio@auroville.org.in 3. THERE SHALL BE NO DEVIATION FROM THE APPROVED DRAWINGS

FRONT ELEVATION OF HANGER

PLAN OF HANGER 40MM WIDE,4MM THK COPPER FLAT BEND AT 90° ON BOTH SIDES FIXED WITH COPPER HANGER AND WALL

MANASVI

CHECKED BY APPROVED BY

ARCHITECT 3D VIEW OF THEGENERAL COPPER HANGER NOTES

PLAN SHOWING SUPPORTS FOR FRAME

SIDE ELEVATION OF HANGER

SCALE DATE

SIDE ELEVATION OF HANGER 40MM WIDE,10MM THK COPPER FLAT

DRAWN BY

NTS

ARCHITECT

CLIENT

R1

OLD WOODEN FRAME

FRONT E

4. THIS DRAWING SHOULD BE READ AND NO 5. ALL DIMENSIONS ARE IN MILLIMETERS AN

UNLESS STATED OTHERWISE.DATE REVISION DESCRIPTION

3D EXPLODED VIEW OF THE COPPER HANGER HANGER 40MM WIDE,10 MM THK COPPER FLAT

6. ALL DRAWINGS MUST BE CROSS-REFERE DISCREPANCY. 7. TOC REPRESENTS TOP19/10/2018 OF CONCRETE & F LEVEL. ALL DIMENSIONS SHOWN IN THE DRA MASONRY DIMENSIONS. 8. ALL ARCHITECTURAL DRAWINGS MUST B WITH STRUCTURAL DRAWINGS.

REV. NO.

DRAWING TITLE

R1

REVISION DESC

NORTH

BLOUSE DISPLAY 03 (BLOUSE BOUTIQUE) DRAWING TITLE

3D VIEW OF COPPER I-SECTION FIXED WITH WALL AND COPPER HANGER

DETAIL OF FIXING DISPLAY FRAME WITH WALL OLD WOODEN FRAME FOR MIRROR

8MM DIA COPPER ROD WITH 10MM THREADING

60X40MM TEAKWOOD OLD WOODEN FRAME SECTION POLISHED IN CLEAR MATTE PU MRF

25MM WIDE,10MM THK COPPER FLAT

PLAN OF HANGER

HANGER DETAIL OF FIXING DISPLAY FRAME WITH WALL 40MM WIDE,10MM THK COPPER FLAT 60X40MM TEAKWOOD OLD WOODEN FRAME 40MM OLD WOODEN FRAME FOR MIRROR

SECTION POLISHED IN CLEAR MATTE PU MRF

WIDE,4MM THK COPPER FLAT HANGER 40MM WIDE,10MM THK BEND AT COPPER 90° ON BOTH SIDES FIXED FLAT WITH COPPER HANGER AND WALL

PROJECT NAME

BLOUSE DISPLAY 03 (BLOUSE BOUTIQUE)

3D VIEW OF COPPER I-SECTION FIXED WITH WALL AND COPPER HANDLOOM HANGER SAREENAME PROJECT

OLD WOODEN FRAME

HANGER 40MM WIDE,10 MM THK COPPER FLAT

STORE CLIENT

HANDLOOM STORE

CLIENT

ARCHITECT

DETAIL OF FIXING DISPLAY FRAME WITH MIRROR FRAME DETAIL OF FIXING DISPLAY FRAME WITH MIRROR FRAME

VIEW OF WOODEN 3D VIEW OF THE COPPER3D HANGER

ARCHITECT

DUSTUDIO DUSTU FORMERLY BUILDAUR FORMERL SWAYAM SWAYA A U R O V I L L E - 6 0 5 1A 0U 1R O V Ph : 0413 Ph : 0413 262 3553 3D FIXED VIEW OFWITH WOODEN SUPPORT FIXED WITH FRAME SUPPORT FRAME KEY PLAN e-mail : du e-mail : dustudio@auroville.org.in OF MIRROR AND BLOUSE DISPLAY

OF MIRROR AND BLOUSE DISPLAY

DUSTUDIO PROJECT NO.

DRAWING NO. 181019-TA-SX-FD-BLOUSE DISPLAY-R1

SIDE ELEVATION OF HANGER 40MM WIDE,10MM THK COPPER FLAT

DRAWN BY

MANASVI

NTS

CHECKED BY

TEJASWI

19-10-2018

APPROVED BY

ARCHITECT

DETAIL OF FIXING DISPLAY FRAME WITH WALLSCALE FRONT ELEVATION OF HANGER

DATE

22


A

B

C

C

C

A

C

B C

C C

B

C

A DUSTUDIO PROJECT NO.

C

C

DUSTUDIO PROJECT NO.

180915-TA-SX-FD-STAIRCASE HANDRAIL-R4

DRAWING NO.

180915-TA-SX-FD-STAIRCASE HANDRAIL-R4

ARCHITECT

DRAWN BY

MANASVI

ARCHITECT

DRAWN BY

MANASVI

TEJASWI

SCALE

NTS

CHECKED BY

TEJASWI

DATE

15-09-2018

APPROVED BY

SCALE

NTS

CHECKED BY

DATE

15-09-2018

APPROVED BY

DRAWING NO.

C

GENERAL NOTES 1. THE ARCHITECT/ARCHITECTURAL CONSULTANT NEEDS TO BE NOTIFIED IN CASE OF ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE CONDITION ON SITE. 2. FOR ALL SPECIALIST WORKS & DETAILS THE CONTRACTOR / SUB-CONTRACTOR ARE TO PROVIDE DETAILED SHOP DRAWINGS FOR ARCHITECT'S / ARCHITECTURAL CONSULTANT'S / ENGINEER'S APPROVAL PRIOR TO CONSTRUCTION. 3. THERE SHALL BE NO DEVIATION FROM THE APPROVED DRAWINGS WITHOUT PRIOR CONSENT OF THE ARCHITECT / ARCHITECTURAL CONSULTANT / ENGINEER. 4. THIS DRAWING SHOULD BE READ AND NOT MEASURED. 5. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS STATED OTHERWISE. 6. ALL DRAWINGS MUST BE CROSS-REFERENCED IN CASE OF ANY DOUBT / DISCREPANCY. 7. TOC REPRESENTS TOP OF CONCRETE & FFL REPRESENTS FINISHED FLOOR LEVEL. ALL DIMENSIONS SHOWN IN THE DRAWINGS ARE STRUCTURAL / MASONRY DIMENSIONS. 8. ALL ARCHITECTURAL DRAWINGS MUST BE REFERRED IN COORDINATION WITH STRUCTURAL DRAWINGS.

C

C

C

GENERAL NOTES 1. THE ARCHITECT/ARCHITECTURAL CONSULTANT NEEDS TO BE NOTIFIED IN CASE OF ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE CONDITION ON SITE. 2. FOR ALL SPECIALIST WORKS & DETAILS THE CONTRACTOR / SUB-CONTRACTOR ARE TO PROVIDE DETAILED SHOP DRAWINGS FOR ARCHITECT'S / ARCHITECTURAL CONSULTANT'S / ENGINEER'S APPROVAL PRIOR TO CONSTRUCTION. 3. THERE SHALL BE NO DEVIATION FROM THE APPROVED DRAWINGS WITHOUT PRIOR CONSENT OF THE ARCHITECT / ARCHITECTURAL CONSULTANT / ENGINEER. 4. THIS DRAWING SHOULD BE READ AND NOT MEASURED. 5. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS STATED OTHERWISE. 6. ALL DRAWINGS MUST BE CROSS-REFERENCED IN CASE OF ANY DOUBT / DISCREPANCY. 7. TOC REPRESENTS TOP OF CONCRETE & FFL REPRESENTS FINISHED FLOOR LEVEL. ALL DIMENSIONS SHOWN IN THE DRAWINGS ARE STRUCTURAL / MASONRY DIMENSIONS. 8. ALL ARCHITECTURAL DRAWINGS MUST BE REFERRED IN COORDINATION WITH STRUCTURAL DRAWINGS.

A B

C

REV. NO.

REVISION DESCRIPTION

R4

C

B

DATE

REV. NO.

REVISION DESCRIPTION

DATE 15-09-18

R4

15-09-18

A C

DRAWING TITLE

C

DRAWING TITLE

NORTH

STAIRCASE HANDRAIL-04

NORTH

STAIRCASE HANDRAIL 05

C

PROJECT NAME

HANDLOOM SAREE STORE

PROJECT NAME

TYPICAL DETAIL SECTION

CLIENT

A

B

A

B

B

A

A

B

B

A

C

C

A - TYPE 1 M.S WELDED MESH B - TYPE 2 M.S WELDED MESH C - CANE PANEL

DUSTUDIO FORMERLY BUILDAUR SWAYAM AUROVILLE - 605 101 Ph : 0413 262 3553 e-mail : dustudio@auroville.org.in

C

A

TYPICAL DETAIL PLAN

CLIENT

A

DETAIL 1

ARCHITECT

PLAN

B

C

SECTION CC'

HANDLOOM SAREE STORE

DETAIL 2

DETAIL 3

B

ARCHITECT

B

A

DUSTUDIO FORMERLY BUILDAUR SWAYAM AUROVILLE - 605 101 Ph : 0413 262 3553 e-mail : dustudio@auroville.org.in

23


A'

3.34 [10'-11"] 2.20 [7'-3"]

REVISION DESCRIPTION

0.17 [7"] 2.86 [9'-5"] 0.17 [7"] 2.89 [9'-6"]

DATE

0.20 [8"]

19.04 [62'-6"]

2.20 [7'-3"]

TREE OF LIFE FABRIC INSTALLATION

7.38 [24'-2"]

REV. NO.

4.75 [15'-7"]

0.80 [2'-8"]

0.60 [2']

C

2.20 [7'-3"]

0.19 [8"] 4.98 [16'-4"] 0.37

0.17 [7"] 2.06 [6'-9"]

1.80 [5'-11"]

ENTRY LEVEL LAYOUT PROJECT NAME

DATE

NORTH

EXISTING FRAMEWORK

CLIENT

0.71 0.60 0.44

1.00

1.00

MIRROR MANNEQUIN

0.40

0.42

ARCHITECT DUSTUDIO FORMERLY BUILDAUR SWAYAM AUROVILLE - 605 101 Ph : 0413 262 3553 e-mail : dustudio@auroville.org.in

0.10

HEIGHT 6'9"- STACKING

0.42 2.40

HEIGHT 3' - STACKING

SECTION AA'

2.40

0.42

HEIGHT 6'9"- HANGING

HEIGHT 5'0"- STACKING

CLIENT

0.10

LEHENGAS

HEIGHT 4'-6"/5'0"- HANGING

0.44

1.50 [4'-11"]

PROJECT NAME

HANDLOOM SAREE STORE 0.17 [7"]

HANDLOOM SAREE STORE

0.75 [2'-6"]

HEIGHT 3 - 6' 9"

0.45 [1'-6"]

1.65 [5'-5"]

D'

Entrance of the Store

REVISION DESCRIPTION

SECTION AA'

NORTH

HEIGHT 2 - 5'

3.20 [10'-6"]

7.76 [25'-6"]

A

REV. NO.

DRAWING TITLE

0.17 [7"]

1.10 [3'-7"]

UP

1.80 [5'-11"]

APPROVED BY

2.23 [7'-4"]

DRAWING TITLE

2.35 [7'-8"]

11-10-2018

0.74

1.20 [3'-11"]

FIRE HYDRANT

TEJASWI

DATE

1.15

PLANTER

1.62 [5'-4"]

1.65 [5'-5"]

HEIGHT 1 - 3'

3.01 [9'-11"]

0.68 [2'-3"]

1.84 [6'-1"]

CUSTOMER BAGGAGE

0.37 [1'-2"]

7.17 [23'-6"]

0.95 [3'-1"]

0.33 [1'-1"]

0.25 [10"]

0.25 [10"]

0.25 [10"] 0.23 [9"]

0.25 [10"]

0.75 [2'-6"]

3.00 [9'-10"]

2.87 [9'-5"]

APPROVED BY

CHECKED BY

0.17 [7"]

01-10-2018

3.24 [10'-8"]

DATE

MANASVI

NTS

GENERAL NOTES 1. THE ARCHITECT/ARCHITECTURAL CONSULTANT NEEDS TO BE NOTIFIED IN CASE OF ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE CONDITION ON SITE. 2. FOR ALL SPECIALIST WORKS & DETAILS THE CONTRACTOR / SUB-CONTRACTOR ARE TO PROVIDE DETAILED SHOP DRAWINGS FOR ARCHITECT'S / ARCHITECTURAL CONSULTANT'S / ENGINEER'S APPROVAL PRIOR TO CONSTRUCTION. 3. THERE SHALL BE NO DEVIATION FROM THE APPROVED DRAWINGS WITHOUT PRIOR CONSENT OF THE ARCHITECT / ARCHITECTURAL CONSULTANT / ENGINEER. 4. THIS DRAWING SHOULD BE READ AND NOT MEASURED. 5. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS STATED OTHERWISE. 6. ALL DRAWINGS MUST BE CROSS-REFERENCED IN CASE OF ANY DOUBT / DISCREPANCY. 7. TOC REPRESENTS TOP OF CONCRETE & FFL REPRESENTS FINISHED FLOOR LEVEL. ALL DIMENSIONS SHOWN IN THE DRAWINGS ARE STRUCTURAL / MASONRY DIMENSIONS. 8. ALL ARCHITECTURAL DRAWINGS MUST BE REFERRED IN COORDINATION WITH STRUCTURAL DRAWINGS.

TEJASWI

0.90 [2'-11"]

C'

0.23 [9"] 2.20 [7'-3"]

CHECKED BY

0.36 [1'-2"]

NTS

DRAWN BY

SCALE

ARCHITECT

3.36 [11']

2.93 [9'-7"]

DRAWN BY

SCALE

0.25 [10"]

0.89 [2'-11"] 1.00 [3'-3"]

0.61 [2'] 0.31 [1'] 1.50 [4'-11"]

MAHESHWARI

181001-TA-LA-SX-R17

ARCHITECT

GENERAL NOTES 1. THE ARCHITECT/ARCHITECTURAL CONSULTANT NEEDS TO BE NOTIFIED IN CASE OF ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE CONDITION ON SITE. 2. FOR ALL SPECIALIST WORKS & DETAILS THE CONTRACTOR / SUB-CONTRACTOR ARE TO PROVIDE DETAILED SHOP DRAWINGS FOR ARCHITECT'S / ARCHITECTURAL CONSULTANT'S / ENGINEER'S APPROVAL PRIOR TO CONSTRUCTION. 3. THERE SHALL BE NO DEVIATION FROM THE APPROVED DRAWINGS WITHOUT PRIOR CONSENT OF THE ARCHITECT / ARCHITECTURAL CONSULTANT / ENGINEER. 4. THIS DRAWING SHOULD BE READ AND NOT MEASURED. 5. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS STATED OTHERWISE. 6. ALL DRAWINGS MUST BE CROSS-REFERENCED IN CASE OF ANY DOUBT / DISCREPANCY. 7. TOC REPRESENTS TOP OF CONCRETE & FFL REPRESENTS FINISHED FLOOR LEVEL. ALL DIMENSIONS SHOWN IN THE DRAWINGS ARE STRUCTURAL / MASONRY DIMENSIONS. 8. ALL ARCHITECTURAL DRAWINGS MUST BE REFERRED IN COORDINATION WITH STRUCTURAL DRAWINGS.

3.72 [12'-3"]

0.90 [2'-11"]

3.90 [12'-10"] 1.30 [4'-3"]

DRAWING NO.

0.71 [2'-4"]

0.90 [2'-11"]

1.47 [4'-10"]

F'

1.12 [3'-8"]

CASH COUNTER

DUSTUDIO PROJECT NO.

CHANDERI

0.61 [2']

0.25 [10"]

0.28 [11"] 1.24 [4'-1"]

E'

10.49 [34'-5"]

UP 0.84 [2'-9"]

DRAWING NO. 181011-TA-SX-ELEVATION-R16

0.78 [2'-7"]

2.70 [8'-10"]

0.85 [2'-9"]

3.19 [10'-6"]

1.30 [4'-3"]

ART INSTALLATION

0.60 [2']

F

0.15 [6"]

0.31 [1']

WASHROOM

DUSTUDIO PROJECT NO.

SUMMER COTTONS

1.08 [3'-7"]

FIRE HOSE

E

7.46 [24'-6"]

1.43 [4'-8"]

3.53 [11'-7"]

0.23 [9"]

1.24 [4'-1"] 3.00 [9'-10"]

0.82 [2'-8"]

B'

0.90 [2'-11"]

B

STORE DIRECTORY

SOUTH COTTONS

1.39 [4'-7"]

1.46 [4'-10"] 0.64 [2'-1"] 3.46 [11'-4"]

0.60 [2'] 0.22 [9"]

0.15 [6"] 0.68 [2'-3"]

0.25 [10"]

TELEVISION

LIFT

0.63 [2'-1"]

D

ARCHITECT DUSTUDIO FORMERLY BUILDAUR SWAYAM AUROVILLE - 605 101 Ph : 0413 262 3553 e-mail : dustudio@auroville.org.in

Display area of the store; where each spaces were designed in a specific way that it represents the handicraft of the region 24


06 Professional

Projects

Freelancing: After completing B.Arch | From Year 2021 Project 1: Refurbishing my own Home (Architecture+Interior)

Duration: 3 Months

Brief: All the existing flaws and mistakes were required to be resolved. In addition, all the things should be easiy maintainance and nothing should be complicated or critical in designing or fixtures. Designing should be such that one likes it lifelong and not very trendy or overdone. It should be unique, classy yet simple. Design Approach: “The overall theme for the designing was an inspiration from my very own culture and traditions.” The new designing and layout was based on the Indian habits and culture but with a hint of contemporariness. This way, it gives a new look as well as stay connected to its roots. Material Palette: Green Rajasthani Stone for outdoors, Full Body Tiles for parking, Natural Teak Wood Furniture, Teal coloured Tapestry, MS Box section for Pergola, Sathvario Stone in Furniture, Brass plates in Doors, Cane weaving in Jali Door, VInyl Flooring and Wallpaper in Living Area.

Conceptual Layout of the area which had to be Redesigned

Removing the Angled wall and Constructing a Right angled wall in place of that, also extending the two windows of the adjacent walls to have a large opening in the Living Area of the House

Redesigning the Front courtyard and Porch of the house 25


Dining Area Partition

Living Area 3D Layout

Corner Sitting Area

Dining Area

Stained Glass Lamp

Living Area

Living Area Partition

Exterior 3D View

Garden area; A Pergola-Semi open structure made out of Metal section and Perforated sheet

Bedroom Walls

Living Area 26


Basin top

Wardrobe 3'11"x2'

Bed size 6'x3'

Dining Space Side unit 2'x1'3"

NT

Kitchen

Side unit 2'x2'

Sofa Set 3 seater

Dining Space

Lounge 5'11"x2'6"

Cabinet under staircase 4'9"x3'

Refridgerator area

Shoe Rack

UP

TV Unit 6'1"x1'5"

Temple area 3'6"x2'

Side unit 2'4"x1'3"

Dressing unit 3'x1'3"

Bed Size 6'x5'

Jhulo 6'x5'

Side unit 2'x1'

Toilet

Toilet

Side unit 2'x1'

Toilet

Wardrobe 3'10"x2'

TV Unit Point

Dressing unit 2' 8"x1'5"

NT

TV Unit Point

Sofa cum Bed Size 6'x5'

00

DN

1:1

UP

Sofa cum Bed Size 6'x5'

NT

DN

pe

UP

Slo

Bed Size 6'x5'

Work Desk 2'8"x1'5"

Side unit 2'4"x1'3"

Toilet

00

Dressing unit 3'x1'3"

1:1

Side unit 2'4"x1'3"

pe

Side unit 2'4"x1'3"

Jhulo 6'x5'

Duration: 4 Months and Ongoing

Wardrobe 3'10"x2' TV Unit Point

Proposed FF Plan

TV Unit Point

Dressing unit 2' 8"x1'5"

Proposed FF Plan Proposed Area 5'

1'-4"

2'

kyaro

Water Tank

Basin top

Shoe Rack

3'

6'-11"

3'

Chowkdi

1'-6"

1'-6"

Brick wall Column 9"x15"

Half brick

2'

kyaro

Parapet

Proposed GF Civil Plan

Proposed Area

10'-8"

Glass brick 7.5"x7.5"x3"

FFL

1 2'-82" 1 72"

6"

5'-11"

2'-9"

2'-9"

1 2'-82"

1 72"

R

10'-11"

4' 8'

1 2'-102"

R

1 2'-102"

Material Palette: Terracotta Tiles for outdoors, Full Body Tiles for parking, Ply Wood Furniture, MS Box section for Pergola, Terracotta Bricks for Parapet wall, Glass bricks for slab.

Kothi Storage 3'6"x2'

Toilet

Slo

Project 2: Renovating a Client’s House (Architecture+Interior)

Design Approach: “Regional materials was thought to be used in the main elevation of the house so it gives the essence of the place.” Another criteria while designing was the budget limitations so whatever was decided was in that framework. To bring in the light at the floor below, glass bricks were fixed in the slab while it was getting casted. This gave a break in the monotony of the space and lit the below area.

Temple area 3'6"x2'

Proposed GF Plan

Freelancing: After completing B.Arch | From Year 2021

Brief: The old house had to be renovated and give a new identity to it. Client wanted to extend their balcony as they wish to have a huge terrace garden at the top. Terrace should have swing , planters and sitting spaces with a wonderful structure of Pergola. The interior space should accomadate all their requirements in the available area.

Kothi Storage 3'6"x2'

Work Desk 2'8"x1'5"

Projects

Refridgerator area

UP

TV Unit 6'1"x1'5"

Proposed GF Plan

Cabinet under staircase 4'9"x3'

Toilet

Slo pe

Lounge 5'11"x2'6"

Shoe Rack

Professional

Slo pe

Bed size 6'x3'

Side unit 2'2"x1'3"

Chowkdi

Wardrobe 3'11"x2'

Dressing Side unit unit 2'x1'3" 2'2"x1'3"

Basin top Water Tank

Kitchen

Side unit 2'x2'

Sofa Set 3 seater

1:1 00

Side unit 2'x1'3"

1:1 00

NT

Chowkdi

Dressing unit 2'x1'3"

Water Tank

Proposed FF Civil Plan

Proposed Front Elevation

Site Photos

Designed and Drawn by: Manasvi and Ravi Dt: 18.07.21

27


Glass Bricks in Concrete Slab

Entrance Views

Proposed Tile Layout eq

eq

SB-KT-01

B

eq

eq

3'6"

eq

eq

eq eq

EXISTING SWITCH BOARD B SB-LR-02

1 1'-84"

eq

Wood

1 3'-32"

3'-8"

1 3'-92"

11"

3'-5"

4'-3"

6'-4"

C

A

A 1 4'-32"

C

6'-7"

SB-BR-01

Open

Wood Metal Perforated Sheet

Open

LEGEND FOR ELECTRICAL ITEMS:

Main Gate Design in Wood and Metal

SB-MR-02

B

1'-3"

SB

EXISTING SB

NIGHT LAMP FOOT LIGHT -9"

C

4' SB

SPLIT A.C.

D

3' SB

AT HEIGHT OF 3' FROM FFL

BS

BELL PUSH SWICH

SAC

SBP.P.

SWITCH BOARD WITH PLUG POINT

BI

BELL INSTRUMENT

2' SB

AT HEIGHT OF 2' FROM FFL

SB-MR-03

5'-7"

FL

WALL POINT @ 7'3" HT.

A

1 5'-14"

NL

CEILING FAN

WP

15A PLUG POINT

D

TV

1 3'-94"

CF

15A PP

EQ

D

D

1 6'-82"

4 EXTRA LIGHT POINTS REQUIRED FOR FUTURE FABRICATION STRUCTURE

C

5'-7"

SB-MR-01

1 5'-12"

SB-BR-03

eq

eq eq

SB-TS-01

Metal Square Hollow Section

C

EQ

A

SB-MR-05

B C

2'-5"

SB-MR-04

SB-MR-06

A

SB-BR-06

SB-KT-01

SB-BR-05

SB-LR-02

Metal Perforated Sheet

eq

eq

eq

SB-BR-04

TV

Closed

eq

1'

eq

eq

Closed

C

eq

eq eq

Jhulo 6'x5'

Metal Square Hollow Section

C

SB-BY-01

eq

1 6'-82"

4'-10"

Open

D

SB-LR-03

eq

Open

SB-BY-01

SB-KT-02

Extended Area (Exterior)

TV

C SB-GR-02

Extended Area (Interior)

A

1'

eq

C SB-KT-03

SB-LR-01

eq eq

SB-ET-01

B

SB-GR-03

C

AT HEIGHT OF 4' FROM FFL

Electrical Layout

Designed and Drawn by: Manasvi and Ravi Dt: 06.08.21

Ongoing Site Work 28


M a n a s v i

S a m a n i

Email: mscorpart04@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.