How to Install a Tile Floor | Easy Nirman

Page 1

How To Install A Tile Floor

Powered By Easy Nirman


How To Install A Tile Floor A clean, precise tile installation is easier than you might think. With planning, preparation, and our step-by-step advice, you can do it on your own.


Step 1: Prepare The Surface Make Sure Your Surfaces Make Your And Surfaces Clean, Sure Smooth, Dry Clean, Smooth, And Dry Best Results. Best Results.

Are Are For For

Take Time To Repair, Patch, Take Time Any To Repair, Patch, And Level Damaged Or And Level Any Damaged Or Uneven Areas. Uneven Areas.


Step 2: Begin Your Layout For An Efficient Layout, Start By For An Efficient Layout, By Marking The Center Point Start Of Each Marking The Center Of Next, Each Of The Walls In ThePoint Room. Of TheChalk Walls Lines In TheBetween Room. Next, Snap The Snap Between Center Chalk Points Lines Of Opposite WallsThe To Center Of Opposite PinpointPoints The Center Of TheWalls Room.To Pinpoint The Center Of The Room.

Make Any Necessary Make Any ToNecessary Adjustments Ensure Adjustments To Ensure That The Intersection That The Creates PerfectIntersection Squares. Creates Perfect Squares.


Step 3: Apply The Adhesive As A General Rule Of Thumb, As General Rule Be A Mindful To Of MixThumb, Only Be Mindful Mix To Only Enough Of The To Adhesive Be Enough Of The Used Within 30 Adhesive Minutes. To Be Used Within 30 Minutes.

Using The Flat Side Of The Using FlatRecommended Side Of The Trowel The Type Trowel Recommended On The Type Adhesive Package, On TheA Adhesive Spread 1/4" Coat Package, On The Spread On Area The Surface AOf1/4" OneCoat Grid Surface One Grid Area Without Of Covering The Without The Guidelines. Covering Guidelines.


Step 4: Cut Tile As Needed Start By Marking Carefully Start By Cuts-to-be Marking Carefully Measured With A Measured Cuts-to-be A Pencil Or Felt-tip Pen With On The Pencil Or Felt-tip Pen On The Tile Surface. Tile Surface. You Can Use A Tile Cutter To You Can Pinpoint Use A TileStraight Cutter Or To Achieve Achieve Straight Or Diagonal Pinpoint Cuts. Make Masterful Diagonal Cuts.With Make AMasterful Curved Cuts Nipper, Curved With A Nipper, ChippingCuts Away Small Pieces Chipping Away Small Pieces For Best Results. For Best Results.


Step 5: Set Your Tile Now That You've Primed The Surface, Created The Layout, Applied Now That You've Primed The Tile, Surface, Layout, For Applied The Adhesive, And Cut The You Created Are FullyThe Prepared The The Adhesive, AndOfCut Actual Installation YourThe Tile.Tile, You Are Fully Prepared For The Actual Installation Of Your Tile.


Step 6: Grouting Joints Now That Your Mohawk Ceramic Tile Is In Place And Has Had 24 Now YourYour Mohawk Ceramic Is In Place HadAnd 24 HoursThat To Set, Last Step Is ToTile "Grout" Or FillAnd TheHas Joints Hours To Set, Your LastInto Step To "Grout" Or Fill The Joints And Consolidate Your Floor OneIs Mass. Consolidate Your Floor Into One Mass.


Thanks For Watching Easy Nirman Construction was never easy, Before us.


To Get More Information To Get More Information About Construction About Construction

&


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.