CV & ARCHITECTURE PORTFOLIO Marco Ciardiello
MCCV Marco Ciardiello Date of birth: Address:
31/10/1996 Via Trento 34, Padria, SS, Italy
Phone number: Email:
Architecture Master’s degree Student from the University of Sassari interested on the “Participatory Urban Planning” theme. My study plan organisation was initially oriented on the studies of the growing cities, more precisely on the city of Santiago de Queretaro (Mexico). It had to bee my Master thesis research field, in order to study, understand and eventually intervene on the problem of the uncontrolled urbanization. Unfortunately, I had to renounce to this project due Covid-19 emergency. For this reason, I decided to orient my new Master thesis studies on the theme of the “depopulation of the Sardinian’s inland areas”, topic that I am currently studying and in which I am very interested.
+39 3317166749 colino9610@gmail.com
Education July 2020
Achievement of "24 credits" training course for schools teaching qualification.
October 2019 - February 2020
Erasmus student in Universitatea din Oradea, Romania.
December 2018 - July 2019
Master degree in Architecture in UNISS University of Sassari.
December 2018
Bachelor graduation in Science of Architecture and Project in University of Sassari. Mark: 110/110. Thesis: “The inhabited centre of Padria: analysis for an integrated urban recovery strategy”..
January 2017 - June 2017
Erasmus student in LTU Leleå University of Technology, Sweden.
July 2016
Bachelor degree in Architecture and Design in UNISS University of Sassari.
October 2015 - December 2018
Workshop DGAAP at “Biennial of Venice” (Italy), promoted by Directorate General Art and Contemporary Architecture and Urban Suburbs of Mibact.
2012
“Italia - Argentina Project”, promoted by “I.I.S. Sebastiano Satta”, Exchange student in the Institute “Dante Alighieri”, Villa Carlos Paz, Argentina.
September 2010 - June 2015
High school of Surveyor Degree (construction, environment and land) at “I.I.S. Sebastiano Satta”, Macomer, Italy. Mark: 98/100
Professional Experiences March 2018 - June 2018
Erasmus+ for Traineeship. Salaried Internship in BHM Architects Studio, London, United Kingdom.
2014
Internship in the Surveyor Office of Massimo Arcero, Padria, Italy.
Other Experiences
2
March 2019 - May 2019
“150 ore” program. Student collaboration in the Architecture Department library, University of Sassari.
2015 - 2020
Lifeguard during summer period
Planned Experiences July 2020 - September 2020
Technical skills
(Postponed due Covid-19)
Erasmus+ for Traineeship. Internship in Homu.studio, Valencia, Spain.
Microsoft Excel Microsoft Power point
March 2020 - June 2020
(Renounced due Covid-19)
Ulisse Master thesis researcher student in UAQ Universidad Autónoma de Querétaro, Mexico. Theme: “Participatory Urban planning”.
March 2020 - June 2020
(Renounced due Covid-19)
Internship in g3arquitectos Studio, Santiago de Querétaro, Mexico.
Microsoft Word Qgis Autodesk Autocad 2d
Languages
SketchUp Lumion
Italian
First Language
English
Advanced - B2
Swedish
Basic - A2
Spanish
In development
Vray Adobe Illustrator Adobe Photoshop Adobe InDesign
Social Skills - Leadership - Organization and management skills - Adaptive skills to every situation - Communication skills in multicultural environment - Ability to work in a collaborative way - Willingness to improve and get involved 3
Content Works index
Interior Design
Architectural project and competitions
Relief, Requalifications and Restoration
4
Appartment in Oradea: Interior Design Project (2019/20) Archaeological site of Anghelu Ruju, Alghero: Exibith Design Project (2018/19) The Prison Context: Exibith Design Project (2017/18)
6 - 13 14 - 17 18 - 21
The inhabited centre of Padria: analysis for an integrated urban recovery strategy, Bachelor Thesis (2017/18) Project for the new Contemporary Theatre of Oradea (2019/2020) “CCEA MOBA” International competions: Škola Smíchov, Primary School design (2017/2018) Sports hall concept for the Oradea former landfill (2019/20)
22 - 25 26 - 31 32 - 35 36 - 39
Restoration Project of Foghe defensive coastal Tower (2019/20) “Cammino 100 Torri”: Enhancement of defensive coastal system Project (2019/20) Requalifications Project of “Bua Manor House” in Oschiri (2017/18) The Sling: Product Design Relief (2017/18)
40 - 43 44 - 47 48 - 53 54 - 57
5
Appartment in Oradea: Interior Design Project Oradea, Bhior, Romania 2019/20
The demand was to design the new interior of an existing apartment in Oradea. Starting from the develop of the concept it was possible to identify the main features that would have characterized the element of the whole house. The aim was to follow all the technical procedure provided in order to develop an interior design project. For this reason, in addition to the new plan of the apartment, the plumbing and the electrical system plan were carried out. From this project is possible to see how important is for the architect to have mastery of representation ability, for himself and tom help the client to understand the general idea of the new design.
6
MINI MAL
LIVING ROOM AND KITCHEN 4 3
1
3
WOODMAN Jugend TV Unit 1 150x45x52
A
5 2
4 JUNIPER
Thin floor lamp
1 JONAS FERNA FERNANDO ANDO PIRES Leither Club N N°2
6
7 B
6
5
9 8
2 DOIMO SALOTTI
LA FAENZA Legno del notaio LNOT2012OLDRM Porcelain tile 200X1200 mm
Jason .77
7 WOODMAN
Iron stool 35x35x65 cm
9 LAMINATED TOP
6
WALNUT TIMBER WITH RESIN FINISHING
8
8
Forniture plan
LAGO -36e8 Wildwood conponible Kitchen
BEDROOM
10 LAGO
Bedroom Flutua 160x200 cm
12 JUNIPER
Thin task lamp with wall mount
11 LAGO
36e 8 componible dresser and bedside tables
5
AXOR MYEDITION
BEDROOM
5
13
AXOR MYEDITION
ROCA Collection Ispira Model Square Single floorstanding g toilet il 37x56x44 cm
14 15 6
10
13 14 ROCA Collection Ispira Model Square Floorstanding bidet 37x56x44 cm
A B
11 12
15 CATALANO Collection Premium COD. 160VP00 60X47 cm
Forniture plan
9
Section A - A
Section B - B
10
Modelling and elevations rendering
Bedroom Elevations
Bathroom Elevations
Modelling and elevations Rendering
11
12
Modelling and Rendering visualization
Modelling and Rendering visualization
13
Archaeological site of Anghelu Ruju, Alghero: Exibith Design Project UNISS 2018/19, Alhgero, SS, Sardinia The necropolis of “Anghelu Ruju� is a prenuragic archaeological site located closed to city of Alghero. It is one of the biggest Sardinian Necropolis. The aim was to design a new visitors centre that included an acceptance space, an exhibition part, and spaces dedicated to refreshment and shop. The Project intends to enrich the visitors experience in order to increase the interest through three principal elements: inform, intrigue and interest. This is possible only by a detailed design of the graphic and communicative methods, materials, scenography and contents.
14
INIZIO VISITA
FINE VISITA
ALGHERO AREOPORTO
INGRESSO AREA BAR AREA BOOKSHOP RECEPTION AREA ESPOSITIVA
In order to make interesting the site, it was chosen to work on a Concept based on the relationship between three themes: History, Archaeology and myth. In fact, in addition to the historical testimonials, it is of relevant importance and interest the mythology built around of these sites. If from the historical point of view they are considered as a Tomb, for the myth they are consider as fairies homes thanks to their narrow conformations, the “Domus De Janas�. Through graphics and communications, it was possible to develop a different own identity for each theme, designed by using a graphic module of the square.
16
Modelling, Rendering and Grapich
Modelling, Rendering and Grapich
17
The Prison Context: Exibith Design Project Digital Design Media, UNISS 2017/18
The aim was to the design an Exhibition project for the “Giuseppe Tommasiello” confinement house of Alghero, for the “Monumenti Aperti” events. The first phase was interest from the analyses of the common perception of the Prisons, in order to understand how the people perceive it, on the prisoner path between the tribunal and reclusion structure, and on the features of the different reclusion system. From these studies is possible to figure out that these sites are perceived as anonymous boxes, in which no one know, and no one wonder what is happening inside. For this reason, the project consisted on the choice of module, that has been modify following the features of the represented
18
structures. Three different elements where define, and their compositions on the space created the expositive area. On the floor a three different coloured line path were designed, in order to allow visitor to understand which could be the possible ways that prisoners could follow before to reach their destination prison typology.
20
Modelling and Rendering visualization
Modelling and Rendering visualization
21
The inhabited centre of Padria: analysis for an integrated urban recovery strategy Bachelor Thesis, Padria, Sardinia 2017/18 The thesis development born as an opposed investigation to the study “Comuni in estinzione. Gli scenari dello spopolamento in Sardegna” published by “Regione Sardegna” in 2013. The study, using data not punctually contextualized, identifies Padria among the municipalities at risk of disappearance and foresees its demographic desertification in the years 2034-2036, preceded only by Semestene and Monteleone Roccadoria with a period of tendential extinction between 2023 and 2031. The thesis, in fact, undertakes to carry out a detailed analysis of the inhabited centre of Padria demonstrating, through what is claimed inside, that it presents numerous traces of relaunch, witnessed by the latest investments which are the synonym of a reality that does not intend to die yet.
22
Residenze Servizi Edifici pubblici Attività commerciali
Residenze abitate Residenze non abitate
Buono stato Manutenzione ordinaria Dissesto (fase iniziale) Dissesto (fase intermedia) Dissesto (fase avanzata) Rudere
Strade comunemente percorse Strade comunemente non percorse
Residenze non abitate in buono stato di conservazione Edifici pubblici in buono stato di conservazione
Se fosse possibile, come vorresti che venisse utilizzato il tuo immobile? 76% (67)
42,8% (39)
24
Attività commerciali
Magazzini Garage
Immobili ubicati nel centro storico Immobili ubicati nell’area esterna al centro storico
Abitazione
6,8% (6)
Considerando di adottare un progetto comunale, saresti disposto a: 47,7% (42)
Persone disposte ad investire sul proprio immobile Persone non disposte ad investire sul proprio immobile
affittare l’immobile
86,5% (64)
17% (15)
15,9% (14)
Non sarei disposto
38,6% (34)
13,5% (10)
patto di partecipazione
Site analysis and data processing
20,4% (18)
57,2% (52)
cedere l’immobile
By overlapping the levels of study it emerged that from a purely analytical and objective point of view, it is possible to define the village as mostly uninhabited and degraded, but from the potential perspective it is possible to define it as an inhabited centre with a high potential for residential use and in a good state of conservation, since the deterioration is mostly a consequence of the lack of ordinary maintenance. These considerations, if integrated with the different levels of study of the territorial context, could really create solid foundations for the implementation of an intervention aimed at the redevelopment of the country through the re-use of the disused private building heritage. The goal of the work carried out was not only to develop a hypothetical intervention strategy, but to use a method of analysis that would give the opportunity to identify and understand the problems and potentials related to a particular place. Urban planning and strategic proposals must know in detail the place and the elements that compose it, so that they can be developed on the basis of concrete, useful and reliable information.
A further goal was to involve the citizens of the country within the analysis, to understand needs, proposals and their will to participate, because there is not better method of evaluation than the one of the people who live there. The results turned out to be satisfactory and reliable, recording a high sense of appearance in the country. The design part of this work wanted to suggest an intervention to enhance and relaunch the country, without however claiming to resolve any problems identified in the analysis. However, we know it is not enough to take into account only the data that emerged from a self-filled questionnaire to develop an intervention strategy that considers the citizen as a protagonist, but it would be necessary to study at least their way to think in a more detailed and intimate way.
Strategia progettuale di OspitalitĂ Diffusa
Abitazione Stanze in abitazione Ricevimento e gestione Punto informazioni Spazio comune
Edifici non compresi nella strategia
Residenze abitate Magazzini/Garage Ripristino del decoro urbano: il manto stradale
Rifacimento strade con l’utilizzo di asfalto per il rispetto dei centri storici
Stato di fatto: pieni e vuoti urbani
Pieni Vuoti
Intervention Strategie
25
Project for the new Contemporary Theatre of Oradea Oradea, Bhior, Romania 2019/20
The potential of the project site are multiple, including the presence of a cultural centre considering the museum, the library and the school. Looking beyond the river instead we find the university campus which also constitutes an important element on which the project is based. The presence of numerous green areas, rivers, cycling and pedestrian routes could, together with the project, be the base for the recovery of the entire area itself. These considerations, together with the problem of the city as the absence of a common social exchange place, the absence of places by creative expression and the absence of the themed spaces, could be a new centre able to solve all of these problems. The proposed architectural concept will be a modern one, capable of reflecting the avant-garde spirit of the proposed function. A contemporary image will be obtained, anchored to the existing urban context.
26
Contemporary Theater project video
Cover Roof
Window w Structure
Fly Tower
Metal Panel Cover
Hungarian Ad Administrative dministrative Foyer Exposition Room Glass Structure
Romanian Administrative Area Unloading Are ea Foyer, Cafetaria, Exposition Space Rappresentatives Rappresentativ ves Rooms Utilities
Secondary Steel Structure
Access Parking Acces ss Room Main Rappr. R oom Second Rappr. Rapprr. Room External Stepss
Access Pubblic Acces ss
Doble Floor Underground Underground Parking
28
Functional and structural schemes
Main Steel Structure
29
Sud Elevation
North Elevation
Ground floor
Section A-A
Section B-B 1° Floor
West Elevation
2° Floor
30
Project documents
West Elevation
31
“CCEA MOBA” International competions: Škola Smíchov Smichov district, Prague, BHM 2017/18
The aim was to design a new public school in the historic Smichov district of Prague. Organized by the Centre for Central European Architecture (CCEA MOBA) on behalf of the City of Prague, the competition drew 66 entries from around the world. The new 10,000 m2 building will accommodate approximately 540 students aged 6 to 14. It is located within the ambitious Smichov City redevelopment, close to the history centre, which aims to transform some 200,000 m2 of former urban railway lands in a multifunctional environment. The project concept was to create a space in which students could grow in an interdisciplinary space, in which the relationship between difference realities could create a perfect and complete learning environment. The aim was not only to create internal relationship, but also to create connection with the external environments.
32
B
A
A
B Plan +5 m
Master plan +8 m
Master plan +11 m
The building itself is conceived of as a simple box, hosting classrooms, gyms, offices, terraces, gardens, etc. These different facilities could be also used from private people outside from the school system, all organized from a detailed schedule. Internally the school is organized around of the central court, where the classes overlook, and the movement spaces are organized as ring around the functions. In order to break the monotony of the long corridors, a series of widening spaces have been designed, and it is possible to feel also from the external forms of the elevations. This is project is the result of the previous considerations together with the theme of the passive structures. For this reason, a natural ventilations system, a solar panel collector, shading system, water collector and coloured solar shields have been designed.
Section A-A
34
Project documents
Master plan +14 m
SOLAR ENERGY COLLECTOR
SHADING SYSTEM
COLOURED GLASSES TO MINIMISE HEAT GAIN
Section B-B
NATURAL VENTILATION SYSTEM
35
Sports hall concept for the Oradea former landfill Oradea, Bhior, Romania 2019/20 FATADA E
Oradea is considered a central and important pole for the Bhior region of Romania, that is why it needs important investments also at a sporting and not just a cultural level. For this reason, an ideas competition was held within the University of Oradea, which included the presentation of a project concept for the new sports centre in the city. The development of the Concept focused on the idea that the new sports centre should fundamentally become a space for social relationship, for this reason a structure was designed that would host as many interdisciplinary functions as possible.
36
FATADA N
FATADA s
FATADA v
2
1 olume Basic volume
3
Site limit
4
Sports hall
rence Rotate by reference line
ission Division
Pubblic and functional spaces
8 Lining and free structure cture
9 Circulation integration ation
10 The Design
5 Spaces function
6 Circolation olation
7 Cuts and modeling
External wall elements Fiber cement panel, Equitone TECTIVA TE20 Load-bearing steel strip Steel counter batten Thermal insulation, extruded polystyrene (XPS) Secondary metal framework with Z profile Containment panel Primary steel structure, beam HEA 300 Steel anchor plate Reticular structure metal profile, L beam Beam-anchor plate anchor bolts Metal profile-anchor plate anchor bolts Waterproofing Gore-Tex membrane Concrete foundation Steel ground anchor Base anchor plate Ground Crawl space with decreasing size upwards Leveling layer in concrete Reinforced screed Electro-welded wire mesh External concrete flooring
The proposal was limited to the consideration of the overall dimensions without however going into the details of the internal distribution. However, the load-bearing structure and the constituent constructive elements of the external walls were studied to demonstrate the feasibility analyses of the project. The whole building will be design on a regular internal steel structure, that it will allow a free disposition of the internal functions, with the possibility to eventually also change the future distributions of the spaces.
38
Structural details
Section detail: external wall - reticular steel structure
Section a-a scale 1:10
Section b-b scale 1:10
39
70 M.S.L
Restoration Project of Foghe defensive coastal Tower UNISS 2018/19, Tresnuraghes, OR, Sardinia
Torre Foghe is located on the territory of Tresnuraghes, more precisely on the “ Punta Foghe” solitary promontory. It is characterized from a fantastic view on the see, on the “Riu Mannu” mouth and on a particularly environment, important for the high cliffs consisting of large cliffs and various little islands. At the moment the tower architectural and static conditions are precarious, with a large number of collapses extended on all the cylinder basement, on the entrance frontal elevations and on the east side masonry. The stairs to go up on to the parade ground is only partially intact, and the other part is interested from an important collapse the let difficult and dangerous the climb. Also, the parade ground parapet is almost all collapsed, becoming a potential danger for the visitors. Following these considerations, a restoration project to secure and to facilitate the use of the site has been done.
40
Legenda Interventi Intervento di consolidamento del terreno interessato da dilavammento ed erosione a causa dell’acqua, tramite rifacimento delle pendenze
Ripristino degli intonaci di protezione della muratura
Intervento di rimozione manuale di rocce e pietrame e livellamento del terreno a quota 70 s.l.m
Intervento di pulitura degli elementi lapidei interessati da patine biologiche eseguito con pulitura con acqua nebulizzata e applicazioni di bioacidi
Consolidamento delle strutture murarie dissestate prossime a crollo, tramite intervento di integrazione nuova muratura
Strutture di progetto
0m
42
5m
Elevations and material map
10 m
Degradation map and restoration interventions
10 m
5m
0m 43
“Cammino 100 Torri”: Enhancement of defensive coastal system Project UNISS 2018/19, Sardinia The Sardinia coastal towers are a fortified structure complex that have constituted the defensive, sighting and communication system of coastal strip In order to enhancement these structures, and to create new important archaeological local site, it was decided to integrated adopt and review the “Cammino 100 Torri” system to the restoration project. It is an existing tracking path of 1284 km the allows visitor to do the tour of the island by walk. This can be considered a Macro system connected by Micro system of shorter path. After a detailed study of the visitor’s needs related with the actual service offered from the existing system, it is emerged the need to develop an infrastructure system in order to follow and inform the users of the tour. The micro systems are developed as a short paths of maximum 30 km, in which are located all the necessary services.
44
CAMMINO 100 TORRI 1
Torre della Scafa
2
Torre del Prezzemolo
3
Torre di Calamosca
Torre di Punta Giglio 53
4
Torre di Cala Fichera
Torre di Capo Galera 54
5
Torre di Sant’Elia
6
Torre del Poetto
7
Torre di Mezza Spiaggia
8
Torre di Carcangiolas
9
Torre di Foxi
Torre di Mortorio
12 Torre di Cala Regina 13 Torre di su Fenugu 14 Torre di Capo Boi 15 Fortezza Vecchia 16 Torre di Cala Caterina 17 Torre dell’Isola dei Cavoli 18 Torre di Porto Giunco
Torre di Colombragia 59 Torre di Ischia Ruja 60 Torre di Foghe 61 Torre di Capo Nieddu 62 Torre di Santa Caterina 63 Torre di Su Puttu 64 Torre di Scab’e Sai 65 Torre delle Saline 2 66 Torre di Capo Mannu 67 Torre di Sa Mora 68 Torre del Seu 69 Torre di San Giovanni 70
23 Torre della Porta 24 Torre di Porto Corallo 25 Torre di San Lorenzo 26 Torre di Murtas 27 Torre di San Giovanna Sarrala 28 Torre di Barì 29 Torre di San Gemiliano 30 Torre di Capo Bellavista
Torre di Capo San Marco 71
Torre di Su Pottu 73 Torre Grande 74 Torre di Marceddì 75 Torre di Capo Frasca 76 Torre dei Corsari 77 Torre di Cala Domestica 78 Torre di Fontanamare 79 Torre di Porto Paglia 80 Torre di Portoscuso 81
32 Torre di Santa Maria Navarrese
Torre di San Vittorio 82 Torre di Calasetta 83
34 Torre di San Giovanni Caletta
Torre di Cannai 84
35 Torre di Longonsardo
Torre di Palmas 85
36 Torre di Santa Reparata 37 Torre di Vignola 38 Torre dell’Isola Rossa 39 Torre di Frigiano 40 Torre di Abbacurrente 41 Torre del Porto 42 Torre delle Saline
Torre di Porto Pino 86 Torre di Cala Piombo 87 Torre di Porto Scuro 88 Torre del Budello 89 Torre di Pixini 90 Torre di Capo Malfatano 91 Torre di Capo Spartivento 92
43 Torre della Pelosa
Torre di Chia 93
44 Torre del Falcone
Torre di Cala d’Ostia 94
45 Torre Negra
Torre del Coltellazzo 95
46 Torre Bianca
Torre di San Macario 96
47 Torre Mozza
Torre del Diavolo 97
48 Torre del Porticciolo
The interpretative infrastructure project is the result of the detailed study of the territory morphology of the whole way and of the analysis of the native flora of the environment. This is because it was necessary to consider the continuous change of the environment during the seasons, because it could be difficult to identify the infrastructure product. All these analyses have led to the creation of information elements that can be visible and recognizable in all different situations. So, in order to optimized also the whole route, the site accessibility project, the interpretive infrastructure project and the interpretative product project were carried out. To identify this network out of the path, a coordinate image (Logo) was designed, a Mobile App and website were developed and the merchandising products have been created. .
TIPOLOGIA PANNELLO 2 Segnaletica direzionale
Lastra di acciaio 3 cm
Torre Zavorra 98
49 Torre della Pegna
Torre di Antigori 99
50 Torre del Buru
Torre degli Ulivi 100
46
Lastra di acciaio 3 cm
Torre di Pischeredda 72
31 Torre di Arbatax
33 Torre di Santa Lucia
TIPOLOGIA PANNELLO 1 Pietra miliare
Torre di Bosa 58
20 Torre di Cala Pira
22 Torre Salinas
1720
Torre Argentina 57
19 Torre di San Luigi
21 Torre di Monte Ferru
Struttura di acciaio riempita
1720
11
Torre di Poglina 55 Torre di Badde Jana 56
1650
10 Torre di Sant’Andrea
Torre di Tramariglio 51 Torre di Porto Conte 52
TIPOLOGIA PANNELO 3 - 4 Pannello informativo Torri Pannello informativo percorso
Interpretative Infrastrutture
Requalifications Project of “Bua Manor House” UNISS 2017/18, Oschiri, SS, Sardinia
Due to the emigration dynamics, the abandoned building heritage of the Sardinia villages is getting bigger. The requalification of this sites is becoming more and more relevant. For this reason, it’s common to assist to the regeneration of old buildings instead of the construction of new ones. The “Bua Manor house”, located in Oschiri, was in a state of decay and instability. The job consisted on the analysis and evaluation of the deterioration grades of the construction elements, in order to intervene with the right capacity improvement.
48
0m
50
10 m
Elevations and plans
20 m
CEV/SEV
Chiusura e struttura esterna verticale in muratura di blocchi lapidei di varie dimensioni.
PIO
Partizione interna orizzontale con struttura in latero cemento costituita da putrelle e tavelloni.
CEV/SEV PIO PIO PIV
CEV/SEV
Chiusura e struttura esterna verticale in muratura di blocchi lapidei di varie dimensioni.
PIO
Partizione interna orizzontale con struttura ad arco costituita da mattone forati e calcestruzzo
PIO 3
8
7
9
6
Partizione interna orizzontale con struttura in latero cemento costituita da putrelle e tavelloni.
1
2
5 4
3
5 7
1 Muratura Portante 2 Strato di allettamento 3 Intonaco interno 4 Cordolo 5 Piastrelle 6 Massetto 7 Calcestruzzo
11 12
10
8 Rete elettro saldata 9 Malta magra
13
10 Tavelloni 11 Putrella
12
12 Intonaco interno 13 Mattoni forati
Construction details
200 cm
100 cm
0 cm 51
0 mm
100 cm
200 cm
CSI Chiusura superiore inclinata con struttura in travi e travicelli di legno, protetti da tegole marsegliesi supportate da listelli in legno.
CSI CEV/SEV
CEV/SEV Chiusura e struttura esterna verticale in blocchetti di calcestruzzo. 1 Tegole 2 Listelli
1 4
1 2 6
6
3 Controlistelli
2
3
4 Intercapedine ventilata 5 Impermeabilizzante
5
6 Tavolato superiore
3
7 Isolante
12
5
8 Freno al vapore 9 Tavolato inferiore 7 4
13
16
1 Tegole 2 Listelli 3 Travicelli 4 Travi 5 Isolamento
17 7
9
7 Tavelle 8 Muratura Portante
15
19
10
6 Mattoni forati
52
14
8
20 21 22
18
10 Travicelli 8
9
11 Travi
10 11
12 Gronda 13 Rete antipassero 14 Isolamento 15 Tavelle 16 Mattoni forati 17 Intonaco interno 18 Muratura Portante 19 Malta 20 Isolamento
9 Intonaco interno
21 Rasatura
10 Intonaco esterno
22 Intonaco esterno
Constructions details requalification
PEV
Partizione esterna verticale, classificabile come parapetto costituito da blocchi di cemento.
PEV CEV/SEV CSO
CSO Chiusura superiore orizzontale con struttura in latero cemento costituita da blocchi di laterizio “Sap�.
CEV/SEV
Chiusura e struttura esterna verticale in muratura di blocchi lapidei di varie dimensioni.
1 1 Parapetto
1
2
2 Intonaco esterno 2 3
4 3
7
5 6
2
3 Cordolo
4
5
6
4 Piastrelle
7
8
5 Supporti angolari
piastrelle
8
6 Strato di separazione
filtrante
7 Isolante 8 Impermeabilizzante 1 Muratura Portante 2 Strato di allettamento
9 Massetto di pendenza
17 13
18
3 Intonaco esterno
10
4 Intonaco interno
12 9
9
11
12 Pignatte 13 Intonaco interno
20
14 Intonaco interno
15
15 Strato di allettamento
21
8 Calcestruzzo 12
10 Rete elettro saldata 11 Calcestruzzo armato
14
7 Massetto
9 Rete elettro saldata
10
13
19
5 Cordolo 6 Piastrelle
11
16 Muratura Portante
16
17 Canale di scolo
10 Malta magra
18 Malta
11 Tavelloni
19 Isolamento
12 Putrella
20 Rasatura
13 Intonaco interno
21 Intonaco esterno
Constructions details requalification
200 cm
100 cm
0 cm 53
The Sling: Product Design Relief Product design, UNISS 2017/18
The aim of the study was to develop a “Meta project� based on the critical analysis of a toys, in this case of the industrial plastic sling. Thanks to the relief of every component and detail, it was possible to have a good knowledge of the object. Starting from the investigation of the use and the relationship between object - user, and following with the study of its unconscious imaginary, was possible to individuate the dualism toy-weapon that afflict this item. Due to these all consideration, a new material object concept was developed, and by using it would be possible to understand this dualism. The Project does not appear in the book because it was only partially developed, but it would like that the attention would be placed on the relief work and modelling.
54
0 mm
50 mm
100 mm
B
A’
B’
56
Sling fork relief
A’
Sling components and elastic relief
100 mm
50 mm
0 mm 57