maria m o ra g a s la rra rt e arc h it ec t u re port folio
Academic formation _Final Thesis in UPC (Technical University of Catalunya) in Bar-celona _High school in techonolgy bracnch in CIC (Barcelona) _Primary school in Thau School (Barcelona)
Further formation _First Certificate in English (FCE), 2008 _Certificate B1 in French, 2006 _Perparatory course for the certificate B2 in French in Istitut Franรงais of Barcelona, 2008 _Particular english speaking courses from 2004 to 2008 _Semestral course of 100h of Advanced level in the Mertit School (Barcelona) in 2012
Languages _Catalan: Mothertongue _Spanish: Mothertongue _English: Hight level spoken and written _French: Good level spoken and written
Computer programs _Autocad and Photoshop: high level _Adobe InDesign and Ilustrator: good level _SketchUp and V-Ray: high level
Other activities tion for the Exchange of Students for Technical Experience) _Jazz dance (7years), skiing _Piano (5years)
Experience
_June-August 2014_Intern architect in META PEYZAJ office in Istambul (Turkey) _September-October 2013_Course of Urban Project in Lima in Ricardo Palma University and NTNU _2013/2014_ Erasmus student in the NTNU; Trondheim (Norway) _June-August 2013_Worker in H&M Barcelona _ Volunteer OPEN HOUSE Barcelona 2012 _2012_Designer of the billboard of OIKOS SPRING MEETING BARCELONA 2012 in the ESADE University
_2012_ Designer of the gym zone of MEDIUM HOTEL CITY (not build yet) _2008/Now_Particular teacher for high school students _2006-2008 _Ski coach in La Masella ski station, Girona, Spain
MARIA MORAGAS
LARRARTE
_2012/Now_ Member of BEST (Board of European Students of Technology) and IAESTE (The International Associa-
Nationality_ Spanish Date of birth_ 10th Sept. 1990, Barcelona Adress_ C/ Alacant 7-9 2n 1a, 08017 Barcelona Tel_ (+34) 609 52 38 69 E-mail_ mmoragaslarrarte@gmail.com
01
PROJECTS
150 HOUSING IN POBLESEC, BCN 200 HOUSING IN POBLENOU, BCN MACBA MUSEUM EXTENSION, BCN NEIBOURHOOD MARKET, BCN COMPLEX BUILDING, TRONDHEIM
OTHERS
03
02
URBANISM
TERRITORIAL INTERVENTION, OLOT
ARCHITECTURAL HISTORY ANALYSIS
URBAN REFORM AND PUBLIC SPACE, MALLORCA
LEARNING FROM MEDELLIN
URBAN DESIGN, LIMA
DESIGING RESILIENT SCHOOLS, PHILIPPINES FURNITURE DESIGN
ARCHITECTURE PHOTOGRAPHY META PEYZAJ URBAN AND LANDSCAPE OFFICE, ISTAMBUL
BARCELONA
150 HOUSING POBLESEC PROJECTS V 2011/2012
Imitating the boulevard of the Avenue Paralel the housing is organized occupying the perimeter of the block as if it was a wall with a permeable public ground floor. It’s roof turns into an agreeable walk with a constant view of the sea and Montjuic. In addition, a few towers were helping to shape the space, creating more intimate zones and stirring the tours into action.
ANALYSIS
GROUND FLOOR OPEN AREA
DRAINPIPE SYSTEM
ACCES TO EVEN FLOORS
STRUCTURE
ACCES TO ODD FLOORS
OPENEDELEVATION
5TH FLOOR
LONGITUDINAL SECTION
1RST FLOOR
APARTMENTS FLOOR PLANS
BARCELONA
200 HOUSING POBLENOU PROJECTS VI 2011/2012
TherebuildingofadesertedblockofthePoblenouneighbourhood is where the project takes place. The duplex housings are organized forming a ring which make a union with all the pieces and that creates a central court inside the block obtaining continuity with the new building and the already existing one. There are two types of duplex and these always see the outside from the two views of the ring, the exterior of the street and the interior patio.
ANALYSIS
GROUND FLOOR
1-3 FLOORS ACCES
2-4 FLOORS ACCES
5TH FLOOR ACCES
OPENED ELEVATION
1RST FLOOR
3RD FLOOR
5TH FLOOR
2ND FLOOR
4RTH FLOOR
6TH FLOOR
MODEL FLOORS STRUCTURE
APARTMENT SECTION
PROJECT SECTION
BARCELONA
MACBA MUSEUM EXTENSION PROJECTS VII 2012/2013
Reusing an old church near the MACBA Museum is the way to build the new museum extension. The strategy is to reuse the buttresses for the structure and creating a new facade that interacts with the current museum and with the square in front. To reach this goal it is build up a new permeable facade covered with a huge sun slats that aids the museum’s visitors to have a double visual relationship with the outside and the inside museum tour.
STREET ELEVATION
MOVEMENT ANALYSIS
GROUND FLOOR
ENTRANCE SECTION
LONGITUDINAL SECTION FLOORS FUNCTIONS
FACADE DETAIL
LONGITUDINAL SECTION
BARCELONA
NEIGHBOURHOOD MARKET PROJECTS VIII 2012/2013
The tres torres neighbourhood is caracterised to be an aera with residencial buildings that breathe between them. The city blokcs are aereated and lightened with a constant rythm of emptiness and fullness. Also is an aera with slate roofs buildings. Is also relevant that is a neighbourhood settled on a slope of the perpendicular streets to the see is between the 5% and the 7%. Thus the new market will follow four premises: -Has to be a building that breath between the surrounfing buildings -Has to strenght teh tension between the inclinated roofs -Has to adapt to the slope -Has to be a singular building
SECTION FUNCTIONS
FLOORS FUNCTIONS
ESCOLES PIES STREET ELEVATION
MARKET GROUND FLOOR
LONGITUDINALSECTION
CROSS SECTION
MARKET FACADE DETAIL
LONGITUDINALSECTION
TRONDHEIM
COMPLEX BUILDING PROJECTS X 2013/2014
Trondheim’s harbour area known as Nyhavna is undergoing a transformation from a industrial harbour area to a new central part of Trondheim city. The future use of Nyhavna will be a mix of offices, dwellings and cultural and public program to benefit Trondheim as a whole. The goal is to create a high-rise in Nyhavna that functions as a “motor” for the new development of the area. Consolidate an urban link of new public areas with different character supported with a high rise as the new landmark of the area.
ny h a con vna nect ion
road
PARK
grid
stru
ctur
e
rrier barrier ba
rrier barrier ba
barrier ba
re
PARK
stru
ctur
e
rrier barrier ba
rrier barrier ba
squa
ING
grid
nyh a con vna nect ion nyh a con vna nect ion
re
nyh a con vna nect ion
squa tat ion
nyh a con vna nect ion
squa re tat ion
entrance
in s
#2
ier barrier barr
ier barrier barr
Tra
#3
#1
library commercial
SITUATION PLAN
dwellings
P
Mat art
nyh a con vna nect ion
hig riseh
re
nyh a con vna nect ion
nyh a con vna nect ion
squa
commercial
ier barrier barr
ier barrier barr
ier barrier barr
ier barrier barr entrance
entrance
START/END
entrance
e
c ran
ent
entrance
city
ce
barrier
ier barrier barr
ier barrier barr
ier barrier barr
ier barrier barr
ran
rrier barrier ba
START/END
ent
entrance
ING
ier barrier barr
ier barrier barr
city
PARK
squa
rrier barrier ba
rrier barrier ba
ig riseh
re h
nyh a con vna nect ion
nyh a con vna nect ion
e
barrier
entrance
ctur
ce
ING
stru
ran
PARK
grid
ier barrier barr
ier barrier barr
ent
entrance
city
road
ier barrier barr
ier barrier barr
START/END
Tra in s
rrier barrier ba
squa
e
rrier barrier ba
ig riseh
re h
nyh a con vna nect ion
nyh a con vna nect ion
ctur
ce
ING
stru
ran
PARK
grid
barrier b
ent
entrance
road
ier barrier barr
ier barrier barr
city
hig riseh
road
nyh a con vna nect ion
nyh a con vna nect ion
city
Train station
hall
URBAN ANALYSIS
C
B
A
a
b
GROUND FLOOR
CROSS SECTION
BUILDING ANALYSIS
Apartment types (XS, S, M, L & XL) L 27,6%
(rooms with shared facilities) single room - 18 m2 couple room - 35 m2
family - 90-120m2
s 13%
xL (duplex) 35,7%
s/m/l s/m
/l
l
family - 120-190m2
2
xl
s/m
= 123 apartments 1880 m2
m 8,9% small family - 60-65m2
4
singel / couple - 28 m
xl
xs 14,6%
technical
common
4
3
4
common
7
technical
technical
technical
technical
technical
technical
2
1
5
6
5
7
common
2
6
1
6
3
4
common
FACADE TOWER DETAIL
APARTMENTS FLOOR
XS & M APARTMENT FLOOR
OLOT
TERRITORIAL INTERVENTION URBAN PLANNING VI 2012/2013
Olot, in Girona’s province, is known as the volcano zone of Catalonia. The fact is that the Fluvià River that cross this territory is not at all used as a connection between the villages that passes through. This project studies the area and draws a continuous path near the riverbank so it connects these zones for the cyclists and walkers giving them some resting areas and agreeable views through the river itinerary.
TERRITORIAL ANALYSIS PLAN
PATH PROPOSAL PLAN
CURCH AREA SECTION
ZOOM INTERVENTION PLAN
CURCH AREA INTERVENTION
MALLORCA
URBAN REFORM AND PUBLIC SPACE URBAN PLANNING V 2012/2013
The project will reform the urban area of the Catalan island of Mallorca. This includes the old Stadium Lluis Sitjar RCD Mallorca and the surrounded environment area, within the general area of the Wedge Green (“Sa falca verda�). It will be very important the connection of the zone with the city and how the new development will effect the city and its citizens. The main reform will be at the stadium, pushing it up and allowing the city movements (pedestrians and vehicles) and live to cross it underneath.
SITE PLAN
SECTIONS ALONG THE STREAM
SECTIONS AND PLAN ACCES TO THE STADIUM
Referènci a Ill a Diagonal,Manuelde Solà Morales
REFERNECE: ILLA DIAGONAL, SOLÀ-MORALES
STADIUM SECTIONS ANALYSIS
+32 +26
+22 +18
SECTION OF THE NEW STADIUM
TERRITORIAL PLAN
REFERNECE: ILLA DIAGONAL, SOLÀ-MORALES
STADIUM COMMERCIAL OPEN AREA
STADIUM COMMERCIAL AREA SECTION
STADIUM LAYERS
CONNECTION ENTRANCES WITH THE CITY
lima
PATCHWORK CITY LIMA
Urban planing in NTNU, Trondheim 2013
The capital of Peru is one of the ďŹ ve largest cities of the Americas. It is growing rapidly and in an uncontrolled manner without following any ofďŹ cial urban development plans. Due to economic and functional reasons, heavy and large-scale industries are moving out of the area of the seaport and are mainly relocating in an expanding industrial zone North of the seaport. Hence many parcels on this area are already abandoned and available for urban development. The project is located in one of the largest parcels within our project area that takes in 30 hectares and belongs to the big industry Alicorp S.A.A. So, reconceiving the site as a connecting element for the sustainable growth of the multi-cultural megacity, the project will focus on the design of a high-density and high-quality urban quarter, comprising living, working and leisure spaces.
LOW DENSITY HOUSING AREA INDUSTRIAL AREA
De
o
Juli
av
Ch
28
ez
INDUSTRIAL AREA
t Av. Faucet
PUBLIC SERVIES
a
entin
rg Av. A
HIGH DENSITY HOUSING AREA
INDUSTRIAL AREA
Neighbourhood housing
GRAIN SILOS = Sport Center
BRICK BUILDING = Libary
Living and Commercial
OIL SILOS & PIPES = Industrial Park WAREHOUSE = Commercial Center MAIN BUILDING = Cultural Center PASTA FACTORY = Educational Building
INDUSTRIAL PARK NEIGHBORHOOD HOUSING
BUSINESS CENTER
Industrial Park
Cultural Center
LIVING & COMMERCIAL CULTURAL CENTER EDUCATIONAL RESEARCH CENTER
LOW DENSITY HOUSING AREA FUTURE HOUSING DEVELOPMENT
PUBLIC SERVIES
HIGH DENSITY HOUSING AREA FUTURE URBAN DEVELOPMENT FUTURE HOUSING DEVELOPMENT
CONCEPT DIAGRAMS
Educational and Research Centre
Bussines Centre SKETCHES OF THE PUZZLE PIECES
SITE PLAN
LONGITUDINAL SECTION
TRAMLINE
Neighborhood
SUBWAY
T
Airport to City Center
T
T
Avenida Faucett
S
TRANSPORTATION HUB
ntina Avenida Arge
M
S M
METROPOLITANA
Port of Callao to City Center
HIGH Density
INTEGRATION of Excisting Structures ACTIVATOR of the Area
MEDIUM Density LOW Density NEW URBAN DEVELOPMENT OF THE FORMER INDUSTRIAL AREA
Housing Kindergarden Social Center Market Commercial center Cinema
Housing Theatre
Conference Center
Exhibition Hall
Housing
University & Research
Sports Center Commercial Ground Floor
Business Center Hotel HUB
Little Shops Park Public Libary Playground NEW URBAN DEVELOPMENT OF THE FORMER INDUSTRIAL AREA
Housing
URBAN Open Space NATURAL Open Space
BUSSINES CENTRE CROSS SECTION
LIVING AND COMMERCIAL CROSS SECTION
Chave
o
e Juli
28 D
Av. Fa uc
ett
z
Av. Argentina
BAZOCHESSUR-GOUYÈNNE
HISTORY ANALYSIS HISTORY IIi 2010/2011
Alvar Aalto leaved us some great work of which we have to learn about. The Maison Louis Carré located in Bazoches-sur-Gouyènne, near Versailles, is one of this examples. The analysis and redrawing of it’s plans allowed the production of a model that uses the corresponding material to express the same wishes of materiality of the Nordic architect as well as the particular false ceiling section that creates an interior environment so particular.
•••••••••••••••
GROUND FLOOR PLAN
Planta baixa
• •• • ••• • •• •• • • ••••••••••••••••
• •• • ••• • SOUTH ELEVATION
••• • •• •• • • ••••••••••••••••
• •• • ••• • • •• • ••••••••••••••
• ••• • • •• • ••••••••••••••
• •• • ••• • •• ••
• •• •NORTH ••• ELEVATION • •• •• • • ••• • •• • ••• •
• •• • ••• • • •• •
WEST ELEVATION
• •• • ••• • • •• • •••••
EAST ELEVATION
• •• • ••• • •• •• • • ••••
MEDELLIN
LEARNING FROM MEDELLIN OPTTAIVE 2012/2013
MedellĂn, located in a Colombian valley, is a city completely dependent of the topography, the river and the quebradas. Being one of the poorest cities and the most violent Colombian region there are proposed different social and urban actions to improve the quality of citizen’s life. The goal this project is the organization of a road network that communicates the whole city getting through all the estratos and connecting them in the most directly way. Although the pronounced topography it will be a project that will aid the city to reach the welfare state.
NEW TRAM LINE
CITY CONNECTIONS PLAN
NEW INFRAESTRUCTURE LINES
NEW INFRAESTRUCTURE PLAN
NEW INFRAESTRUCTURE ZOOMED PLAN
PHILIPPINES
DESIGNING RESILIENT SCHOOLS ON-LINE COURSE 2013/2014
In November 8, 2013 the devastating Typhoon Haiyan hit the Philippines,causing more than 5,000 deaths and destroying the homes and cities for millions. Natural disasters are happening more and more often due to climate change. We can’t do much to stop them, but as architects we can help with the recovery and to build shelters that would withstand them. The goal of this project is to generate design ideas for resilient schools for the victims of Typhoon Haiyan and other natural disasters.
Cordillera Administrative Region
Ilocos Region
Central Luzon
National Capital Region
Cagayan Valley
S
Calabarzon
S Bicol Region
outh hina ea
Eastern Visayas
Mimaropa
Western Visayas
Caraga Central Visayas
ulu ea
Guiuan, Eastern Samar
Northern Mindanao
Zamboanga Peninsula
Autonomous Region in Muslim Mindanao
Malaysia
Danao Region
Soccsksargen
SITE LOCATION N
.0m
77
Open back space/playground
.0
0 25
.0 m
droop-on/
190
m
entrance aera
parking area
SITE DESIGN
GENERAL VIEW
Classroom
Vegetable garden
Entry Hall
Vegetable garden
Classroom
CROSS SECTION
Gym
Classroom
Viewing stand
40
UNITS
22
CLASSROOMS
5
AUDITORIUMS
Sport court
Bathrooms
unit Canteen
Vegetable garden Library Auditoriums
bathroom
Entry Hall
Main entrance
UNIT AGGREGATION
Administration Meeting space
or teachers
Strong, concrete walls work as a backbone to the unit. Triangulated shapes give structural endurace and integrity.
heat
Lighter, movable division walls function as acoustic panels and filter in natural light. They can also be fully shut in case of a storm.
Unit structure scheme
air flow Roof can be opened with skylights in order to allow more light inside.
Classroom with elevated seating platforms. Storage units and bathrooms along the corridor.
room
Structure can be divided into smaller rooms for administration or privacy purposes. Exterior space for the small apartments / rooms or interior common space.
typhoon
room room
UNIT CONCEPT
Classroom 45 pupils
6m
ooks
l
s
ora
rain ooks
Group work 64 pupils
Group work spa 4 pupils
l s Group work spa 4 pupils
floods
Group work spa 4 pupils
CLASSROOM LAYOUT OPTIONS
C L I M AT E
N
1rst PHASE: - Entrance hall/ Library/ Canteene - Vegetable garden
2nd PHASE: - Gym - Viewing stand -Sport court
3rd PHASE: - Administration - Auditoriums
4rth PHASE: - Classrooms modules 1
5th PHASE: - Classrooms modules 2
PHASING
Roofing with GI sheets
Bamboo truss
Auditorium layout Support for bamboo structure Elevated platform
Reinforced concrete wall Heavy Shield
Panels / light filters Different possible materials: Wood wool + Cement
5.0m
3.8m
Fiber cement
Coir fiber
Bamboo
5.8m
Bamboo structure junctions
CLASSROOM MODULES
TRONDHEIM
FURNITURE DESIGN OPTATIVE 2013/2014
The aim of this project is to design a desk for studying (Norwegian “lesesalsplass�). These desks for studying have been quite unchanged (at NTNU) the last 3 decades. The challenge is to see if the ways we work today affects the place where we study. The increased use of computers have changed the way we study and have also affected the interaction between knowledge and other people during studying. Thus, the design will emphasize on some qualities such as flexibility, privacy, design, construction and material, in this case a whole wood production.
EVOLUTION OF THE IDEA
OPENNING B O A R D
ST
OR
AG
E
E
STORAGE
INDIVIDUAL P O S I T I O N
G R O U P S P O S I T I O N
W O R K I N G A R E A
STORAGE
AG
STORAGE
OR
STORAGE
ST
FUNCTIONALITY
MOVEMENTS
INDIVIDUAL
RAWS
FACE TO FACE
SQUARE
GROUPS
RAWS
FACE TO FACE
ORGANIZATION CONCEPT
PLANS OF ORGANIZATION
CONSTRUCTION
OPENNING MECANISM DETAIL
TRONDHEIM
ARCHITECTURE PHOTOGRAPHY
OPTTAIVE 2013/2014
The aim of this photographs is to discover how the analogic cameras worked on the past as well as how the red room functions and how we can play with it on the post production in a manual way. It is emphasized the kind of photographs focused on the architecture and urban situations and how we can show it throw a lent.
INSIDE IN THE OUTSIDE_ANALOGIC CAMERA_RED ROOM POST PRODUCTION
OUTSIDE IN THE INSIDE_ANALOGIC CAMERA_RED ROOM POST PRODUCTION
ARCHITECTURE&MOVEMENT_ANALOGIC CAMERA_RED ROOM POST PRODUCTION
OUTSIDEINTHEINSIDE_ANALOGICCAMERA_REDROOMPOSTPRODUCTION
ARCHITECTURE&MOVEMENT_ANALOGIC CAMERA_RED ROOM POST PRODUCTION
ARCHITECTURE&MOVEMENT_ANALOGIC CAMERA_RED ROOM POST PRODUCTION ARCHITECTURE&MOVEMENT_ANALOGIC CAMERA_RED ROOM POST PRODUCTION
FORM AND COLOUR_DIGITAL CAMERA_COMPUTER POST PRODUCTION
OUTSIDE&INSIDE_DIGITAL CAMERA_COMPUTER POST PRODUCTION
FORM AND COLOUR_ANALÒGIC CAMERA_COMPUTER POST PRODUCTION
OUTSIDE&INSIDE_ANALÒGIC CAMERA_COMPUTER POST PRODUCTION
OLD&NEW_DIGITA CAMERA_COMPUTER POST PRODUCTION
OLD&NEW_ANALÒGIC CAMERA_COMPUTER POST PRODUCTION
ISTAMBUL
META PEYZAJ URBAN PLANNING AND ARCHITECTURE OFFICE SUMMER 2014
The Turkish office is focused on urban planning and landscape architecture with projects throw all along Turkey as well as other oriental countries like Iraq. They also work with the architecture affected to those projects the area where I was working on as an architect designer.
erbil park IRAQ Iraq is under a huge urban development and this urban, landscape and architecture project develops a huge recreative park in Erbil, Iraq. The designs of different buildings requested by the client were the works that I was focus on. Likewise I worked on the first design of some structures such as a n Eco-restaurant, which followed the lines of the landscape project and the material of an eco-building, a palms greenhouse, a prototype of kiosks and a big sunshade for an stage area.
uluova milk factory TURKEY
For the last few years the Turkish milk factory Uluova is under growing and they are building a huge new factory with different constructions such as the farm area for the milk cows, the milk post treatment area, the workers houses and facilities and the administrative buildings. In this case the project is focused on the design of the facade of an existing project for the administrative building that works as an eco-facade and reflects at the same time which kind of factory is.