ARQUITECTURE PORTFOLIO AND RESUME MARIA SERRANO VECINO
MARIA SERRANO A
R
SPAIN 1992
C
H
I
T
E
C
T
Date of Birth : 25 - 01 - 1992 (26 years) From : Seville (Spain) Live : Schiedam (3111NR,NL)
PROFILE
COURSES
Hello, my name is Maria, and I am a Spanish architect. I have finished my studies in July, I consider myself to be an architect who loves the structures. I decided to come to Rotterdam, because it is a catalog of architecture, where you can observe and learn infinity. I think that I could contribute many things to your study. I am hardworking, perfectionist and have knowledge of some software. LANGUAGE SKILLS
S P A N I S H MOTHER LANGUE
SOFWARE SKILLS
ENGLISH B1/TRINITY ITERMEDIATE
- Adobe photoshop Cs5.5 Avanced (60 hours) - Microsorf Excel specialist (50 hours) - Effective time management (50 hours) - Occupational health preventing (80 hours) - Rhinosceros V5 + Vray 2.0 and Photoshop CS6 (42 Hours)
FRENCH A2 PREINTERMEDIATE
SKILLS
AUTOCAD 2015 RHINOSCERO 5.0 SKETCH-UP ILUSTRATOR CS6 PHOTOSHOP CS6
Hardworking
Creative
Efficiency
INDISING CS6 CYPE 2014 MECHANICAL APDL ANSYS ICEM SAP 2000 OFFICE 2013
WorkGroup
Perfectionist
ACADEMIC EXPERIENCE
- September 2010 - July 2016
Degree in Architecture - University of Seville
Internal student at Departament of Continuoum mechanics and Structures - University of Seville Research of historical structures, Mosque - Cathedral of Cordoba (Spain)
- September 2014 - Dic 2017
4
PROFESSIONAL EXPERIENCE
YEAR
Practice - November 2014 - February 2015 OS-41, Seville (Spain) Work on projects from the beginning, development conceptual design assisted by architect. Development of 3D modelling for projects. Drawings of planimetry. Architect - March 2016 - September 2016 Duarte Asociados S.L.P., Seville (Spain) Calculation of structures of different sizes, from small structures to participation in big structures. Development of projects, in metal and concrete structures. Drawing and layout of structures projects. calculate structures with Cype. -June 2015 - July 2016 Verรณnica Torres de Sande Architect, Seville (Spain) Development of planimetry and assist to the calculation of structures for single-family homes.
Others Jobs Sales assistant - Visual Merchandising MANGO Rotterdam Training as visual merchandising with the Mango academy program.
- June 2017 - Actually
COMPETITIONS
- February 2015
Arquidea. IWC Competition. Crunger Park
1 INDUSTRIAL REHABILITATION WHEAT SILO _SEVILLA SOCIAL CENTER MULTIPURPOSE
2 INNOVATION IN URBAN DEVELOPMENT BETWEEN CITIES_ ALCALA DE GUADAIRA _ SEVILLA
3 INDUSTRIAL REHABILITATION AND MUSEUM MILL _ECIJA (SPAIN) EDIFICIO
P C
R U
O R
ALTURA
EN
O
Y S
E C T O S 1 0 2 0 1 4 - 2 0 1 5
MARIA SERRANO VECINO ETSA
4 HIGH BUILDING SOCIAL CENTER + MUSEUM + HOUSES BELLAVISTA, SEVILLA (SPAIN)
5 INDUSTRIAL REHABILITATION COWORKING CENTER WINERY _SANLUCAR DE BARRAMEA (SPAIN)
EN BELLAVISTA CORTIJO DE CUARTO
ENTREGA 19/06/2015
SCHOOL PROJECTS
1 INDUSTRIAL REHABILITATION WHEAT SILO _SEVILLA SOCIAL CENTER MULTIPURPOSE WORKING WITH: AUTOCAD 2D - 3D PHOTOSHOP ILUSTRATOR
2 INNOVATION IN URBAN DEVELOPMENT DESING PROCESS
TALLER DE ARQUITECTURA
BLANCA ESCRIBANO ROLDÁN_ BE ESCUELA TÉCNICA SUPERIOR DE
2 INNOVATION IN URBAN DEVELOPMENT BETWEEN CITIES_ ALCALA DE GUADAIRA _ SEVILLA SMALL PARKS PUBLIC SPACE
CHAT IMPROVES CITIZENS
NO LINEAR PARKING PARKING TOWERS
WORKING WITH: AUTOCAD 2D - 3D PHOTOSHOP ILUSTRATOR RHINOSCEROS
CALLE INTERIOR TALLER DE ARQUITECTURA 7_
“
BLANCA ESCRIBANO ROLDÁN_ BEATRIZ ESCUELA TÉCNICA SUPERIOR DE ARQU
ECOLOGICAL POINTS WIFI POINTS
DO_ MARÍA SERRANO VECINO
RECYCLING OF ABANDONED BU CULTURAL ACTIVITIES POINTS METRO STATION PARKING TOWERS
CALLE INTERIOR
UGAR DE IMPLANTACION ESTA DIRECTAMENTE LIGADO A A-92, Y LA S-40, SIENDO ESTAS DOS DETERMINANTES LA PROPUESTA DE CIUDAD
ORDENACION DEL LUGAR SURGE A PARTIR DE BUCLES ERRANO VECINO ACTIVACIÓN DEL TERRITORIO, DE SALIDA Y ENTRADA
DE LA A-92, APORTANDOLE EL VALOR DE CARRETERA SOLO DE PASO, SINO DE ENTRADA A NUEVOS NUCLEOS ANOS.
TALLER DE ARQUITECTURA 7_
CADA BUCLE SERA CONTENEDOR DE UN SISTEMA ECONOMICO-LABORAL, EQUILIBRANDO LAS TRES ZONAS ADSCRITAS DE LA MISMA FORMA, Y POTENCIANDO LAS TRES POR IGUAL. LA FRACTURA OCASIONADA POR LA S-40 SE COSE MEDIANTE UNA GRAPA ASIGNADA A UN USO MAS OCIO-DEPORTIVO, CREANDO UN LUGAR DE INTERES, NO SOLO LOCAL, SINO TAMBIÉN DE NIVEL TERRITORIAL.
“ENTRE CIUDADES”
COMPLEMENTANDO LOS BUCLES, EXISTEN VIARIOS SECUNDARIOS QUE DAN ACCESO A LAS DISTINTAS ZONAS(TERCIARIOS, DE PRODUCCION, I+D+I, RESIDENCIAL...) LA FORMA PROPUESTA DE LOS BUCLES, CREA UN CONTROL DEL TRÁFICO, QUE GRACIAS AL DEGRADADO DEL USO EN LA PROPUESTA, EL TRAFICO SE VA DISMINUYE DE FORMA REGULAR, HASTA LA ZONA RESIDENCIAL, DONDE ES MINIMO. DE ESTA FORMA NO ES NECESARIO EL USO DE VIARIO RESTRINGIDO.
BLANCA ESCRIBANO ROLDÁN_ BEATRIZ GARRIDO JIMÉNEZ_ MARÍA QUINTERO ROSADO_ MARÍA SER
CITY DESING PEDESTRIAN
BIKE LANE
ZONE
FLEXIBLE CITY TEMPORARY USES OF
INTELLIGENT LIGHTING
ABANDONED BUILDINGS
APP MOBILE INTEREST POINTS
ONLINE BUSINESS
SHARE TOOLS AND FACILITIES
CULTURAL ACTIVITIES POINTS
WIFI POINTS ITIZEN PARTICIPATION IN GREEN AREAS
RESEARCH AND ENTREPRENEURSHIP
ORCHARDS URBANS
CENTERS
RE-EDUCATION IN RECYCLING
CALLE INTERIOR
“ENTRE CIUDADES”
Z GARRIDO JIMÉNEZ_ MARÍA QUINTERO ROSADO_ MARÍA SERRANO VECINO UITECTURA___UNIVERSIDAD DE SEVILLA
UILDINGS
CALLE INTERIOR
RRANO VECINO
EN LA NUEVA PROPUESTA DE CIUDAD LOS EDIFICIOS SE ADOSAN A LAS CALLES, CREANDO UNA CIUDAD LINEAL, EN LA QUE LA CALLE SE CONVIERTE EN EL LUGAR DE ENCUENTRO
LAS ZONAS VERDES SE VAN ENTRLAZANDO CON LAS CALLES Y LOS EDIFICIOS. EN EL BUCLE 3, EXISTE UNA PEQUEÑA IDEA DE INTERVENCIÓN EN LA QUE LOS EDIFICIOS INDUSTRIALES QUE NO ESTEN EN USO, ENTRE EN CARGA, REACTIVANDOLOS CON NUEVAS IDEAS, RELACIONADAS CON LA TEMATICA DE LA ZONA, LO AGRICOLA
3 INDUSTRIAL REHABILITATION AND MUSEUM DESING PROCESS
3 INDUSTRIAL REHABILITATION AND MUSEUM MILL _ECIJA (SPAIN)
0,00
0.00
-3.00
-2.00
-2.00
-1.50
-1.30
-1.20
-0.90
-1.30
-0.60
-2.00
-0.30
0,00 (+100)
0,00
-2.00
WORKING WITH: AUTOCAD 2D PHOTOSHOP ILUSTRATOR RHINOSCEROS
4 HIGH BUILDING_ SOCIAL CENTER + MUSEUM + HOUSES DESING PROCESS
4 HIGH BUILDING_ SOCIAL CENTER + MUSEUM + HOUSES BELLAVISTA, SEVILLA (SPAIN)
5 INDUSTRIAL REHABILITATION COWORKING CENTER WINERY _SANLUCAR DE BARRAMEDA (SPAIN) THIS EXERCISE RAISES THE POSSIBILITY OF INTERVENING FROM A MACRO-SCALE TO A MICRO- SCALE. MACRO-SCALE OF URBAN REGENERATION, IN THE NATURAL SCAR THAT DISCONNECTS THE UPPER DISTRICT LOWER
(HISTORICAL CENTER) OF THE (ECONOMIC CENTER),
DISTRICT
ISOLATING THEM DUE TO THE LACK OF APPROPRIATE CONNECTIONS.
AND IT ENDS WITH A MICRO-SCALE INTERVENTION, LIKE A PROPOSAL IN THE CASTLE'S WINERY, TO CREATE A CENTER OF ATTRACTION FOR THE POPULATION, COWORKING CENTER.
HISTORICAL CENTER SANLUCAR DE BARRAMEDA
WORKING WITH: AUTOCAD 2D PHOTOSHOP ILUSTRATOR INDISING RHINOSCEROS
5 INDUSTRIAL REHABILITATION COWORKING CENTER WINERY _SANLUCAR DE BARRAMEDA (SPAIN)
FIRST FLOOR
147
LLER TA m2 18 1
A
OFICIN 18 m2
.5
1095
LLER TA m2 28 2
OS ASE m2 25
A
OFICIN 18 m2
ONES
DE
120
RTO CUA m2 17
ACI INSTAL
420.5
OS ASE m2 17
A
OFICIN 18 m2
160
190
540
SALA RKING COWO 53 m2
INAS
176.5
QU DE MÁ SALA 6 m2
2
LLER TA m2 27 3
406.5
319
LA KING SA WOR CO m2 78
A OFICIN 18 m2
3
240.5
713.5
401
8.5
22 843.5
.5 1092
SALA RKING COWO 46 m2
1
670.5
7.5
78
9.5
31
464 547
PRINCIPAL FLOOR 159
947
SO
CAN
A DES ARE 53 m2
609 36
15
8
45
587
1097
A OFICIN 34 m2
474
FO LA SA m2 48
513.5
AT
RM IVAS
OS ASE 25 m2
612.5
587
322.5
A
OFICIN 34 m2
250.5
ES
ACION
TAL DE INS
525.5
420.5
300
RTO CUA m2 17
236
305
195.5
204
85.5
656
OS ASE m2 17 3356
553.5
530
EX NA ZO m2 0 17
525
A OFICIN + 4 m2 34 m2
SICI
PO ÓN
502
A RE LA SA m2 23
110
OFICIN 27 m2
UN
405
S
IONE
247.5
318.5
ACIÓN
INISTR ADM 61 m2
1858
584
422.5
A OFICIN + 4 m2 29 m2
A
SC
620.5
PATIO 116 m2
304.5
IAS
464.5
FERENC
SO
AN
87
257
DE CON SALA m2 47.50
.5
DE EA AR m2 70
1102
OFICIN 27 m2
305.5
IÓN
EPC REC 20 m2
EPCIÓN REC 16 m2
150
855
1553 2720
530.5 863.5
496 1801
431.5
STRUCTURES PROJECTS
6 JOBS WITH STRUCTURES ANALISYS _ WATERLOO INTERNATIONAL STATION
PERFILES Tub Tub Tub Tub Tub
Tub 4026/16
Tub 406/20
Tub 230/12 Tub 240/12 Tub 273/12.5 Tub 355/16
PERFILES BARRAS
Tub
TEXTILE COVER POST-TENSIONED RIVER BANK GUADALQUIVIR
S BARRAS 230/12 240/12 273/12.5 355/16 406/20 4026/16
ESCALA 1/100 ESTRUCTURAS ESPECIALES 2015 ADRIÁN CARRETERO, PEDRO GARCÍA AGENJO, MARÍA SERRANO VECINO, ELENA TRIO
THANKS