Mariia Kolodiazhna architecture portfolio 2014

Page 1


MARIIA KOLODIAZHNA

Mobile: 07876177143 E-mail: mariiakolodiazhna@gmail.com Date of birth: 17.11.1990 Nationality: Ukrainian

PROFESSIONAL SKILLS ArchiCAD Rhinoceros Grasshopper

Photoshop Illustrator InDesign

AutoCAD 3ds MAX SketchUp

English

German

LANGUAGE SKILLS Russian Ukrainian

EDUCATION 2012-2014 Dessau / Germany

2007-2012 Kyiv / Ukraine

Hochschule Anhalt / Dessau Institute of Architecture (DIA) / Bauhaus campus

Master of Architecture / MA_Arch

Kyiv National University of Construction and Architecture (KNUCA)

Bachelor of Architecture / BA_Arch

Awarded 1.9 (where 1=best, 6=worst)

Awarded 5.0 (where 5=best, 1=worst)


PROFESSIONAL WORK EXPERIENCE 2013 – Present:

Feb 2011 – Sep 2012 (1,5 years)

Freelance - Interior design of a private house / 280 sq. m. AB Zotov&Co - Tower “Roshen”

http://www.zotov.com.ua/en/

- “Furshet” shopping mall - Landscaping of Hreshatyk street and Independence Square in Kyiv 2008 (2 months)

Kyiv Department of City Planning and Architecture - Street facade lighting in Kyiv

In progress - construction stage

Associate Architect 9 people team. Winner of invitational competition. Concept design. 7 people team. Concept stage and further construction development. 6 people team. Project for Kyiv local authority.

Summer placement concept design / construction development

OTHER WORK EXPERIENCE Apr 2012

CANactions 2012 spring - International Workshop ‘Kontraktova Square: Scenarios for Development’

Organizer / graphic design of festival / co-ordinator of workshop / developer of workshop brief

Dec 2012

CANactions 2012 winter - Kiev ISLANDS Open International Urban Planning Competition

Organizer / graphic design of festival and competition related materials / developer of competition brief

Apr 2011

CANactions 2011 - Kiev EDGE Open International Architectural Competition

Organizer / graphic design

http://www.canactions.com/en


4


A B

C

D

5

CONTENT FREELANCE interior design

UNIVERSITY PROJECT master thesis - Resilience of Hreschatyk street to changes over time computational projects - Ant bridge - BBQ shelter ASSOCIATE ARCHITECT AB Zotov&co - Tower “Roshen” - Landscaping of Hreshatyk street and Independence Square in Kyiv - “Furshet” shooping mall

9

13 19 21

25 26 27

ORGANISER, GRAPHIC DESIGNER, CO-ORDINATOR OF WORKSHOP, DEVELOPER OF WORKSHOP BRIEF 31 CANactions


A 6


FREELANCE

7


8


project: Interior design of a private house location: Ukraine / Rubezhnoe area: 280 sq. m. stage: work in progress, currently at the costruction stage

1

5 10

11

12

13

14

15

16

9

17

9 8 7 6

2

5

4

ДГ-4

ДГ-4

1

2

2 ДГ-4

3

6

1

3

5

подвес потолочный 60х27мм

4

профиль 60х27мм

ДГ-4

профиль направляющий 27х28мм цементнолатексный раствор гидроизоляция

гипсокартон

уголок 35х35мм

шпаклевка

профиль для штор Busche крепление с потолку

2 3 4

профиль потолчный 60х27мм

шуруп

1

5

3

4

ПЛАН РАССТАНОВКИ МЕБЕЛИ +0,000 Условные обозночения:

гидроизоляция

Дата:

цементно-латексный раствор

подоконник пенополистирол

уголок 35х35мм шуруп

320

батарея под покраску

139

вывод отопления профиль направляющий 50х40мм стоечный профиль

20

50 20

5

Дата:

гипсокартон 20мм шпаклевка

санузел

спальня

встроенная розетка SIMON connect KF300C/1 Дуб копченый брошированный стиль Metropolitan Edition 1 3500х280х30мм пароизоляция лага 100х50мм, через 600мм утеплитель

+3 100 Разработала: Колодяжная М.

вход

кухня-столовая гостинная

гардероб вход

500

Стадия: рабочий проект

Пащенко В., Пащенко Е.

h=900мм

100

50

30

80

План расстановки мебели Заказчик:

450

Стадия: рабочий проект

Разработка интерьера жилого дома

Лист:

М 1:50

Лист:


10


UNIVERSITY PROJECTS

school: Hochschule Anhalt / Dessau institute of Architecture DIA degree: MA_Architecture location: Germany / Dessau description: Master program in english. International representatives from all over the world (Australia, South and North America, Asia, Europe). Sctrong faculty representation in research (with such teachers, as Neil Leach, Arie Graafland, Gunnar Hartmann) and digital studies (Christos Passas, Krassimir Krastev, Alex Kalachev).

11


12


master thesis project: Resilience of Hreschatyk street to changes over time studio topic: Re-design year: 2014 description: Initially Hreshatyk street merging with Maidan square, a diverse and multifunctional public spot for the city, was studied as a stage of communication of all users in the city: car drivers, cyclists, and pedestrians. However under a closer look - many clashes and contradictions were identified with the current structure and this lead to the idea of Maidan‘s reorganization through the understanding of the needs of various groups of users. Considering both the current and the previous situations, a detailed analysis of conflicts of interests of users on the site was performed. This lead the project to the concept of providing a flexible and multifunctional set of spaces for the public to use and share, by proposing a thoughtful and adaptable design of units and site in the form of architectural and urban intervention.

13


RESILIENCE OF THE HRESCHATYK ST KYIV , UKRAINE

HRESHATYK AFTER REVOLUTION Hreshatyk street was occupied on 30 November 2013 and is still occupied today. It has now been 7 months that only pedestrians have used the street. Kyiv’s traffic system and car flows operating without the use of Hreshatyk street. This phenomenon affected three different User groups, as described below.

COMPARISON OF STREET ACTIVITY

FOR PEOPLE

FOR CARS

1980

2013

WEEKDAY

FOR PEDESTRIANS 2013

WEEKDAY

1

FOR GATHERING EUROMAIDAN

SCALE DOWN area of stairs to minimum ADD slops for disable people

R t

SCALE DOW ADD slops for

CONCLUSION Users on the street a to follow the flow of t

1-1

SCENARIO PLANNING

FOR CARS

FOR PEOPLE

scenario 1 / 4 EVERY DAY / WINTER

scenario 2 EVERY NIGHT

scenario 3 FOR GATHERING

USERS TOURIST

CITIZEN

WORKER

TOURIST

CITIZEN

VISITORS

WORKER

food / drinks

leisure

entertainment

leisure

food / drinks

shopping

entertainment

leisure

shortest route to work place

food / drinks

cultural experience

long / walking route

shopping

NEEDS entertainment

businessman: During the time of Revolution the privately owned business represented on the street faced some changes. However, with the renewed attraction of tourists and citizens to the area, new kiosks and temporary sellers started to pop up

PROBLEM Hreshatyk street has 2 design int time this 3 little landscape, thi area. Partly some st complicate the 1 acce area. REPLACE stairs with ramps

car owners: Car owners had to come to terms with changes and adapt to new conditions Hreshatyk as a pedestrian street. Eight line road is closed and city is operating. pedestrians: During this time Hreshatyk street and Independence square became the symbol of freedom and honesty. Euromaidan gathered 1 million people on the area.

SCALE DOWN ADD slops for

2014

WEEKEND

1

architecture / sightseeing

14

INDEPENDENT SQUARE


CRITISISM OF URBAN DESIGN ON HRESHATYK STREET

2 1

3

SCALE DOWN area of stairs to minimum ADD slops for disable people

2 1

4

REPLACE stairs with ramps

SCALE DOWN area of stairs to minimum ADD slops for disable people

3

REMOVE design that blocks pedestrians route

4

REPLACE stairs with ramps

5

REMOVE design that blocks pedestrians route

IMPROVE design that blocks pedestrians route

2-2

OPEN access for people

5

1-1

IMPROVE design that blocks pedestrians route

2-2

1-1

OPEN access for people

HRESHATYK STREET

INDEPENDENT SQUARE

1-1

problem Hreshatyk street has design without pedestrian access . At the same time 2-2 this design intereferes with pedestrian 1-1 this routes. The area has little landscape, results in numerous staircases through STREET 2-2 HRESHATYK the area. Partly some staircases are also supported with ramps. Stairs complicate the access of disable people and cyclists through the area. conclusion Users on the street are surrounded by limits and borders. Design has to follow the flow of the people and support pedestrian requirements.

INDEPENDENT SQUARE

2 1

4

REPLACE stairs with ramps

SCALE DOWN area of stairs to minimum ADD slops for disable people

3

REMOVE design that blocks pedestrians route

2-2

OPEN access for people

5

1-1

IMPROVE design that blocks pedestrians route

2-2

1-1

INDEPENDENT SQUARE

HRESHATYK STREET

15


bus stop

cultural experience

food / drinks

entertainment

food / drinks

2

entertainment

EVERY DAY

food / drinks

SCENARIO basic

food / drinks

EVERY NIGHT

entertainment

cultural experience

EVERY DAY

food / drinks

1 leisure

food / drinks

retail

leisure

scenario 2

temporary parking

entertainment

food / drinks

retail

food / drinks

scenario 1

bus stop

entertainment

leisure

food / drinks

temporary parking

16

SCENARIO time change

WINTER


bus stop

food / drinks

skiing outdoor

food / drinks

retail

entertainment

retail

food / drinks

cultural experience

entertainment

cultural experience

4

long / walking route

retail

food / drinks

GATHERING

temporary parking

food / drinks

retail

food / drinks

SCENARIO density change

bus stop

entertainment

leisure

food / drinks

temporary parking

3

scenario 3 scenario 4

GATHERING SEASON CHANGE

SCENARIO seasonal change

WINTER

17


18


AGENT SCENARIO AGENT SCENARIO

AGENT SCENARIO

EXTEND extend

1/2 body

AGENT SCENARIO

VENTURE venture

1/2 body

1/2 body

SUPPORT support

1/2 body body

spreading direction

bridge assembling

SPREADING DIRECTION BULL ANT myrmeca sp.

MODUL working in four directions

BRIDGE ASSEMBLING

project: Ant bridge team: 2 people stage: built year: 2013 description: Project based on studying swarm behavior of ants. The size of the module and basic rules for assembling were taken from analysis of individuals ants.

19


20


SIMULATION perspective

plan

L 30

0

joints

start

bend / split 1

1

2

growth

end to the ground

2

1 1 L30

00

YY67 67

0

1 1

22

11

22

11

2 2

2 22 11 11 2

11 2 2

project: BBQ shelter idea development: 11 people digital simulation: 3 people assembly: 40 people (personal input at every stage of project) stage: built year: 2014 description: Task - analysis of pipe material perfomance. 5 groups (711 people) presenting one idea each. The winning idea was selected for construction. Project idea studied the branching system. Followed by digital simulation and construction.

21


22


ASSOCIATE ARCHITECT AB ZOTOV&CO

http://www.zotov.com.ua/en/ Zotov&Co is an architectural bureau in Kyiv / Ukraine with 24 staff. Projects in Ukraine and Russia.

23


24


project: Tower “Roshen” location: Ukraine / Kyiv team: 9 people stage: concept design description: Winner of invitational competition.

25


project: Landscaping of Hreshatyk street and Independence Square in Kyiv location: Ukraine / Kyiv team: 6 people stage: concept design description: project for Kyiv local authority

PROPOSITIONEXISTING

PROPOSITIONEXISTING

26

не додавати, не прикрашати, позбутися зайвого, під


project: “Furshet” shooping mall location: Ukraine / Kyiv team: 7 people stage: concept design and further construction development.

МЕТОД: ІСНУЮЧА СИТУАЦІЯ

ПРИБИРАННЯ! дтримувати порядок...

27


28


ORGANISER, DESIGNER,

GRAPHIC CO-ORDINATOR

OF WORKSHOP, DEVELOPER OF WORKSHOP BRIEF CANactions Is an international architectural youth festival that was first established in 2008. guides: movement ARCHITECTURE

towards

MODERN

- the field of the IDEAS exchange for architects, students of architecture higher education institutions, experts of the allied industries, representatives of authorities, business and the community - cultivation of better UNDERSTANDING OF ARCHITECTURE in Ukraine - EDUCATION of the general public on the way to integration of the Ukrainian architecture into the world one

29


30


years: 2011-2012 link: http://canactions.com

31

International Workshop ‘Kontraktova Square: Scenarios for Development’ link: http://issuu.com/ponomarova/docs/ brief__kontraktova_square_scenarios_ for_developmen Kiev ISLANDS Open International Urban Planning Competition link: www.competition-kievislands.com

NE

W

CONTEST FOR THE BES ARCHITECTURAL INFOGRAPHICS

events:

CANactions CANactions EVENTS EVENTS

WORKSHOPS

PRESENTATIONS OF YOUNG ARCHITECTS

NE

W

NE

W

CONTEST CONTEST FOR THEFOR BESTTHE BEST ARCHITECTURAL ARCHITECTURAL INFOGRAPHICS INFOGRAPHICS

NE

W

NE

INTERNATIONAL CONTESTS

W

CANactions EV

CONTEST CONTEST FOR THEFOR BESTTHE BEST ARCHITECTURAL ARCHITECTURAL MODEL MODEL

CONFERENCES

MASTER CLASSES and LECTURES

EXHIBITIONS

NE

WORKSHOPS WORKSHOPS

INTERNATIONAL INTERNATIONAL CONTESTS CONTESTS

COMPETITION COMPETITION FOR YOUNG FOR YOUNG ARCHITECTS ARCHITECTS

NE

CONFERENCES CONFERENCES

EXHIBITIONS EXHIBITIONS

MASTER MASTER CLASSESCLASSES PRESENTATIONS OF YOUNG and LECTURES and LECTURES ARCHITECTS

PARTIES PARTIES WORKSHOPS

ARCHITECTURAL INFOGRAPHICS

THURSDAYS THURSDAYS

W

CONTEST FOR THE BEST ARCHITECTURAL ARCHITOURS ARCHITOURS INFOGRAPHICS INTERNATIONAL CONTESTS

NE

PARTIES

NE

W

CANactions CONTEST FOREVENTS THE BEST PRESENTATIONS OF YOUNG PRESENTATIONS OF YOUNG ARCHITECTS ARCHITECTS

COMPETITION FOR YOU ARCHITECTS

W

CONTEST FOR THE ARCHITECTUR MODEL

W

CONTEST FOR THE BEST ARCHITECTURAL MODELFOR YOUNG COMPETITION ARCHITECTS

THURSDAY


mobile: 07876177143

e-mail: mariiakolodiazhna@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.