MARIJA ZDRAVKOVIĆ s e l e c t e d w o r k 2 0 1 2 - p r e s e n t
EXIBITION PAVILLION ass prof. Nenad Šekularac Revit 2014 Crveni krst, Beograd
THE GENESIS OF THE IDEA
PROGRAM
CONSTRUCTION
VERTICAL COMUNICATION
AXONOMETRY
ambients
FLOORS parking -2
parking -1
ground floor
first floor - exibition
second floor - exibition
roof
SECTIONS section 1
section 2
section 3
section 4
FACADES east facade
south facade
CONSTRUCTION OF THE ROOF axonometry of the roof construction
roof construction
STATIC CALCULATION OF THE BEAM parking -2
parking -1
ground floor
first floor - exibition
second floor - exibition
roof
STATIC CALCULATION OF THE DOME
theme mentor collabotation location program software year
EXIBITION PAVILLION FOR IT TECHNOLOGY ass prof. Zoran Stepanović Danilo Blagojević & Nikola Balanović Block 58, New Belgrade Exibition pavillion for IT technolog AutoCAD, Revit, Lumion, Photoshop 2014
1
2
3
4
4120 305
685
540
420
427
86
8.80
1008
460
87
2
15
21
3
440
30 4
nagib 0.5 %
2
-0.71
-0.61
0.00
+8.80
+8.80
+7.64
+7.64
-0.63
-0.63
0.00
+4.08
+4.08
+3.26
+3.26
0.00
-2.84 -9.414
-2.93
-8.37
-2.93
+0.00
+0.00
-0.51 -0.56
-0.51 -0.56
8.10
5
6
780
7
540
540
310
1 8.80 C
nagib 0.5 %
8.10
B
-0.51
1
7
6
5
4
3
2
1
+8.80
+7.64
0.00
-0.75
+4.08
+3.26
0.00 -0.70
+0.00 -0.51
-0.74
PROJECT DOCUMENTATION GROUND FLOOR 685
1
540
2
420
3
4
2465
770
120
418
120
2
28 11
15
395
34
185
48
120
166
15
619
157
45
120
218
575 06
06
P-10
P-08
-0.51
-0.51
-0.51
04
6
P-
121
15 2 10 10 15
06
651
34
253
100
253
-0.51
15
28 10
651
340
05
160
15
15
151
915
28
34
15
28
28 9
05
39
1217
-0.51
108
169
1035
158
P-07
04
28
1515
09
28 10 25
425
440
120
243
15
P-09 120
09
915
506
1210
117
28
207
85
04
15
10 15 10
272
941
06
28 10
396
2 44 2
120
1217
09
Rigips RB (RBI) gypsum board 12,5 mm Rigips RF (RFI) fireproof plaque 12,5 Rigips wall profile UW 75 - 06 mm Sound protection: isover mineral wool Fire protection: Isover mineral wool A class Rigips RF (RFI) fireproof board 12,5 Rigips RB (RBI) gypsum board 12,5 mm
03
Tiles 1cm Tile adhesive 1cm Hydro isolation 1cm Cement mortar 4cm Double foil 0,6cm URSA termal isolation XS N-III-L 14cm Hydro isolation 1cm Reinforced concrete slab 10cm Gravel 10cm
10
Rigips waterproofing gypsum board 12,5 mm Rigips RB (RBI) gybsum board 12,5 mm 2 x Rigips wall profile UW 75 - 06 mm Sound protection: isover mineral wool Fire protection: Isover mineral wool A class Rigips RB (RBI) gypsum board 12,5 mm Rigips RB (RBI) gypsum board 12,5 mm
11
04
Sika industrial floor 0.5cm Cement slate 10cm Hydro isolation 1cm Reinforced concrete slab 10cm Gravel 10cm
Flagstone 3cm Cement mortar 2cm Cement slate 4cm Hydro isolation 1cm Reinforced concrete slab + profiled sheet 12cm Subconstruction of a suspended ceiling Gypsum board 1.25cm
05
1 Rigips waterproofing gypsum board 2 x Rigips Duraline 12,5 VARIO (impregnated) 2 x Subconstruction Rigips wall profile UW 100 - 06 mm Sound protection: isover mineral wool Fire protection: Isover mineral wool A class 2 x Rigips Duraline 12,5 VARIO (impregnated) 1 Rigips waterproofing board
12
Tiles 1cm Cement mortar 2cm Cement slate 4cm Hydro isolation 1cm Sound protection 1cm Reinforced concrete slab + profiled sheet 12cm Subconstruction of a suspended ceiling Gypsum board 1.25cm
06
Rigips Duraline 12,5 mm VARIO Duraline 12,5 mm VARIO (impregnated) Rigips wall profile UW 100-06 Acoustics: mineral wool Rigips VARIO filler of joints Duraline 12,5 mm VARIO (impregnated) Rigips Duraline 12,5 mm VARIO
13
KINGSPAN roof panel 14cm Subconstruction for slope + m.k. Subconstruction of a suspended ceiling Fire protection 10cm Gypsum board 1,25cm
1 Rigips waterproofing gypsum board 2 x Rigips Duraline 12,5 VARIO (impregnated) 2 x Subconstruction Rigips wall profile UW 100 - 06 mm Sound protection: isover mineral wool Fire protection: Isover mineral wool A class 2 x Rigips Duraline 12,5 VARIO (impregnated) 1 Rigips waterproofing board
14
15
Flagstone 3cm Cement mortar 2cm Cement slate 4cm Hydro isolation 1cm Reinforced concrete slab + profiled sheet 12cm Subconstruction of a suspended ceiling Gypsum board 2 x 1,25cm Flagstone 3cm Cement mortar 6cm Hydro isolation 1cm Reinforced concrete slab + profiled sheet 12cm Subconstruction of a suspended ceiling Rigips gypsum board 3x1,25cm
901
Flagstone 3cm Cement mortar 3cm Cement slate 4cm Double foil 0,6cm URSA thermal isolation XS N-III-L 14cm Hydro isolation 1cm Reinforced concrete slab 10cm Gravel 10cm
120
02
120
Rigips RB (RBI) gypsum board 12,5 mm Rigips RF (RFI) waterproofing board 12,5 2 x Rigips wall profile UW 100 - 06 mm Sound protection: isover mineral wool Fire protection: Isover mineral wool A class Rigips RF (RFI) waterproofing gypsum board 12,5 Rigips waterproofing gypsum board 12,5 mm
120
08
120
Flagstone 3cm Cement mortar 3cm Cement slate 10cm Double foil 0.6cm Hydro isolation 1cm Reinforced concrete slab 10cm Gravel 10cm
22
01
120
120
2
07
68
26
3x17/30
04
3
26 11
08
P-11
445
445
157 34
15
120
120
460
05
251
15
10 28
28
384
28 223
05
28
10 28
05
GROUND FLOOR OZ. ROOM
O/m1
P/m2
floor facing wall facing ceiling facing
01 ENTRANCE
37.52
78.58
ceramics
plaster
plaster
02 EXIBITION
75.48
276.70 ceramics
plaster
plaster
03 HALLWAY
13.68
8.36
ceramics
plaster
plaster
04 WC - DISABLED
10.12
6.30
ceramics
plaster
plaster
05 WC - LADIES 06 WC - MALE
10.54
6.91
ceramics
plaster
plaster
17.42
11.31
ceramics
plaster
plaster
07 ELEVATOR
6.36
2.52
ceramics
plaster
plaster
21.03
26.29
ceramics
plaster
plaster
plaster
plaster plaster
08
WAEHOUSE
33.11
48.77
ceramics
10
THERMAL SUBSTATIONS 15.94
27.79
ceramics
plaster
11
AGREGATE
17.86
ceramics
plaster
09 AIR CHAMBER
16.8
plaster
NET AREA
511.39 m2
GROSS AREA
536.55 m2
34
780
540
5
34 6
503
1037
139
113
113
139
139
113
113
139
540
7
0
34
60
506
34
233
30
30
506
34
233
30
30
26
79
164
26
85
159 6 159
10
26
11 26
212
26
223
26
527
6
838
08
113
10
C 23 6 5
121
164
64
28 6 4
07
-06
P-05
P-04 113
09
03
113 09
1212
527
6
527
6
P-02 180
42
39
1626
23 6 511
34
233
30
30
34
233
30
30
A
108 108
506
-0.61
773
60
113
120
180
120
240
2
838
23 6 5
28
80 28 10
426
1673
3
01
113
198
34
838
-0.10
02
1716
23 6
120 120
42
108 108
240
120
2
1
23 6 5
28
80 28 10
746
B
60
P-01
0.00 12x17/30
778
1.5%
57
3x17/30
39
100
113
703
903
P-03
PROJECT DOCUMENTATION FIRST FLOOR
163
180
34
163
180
163
163
73
34
163
180
163
1455
103
10 12 12
103
10
180
100
180
100
26 11
395
68
26
P-14
6
79
6
08
10
426
115
09
150
4
420
34
28
73
73
74
34
3
540
163
75
75 6 218
2
180
6
75 66
163
115
6
73
35
6
64
34
144
64
2
685
224
26 6 2
1
305 64
160 26
6
34
651
34
506
10 26 17 7 10
1460
09
188
620
7
651
34
340
160
15
P-12 15
28
39
1348
154 1501
2 44
386
34
386
32 2
2
°
18
. 98
430
15 10
160
05
200
15 15
34
34
P-21
09
158
91
218 32 04
Sika industrial floor 0.5cm Cement slate 10cm Hydro isolation 1cm Reinforced concrete slab 10cm Gravel 10cm
05
1 Rigips waterproofing gypsum board 2 x Rigips Duraline 12,5 VARIO (impregnated) 2 x Subconstruction Rigips wall profile UW 100 - 06 mm Sound protection: isover mineral wool Fire protection: Isover mineral wool A class 2 x Rigips Duraline 12,5 VARIO (impregnated) 1 Rigips waterproofing board
06
Rigips Duraline 12,5 mm VARIO Duraline 12,5 mm VARIO (impregnated) Rigips wall profile UW 100-06 Acoustics: mineral wool Rigips VARIO filler of joints Duraline 12,5 mm VARIO (impregnated) Rigips Duraline 12,5 mm VARIO
07
1 Rigips waterproofing gypsum board 2 x Rigips Duraline 12,5 VARIO (impregnated) 2 x Subconstruction Rigips wall profile UW 100 - 06 mm Sound protection: isover mineral wool Fire protection: Isover mineral wool A class 2 x Rigips Duraline 12,5 VARIO (impregnated) 1 Rigips waterproofing board
11
Flagstone 3cm Cement mortar 2cm Cement slate 4cm Hydro isolation 1cm Reinforced concrete slab + profiled sheet 12cm Subconstruction of a suspended ceiling Gypsum board 1.25cm
12
Tiles 1cm Cement mortar 2cm Cement slate 4cm Hydro isolation 1cm Sound protection 1cm Reinforced concrete slab + profiled sheet 12cm Subconstruction of a suspended ceiling Gypsum board 1.25cm
13
KINGSPAN roof panel 14cm Subconstruction for slope + m.k. Subconstruction of a suspended ceiling Fire protection 10cm Gypsum board 1,25cm
14
Flagstone 3cm Cement mortar 2cm Cement slate 4cm Hydro isolation 1cm Reinforced concrete slab + profiled sheet 12cm Subconstruction of a suspended ceiling Gypsum board 2 x 1,25cm
15
Flagstone 3cm Cement mortar 6cm Hydro isolation 1cm Reinforced concrete slab + profiled sheet 12cm Subconstruction of a suspended ceiling Rigips gypsum board 3x1,25cm
826
Rigips waterproofing gypsum board 12,5 mm Rigips RB (RBI) gybsum board 12,5 mm 2 x Rigips wall profile UW 75 - 06 mm Sound protection: isover mineral wool Fire protection: Isover mineral wool A class Rigips RB (RBI) gypsum board 12,5 mm Rigips RB (RBI) gypsum board 12,5 mm
254
2
462
258
°
80
2
469
66
10
103
Tiles 1cm Tile adhesive 1cm Hydro isolation 1cm Cement mortar 4cm Double foil 0,6cm URSA termal isolation XS N-III-L 14cm Hydro isolation 1cm Reinforced concrete slab 10cm Gravel 10cm
170
03
2 21
Rigips RB (RBI) gypsum board 12,5 mm Rigips RF (RFI) fireproof plaque 12,5 Rigips wall profile UW 75 - 06 mm Sound protection: isover mineral wool Fire protection: Isover mineral wool A class Rigips RF (RFI) fireproof board 12,5 Rigips RB (RBI) gypsum board 12,5 mm
937
09
58
Flagstone 3cm Cement mortar 3cm Cement slate 4cm Double foil 0,6cm URSA thermal isolation XS N-III-L 14cm Hydro isolation 1cm Reinforced concrete slab 10cm Gravel 10cm
0°
02
10
Rigips RB (RBI) gypsum board 12,5 mm Rigips RF (RFI) waterproofing board 12,5 2 x Rigips wall profile UW 100 - 06 mm Sound protection: isover mineral wool Fire protection: Isover mineral wool A class Rigips RF (RFI) waterproofing gypsum board 12,5 Rigips waterproofing gypsum board 12,5 mm
°
08
.82
Flagstone 3cm Cement mortar 3cm Cement slate 10cm Double foil 0.6cm Hydro isolation 1cm Reinforced concrete slab 10cm Gravel 10cm
91
01
120
2
696
6
11
1277
28
64
28
6
28 10 25
P-13 64
15 15
4.08
108
180
93
58
3
09
218
150
64
2
34
902 6
150
64
24
26 11
146
150
729
P-
FIRST FLOOR OZ. ROOM
O/m1
P/m2 floor facing wall facing ceiling facing
12 EXIBITION
68.64
239.25 ceramics
plaster
plaster
13 OFFICE
48.35
127.98 ceramics
plaster
plaster
14 KITCHEN
17.46
18.83
ceramics
plaster
plaster
15 OFFICE
43.97
85.22
ceramics
plaster
plaster
16 CONFERENCE ROOM
21.26
25.63
ceramics
plaster
plaster
17 DIRECTOR'S OFFICE
17.2
16.45
ceramics
plaster
plaster
plaster
plaster
18 HALLWAY 19 LADIES WC
13.68
8.36
ceramics
10.54
6.91
ceramics
plaster
plaster
20 MENS WC
17.42
11.31
ceramics
plaster
plaster
21 ELEVATOR
6.36
2.52
ceramics
plaster
plaster
NET AREA
517.46 m2
GROSS AREA
550.89 m2
163
180
163
34
163
180
85
73
34
68
34
26 6 2
28 26
79
6
159
26
6
159
26
212
34
10
223
10
1214
C 6
325
170
90
79
64
6
64
509 10
33 10
09
180
352
133
5 93
P-17
460
09
180
14
10
49 10
10
08
P-19
09
-20
283
35
75
265
5
164
26
115
28
28
07
164
310 229
75
90
91
180
176
163
75
34
75
163
74
1
7
540
180
6
6
540 163
6
5
780 817
P-18
17 7 10
212
22
632
09
100
165
159 10
548 670
10
6
64
6
64
34
83
670
10
34
413 05
746
464
1673
2
941
2
941
28
28 10
05
223
6
64
6
64
A
1433
P-16 88
0.00
1
28
28
32
223 28 10
34
6
64
6
64
440
180 88
10
632 506
60
7 7 17 10
88
165 746
32
598
3
P-16
09
21
P-15
12x17/30
28
12x17/30
383
2.04
180
0.00 373
598
623
7
88
46
83
100
4.08
1193
B
10 31
10
10 35
10 35
10
26 20 26
10
244
26
100
26
169
49
238
100
100
186
12
PROJECT DOCUMENTATION
details
10
10 4
10 4
9.6
4
5
2
REBRO IPN 360
7
8
9
1.25 22.75 24
section 1-1 2
4
3
40
60
39 134
+8.06
95
20 35
74
39
13
+7.86
138
+7.46
09
200
338
338
09
11
14
18 1210
+3.64
207
886
+3.682
208
40
+4.08
05
09
202
200
419
09
140
101010 10
04
10 40
10 40
58 10 40
10
Section 3-3
108
31
02
-0.51
34
8 6
10
6
1
3
3.75
60
36
1
7
5
48.8
47.64
47.64
36 36
1.25 22.75
12 1 4 2 3 22
3
nagib 0.5%
2
REBRO IPN 360 1
REBRO IPN 360
4
9.6 5
Kamene ploče 3cm C. malter 2cm AB košuljica 4cm Zvučna izolacija 1cm AB ploča + prof. lim 12m Konstrukcija spuštenog plafona Gips-karton ploče 1.25cm
5
4
28.6
11
1
4 10
12
13 12
nagib 5°
9.6
nagib 5°
13
3 2
KINGSPAN krovni oanel 14cm Konstukcija za pad +MK konstrukcija spustenig plafona Protiv-požarna zastita10cm Gips karton 1.25cm
KINGSPAN krovni oanel 14cm Konstukcija za pad +MK + konstrukcija spustenig plafona Protiv-požarna zastita10cm Gips karton 1.25
18.8
9
7
3
Kamene ploče 3cm C. malter 3cm AB košuljica 4cm Dvostruka zastitna folija 0.6cm hidroizolacija 1cm AB ploča 10cm Šljunak 10cm
3
42
10 1 14
3.6
-0.61
10
pad 1.5 %
10
93 103
94
10
12 13
98.6
+3.44
-1.396
+340 +3.20 40
-1.796
45
5
-1.896
10
5
-0.455 62.92
144
10
30 120
45
7
6
+8.80 39
13
134
+7.64
95
+8.06 +7.70
338
09
338
472
+7.46
+4.98
+4.08
82
82
15
336
14
336
+4.08
+3.26
418
+3.26
-0.10 51
26 6
26
-0.61
104
106
144
50
1010
01
-1.40 10 40
0.00
10
10
9
-0.256
5
8
10
22
12
+3.86
8
7
+4.08
10
1.25 22.75 2.97 2.44 1.25 7.56 9.78
6
+0.036
4
26
1
11
7 6
2
8
36
36
REBRO IPN 360
56.25
+7.648
3
3.75
22
+7.70
2
12 1 4 2 3
12 13
Kamene ploče 3cm C. malter 6cm Hidroizolacija 1cm AB ploča + prof. lim 12cm Konstrukcija spuštenog plafona Gips-karton ploče 3x1.25cm
4
1 6 3
Kamene ploče 3cm C. malter 2cm AB košuljica 4cm Zvučna izolacija 1cm AB ploča + prof. lim 12m Konstrukcija spuštenog plafona Gips-karton ploče 1.25cm
3.75 10 10.27
+8.06
+7.46
1
+0.00
2 6
10
10
25.6 0.6 43 3
11
15.4
+8.80
-1.80 -1.90
PROJECT DOCUMENTATION
details
13
40 10
-1.896
10
-1.796
8
36
1
GREDA IPN 400 1
+3.40
12 1 6 3
22
10
15.3 1.4 6.7 2.5 11.4
22
12 1 4 2 3 20
20
2 40
7
-1.896
10
9
6
12 +3.86 +3.66
3.75
144.4
58 108
3
-1.796 10
4
6
Kamene ploče 3cm C. malter 2cm AB košuljica 4cm Zvučna izolacija 1cm AB ploča + prof. lim 12m Konstrukcija spuštenog plafona Gips-karton ploče 2x1.25cm
+4.08
5
13 4
-1.396
40
-1.396
Kamene ploče 3cm C. malter 2cm AB košuljica 4cm Zvučna izolacija 1cm AB ploča + prof. lim 12m Konstrukcija spuštenog plafona Gips-karton ploče 3x1.25cm
Kamene ploče 3cm C. malter 6cm Hidroizolacija 1cm AB ploča + prof. lim 12m Konstrukcija spuštenog plafona Gips-karton ploče 3x1.25cm
10
4 3
94.4
10
11
-0.51
10 10 1 4 5.5 0.5
10
Silka industriski pod 0.5cm Cementna košuljica 5.5cm AB košuljica 4cm Hidroizolacija 1cm AB ploča 10cm
0.00
14 0.6 4 3 3 1 25.6
1
Kamene ploče 3cm C. malter 3cm AB košuljica 4cm Dvostruka zastitna folija 0.6cm Hidroizolacija 1cm AB ploča 10cm Šljunak 10cm
10
2
1
11
+3.20
section 1-1 A
B
nagib 5°
13
+7
1088
14
+
+3
02
48
1136
05
Section 1-1
02
0
3 1
11
10 1 4 5.5 0.5
+4.08
-0.455
1 4
-0.61
pad 1.5 %
IPN 200 9
6
+3.26
-1.396
7
40
8 5
108
10
1
26
10
-1.396
40
11
58
20
10
12 15.3
1.7 2.5 11.1
10
3
2 3 -0.51
10
2
4
22
2
Kamene ploče 3cm C. malter 6cm Hidroizolacija 1cm AB ploča + prof. lim 12m Konstrukcija spuštenog plafona Gips-karton ploče 3x1.25cm
12 1 6 3
-0.61
Silka industriski pod 0.5cm Cementna košuljica 5.5cm AB košuljica 4cm Hidroizolacija 1cm AB ploča 10cm Kamene ploče 3cm C. malter 2cm AB košuljica 4cm Zvučna izolacija 1cm AB ploča + prof. lim 12m Konstrukcija spuštenog plafona Gips-karton ploče 2x1.25cm
22
-1.796 10
-1.796 -1.896
-1.896
10
pad 1.5 %
Silka industriski pod 0.5cm Cementna košuljica 5.5cm AB košuljica 4cm Hidroizolacija 1cm AB ploča 10cm
3.75 10
1
-0.51
5 23
1.51
section 2-2 B
115
40 20 40
7.46
+7.64
60
+7.64
7 19 34
123
+8.80
nagib 5°
129
13
42
24
16
nagib 5°
24
+8.80
nagib 5°
C
67
A
C
+7.46
357
338
338 60
82
20 18 22
53
+4.08
15
+3.64
7
82
+3.26
+4.08
399
11
399
+4.08
22
15
910
+4.08
338
338
338
459
05
+3.26
05
06
05
387
459
326
326
408
3.26
21
1010 59
-1.40
50
58 98 10 40
-0.61
1.5 %
108
31
101016 59
Presek 2-2
10
10 40
-1.80 -1.90
-0.51
50
10 10 26
46
94
-1.40
134 10
46
04
-0.61 -0.66
101011
+0.00
0.00
-1.80 -1.90
theme PARAMETRIC SPATIAL STRUCTURES mentor full prof. Miodrag Nestorović year 2016 location Belgrade fair program public space, culture, comercial software Rhino 5 + Grasshopper, AutoCAD 2015, Photoshop
GENESIS OF IDEA
concept idea
the essence of the idea
realization of the idea
STUDY OF FORMING ASPECTS
space without activities entrance
attractors / obstacles range of action communication without obstacles communication with obstacles adding attractors / obstacles communication without obstacles space of specific activity separation of the communication zone and the specific activity zone zoning communication without obstacles space of specific activity mapping positions with activities defining activities from an obstacles
communication without obstacles space of specific activity outdoor activities outdoor and indoor activities
indoor activities
primary communication secondary communication tertiary communication paths
METHODOLOGY
definition for Grasshopper. Attractor points. Grid spreading
definition for Grasshopper. Attractor points. Grid distortion
alternatives
AXONOMETRY OF EVOLUTION
SPATIAL PROGRAM STUDY
entertainment education relaxation
2. openspace amphitheater
5. playground
3. cultural center
8. box office
6. restaurant 7. skate park
PROGRAM SCHEME
relaxation
overhang relaxation ramp
amphytheater view cultural centar conference room
access
museum exibition space
playground (5-7)
exibition space
playground (7-12) for parents
great view
relaxation
restaurant caffee skate park equipment
relaxation adrenalin parc
extreme polygon
box office
SECTIONS
view 1. 1:500
view 3. 1:500
view 4. 1:500
GROUND FLOOR
ground floor 1:500
SITE PLAN
site plan 1:500
view 2. 1:500
PERSPECTIVE
CONSTRUCTION construction
PROJECT DOCUMENTATION 1:200 box office
roof detail
Slanted roo
box office conference room administration 15 employed -
section
Hikin Hiking trails in
first floor
ground floor
of with tilt 15-45 with slippery system ng trails in urban areas, tiled n urban areas, with networking paving -
PROJECT DOCUMENTATION 1:200 cultural center
_ the library _ room for lectures - conference room _ administration _ multifunctional space on thefloor _ cultural content _ capacity of up to 150 seats _ capacity less than 100 places _ 20 employees
section
section
section restaurant
multifunctional space _ café _ a restaurant _ administration _ kitchen _ Suitable for smaller concerts _ capacity up to 30 tables _ capacity for 120 people _ weekend space is used as a club _ employed up to 20 people _
section
section museum
Museum entrance part with port conference room administration toilets stock 15 employees -
ground floor
first floor
section
section
section public toilet / warehouse
public toilet - capacities Women: 4 closed cabins men: 1 closed cabin and 3 urinals 1 disabled toilet changing room for diapers room for cleaners with a triangle bicycle storage and other accompanying equipment for entertainment warehouse for plant maintenance machines 5 employees -
ground floor