INDEX
1/99
GROUPE SCOLAIRE CAMILLE CLAUDEL / BONDY / FRANCE / 2019 SCHOOL COMPLEX CAMILLE CLAUDEL / BONDY / FRANCE / 2019 -
2
57 LOGEMENTS COLLECTIFS / NANTES / FRANCE / 2019 SCHOOL COMPLEX CAMILLE CLAUDEL / BONDY / FRANCE / 2019 -
6
ÉTUDE DE FAISABILITÉ / CHAMPIGNY-SUR-MARNE / FRANCE / 2020 FEASIBILITY STUDY / CHAMPIGNY-SUR-MARNE / FRANCE / 2020
10
RÉHABILITATION DE 84 LOGEMENTS COLLECTIFS / FRANCE (94) / 2018 / CONCOURS COLLECTIVE HOUSING RENOVATION / FRANCE (94) / 2018 / COMPETITION
12
RÉHABILITATION DE 108 LOGEMENTS COLLECTIFS / FRANCE (78) / 2017 -... COLLECTIVE HOUSING RENOVATION / FRANCE (78) / 2017 -...
18
MAISON PRIVÉE / 2012 / 2018 / PROJET PERSONNEL SINGLE FAMILY HOME / 2012 / 2018 / PERSONAL PROJECT
22
AMENAGEMENT D’UNE MAISON DE SANTE PLURIDISCIPLINAIRE / FRANCE (45) / 2017 / CONCOURS HEALTHCARE CENTER EXTENSION / FRANCE / 2017 / COMPETITION
28
VILLAGE MODERNIZATION / FINAL THESIS / ENSAPLV 2016 MODERNISATION DU VILLAGE / PFE / ENSAPLV / 2016
32
PROJET D’AMÉNAGEMENT DE LA ZAC BERCY-CHARENTON (75) / ENSAPLV / 2016 DEVELOPMENT OF THE CHARENTON-BERCY SITE (75) / ENSAPLV / 2016
42
CHAISE / ANTONHOUSE / RUSSIE / 2015 / ARCHPOLE CHAIR / ANTONHOUSE / RUSSIA / 2015 / ARCHPOLE
44
TABLE / ANTONHOUSE / RUSSIE / 2015 / ARCHPOLE TABLE / ANTONHOUSE / RUSSIA / 2015 / ARCHPOLE
48
COMMODE / ANTONHOUSE / RUSSIE / 2015 / ARCHPOLE DRESSER / ANTONHOUSE / RUSSIA / 2015 / ARCHPOLE
49
DIMAFLAT / MOSCOU / RUSSIE / 2014 / ARCHPOLE DIMAFLAT / MOSCOW / RUSSIA / 2014 / ARCHPOLE
50
POUF / ANTONHOUSE / RUSSIE / 2015 / ARCHPOLE BEAN BAG CHAIR / ANTONHOUSE / RUSSIA / 2015 / ARCHPOLE
58
SECONDFRIENDSTORE SHOWROOM / MOSCOU / RUSSIE / 2014 / ARCHPOLE SECONDFRIENDSTORE SHOWROOM / MOSCOU / RUSSIE / 2014 / ARCHPOLE
60
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / ESPAGNE / 2014 WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / SPAIN / 2014
66
TRANSFORMATION DE L’ESPACE SOUS UN PONT EN UN PARC / YAROSLAVL / RUSSIE / 2014 / CONCOURS TRANSFORMATION OF THE UNDERBRIDGE AREA INTO A PARC / YAROSLAVL / RUSSIA / 2014 / COMPETITION
72
PFE / MOSCOU / RUSSIE / 2013 GRADUATION PROJECT / MOSCOW / RUSSIA / 2013
77
LA MODERNISATION ET LA RECONSTRUCTION DU TERRITOIRE DE STATION ÉLECTRIQUE / MOSCOU / RUSSIE / 2012 MODERNIZATION AND RECONSTRUCTION OF THE POWER STATION / MOSCOW / RUSSIA / 2012
88
UNITÉ INDUSTRIELLE / RUSSIE / 2010 MULTIPURPOSE INDUSTRIAL WORKSHOP / RUSSIA / 2010
94
STADE DE FOOTBALL / GROZNY / RUSSIE / 2011 FOOTBALL STADIUM / GROZNY / RUSSIA / 2011
95
BAR DANS LA PRARIE / NIKOLA-LENIVETS / RUSSIE / 2012 A BAR IN A MEADOW / NIKOLA-LENIVETS / RUSSIA / 2012
96
CABINES DE PEAGE / RUSSIE / 2010 TOLL BOOTH / RUSSIA / 2010
97
FABRICATION DE MAQUETTES / MOSSCOU / RUSSIE / 2010 MODEL MAKING / MOSCOW / RUSSIA / 2010
98
2/99
Maîtrise d’ouvrage: VIlle de Bondy Maître d’œuvre: GAËTAN LE PENHUEL Architectes AMO: Exprimme Bureau d’études Structure / CVC / VRD / Elec : TPF-I DECEMBRE 2019 Bureau d’études Acoustique: Général acoutics Bureau d’études: Environnemental: Etamine Bureau d’études SSI: Casso Bureau d’études Cuisiniste: Convergence Économiste: ICTEC Paysagiste: Florence GUIN Surface: 4 901 m² Année: 2019 -
GROUPE SCOLAIRE CAMILLE CLAUDEL A B
Statut: DCE
GROUPE SCOLAIRE CAMILLE CLAUDEL / BONDY / FRANCE / 2019 -
3/99
BONDY RÉUNION DE PRÉSENTATION APS
Programme:
Construction d’un groupe scolaire de 29 classes et de locaux mutualisés
SCHOOL COMPLEX CAMILLE CLAUDEL / BONDY / FRANCE / 2019 -
4/99
GROUPE SCOLAIRE CAMILLE CLAUDEL / BONDY / FRANCE / 2019 -
5/99
LOCAUX ÉLEMENTAIRES TYPE 2
VUE 3D
LES LOCAUX D’ENSEIGNEMENT ET DE PÉRISCOLAIRES
SCHOOL COMPLEX CAMILLE CLAUDEL / BONDY / FRANCE / 2019 -
6/99
ISE D'OUVRAGE
Programme: MO DELEGUEE
MAITRISE D'OEUVRE
ANTES TALENSAC COVIVIO DEVELOPPEMENT GAËTAN LE PENHUEL enue Kleber 30 Avenue 23 rue de Cléry dont • Kleber 57 logements collectifs PARIS 75016 PARIS 75002 Paris
•
ECONOMISTE
:
VAUBAN INGENIERIE 130logements rue Thiers 92100 24 en Boulogne Billancourt
BET VRD
BE Structure
TRIBU ENERGIE INGEBAT 140-142 3 ruelibre d'Enfer social et rue 33 du en accession Chevaleret 75013 Paris 44000 Nantes
2 surfaces commerciales à rez-de-rue totalisant près de 285m², livrées en coque vide et traitées en ERP de 5ème catégorie.
•
un parc de stationnement de 32 places sur un niveau enterré
•
locaux d’accompagnement réglementaires (locaux OM/vélos...).
57 LOGEMENTS COLLECTIFS / NANTES / FRANCE / 2019 -
NANTES - Allée des Tanneurs/Rue Moquechien Construction d'une opération de 57 logements, de locaux d'activités et d'un parking
7/99
Maîtrise d’ouvrage: SNC NANTES TALENSAC Maîtrise d’ouvrage déléguée: COVIVIO Maîtrise d’œuvre: GAËTAN LE PENHUEL Architectes Bureau d’études Structure: INGEBAT Bureau d’études VRD: TRIBU ENERGIE Surface: 4 306 m2 SDP Année: 2018 -
Statut: APS
DEMANDE DE PERMIS DE CONSTRUIRE Vue Nord - Ouest depuis rue Jeanne d'Arc
date : 05/03/2020 échelle :
PC-06.1.2 ind.: A
COLLECTIVE HOUSING / NANTES / FRANCE / 2019 -
8/99
MAITRISE D'OUVRAGE
MO DELEGUEE
MAITRISE D'OEUVRE
SNC NANTES TALENSAC COVIVIO DEVELOPPEMENT GAËTAN LE PENHUEL 30 Avenue Kleber 30 Avenue Kleber 23 rue de Cléry 75116 PARIS 75016 PARIS 75002 Paris
ECONOMISTE
BET VRD
BE Structure
VAUBAN INGENIERIE 130 rue Thiers 92100 Boulogne Billancourt
TRIBU ENERGIE 140-142 rue du Chevaleret 75013 Paris
INGEBAT 3 rue d'Enfer 44000 Nantes
57 LOGEMENTS COLLECTIFS / NANTES / FRANCE / 2019 -
NANTES - Allée des Tanneurs/Rue Moquechien Construction d'une opération de 57 logements, de locaux d'activités et d'un parking
9/99 Cette parcelle constitue une opportunité rare de construire dans le centre de Nantes, à proximité du secteur sauvegardé, du Monument Charles de Gaulle, de la Préfecture, du marché Talensac et de l'Erdre notamment. Le contexte bâti proche est assez varié avec l'adossement à un bâtiment tertiaire à R+4 des années 70 donnant sur l'allée des Tanneurs, et en face d'un petit îlot faubourien bas à R+2 donnant sur la rue Moquechien. L'opération vient ainsi s'intercaler entre plusieurs époques et plusieurs hauteurs de constructions du centre-ville. L'objectif est de s'y intégrer de façon délicate, tout en affirmant l'aspect contemporain de la construction. Pour se faire, les nouvelles constructions gardent les proportions du tissu urbain environnant du point du vue des volumes et des formes architecturales et dimensions à l’échelle d’un quartier. La hauteur du RDC s'adapte à celle du bâtiment voisin afin d'assurer l'insertion harmonieuse dans l'ensemble urbain. Afin de participer à la création d'une identité architecturale du quartier, nous traitons des façades métalliques perforées sur rue. Sur la venelle et en coeur d'îlot un traitement différencié des façades revêtues d'un enduit de teinte gris moyen permet un dialoque architectural entre la rue et le jardin.
DEMANDE DE PERMIS DE CONSTRUIRE
date : 05/03/2020
Vue Nord-Est depuis la place du Pont Morand
échelle :
PC-06.1.1 ind.: A
COLLECTIVE HOUSING / NANTES / FRANCE / 2019 -
10/99 R+4
R+5
R+4
R+5
R+5
R+5
R+4 R+5
R+4
R+5
R+4 R+4
R
R+
N
R+6
R+4
R+5
R+6
R+6 R+5
R+5
R+5
R+5
R+4
Cr
Ru e
Ru e
de
de
o
R+4 t iza
t e ois roiza br C Am ise ue bro n e m Av e A u n e Av
R+6 Be rn aü
R+5 R+5 e Av
R+4
R+6
R+5
Av
R+5
Am
br
br
o
o
ise
Cr
oiz
oiz
at
at
R+6 R+6
R+4
c
Be rn aü
en
ue
Am
Cr
R+4
R+5
c
n
ue
ise
R
R+5 R+5
R+6
R+6 R+5
R+2
R+5
R+6
R+6
R+2
R+5
R+5
R+6 R+5 R+4
20,19
10 +23.00
5 R+5 7 Toiture R+4 64R+6 R+3 53R+5 R+2 42R+4 R+1 31R+3
17,58
20 R+2 RDC
17,58
R+5
20,19 R+2
R+6
R+4
AXONOMETRIE (2) 1:1000 AXONOMETRIE (2) 1:1000
Emprise au sol / CES
15,80
Emprise au sol / CES Programme
15,80 SS1
1 R+1 -1 SS1
AXONOMETRIE (2) 1:1000
--parking sur 2 niveaux stationnement existant supprimé R+6 - stationnement existant supprimé
Hauteur MAX
R+5
15,80
- coeur d'îlot en pleine terre + totalité des toitures vég
E 17,58 en pleine terre 15,80 + totalité des toitures 7 Toiture --coeur d'îlot végé parking sur 2 niveaux R+6
37,23
R+5
R+5
17,58
Hauteur R+6MAX
5 limite de parcelle limite de parcelle
7 Toiture
37,23
5
+23.00
AXONOMETRIE (2) 1:1000
SS1
R+6
SS2
limite de parcelle limite de parcelle
SS1 R+6 - parking sur 2 niveaux -1 SS1
- stationnement existant supprimé
-2 SS2
Champigny-sur-Marne
METRIE (2) 1:1000
Parcelle 314 Rue de Bernaü / Avenue Ambroise Croizat
Champigny-sur-Marne
Parcelle 314 Rue de Bernaü / Avenue Ambroise Croizat
4 337 m2 / 34%
Emprise au sol / CES
7 Toiture 6 R+6 5 R+5 4 R+4 3 R+3
2 R+2 'OUVRAGE :
'OUVRAGE : 1 R+1
harron 75008 Paris
harron 75008 Paris
0 RDC
Avenue Ambroise Croizat Avenue Ambroise Croizat
Programme - coeur d'îlot en pleine terre + totalité des toitures végétaliséeS Type d'habitat 7 Toiture SS2
0-2RDC SS2
76Toiture R+6 65R+6 R+5
R+5 75Toiture
H R+3 53R+5
4 logements 337 m2 / 34%
CATELLA 72, rue 3Pierre R+3Charron 75008 Paris
23 rue de Cléry 75002 Paris
S
Hypothèse 02 DENSITE IMPORTANTE R+6
2.0
Étude de faisabilité 2.0
252 logements/ha
Hypothèse 02 DENSITE IMPORTANTE
252 0.5logements/ha 0.5 3 190 m2
Type d'habitat
habitat collectif
SNombre total Terrasses végétalisées total de logements dalle/toit
2 3 ≈190 328m
TypeSS1 de bloc Hauteur SS1 moyenne
îlot ouvert
1 R+1 0 RDC
Nombre Nombretotal totalde delogements places de parking
≈ ≈328 351
Nombre total de places de parking
≈ 351
Hauteur maximale
R+6
Densité bâtie
2.0
MAITRISE D'OEUVRE : Coefficient de biotope
Étude de faisabilité 0.5
GAËTAN LE PENHUEL Étude de 02 faisabilité MAITRISE D'OEUVRE : Hypothèse DENSITE S total Terrasses végétalisées dalle/toit 3 190 m2 23 rue de Cléry 75002 Paris
IMPORTANTE Hypothèse 02 DENSITE IMPORTANTE ≈ 328
GAËTAN LE PENHUEL 23 rue de Clérytotal 75002 de Parislogements Nombre
ÉTUDE DE FAISABILITÉ / CHAMPIGNY-SUR-MARNE / FRANCE / 2020 Nombre total de places de parking ≈ 351
SURFACE DE PLANCHER
20 711 m2
SURFACE HABITABLE
19 675 m2
S
COUPE C (2)1:500
GAËTAN LE PENHUEL 23 rue de Cléry 75002 Paris
Densité résidentiel Coefficient de biotope
N
N -2 SS2
Coefficient de biotope S total Terrasses végétalisées dalle/toit
Densité résidentiel
0-2RDC SS2
R+5 Étude de faisabilité R+6
2 R+2 1 R+1
-2 SS2
S
-1 SS1
logements
COUPE C (2)1:500 252 logements/ha COUPE C (2)1:500
C
1 R+1 -1 SS1
îlot ouvertCOUPE C (2)1:500 R+5
MAITRISE D'OEUVRE : Densité bâtie DensitéGAËTAN résidentiel LE PENHUEL
-1 SS1 -2 SS2
D
20R+2 RDC
Type de bloc Hauteur moyenne
maximale Densité bâtie PLAN Hauteur DE MASSE (2) 1:1000
R+5
D
R+1 4 337 m2 / 34%31R+3
habitat collectif îlot ouvert
4 R+4D'OUVRAGE : MAITRISE 3 R+3
0 RDC -1 SS1
H
R+2 42R+4
Type Typed'habitat de bloc SS1
54R+5 CATELLA R+4 72, rue Pierre Charron 75008 Paris
T
T
R+4 64R+6
logements habitat collectif
Hauteur moyenne MAITRISE D'OUVRAGE : MAITRISE D'OEUVRE : Hauteur maximale
2 R+2
P
6 R+6
Programme
-1 SS1 -2 SS2
Avenue Ambroise Croizat Croizat Avenue Ambroise
10
6 R+6
c
R+1
limite de parcelle limite de parcelle
c
SURFACE DE PLANCHER SURFACE DE PLANCHER SURFACE HABITABLE SURFACE HABITABLE
20 711 m2 20 711 m2 2 19 675 m 19 675 m2 PHASE :
EMET. :
PHASE : CRS
EMET. : GLP
CRS
GLP
ECH
ECH : 1:1000, 1:501 1:1000, 1:500
iture
6
5
4
3
2
s
1
DC
S1
S2
R+6
R+4
R+6
R+5
R+4
R+6
R+5 R+6 R+4 R+5 R+4
R+4
R+5
R+4
R+4 R+4
N
R+6
R+5
R+6
R+6
R+5
R+6
R+6 R+4
R+6
Ru e
Ru e
de
de
Be rn aü
R+6
A
R+5
R+5 R+4
R+4 at oiz Cr t e ois iza br Cro Am ise ue bro n e m Av e A u n ve
R+5 R+5
e Av
R+4
c
R+6
R+5
Av
R+5
c
n
en
ue
ue
Am
Am
br
br
o
ise
o
ise
Cr
Cr
oiz
oiz
at
at
R+5
R+6
R+5 c
R+6
R+6
R+4 R+1 R+4 R+1
R+5 R+5
R+6
R+6
R+6
R+2
R+5
R+6
R+6 R+5
R+2
R+5
coeur d'îlot e -- stationnemen
R+4 AXONOMETRIE (3) 1:1000
R+1
5 R+5 7 Toiture 4 6 R+4 R+6 3 5 R+3 R+5 2 4 R+2 R+4
R+2 02RDC
17,58
limite de parcelle limite de parcelle
+23.00
20,19 5
17,58
Hauteur MAX
10
6 R+6
37,23
R+2
R+5
R+6
37,23
R+6
R+4
R+5 AXONOMETRIE (3) 1:1000
R+6 - stationnement existant supprimé
AXONOMETRIE (3) 1:1000
Emprise au sol / CES
15,80
Emprise au sol / CES Programme
15,80 SS1
Programme
SS1
SS1
R+6 -2 SS2
SS2
- stationnement existant supprimé Champigny-sur-Marne
Parcelle 314 Rue de Bernaü / Avenue Ambroise Croizat
Champigny-sur-Marne
Parcelle 314 Rue de Bernaü / Avenue Ambroise Croizat
Emprise au sol / CES Programme
Avenue Ambroise Croizat Avenue Ambroise Croizat
R+6
- parking sur 2 niveaux
7 Toiture 6 R+6 6 R+6 5 R+5
Hauteur maximale Densité bâtie PLAN DE MASSE (3) 1:1000 MAITRISE D'OEUVRE : Densité bâtie Densité résidentiel GAËTAN LE PENHUEL
CATELLA 72, rue Pierre Charron 75008 Paris 3 R+3
logements
2.2
-2 SS2
COUPE C (3)1:500
COUPE C (3)1:500 Densité résidentiel 285 logements/ha Étude de faisabilité MAITRISE D'OEUVRE : Coefficient de biotope 0.5 max GAËTAN LE D'OEUVRE PENHUEL Étude de faisabilité MAITRISE : Hypothèse 03 FORTE DENSITE 23 rue de Cléry 75002 Paris 2 GAËTAN LE PENHUEL S total Terrasses végétalisées dalle/toit03 FORTE 3 280 m Hypothèse DENSITE
Nombre total de logements
≈ 370
Nombre total de places de parking
≈ 391
SURFACE DE PLANCHER
23 362 m2 2
285 logements/ha
2850.5 logements/ha max
≈ 391
Densité bâtie
SURFACE DE PL
Hypothèse 03 FORTE DENSITE
Nombre total de places de parking
-1 SS1 -2 SS2
23 rue de Cléry 75002 Paris
23 rue de Cléry 75002 Paris
Densité résidentiel Coefficient de biotope
≈ 370 ≈ 391
R+5
Nombre total de p SURFACE HABIT
2.2
Nombre total dede logements Nombre total places de parking
0 RDC -1 SS1
-1 SS1
Étude de faisabilité 2.2
3 280 m2 ≈ 370
îlot ouvert
0 RDC -2 SS2
SURFACE HABIT
S total Terrasses dalle/toit Nombre total végétalisées de logements
TypeSS1 de bloc SS1 SS2 moyenne Hauteur SS2 Hauteur maximale
Nombre total devé p S total Terrasses
Nombre total SURFACE DEdePLlo
COUPE C (3)1:500
0.53max 280 m2
habitat collectif
1 R+1
Hypothèse 03 FORTE R+6 DENSITE
Coefficient de biotope S total Terrasses végétalisées dalle/toit
Type d'habitat
SDensité total Terrasses vé résidentiel Nombre total Coefficient dede biolo
2 0 R+2 RDC
R+5R+6 Étude de faisabilité
2 R+2 1 R+1 1 R+1 0 RDC
R+6
2 4 R+2 R+4
îlotR+5 ouvertCOUPE C (3)1:500 -2 SS2
GAËTAN LE PENHUEL 23 rue de Cléry 75002 Paris
Hauteur Type de maximale bloc Densité bâtie Hauteur moyenne
Densité Hauteurrésidentiel maximale PLAN DE MA Coefficient de bio Densité bâtie
R+3 4 823 m2 / 37%13 R+1
4 823 m2 / 37% logements
Type de bloc Programme Hauteur moyenne Type d'habitat
PLAN DE
3 5 R+3 R+5
Type de bloc SS2 Hauteur moyenne
4 R+4 D'OUVRAGE : MAITRISE 3 R+3
4 823 m / 37%
4 6 R+4 R+6
habitat collectif îlot ouvert
5 R+5 CATELLA 4 R+4 72, rue Pierre Charron 75008 Paris
2 R+2
5 7 R+5 Toiture
Type d'habitat Type de bloc SS1
Hauteur moyenne MAITRISE D'OUVRAGE : MAITRISE D'OEUVRE : Hauteur maximale
2
6 R+6
-1 SS1 logements habitat collectif
Type d'habitat 7 Toiture SS2 terre divisé + totalité des toitures SS2 - coeur d'îlot en pleine végétalisées 0 RDC -2 SS2 -1 SS1
Emprise au sol / C
Type d'habitat 17,58 15,80divisé + totalité des toitures Emprise au sol / C 7 Toiture - coeur d'îlot terre végétalisé - parking suren2 pleine niveaux R+6
R+5
17,58
1 R+1 -1 SS1
AXONOMETRIE (3) 1:1000
- parking sur 2 niveaux - stationnement existant supprimé
Hauteur MAX R+5
15,80
Programme - coeur d'îlot en pleine terre divisé + totalité des toitures végétal Avenue Ambroise Avenue Ambroise Croizat Croizat
+23.00 7 Toiture
1 3 R+1 R+3
20,19 5
- parking sur 2
- stationnemen
limite de parcelle limite de parcelle
10
R+4
- parking sur 2
c
R+5
R+4
- coeur d'îlot e
R+5
R+6
c
c
R+6
R+5
Be rn aü
limite de parcelle limite de parcelle
000
11/99
SURFACE DE PLANCHER SURFACE DE PLANCHER SURFACE HABITABLE SURFACE HABITABLE
23 362 m2 23 362 m2 2 22 194 m 22 194 m2 PHASE : PHASE : CRS
EMET. : EMET. : GLP
ECH : ECH : 1:1000, 1:500 1:1000,
CRS GLP 1:500 FEASIBILITY STUDY / CHAMPIGNY-SUR-MARNE / FRANCE / 2020
DATE
DATE : 15/01/20 15/01/2020
12/99
VUE DEPUIS LA RUE MARIUS DELCHER. PROJET.
COLLECTIVE HOUSING RENOVATION / FRANCE (94) / 2018 / COMPETITION
13/99 Programme: - Amélioration de la performance énergétique BBC Rénovation - ITE des façades - Réfection de l’étanchéité toiture - Remplacement des menuiseries extérieures - Réfection des pièces humides - Remise aux normes de sécurité. - Mise en conformité des installations électriques. - Protection contre les chutes. - Amélioration du bâtiment et de l’accessibilité. - Ttraitement des façades. - Amélioration de l’environnement extérieur et du cadre de vie. - Amélioration de l’attractivité commerciale
Maître d’ouvrage: EMMAUS Habitat Maître d’œuvre: Cuadra Architecture Bureau d’études techniques: L’ARCHE Entreprise générale: GBR Année: 2018 Statut: Concours
RÉHABILITATION DE 84 LOGEMENTS COLLECTIFS / FRANCE (94) / 2018 / CONCOURS
14/99
VUE DEPUIS LA RUE DU PETIT CHATEAU. EXISTANT.
ESPACES COMMUNS. HALL A.
COLLECTIVE HOUSING RENOVATION / FRANCE (94) / 2018 / COMPETITION
15/99
VUE DEPUIS LA RUE DU PETIT CHATEAU. PROPOSITION.
ESPACES COMMUNS. HALL B.
RÉHABILITATION DE 84 LOGEMENTS COLLECTIFS / FRANCE (94) / 2018 / CONCOURS
16/99
COLLECTIVE HOUSING RENOVATION / FRANCE (94) / 2018 / COMPETITION
17/99
TRAITEMENT PAYSAGÉ
LES GARDE-CORPS EXISTANTS.
LES GARDE-CORPS EN VERRE TRANSLUCIDE PROGRESSIF. PROJET.
RÉHABILITATION DE 84 LOGEMENTS COLLECTIFS / FRANCE (94) / 2018 / CONCOURS
18/99
COLLECTIVE HOUSING RENOVATION / FRANCE (78) / 2017 -
Programme: - Amélioration de la performance énergétique HPE Rénovation - ITE avec retour sur acrotère - Réfection de l’étanchéité toiture - Isolation des sous-faces des bow-windows - Isolation des planchers bas du passage couvert - Mise en place d’une bande stérile - Remplacement des menuiseries extérieures - Réfection des pièces humides - Remise aux normes de sécurité. - Mise en conformité des installations électriques. - Protection contre les chutes. - Amélioration du bâtiment et de l’accessibilité. - Ttraitement des façades. - Amélioration de l’environnement extérieur et du cadre de vie. - Amélioration de l’attractivité commerciale
Maître d’ouvrage: EFIDIS Maître d’œuvre: Cuadra Architecture Bureau d’études techniques: BeA Groupe Pingat Entreprise générale: GTM Bâtiment Année: 2017 Statut: En cours
RÉHABILITATION DE 108 LOGEMENTS COLLECTIFS / FRANCE (78) / 2017 -
19/99
FAÇADE PROJETÉE
20/99
retour d'isolant polyuréthane sur acrotère
retour d'isolant polyuréthane sur acrotère
garde-corps autoporteur posé sur étanchéité
garde-corps autoporteur posé sur étanchéité
Couvertine alu laqué blanc 15/10e fixée sur tire-fond
pare-vapeur collé sur support béton
pare-vapeur collé sur support béton
isolant ep=120mm polyuréthane lambda = 0,023 W/m.K
Couvertine alu laqué blanc 15/10e fixée sur tire-fond
isolant ep=120mm polyuréthane lambda = 0,023 W/m.K
étanchéité bi-couche autoprotégée
étanchéité bi-couche autoprotégée
isolant laine minérale 150mm λ=0,038 W/m.K
isolant laine minérale 150mm λ=0,038 W/m.K enduit mince sur isolation encadrement de fenêtre en surépaisseur d'enduit, finition lissée capotage en aluminium amovible permettant l'entretien du volet roulant
enduit mince sur isolation encadrement de fenêtre en surépaisseur d'enduit, finition lissée
cadre bois existant conservé nouvelle fenêtre PVC blanc posée en rénovation, modèle monobloc avec volet roulant
nouvelle fenêtre PVC blanc posée en rénovation avec volet roulant , châssis central fixe nouvelle fenêtre PVC blanc posée en rénovation avec volet roulant, châssis ouvrant
remise en peinture du garde-corps existant
Garde-corps remplacé
95
appui de fenêtre existant conservé
16
16
Bande ASOURBV collée en sous face patte de fixation fixée mécaniquement
95
Bande ASOURBV collée en sous face
17
Capot de finition PVC Bavette alu laqué 15/10e fixée mécaniquement sur dormant bois existant
17
Capot de finition PVC Bavette alu laqué 15/10e fixée mécaniquement sur dormant bois existant
encadrement de fenêtre en surépaisseur d'enduit, finition lissée
encadrement de fenêtre en surépaisseur d'enduit, finition lissée capotage en aluminium amovible permettant l'entretien du volet roulant
cadre bois existant conservé
fibrastyrène ep=11,5 cm, λ=0,032 W/m.K cadre bois existant conservé
cadre bois existant conservé
nouvelle fenêtre PVC blanc posée en rénovation, modèle monobloc avec volet roulant
nouvelle fenêtre PVC blanc posée en rénovation, modèle monobloc avec volet roulant
Capot de finition PVC Bavette alu laqué 15/10e fixée mécaniquement sur dormant bois existant
Capot de finition PVC Bavette alu laqué 15/10e fixée mécaniquement sur dormant bois existant
Bande ASOURBV collée en sous face
Bande ASOURBV collée en sous face
appui de fenêtre existant conservé
appui de fenêtre existant conservé
DE 108 LOGEMENTS NICOLAS POUSSIN
et Rue Jean Baptiste Chardin GNY LE BRETONNEUX
MAITRE D'OUVRAGE
EFIDIS, filiale de CDC Habitat 20 place des VINS DE FRANCE 75610 PARIS Cédex 13 Tél. 01 80 49 77 77
ENTREPRISE
83-85, rue Henri Barbusse 92735 Nanterre Cédex Tél: 01 46 95 70 00
ARCHITECTE
126, Avenue Jean Jaurès 92140 CLAMART Tél: 01 49 77 88 92 cuadra@cuadra.fr
BUREAU D'ETUDES
Immeuble Le Chanzy 18, avenue Winston Churchill 94220 Charenton-le-Pont Tél : 01.43.75.80.00
VUE DEPUIS LA RUEJEAN BAPTISTE CHARDIN. EXISTANT. COLLECTIVE HOUSING RENOVATION / FRANCE (78) / 2017 -
COORDINATEUR SPS
ACOR ETUDES 130 Avenue Joseph KESSEL 78960 Voisins-le-Bretonneux Tél. : 01 30 48 95 42
CARNET DE DETAILS Indice
Date
A
10-12-18
COUPE F-F SUR FENÊTRE
Date:
14/1
Modifications
Echelle:
1:3
Isolation Bât G' RDC; R+1- 03.7 Changement fenêtre T4 Bât G, RDC - 06.6.1;
D: M.S V: H.B
21/99
ESPACES COMMUNS. HALLS B et C
HALL B. PERSPECTIVE
VUE DEPUIS LA RUEJEAN BAPTISTE CHARDIN. PROJET. RÉHABILITATION DE 108 LOGEMENTS COLLECTIFS / FRANCE (78) / 2017 -
22/99
SINGLE FAMILY HOME / 2012 / 2018 / PERSONAL PROJECT
23/99 SOLAR PANELS PLACED ON THE SOUTHERN FACING ROOF / DC ELECTRICITY IS DIRECTED TO INVENTOR IN THE UNDEGROUND LEVEL
SKYLIGHT WINDOWS
SLIDING GLASS DOORS PRIVATE ELEVATOR
A SELF-SUSTAINING VEGETABLE GARDEN
INSULATED GLAZING WITH A VENTILATED CAVITY BETWEEN THE LAYERS
LAUNDARY CHUTE LAUNDARY ROOM THE STRUCTURAL CORE MADE FROM THE PREFABRICATED MODULE
L A R G E R E C H A R G E A B L E B A T T E R I E S/ THAT CAN STORE SEVERAL kWt OF ELECTRICITY
ACCESS TO THE HOUSE
RENEWABLE GENERATOR
GEOTHERMAL HEAT PUMP USES THE STEADY TEMPERATURE OF THE EARTH AS A HEAT SOURCE
ACCESS TO THE UNDERGROUND PARKING
WHY
WHAT
HOW
The idea of the project comes from the reflection on a life quality that we have in cities today. Build environment had become our dwelling yet it doesn’t feel like home at all. In fact, it feels placeless and temporary. This “feeling” provides a huge hunger for an escape to somewhere else where the “real life” happens. What if this lack of home is caused by our generic environment? If so how can we fix it with architecture?
The project presents a concept of a single family house with a plan which can variate depending on a number of family members and their activities. The structure assumes a range of locations but performs best in natural landscapes. The main purpose is to allow the place that surrounds us to become a stage for our living.
The heart of the house is its structural core containing all the the engineering systems. Space around the core provides the main living areas and can be organised differently. House is divides into 3 levels. The “dug” ground floor allows enjoying nature at eye level. This zone is completely open and dedicated to "social" life. The first floor is a private zone, designed for quite and calm activities.The underground part contains all the technical equipment needed to stay off the grid.
MAISON PRIVÉE / 2012 / 2018 / PROJET PERSONNEL
24/99
SINGLE FAMILY HOME / 2012 / 2018 / PERSONAL PROJECT
25/99
11
12
14 11. hobby room / free space 12. master bedroom 13. loggia 14. bedroom
13
3
GSPublisherVersion 0.6.100.100
Revision His RevID
4
ChID
2
F
F
F
1
1. hall 2. kitchen 3. living room 4.TV/ game room
Company Tit
#C
#Contact Ad #Contact Cit #Contact Co #Contact Po
#Site Addres #Site City #Site Countr #Site Postco
Drawing Nam
Drawing Sta
Modified by
Checked by
Drawing Sca
DR
DR
10
W
Layout ID
W
A.05
GSPublisherVersion 0.6.100.100
9
7
5 5 4 3 2
8
1
6
5. garage 6, storeroom 7. laundary room 8. heating & water supply 9. electricity generation 10. technical room
R
C
MAISON PRIVÉE / 2012 / 2018 / PROJET PERSONNEL
# # # #
# # # #
D
D
26/99
GSPublisherVersion 137.6.100.100
SINGLE FAMILY HOME / 2012 / 2018 / PERSONAL PROJECT
27/99
MAISON PRIVÉE / 2012 / 2018 / PROJET PERSONNEL
28/99
HEALTHCARE CENTER EXTENSION / FRANCE / 2017 / COMPETITION
AVEC DO ARCHITECTES Programme:
des aménagements ponctuels dans le bâtiment existant et une extension de 658 m2 SDO.
AMENAGEMENT D’UNE MAISON DE SANTE PLURIDISCIPLINAIRE / FRANCE (45) / 2017 / CONCOURS
29/99
30/99
HEALTHCARE CENTER EXTENSION / FRANCE / 2017 / COMPETITION
31/99
AMENAGEMENT D’UNE MAISON DE SANTE PLURIDISCIPLINAIRE / FRANCE (45) / 2017 / CONCOURS
32/99
VILLAGE MODERNIZATION / FINAL THESIS / ENSAPLV 2016
33/99
Y-a-t-il de la vie dans le village ?
Chaque année en Russie, des milliers de villages et de petites colonies sont en train de disparaître. Même s'ils continuent formellement à exister sur les cartes, en réalité personne ne vit là-bas. L'essentiel de ces localités sont concentrées dans les districts fédéraux centraux et du nord-ouest : dans les régions de Iaroslavl, de Vologda, de Novgorod et de Pskov, où la proportion de très petits villages dépasse les 40%. Une des raisons du reflux de la population est la dégradation de l'industrie locale et, en conséquence, le manque d'emplois. La situation est aggravée par la politique de la réduction des dépenses sociales dans les zones rurales. Les gens perdent les
dernières possibilités pour l’existence dans les villages et dans les bourgs. Ainsi, ils sont obligés de se déplacer vers les grandes villes.
Il y a en même temps un processus inverse, soi-disant d’urbanisation, lié au désir des familles d'avoir des maisons séparées, ce qui n'est pas possible dans les conditions de la vie urbaine moderne. A mon avis, la superficie du territoire de la Russie permet d'assurer la population par les terrains nécessaires en présence de l'infrastructure correspondante.
Le but du projet est l'utilisation du potentiel des ressources naturelles du pays pour créer un éco-règlement sur la base du village existant. La principale ressource du territoire examinée est le bois, le projet suppose donc un cycle complet de la production du bois comprenant une mini centrale biomasse sur les déchets de bois afin de produire de l'énergie électrique et thermique, ainsi que l'organisation stable de consommation sur les forêts. L’objectif est non seulement la restitution de l’infrastructure perdue, mais également la création des conditions pour la vie équilibrée en campagne.
MODERNISATION DU VILLAGE / PFE / ENSAPLV / 2016
34/99
ANALYSE
des années 70 — l’expansion économique
L’organisation des artels d’agricole et de l’industrie forestière
1830
A partir de 1879 il y avait l’école du zemstvo
église en pierre
A partir des années 40 40 - la naissance de l’exploitation de l’industrie forestière
1890 étudiants 161 ; étudiantes 55
Fin des années 80 début des années 90
1618
L’église et la maison de prêtre Lukyanov sont attribuées à des objets du patrimoine culturel
mention de l’église de Saint George dans la livre de taxes
1600
1868
le début de pouvoir Soviétique
En 1868 il y avait 1169 de paroissiens
1700
1800
1900
fin de financement des travaux d’amélioration de terre
1918
Au début de XIX siècle sur le territoire de l’église il y avait 4 boutiques. Plus tard les paysans ont construit le bâtiment du commerce qui a contenu 29 boutiques
VILLAGE MODERNIZATION / FINAL THESIS / ENSAPLV 2016
Jusqu’à 1930 le village appartenait à la région Rubezhskaya de district Kadnikovskoe
2000
1938
1989 г —
l’eglise de Saint George est fermée.
l’élimination de l’industrie du bois, qui a été divisé en un certain nombre de petites entreprises qui ne pourraient pas survivre dans le marché
En octobre 1940 l’eglise a été réaménagé à la station de tracteurs à moteur
35/99
Le projet vise à révéler un ensemble d’instruments qui peuvent être plus ou moins ajustés à des situations similaires innombrables à travers une immersion profonde dans un habitat spécifique, l’étude de ses qualités, particularités, les conditions de son développement.
Velsk
Syamzha
Totma
Kirillov
R = 260 km
Kadnikov
Vologda
?
La condition principale pour la réalisation du projet est une mise en oeuvre simultanée d’un certain nombre de facteurs responsables des divers aspects du processus de rajeunissement : la création de l’entreprise privée qui est basé sur des ressources existantes, le soutien du gouvernement de l’activité d’investissement, la fourniture de l’infrastructure nécessaire, initiative actif des habitants de la bataille pour la survie sociale.
Gridino
Syamzha
Georgievskaya
R = 30 km
Peshkovskaya
Druzhba
RÉPARTITION DE LA POPULATION APTE AU TRAVAIL SELON LES BRANCHES:
26 %
agriculture, chasse, foresterie
Korostelevo
Arganovo Georgievskaya
Korobytsyno
R = 6 km
14,5 %
système de l’éducation
13,6 %
organismes de la santé publique, service social
13,4 %
gestion publique et sécurité nationale
Vysokovo
Zaytsevo
11,3 %
commerce
5,6 %
тtransporte
5,1 %
industrie services publics
5% 3% 1% 0,8 % 0,7 %
R = 0.75 km
production d’électricité/ gaz /l’eau fonction financière immobiliers hôtels et restaurants
MODERNISATION DU VILLAGE / PFE / ENSAPLV / 2016
36/99
patrimoine culturel et éducatif
EXISTANT
commerce logement dépendances abandonné
l’ancien dépôt
maisons abandonnées
l’ancienne scierie (ne fonctionne plus) administration
cour d’école commerce
l’école (40 enfants) centre d’animation
L’église George de Lydda, 1837
l’ancien presbytère
industrie abandonnée lac
VILLAGE MODERNIZATION / FINAL THESIS / ENSAPLV 2016
37/99
EXISTANT
PROJET URBAIN
MODERNISATION DU VILLAGE / PFE / ENSAPLV / 2016
espace public administration commerce
arrêt de bus
espace public commerce récréation
école
commerce
38/99 arrêt de bus magasin d’alimentation
école maternelle
galerie atelier de couture
médiathèque centre de loisirs restaurant
ébénisterie métal studio scierie office
VILLAGE MODERNIZATION / FINAL THESIS / ENSAPLV 2016
production d’énergie
cour de récréation
O2
dioxyde de carbone
O2
C
O2
C
C
39/99
CO2 Stockage temporaire de CO2 sous forme de carbone organique
unité de production d’énergie (résidus de bois non-recyclables)
recyclage de résidus de bois propres
exploitation forestière
première transformation
seconde transformation
scierie vie en oeuvre
étapes: - sylviculture - exploitation forestière - première transformation - seconde transformation - mise en oeuvre - vie en oeuvre - fin de vie
stockage de carbone dans les produits bois production des panneaux
Cycles de vie des produits à base de bois et séquestration du carbone
structure de production
production d’énergie electrique
centre d’animation
ateliers couture
atelier du métal
design studio administration
scierie
production de meubles
production des matériaux
exposition de produits
MODERNISATION DU VILLAGE / PFE / ENSAPLV / 2016
40/99
VILLAGE MODERNIZATION / FINAL THESIS / ENSAPLV 2016
41/99
Le projet est lauréat du Concours international Archi-World Academy Awards III choisi par Agence Rudy Ricciotti. The project has been selected by Rudy Ricciotti Architects as one of the winners of international competition of Archi-World Academy Awards III. Topic: ‘Responsible Future Architecture’.
MODERNISATION DU VILLAGE / PFE / ENSAPLV / 2016
La murène ruban (Rhinomuraena quaesita) est une espèce de poisson de la famille des Muraenidae.
42/99
INSPIRATION: formes d’organisme vivant La murène ruban La murène ruban Règne Embranchement Ordre Famille Genre
Animalia Chordata Anguilliformes Muraenidae Rhinomuraena
Rhinomuraena 3D quaesita
La murène ruban a un corps serpentiforme allongé et comprimé latéralement, avec des nageoires ventrale et dorsale continues.
3D
Morphologies typiques
SIMULATIONS PARAMÉTRIQUES
L’APPLICATION DU PRINCIPE AU PROJET DE RENOUVELLEMENT URBAIN
DEVELOPMENT OF THE CHARENTON-BERCY SITE (75) / ENSAPLV / 2016
43/99
PROJET D’AMÉNAGEMENT DE LA ZAC BERCY-CHARENTON (75) / ENSAPLV / 2016
44/99
CHAIR / ANTONHOUSE / RUSSIA / 2015 WITH ARCHPOLE
45/99
CHAISE / ANTONHOUSE / RUSSIE / 2015 AVEC ARCHPOLE
46/99
CHAIR / ANTONHOUSE / RUSSIA / 2015 WITH ARCHPOLE
47/99
CHAISE / ANTONHOUSE / RUSSIE / 2015 AVEC ARCHPOLE
48/99
TABLE / ANTONHOUSE / RUSSIA / 2015 WITH ARCHPOLE
TABLE / ANTONHOUSE / RUSSIE / 2015
49/99
DRESSER / ANTONHOUSE / RUSSIA / 2015
COMMODE / ANTONHOUSE / RUSSIE / 2015 AVEC ARCHPOLE
50/99
DIMAFLAT / MOSCOW / RUSSIA / 2014
WITH ARCHPOLE
51/99 Programme: Superficie: Client:
studio renovation 40,2 m2 jeune couple
DIMAFLAT / MOSCOU / RUSSIE / 2014
AVEC ARCHPOLE
52/99
DIMAFLAT / MOSCOW / RUSSIA / 2014
WITH ARCHPOLE
53/99
DIMAFLAT / MOSCOU / RUSSIE / 2014
AVEC ARCHPOLE
54/99
DIMAFLAT / MOSCOW / RUSSIA / 2014
WITH ARCHPOLE
55/99
DIMAFLAT / MOSCOU / RUSSIE / 2014
AVEC ARCHPOLE
56/99
DIMAFLAT / MOSCOW / RUSSIA / 2014
WITH ARCHPOLE
57/99
DIMAFLAT / MOSCOU / RUSSIE / 2014
AVEC ARCHPOLE
380
469
898
58/99
990
417
489
417
814
BEAN BAG CHAIR / ANTONHOUSE / RUSSIA / 2015 WITH ARCHPOLE
59/99
POUF / ANTONHOUSE / RUSSIE / 2015 AVEC ARCHPOLE
60/99
SECONDFRIENDSTORE SHOWROOM / MOSCOW / RUSSIA / 2014 WITH ARCHPOLE
61/99
Programme: Superficie: Client:
retail, bureau, studio photo 241,4 m2 SecondFriendStore
SECONDFRIENDSTORE SHOWROOM / MOSCOU / RUSSIE / 2014 AVEC ARCHPOLE
62/99
SECONDFRIENDSTORE SHOWROOM / MOSCOW / RUSSIA / 2014 WITH ARCHPOLE
63/99
SECONDFRIENDSTORE SHOWROOM / MOSCOU / RUSSIE / 2014 AVEC ARCHPOLE
64/99
SECONDFRIENDSTORE SHOWROOM / MOSCOW / RUSSIA / 2014 WITH ARCHPOLE
65/99
SECONDFRIENDSTORE SHOWROOM / MOSCOU / RUSSIE / 2014 AVEC ARCHPOLE
66/99
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / SPAIN / 2014
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / ESPAGNE / 2014
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / SPAIN / 2014
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / ESPAGNE / 2014
67/99
68/99
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / SPAIN / 2014
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / ESPAGNE / 2014
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / SPAIN / 2014
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / ESPAGNE / 2014
69/99
70/99
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / SPAIN / 2014
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / ESPAGNE / 2014
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / SPAIN / 2014
WORKSHOP BETWEEN THE CLOUDS / COVARRUBIAS / ESPAGNE / 2014
71/99
72/99
TRANSFORMATION OF THE UNDERBRIDGE AREA INTO A PARC / YAROSLAVL / RUSSIA / 2014 / COMPETITION
AVEC
Anna Fesenko, architecte Anton Evdokimov, designer graphique
Le pont Tolboukhinskiy est un pont pour les voitures et les piétons sur la rivière de Kotorosl’ qui se trouve à la ville de Yaroslavl’ (Russie). Un des objectifs du projet a été la création d’un programme de la réalisation de l’espace sous le pont qui pourrait réorganiser le territoire et de lui donner un certain vecteur de développement. Les éléments les plus réussis du programme pourraient être appliqués à d’autres territoires pareils. Une partie de la conception est un renouvellement et une modification constants de l’espace, aussi, c’est pourquoi il n’y a presque pas de quelques grands objets stationnaires, mais, au contraire, l’apparition de nouvelles constructions temporaires, par exemple, pour les foires et les festivals d’architecture, est admissible.
TRANSFORMATION DE L’ESPACE SOUS UN PONT EN UN PARC / YAROSLAVL / RUSSIE / 2014 / CONCOURS
73/99
74/99
TRANSFORMATION OF THE UNDERBRIDGE AREA INTO A PARC / YAROSLAVL / RUSSIA / 2014 / COMPETITION
75/99
TRANSFORMATION DE L’ESPACE SOUS UN PONT EN UN PARC / YAROSLAVL / RUSSIE / 2014 / CONCOURS
76/99
77/99
LE BUT DU PROJET VISE A EXPLORER LA VILLE ET SON RÉSEAU PRINCIPAL DE TRANSPORT - LE MÉTROPOLITAIN DE MOSCOU. LA CORRÉLATION DU MÉTROPOLITAIN AVEC D'AUTRES MOYENS DE TRANSPORT ET LE TERRITOIRE ENTOURANT ONT ETE ANALISES.
PFE / L’ANALYSE / MOSCOU / RUSSIE / 2013
78/99
GRADUATION PROJECT / RESEARCH / MOSCOW / RUSSIA / 2013
79/99
PFE / L’ANALYSE / MOSCOU / RUSSIE / 2013
80/99
Dès que le noeud de transport (ТПУ) sur la station «Tushinskaya» est un des plus noeuds chargés, le but principal du projet consistait à créer une espace confortable de la correspondance avec la navigation au maximum simple. De plus, organiser sur le territoire adhérant le milieu urbain attrayant, parce qu'en dehors des fonctions de transport le noeud de correspondance est socialement objet important pour l'ensemble du district.
GRADUATION PROJECT / MOSCOW / RUSSIA / 2013
En outre la station « Tushinskaya » est le premier endroit à Moscou où les passagers de la région et d'autres villes atterissent. Ce qu'ils voient, c'est leur première impression de la ville. C'est-à-dire, c'est le fond de la gare. C'est pourquoi une principale idée consistait à faire dans le même plan avec le vestibule souterrain du métro de la place ronde de piéton, autour de laquelle toutes les fonctions de correspondance serons ramassées. La
disposition des zones avec de divers moyens de transport sur les différents étages exclut les intersections du transport avec les gens. La plate-forme de correspondance se réalise en un seul niveau ce qui la fait au maximum confortable pour les voyageurs.
81/99
Le projet du noeud comprend la station de métro de ligne « tagansko-krasnopresnenskaya», le quai ferroviaire avec la plate-forme de correspondance sur les trains électriques de banlieue de la direction de Riga, la station interurbaine d'autobus, le centre commercial souterrain et le stationnement saisissant. En dehors de la fonction principale du noeud de correspondance le terminal est l'objet,
unissant deux parties de la ville, dont le territoire se divise par les voies ferrées. Pratiquement tout l'ensemble se trouve en dessous du niveau du sol et le lien avec l'environnement est assuré par la place de piéton intérieure, remplie le long de tout son périmètre par la bande de la pose de vitres totale. Cela permet à la lumière du jour pénétrer sans difficultés dans l'espace du vestibule, où les voyageurs se déplacent. Puisque l'angle d'incidence des
rayons solaires change constamment pendant le jour, l'éclairage varie aussi, et le vestibule vit ainsi un âge nouveau de son histoire, caractérisé par son propre jour personnel lumineux. Cela aide les gens qui sont à l'intérieur à orienter dans le temps et ne pas perdre le lien avec l'environnement même en se trouvant sous la terre.
PFE / MOSCOU / RUSSIE / 2013
82/99
GRADUATION PROJECT / MOSCOW / RUSSIA / 2013
83/99
PFE / MOSCOU / RUSSIE / 2013
84/99
GRADUATION PROJECT / MOSCOW / RUSSIA / 2013
85/99
PFE / MOSCOU / RUSSIE / 2013
86/99
GRADUATION PROJECT / MOSCOW / RUSSIA / 2013
87/99
PFE / MOSCOU / RUSSIE / 2013
88/99
MODERNIZATION AND RECONSTRUCTION OF THE POWER STATION / MOSCOW / RUSSIA / 2012
89/99
LA MODERNISATION ET LA RECONSTRUCTION DU TERRITOIRE DE STATION ELECTRIQUE / MOSCOU / RUSSIE / 2012
90/99
MODERNIZATION AND RECONSTRUCTION OF THE POWER STATION / MOSCOW / RUSSIA / 2012
91/99
LA MODERNISATION ET LA RECONSTRUCTION DU TERRITOIRE DE STATION ELECTRIQUE / MOSCOU / RUSSIE / 2012
92/99
Le but du projet - la création des espaces publiques et ducentre de coordination du travail des organisations publiques non gouvernementales, orientées à la protection des droits de la personne, à la protection et à la conservation de l'environnement: Le projet est divisé en plusieurs étapes. Le premier - est un remplacement de la technologie qui permettra d'installer la station dans le bâtiment d'une ancienne chaufferie. L'espace finalement libéré du bâtiment de la « GES1 » est dérivée du statut industriel et est donnée pour le centre intellectuel. Deuxième –c’est l'effacement des territoires des démolitionsd'exploitation plus inutiles et la démolition du bâtiment dissonant du central téléphonique (ATC). La troisième étape– c’est une nouvelle construction, permettant de révéler l'espace libérée et installer les nouvelles fonctions. Du point de vue de la zone d'aménagement urbain le territoire est divisé en deux zones, qui sont reliées par un passage dans l'accès visuel l'un de l'autre. Selon l'esthétique ce sont deux espaces différentes: la première zone directement adjacente à l'usine -c'est une espace stricte, formellement fermée, ouvrant la façade de l'ancienne maison de la chaudière, conçue en 1928 par Zholtovsky. Dans cet ancien bâtiment industriel des bureaux peuvent être s'installer. La deuxième zone adhère au théâtre et à la banque installée au contraire (les deux bâtiments - les maisons anciennes individuelles de 16-17 siècles, présentant les objets historiques et culturels de valeur). Une nouvelle structure - une maison avec la cour intérieure devrait fermer la place. Cependant l'espace reste accessible grâce aux passages dans les galeries des premiers étages. Donc, les liaisons visuelles se gardent. La place est plantée et aménagée comme la zone de parc. Elle est accessible et ouverte. Aux premiers étages du nouveau bâtiment des nouvelles fonctions socioculturelles sont disposées, les autres étages sont rendues aux sièges des organisations internationales.
MODERNIZATION AND RECONSTRUCTION OF THE POWER STATION / MOSCOW / RUSSIA / 2012
93/99
LA MODERNISATION ET LA RECONSTRUCTION DU TERRITOIRE DE STATION ELECTRIQUE / MOSCOU / RUSSIE / 2012
94/99
MULTIPURPOSE INDUSTRIAL WORKSHOP / RUSSIA / 2010
UNITÉ INDUSTRIELLE / RUSSIE / 2010
95/99
FOOTBALL STADIUM / GROZNY / RUSSIA / 2011
STADE DE FOOTBALL / GROZNY / RUSSIE / 2011
96/99
BAR IN A MEADOW / NIKOLA-LENIVETS / RUSSIA / 2012
BAR DANS LA PRARIE / NIKOLA-LENIVETS / RUSSIE / 2012
97/99
TOLL BOOTH / RUSSIA / 2010
CABINES DE PEAGE / RUSSIE / 2010
98/99
MULTIFUNCTIONAL LIVING COMPLEX WITH PUBLIC SPACES AND OFFICE PREMISSES IN ROSTOV-ON-DON / SERGEY SKURATOV ARCHITECTS
MODEL MAKING / MOSCOW / RUSSIA / 2010
99/99
FABRICATION DE MAQUETTES / MOSSCOU / RUSSIE / 2010
100/99
LUXURY RESIDENTIAL COMPLEX ON PETROVKA STR. / SERGEY SKURATOV ARCHITECTS
MODEL MAKING / MOSCOW / RUSSIA / 2010
101/99
FABRICATION DE MAQUETTES / MOSSCOU / RUSSIE / 2010