MARISA LAPPIN Architectural Designer
INFO
ADDRESS
PROFILE
marisa.lappin@gmail.com
Analytical and creative professional with over five years experience in architectural design practice and hands-on experience with design-build projects. Capacity to drive architectural projects while meeting design requirements of clients and firm leadership. Possess technical expertise to accomplish projects in Revit, Rhinoceros, AutoCAD, SketchUp, and the Adobe Creative Suite. Articulate and refined communicator; establishes and sustains strong relationships with colleagues, management, consultants, and clients.
LINKS
EDUCATION
Raleigh, NC 27601 PHONE
864-918-2157 EMAIL
Portfolio
SKILLS Architectural Drawing BIM Development Technical Issue Resolution
MASTER OF ARCHITECTURE, 2017
University of Oregon, Eugene, OR
BACHELOR OF ARTS IN ARCHITECTURE, 2014
Clemson University, Clemson, SC DESIGN-BUILD STUDIO, 2013
Asheville Design Center, Asheville, NC FLUID CAMPUS, 2012
Clemson University, Barcelona, Spain
Steward of Office Culture
EXPERIENCE
Documentation and Reporting
MATHES BRIERRE ARCHITECTS, 2017- MARCH 2020 NEW ORLEANS, LA ARCHITECTURAL DESIGNER
Design Proposal Administrative Support
• • • • • • • •
Served on several design teams for educational, commercial, and institutional projects for both new construction and preservation. Led the adoption of BIM standards and provided formal and informal support to colleagues to ensure standards were implemented. Created Condo/BOMA documents related to leasing/rental prices for commercial/multi-use buildings. Led visioning workshops with a large client, developing better understanding of requirements. Steered numerous small projects in coordination with the lead architect. Supervised “Unofficial Official Social Committee” for the office, managing events in the office. Started a sketching group; organized and led Revit tutorial sessions for the office. Managed and provided ARE testing and other information related to licensing.
FREELANCE CONSTRUCTION, 2016 EUGENE, OR
• 1/2
Executed major demolition, renovation, and addition to existing residence with group of student colleagues under direction of university professor.
MARISA LAPPIN Architectural Designer
INFO
EXPERIENCE, CONT’D
Raleigh, NC 27601 PHONE
UNIVERSITY OF OREGON, 2016- 2017 EUGENE, OR TEACHER’S ASSISTANT
• •
ADDRESS
864-918-2157 marisa.lappin@gmail.com
•
LINKS LinkedIn
Portfolio
Met with students individually, guiding through the assignment. Evaluated student assignments and provided constructive feedback to improve design. Responsible for archiving, researching, and curation of presentation of historical architecture images
GOODWYN, MILLS, CAWOOD, 2013- 2015 GREENVILLE, SC INTERN ARCHITECT
• • •
Prepare and layout drawings from Design Development through Construction Documents for commercial, higher education, and industrial projects. Fabricated physical models for project proposal presentations. Closely monitored firm and project operations while learning BIM in-depth.
VOLUNTEER National Organization of Minority Architects-Louisiana- Secretary & Project Pipeline Mentor Tulane Women in Architecture - Panelist Tools of the Trade - Exhibit Designer Blue House + Civic Studio - Dinner & Design Partner New Orleans Architecture Foundation Women in Architecture Committee of AIA New Orleans American Institute of Architecture Students Clemson AIAS Freedom by Design - Fundraising Co-Chair
2/2
HA NC O C K W H I T N E Y C E N T E R O F F ICES Interior Renovation
PROGRAM:
10 floors of office space interior renovation Executive office spaces Customer transaction space RESPONSIBILITIES:
• • •
CAD Drafting Team member responsible for CD Set- Floors 13-16, 30 Communicate with Lead Designer to resolve design issues
IIDA Delta Regional Chapter 2019 Interior Design Excellence Awards- Award of Recognition, Large Corporate
1
2
3
4
5
6
7
9
8
10
11
12
13
14
15 MATERIALS KEYING/ GENERAL NOTES
Q
PERDIDO STREET P
N
M
L EWC
AED
J
H
ST. CHARLES AVENUE
CARONDELET STREET
K
REVISION/SUBMISSIONS
NO.
DATE
G
Mathes Brierre EWC
A R
F
C
H
I
T
E
C
T
S
201 St. Charles Avenue. Forty First Floor New Orleans, Louisiana 70170-4100 Voice. 504. 586. 9303. Fax. 504. 582. 1305 architecture@mathesbrierre.com
PROJECT TITLE
E CORPORATE OFFICE RELOCATION FOR
HANCOCK WHITNEY BANK
D
FLOORS 13-16, 30 C
701 POYDRAS STREET NEW ORLEANS, LOUISIANA
POYDRAS STREET
FOR CONSTRUCTION SET B
DESIGNED BY DRAWN BY SHEET TITLE
JFA
CHECKED BY
JFA
DATE
AES
JUNE 1, 2018
15TH FLOOR PLAN FOR REFERENCE ONLY
PROJECT NO.
A
11600.2 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
SHEET NO.
A115
CH EV R O N N O R T H PA R K Interior Renovation- Programming
PROGRAM:
Existing
Schematic planning and visualization of proposed office re-organization and renovations
(Third floor North used for design analysis)
3 work zones
Proposed
5 work zones
RESPONSIBILITIES:
• • • • • •
BIM model Schematic interior renders Existing floor plan analysis Proposed floor plan analysis Team member responsible for curating presentation Lead workplace visioning workshops with employees
Heads down :
Heads down :
46%
26%
Residence
6%
Quiet Zone
Workstation
Collaborative :
14% 4%
Town Square
Collaborative :
Conference Areas
7%
Break/Copy Rooms
21%
11%
Building Functions
25%
Circulation
8.5’ x 8.5’ workstation per employee (84 current, 55 vacant) 46% heads down space
= plumbing location)
Closed collaboration
9%
Open collaboration
11%
Building Functions
20%
18% collaborative space
Town Square (
Circulation
6.5’ x 8.5’ workstation per employee (current + 18% growth = 106) 32% heads down space 37% collaborative space
Proposed Design – Mid-High Level Solution Existing
(Third floor North used for design analysis)
3 work zones
Proposed
5 work zones
Open Collaboration
Heads down :
Heads down :
46%
26%
Residence
6%
Quiet Zone
Workstation
Collaborative :
14% 4%
Collaborative :
Conference Areas
7%
Break/Copy Rooms
21%
11%
Building Functions
25%
Circulation
8.5’ x 8.5’ workstation per employee (84 current, 55 vacant) 46% heads down space 18% collaborative space
Town Square (
= plumbing location)
Closed collaboration
9%
Open collaboration
11%
Building Functions
20%
Circulation
6.5’ x 8.5’ workstation per employee (current + 18% growth = 106) 32% heads down space 37% collaborative space
Residence
Proposed Design – Mid-High Level Solution
Quiet Zone
JES UI T H I G H SC H OOL AD M I NIS T R AT I O N B U IL D IN G New Construction - Addition 1
5
6
7
8
9
10
11
12
13
14
15
B.5
C
D
E
B B.1
1 A401
P
A
A
B.1 B
C
1 A400
1 A400
D
1 A401
E
CAST STONE CROSS BEYOND
CAST STONE CROSS
TOP OF CAST STONE EL:99.15'
1 A431
TOP OF CAST STONE EL:99.15'
1 A403
PLASTER PEDIMENT
N 8
6
8
A420
A420
6
A420
PLASTER PEDIMENT
CAST STONE RAKING CORNICE ROOFTOP EQUIPMENT - SEE MEP
A420
CAST STONE COPING
T.O.S. EL:86.89' BRICK VENEER
T.O.S. CAST STONE EL:86.89' RAKING CORNICE
M
ATTIC LEVEL EL:80.93'
ATTIC LEVEL EL:80.93'
L
CAST STONE BELT COURSE
12' - 0"
CAST STONE ENTABLATURE AND CORNICE
PLASTER ENTABLATURE
FOURTH FLOOR T.O.C. EL:68.93'
12'-0"
1 A403
RESPONSIBILITIES:
FOURTH FLOOR T.O.C. EL:68.93'
BRICK VENEER
1
CAST STONE SILLS
THIRD FLOOR T.O.C. EL:54.93'
T.O.C. EL:54.93'
CAST STONE PORTICO
7 A420
14' - 0"
ALUMINUM FRAME WINDOWS
J
CAST STONE SILLS
PLASTER BASE
WATER TABLE EL:20.29' FIRST FLOOR T.O.C. EL:19.70'
FIRST FLOOR T.O.C. EL:19.70'
PORTLAND CEMENT PLASTER RAMP WALLS MATCH CAST STONE
2
E
3
4
1
5
A300
NORTH6 ELEVATION
7
1/8" = 1'-0"
8
BASE FLOOD ELEVATION EL:18.43'
T.O.C. EL:14.70'
BASE FLOOD ELEVATION EL:18.43' Boiler FFE EL:18.25'
F
2 A403
6
9
10
Boiler FFE EL:18.25' BRICK LEDGE EL:17.00'
11
2
12
A300
SOUTH ELEVATION 13 14
Mathes Brierre
15
1/8" = 1'-0"
MATERIALS KEYING/ GENERAL NOTES
A R C H I T E C T S
Q
9
D
8
7
6
5
4
3
1.1
2
201 St. Charles Avenue. Forty First Floor New Orleans, Louisiana 70170-4100 Voice. 504. 586. 9303. Fax. 504. 582. 1305
1
PROJECT TITLE 2 A402
P
1 A402
ROOFTOP EQUIPMENT - SEE MEP
C
2 A403
B
JESUIT HIGH SCHOOLNEW ADMINISTRATION BUILDING
CAST STONE CROSS 1 A423
ELEVATOR SHAFT OVERRUN BEYOND (7/8" PORTLAND CEMENT PLASTER ON 8" MTL. STUDS W/ BATTS AND 1" SHAFTWALL BEYOND)
N
3
3
A420
A420
OPP. SIM.
TOP OF CAST STONE EL:99.15'
4133 BANKS ST. NEW ORLEANS, LOUISIANA
ASPHALT SHINGLES CAST STONE RAKING CORNICE
DESIGNED BY
CAST STONE ENTABLATURE AND CORNICE
M
T.O.S. EL:86.89'
MTL. DOWNSPOUTS - TIE INTO SUBSURFACE DRAINAGE SYSTEM, TYP. SEE CIVIL
5
A
DRAWN BY
3
4
5
6
7
8
9
ALUM. FRAME WINDOWS
10
11
11801
PLASTER BELT COURSE
2 A310
K
12FOURTH FLOOR
PLASTER VENEER BEYOND
13
T.O.C. EL:68.93'
14
2 5 6
14'-0"
2
No.
15
Addendum #2 Addendum #5 PCR #002
Description
Date 06/21/19 07/01/19 10/15/19
TYP.
THIRD FLOOR T.O.C. EL:54.93'
KEY PLAN
7
7
7
A420
A420
A420
TYP.
TYP.
TYP.
ALUMINUM FRAME WINDOWS
BRICK INSETS WITH IRON GRILLWORK
1 A231
OPEN
21'-2 3/4"
1 A411
G
D.S.
FIRST FLOOR T.O.C. EL:19.70'
D.S.
1
BASE FLOOD ELEVATION EL:18.43'
PLASTER BASE
A420
F 3
TOP OF PLASTER BASE EL:21.06' WATER TABLE EL:20.29'
Boiler FFE EL:18.25'
2
SECOND FLOOR T.O.C. EL:40.93'
CAST STONE SILLS
3 A310 TYP.
H
CAST STONE LATTICE PANELS
14'-0"
CAST STONE PORTICO
J
BRICK VENEER
4
5
6
7
8
9
10
11
12
13
14
1
A301
Q
BRICK MASONRY
15
EAST ELEVATION
BRICK LEDGE EL:17.00'
6
PLASTER MATERIALS KEYING/ GENERAL NOTES BASE
1/8" = 1'-0"
Mathes Brierre
E A
P
B
1'-0"
C
1 A400
18'-4"
D
1 A401
82'-0"
1 A300 21'-8"
A R C H I T E C T S
E
20'-7"
19'-5"
201 St. Charles Avenue. Forty First Floor New Orleans, Louisiana 70170-4100 Voice. 504. 586. 9303. Fax. 504. 582. 1305
1'-0"
D PROJECT TITLE OVERFLOW ROOF DRAIN FROM ABOVE, SEE MECH.
DN
D
D
1 A604
DN
JESUIT TERRAZZO LOGO, SEE SPECS
D
D
D
C
1
4 SIM OPP. 5 A730 6
LOBBY 105
8'-1 19/32"
3
1 A600
6
5
13
CONF. 114 7 A740
ELEVATOR 113
1 A610
6
117-1
2.0
116-1
JESUIT HERITAGE CENTER 115
2
1
1 A210
2.0
TLT 120
G
61'-0"
14.0
6.1
VEST 122
CORR. 112
115-2
6.1
3
112-1
4
8
1.0
STOR. 129
1.0 129-1 2.0
ATHLETIC DIRECTOR 131
A403
D
112A-1
D
DN
2 A300
5 A230
23'-3 21/32"
Mathes Brierre
B
A R C H I T E C T S
7 DN DN
EXISTING COMMUNITY HOUSE 10"
2 A402
STOR. 128
128-1 1.0
1.0 127-1
2.0 131-1
112-3
8
10'-11"
1.0
125-1
I.T. 127
1.0
1 A605
10" 4'-10 9/32"
201 St. Charles Avenue. Forty First Floor New Orleans, Louisiana 70170-4100 Voice. 504. 586. 9303. Fax. 504. 582. 1305 PROJECT TITLE
2 A403
JESUIT HIGH SCHOOLNEW ADMINISTRATION BUILDING
DRAWING NOTES:
14'-10 23/32"
1
EXISTING WINDOW- RESTORE AND REPAIR AS REQUIRED TO MAKE WATER TIGHT AND PROVIDE NEW PAINT FINISH
2
EXISTING WINDOW- RESTORE AND REPAIR AS REQUIRED AND PROVIDE NEW PAINT FINISH. REMOVE METAL SECURITY SCREEN
B
4133 BANKS ST. NEW ORLEANS, LOUISIANA DESIGNED BY
1
A201
FIRST FLOOR PLAN
N.
1/8" = 1'-0"
DRAWN BY
11801
2 HR. RATED FIRE BARRIER
2
3
4
5
6
7
8
9
10
11
12
13
CHECKED BY DATE
SE 06.07.2019
FIRST FLOOR PLAN PROJECT NO.
1 HR. RATED FIRE PARTITION
1
TMH MEL
SHEET TITLE
DRAWING LEGEND:
A
14
15
SHEET NO.
A201
CHECKED BY DATE
SE 06.07.2019
EXTERIOR ELEVATIONS PROJECT NO.
12
1 A301
6 1 A230
ADMISS. DIREC. 130
UP
B
112-5
B.1
11
1.0
A730
TMH MEL
SHEET TITLE
11801
10
CONF. 125
3 112-4
6
Date 06/14/19 06/21/19 06/25/19 10/15/19
COPY 123
5'-9 3/8"
19'-4 11/32"
112-8
9
C
112-2 1 VEST. 112A A404 2
6
12
1.0
A731
TYP.
WAITING 1.0 124A STAIR S-2
1 A403
B.5 3 A403
Description
5 A731
2
130-1
126-1
Addendum #1 Addendum #2 Addendum #3 PCR #002
11
12
A731
1
8"x8" BRICK PIER EA SIDE
B
A732
124-2
1.2
ADMISS. RECEPT. 124
1 A601
E
1.0
1.2 121-1
A731
D
No.
3
9
CONF. 110C
110C-2
124-1
F 15
1 2 3 6
110B-2
1.0
2.0
6
EXISTING BOILER ROOM 126
K
1.3
1.3
ADMISS. STOR. 121
1.2
1
DS
8
110C-1
118-1 120-1
1 A402
4
119-1
ELEC. 119
JAN. 118
DRAWN BY
2
KEY PLAN CONF. 110B 110B-1
ELEC. 117
115-1 6
1 A302
B 110A-2
1.2
7 2.0
TLT. 116
2 A230
A732
H
6
1.0 CONF. 110A
1.2
CORR. 109
1.2
114-1
108-2 1.2
HERITAGE 106-3 CENTER STOR. 111
18'-10 1/2"
112-7
4
8"x8" BRICK PIER EA SIDE
DESIGNED BY
A730
14
110A-1
109-1
1.2
108-3
2
ELEVATOR LOBBY 108A 6
6.1
DS
1
4133 BANKS ST. NEW ORLEANS, LOUISIANA
STORAGE 13 106A
9'-10"
A
J
106-2
8
7
105-4
CORRIDOR 108
STAIR S-1
B
1 A741 A730
106-1
9
108-1
UP B
BOOKSTORE 106
5
7 105-3
K
6
19'-1"
R.D. FROM ABOVE, SEE MECH.
6.1
96'-4"
WAITING 105A
22'-2"
1.0
104-1 CORR. 107
12'-0"
A730
1.0 1.0
20'-4"
32'-0"
2
3 1.0
2.0 101-1
105-2
1'-0"
103-1
1
105-1
5'-11 19/32"
2.0
STOR. 103
A730
MAIL 104
12'-10 15/32"
VOL. COORD. 101
B
2.0
1.1
B
DS
102-1
1'-1 1/2"
STOR. 102
DS
M
L
JESUIT HIGH SCHOOLNEW ADMINISTRATION BUILDING
DN
D
1'-0"
N
13
14
CHECKED BY DATE
SE 06.07.2019
EXTERIOR ELEVATIONS PROJECT NO.
12'-0"
BRICK VENEER
1
TMH MEL
SHEET TITLE
ATTIC LEVEL EL:80.93'
A420
L
1
Date 06/21/19 07/01/19 10/15/19
BRICK INSETS WITH IRON GRILLWORK
TOP OF PLASTER BASE EL:21.06'
TOP OF PLASTER EX. BOILER BASE HOUSE EL:21.06' BEYOND WATER TABLE EL:20.29'
T.O.C. EL:14.70'
Description
KEY PLAN
PLASTER BELT COURSE
TYP.
3 A310
PORTLAND CEMENT PLASTER BASE - MATCH CASTE STONE
BRICK LEDGE EL:17.00'
Addendum #2 Addendum #5 PCR #002
ALUMINUM FRAME WINDOWS SECOND FLOOR T.O.C. EL:40.93'
METAL DOWNSPOUT BEYOND - TIE INTO SUBSURFACE DRAINAGE SYSTEM, TYP.
G
No.
CAST STONE BALCONY BEYOND
7 A420
TYP.
SECOND FLOOR T.O.C. EL:40.93' 1 A310
H
2 5 6
14'-0"
CAST STONE DOOR SURROUND BEYOND
PORTLAND CEMENT PLASTER BELT COURSE - MATCH THIRD FLOOR CAST STONE
TYP.
21'-2 3/4"
A420
TYP.
14'-0"
CAST STONE LATTICE PANELS
7
A420
21' - 2 3/4"
BIM model: draft and model building components and families Coordinate/incorporate structural consultant work into project BIM Responsible for Schematic Design, Design Document, and Construction Document sets
7
K
14' - 0"
PLASTER
8'-0 7/8"
•
4
B.5
4 Story administration addition Office space School Museum Mechanical space
•
3
MATERIALS KEYING/ GENERAL NOTES
PROGRAM:
•
2
Q
15
SHEET NO.
A301
SHEET NO.
A300
ST. A NN A’ S D O D WE L L H O U S E CO MMU N I T Y R ES OU R C E C E N T E R Historic Restoration
NDITIONS
PROGRAM:
Multi-use rooms Kitchen Open office Private apartment Cafe
1
3
2
5
4
6
7
9
8
10
11
13
12
RESPONSIBILITIES: Q
• • •
Surveyed and generated measured drawings of existing conditions Production of Design Document drawings Coordinate consultant work and architectural drawings P
1
N
3
2
5
4
6
7
9
8
10
11
12
Q
M
P
L
N
K M
MA
NE
J
NE
NE
BR HE
L
TH
AL
H
M
RE TO
K
NE
NE TU
G
4
NE FA
DODWELL HOUSE ST. ANNA’S EPISCOPAL CHURCH
J
NE DE
NE PO
NE 3-
NE
F
NE
SL TO
H
EX
NE
RE GU
E
NE
RE GU
Q
P
N
M
L
K
J
H
G
F
E
D
C
B
A
G
EX M
RE
D 1
1
FI
NE SI
F
EX
COOK FRZR
COOL
PREP
C
2
2
E UP
B 3
3
D
A
2
C
4
4
1
3
5
4
6
7
8
9
10
11
13
12
B 5
5
A 6
6
1
2
3
4
5
6
7
8
9
10
11
12
7
7
8
8
WW I I M U SE U M PA R A D E G R OU N D S Promotional Images
PROGRAM:
Images emphasizing memorial bricks in parade ground of WWII Museum. RESPONSIBILITIES:
• • •
Develop SketchUp model Render 3-D model Post production of images
CA
BOLLINGER
CANOPY OF PEACE
M
PA I CO GNS UR O AG F E