Portfolio Selected works 2023
Oasis Central Sudirman | Jarkata
of: health and wellness; space that generates activity, relationships, and commerce; all set in an urban oasis that is integrated with nature and simultaneously protected from the environment.
Architectural Concept
Wellness
The Project as a Cultural Statement
Remaining Unique in a Global World
The textures, crafts and nature of Indonesia present a fertile source of inspiration for a unique design sensibility that is both contemporary as well as grounded in the cultural context of the place.
Design Explorations
signature of the power and beauty of Jakarta and Indonesia to the world.
The iconic roof structures are transformed into canopies that welcome the visitors, while the Batik fabrics provide a template for the design of the exterior shading system. Nature-inspired biophilic design creates yet another layer of connection to the place and it’s culture.
The project’s most impactful sustainability features are strategically balanced to achieve optimum building performance that also enhances human comfort. In addition to harvesting rainwater and generating energy, the shading canopies at the retail village favorably improve the microclimate, thus help extend the time people spend outdoors.
The facades are conceived as breathing envelopes that incorporate self-shading and operable windows that bring defused light in and fresh air, while the carved out outdoor spaces at the refuge floors and the top of the buildings provide access to nature.
77 Located in the heart of Jakarta’s Golden Triangle, Oasis Central Sudirman will become the landmark development for Indonesia. is designed as forward thinking next generation mixed-use development that brings people together in unique and exciting ways, integrates with nature, and minimizes it ecological footprint. The project also reflects the beauty and passion of Indonesia! Indonesia is one of the most bio-diverse countries in the world and this project is positioned to become the leading sustainable project in Jakarta setting an example for all to follow. We have also taken inspiration from the geography and culture and have created a modern and contemporary design that will be uniquely Indonesian. The key components of the design support a place of: health and wellness; space that generates activity, relationships, and commerce; all set in an urban oasis that is integrated with nature and while simultaneously protected from the environment. This all begins at the ground level by the creation of an experience village that integrates retail, food and beverage, amenities, social spaces, and outdoor plazas into an inviting, relaxing, and dynamic human scaled environment. Two distinct landmark towers rise out of this village and create unique image on the skyline. The office/service apartment tower and the residential tower are cloaked in an environmental sleeve that protects its inhabitants from the sun while simultaneously creating a unique pattern indicative of Indonesian culture. These sleeves then erode at specific points that allow the building to turn itself inside out bringing the inhabitants in contact with outdoor spaces at multiple levels. The Oasis Central Sudirman will become a world-class
51
Tectonic Expressions Stacking Boxes Sweeping Veils Woven Sleeves Selected Option Massing Variations Selected Option 61 60 Concept Design Evolving the Mixed-Use Development NBBJ’s design approach evolves the mixed-use development to a new level of design thinking: the standard Stacked Programs model has been transformed into a vertical urban community of Integrated Human Networks. Stacked Programs Integrated Human Networks Constructing Vertical Communities 63 62
Wellness Loop Wellness Loop Regenerative Loop Regenerative Loop Urban Oasis
Oasis 66
Woven Facade Vertical Ecosystem Layered Canopies 70 A Beacon of Sustainability Synergy of Human Comfort and Building Performance
Sun Protection Energy Generation Water Management Breathing Building Envelope Sun Shading Energy Generating Canopy Structure Water Storage Water Collection Irrigation 68
ANGGARA 75
NBBJ NEW YORK STUDIO
ARUP
TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA JL.TEBET BARAT NO. 12B JAKARTA 7777 WATER STREET, NEW YORK, NY, 10005 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE JI. PROF. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN 01/04/2022 75% PROGRESS SET
PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 Designer LEVEL PLAN -102
NEW YORK, NY 10005 LEGAL, CONSTRUCTION-RELATED MATTERS.
-- - - - - - - - ----
INHABIT 0301/31/2022 100% SD
--Elevator_Retail Elevator_Service
----
Oasis Centeral Sudirman 100% SCHEMATIC DESIGN
--T2--- - - - - - - - - -
--9880 7570 9000 11050 7500 9000 10990
--- - - - - - - - -9000 11050 7500 BROADWAY FAX 9292
INHABIT
- -ANGGARA B M
H.R. RASUNA SAID KAV. C22 BLOK IIB TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 7777 WATER STREET, NEW YORK, 10005 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. 3-5, SUSTAINIBILITY CONSULTANT:
-Oasis Centeral Sudirman 100% SCHEMATIC DESIGN
PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 11/01/21 LEVEL B1M -106
ARUP
SECURITY - - - - - - - - -----Elevators_SA LOBBY Office Lobby +10.56 +11.29 +12.00 +11.90 +11.50 +12.00 +12.00 +11.40---STR - - - - - - - - -BROADWAY 29TH FLOOR NEW YORK, NY 10005 DWG. CONSTRUCTION DOCUMENTS OR FOR TECHNICAL, FACADE ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE ARCHITECTURE DESIGN CONSULTANT: MITSUBISHI ESTATE INDONESIA INDONESIA JL.TEBET BARAT NO. 12B JAKARTA 12810 YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 ATELIER TEN DEVELOPMENT 102632.00 Designer LEVEL PLAN -101 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA - - T1- -21 - - - T1- -26----BALCONY BOH Elevator_Retail Elevator_Service--DA-- - - - - - - - -NEW YORK, 10005 PHONE 9000 FAX 212 924 9292 STRUCTURAL ENGINEER: MEP ENGINEER: NBBJ LP NEW YORK STUDIO JL. H.R. RASUNA SAID KAV. C22 BLOK TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 7777 WATER STREET, NEW YORK, NY, 10005 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. 3-5, SUSTAINIBILITY CONSULTANT: INHABIT PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 11/01/21 LEVEL PLAN -103 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP ANGGARA - -- - - - - - - - -T2-T2T2---- - - - - - - - - - - - - - - - - - - - - - ---------Elevator_Office----STR STR - - - - - - - - -140 BROADWAY 29TH FLOOR NEW YORK, 10005 DWG. CONSTRUCTION DOCUMENTS FOR TECHNICAL, FACADE ENGINEER: LOCAL ARCHITECT RECORD: ISSUE ARCHITECTURE DESIGN CONSULTANT: PT. MITSUBISHI ESTATE INDONESIA INDONESIA JL.TEBET BARAT NO. 12B JAKARTA 12810 YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 ATELIER TEN DEVELOPMENT 102632.00 Designer LEVEL PLAN -104 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA e - -- - - - - - - - ---D1---C1- - - - - - - - - - - - - - - - - - - - - - ------T1---CORE Elevator_Office Elevator_Service Office Lobby-T2---
- -
9000 9000 9000 12000 9000 10500 9000 11500 11500 6500 6500 9550 9000 11050 10800 5600 6400 720046004500 7700 9880 7570 9000 11050 9000 10990 BROADWAY FAX 9292 NEW YORK, NY 10005 LEGAL, CONSTRUCTION-RELATED MATTERS. NBBJ LP NEW YORK STUDIO TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA JL.TEBET BARAT NO. 12B JAKARTA 7777 WATER STREET, NEW YORK, 10005 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN 01/04/2022 75% PROGRESS SET INHABIT 0301/31/2022 100% SET PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 Designer LEVEL PLAN -105 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP ANGGARA 1 5
T1-
T1-
T1-
T1- -12 T1- -
T1- -17
T1- -22 - -24 - T1- -27
T1-
- - - - - - -
Open Below
- -- - - - - - - -Retail Circulation
--T2-
NEW YORK, NY 10005 PHONE 212 924 9000 FAX 9292 STRUCTURAL ENGINEER: MEP ENGINEER:
-NBBJ LP NEW YORK STUDIO
BROADWAY 29TH FLOOR DWG. SOLELY COMMUNICATE ARCHITECTURAL DESIGN CONSTRUCTION DOCUMENTS TECHNICAL, FACADE ENGINEER: LOCAL ARCHITECT OF RECORD: ARCHITECTURE DESIGN CONSULTANT: MITSUBISHI ESTATE INDONESIA TRINITY TOWER, 52ND FLOOR INDONESIA JL.TEBET BARAT NO. 12B JAKARTA 12810 YORK, NY, 10005 JALAN BUKIT MERAH #01-01 ONE PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 ATELIER TEN PT. CENTRAL SUDIRMAN DEVELOPMENT 102632.00 Adrian OFFICE FLOOR PLAN LOW ZONE LEVEL A-114 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN LIFT MOTOR ROOM COM-MZ-1 COM-MZ-7 5m POTABLE WATER 14.5 4.5m (TX Off BREAK TANK PUMP Grey Water Pump - - - - -T1T1-T1--Elevator_Service Terrace 8450 1550550 7150 1500 1550150 7800 1000 4002750 300 8400 635030030000 1550 8450 9000 9000 9000 8450 1550 BROADWAY 29TH FLOOR DWG. SOLELY COMMUNICATE ARCHITECTURAL DESIGN CONSTRUCTION DOCUMENTS TECHNICAL, FACADE ENGINEER: LOCAL ARCHITECT OF RECORD: ARCHITECTURE DESIGN CONSULTANT: MITSUBISHI ESTATE INDONESIA TRINITY TOWER, 52ND FLOOR INDONESIA JL.TEBET BARAT NO. 12B JAKARTA 12810 YORK, NY, 10005 JALAN BUKIT MERAH #01-01 ONE PROF. DR. SATRIO KAV. JAKARTA 12940 ATELIER TEN PT. CENTRAL SUDIRMAN DEVELOPMENT 102632.00 Adrian REFUGE FLOOR LEVEL A-120 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN 29TH FLOOR NEW YORK, NY 10005 PHONE 212 9000 DATE: PURPOSES. NBBJ HAS PREPARED THIS DRAWING CONSTRUCTION DOCUMENTS TECHNICAL, FACADE ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: MITSUBISHI ESTATE INDONESIA H.R. RASUNA SAID KAV. C22 BLOK SCALE: 12810 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD PT. CENTRAL SUDIRMAN DEVELOPMENT 102632.00 OFFICE SKY GARDEN PLANS L24 A-118 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA - - - - -T1T1---Elevator_Office Elevator_Service Office Lobby 8450 Below 1550 8450 9000 9000 9000 8450 1550 47000 29TH FLOOR NEW YORK, 10005 PHONE 212 9000 DATE: PURPOSES. NBBJ HAS PREPARED THIS DRAWING CONSTRUCTION DOCUMENTS TECHNICAL, FACADE ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: MITSUBISHI ESTATE INDONESIA H.R. RASUNA SAID KAV. C22 SCALE: 12810 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE DBS BANK TOWER 28/F, CIPUTRA PT. CENTRAL SUDIRMAN DEVELOPMENT 102632.00 OFFICE SKY GARDEN PLANS LEVEL 28 A-122 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA 29TH FLOOR NEW YORK, NY 10005 PHONE 212 9000 DATE: PURPOSES. NBBJ HAS PREPARED THIS DRAWING CONSTRUCTION DOCUMENTS TECHNICAL, FACADE ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: MITSUBISHI ESTATE INDONESIA H.R. RASUNA SAID KAV. C22 BLOK SCALE: 12810 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD PT. CENTRAL SUDIRMAN DEVELOPMENT 102632.00 Designer OFFICE SKY GARDEN PLANS L25 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA - - - - -T1T1---Elevator_Office Elevator_Service Office Lobby 700900 7950 21700 1550 8450 9000 9000 9000 8450 1550 47000 29TH FLOOR NEW YORK, 10005 PHONE 212 9000 DATE: PURPOSES. NBBJ HAS PREPARED THIS DRAWING CONSTRUCTION DOCUMENTS TECHNICAL, FACADE ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: MITSUBISHI ESTATE INDONESIA H.R. RASUNA SAID KAV. C22 SCALE: 12810 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE DBS BANK TOWER 28/F, CIPUTRA PT. CENTRAL SUDIRMAN DEVELOPMENT 102632.00 OFFICE LEVEL 39 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA
- - - - ----Elevators_SA Elevators_SA Express Lobby 700900 7950 900 47000 NEW YORK, 10005 PHONE 9000 FAX 212 924 9292 PROJ. ARCH.: THIS DRAWING NOT FOR CONSTRUCTION BIDDING STRUCTURAL ENGINEER: MEP ENGINEER: NBBJ NEW YORK STUDIO JL. H.R. RASUNA SAID KAV. C22 BLOK TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 7777 WATER STREET, NEW YORK, NY, 10005 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. SUSTAINIBILITY CONSULTANT: INHABIT PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 11/01/21 SA MULTIPURPOSE FlOOR A-130 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP ANGGARA -LIFT MOTOR - - - - ----Green Terrace One Bedroom Apartment Two Bedroom Apartment 1550 8450 9000 9000 9000 8450 1550 47000 ARCHITECTURE DESIGN CONSULTANT: PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK PT. CENTRAL SUDIRMAN DEVELOPMENT 10/28/21 SA LOW RISE STACK 01A (L50) -134 A - -19 - T1- T1- T1----Elevator_Service Elevators_SA Elevators_SA Express 47000 140 BROADWAY FAX 212 924 9292 LEGAL, CONSTRUCTION-RELATED MATTERS. NBBJ NEW YORK STUDIO TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA JL.TEBET BARAT 12B JAKARTA 7777 WATER STREET, NEW YORK, NY, 10005 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN 01/04/2022 PROGRESS SET 0301/31/2022 100% SET PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 rman/OCS_ARCH_MAIN.rvt Adrian SA LOW RISE STACK 01C (L52) A-136 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP ANGGARA v y S 1 C - -19 - - T1----Express Amenity 22070 47000 140 BROADWAY NEW YORK, 10005 FAX 212 924 9292 LEGAL, CONSTRUCTION-RELATED MATTERS. NBBJ NEW YORK STUDIO TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA JL.TEBET BARAT NO. 12B JAKARTA 7777 WATER STREET, NEW YORK, NY, 10005 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN SD PROGRESS INHABIT PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 Designer SA AMENITIES_POOL -133 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP ANGGARA - - - - ----Three Bedroom Apartment Two Bedroom Apartment 1550 8450 9000 9000 9000 8450 1550 29TH FLOOR NEW YORK, 10005 NOT FOR CONSTRUCTION CONSTRUCTION DOCUMENTS FOR TECHNICAL, FACADE ENGINEER: LOCAL ARCHITECT RECORD: ISSUE ARCHITECTURE DESIGN CONSULTANT: PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK SCALE: 12810 YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 PT. CENTRAL SUDIRMAN DEVELOPMENT rman/OCS_ARCH_MAIN.rvt 102632.00 Au SA MID RISE STACK 03C A-144 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA v S C - -19 - - T1- T1----Three Bedroom Apartment Two Bedroom Apartment 47000 140 BROADWAY FAX 212 924 9292 LEGAL, CONSTRUCTION-RELATED MATTERS. NBBJ NEW YORK STUDIO TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA JL.TEBET BARAT 12B JAKARTA 7777 WATER STREET, NEW YORK, NY, 10005 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN 01/04/2022 PROGRESS 0301/31/2022 100% SET PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 Designer SA HIGH RISE STACK 04B A-146 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP ANGGARA v A B Service Apartments Roof Top Terraces 119 118 Residential Tower Apartments 123 122 Level +6000 Level +11000 Level +16000 Roof (Top of Tower) +326200 Level +21000 Level Mezz -4900 Level +25550 Level Office +30100 Level Office Level Typ Low Zone Office (Z1) +39200 Level (Refuge) +43750 Level +48300 Level Office Level Office +57400 Level Office +61950 Level (Typ. Mid Zone) Level +71050 +75600 Level Mid Zone Office (Z3) +80150 Level Office Level Office +89250 Level Office +93800 Level Office +98350 Level Office +102900 +107450 Level Office +112000 Level (Refuge/MEP) Level (MEP) +121100 Level Office +125650 Level Office +130200 Level (Typ. High Zone Office) +134750 +139300 Level +143850 Level Level +152950 +157500 Level +162050 Level +166600 Level +171150 Level +175700 Level (Refuge/MEP) +189350 Level (MEP/VOID) +193900 Level Multi Purpose Room +198450 Level (VOID) +203000 Level Sky Lobby Restaurant +207550 Level BOH Level Facility Pool +216650 +221200 Level +225750 Level (Typ SA Stack 01B) Level +233250 Level (Typ SA Stack +237000 +240750 Level (Typ SA Stack +244500 Level +248250 Level (Typ SA Stack 02B) Level (Refuge MEP) +255750 Level (MEP VOID) +260300 Level +264850 Level (Typ SA Stack 03A) +268700 Level (Typ SA Stack 03B) +272550 +276400 Level (Typ SA Stack 3C) +280250 Level (Typ SA Stack 3C) +284100 Level +287950 Level (Typ SA Stack 04B) +291800 Level +295650 Level (Typ SA Stack 04C) Level Level (SA Stack 04 D) +307200 Level Sky Bar +311050 Level (VOID) Level (ROOF MEP BMU) T1-B T1-D T1-E T1-F T1-H Level -11900 Level -15150 LevelT1-G T1-A Mech. T1-C Level (VOID) +184800 Level Multifunction 319m 326m STR 140 BROADWAY 29TH FLOOR NEW YORK, NY 10005 PHONE 212 924 9000 FAX 212 924 9292 29TH FLOOR PROJ. NO.: DATE: PROJ. ARCH.: DWG. DWG. MARKDATE DESCRIPTION B B NOT FOR CONSTRUCTION THIS DRAWING IS NOT FOR CONSTRUCTION OR BIDDING PURPOSES. NBBJ HAS PREPARED THIS DRAWING SOLELY TO COMMUNICATE ARCHITECTURAL DESIGN INTENT.NBBJ IS NOT THE ARCHITECT OF RECORD AND THEREFORE IS NOT RESPONSIBLE FOR PREPARING CONSTRUCTION DOCUMENTS OR FOR TECHNICAL, LEGAL, OR CONSTRUCTION-RELATED MATTERS. FACADE ENGINEER: STRUCTURAL ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: NBBJ LP NEW YORK STUDIO PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK IIB TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA SCALE: JL.TEBET BARAT NO. 12B JAKARTA 12810 7777 WATER STREET, NEW YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE JI. PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN 01 02 12/16/2021 01/04/2022 50% SD PROGRESS SET 75% SD PROGRESS SET INHABIT 0301/31/2022 100% SD SET PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 102632.00 Designer T1 SECTIONS A-301 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP SURBANA ANGGARA 500 1 T1 Sect on FOR COM-FL-1 Pump SPACE 8000x2000 TIERS) -18 - -20 - -----1550 8450 9000 9000 9000 8450 1550 29TH FLOOR NEW YORK, 10005 NOT FOR CONSTRUCTION CONSTRUCTION DOCUMENTS FOR TECHNICAL, FACADE ENGINEER: LOCAL ARCHITECT RECORD: ISSUE ARCHITECTURE DESIGN CONSULTANT: PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK IIB SCALE: 12810 YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 PT. CENTRAL SUDIRMAN DEVELOPMENT 102632.00 L74 (ROOF /MEP BMU) -150 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA e OO M
Level +16000 +326200 T1- T1- T1Level +12000 Roof +274600 Level - REFUGE FLOOR Level +44400 +52000 Level +59600 Level +67200 Level Level+93800 Level +102600 Level +110200 Level +129200 +136800Level - Garden +153200 LEVEL +173400 +181000 Level +188600 Level +196200+217600 Level Level +242600 Level Level +267600 T2- T2- T2- T2- T2- T2- T2- T2- T2-10T2-11 T2Level Level +144400 Level Office Level Office +34650 +39200 Level 13 Office Level 14 Office +61950 +66500 Level 18 Mid Zone Office (Z3) Level 19 Office Level 20 Office +89250 +93800 Level 25 Office Level 26 (Refuge/MEP) +116550 +121100 Level 30 (Typ. High Zone Office) Level 31 Level 32 +143850 +148400 Level 37 Level 38 +171150 +175700 Level 42 (Refuge/MEP) Level 43 (MEP/VOID) Level 44 Multi Purpose Room +198450 +203000 Level 46 Sky Lobby Restaurant Level 48 Facility Pool Level 49 +221200 +225750 Level 51 (Typ Stack 01B) +233250 Level 53 (Typ Stack Level 55 (Typ Stack Level 57 (Typ Stack 02B) Level 58 (Refuge MEP) Level 59 (MEP VOID) Level 60 +268700 Level 62 (Typ Stack 03B) Level 63 +276400 Level 65 (Typ Stack Level 66 +287950 Level 67 (Typ Stack 04B) Level 68 +299500 Level 71 (SA Stack Level 73 (VOID) Level 74 (ROOF MEP BMU) T1-2 T1- T1- T1- T1- T1- T1-10 T1-11 T1-12 T1-13 T1-14 T1-15 T1-16 T1-17 T1-18 T1-19 T1-20 T1-21 T1-22 T1-23 T1-24 T1-25 T1-26 T1-27 Level 41 (VOID) Level Level +16000 Level +12000 +274600 Level Level - REFUGE FLOOR +31800 Level Level Level +59600 +67200 Level +74800 Level +82400 LEVEL - PREMIUM FLOOR+102600 +110200 Level +117800 Level Level+153200 LEVEL +162000 Level +188600 +196200Level +217600 Level +227600 Level +242600 Level +252600 Level +267600 T2- T2- T2-E T2-GT2-F T2- T2Level +203800 Level +125400 Level Level Level Office +30100 +34650 Level (Refuge) Level Office Level Office +57400 +61950 Level Zone Office (Z3) Level Office +84700 +89250 Level Office Level Office +112000 +116550 Level (Typ. High Zone Office) Level +139300 +143850 Level Level +166600 +171150 Level (Refuge/MEP) Level (MEP/VOID) +193900 +198450 Level (VOID) Level Sky Lobby Restaurant Level Facility Pool Level +221200 +225750 Level (Typ Stack 01B) Level (Typ Stack Level (Typ Stack +244500 Level (Typ Stack 02B) +252000 Level (Refuge MEP) Level (MEP VOID) Level +264850 Level (Typ Stack 03B) Level +276400 Level (Typ Stack 3C) Level (Typ Stack 3C) +287950 Level (Typ Stack 04B) Level +295650 Level Stack 04 +307200 Level Level (VOID) Level (ROOF MEP BMU) T1-B T1- T1- T1-F T1- T1-G T1-A T1-C Level (VOID) 420053006400 725044504200 STR 140 BROADWAY 29TH FLOOR NEW YORK, PHONE 212 FAX 212 924 PROJ. NO.: DATE: PROJ. ARCH.: DWG. DWG. MARKDATE NOT FOR CONSTRUCTION THIS DRAWING PURPOSES. NBBJ SOLELY TO COMMUNICATE INTENT.NBBJ IS NOT THEREFORE NOT CONSTRUCTION DOCUMENTS LEGAL, OR CONSTRUCTION-RELATED FACADE STRUCTURAL LOCAL ARCHITECT ISSUE MEP ENGINEER: ARCHITECTURE NBBJ LP PT. MITSUBISHI JL. H.R. RASUNA TRINITY JAKARTA INDONESIA SCALE: JL.TEBET 12810 7777 WATER YORK, NY, 168 JALAN CONNECTION DBS BANK ONE JI. PROF. JAKARTA SUSTAINIBILITY ATELIER 01 02 12/16/2021 01/04/2022 INHABIT 0301/31/2022 PT. CENTRAL DEVELOPMENT 14A SAGO 1/31/2022 10:54:27 PM BIM 360://102632.00 Mitsubishi Oasis Central Sudi rman/OCS_ARCH_MAIN.rvt 102632.00 10/27/21 Designer OVERALL SOUTH, A-202 Oasis Centeral 100% SCHEMATIC ARUP SURBANA ANGGARA 500 1 T1+T2 OVERALL ELEVAT ON - SOUTH 500 2 T1+T2 OVERALL ELEVAT ON - EAST Level +11000 Roof (Top Tower) Level +21000 +18000 Level +28000Level Level +48200 +55800 Level +63400 Level +71000 Level LevelLevel +106400 Level +114000 Level Level +140600+148200 - Garden Level Level +177200 +184800 Level +192400 Level +200000 Level - REFUGE Level +222600 Level +237600 Level +247600 Level +262600 T2- T2-C T2- T2- T2- T2- T2-D 420044507250 640053004200 +25550 Level Typ Low Zone Office (Z1) Level 10 (Refuge) Level +48300 +52850 Level (Typ. Mid Zone) Level Level Office +75600 +80150 Level Office Level Office +102900 +107450 Level (Refuge/MEP) Level 27 (MEP) Level Office Level Office +130200 +134750 Level Level +157500 +162050 Level Level (MEP/VOID) Level Multi Purpose Room Level (VOID) Level Sky Lobby Restaurant +207550 +212100 +229500 Level Level Level 57 (Typ SA Stack 02B) Level (Refuge MEP) +255750 +260300 Level 61 (Typ SA Stack 03A) +272550 Level (Typ Stack 3C) +284100 Level 67 (Typ SA Stack 04B) +291800 Level 69 (Typ SA Stack 04C) Level +303350 Level Stack Level Sky Bar +316050 Level (ROOF MEP BMU) +319050 T1- T1-D T1- T1- T1- T1-G T1- T1+184800 Level Multifunction +180250 STR Level +11000 Roof (Top Tower) Level +21000T1- T1-4 T1+0 +18000 Level +28000Level Level +48200 +55800 Level +63400 Level +71000 Level LevelLevel +106400 Level +114000 Level Level +140600+148200 - Sky Garden Level Level +177200 +184800 Level +192400 Level +200000 Level - REFUGE Level +222600 Level +237600 Level +247600 Level +262600 T2- T2- T2- T2-5 T2-6 T2- T2- T2-9 T2-10T2-11T2+25550 Level Typ Low Zone Office (Z1) Level (Refuge) Level +48300 +52850 Level (Typ. Mid Zone) Level Level Office +75600 +80150 Level Office Level Office +102900 +107450 Level (Refuge/MEP) Level 27 (MEP) Level Office Level Office +130200 +134750 Level Level +157500 +162050 Level Level (MEP/VOID) Level Multi Purpose Room Level (VOID) Level Sky Lobby Restaurant +207550 +212100 +229500 Level Level Level 57 (Typ Stack 02B) Level (Refuge MEP) +255750 +260300 Level 61 (Typ Stack 03A) +272550 Level (Typ Stack 3C) +284100 Level 67 (Typ Stack 04B) +291800 Level (Typ Stack 04C) Level +303350 Level (SA Stack Level Sky Bar +316050 Level 74 (ROOF MEP BMU) +319050 T1- T1- T1- T1-7 T1- T1- T1-10 T1-11 T1-12 T1-13 T1-14 T1-15 T1-16 T1-17 T1-18 T1-19 T1-20 T1-21 T1-22 T1-23 T1-24 T1-25 T1-26 T1-27 +184800 Level 40 Multifunction +180250 140 BROADWAY 29TH FLOOR NEW YORK, NY 10005 PHONE 212 924 9000 FAX 212 924 9292 PROJ. NO.: DATE: PROJ. ARCH.: DWG. DWG. MARKDATE DESCRIPTION NOT FOR CONSTRUCTION THIS DRAWING IS NOT FOR CONSTRUCTION OR BIDDING PURPOSES. NBBJ HAS PREPARED THIS DRAWING SOLELY TO COMMUNICATE ARCHITECTURAL DESIGN INTENT.NBBJ NOT THE ARCHITECT OF RECORD AND THEREFORE IS NOT RESPONSIBLE FOR PREPARING CONSTRUCTION DOCUMENTS OR FOR TECHNICAL, LEGAL, OR CONSTRUCTION-RELATED MATTERS. FACADE ENGINEER: STRUCTURAL ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: NBBJ LP NEW YORK STUDIO PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK IIB TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA SCALE: JL.TEBET BARAT NO. 12B JAKARTA 12810 7777 WATER STREET, NEW YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE JI. PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN 01 02 12/16/2021 01/04/2022 50% SD PROGRESS SET 75% SD PROGRESS SET INHABIT 0301/31/2022 100% SD SET PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 1/31/2022 10:56:02 PM 102632.00 01/31/2022 Designer OVERALL ELEVATIONNORTH, WEST A-201 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP SURBANA ANGGARA 500 2 T1+T2 OVERALL ELEVAT ON - WEST 500 1 T1+T2 OVERALL ELEVATION - NORTH
Level +0 Level +11000 Roof (Top Tower) +326200 Level +25550 Level Office +30100 Level Typ Low Zone Office (Z1) Level 10 (Refuge) +43750 Level 11 +48300 Level 14 Office +61950 Level 15 (Typ. Mid Zone) +75600 Level 18 Mid Zone Office (Z3) +80150 Level 21 Office +93800 Level 22 Office +98350 Level 25 Office +112000 Level 26 (Refuge/MEP) +116550 Level 29 Office +130200 Level 30 (Typ. High Zone Office) +134750 Level 33 +148400 Level 34 +152950 Level 37 +166600 Level 38 +171150 Level 42 (Refuge/MEP) +189350 Level 44 Multi Purpose Room Level 45 (VOID) +203000 Level 46 Sky Lobby Restaurant +207550 Level 48 Facility Pool Level 49 +221200 Level 50 +225750 Level 51 (Typ SA Stack 01B) +229500 +233250 Level 53 (Typ SA Stack 01 Level 55 (Typ SA Stack 01 +244500 Level 56 +248250 Level 57 (Typ SA Stack 02B) Level 58 (Refuge MEP) Level 59 (MEP VOID) +260300 Level 60 +264850 Level 61 (Typ SA Stack 03A) Level 62 (Typ SA Stack 03B) +272550 Level 63 +276400 Level 64 (Typ SA Stack 3C) Level 65 (Typ SA Stack 3C) +284100 Level 67 (Typ SA Stack 04B) +291800 Level 68 +295650 Level 69 (Typ SA Stack 04C) Level 70 +303350 Level 71 (SA Stack 04 Level 72 Sky Bar +311050 Level 73 (VOID) Level 74 (ROOF MEP BMU) +319050 T1-B T1-D T1-E T1- T1-H T1-G T1- T1-C Level 41 (VOID) +184800 STR Level Level +11000 Roof (Top Tower) +326200 Level +25550 Level Office +30100 Level Typ Low Zone Office (Z1) Level (Refuge) +43750 Level +48300 Level Office +61950 Level (Typ. Mid Zone) +75600 Level Mid Zone Office (Z3) +80150 Level Office +93800 Level Office +98350 Level Office +112000 Level (Refuge/MEP) +116550 Level Office +130200 Level (Typ. High Zone Office) +134750 Level +148400 Level +152950 Level +166600 Level +171150 Level (Refuge/MEP) +189350 Level Multi Purpose Room Level (VOID) +203000 Level Sky Lobby Restaurant +207550 Level SA Facility Pool Level +221200 Level SA +225750 Level (Typ SA Stack 01B) +229500 +233250 Level (Typ SA Stack Level (Typ SA Stack +244500 Level +248250 Level (Typ SA Stack 02B) Level (Refuge MEP) Level (MEP VOID) +260300 Level SA +264850 Level (Typ SA Stack 03A) Level (Typ SA Stack 03B) +272550 Level +276400 Level (Typ SA Stack 3C) Level (Typ SA Stack 3C) +284100 Level (Typ SA Stack 04B) +291800 Level +295650 Level (Typ SA Stack 04C) Level +303350 Level (SA Stack D) Level Sky +311050 Level (VOID) Level (ROOF MEP BMU) +319050 T1-16 T1-17 T1-18 T1-19 T1-20 T1-21 T1-22 T1-23 T1-24 Level (VOID) +184800 Level Level +11000 Roof (Top Tower) +326200 Level +25550 Level Office +30100 Level Low Zone Office (Z1) Level (Refuge) +43750 Level +48300 Level Office +61950 Level (Typ. Mid Zone) +75600 Level Mid Zone Office (Z3) +80150 Level Office +93800 Level Office +98350 Level Office +112000 Level (Refuge/MEP) +116550 Level Office +130200 Level (Typ. High Zone Office) +134750 Level +148400 Level +152950 Level +166600 Level +171150 Level (Refuge/MEP) +189350 Level Multi Purpose Room Level (VOID) +203000 Level Lobby Restaurant +207550 Level SA Facility Pool Level +221200 Level SA +225750 Level (Typ Stack 01B) +229500 +233250 Level (Typ Stack C) Level (Typ Stack C) +244500 Level +248250 Level (Typ Stack 02B) Level (Refuge MEP) Level (MEP VOID) +260300 Level SA +264850 Level (Typ Stack 03A) Level (Typ Stack 03B) +272550 Level +276400 Level (Typ Stack 3C) Level (Typ Stack 3C) +284100 Level (Typ Stack 04B) +291800 Level +295650 Level (Typ Stack 04C) Level +303350 Level (SA Stack Level Sky Bar +311050 Level (VOID) Level (ROOF MEP BMU) +319050 T1-B T1- T1-E T1-F T1-H T1-G T1-A T1-C Level (VOID) +184800 STR Level Level +11000 Roof (Top Tower) +326200 Level +25550 Level Office +30100 Level Typ Low Zone Office (Z1) Level (Refuge) +43750 Level +48300 Level Office +61950 Level (Typ. Mid Zone) +75600 Level Zone Office (Z3) +80150 Level Office +93800 Level Office +98350 Level Office +112000 Level (Refuge/MEP) +116550 Level Office +130200 Level (Typ. High Zone Office) +134750 Level +148400 Level +152950 Level +166600 Level +171150 Level (Refuge/MEP) +189350 Level Multi Purpose Room Level (VOID) +203000 Level Sky Lobby Restaurant +207550 Level Facility Pool Level +221200 Level +225750 Level (Typ SA Stack 01B) +229500 +233250 Level (Typ SA Stack Level (Typ SA Stack +244500 Level +248250 Level (Typ SA Stack 02B) Level (Refuge MEP) Level (MEP VOID) +260300 Level +264850 Level (Typ SA Stack 03A) Level (Typ SA Stack 03B) +272550 Level +276400 Level (Typ SA Stack 3C) Level (Typ SA Stack 3C) +284100 Level (Typ SA Stack 04B) +291800 Level +295650 Level (Typ SA Stack 04C) Level +303350 Level Stack Level +311050 Level (VOID) Level (ROOF MEP BMU) +319050 T1-18 T1-19 T1-20 T1-21 T1-22 T1-23 Level (VOID) +184800 140 BROADWAY 29TH FLOOR NEW YORK, NY 10005 PHONE 212 924 9000 FAX 212 924 9292 FAX 212 924 9292 NEW YORK, NY 10005 PROJ. NO.: DATE: PROJ. ARCH.: DWG. DWG. MARKDATE E E NOT FOR CONSTRUCTION THIS DRAWING IS NOT FOR CONSTRUCTION OR BIDDING PURPOSES. NBBJ HAS PREPARED THIS DRAWING SOLELY TO COMMUNICATE ARCHITECTURAL DESIGN INTENT.NBBJ IS NOT THE ARCHITECT OF RECORD AND THEREFORE NOT RESPONSIBLE FOR PREPARING CONSTRUCTION DOCUMENTS OR FOR TECHNICAL, LEGAL, OR CONSTRUCTION-RELATED MATTERS. FACADE ENGINEER: STRUCTURAL ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: NBBJ LP NEW YORK STUDIO PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK IIB TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA SCALE: JL.TEBET BARAT NO. 12B JAKARTA 12810 7777 WATER STREET, NEW YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE JI. PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN 01 02 12/16/2021 01/04/2022 50% SD PROGRESS SET 75% SD PROGRESS SET INHABIT 0301/31/2022 100% SD SET PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 1/31/2022 10:58:12 PM rman/OCS_ARCH_MAIN.rvt 102632.00 01/07/22 Adrian Au T1 OVERALL ELEVATIONS A-203 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP SURBANA ANGGARA 500 02 OVERALL ELEVAT ON - T1 EAST (H DDEN 500 03 OVERALL ELEVAT ON - T1 SOUTH 500 04 OVERALL ELEVAT ON - T1 WEST H DDEN) 500 01 OVERALL ELEVATION - T1 NORTH - - - - - -NEW YORK, 10005 CONSTRUCTION CONSTRUCTION DOCUMENTS TECHNICAL, STRUCTURAL ENGINEER: NBBJ NEW YORK STUDIO PT. MITSUBISHI ESTATE INDONESIA 7777 WATER STREET, NEW 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 ONE PROF. DR. SATRIO KAV. 3-5, 50% PROGRESS SET 75% PROGRESS SET 100% PT. CENTRAL SUDIRMAN 12/27/21 T1 ENLARGED ELEVATION SKY GARDEN Oasis Centeral Sudirman 100% SCHEMATIC DESIGN K G R EN - A T L V O T1- T1- -20 T1- -8450 9000 9000 9000 8450 NEW YORK, 10005 PHONE 212 924 9000 FAX 9292 DWG. SOLELY TO COMMUNICATE ARCHITECTURAL DESIGN LEGAL, CONSTRUCTION-RELATED MATTERS. FACADE ENGINEER: STRUCTURAL ENGINEER: LOCAL ARCHITECT OF RECORD: NBBJ LP NEW YORK STUDIO TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 ONE PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 T1 ENLARGED ELEVATION SKY GARDEN 214 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA K G R EN-S U H L V T O N - - - - -140 BROADWAY 29TH FLOOR PURPOSES. NBBJ HAS PREPARED THIS DRAWING CONSTRUCTION DOCUMENTS FOR TECHNICAL, STRUCTURAL ENGINEER: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK JL.TEBET BARAT NO. 12B JAKARTA 7777 WATER STREET, NEW YORK, NY, 10005 CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD PT. CENTRAL SUDIRMAN DEVELOPMENT Adrian T1 ENLARGED ELEVATION - SKY GARDEN - NORTH -212 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN S Y G RD N-NO T E V T ON - - - - -8450 9000 9000 9000 8450 NEW YORK, NY 10005 PHONE 212 924 9000 FAX 9292 SOLELY TO COMMUNICATE ARCHITECTURAL DESIGN LEGAL, CONSTRUCTION-RELATED MATTERS. FACADE ENGINEER: STRUCTURAL ENGINEER: NBBJ LP NEW YORK STUDIO PT. MITSUBISHI ESTATE INDONESIA TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 ONE PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 ATELIER TEN 12/16/2021 01/04/2022 50% PROGRESS SET 75% PROGRESS SET 0301/31/2022 100% SET PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 12/27/21 T1 ENLARGED ELEVATION - SA AMENITY - NORTH -216 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA ANGGARA S ME Y-NO T E V T ON - - - - - -NEW YORK, 10005 PHONE 9000 DESCRIPTION INTENT.NBBJ NOT THE ARCHITECT RECORD LOCAL ARCHITECT RECORD: TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 SCALE: JL.TEBET BARAT NO. 12B JAKARTA 12810 7777 WATER STREET, NEW YORK, NY, 10005 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. JAKARTA 12940 SUSTAINIBILITY CONSULTANT: INHABIT PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 102632.00 Au T1 ENLARGED ELEVATION - SA AMENITY - EAST -217 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN A EN Y- A T E A N
Level +0 Level +6000 Level +16000 Level +21000T1- T1- T1Level +25550 Level Typ Low Zone Office (Z1) +39200 T1-2 T1-1 T1- T1- T1- T1-9 T1-10 T1-11 T1-12 T1-13 T1-14 T1-15 T1-16 T1-17 T1-18 T1-19 T1-20 T1-21 T1-22 T1-23 T1-24 T1-25 T1-26 T1-27 A-224 A-225 A-226 490060005000500050004550455045504550 Level +6000 Level +11000 Level +21000 T1- T1- T1Level Office +34650 T1- T1- T1-8 T1- T1-10 T1-11 T1-12 T1-13 T1-14 T1-15 T1-16 T1-17 T1-18 T1-19 T1-20 T1-21 T1-22 T1-23 T1-24 T1-25 T1-26 T1-27 9000 9000 7500 11050 8450 9000 9000 9000 8450 9550 9000 6500 6500 11500 11500 9000 9000 9000 10500 9000 9000 12000 9000 9000 A-227 A-228 A-229 +11.50 +11.00 Level +11000 Level B1 Mezz -4900 Level Office +30100 Level Office +34650 Level Typ Low Zone Office (Z1) T1-B T1- T1-E T1-F T1-H T1-G T1- T1- T2- T2-B STR 4550 4550 4550 4550 5000 5000 5000 6000 4900 4200 9900 8700 7800 9000 9000 9000 9000 6950 9550 Level +11000 Level B1 Mezz -4900 Level Office +30100 Level Office +34650 T1- T1- T1- T1-F T1-H T1-G T1- T1- T2- T2-B T2-C STR 9550 6950 9000 9000 9000 9000 7800 8700 9900 42004450 140 BROADWAY 29TH FLOOR NEW YORK, NY 10005 PHONE 212 924 9000 FAX 212 924 9292 MARKDATE G G NOT FOR CONSTRUCTION THIS DRAWING NOT FOR CONSTRUCTION OR BIDDING PURPOSES. NBBJ HAS PREPARED THIS DRAWING SOLELY TO COMMUNICATE ARCHITECTURAL DESIGN INTENT.NBBJ IS NOT THE ARCHITECT OF RECORD AND THEREFORE NOT RESPONSIBLE FOR PREPARING CONSTRUCTION DOCUMENTS OR FOR TECHNICAL, LEGAL, OR CONSTRUCTION-RELATED MATTERS. FACADE ENGINEER: STRUCTURAL ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: NBBJ LP NEW YORK STUDIO PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK IIB TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA JL.TEBET BARAT II NO. 12B JAKARTA 7777 WATER STREET, NEW YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE JI. PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN 12/16/2021 01/04/2022 50% SD PROGRESS SET 75% SD PROGRESS SET INHABIT 0301/31/2022 PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 OVERALL PODIUM ELEVATIONS Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA ANGGARA 300 4 OVERALL POD UM ELEVAT ON - NORTH 300 3 OVERALL POD UM ELEVAT ON - SOUTH 300 1 OVERALL PODIUM ELEVATION - EAST 300 2 OVERALL POD UM ELEVAT ON - WEST - - - - - - -+8.90 +10.90 - - - - - - -PURPOSES. NBBJ HAS PREPARED THIS DRAWING FACADE ENGINEER: LOCAL ARCHITECT OF RECORD: ARCHITECTURE DESIGN CONSULTANT: NBBJ LP NEW YORK STUDIO H.R. RASUNA SAID KAV. C22 BLOK JAKARTA SELATAN 12940 JL.TEBET BARAT NO. 12B JAKARTA CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. 3-5, PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN S CT ON T SE V E RO D - EA T E E A ON 9000 +8.90- - - - - - -+11.00 +8.00 140 BROADWAY 29TH FLOOR NEW YORK, 10005 PHONE 212 9000 FAX 212 924 9292 NOT FOR CONSTRUCTION INTENT.NBBJ ARCHITECT ISSUE MEP ENGINEER: ARCHITECTURE DESIGN JL. H.R. RASUNA SAID TRINITY TOWER, 52ND 7777 WATER STREET, YORK, NY, 10005 168 JALAN BUKIT MERAH DBS BANK TOWER 28/F, ONE PROF. DR. SATRIO JAKARTA 12940 SUSTAINIBILITY CONSULTANT: 12/16/2021 01/04/2022 50% PROGRESS 75% PROGRESS INHABIT 0301/31/2022 100% PT. CENTRAL DEVELOPMENT 102632.00 T1 ENLARGED ELEVATIONSEAST WEST ELEVATIONS -234 Oasis Centeral 100% SCHEMATIC ARUP SURBANA ANGGARA 2 E N T S R C OA - EA E VA N 1 W S E V T N - - - - - - - -NEW YORK, 10005 ARCHITECTURE DESIGN CONSULTANT: JL. H.R. RASUNA SAID KAV. C22 BLOK TRINITY TOWER, 52ND FLOOR JL.TEBET BARAT NO. 12B JAKARTA 7777 WATER STREET, NEW DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. 3-5, PT. CENTRAL SUDIRMAN DEVELOPMENT T1 ENLARGED ELEVATIONS NORTH (EAST) Oasis Centeral Sudirman 100% SCHEMATIC DESIGN OR H E E ON - T1- - - - T1- -8700 7800 9000 9000 9000 9000 6950 9550 STR PROJ. CONSTRUCTION 0301/31/2022 T1 ELEVATIONS TOWER LOBBY)Oasis 100% S A T E V T ON - - -12 - - T1- - -17 -8450 9550 9000 6500 6500 11500 11500 9000 9000 1 OR H E V T ON - - - - - -140 BROADWAY 29TH FLOOR NEW YORK, 10005 PROJ. ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: JL. H.R. RASUNA SAID KAV. C22 BLOK TRINITY TOWER, 52ND FLOOR JL.TEBET BARAT NO. 12B JAKARTA 12810 7777 WATER STREET, NEW YORK, NY, 10005 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE PROF. DR. SATRIO KAV. 3-5, INHABIT PT. CENTRAL SUDIRMAN DEVELOPMENT Adrian T1 ENLARGED ELEVATIONS - PODIUMTOWER BASE (WEST, OFFICE LOBBY) -232 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP 1 B S W S E A O
WT-1 WT-2A WT-2B WT-3 WT-4 WT-6 WT-1 WT-2B WT-3 WT-2A WT-6 WT-4 140 BROADWAY 29TH FLOOR NEW YORK, NY 10005 PHONE 212 924 9000 FAX 212 924 9292 PROJ. NO.: DATE: PROJ. ARCH.: DWG. DWG. MARKDATE DESCRIPTION NOT FOR CONSTRUCTION THIS DRAWING IS NOT FOR CONSTRUCTION OR BIDDING PURPOSES. NBBJ HAS PREPARED THIS DRAWING SOLELY TO COMMUNICATE ARCHITECTURAL DESIGN INTENT.NBBJ NOT THE ARCHITECT OF RECORD AND THEREFORE IS NOT RESPONSIBLE FOR PREPARING CONSTRUCTION DOCUMENTS OR FOR TECHNICAL, LEGAL, OR CONSTRUCTION-RELATED MATTERS. FACADE ENGINEER: STRUCTURAL ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: NBBJ LP NEW YORK STUDIO PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK IIB TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA SCALE: JL.TEBET BARAT NO. 12B JAKARTA 12810 7777 WATER STREET, NEW YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE JI. PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN 01 02 12/16/2021 01/04/2022 50% SD PROGRESS SET 75% SD PROGRESS SET INHABIT 0301/31/2022 100% SD SET PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 1/31/2022 10:13:15 PM BIM 360://102632.00Mitsubishi Oasis Central Sudi rman/OCS_ARCH_MAIN.rvt 102632.00 01/06/22 Designer T1 FACADE SYSTEM INDEX A-401 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP SURBANA ANGGARA 1 WALL TYPE NDEX 2 WALL TYPE NDEX Level Office +57400 Level Office +61950 Level (Typ. Mid Zone) +66500 Level +71050 T1-20 T1-21 T1-22 9000 9000 A-403 T1-20 T1-21 T1-22 T1-H 9000 9000 A-403 1500 1500 1500 TYP. 1500 1500 1500 1500 1500 1500 1500 1500 1500 300 4500 4500 4500 4500 Level Office +57400 Level Office +61950 Level (Typ. Mid Zone) +66500 Level +71050 T1-H 350 900 3300 350 900 3650 700500 150 500 750 500 1400 3000 150 200 600 GL01 GLASS TYPES VISION GLAZING (TOWER GL02 SPANDREL GLAZING GL03 GLASS GUARDRAIL (TOWER GL04 VISION GLASING (LOBBY METAL TYPES ARCHITECTURAL STEEL ALUMINUM MULLION TYPES TOWER MULLION TOWER SHADING LOUVER TOWER BACKPAN WOOD TYPES WD02 EXTERIOR FLOORING LOBBY STRUCTURAL STONE CLADDING TYPES ST01 PODIUM STONE SILL WD01 EXTERIOR WALL CLADDING CANOPY GLASS EXTERIOR SOFFIT METAL PANEL VISION GLASS SPANDREL PODIUM VISION BALUSTRADE LOUVERS DRAWING NOTES C D C D MATERIAL CODES LEGENDS KEY PLAN 1/31/2022 10:13:26 PM BIM 360://102632.00Mitsubishi Oasis Central Sudi rman/OCS_ARCH_MAIN.rvt 50 3 ELEVAT ON 50 1 TYP PLAN 50 4 WT1 SECT ON 2 AXON
Level (Typ Stack 01 +237000 Level (Typ Stack 01 Level +248250 T1-19 T1-20 T1-21 A-404 A-404 9000 9000 T1-19 T1-20 T1-21 T1-B 9000 9000 A-404 A-404 1500 3000 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 220 960 1500 1400 1360 1410 950 5003001250 Level (Typ Stack 01 +237000 Level (Typ Stack 01 Level +248250 T1-B 3750 3750 3750 3750 650 650 100 6700 7500 Level (Typ Stack 01 +237000 Level (Typ Stack 01 Level +248250 T1T1-19 T1-20 T1-21 T1A-404 A-404 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 950 1500 1500 1500 1500 950 960 1500 1400 SPANDREL GLAZING (TOWER PODIUM) GLASS GUARDRAIL (TOWER PODIUM) VISION GLASING (LOBBY AND PODIUM) BALUSTRADE CLEAR GLASS 140 BROADWAY 29TH FLOOR NEW YORK, NY 10005 PHONE 212 924 9000 FAX 212 924 9292 NOT FOR CONSTRUCTION THIS DRAWING IS NOT FOR CONSTRUCTION OR BIDDING PURPOSES. NBBJ HAS PREPARED THIS DRAWING SOLELY TO COMMUNICATE ARCHITECTURAL DESIGN INTENT.NBBJ IS NOT THE ARCHITECT OF RECORD AND THEREFORE IS NOT RESPONSIBLE FOR PREPARING CONSTRUCTION DOCUMENTS OR FOR TECHNICAL, LEGAL, OR CONSTRUCTION-RELATED MATTERS. FACADE ENGINEER: STRUCTURAL ENGINEER: LOCAL ARCHITECT OF RECORD: MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: NBBJ LP NEW YORK STUDIO PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK IIB TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA JL.TEBET BARAT NO. 12B JAKARTA 7777 WATER STREET, NEW YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE JI. PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 1/31/2022 10:17:39 PM BIM 360://102632.00 Mitsubishi Oasis Central Sudi rman/OCS_ARCH_MAIN.rvt 102632.00 01/06/22 Designer T1 WALL TYPE 2A TYPICAL SA FACADE Oasis Centeral Sudirman 100% SCHEMATIC DESIGN SURBANA ANGGARA 50 4 TYP NORTH ELEVAT ON 50 2 Leve 54 P an 50 5 TYP SECTION 50 6 TYP SECT ON 50 1 Leve 52 P an 3 AXON Level +233250 Level (Typ Stack Level +240750 +244500 T1-20 T1-21 T1-22 A-405 A-405 9000 9000 Level +233250 Level (Typ Stack Level +240750 +244500 T1-G 600 Level 52 +233250 Level 53 (Typ SA Stack C) Level 54 +240750 +244500 T1950 950 950 950 T1-20 T1-21 T1-22 T1-G A-405 A-405 9000 9000 1250 1200 1400 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 150 GL01 GLASS TYPES VISION GLAZING (TOWER PODIUM) SPANDREL GLAZING (TOWER PODIUM) GLASS GUARDRAIL (TOWER PODIUM) VISION GLASING (LOBBY AND PODIUM) METAL TYPES M01 ARCHITECTURAL STEEL ALUMINUM MULLION TYPES A01 TOWER MULLION A02 TOWER SHADING LOUVER A03 TOWER BACKPAN WOOD TYPES EXTERIOR FLOORING GL05 LOBBY STRUCTURAL GLASS FIN STONE CLADDING TYPES PODIUM STONE SILL EXTERIOR WALL CLADDING GL06 CANOPY GLASS WD03 EXTERIOR SOFFIT METAL PANEL FINS VISION GLASS SPANDREL GLASS PODIUM VISION GLASS BALUSTRADE CLEAR GLASS LOUVERS DRAWING NOTES MATERIAL CODES LEGENDS KEY PLAN 1/31/2022 10:13:52 PM BIM 360://102632.00 Mitsubishi Oasis Central Sudi rman/OCS_ARCH_MAIN.rvt 50 3 TYP SOUTH ELEVAT ON 50 4 TYP SECT ON 50 5 TYP SECTION 50 1 TYP PLAN - LEVEL 52 2 AXON
T1-19 T1-20 T1-21 T1-22 T1-H REFUGE A-406 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 150 4500 4500 4500 4500 1100 300 9000 9000 9000 Level (Refuge/MEP) +116550 Level (MEP) +121100 Level Office +125650 T1-H REFUGE Level (Refuge/MEP) +116550 Level (MEP) +121100 Level Office +125650 T1-19 T1-20 T1-21 T1-22 A-406 9000 9000 9000 GL01 GLASS TYPES VISION GLAZING (TOWER PODIUM) SPANDREL GLAZING (TOWER PODIUM) GLASS GUARDRAIL (TOWER PODIUM) VISION GLASING (LOBBY AND PODIUM) METAL TYPES M01 ARCHITECTURAL STEEL ALUMINUM MULLION TYPES A01 TOWER MULLION A02 TOWER SHADING LOUVER A03 TOWER BACKPAN WOOD TYPES EXTERIOR FLOORING GL05 LOBBY STRUCTURAL GLASS FIN STONE CLADDING TYPES PODIUM STONE SILL EXTERIOR WALL CLADDING GL06 CANOPY GLASS WD03 EXTERIOR SOFFIT METAL PANEL FINS VISION GLASS SPANDREL GLASS PODIUM VISION GLASS BALUSTRADE CLEAR GLASS LOUVERS 140 BROADWAY 29TH FLOOR NEW YORK, NY 10005 PHONE 212 924 9000 FAX 212 924 9292 DRAWING NOTES PROJ. NO.: DATE: PROJ. ARCH.: DWG. DWG. MARKDATE DESCRIPTION NOT FOR CONSTRUCTION THIS DRAWING IS NOT FOR CONSTRUCTION OR BIDDING PURPOSES. NBBJ HAS PREPARED THIS DRAWING SOLELY TO COMMUNICATE ARCHITECTURAL DESIGN INTENT.NBBJ IS NOT THE ARCHITECT OF RECORD AND THEREFORE IS NOT RESPONSIBLE FOR PREPARING CONSTRUCTION DOCUMENTS OR FOR TECHNICAL, LEGAL, OR CONSTRUCTION-RELATED MATTERS. FACADE ENGINEER: STRUCTURAL ENGINEER: LOCAL ARCHITECT OF RECORD: ISSUE MEP ENGINEER: ARCHITECTURE DESIGN CONSULTANT: NBBJ LP NEW YORK STUDIO PT. MITSUBISHI ESTATE INDONESIA JL. H.R. RASUNA SAID KAV. C22 BLOK IIB TRINITY TOWER, 52ND FLOOR JAKARTA SELATAN 12940 INDONESIA MATERIAL CODES LEGENDS KEY PLAN SCALE: JL.TEBET BARAT NO. 12B JAKARTA 12810 7777 WATER STREET, NEW YORK, NY, 10005 168 JALAN BUKIT MERAH #01-01 CONNECTION ONE SINGAPORE 150168 DBS BANK TOWER 28/F, CIPUTRA WORLD ONE JI. PROF. DR. SATRIO KAV. 3-5, JAKARTA 12940 SUSTAINIBILITY CONSULTANT: ATELIER TEN 12/16/2021 01/04/2022 50% SD PROGRESS SET 75% SD PROGRESS SET INHABIT 0301/31/2022 100% SD SET PT. CENTRAL SUDIRMAN DEVELOPMENT 14A SAGO STREET SINGAPORE 059015 1/31/2022 10:14:01 PM BIM 360://102632.00 Mitsubishi Oasis Central Sudi rman/OCS_ARCH_MAIN.rvt 102632.00 01/06/22 Designer T1 WALL TYPE 3 - TYPICAL LOUVER A-406 Oasis Centeral Sudirman 100% SCHEMATIC DESIGN ARUP SURBANA ANGGARA 50 1 TYP PLAN - LEVEL 26 50 4 TYP LOUVER SECT ON 2 AXON 50 3 SOUTH ELEVATION +326200 Level Sky Bar +319050 T1-18 T1-19 T1-20 9000 8450 A-407 A-407 T1-18 T1-19 T1-20 T1-B A-407 A-407 5500 4500 4500 4500 Terrace Interior 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 150 1000 1550 8450 9000 Interior 500 1550 1400 1500 1500 1500 1500 1500 T1-18 T1-19 T1-20 T1A-407 A-407 800 1500 1500 1500 1500 1500 1500 4500 4500 4500 5500 Open To Below Roof BMU Roof 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 150 1000 1550 8450 9000 +326200 Level Sky Bar +319050 T1-B Sky Bar Interior Roof +326200 Level Sky Bar +319050 T1Sky Bar Interior Roof BMU Parapet Column Beam Beyond GL01 GLASS TYPES VISION GLAZING (TOWER PODIUM) SPANDREL GLAZING (TOWER PODIUM) GLASS GUARDRAIL (TOWER PODIUM) VISION GLASING (LOBBY AND PODIUM) METAL TYPES M01 ARCHITECTURAL STEEL ALUMINUM MULLION TYPES A01 TOWER MULLION A02 TOWER SHADING LOUVER A03 TOWER BACKPAN WOOD TYPES EXTERIOR FLOORING GL05 LOBBY STRUCTURAL GLASS FIN STONE CLADDING TYPES PODIUM STONE SILL EXTERIOR WALL CLADDING GL06 CANOPY GLASS WD03 EXTERIOR SOFFIT METAL PANEL FINS VISION GLASS SPANDREL GLASS PODIUM VISION GLASS BALUSTRADE CLEAR GLASS LOUVERS DRAWING NOTES MATERIAL CODES LEGENDS KEY PLAN 1/31/2022 10:14:18 PM BIM 360://102632.00 Mitsubishi Oasis Central Sudi rman/OCS_ARCH_MAIN.rvt 4 NORTH ELEVATION 1 Leve 72 Sky Ba 2 Leve 74 (ROOF MEP) 50 5 SECTION 6 SECT ON AT BALCONY 3 AXON
73
The Central Node | Hangzhou
丝带舞灵感 Ribbon Dance Inspiration
方案的设计灵感来源于中国传统的丝带舞。它萦绕串联了整个开发项 目,连接起了各个配套功能和公共空间。丝带空间的舞动引导了流线
穿过整个场地的所有空间。
The traditional Chinese ribbon dance inspires the scheme. It wraps around the whole development, connecting and embracing Amenity functions and public spaces.
The Active movement of the ribbon inspires fluent dance-like guidance through all areas on our site.and pandas, where they can get together and find comfort and relaxation.
景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01
方案的设计灵感来源于中国传统的丝带舞。它萦绕串联了整个开发项 目,连接起了各个配套功能和公共空间。丝带空间的舞动引导了流线
The traditional Chinese ribbon dance inspires the scheme. It wraps around the whole development, connecting and embracing Amenity
The Active movement of the ribbon inspires fluent dance-like guidance through all areas on our site.and pandas, where they can
29
29 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01
目,连接起了各个配套功能和公共空间。丝带空间的舞动引导了流线 穿过整个场地的所有空间。 The traditional Chinese ribbon dance inspires the scheme. It wraps around the whole development, connecting and embracing Amenity functions and public spaces. The Active movement of the ribbon inspires fluent dance-like guidance through all areas on our site.and pandas, where they can get together and find comfort and relaxation. 丝带舞灵感 Ribbon Dance Inspiration 29 28 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 03 设计概念 Design Concept
方案的设计灵感来源于中国传统的丝带舞。它萦绕串联了整个开发项
From Single Program Buildings
文化 Culture 运动 Sport 工作 Work 14 从单一功能建筑 From Single Program Buildings 到各种活动的集合 To Integrated Activities 能量中心 Center of Energy 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 01 场地环境 Context
绿色走廊 Green Corridor
景芳三堡单元
连接节点 Conectivity
地块方案设计征集
连接节点 Conectivity
1. 钱塘江 Qiantang River 2. 大运河 Grand Canal 3. 铁沙河 Tiesha River 4. 新开河 Xinkaihe
图例 Legend 21 20 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 02 场地分析 Site Analysis 场地条件 Site Conditions 公共交通 Public Transport 车流 Traffic 视野 Views 能见度 Visibility 23 22 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 02 场地分析 Site Analysis 场地条件 Site Conditions 公共交通 Public Transport 车流 Traffic 视野 Views 能见度 Visibility 23 22 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 02 场地分析 Site Analysis 场地条件 Site Conditions 公共交通 Public Transport 车流 Traffic 视野 Views 能见度 Visibility 23 22 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 02 场地分析 Site Analysis Corridor
21
JG1203-74
Qian Jiang New City Development 2023.01 Analysis 场地条件 Site Conditions 公共交通 Public Transport 车流 Traffic 视野 Views 能见度 Visibility 23 22 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 02 场地分析 Site Analysis
西南角办公区视角 Office View From Southwest 34 1.
Program
2.
6.
功能
4. 体量高度 Heights
中央广场 Open Space
气孔率 Porosity 3. 能见度 Visibility
31 30 文化设施 Cultural Facility 办公休憩空间 Office Respite Moments 连接丝带 Connective Ribbon 连接丝带 Connective Ribbon 恢复性露台 Restorative Terraces 开放地面 Open Ground 体育设施 Sports Facility 创造性空间 Generative Environments 33 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 设计原则 Design Drivers 1. 功能 Program 4. 体量高度 Heights 2. 中央广场 Open Space 6. 气孔率
3. 能见度 Visibility 5. 连通的丝带 Connective
景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 03 设计概念 Design Concept
5. 连通的丝带 Connective Ribbon
Porosity
Ribbon
N 5 0 0 运河西路Yunhe West Road 三新路 Sanxin Road 太平门直街 Taipingmen St 运河西路Yunhe West Road 三新路 Sanxin Road 太平门直街 Taipingmen St O O n 快� 机� C C O b P P �公大堂 停� O b �公大堂 o-w g 共享�公 大堂 停� 咖 � 餐� �行 快� 商� M 落客区 B C O b Cn A A W W C P 群体活� 活�中心 大堂 大堂 停� 停� 落客区 落客区 前台 �公 有机餐吧 �店咖 � 厨房 �堂 �所 W �所 �公 登�台 �� �所 N 0 5 0 2 0 首层平面 Ground Plan 运动 Sports 文化 Culture 图例 Legend 办公 Office 景观 Landscape 商业 Retail 机电 和厨房 MEP/ BOH 服务空间 Servicing
Roof Plan 艺术文化中心 ART AND CULTURAL BUILDING 体育中心 SPORTS BUILDING 办公楼 OFFICE BUILDING 办公楼 OFFICE BUILDING 39 38 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 03 设计概念 Design Concept
屋顶平面
5层健康露台
Sports Plan 三新路 Sanxin Road 太平门直街 Taipingmen St 标准文体中心平面 Typical Culture & Sports Plan N 5 O O O O O R o G en b 屋�花 大堂 �公 O 展� 三新路 Sanxin Road Exhibition Space View 03 设计概念 Design Concept 5层健康露台 L5: Wellness Terraces 运动 文化 图例 Legend 办公 景观 商业 机电 和厨房 服务空间 N 0 5 0 5 0 2 0 1 F F C C O e b w N C -Wo n 上空 共享�公 o-W g 共享�公 W h n R C mb n a & S F K c n e T D n g �重区 攀岩 有 �区 露台 露台 餐� D n n 餐� 餐� W �所 W �所 W C �所 厨房 吧台 上空 上空 运河西路Yunhe West Road 三新路 Sanxin Road 太平门直街 Taipingmen St
L5: Wellness Terraces 运动 Sports 文化 Culture 图例 Legend 办公 Office 景观 Landscape 商业 Retail 机电 和厨房 MEP/ BOH 服务空间 Servicing F C -Wo n 共享�公 We g g o C m g A A D n g �重区 攀岩 有 餐� W �所 吧台 上空 上空 三新路 Sanxin Road 太平门直街 Taipingmen St 60 03 设计概念 Design Concept N毛球� 毛球� 展� 展� 展� ��身区�� �所 �所 �所 �所 前台 上空 上空 上空 上空 休息区 运河西路Yunhe West Road 太平门直街 Taipingmen St 展览区视图 Exhibition Space View 63 体育文化中心剖面 Section of Sports/Arts Center 图例 Legend 展览 Exhibition 办公/教育 Class/Office 餐厅 Art Restaurant 艺术/手工 Arts Craft Education 图书馆 Library 艺术图书馆 Art Lobby 健身房 Gym 游泳池 Pool 体育中心大堂 Sports Lobby 10 连接巷道 Connection Alley 10 64 65 03 设计概念 Design Concept 5层健康露台 L5: Wellness Terraces 运动 Sports 文化 Culture 图例 Legend 办公 Office 景观 Landscape 商业 Retail 机电 和厨房 MEP/ BOH 服务空间 Servicing N餐� 运河西路Yunhe West Road 三新路 太平门直街 Taipingmen St 60 61 03 设计概念 Design Concept 5层恢复性露台平面 L5: Restorative Terraces N�重区 露台 餐� �所 运河西路Yunhe West Road 三新路 Sanxin Road 太平门直街 Taipingmen St 运动 Sports 文化 Culture 图例 Legend 办公 Office 景观 Landscape 商业 Retail 机电 和厨房 MEP/ BOH 服务空间 Servicing 58 59 03 设计概念 Design Concept
To reduce energy use and the effect fo glare on surrounding residential buildings, the office facade uses metal shading panels to reduce direct sunlight into interior space, and hides the operable windows behind perforated panels to bring in natural ventilation.
办公墙型 Office Wall Type
To reduce energy use and the effect fo glare on surrounding residential buildings, the office facade uses metal shading panels to reduce direct sunlight into interior space, and hides the operable windows behind perforated panels to bring in natural ventilation.
OFFICE FACADE
IThe ribbon wall type are made of exterior champagne color aluminum panels, it covers all the important outdoor public space with a freeform curvy surfaces, and creates a sense of technology and fluidity using the linear lighting fixutures embedded into its pattern
灵感来源于丝带的半透明度和柔软形态,体育中心立面 通过在玻璃幕墙外设置曲面金属穿孔板,降低能耗并室
体育中心墙型
曲线形态覆盖并串联起整个项目所有的室外公
IThe ribbon wall type are made of exterior champagne color aluminum panels, it covers all the important outdoor public space with a freeform curvy surfaces, and creates a sense of technology and fluidity using the linear lighting fixutures embedded into its pattern
the sports wall type places curved perforated metal panels outside of curtain wall system, which reduce the energy loads and creates soft natural lighting into interior sports spaces
Inspired by the transparency and softness of ribbons, the sports wall type places curved perforated metal panels outside of curtain wall system, which reduce the energy loads and creates soft natural lighting into interior sports spaces
文化中心墙型
The cultural wall type creates a strong dynamic volumetric reading on the facade with its various use of glass and metal panels, and provide a flexible combination of closed and open coverage to its interior space
文化中心立面通过虚实结合营造出几何形态丰富多变 的立面纹理,为室内文化空间提供了灵活分布的封闭 和开放空间布局
The cultural wall type creates a strong dynamic volumetric reading on the facade with its various use of glass and metal panels, and provide a flexible combination of closed and open coverage to its interior space
北立面 NORTH ELEVATION 建筑立面 Elevations 办公墙型 Office Wall Type 办公墙型 Office Wall Type 丝带墙型 Ribbon Wall Type 办公墙型 Office Wall Type 文化中心墙型 Culture Center Wall Type 体育中心墙型 Sports Center Wall Type 体育中心墙型 Sports Center Wall Type 建筑立面 Elevations 文化中心墙型 Culture Center Wall Type 文化中心墙型 Culture Center Wall Type Sports Center Wall 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development Facade Design 1600 1200 4500 4500 1200 3000 4500 3300 1200 4500 3300 3000 5800 4500 5800 2900 1600 1000 1500 1000 1500 1500 1500 3000 4300 5800 4500 5800 2900 1600 1500 1000 曲线形态覆盖并串联起整个项目所有的室外公 共灰空间,并顺着金属板条纹设置线性光带营 造科技感和流动感
75 4500 1200 3000 4500 3300 1200 3000 4500 3300 1500 5800 4500 5800 2900 1600 1000 1000 1500 1500 4300 5800 4500 5800 2900 1600 9000 1500 1000 1500 1500 1500 1500 1500 1500
共灰空间,并顺着金属板条纹设置线性光带营 造科技感和流动感
丝带墙型由室外悬挂的香槟色铝板,以流畅的
丝带墙型 Ribbon Wall Type 75 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 北立面 NORTH ELEVATION 西立面 WEST ELEVATION 办公墙型 Office Wall Type 办公墙型 Office Wall Type 丝带墙型 Ribbon Wall Type 办公墙型 Office Wall Type 体育中心墙型 Sports Center Wall Type 东立面 EAST ELEVATION 南立面 SOUTH ELEVATION
Elevations 办公墙型 Office Wall Type 办公墙型 Office Wall Type 文化中心墙型 Culture Center Wall Type 文化中心墙型 Culture Center Wall Type 文化中心墙型 Culture Center Wall Type 文化中心墙型 Culture Center Wall Type 体育中心墙型 Sports Center Wall Type 体育中心墙型 Sports Center Wall 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 1000 4800 6000 1200 4800 6000 1200 1500 1500 1500 1500 1000 1000 1000 1000 4800 6000 1200 4800 6000 1200 4800 6000 1500 1500 1500 1500 1500 1500 1500 1500
建筑立面
内提供柔和的自然采光
1000 1000 1500 1500 1500 1500 1500 1500 1500 1500
76 5800 5800 2900 1000 1000 1500 1000 1000 4800 6000 1200 4800 6000 1200 1500 1500 1500 1500 1500 1500 1500 1500 1000 1000 1000 1000 4800 6000 1200 4800 6000 1200 4800 6000 1200 1500 1500 1500 1500 1500 1500 1500
灵感来源于丝带的半透明度和柔软形态,体育中心立面 通过在玻璃幕墙外设置曲面金属穿孔板,降低能耗并室 内提供柔和的自然采光 Inspired by the transparency and softness of ribbons,
1000 1000 1500 1500 1500 1500 1500 1500 1500 1500 3300 4500 1200 3300 4500 1200 3300 4500 1200 1000 1000 1000 1000 1500 1500 1500 1500 1500 1500 1500 1500 3300 4500 1200 3300 4500 1200 3300 4500 1200
Sports Wall Type
Culture Wall Type 文化中心立面通过虚实结合营造出几何形态丰富多变 的立面纹理,为室内文化空间提供了灵活分布的封闭 和开放空间布局
77 76 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 04 立面设计 Facade Design
消防策略 Fire Strategy
绿化率 Green Ratio 场地绿化: 覆土厚度> Ground Level 图例 Legend 裙楼绿化: 覆土厚度> Podium Soil 地块74 Plot 74 绿化率 Green 地块74 Plot 73 场地绿植外墙: Ground Level Facade (Soil 裙楼绿植外墙: Podium Vertical depth > 0.5m)
运河西路Yunhe West Road 三新路 Sanxin Road 太平门直街 Taipingmen St O O 快� 机� bb �公大堂 停� O bb �公大堂bb 共享�公 大堂 停� 咖 餐� �行 快� 商� M 落客区 bb bbU W 群体活� 活�中心 大堂 大堂 停� 停� 落客区 落客区 前台 �公 有机餐吧 �店咖 � 厨房 �堂 �所 �所 �公 登�台 �� �所 100 F&B OO OO F Bank 快递 机电 Cafe Retail C O O Office Lobby P P 办公大堂 停车 Office Lobby 办公大堂 Co-working Lobby 共享办公 大堂 停车 咖啡厅 餐饮 银行 快递 商业 MEP 落客区 Book Cafe Event Space Lobby Office Group Exercise Earth Bar Reception Lobby Office Storage Check-in Snack Kitchen Lecture AF UP UP W/C W/C P 群体活动 活动中心 大堂 大堂 停车 停车 落客区 落客区 前台 办公 有机餐吧 书店咖啡厅 厨房 讲堂 厕所 W/C 厕所 办公 登记台 仓库 厕所 N 051020 50 8000 图例 Legend 142 景芳三堡单元 JG1203-74 01 章节名称 Chapter Name 行人入口 Pedestrian Access 运河西路Yunhe West Road 三新路 Sanxin Road 太平门直街 Taipingmen St 快� 机� O �公大堂 停� �公大堂享�公 大堂 停� 咖 餐� �行 快� 商� M 落客区 O群体活� �中心 大堂 大堂 停� 停� 落客区 落客区 前台 �公 机餐吧 �店咖 � 厨房 �堂 �所 �所 �公 登�台 �� �所 N 0 办公 Office 共享办公 Co-working 文化 Culture 运动的 Sports 送货 Delivery 停车电梯 Parking Elevator 使用权 Access 零售渠道 Retail Access 传奇 Legend 图例 Legend 体育 文化 快递出入口 停车 建筑出入口 商业出入口 办公 车辆流线 图例 Legend 人行流线 流线图 Circulation 落客处 144 景芳三堡单元 JG1203-74 01 章节名称 Chapter Name
B1 车辆交通 B1 Vehicular Circulation B2 车辆交通 B2 Vehicular N 5 o U D M M M M M M N P D d b o o P M E M M P 179 Parking 114 Parking on o on 机� 机� 机� 机� 机� 机� 机� 机� 机� 机� 机� 机� 机� 大堂 大堂 大堂 大堂 �� �� 卸�区 卸�区 卸�区 卸�区 �接至 地� �接至 地� 机� H 10 A 传奇 Legend 加载中 Loading 停车大堂 Parking Lobby 货运电梯 Freight Elevator 电梯 Elevator ADA Access 图例 Legend 无障碍入口 停车 卸货 图例 Legend 无障碍入口 停车 卸货 148 景芳三堡单元 01 章节名称 Chapter Name B2 车辆交通 B2 Vehicular Circulation N 传奇 Legend 加载中 Loading 停车大堂 Parking Lobby 货运电梯 Freight Elevator F 电梯 Elevator P ADA Access N 5 0 0 0 10 D G H M C 10 b U M M M M P M M U b P M M P M Con on 机� 大堂 机� 机� 机� 机� 机� 机� 机� 机� 机� 机� 机� 机� 机� 机� 机� 大堂 大堂 大堂 �接至 地� �接至 地� 传奇 Legend 停车大堂 Parking Lobby 电梯 Elevator ADA Access P 图例 Legend 无障碍入口 停车 卸货 149 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 O O 快� 机� �公大堂 停� �公大堂共享�公 大堂 停� 咖 � 餐� �行 快� 商� 落客区W 群体活� 活�中心 大堂 大堂 停� 停� 落客区 落客区 前台 �公 有机餐吧 店咖 � 厨房 �堂 �所 �所 �公 登�台 �� �所 West Road 停车电梯 使用权 Access 零售渠道 Retail Access 传奇 Legend 车辆流线 Vehicular Route 图例 Legend 流线图 Circulation 三新路 SANXIN RD 运河西路 Canal West Rd 太平门直街 Taipingmen St 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 车辆&无障碍入口 Vehicular & ADA Access 运河西路Yunhe West Road 三新路 Sanxin Road 太平门直街 Taipingmen St 快� 机� O O O O �公大堂 停� �公大堂共享�公 大堂 停� � 餐� �行 快� 商� 落客区 GW 群体活� 活�中心 大堂 大堂 停� 停� 落客区 落客区 前台 �公 有机餐吧 店咖 厨房 �堂 �所 W �所 �公 登�台 �� �所 N 0 车辆流通 Vehicular circulation 传奇 Legend 加载中 Loading ADA Access 图例 Legend 无障碍入口 客车入口 卡车入口 公交站 垂直交通 Vertical Circulation Level Level Level Level Level Level Level Roof Level0.0 7.0 11.5 16.0 22.0 26.5 31.0 5.5 0.0 T.O.P 41.5 Level -10.5 M 4500 4500 6000 4500 4500 4500 4500 1500 Level0.0 7.0 11.5 16.0 22.0 26.5 31.0 35.5 T.O.P 48.0 -10.5 4500 4500 6000 4500 4500 6000 4500 1500 5000 41.5M 46.5M Roof L2 5.90 10.4 15.2 5900 4500 4800 4800 20.0 4500 4500 4500 4500 4500 4500 4500 24.5 29.0 33.5 38.0 L10 42.5 L11 47.0 L12 51.5 Roof 56.0 4500 4000 T.O.P 60.0 0.0 B1 0.0 B2 0.0 7000 3500 73 地块 74 地块 图例 Legend 体育电梯 文化电梯 停车电梯 办公电梯 货运电梯 147 146 景芳三堡单元 JG1203-74 地块方案设计征集 Qian Jiang New City Development 2023.01 01 章节名称 Chapter Name
Medical Office Building | Boston
OB S S R S VC EC 6 C R G ( B 12 ( P R RD S BS S O O S O ) O ) R C T O R N D 12 CORD G R OR C 8 S S S S G O R C O S S N 4 S O SMH 1215 SMH 1232 SMH 1231 SMH 1156 SMH SMH SMH 1243 SMH 1242 1241 SMH 1519 SMH 1520 SMH 1521 RIM=120.43 8"(IN)=113.35 12"(IN)=113.23 12"(OUT)=113.17 SMH 1208 SMH 1207 SMH 1206 SMH 1213 1214 1521A SMH 1521B (D) SMH 1521C (C) 1521D RIM=135.02 6"(OUT)=130.42 INV(IN)=131.37 1215A SMH 1215B SMH 1215C (A) SMH 1243A (G4) SMH 1243B (G5) SMH 1243C (K) SMH 1243F (G2) SMH 1243G (G1) SMH 1243H (G) SMH 1243E (I) SMH CTB DMH RIM=117.96 RIM=119.21 DMH RIM=119.85 RIM=117.44 DMH RIM=117.84 CTB RIM=116.69 CTB DMH RIM=115.41 DMH DMH RIM=114.74 CTB RIM=114.20 CTB RIM=114.19 CTB RIM=113.69 CTB RIM=114.24 DMH RIM=114.18 DMH RIM=114.19 DMH RIM=114.25 DMH RIM=114.35 DMH RIM=113.62 DMH RIM=115.76 CTB RIM=115.15 CTB RIM=115.01 DMH DMH RIM=115.76 DMH RIM=115.64 CTB RIM=116.50 DMH RIM=118.34 CTB DMH RIM=119.36 CTB RIM=124.77 DMH RIM=124.24 DMH RIM=122.45 DMH RIM=119.95 DMH RIM=121.09 DMH RIM=121.10 CTB RIM=132.82 DMH RIM=134.94 CTB RIM=122.20 CTB RIM=135.28 CTB CTB RIM=135.74 CTB RIM=135.82 CTB RIM=136.06 12"(IN)=131.06 12"(OUT)=131.01 CTB RIM=135.71 12"(IN)=130.91 12"(OUT)=130.72 CTB RIM=135.60 6"PVC(IN)BLDG=130.78 12"CMP(IN)=130.67 12"CMP(OUT)=130.65 DMH RIM=135.82 8"VC(IN)=122.12 8"VC(OUT)=122.02 6"PVC(IN)BLDG=122.22 6"PVC(IN)=129.80 DMH RIM=124.74 CTB RIM=117.72 CTB RIM=118.73 CTB RIM=116.01 CTB RIM=117.24 RIM= CTB CTB CTB CTB DMH CTB E EC R R E RE) EC ( E E E 1 V T E DS ) D (D S S D PIV D N S D G R D E O N G R N R C) C ( C ) C MA S REC R C T E C 8 P R C) 1 R R C R REC ( C REC VC V ) 1 ( ) 2 C (R C 2 P RC R R R RCP C RCC RC RE P ) 8 R P R C C 1 VEC RE REC MOD MOR OP R A H IRRIG. CONTROL PLTG. GRASS GRASS PLTG. MULCH GRASS GRASS PLTG. TREES GRASS GRASS MULCH STONE PATH WITH COBBLE EDGING GRASS GRASS H M GR G O U R ( ) T M P T E GASG S S R -HU----S ) D C T A P P A N A V E N U E STURDYMEMORALHOSPTAL STURDY STREET PARKSTREET RAMP FUEL FILL/ACCESSL FUEL FUEL R D G OO SH F E H D 5 E 5 E G R R 6 T V C G R N D K O D C MN MP D A DO A C B NC WOOD GUIDERAIL WOOD GUIDERAIL H O H F H O P A THRESHOLD FF=136.23 OVERHANG V H G H H R N O E N G B HO R O TH O F T H SH R T A N A O F T ON ONC AD E P B O P M M R T A P P A N A V E N U E DUNHAM TREE GAS METER AND BURIED OXYGEN DUNHAMSTREET O N E L B L V D O N E I L B L V D PARKSTREET EM V R H O D TRANS SIGN SIGN SIGN BUSH B W A W W CON C C W W W W W N K C W W C C W W CON SBSB SB GROUND WATER PUMP RIM=116.51 CTB RIM=115.46 DMH RIM=115.56 CTB RIM=114.63 CTB RIM=117.56 DMH RIM=118.31 DMH RIM=118.16 RIM=118.90 DMH RIM=118.50 DMH RIM=117.14 DMH RIM=117.21 CTB RIM=117.49 DMH RIM=115.42 DMH RIM=115.88 DMH RIM=116.39 DMH RIM=116.94 DMH RIM=117.28 RIM=117.47 CTB RIM=118.44 CTB RIM=119.93 CTB RIM=124.08 CTB RIM=128.72 DMH RIM=122.69 DMH RIM=120.86 CTB RIM=120.56 DMH RIM=122.69 DMH DMH RIM=116.28 CTB RIM=117.06 RIM=118.27 DMH RIM=120.01 DMH RIM=122.67 CTB RIM=120.48 P U R C H A S E S T R E E T F O R L O C 4.3' BITUMINOUS BITUMINOUS BIT. CONCRETE BITUMINOUS GRAVEL BIT. BIT. S WSO SMH SMH #1377 #1392 #1538 SMH #1539 SMH #1567 #1568 #1747 #1748 FN (TYP.) MW MW MW MW MW MW MW MW MW MW/X MW MW MW MW MW MW MW MW MW MW MW MW MW HVAC UNIT EM EM BO O NeilBLVD PearlSt Dunham St DEMO NOTES AND LEGEND IN GENERAL, THE FULL EXTENT OF THIS WORK INCLUDES ALL DEMOLITION NECESSARY FOR THE INSTALLATION OF NEW CONSTRUCTION. COORDINATE DEMOLITION OUTSIDE THE PROJECT AREA TO THE POINT OF CONNECTION FOR MECHANICAL, ELECTRICAL AND PLUMBING. EXISTING MECHANICAL, PLUMBING AND ELECTRICAL SERVICES WHICH SERVE OTHER EXISTING OCCUPIED AREAS MUST REMAIN AND SHALL BE PROTECTED DURING THE CONSTRUCTION. STRUCTURES TO BE DEMOLISHED PREPARTION FOR NEW BRIDGE TO INCLUDE DEMO OF EXISTING STEEL CANOPY, PARTIAL BRICK FACADE, WINDOW. EXISTING PIPING ABOVE STEEL CANOPY TO BE REROUTED. CENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER PROJECT ARCHITECT SHEET NAME SHEET NUMBER E G N R A S C C R C R G N R REVISIONS MARK DATE DESCRIPTION SHEET OF 250 PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE & PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 BR+A CONSULTING ENGINEERS 10 GUEST STREET, 4TH FLOOR BOSTON, MA 02135 617-254-0016 T E T INDIGO REM, INC. 33 HILLSIDE STREET ROWLEY, MA 01969 774-994-0685 9 / 2 8 2 0 2 2 5 : 2 9 1 4 P M B M 3 6 0 / 1 0 2 9 6 8 0 0S t d y M H p t l M O B R 2 1 / N M O B t 2 6 0 e n S TE DEMO PLAN AD100 S urdy Memor a Hosp tal - New MOB SCHEMATIC DESIGN s e a 1" 40'-0" 1 DEMOLIT ON SITE PLAN 11B I M 3 6 0 / 1 0 2 9 6 8 0 0S d y M H p M O B R 2 1 N M O B 20'-0" 1 S TE PLAN
UP URO OGY ARD OLOG GAS RO TE OLOG AE202 AE201 AE201 AE202 209' 117 SF EXAM 114 SF EXAM 115 SF EXAM 205 SF CYSTO PROCEDURE 114 SF EXAM 95 SF EXAM 65 SF ADA TLT 60 SF SCOPE WASH 205 SF CYSTO PROCEDURE 115 SF EXAM 70 SF PoS TOILET 81 SF STFTOILET 76 SF CLEAN LINEN 96 SF MEDS 114 SF EXAM 114 SF EXAM 113 SF EXAM 113 SF EXAM 114 SF EXAM 114 SF EXAM 115 SF EXAM 58 SF ADA TLT 117 SF EXAM 114 SF EXAM SF PoS TOILET 235 SF FIRE PUMP (ADD ALT) 333 SF PLUMBING 114 SF EXAM 81 SF EMERG ELEC 386 SF STAFF LOUNGE/ LOCKERS 100 SF EQUIP/ STOR 123 SF 151 SF ULTRASOUND 151 SF CLEAN 114 SF EXAM SF OFFICE 80 SF OFFICE 115 SF EXAM 97 SF SECURITY INFO 117 SF EXAM 80 SF OFFICE 117 SF EXAM 114 SF EXAM 248 SF NORMAL ELEC SF RECEIVING 114 SF EXAM 79 SF EMR 176 SF SOILED 81 SF OFFICE 113 SF CHECK-OUT 184 SF CLINIC CHECK-IN/CHECK-OUT 442 SF STRESS TEST 80 SF OFFICE SF OFFICE 95 SF CONSULT 174 SF CLINIC CHECK-IN /CHECK-OUT 138 SF CLINIC CHECK-IN/CHECK-OUT SERV 80 DOMESTIC WATER SERV 45 WATER HEATER 42 MED VAC PUMP 80 SF OFFICE WATER BOOSTER (ADD ALT) 60sf 80 SF OFFICE 80 SF OFFICE 80 SF OFFICE SF OFFICE SF OXYGEN MANIFOLD 80 SF OFFICE AE700 AE700 AE301 AE301 AE301 OMNI 46 SF READING VESTIBULE BRIDGE ABOVE 30 SF Elev. CR PAD MOUNTED TRANSFORMER COPIER COPIER SF EVS SCOPES 15' AE321 53 SF O2 STR. 10" SCOPES 51 SF ADA TLT 51 SF STF TLT TREADMILL WORK STATION TABLE 56 SF STF TLT 54 SF STF TLT STAIR STAIR 9" 19' 30' 30' 0" 30' CENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER SHEET NAME SHEET NUMBER REVISIONS MARKDATEDESCRIPTION SHEET OF 250 PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 GUEST STREET, 4TH FLOOR BOSTON, MA 02135 617-254-0016 INDIGO REM, INC. HILLSIDE STREET ROWLEY, MA 01969 774-994-0685y F1 FLOOR PLAN AE101 S u d Mem a Hosp a - New MOB SCHEMAT C DES GN 1/8" 1'-0" 1 F1 FLOOR PLAN DN UP DN WAITING BRIDGE NFU ON H MATO OGY ONCO OGY 98 SF OFFICE 86 SF OFFICE 86 SF OFFICE 86 SF ELEC 86 SF EVS 86 SF OFFICE 339 SF STAFF LOUNGE/LOCKERS SF IT NURSE STATION NURSE STATION AE202 AE201 AE201 AE202 159 SF EXAM 135 SF EXAM 119 SF EXAM 118 SF EXAM 58 SF ADA TLT 86 SF SOILED 122 SF CLEAN 126 SF EXAM 126 SF EXAM 126 SF EXAM 282 SF PROCEDURE 282 SF PROCEDURE 65 SF ADA TLT 119 SF EXAM 117 SF EXAM 115 SF EXAM 110 SF EXAM 113 SF EXAM 104 SF MEDS 51 SF STF TLT 57 SF STF TLT 196 SF PRE-& POST-PROCEDURE 179 SF CHECK-IN /CHECK-OUT 127 SF CLEAN SUPPLY 61 SF ADA TLT PA N MGMT 132 SF CONSULT 171 SF EXAM 86 SF OFFICE 154 SF EXAM 133 SF EXAM 133 SF EXAM 450 SF STF WORK 125 SF TRTMT FAST TRACK CHECK-IN CHECK-OUT AE700 Return L1 Supply L1 AE700 WO ND MS D AE301 AE301 AE301 OMNI 328 SF PHLEBOTOMY 79 SF STORAGE AE460 1/4" AE460 AE460 AE461 AE460 107 SF EXAM 203 SF CHECK-IN CHECK-OUT 28 SF NOUR 130 SF EXAM 130 SF EXAM 130 SF EXAM 118 SF EXAM 75 SF STF TLT 131 SF MEDS 127 SF NOURISH 133 SF EXAM SF PoS TLT SF ADA TLT 105 SF TRTMT 109 SF TRTMT 105 SF TRTMT 109 SF TRTMT 106 SF TRTMT 109 SF TRTMT 108 SF TRTMT 107 SF TRTMT 152 SF QUIET WORK OMNI 127 SF SOILED WORKRM 113 SF TRTMT 10 111 SF TRTMT 112 SF TRTMT 11 172 SF PoS TRTMT 12 127 SF TRTMT EMERG EQUIP AE321 67 SF CLEAN SF STF TLT ELEVATOR LOBBY AE461 AE460 AE461 AE461 AE461 AE461 AE461 29' 9" 30' 0" 30' 14' STAIR CENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER SHEET NAME SHEET NUMBER REVISIONS MARKDATEDESCRIPTION SHEET OF 250 PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 GUEST STREET, 4TH FLOOR BOSTON, MA 02135 617-254-0016 INDIGO REM, INC. HILLSIDE STREET ROWLEY, MA 01969 774-994-0685y F2 FLOOR PLAN AE102 S u d Memo a Hosp a - New MOB SCHEMAT C DES GN 1/8" 1'-0" F2 FLOOR PLAN
DN UP DN Return L1 AE202 AE201 AE201 AE202 AE700 Supply L1 Return L2 Supply L2 AE700 AE301 AE301 AE301 AE301 AE321 AE321 STAIR STAIR SHELL SPACE 9" 19' 30' 30' 0" 30' 86 SF ELEC 86 SF CENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER SHEET NAME SHEET NUMBER REVISIONS MARKDATEDESCRIPTION SHEET OF 250 PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 GUEST STREET, 4TH FLOOR BOSTON, MA 02135 617-254-0016 INDIGO REM, INC. HILLSIDE STREET ROWLEY, MA 01969 774-994-0685y F3 FLOOR PLAN AE103 S u d Mem a Hosp a - New MOB SCHEMAT C DES GN 1/8" 1'-0" 1 F3 FLOOR P AN AE201 AE201 AE202 AE700 AHU AHU AHU AE301 AE301 AE301 AE301 30' 0" 30' 30' SLOPE 1/4"/FT SLOPE 1/4"/FT SLOPE 1/4"/FT SLOPE 1/2"/FT SLOPE 1/4"/FT SLOPE 1/4"/FT ROOF DRAIN, TYP STAIR SLOPE 1/4"/FT CENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER PROJECT ARCHITECT SHEET NUMBER REVISIONS MARKDATEDESCRIPTION SHEET OF 250 PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 BR+A CONSULTING ENGINEERS GUEST STREET, 4TH FLOOR BOSTON, MA 02135 INDIGO REM, INC. HILLSIDE STREET ROWLEY, MA 01969 774-994-0685y p ROOF PLAN & STA R ROOF PLAN AE104 S u y Memo a Hosp a - New MOB SCHEMAT C DES GN 1/8" 1'-0" 1 F4 ROO P AN 1/8" 1'-0" 2 STA R 1 ROOF
F1 -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" AE301 29' 9" 30' 30' 0" 30' 30' 30' 0" AE400 7 F1 0' -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" C E AE301 25' 25' 23' AE321 AE400 CENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER PROJECT ARCHITECT SHEET NAME SHEET NUMBER C REVISIONS MARKDATEDESCRIPTION SHEET OF 250 PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 BR+A CONSULTING ENGINEERS 10 GUEST STREET, 4TH FLOOR BOSTON, MA 02135 617-254-0016 R INDIGO REM, INC. 33 HILLSIDE STREET ROWLEY, MA 01969 774-994-0685 9 2 8 2 0 2 2 5 2 9 2 4 P My p 1 D g EXTER OR ELEVAT ONS AE201 S urdy Memo a Hosp a - New MOB SCHEMAT C DES GN 1/8" 1'-0" 1 NORTH ELEVAT ON 1/8" 1'-0" 2 EAST ELEVAT ON F1 -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" 12' 0" 14' 6" 14' 6" 19' 0" AE301 29' 9" 10' 9" 19' 30' 0" 30' 30' 30' 0" 30' AE401 5 F1 -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" C AE301 25' 0" 23' AE401 CENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER PROJECT ARCHITECT SHEET NAME SHEET NUMBER G D R REVISIONS MARKDATEDESCRIPTION SHEET OF 250 PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 BR+A CONSULTING ENGINEERS 10 GUEST STREET, 4TH FLOOR BOSTON, MA 02135 617-254-0016 INDIGO REM, INC. 33 HILLSIDE STREET ROWLEY, MA 01969 774-994-0685 9 2 8 2 0 2 2 5 2 9 2 7 P My p EXTER OR ELEVAT ONS AE202 S urdy Memo a Hosp a - New MOB SCHEMAT C DES GN 1/8" 1'-0" 1 SOUTH ELEVAT ON 1/8" 1'-0" 2 WEST ELEVAT ON
UP UP STAIR NSTR3 FEC. TREATMENT ROOM N2003 WAITING AE321 AE321 AE321 AE321 B A 0" 14' WAITING A AE321 AE321 AE321 AE321 B A 0" 14' 25' 1/4" VIF AE321 AE321 AE321 AE321 B A SLOPE 1/4"/FT SLOPE 1/4"/FT GUTTER, SLOPE TO DRAIN. RAINLEADERS AT COLUMNS. CENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER PROJECT ARCHITECT SHEET NAME SHEET NUMBER C R R U M REVISIONS MARKDATEDESCRIPTION SHEET OF 250 PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 BR+A CONSULTING ENGINEERS 10 GUEST STREET, 4TH FLOOR BOSTON, MA 02135 617-254-0016 INDIGO REM, INC. 33 HILLSIDE STREET ROWLEY, MA 01969 774-994-0685 9 2 8 2 0 2 2 5 2 9 2 9 P M B M 3 6 0 1 0 2 9 6 8 0 0S u d y M e m o a H o s p a M O B R 2 1 N e w M O B v t BR DGE PLANS AE320 Stu dy Memo a Hosp a - New MOB SCHEMATIC DES GN D 8 1/8" 1'-0" 1 F1 FLOOR PLAN - BR DGE 1/8" 1'-0" 2 F2 FLOOR PLAN - BR DGE 1/8" 1'-0" 3 F3 FLOOR PLAN - BR DGE ROOF F1 0' -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" A MIN CLEARANCE 12' 0" 14' 6" 14' 6" 19' 0" AE321 AE321 A F1 -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" A MIN CLEARANCE AE321 AE321 B F1 -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" 1' 6" CENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER PROJECT ARCHITECT SHEET NAME SHEET NUMBER N R REVISIONS MARKDATEDESCRIPTION SHEET OF 250 PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 BR+A CONSULTING ENGINEERS 10 GUEST STREET, 4TH FLOOR BOSTON, MA 02135 617-254-0016 INDIGO REM, INC. 33 HILLSIDE STREET ROWLEY, MA 01969 774-994-0685 9 2 8 2 0 2 2 2 9 3 0 B M 3 6 0 1 0 2 9 6 8 0 0S d M H t M O B R 2 1 N M O B 8 BR DGE ELEVAT ONS & SECT ON AE321 S u dy Memo Hosp a - New MOB SCHEMAT C DES GN D e 2 2 1/8" 1'-0" 1 BR DGE ELEVAT ON EAST 1/8" 1'-0" 2 BR DGE ELEVAT ON WEST 1/8" 1'-0" 4 BR DGE SECT ON 02
GL-1 TEMPERED VISION GLASS GL-2 SPANDREL GLASS PC-1 UHPC MP-1 METAL PANEL STN-1 STONE PANEL EWA- EXTERIOR WALL ASSEMBLY TYPE. REFER TO SHEET AE500N FOR ADDITIONAL INFORMATION EGA- CURTAINWALL SYSTEM TYPE. REFER TO SHEET AE500N FOR ADDITIONAL INFORMATION ERA- EXTERIOR ROOF ASSEMBLY TYPE. REFER TO SHEET AE500N FOR ADDITIONAL INFORMATION GLEXTERIOR MATERIAL TYPE. REFER TO SHEET AE500N FOR ADDITIONAL INFORMATION GL-1A SHADOW BOX, TEMPERED GLASS SYSTEM AND MATER AL LEGEND F1 0' -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" AE400 GLPCSTGL-1A GLGLPCMPF1 0' -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" A 12' 0" 14' 6" 14' 6" 19' 0" ERA1 EGA1 EWA3 EWA1 EWA1 EGAEWAESAF1 0' -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" AE400 GLPCSTMPGLPCMPGLPCF1 0' -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" ERA1 EGA1 EWA3 EWAESAEWA2 EWA1 EGA1 EWA1 EWACENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER PROJECT ARCHITECT SHEET NAME SHEET NUMBER V R E R C G REVISIONS MARKDATEDESCRIPTION B SHEET OF 250 A C D E B A C D PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE & PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 BR+A CONSULTING ENGINEERS 10 GUEST STREET, 4TH FLOOR BOSTON, MA 02135 617-254-0016 S INDIGO REM, INC. 33 HILLSIDE STREET ROWLEY, MA 01969 774-994-06851 6 D e PARTIAL ELEVAT ONS & SECTIONS AE400 S u dy Memo a Hosp ta - New MOB SCHEMAT C DES GN D 9 2 2 1/4" 1'-0" 3 PART AL ELEVAT ON - NORTH 1/4" 1'-0" 4 PARTIAL SECTION - NORTH 1/4" 1'-0" 1 PART AL ELEVAT ON - EAST 1/4" 1'-0" 2 PARTIAL SECTION - EAST F1 0' -0" F2 19' -0" F3 33' -6" ROOF 48' -0" AE401 GLPCGLGLGLGLGLMPF1 -0" F2 19' -0" F3 33' -6" ROOF 48' -0" 14' 6" 14' 6" 19' 0" 1' 0" 5' 6" 9' 0" 5' 6" 9' 0" 6' 6" 11' 0" 1' 6" 1 EWA1 EGAERA1 EWA1 EGA1 EWA1 EGA3 EWAEWAEGAERAGLSYSTEM F1 0' -0" F2 19' -0" F3 33' -6" ROOF 48' -0" AE401 GLPCGLMPSTGLGL-1A F1 0' -0" F2 19' -0" F3 33' -6" ROOF 48' -0" EWAEGA1 ERAEWAEGAEWAEWAESA3 EWAd y M H p M O B R 2 1 N M O B 1/4" 1'-0" 3 PART AL ELEVAT ON - SOUTH 1/4" 1'-0" 4 PART AL SECT ON - SOUTH 1/4" 1'-0" 1 PARTIAL ELEVATION - WEST 1/4" 1'-0" 2 PART AL SECT ON - WEST
F1 -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" STAIR F1 -0" F2 19' -0" F3 33' -6" ROOF 48' -0" T.O. SCREEN 60' -0" STAIR CENTER PLAZA SUITE 800 BOSTON, MASSACHUSETTS 02108 PHONE 617 378 4800 www.nbbj.com PROJECT NUMBER PROJECT ARCHITECT SHEET NAME SHEET NUMBER REVISIONS MARKDATEDESCRIPTION SHEET OF 250 PLACES ASSOCIATES, INC. 256 GREAT ROAD, SUITE LITTLETON, MA 01460 978-486-0334 SOUZA, TRUE PARTNERS, INC. 265 WINTER STREET, THIRD FLOOR WALTHAM, MA 02451 617-926-6100 BR+A CONSULTING ENGINEERS GUEST STREET, 4TH FLOOR BOSTON, MA 02135 617-254-0016 INDIGO REM, INC. 33 HILLSIDE STREET ROWLEY, MA 01969 774-994-0685 STA R SECT ONS AE700 S u dy Memo a Hosp a - New MOB SCHEMAT C DES GN D 0 1/4" 1'-0" 1 SECT ON STAIR 1 1/4" 1'-0" 2 SECT ON STA R 2
MOB
STURDY MEMORIAL HOSPITAL
Out Patient Emergency Department Garage
Cornell Tech | NYC
D B G 489 SF WORKSHOP 462 89 SF HUDDLE 463 100 SF OFFICE 464 100 SF OFFICE 466 122 SF LASER CUTTER 461A 650 SF CLASSROOM 460 SF PLOTTER 461 104 SF OFFICE 11 454 104 SF OFFICE 455 1,297 SF RESEARCH 451 503 SF FLEX SPACE 444 94 SF HUDDLE 446 285 SF EQUIPMENT ROOM 445 SF JANITOR STOR 40060 1,570 SF CRIT 490 100 SF STORAGE 430A SF PHONE 420 54 SF PHONE 419 SF STORAGE 406 593 SF CLASSROOM 408 591 SF CLASSROOM 408B 101 SF OFFICE 403 102 SF OFFICE 404 104 SF OFFICE 405 68 SF HUDDLE 416 61 SF STORAGE 417 55 SF HUDDLE 418 1,014 SF RESEARCH 422 1,008 SF RESEARCH 424 1,729 SF PHD COMP CLASSROOM 429 1,468 SF RESEARCH 441 3,076 SF OPEN WORK AREA 471 2,225 SF OPEN WORK AREA 401 1,302 SF ELEVATOR LOBBY 40041 316 SF PANTRY 434 103 SF OFFICE 12 453 MECHANICAL TEL ELEC PE1 PE2 PE3 PE4 STAIR STAIR JANITOR VESTIBULE SE1 TEL ELEC MENS -204.00 G4-204.00-204.00 F7 11 1/4" 0" 0" 0" 20' 20' 20' 20' 20' 16' 3/8"-205.00 G4 -205.00 -205.00 -205.00 G7 C6 111 SF DISPLAY/LIBRARY 471A 42 SF STORAGE 401C FHV FHV FEC FEC FHV C9 C9-204.00 S CTOR A S CTOR C S CTOR B ECTOR D SECTOR C SECTOR D SECTOR A SECTOR B SECTOR A SECTOR B SECTOR D SECTOR C 117 SF OFFICE 415 118 SF OFFICE 414 244 SF CONF RM 412 -205.00 CORRIDOR 40040 MEETING 429A CORRIDOR 40042 MEETING -204.00 -204.00 F2 -204.00 G2 -206.00 G7 -206.00 -206.00 G4 -206.00 D3 -204.00 D4-206.00 G8 -205.00 C10 C11 C11 C12 -206.00 D8 E7 C8 -206.00 C7 -205.00 -204.00 -205.00 77 SF HUDDLE 436 -204.00-204.00 -204.00 1,386 SF MULTIFUNCTION 430 G3 978 SF CRIT CORRIDOR 471B 228 SF CRIT CORRIDOR 401B MEETING 421 ELEC 407 STORAGE 410-206.00 -206.00 G3 -206.00 F3 -206.00 D2 -206.00 E2 -206.00 E3 G2 -205.00 245 SF CRIT CORRIDOR 401A -207.00 -207.00 G4 21 SF CLOSET 408A 19 SF PLOTTER 401D C15 C18 C18 TYP. C18 C18 SF AV CLOSET 490A SF AV CLOSET 430B F OOR N OT S DRAWINGS HAVE BEEN PREPARED ON AN ORIGINAL SHEET SIZE 48". HORIZONTAL DIMENSIONS SHOWN INDICATE FACE TO FACE OF SHEATHING, CENTERLINE OF COLUMN GRIDLINE, FACE OF FINISH, UNO. PARTITIONS ARE PARALLEL ORTHAGONAL EXTERIOR WALLS, UNO. ALIGN CENTERLINE SITE BUILT GLASS PARTITIONS WITH CENTERLINE GWB PARTITION, UNO. REFER TO ALIGN FACE OF NEW PARTITIONS WITH FACE OF EXISTING PARTITIONS, UNO. ALIGN CENTERLINE PARTITIONS WITH CENTERLINE OF EXISTING EXTERIOR MULLIONS, UNO. VERIFY LAYOUT DIMENSIONS FIELD AND NOTIFY ARCHITECT OF ANY DISCREPANCIES. INSTALL FINISHED DOOR OPENINGS 6”FROM AN ADJACENT WALL OR PARTITION UNO GRIND, PATCH AND/OR APPLY UNDERLAYMENT TO PROVIDE FLAT AND LEVEL SUBSTRATE FOR NEW FLOOR "SIM" NOTE INDICATES SIMILAR OPPOSITE HAND CONDITION. SEE INTERIOR ELEVATIONS FOR BLOCKING SCOPE AND LOCATIONS, UNO BY WALL TYPE. SEE FINISH PLANS FOR INFORMATION ON FLOOR FINISHES AND TRANSITIONS. PROVIDE LISTED FIRE-RESISTANT PENETRATION FIRESTOPPING AT ALL PENETRATIONS OF FIRE RATED CONSTRUCTION. PROVIDE ELECTRICAL CONNECTIONS, SUPPORT AND BACKING FOR AUDIO-VISUAL EQUIPMENT PROVIDED OWNER. COORDINATE SCOPE OF WORK WITH OWNER. COORDINATE LOCATIONS LIGHT SWITCHES, CONTROL DEVICES AND THERMOSTATIC SENSORS WITH ARCHITECT PRIOR INSTALLATION. F OOR L N E ND NEW PARTITION NOT CONTRACT LIMIT WORK LINE NOTES, REFER TO "KEYNOTES" NEW DOOR EXISTING DOOR FIXED MILLWORK COUNTER 111 5TH AVENUE FLOORS 10 AND 11 NEW YORK, NY, USA 10003 +1 (212) 989-3993 DRAWN BY: PROJ. NO.: DATE: PROJ. ARCH.: DWG. DWG. ISSUE NYC DOB STAMP NYC DOB BSCAN CORNELL TECH WEST LOOP RD NEW YORK, NY 10044 MEP ENGINEER: JB&B 80 PINE STREET NEW YORK, NY 10005 OWNER: STRUCTURAL ENGINEER: LERA 40 WALL STREET, FLOOR 23 NEW YORK, NY 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, NJ 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE OF THE AMERICAS, 4TH FLOOR NEW YORK, NY 10018 0102/08/2023100% SD 0203/31/2023100% DD 0405/31/2023100% CD 6/1/2023 5:22:37 PM Autodesk Docs://103015.00 Cornell Tech Tata Innovati on Center Fit Out R22/ARCH-CORNELLTECH_TATA-INTERIOR.rvt Author 103015.00 05/31/23 Designer F4 FLOOR PLANOVERALL CORNELL TECH TATA INNOVATION CENTER A-114.00 11 EAST LOOP RD NEW YORK, NY 10044 1/8" 1'-0" G8 F4 FLOOR PLAN EY OT S - CON T UC ON Tag Text C2GLASS PARTITION. REFER TO A-201 FOR DIMENSIONS C3FIN TUBE ALONG FACADE. REFER TO MEP DWGS C4HEAVY DUTY WIREMOLD FOR POWER DATA ALONG C5PROVIDE CONCRETE TOPPING SLAB MATCH LOBBY LEVEL. REFER GEOMETRY PLAN G2/A-111 EXTENTS AND EDGE DETAILS C6PROVIDE REINFORCEMENT TO EXISTING FINTUBE COVER WITH STEEL ANGLE C7FUTURE DEMOUNTABLE PARTITION. PROVIDE INFRASTRUCTURE CONF RM FOR FUTURE DIVISION INTO OFFICES C9PROVIDE SOLAR SHADE ACROSS EXTENTS OF BUILDING PERIMETER C10CRIT WALLS TO BE CONSTRUCTED OWNER AND C11HSS 8X8 TUBE FOR OPERABL CRIT WALL SUPPORT PROVIDED BY CONTRACTOR C12EXISTING WALL TO BE FURRED OUT TO ALIGN WITH CRIT AND MULTIPURPOSE WALLS BEYOND AND ALIGN WITH CEILING C13ADD ALTERNATE: SLIDIN TELESCOPING DOORS: TWO DOORS EACH WITH TWO LEAVES. EACH DR MADE OF PERFORATED METAL PANEL SKIN FRONT AND BACK, ON METAL C-CHANNEL FRAME. SECOND LEAF NESTS INTO FIRST LEAF, DR PULL REMAINS EXPOSED. DRS HUNG FROM HEADER ABOVE WITH BALL-BEARING SLIDING HDWR INDICATED. ALIGN BOTTOM OF DRS WITH TOP OF TOE KICK; PROVIDE GUIDE TRACK C14EXISTING OVERHEAD PROJECTOR AND SCREEN PROVIDED BY OWNER, CONTRACTOR INSTALLED C15NEW OPERABLE PARTITION FROM MODERNFOLD WITH STRUCTURAL STEEL SUPPORT C16FLOOR CLEARANCE FOR CEILING HUNG ELECTRICAL C17EXISTING SPRINKLER FLOOR VALVE TO REMAIN THE SPACE BUT NOT UTILIZED FOR MAKERLAB FITOUT C18TYPICAL COLUMN ENCLOSURE WITH GYP BOARD. REFER ADD ALTERNATES LIST FOR HEIGHTS. C19ADD ALTERNATE: SEE ELEVATION FOR GLASS EXTENTS AND NOTES MM MM SSS 2 2D 2D 2D 2D 2D OS W K CRIT 490 PANTRY 434 ELEVATOR LOBBY 40041 PHONE 419 PHONE 420 RESEARCH 422 RESEARCH 424 PHD COMP CLASSROOM 429 STORAGE 417 HUDDLE 416 OFFICE 405 OFFICE 404 OFFICE 403 OPEN WORK AREA 401 CLASSROOM 408 STORAGE 406 CLASSROOM 408B WORKSHOP 462 HUDDLE 463 OFFICE 464 OFFICE 466 LASER CUTTER 461A PLOTTER 461 CLASSROOM 460 OFFICE 10 455 OFFICE 11 454 OFFICE 12 453 OPEN WORK AREA 471 RESEARCH 451 EQUIPMENT ROOM 445 JANITOR STOR 40060 FLEX SPACE 444 HUDDLE 446 RESEARCH 441 STORAGE 430A MECHANICAL TEL ELEC PE1 PE2 PE3 PE4 STAIR STAIR JANITOR VESTIBULE SE1 TEL ELEC MENS 17' 1/4" 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 20' 16' 3/8" ACT-ACT-01 - A.F.F. ACT-01 - A.F.F. ACT-01 - A.F.F. ACT- A.F.F. ACT-01 - A.F.F. ACT- A.F.F. ACT- A.F.F. ACT- A.F.F. ACT10' - A.F.F. ACT10' - A.F.F. HUDDLE 418 HUDDLE 436 FHV FHV FEC FEC FHV ACT- A.F.F. ACT- A.F.F. ACT-01 - A.F.F. ACT-01 - A.F.F. ACT-01ACT-01 - ACT-01 - A.F.F. ACT-01 - A.F.F. SLOPED CEILING SLOPED CEILING -203.00 G4 ACT-01 - A.F.F. CONF RM 412 OFFICE 414 OFFICE 415 EXP EXP EXP EXP EXP ACT- A.F.F. ACT- A.F.F. MSS GYP 10' - A.F.F. GYP BD 10' - A.F.F. EXP 1/2" GYP BD - A.F.F. EXP EXP EXP EXP EXP EXP EXP EXP EXP MSS EXP EXP - A.F.F. GYP BD - A.F.F. GYP - A.F.F. EXP EXP EXP MSS ACT- A.F.F. EXP EXP EXP EXP ACT-ACT-01A.F.F. SECTOR SECTOR SECTOR ECTOR D SECTOR C SECTOR D SECTOR A SECTOR B SECTOR A SECTOR B SECTOR D SECTOR GYP GYP BD STORAGE 401C GYP BD GYP BD 10' -0" A.F.F R2 TYP. TYP. TYP. R2 TYP. E G P A NO ES PROVIDE PRICING FOR MSS CEILING SYSTEM (UNISTRUT) AS AN ADD ALTERNATE. BASE PRICE WOULD FOR AN EXPOSED CEILING WITHOUT MSS (UNISTRUT) BOWTIE SPACES CONFORM TO BASE BUILDING STANDARD DIMENSIONS ARE TO FACE FINISH OR TO CENTERLINE OR EDGE OF FIXTURE. ALL CEILING HEIGHT DIMENSIONS ARE TO BOTTOM OF SUSPENSION GRID AT ACOUSTICAL PANEL CEILINGS OR FINISHED FACE OF GYPSUM BOARD, UNLESS INDICATED OTHERWISE. CENTER SUSPENSION SYSTEM OR CEILING PANELS ALL ROOMS BOTH DIRECTIONS UNLESS INDICATED EITHER DIRECTION. LOCATE SPRINKLER HEADS, SMOKE DETECTORS, SPEAKERS AND OTHER CEILING-MOUNTED MECHANICAL, ELECTRICAL, PLUMBING AND SECURITY DEVICES CENTERED IN ACOUSTICAL CEILING PANELS UNLESS NOTED OTHERWISE. GYPSUM BOARD CEILINGS, ALIGN FIXTURES AND DEVICES AND CENTER IN SPACES UNLESS NOTED OTHERWISE. CENTER LIGHT FIXTURES AND ORIENT ROOMS AS SHOWN, UNLESS NOTED OTHERWISE. MULTIPLE IDENTICAL CENTERLINE OF THE GOVERNING DIMENSION. LIGHT FIXTURES CEILING PANELS ARE TO BE CENTERED ON THE PANEL OR ALIGNED WITH THE PANEL EDGE UNLESS NOTED OTHERWISE. PROVIDE ACCESS PANELS GYPSUM BOARD CEILINGS AS REQUIRED TO ALLOW ACCESS TO ABOVE CEILING EQUIPMENT AND DEVICES. LINEAR FIXTURES ARE TO BE THE LONGEST CONTINUOUS RUN LENGTHS POSSIBLE FIT LOCATIONS AS SHOWN. ACOUSTICAL CEILING TILE ACOUSTICAL CEILING TILE EXPOSED CEILING, PAINTED PAINTED GYPSUM BOARD ACCESS PANEL COLOR TO MATCH 24" SQUARE 24" SQUARE SUPPLY DIFFUSER RECESSED LINEAR AT GYP CEILING CEILING MOUNTED FIRE ALARM SPEAKER/ STROBE SPEAKER EXIT SIGN CYLINDER DOWNLIGHT PENDANT E G T P GE D OCCUPANCY SENSOR SPRINKLER HEAD ANTENNA WIRELESS ACCESS POINT E G P A GE D CEILING MOUNTED PROJECTOR RECESSED LINEAR TASK LIGHT METAL SUSPENSION SYSTEM (UNISTRUT) ACTACTEXP GYP MSS HT NG X UR EGE D F1A F3 SPOT LIGHT TRACK SYSTEM F4 F5 F7 CEILING MOUNTED POWER DROP PLUG-IN ON BUSWAY POWER REEL ON UNISTRUT OVERHEAD SERVICE PANEL AT EXPOSED CYLINDER DOWNLIGHT PENDANT F12 DECORATIVE CEILING MOUNTED LIGHT F9 RECESSED LINEAR F2 LINEAR LED PENDANT LINEAR LED PENDANT AT PERIMETER F8 RECESSED DOWNLIGHT F10 ACP ACOUSTIC PANEL OVERHEAD SERVICE PANEL AT ACT CEILING MIC SECURITY CAMERA 111 5TH AVENUE FLOORS 10 AND 11 NEW YORK, NY, USA +1 (212) 989-3993 DRAWN BY: PROJ. NO.: DATE: DWG. DWG. ISSUE NYC DOB STAMP NYC DOB BSCAN CORNELL TECH WEST LOOP RD NEW YORK, NY 10044 MEP ENGINEER: JB&B 80 PINE STREET NEW YORK, NY 10005 OWNER: STRUCTURAL ENGINEER: LERA 40 WALL STREET, FLOOR NEW YORK, NY 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, NJ 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE OF THE AMERICAS, NEW YORK, NY 10018 0102/08/2023100% 05/12/2023 05/31/2023100% 03/10/2023 6/1/2023 5:24:02 PM Author F4 REFLECTED CEILING OVERALL CORNELL TATA INNOVATION CENTER A-124.00 11 EAST NEW YORK, 1/8" 1'-0" G8 F4 REFLECTED CE L NG P AN EY OT S - CE L NG Tag R1ADD ALTERNATE: UNISTRUT GRID 424 R2ADD ALTERNATE: ADD ACOUSTICAL PANELS RESEARCH SPACES: 422, RM 424, RM 441, RM 451
-204.00 D8-205.00 CRIT 490 STORAGE 406 CLASSROOM 408 CLASSROOM 408B OFFICE 403 OFFICE 404 OFFICE 405 OPEN WORK AREA 401 ELEVATOR LOBBY 40041 MECHANICAL PE1 PE2 STAIR 20' 20' 20' 20' 20' STORAGE 401C FHV FHV FEC -204.00 -204.00 SE O SE O SECTOR B- 400A 401C 401D 401E 490B C10 C11 CONF RM 412 OFFICE 414 OFFICE 415 CORRIDOR 40040 C12 A0350 A0350 A0350 A0350 A0350 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 A03 H03 H03 H03 STORAGE 410 ELEC 407 -206.00 -206.00 7/8" GLAZED PARTITION 7/8" C1 A0350 H02 W02 A0355 C15 -509.00A0355 A0350 A0350 PARTITIONS, UNO. EXISTING EXTERIOR MULLIONS, UNO. VERIFY LAYOUT DIMENSIONS FIELD AND NOTIFY ARCHITECT ANY DISCREPANCIES. INSTALL FINISHED DOOR OPENINGS 6”FROM AN ADJACENT WALL OR PARTITION UNO GRIND, PATCH AND/OR APPLY UNDERLAYMENT TO "SIM" NOTE INDICATES SIMILAR OR OPPOSITE HAND CONDITION. SEE INTERIOR ELEVATIONS FOR BLOCKING SCOPE AND LOCATIONS, UNO BY WALL TYPE. SEE FINISH PLANS FOR INFORMATION FLOOR FINISHES CONSTRUCTION. PROVIDE ELECTRICAL CONNECTIONS, SUPPORT AND BACKING FOR AUDIO-VISUAL EQUIPMENT PROVIDED OWNER. COORDINATE SCOPE WORK WITH OWNER. COORDINATE LOCATIONS LIGHT SWITCHES, CONTROL OO A G N NEW PARTITION NOT CONTRACT NOTES, REFER TO "KEYNOTES" FLOORS 10 AND 11 NEW YORK, NY, USA 10003 +1 (212) 989-3993 DRAWN BY: PROJ. NO.: PROJ. ARCH.: ISSUE CORNELL TECH WEST LOOP RD NEW YORK, NY 10044 MEP ENGINEER: JB&B 80 PINE STREET NEW YORK, NY 10005 SEAL OWNER: KEY PLAN STRUCTURAL ENGINEER: LERA 40 WALL STREET, FLOOR NEW YORK, NY 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE OF THE AMERICAS, 4TH FLOOR NEW YORK, NY 10018 0102/08/2023100% 03/31/2023100% 100% DD 05/12/2023 50% 03/10/2023 50% Author 103015.00 05/31/23 Designer F4 FLOOR PLANSECTOR A CORNELL TECH TATA INNOVATION CENTER A-115.00 11 EAST LOOP RD NEW YORK, NY 10044 1'-0" G F F OOR P AN - ECTOR K N - C N R C N Tag C1NEW PARTITION TO MATCH EXISTING C4HEAVY DUTY WIREMOLD FOR POWER DATA ALONG C5PROVIDE CONCRETE TOPPING SLAB TO MATCH LOBBY C7FUTURE DEMOUNTABLE PARTITION. PROVIDE C12EXISTING WALL FURRED OUT ALIGN WITH CRIT TELESCOPING DOORS: TWO PERFORATED METAL PANEL SKIN FRONT AND BACK, ON METAL C-CHANNEL FRAME. SECOND LEAF NESTS INTO FIRST LEAF, DR PULL REMAINS EXPOSED. DRS HUNG FROM PROVIDE GUIDE TRACK BY OWNER, CONTRACTOR INSTALLED STRUCTURAL STEEL SUPPORT TRANSFORMER ABOVEPHONE 420 PHONE 419 HUDDLE 416 STORAGE 417 HUDDLE 418 RESEARCH 422 RESEARCH 424 PHD COMP CLASSROOM 429 20' 16' 3/8" FHV C9 -204.00 S SECTOR A SECTOR B-204.00 -204.00 429B 416 417 418 MEETING 429A MEETING 421 GLAZED PARTITIONA0355 A0355 A03<varies> EQ A0345 A03 H02 H02 1/2" H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 H02 -205.00 A0355 A0355 C6 MULTIFUNCTION 430-205.00 1/4" 5/8" W02 W02 A0355 -160.00 C19G5 -160.00 on Center Fit Out R22/ARCH-CORNELLTECH_TATA-INTERIOR.rvt 1'-0" G F F OO PL N - ECTOR -204.00-205.00WORKSHOP HUDDLE 463 OFFICE 464 OFFICE 466 LASER CUTTER 461A CLASSROOM 460 PLOTTER 461 OFFICE 454 OFFICE 10 455 CRIT 490 OPEN WORK AREA 471 OFFICE 453 DISPLAY/LIBRARY 471A CT S O C SECTOR C463 461 400C C10 490C C6 -206.00A0355 A0655 A0345 A0655 A0655 A03H02 H02 H02 H02 H02 H02G8-501.00-A0655 W02 W02 490D 471B -504.00 C19 F O N N E DRAWINGS HAVE BEEN PREPARED AN ORIGINAL SHEET SIZE 48". FACE OF SHEATHING, CENTERLINE COLUMN GRIDLINE, FACE OF FINISH, UNO. ALIGN CENTERLINE SITE BUILT GLASS PARTITIONS WITH CENTERLINE GWB PARTITION, UNO. REFER ALIGN FACE NEW PARTITIONS WITH FACE OF EXISTING PARTITIONS, UNO. DIMENSIONS FIELD AND NOTIFY ARCHITECT ANY DISCREPANCIES. GRIND, PATCH AND/OR APPLY UNDERLAYMENT TO "SIM" NOTE INDICATES SIMILAR OPPOSITE HAND CONDITION. 11. SEE FINISH PLANS FOR INFORMATION ON FLOOR FINISHES AND TRANSITIONS. FIRESTOPPING PENETRATIONS OF FIRE RATED CONSTRUCTION. 13. PROVIDE ELECTRICAL CONNECTIONS, SUPPORT AND OWNER. COORDINATE SCOPE OF WORK WITH OWNER. 14. COORDINATE LOCATIONS OF LIGHT SWITCHES, CONTROL PRIOR INSTALLATION. F O N E N NEW PARTITION EXISTING PARTITION NOT CONTRACT 111 5TH AVENUE FLOORS 10 AND NEW YORK, NY, USA 10003 (212) 989-3993 DWG. ISSUE CORNELL TECH WEST LOOP NEW YORK, NY 10044 MEP ENGINEER: PINE STREET NEW YORK, NY 10005 SEAL OWNER: KEY PLAN STRUCTURAL ENGINEER: LERA WALL STREET, FLOOR NEW YORK, NY 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE THE AMERICAS, 4TH FLOOR NEW YORK, NY 10018 0102/08/2023100% SD 03/31/2023100% CD 100% 05/12/2023 50% CD Author 103015.00 05/31/23 Designer F4 FLOOR PLANSECTOR C CORNELL TECH TATA INNOVATION CENTER A-117.00 11 EAST LOOP RD NEW YORK, NY 10044 G F LOOR P AN - SE TOR C Y T - O T C C1NEW PARTITION MATCH EXISTING C2GLASS PARTITION. REFER A-201 FOR DIMENSIONS FACADE. REFER TO MEP DWGS C5PROVIDE CONCRETE TOPPING SLAB MATCH LOBBY WITH STEEL ANGLE C7FUTURE DEMOUNTABLE PARTITION. PROVIDE PERIMETER C10CRIT WALLS TO CONSTRUCTED OWNER AND INSTALLED CONTRACTOR C11HSS TUBE FOR OPERABL CRIT WALL SUPPORT BE AND MULTIPURPOSE WALLS BEYOND AND ALIGN WITH CEILING C13ADD ALTERNATE: SLIDIN TELESCOPING DOORS: TWO PERFORATED METAL PANEL SKIN FRONT AND BACK, METAL C-CHANNEL FRAME. SECOND LEAF NESTS INTO FIRST LEAF, DR PULL REMAINS EXPOSED. DRS HUNG FROM HEADER ABOVE WITH BALL-BEARING SLIDING HDWR INDICATED. ALIGN BOTTOM OF DRS WITH TOP TOE KICK; OWNER, CONTRACTOR INSTALLED C15NEW OPERABLE PARTITION FROM MODERNFOLD WITH STRUCTURAL STEEL SUPPORT C16FLOOR CLEARANCE FOR CEILING HUNG ELECTRICAL ADD ALTERNATES LIST FOR HEIGHTS. C19ADD ALTERNATE: SEE ELEVATION FOR GLASS EXTENTS AND-204.00 RESEARCH 451 FLEX SPACE 444 HUDDLE 446 EQUIPMENT ROOM 445 JANITOR STOR 40060 STORAGE 430A RESEARCH 441 ELEVATOR LOBBY 40041 PANTRY 434 VESTIBULE SE1 ELEC MENS HUDDLE 436 - C R CTO SECTOR D--206.00 -204.00 D4-205.00 400E 436 400C MEETING -205.00 OA0345 A0345 A0355 A0355 A0345 A0345 H02 A03 H02-H02 H02 H02 H02 H02 MULTIFUNCTION 430 -204.00 -204.00 CLOSETSK-3 SK-3D2-206.00 H02 H02 H02 430E 451A-504.00 434B -205.00 C19 O R A O SIZE OF 48". HORIZONTAL DIMENSIONS SHOWN INDICATE FACE TO FACE SHEATHING, CENTERLINE COLUMN GRIDLINE, FACE FINISH, UNO. PARTITIONS ARE PARALLEL OR ORTHAGONAL EXTERIOR WALLS, UNO. CENTERLINE OF GWB PARTITION, UNO. REFER TO INTERIOR ELEVATIONS FOR HEIGHTS AND JOINT SPACING. ALIGN CENTERLINE PARTITIONS WITH CENTERLINE OF EXISTING EXTERIOR MULLIONS, UNO. VERIFY LAYOUT DISCREPANCIES. INSTALL FINISHED DOOR OPENINGS 6”FROM ADJACENT PROVIDE FLAT AND LEVEL SUBSTRATE FOR NEW FLOOR FINISHES WITH MAXIMUM TOLERANCE OF 1/8”IN 10’. CONDITION. SEE INTERIOR ELEVATIONS FOR BLOCKING SCOPE AND LOCATIONS, UNO WALL TYPE. AND TRANSITIONS. PROVIDE LISTED FIRE-RESISTANT PENETRATION CONSTRUCTION. PROVIDE ELECTRICAL CONNECTIONS, SUPPORT AND BACKING FOR AUDIO-VISUAL EQUIPMENT PROVIDED BY COORDINATE LOCATIONS LIGHT SWITCHES, CONTROL DEVICES AND THERMOSTATIC SENSORS WITH ARCHITECT O R A G D NEW PARTITION EXISTING PARTITION LIMIT WORK LINE NOTES, REFER TO "KEYNOTES" NEW DOOR FIXED MILLWORK COUNTER 111 5TH AVENUE FLOORS AND 11 NEW YORK, NY, USA 10003 +1 (212) 989-3993 DRAWN PROJ. ARCH.: DWG. DWG. MARKDATEDESCRIPTION ISSUE NYC DOB BSCAN CORNELL TECH WEST LOOP RD NEW YORK, 10044 MEP ENGINEER: JB&B PINE STREET NEW YORK, 10005 OWNER: STRUCTURAL ENGINEER: LERA WALL STREET, FLOOR NEW YORK, 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, NJ 07042 CERAMI 1001 AVE OF THE AMERICAS, 4TH FLOOR NEW YORK, 10018 0105/19/2023ISSUED FOR PERMIT on Center Fit Out R22/ARCH-CORNELLTECH_TATA-INTERIOR.rvt Author 103015.00 05/31/23 F4 FLOOR PLAN SECTOR CORNELL TECH TATA INNOVATION CENTER A-118.00 11 EAST LOOP RD NEW YORK, NY 10044 G8 4 F OOR P A - ECT R D E O S - C N U N LEVEL. REFER GEOMETRY PLAN G2/A-111 EXTENTS AND INFRASTRUCTURE CONF FOR FUTURE DIVISION INTO C9PROVIDE SOLAR SHADE ACROSS EXTENTS BUILDING INSTALLED CONTRACTOR C11HSS 8X8 TUBE FOR OPERABL CRIT WALL SUPPORT PROVIDED CONTRACTOR C12EXISTING WALL TO FURRED OUT ALIGN WITH CRIT CEILING DOORS EACH WITH TWO LEAVES. EACH DR MADE PERFORATED METAL PANEL SKIN FRONT AND BACK, ON METAL C-CHANNEL FRAME. SECOND LEAF NESTS INTO FIRST LEAF, PULL REMAINS EXPOSED. DRS HUNG FROM INDICATED. ALIGN BOTTOM DRS WITH TOP OF TOE KICK; C14EXISTING OVERHEAD PROJECTOR AND SCREEN PROVIDED STRUCTURAL STEEL SUPPORT TRANSFORMER ABOVE C17EXISTING SPRINKLER FLOOR VALVE REMAIN THE NOTES Cornell Tech Tata Innovation VIEW OF CRIT SPACE
SM SM SM OS SM SM SM MM OS ELEVATOR LOBBY 40041 OFFICE 405 OFFICE 404 OFFICE 403 OPEN WORK AREA 401 CLASSROOM 408 STORAGE 406 CLASSROOM 408B MECHANICAL PE1 PE2 PE4 STAIR ACT10' - A.F.F.FHV FHV FEC--ACT- A.F.F. ACT- A.F.F. ACT- A.F.F. 26' 1/8"-EXP EXP EXP 1/8" CONF RM 412 OFFICE 414 OFFICE 415 AFF, TYP STORAGE 401CSLOPED CEILING F8 F7 F7 F1/A F1/A F7 F7 F7 F6 F2 F2 F2 F6ACP ACP ACP ACP ACP ACP EXP EXP GYP BD - A.F.F. C1 -504.00 -504.00 C1 -504.00 1,570 CRIT 490 -509.00 F4 F1/A F1/A ACP F6 OTHERWISE. CENTER SUSPENSION SYSTEM CEILING PANELS ALL ROOMS BOTH DIRECTIONS UNLESS INDICATED OTHERWISE. PARTIAL PANELS SHALL NOT LESS THAN EITHER DIRECTION. LOCATE SPRINKLER HEADS, SMOKE DETECTORS, SPEAKERS AND OTHER CEILING-MOUNTED MECHANICAL, CENTERED ACOUSTICAL CEILING PANELS UNLESS NOTED OTHERWISE. GYPSUM BOARD CEILINGS, ALIGN FIXTURES AND DEVICES AND CENTER SPACES UNLESS NOTED OTHERWISE. CENTER LIGHT FIXTURES AND ORIENT ROOMS AS SHOWN, UNLESS NOTED OTHERWISE. MULTIPLE IDENTICAL FIXTURES CEILING PANELS ARE BE CENTERED ON THE PANEL OR ALIGNED WITH THE PANEL EDGE UNLESS NOTED OTHERWISE. PROVIDE ACCESS PANELS GYPSUM BOARD CEILINGS REQUIRED ALLOW ACCESS ABOVE CEILING EQUIPMENT AND DEVICES. ACOUSTICAL CEILING TILE ACOUSTICAL CEILING TILE EXPOSED CEILING, PAINTED PAINTED GYPSUM BOARD 24" SQUARE 24" SQUARE CYLINDER DOWNLIGHT PENDANT E G T E L D SPRINKLER HEAD SECURITY CAMERA ANTENNA WIRELESS ACCESS POINT E G P N L E D RECESSED LINEAR TASK LIGHT METAL SUSPENSION SYSTEM (UNISTRUT) ACTACTGYP G N U E E E D F1A LINEAR LED PENDANT CEILING MOUNTED POWER DROP PLUG-IN BUSWAY POWER REEL UNISTRUT OVERHEAD SERVICE DECORATIVE CEILING MOUNTED LIGHT RECESSED LINEAR LINEAR LED PENDANT LINEAR LED PENDANT AT PERIMETER ACP OVERHEAD SERVICE MIC SECURITY CAMERA 111 5TH AVENUE FLOORS AND NEW YORK, NY, USA 10003 (212) 989-3993 DATE: PROJ. ARCH.: DWG. DWG. MARKDATEDESCRIPTION ISSUE CORNELL TECH WEST LOOP RD NEW YORK, NY 10044 MEP ENGINEER: JB&B PINE STREET NEW YORK, NY 10005 OWNER: STRUCTURAL ENGINEER: LERA WALL STREET, FLOOR NEW YORK, NY 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, NJ 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE OF THE AMERICAS, 4TH FLOOR NEW YORK, NY 10018 0102/08/2023100% SD 02 03/31/2023100% CD 100% DD 03 05/12/2023 50% CD 04 05/31/2023100% CD ADDENDUM 03/10/2023 50% CD on Center Fit Out R22/ARCH-CORNELLTECH_TATA-INTERIOR.rvt Author 103015.00 05/31/23 Designer F4 REFLECTED CEILING PLANSECTOR A CORNELL TECH TATA INNOVATION CENTER A-125.00 11 EAST LOOP RD NEW YORK, NY 10044 1/4" 1'-0" G8 F RE L CTED E L NG P AN - SECTOR A E N E - L N Text R1ADD ALTERNATE: UNISTRUT GRID 2FM 2FM 2FM 2FM 2FM 2FM 2FM 2FM 2FM 2FM 20' 16' 3/8" FHV ACT- A.F.F. PHONE 419 PHONE 420 RESEARCH 422 RESEARCH 424 PHD COMP CLASSROOM 429 STORAGE 417 HUDDLE 416 HUDDLE 418 FHV ACT- A.F.F. ACT-EXP EXP EXP ACT- A.F.F. ACT- A.F.F.-EQ EXPSLOPED CEILING GYP BD F7 F7 F7 F1/A F1/A F7 F7 F7 F1/A F1/A F1/A EXP ACP ACP ACP ACP ACP ACPC1F1/A F1/A F1/A EXP -508.00 OTHERWISE. CENTER SUSPENSION SYSTEM OR CEILING PANELS ALL ROOMS BOTH DIRECTIONS UNLESS INDICATED OTHERWISE. PARTIAL PANELS SHALL NOT BE LESS THAN EITHER DIRECTION. LOCATE SPRINKLER HEADS, SMOKE DETECTORS, SPEAKERS AND OTHER CEILING-MOUNTED MECHANICAL, CENTERED ACOUSTICAL CEILING PANELS UNLESS NOTED OTHERWISE. IN GYPSUM BOARD CEILINGS, ALIGN 111 5TH AVENUE FLOORS 10 AND 11 NEW YORK, NY, USA 10003 (212) 989-3993 CORNELL TECH WEST LOOP RD NEW YORK, 10044 OWNER: on Center Fit Out R22/ARCH-CORNELLTECH_TATA-INTERIOR.rvt G F4 REF ECT D CE NG LAN - SEC OR B SM 17' 11 20'ACT- A.F.F.WORKSHOP 462 HUDDLE 463 OFFICE 464 OFFICE 466 LASER CUTTER 461A PLOTTER 461 CLASSROOM 460 OFFICE 10 455 OFFICE 454 OFFICE 453 OPEN WORK AREA 471 ACT----- A.F.F. ACT- A.F.F. GYP BD - A.F.F. EXP EXP EXPBUSWAY AFF, TYP AFF, TYPGYP F7 F8 F1/A F1/A F1/A F1/A C14 GYP BDC1 -504.00 F1/A ACP ACP ACP ACP C N N N E PROVIDE PRICING FOR MSS CEILING SYSTEM (UNISTRUT) AN ADD ALTERNATE. BASE PRICE WOULD BE FOR EXPOSED CEILING WITHOUT MSS (UNISTRUT) BOWTIE SPACES CONFORM BASE BUILDING STANDARD EDGE OF FIXTURE. CEILING HEIGHT DIMENSIONS ARE TO BOTTOM OF OTHERWISE. CENTER SUSPENSION SYSTEM OR CEILING PANELS EITHER DIRECTION. LOCATE SPRINKLER HEADS, SMOKE DETECTORS, ELECTRICAL, PLUMBING AND SECURITY DEVICES CENTERED ACOUSTICAL CEILING PANELS UNLESS NOTED OTHERWISE. GYPSUM BOARD CEILINGS, ALIGN NOTED OTHERWISE. CENTER LIGHT FIXTURES AND ORIENT ROOMS AS LIGHT FIXTURES SPACE SHALL ALIGNED THE CENTERLINE THE GOVERNING DIMENSION. LIGHT NOTED OTHERWISE. PROVIDE ACCESS PANELS GYPSUM BOARD CEILINGS EQUIPMENT AND DEVICES. LINEAR FIXTURES ARE BE THE LONGEST CONTINUOUS ACOUSTICAL CEILING TILE ACCESS PANEL COLOR MATCH RETURN REGISTER 24" SQUARE CEILING MOUNTED FIRE ALARM EXIT SIGN C N E E N C N N E N CEILING MOUNTED (UNISTRUT)ACTMSS G U G D F1A LINEAR LED PENDANT F1 DROP PLUG-IN BUSWAY UNISTRUT PANEL EXPOSED CYLINDER DOWNLIGHT PENDANT F12 DECORATIVE CEILING MOUNTED LIGHT F9 RECESSED LINEAR F2 LINEAR LED PENDANT F8 RECESSED DOWNLIGHT F10 PANEL ACT CEILING 111 5TH AVENUE FLOORS 10 AND NEW YORK, NY, USA 10003 (212) 989-3993 PROJ. NO.: DATE: DWG. MARKDATEDESCRIPTION ISSUE NYC DOB STAMP PAGE CORNELL TECH WEST LOOP NEW YORK, NY 10044 MEP ENGINEER: JB&B PINE STREET NEW YORK, NY 10005 OWNER: STRUCTURAL ENGINEER: LERA WALL STREET, FLOOR NEW YORK, NY 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE THE AMERICAS, 4TH FLOOR NEW YORK, NY 10018 03/31/2023100% CD 100% DD 05/31/2023100% CD ADDENDUM 03/10/2023 50% CD Author 103015.00 05/31/23 Designer F4 REFLECTED CEILING PLANSECTOR C CORNELL TECH TATA INNOVATION CENTER A-127.00 11 EAST LOOP RD NEW YORK, NY 10044 G F R F EC ED E NG P N - SEC OR N ETag SM SM OS SM JANITOR SE VESTIBULE SE1 MENS WOMENS ACT- A.F.F. FEC FHV CEILING PANTRY 434 ELEVATOR LOBBY 40041 RESEARCH 451 EQUIPMENT ROOM 445 JANITOR STOR 40060 FLEX SPACE HUDDLE 446 RESEARCH 441 STORAGE 430A HUDDLE 436 GYP - A.F.F.GYP - A.F.F. EXP EXP EXP MSS EXP-- A.F.F.PNT-EXP F1/A AT AFF F1/A F1/A F10 F10 F10 F10-----PNT-0" A.F.FACP ACP ACP ACP ACP ACP ACP ACP ACP ACP ACP ACP -508.00 R2 E G L O PROVIDE PRICING FOR MSS CEILING SYSTEM (UNISTRUT) EXPOSED CEILING WITHOUT MSS (UNISTRUT) PROVIDE SLOPED GYP BD CEILING PERIMETER OF DIMENSIONS ARE FACE OF FINISH OR CENTERLINE OR EDGE FIXTURE. SUSPENSION GRID ACOUSTICAL PANEL CEILINGS FINISHED FACE GYPSUM BOARD, UNLESS INDICATED ALL ROOMS BOTH DIRECTIONS UNLESS INDICATED OTHERWISE. PARTIAL PANELS SHALL NOT LESS THAN LOCATE SPRINKLER HEADS, SMOKE DETECTORS, SPEAKERS AND OTHER CEILING-MOUNTED MECHANICAL, ELECTRICAL, PLUMBING AND SECURITY DEVICES NOTED OTHERWISE. GYPSUM BOARD CEILINGS, ALIGN FIXTURES AND DEVICES AND CENTER SPACES UNLESS SHOWN, UNLESS NOTED OTHERWISE. MULTIPLE IDENTICAL FIXTURES CEILING PANELS ARE CENTERED THE PANEL ALIGNED WITH THE PANEL EDGE UNLESS REQUIRED ALLOW ACCESS ABOVE CEILING EQUIPMENT AND DEVICES. RUN LENGTHS POSSIBLE TO LOCATIONS SHOWN. ACOUSTICAL CEILING TILE EXPOSED CEILING, PAINTED PAINTED GYPSUM BOARD ADJACENT 24" SQUARE SUPPLY DIFFUSER RECESSED LINEAR GYP CEILING SPEAKER/ STROBE SPEAKER CYLINDER DOWNLIGHT PENDANT E G Y G D OCCUPANCY SENSOR SPRINKLER HEAD SECURITY CAMERA ANTENNA WIRELESS ACCESS POINT E G L G D RECESSED LINEAR TASK LIGHT (UNISTRUT) ACT-EXP GYP T N X R E E SPOT LIGHT TRACK SYSTEM CEILING MOUNTED POWER POWER REEL ON OVERHEAD SERVICE ACP ACOUSTIC PANEL OVERHEAD SERVICE MIC SECURITY CAMERA 111 5TH AVENUE FLOORS AND 11 NEW YORK, NY, USA 10003 +1 (212) 989 DRAWN DWG. ISSUE CORNELL TECH WEST LOOP RD NEW YORK, 10044 MEP ENGINEER: JB&B PINE STREET NEW YORK, 10005 SEAL OWNER: STRUCTURAL ENGINEER: LERA WALL STREET, FLOOR NEW YORK, 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, NJ 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE OF THE AMERICAS, 4TH FLOOR NEW YORK, 10018 0102/08/2023100% 05/12/2023 50% 04 on Center Fit Out R22/ARCH-CORNELLTECH_TATA-INTERIOR.rvt Author F4 REFLECTED CEILING PLAN SECTOR CORNELL TECH INNOVATION A-128.00 11 EAST LOOP RD NEW YORK, NY 10044 G E F R F EC ED C NG L N - SEC OR D E O S - C L G Tag Text SPACES: RM 422, 424, 441, 451 Cornell Tech Tata Innovation Center Fit-Out PLANS AND VIEWS 4th Floor Views VIEW OF MULTIFUNCTION SPACE
AWS CASEWORK LEGEND ARCHITECTURAL WOODWORK STANDARDS (AWS) CASEWORK DESIGN SERIES (CDS) E E 100 -LOWER WITHOUT DRAWERS 200 -LOWER WITH DRAWER 300 -UPPER 400 -FULL-HEIGHT 500 -WARDROBE 800 -CUSTOM 900 -CUSTOM -MODIFICATION M C O N (#)ADJ ADJUSTABLE SHELVES (#)DR DOORS (#)DRW DRAWERS (#)EQ EQUAL DRAWERS (#)OPEN SH OPEN SHELVES (#)SH SHELVES (EX: (2)SH SHELVES) APN APRON ONLY; NO DOORS END FINISHED END/SIDE PANEL EQUIP OPEN SHELF FOR EQUIPMENT FIXED FIXED PANEL GLOVES LOCKING L/U DR LOWER UPPER DOORS MICRO MICROWAVE NO FILE NO FILE FOLLOWER OR HANGING SYSTEM NO SH NO SHELF NO SINK NO SINK PPE PERSONAL PROTECTIVE EQUIPMENT TRASH TRASH OPENING; NO DRAWER VAL VALENCE 202M EXTRA SHELF STYLE OF CABINET DEPTH OF CABINET HEIGHT OF CABINET WIDTH OF CABINET MODIFICATIONS TYP CAL M WORK F N SHES UPPER, LOWER, AND FULL HEIGHT CASEWORK TO RECEIVE PLAM-2 ON ALL EXPOSED SURFACES, UNO COUNTER TOP AND BACKSPLASH, SSM-1, UNO NO BACKSPLASH WHERE TILE IS NOTED F4 63' -7 5/8" F5 77' -7 5/8" CRK GL GYP BD RWBA-507.00 D8 7' 5/8" 14' 1/4" 5/8" -507.00 D7 F6 -504.00 F6 -504.00 F2 -504.00 F4 63' -7 5/8" F5 77' -7 5/8" CRK 14' 0" GL C10 C11 RWBPNT-507.00 F7 F4 63' -7 5/8" F5 77' -7 5/8" EXISTING FINTUBE COVER CRK GL RWBPNT-507.00 D8 -507.00 F7 F4 63' -7 5/8" F5 77' -7 5/8" EXISTING FINTUBE COVER CUSTOM DOORS WITH PINABLE WALL SURFACE TO MATCH SURROUNDING WALL CRK RWBPNTPNT-507.00 D8 -507.00 D7 F4 63' -7 5/8" F5 77' -7 5/8" SSTN1/2" TERRAZZO FACE WITH 3/4" PLYWOOD SUBSTRATE WITH REQ BLOCKING. OPEN TO ELEVATOR LOBBY BEYOND SSTNSSTN- SSTN"V" SHAPED BAR HEIGHT COUNTER 10' 0" F4 63' -7 5/8" F5 77' -7 5/8" PNTCT SSTNPMTL PMTL INTEGRATED SCREEN DISPLAY INTEGRATED SCREEN DISPLAY PLAM SK-2 SK-2 PLAM PNT- PNTPLAM D1 -504.00 RWBC5 -510.00 B8 -510.00 C5 -510.00 DW-1 DW-1 RF-1 RF-1 E8 -510.00 1' 10" 2' 9 1/4" F4 63' -7 5/8" F5 77' -7 5/8" EQ EQ 1/2" 1/2" 14' 0" GL B1 -504.00 CR CR DISTRACTION BANDING, PATTERN TO BE CONFIRMED BY OWNER E2 -504.00 G4 -504.00 G6 A-504.00 SIM 2' 6" 2' 4" F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" GL EQ EQ 1/2" 1/2" 430A 430B B1 -504.00 CR CR DISTRACTION BANDING, PATTERN TO BE CONFIRMED BY OWNER E2 -504.00 G4 -504.00 G6 -504.00 SIM F4 63' -7 5/8" F5 77' -7 5/8" PMTL PLAM STORAGE WITH KV SHELVING PMTL PMTL PMTL PNTPLAM INTEGRATED SCREEN DISPLAY INTEGRATED SCREEN DISPLAY STORAGE WITH KV SHELVING PERFORATED METAL NESTED DOORS WITH HEAVY DUTY TOP AND BOTTOM BALL BEARING DRAWER SLIDE HDWR -FULTERER FR5400 OR SIM PERFORATED METAL NESTED DOORS WITH HEAVY DUTY TOP AND BOTTOM BALL BEARING DRAWER SLIDE HDWR -FULTERER FR5400 OR SIM C13 PLAM PLAM RWBF4 63' -7 5/8" F5 77' -7 5/8" 1/2" TERRAZZO FACE WITH 3/4" PLYWOOD SUBSTRATE WITH REQ BLOCKING. "V" SHAPED BAR HEIGHT COUNTER. OPEN TO PANTRY BEYOND SSTNSSTNSSTNSSTNF4 63' -7 5/8" F5 77' -7 5/8" 14' 0" PNTPNTRWBPNT- PNT3/8" 5' 5/8" 3/8" 5/8" 3/8" 5' /8" 3/8" G8 -507.00 D1 -504.00 D1 -504.00 F4 63' -7 5/8" F5 77' -7 5/8" RWBPNTDASHED LINES INDICATE DISPLAY AND MOUNTING BRACKET, COORDINATE WITH AV DRAWINGS EQ EQ 8' 6" F6 -504.00 B F4 63' -7 5/8" F5 77' -7 5/8" EQ EQ RWBPNTDASHED LINES INDICATE DISPLAY AND MOUNTING BRACKET, COORDINATE WITH AV DRAWINGS F6 -504.00 F4 63' -7 5/8" F5 77' -7 5/8" 6' 1/2" 5/8" DASHED LINES INDICATE DISPLAY AND MOUNTING BRACKET, COORDINATE WITH AV DRAWINGS RWBPNTF6 -504.00 1 F4 63' -7 5/8" EQ EQ RWBPNTDASHED LINES INDICATE DISPLAY AND MOUNTING BRACKET, COORDINATE WITH AV DRAWINGS F6 -504.00 1 F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" PNTGL RWBGL 11 3/4" 11 3/4" 420 419 1 F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" 8' 0" PNTGL RWB18' 1/2" 20' F2 -504.00 F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" PNTGL GL RWB17' 3/8" 416 418 417 3' 6" 4' 6" ADD ALTERNATE: EXTEND GLASS TO FINISH FLOOR. EXTENTS TO FOLLOW DIAGONAL HATCH AS INDICATED ADD ALTERNATE: EXTEND GLASS TO FINISH FLOOR. EXTENTS TO FOLLOW DIAGONAL HATCH AS INDICATED F4 63' -7 5/8" F5 77' -7 5/8" PNTRWB0" MKR BD PAINT GLASS CORK ELEVAT ON MATER AL LEGEND 111 5TH AVENUE FLOORS 10 AND 11 NEW YORK, NY, USA 10003 +1 (212) 989 DRAWN BY: PROJ. NO.: DATE: DWG. DWG. E G MARKDATEDESCRIPTION ISSUE NYC DOB STAMP PAGE NO. NYC DOB BSCAN OF CORNELL TECH WEST LOOP RD NEW YORK, NY 10044 MEP ENGINEER: JB&B 80 PINE STREET NEW YORK, NY 10005 SEAL OWNER: KEY PLAN STRUCTURAL ENGINEER: LERA 40 WALL STREET, FLOOR 23 NEW YORK, NY 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, NJ 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE OF THE AMERICAS, 4TH FLOOR NEW YORK, NY 10018 0102/08/2023100% SD 02 03 04 05 6/1/2023 5:27:34 PM Autodesk Docs://103015.00Cornell Tech Tata Innovati on Center Fit Out R22/ARCH-CORNELLTECH_TATA-INTERIOR.rvt F4 INTERIOR ELEVATIONS CORNELL TECH
NEW YORK, NY 10044 1/4" 1'-0" D7 MULT FUNCT ON NORTH ELEVAT ON 1/4" 1'-0" D8 CRIT SPACE NORTH ELEVAT ON 1/4" 1'-0" F8 CR T SPACE SOUTH ELEVAT ON 1/4" 1'-0" F7 MULT FUNCTION SOUTH ELEVAT ON 1/4" 1'-0" E6 PANTRY SLAND NORTH ELEVAT ON 1/4" 1'-0" G4 PANTRY SOUTH ELEVAT ON - OPEN 1/4" 1'-0" G8 L4 - CR T GLAZ NG 1/4" 1'-0" G7 L4 - MULTI FUNCT ON GLASS 1/4" 1'-0" G6 PANTRY SOUTH ELEVAT ON - CLOSED KEYNOTES - CONSTRUCT ON Tag Text C1NEW PARTITION TO MATCH EXISTING C2GLASS PARTITION. REFER TO A-201 FOR DIMENSIONS C3FIN TUBE ALONG FACADE. REFER TO MEP DWGS C4HEAVY DUTY WIREMOLD FOR POWER DATA ALONG FACADE. REFER TO MEP DWGS C5PROVIDE CONCRETE TOPPING SLAB TO MATCH LOBBY LEVEL. REFER TO GEOMETRY PLAN G2/A-111 EXTENTS AND EDGE DETAILS C6PROVIDE REINFORCEMENT TO EXISTING FINTUBE COVER WITH STEEL ANGLE C7FUTURE DEMOUNTABLE PARTITION. PROVIDE INFRASTRUCTURE CONF RM FOR FUTURE DIVISION INTO OFFICES C9PROVIDE SOLAR SHADE ACROSS EXTENTS OF BUILDING PERIMETER C10CRIT WALLS TO BE CONSTRUCTED BY OWNER AND INSTALLED BY CONTRACTOR C11HSS 8X8 TUBE FOR OPERABL CRIT WALL SUPPORT TO BE PROVIDED BY CONTRACTOR C12EXISTING WALL TO BE FURRED OUT TO ALIGN WITH CRIT AND MULTIPURPOSE WALLS BEYOND AND ALIGN WITH CEILING C13ADD ALTERNATE: SLIDING, TELESCOPING DOORS: TWO DOORS EACH WITH TWO LEAVES. EACH DR MADE OF PERFORATED METAL PANEL SKIN FRONT AND BACK, ON METAL C-CHANNEL FRAME. SECOND LEAF NESTS INTO FIRST LEAF, DR PULL REMAINS EXPOSED. DRS HUNG FROM HEADER ABOVE WITH BALL-BEARING SLIDING HDWR AS INDICATED. ALIGN BOTTOM OF DRS WITH TOP OF TOE KICK; PROVIDE GUIDE TRACK C14EXISTING OVERHEAD PROJECTOR AND SCREEN PROVIDED BY OWNER, CONTRACTOR INSTALLED C15NEW OPERABLE PARTITION FROM MODERNFOLD WITH STRUCTURAL STEEL SUPPORT C16FLOOR CLEARANCE FOR CEILING HUNG ELECTRICAL TRANSFORMER ABOVE C17EXISTING SPRINKLER FLOOR VALVE TO REMAIN IN THE SPACE BUT NOT UTILIZED FOR MAKERLAB FITOUT C18TYPICAL COLUMN ENCLOSURE WITH GYP BOARD. REFER TO ADD ALTERNATES LIST FOR HEIGHTS. C19ADD ALTERNATE: SEE ELEVATION FOR GLASS EXTENTS AND NOTES 1/4" 1'-0" E4 PANTRY SLAND SOUTH ELEVATION 1/4" 1'-0" G3 L FT LOBBY ELEVAT ON 1/4" 1'-0" C6 HUDDLE 01 EAST ELEVAT ON 1/4" 1'-0" C4 HUDDLE 02 ELEVAT ON 1/4" 1'-0" C3 HUDDLE 03 ELEVAT ON 1/4" 1'-0" D3 HUDDLE 04 ELEVATION 1/4" 1'-0" G2 PHONE BOOTH ELEVAT ON 1/4" 1'-0" F2 DRY RESEARCH SOUTH ELEVAT ON 1/4" 1'-0" D2 STORAGE ROOM ELEVAT ON 1/4" 1'-0" D4 HUDDLE 4 ENTRANCE ELEVAT ON
A-204.00
AWS CASEWORK LEGEND ARCHITECTURAL WOODWORK STANDARDS (AWS) CASEWORK DESIGN SERIES (CDS) 100 -LOWER WITHOUT DRAWERS 200 -LOWER WITH DRAWER 300 -UPPER 400 -FULL-HEIGHT 500 -WARDROBE 800 -CUSTOM 900 -CUSTOM -MODIFICATION N (#)ADJ ADJUSTABLE SHELVES (#)DR DOORS (#)DRW DRAWERS (#)EQ EQUAL DRAWERS (#)OPEN SH OPEN SHELVES (#)SH SHELVES (EX: (2)SH SHELVES) APN APRON ONLY; NO DOORS END FINISHED END/SIDE PANEL EQUIP OPEN SHELF FOR EQUIPMENT FIXED FIXED PANEL GLOVES LOCKING L/U DR LOWER UPPER DOORS MICRO MICROWAVE NO FILE NO FILE FOLLOWER OR HANGING SYSTEM NO SH NO SHELF NO SINK NO SINK PPE PERSONAL PROTECTIVE EQUIPMENT TRASH TRASH OPENING; NO DRAWER VAL VALENCE 202M W EXTRA SHELF STYLE OF CABINET DEPTH OF CABINET HEIGHT OF CABINET WIDTH OF CABINET MODIFICATIONS TYP CAL M LLWORK F N SHES UPPER, LOWER, AND FULL HEIGHT CASEWORK TO RECEIVE PLAM-2 ON ALL EXPOSED SURFACES, UNO COUNTER TOP AND BACKSPLASH, SSM-1, UNO NO BACKSPLASH WHERE TILE IS NOTED F4 63' -7 5/8" F5 77' -7 5/8" PNTRWB3/4" 17' 3/8" F4 63' -7 5/8" F5 77' -7 5/8" GL RWBCRK 20' 408B 3' 1/4"1' 3/4" CR E F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" 19' 7" 21' RWB18' 3/4" 15' 10 1/4" 10"2' 7/8" 11' 3/4" 22' 3/8" PNT- PNT- PNT- PNT- CR E F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" RACEWAY PNTRWB17' 7/8" 17' 7/8" F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" RACEWAY PNTRWB19' 1/2" 19' D F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" 21' RACEWAY PNTRWB10' 3/4" F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" RACEWAY PNTGL RWB13' 1/4" 1/8"3' 1/8"3' 1/8" F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" CRK RWBF4 63' -7 5/8" F5 77' -7 5/8" PNT20' OPERABLE PARTITION G5 -509.00 F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" 20' 0" PNTOPERABLE PARTITION G5 -509.00 F4 63' -7 5/8" F5 77' -7 5/8" CRK RWB14' 0" F4 63' -7 5/8" F5 77' -7 5/8" GL PNTRWB14' 0" GL CR 441 ROOM SIGNAGE ADD ALTERNATE: EXTEND GLASS TO FINISH FLOOR. EXTENTS TO FOLLOW DIAGONAL HATCH AS INDICATED D 1 F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" CRK 8' 1/2" RWBF4 63' -7 5/8" F5 77' -7 5/8" PNTRACEWAY RWB22' 10 5/8" F4 63' -7 5/8" F5 77' -7 5/8" 8' 0" GL PNTCR 444 ROOM SIGNAGE ADD ALTERNATE: ADD GLASS EXTENDING TO FINISH FLOOR. EXTENTS TO FOLLOW DIAGONAL HATCH AS INDICATED F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" 8' 0" PNTGL GL RWB5/8" F4 63' -7 5/8" F5 77' -7 5/8" PNTRWB20' PNTRWBF4 63' -7 5/8" F5 77' -7 5/8" PNTRWB7"5' 3/8" F4 63' -7 5/8" F5 77' -7 5/8" PNTRWB14' 0" PAINT GLASS CORK ELEVAT ON MATER AL EGEND F4 63' -7 5/8" F5 77' -7 5/8" 14' 0" OPERABLE PARTITION 17' 3/8" CRK CRK RWB-509.00 G5 -509.00 G5 C8 -503.00 C7 -503.00 -504.00 F6 -504.00 111 5TH AVENUE FLOORS 10 AND 11 NEW YORK, NY, USA 10003 +1 (212) 989-3993 DRAWN BY: PROJ. NO.: DATE: PROJ. ARCH.: DWG. DWG. G MARKDATEDESCRIPTION ISSUE NYC DOB STAMP PAGE NO. NYC DOB BSCAN OF CORNELL TECH WEST LOOP RD NEW YORK, NY 10044 MEP ENGINEER: JB&B 80 PINE STREET NEW YORK, NY 10005 SEAL OWNER: KEY PLAN STRUCTURAL ENGINEER: LERA 40 WALL STREET, FLOOR 23 NEW YORK, NY 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, NJ 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE OF THE AMERICAS, 4TH FLOOR NEW YORK, NY 10018 0102/08/2023100% SD 02 03/31/2023100% CD 100% DD 03 05/12/2023 50% CD 04 05/31/2023100% CD ADDENDUM 03/10/2023 05 50% CD 6/1/2023 5:27:50 PM on Center Fit Out R22/ARCH-CORNELLTECH_TATA-INTERIOR.rvt Author 103015.00 05/31/23 Designer F4 INTERIOR ELEVATIONS CORNELL TECH TATA INNOVATION CENTER
11 EAST LOOP RD NEW YORK, NY 10044 1/4" 1'-0" G7 CORRIDOR ELEVAT ON 1/4" 1'-0" D6 NORTH STUD O ELEVAT ON 02 1/4" 1'-0" G8 SOUTH CORR DOR ELEVAT ON 1/4" 1'-0" D8 FAB LAB ELEVATION 01 1/4" 1'-0" C8 FAB LAB ELEVAT ON 02 1/4" 1'-0" E7 FAB LAB ELEVAT ON 03 1/4" 1'-0" C7 FAB LAB ELEVAT ON 04 KEYNOTES - CONSTRUC ON Tag Text C1NEW PARTITION TO MATCH EXISTING C2GLASS PARTITION. REFER TO A-201 FOR DIMENSIONS C3FIN TUBE ALONG FACADE. REFER TO MEP DWGS C4HEAVY DUTY WIREMOLD FOR POWER DATA ALONG FACADE. REFER TO MEP DWGS C5PROVIDE CONCRETE TOPPING SLAB TO MATCH LOBBY LEVEL. REFER TO GEOMETRY PLAN G2/A-111 EXTENTS AND EDGE DETAILS C6PROVIDE REINFORCEMENT TO EXISTING FINTUBE COVER WITH STEEL ANGLE C7FUTURE DEMOUNTABLE PARTITION. PROVIDE INFRASTRUCTURE IN CONF RM FOR FUTURE DIVISION INTO OFFICES C9PROVIDE SOLAR SHADE ACROSS EXTENTS OF BUILDING PERIMETER C10CRIT WALLS TO BE CONSTRUCTED BY OWNER AND INSTALLED BY CONTRACTOR C11HSS 8X8 TUBE FOR OPERABL CRIT WALL SUPPORT TO BE PROVIDED BY CONTRACTOR C12EXISTING WALL TO BE FURRED OUT TO ALIGN WITH CRIT AND MULTIPURPOSE WALLS BEYOND AND ALIGN WITH CEILING C13ADD ALTERNATE: SLIDING, TELESCOPING DOORS: TWO DOORS EACH WITH TWO LEAVES. EACH DR MADE OF PERFORATED METAL PANEL SKIN FRONT AND BACK, ON METAL C-CHANNEL FRAME. SECOND LEAF NESTS INTO FIRST LEAF, DR PULL REMAINS EXPOSED. DRS HUNG FROM HEADER ABOVE WITH BALL-BEARING SLIDING HDWR AS INDICATED. ALIGN BOTTOM OF DRS WITH TOP OF TOE KICK; PROVIDE GUIDE TRACK C14EXISTING OVERHEAD PROJECTOR AND SCREEN PROVIDED BY OWNER, CONTRACTOR INSTALLED C15NEW OPERABLE PARTITION FROM MODERNFOLD WITH STRUCTURAL STEEL SUPPORT C16FLOOR CLEARANCE FOR CEILING HUNG ELECTRICAL TRANSFORMER ABOVE C17EXISTING SPRINKLER FLOOR VALVE TO REMAIN THE SPACE BUT NOT UTILIZED FOR MAKERLAB FITOUT C18TYPICAL COLUMN ENCLOSURE WITH GYP BOARD. REFER TO ADD ALTERNATES LIST FOR HEIGHTS. C19ADD ALTERNATE: SEE ELEVATION FOR GLASS EXTENTS AND NOTES 1/4" 1'-0" F4 CLASSROOM 01 NORTH ELEVAT ON 1/4" 1'-0" E4 CLASSROOM 01 SOUTH ELEVAT ON 1/4" 1'-0" G6 CLASSROOM 02 NORTH ELEVAT ON 1/4" 1'-0" F6 CLASSROOM 02 SOUTH ELEVAT ON 1/4" 1'-0" G4 RESEARCH 3 ENTRANCE ELEVAT ON 1/4" 1'-0" G3 RESEARCH 03 WEST ELEVAT ON 1/4" 1'-0" F3 FLEX SPACE NORTH ELEVAT ON 1/4" 1'-0" D3 FLEX SPACE ENTRANCE ELEVAT ON 1/4" 1'-0" E3 RESEARCH 3 ELEVAT ON 01 1/4" 1'-0" G2 RESEARCH 3 ELEVATION 02 1/4" 1'-0" E2 RESEARCH 3 ELEVAT ON 03 1/4" 1'-0" D2 RESEARCH 3 ELEVAT ON 04 1/4" 1'-0" C1 CLASSROOM 1& 2 EAST ELEVAT ON MAIN TEE SPLICE COUPLING (OCCURS AT RANDOM) 1/2" CHANNEL, APPROX. 4'-0" O.C., MAY OCCUR DIRECTLY OVER LIGHT VARIES TO SUIT INSTALLATION CLEARANCE LIGHT FIXTURE HEIGHT THE RECESSED FIXTURE MAY BE SUPPORTED BY THE MAIN TEES SPACED 2'-0" OR 4'-0" O.C. 1/2" COLD ROLLED 16 GA. STEEL SUP. CHANNEL (BLACK IRON), APPROX. 4'-6" O.C. (NOTE: LARGE OR HEAVIER CHAN. MAY BE USED WHEN REQ'D. BY BUILDING CODE). INSTALLED PER SECT. OF N.Y.C. CODE GAT CLIP CROSS TEE -MAY BE 1/2" OR HIGH, AND MAY BE 2'-0" OR 4'-0" O.C. 1/4" DIA. GALV. STEEL ROD OR 1/8" 1" FLAT STRAP HANGER NOT TO EXCEED 4'-6" O.C. DIRECT HANG CLIP CAT. #548 .58 .SM MAIN TEE -48 O.C. MAX. (SHAPE DESIGN AS APPROVED) 1/2" COLD ROLLED SUSPENSION CHANNEL (BLACK IRON) ACOUSTIC CEILING TILE CHANNEL SPLICE SCHED. CLNG. SEE RCP B.O. EXISTING STRUCTURE ABOVE 1/4" DIAM. METAL ROD OR 1/8" FLAT STRAP HANGER SECURED TO STRUCTURE ABOVE. NOT TO EXCEED 4'-6" O.C. 3/16" STL ANGLE @ 4'-6" O.C. MAX SLOTTED TO RECEIVE 3/8" DIA BOLT ATTACH TO STRUCTURE ABOVE W/ EXPANSION BOLTS WITH SAFE WORKING LOAD OF 300 LBS MIN. (TYP) 1/8" STEEL FLAT BARS 4'-6" O.C. MAX SLOTTED FOR 3/8" DIA BOLT (TYP) FLAT BAR HANGER EXISTING STRUCTURE ABOVE 3/8" DIA BOLT W/ NUT LOCK WASHER (TYP) 3/16" STL ANGLE @ 4'-6" O.C. MAX SLOTTED TO RECEIVE 3/8" DIA BOLT ATTACH TO STRUCTURE ABOVE WITH EXPANSION BOLTS WITH SAFE WORKING LOAD OF 300 LBS MIN. (TYP) SLOTTED FOR 1/4" DIA STL ROD 1/4" DIA GALVANIZED STEEL ROD @ 4'-6" O.C. MAX ROD HANGER @ EXISTING STRUCTURE ABOVE (FOR UNDER 4PSF LOAD) PARTITION AS SCHEDULED CLIP ANGLE SIDES CONTINUOUS CONCEALED HINGE MTL ACCESS PANEL FIXED MTL SLEEVE W/ LOCKING LATCH 2" VARIES LAYER 3/4" PLYWOOD BLOCKING INSTALLED WITHIN THE STUD BAYS PER AV DWGS DASHED LINES INDICATE DISPLAY AND MOUNTING BRACKET, COORDINATE WITH AV DRAWINGS SCHEDULED PARTITION AND ACOUSTICAL INSULATION 2' 0" 2' 0" 5/8" GYP BD OVER 5/8" MTL STUDS SECURED TO STRUCTURE ABOVE B.O. EXISTING SLAB APPROX. 14' -0" AFF (VIF) GYP BD HEADER SEE ELEVATION SCHEDULED GYP BD CEILING GLASS WALL SYSTEM, REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION BLOCKING AS REQUIRED FOR GLASS WALL SYSTEM TIE-IN B.O. EXISTING SLAB APPROX. 14' -0" AFF (VIF) 5/8" GYP BD OVER 5/8" MTL STUDS SECURED TO STRUCTURE ABOVE CONTINUOUS CEILING TRIM MOLDING SCHED. CLNG. SEE RCP SCHEDULED ACT CEILING SYSTEM GYP BD HEADER SEE ELEVATION GLASS WALL SYSTEM, REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION BLOCKING AS REQUIRED FOR GLASS WALL SYSTEM TIE-IN R 5/8" MTL STUDS SECURED TO STRUCTURE ABOVE AND BRACED AS REQUIRED B.O. EXISTING SLAB APPROX. 14'-0" AFF (VIF) 5/8" GYP, BEAD, TAPE, SPACKLE, AND FINISH CORNERS AS REQUIRED, TYPICAL. SCHED. CLNG. SEE RCP 5/8" GYP BD 5/8" GYP BD GAT CLIP 1/4" DIAM. METAL ROD OR 1/8" FLAT STRAP HANGER SECURED TO STRUCTURE ABOVE. NOT TO EXCEED 4'-6" O.C. 5/8" GYPSUM BOARD ON 7/8" FURRING CHANNEL. BEAD, TAPE, SPACKLE AND FINISH AS REQ'D (TYP) GAT CLIP 1/4" DIAM. GALV. STEEL ROD OR 1/8"=1' FLAT STRAP HANGER NOT TO EXCEED 4'-6" O.C. 1/2" 16 GA. COLD ROLLED SUSPENSION CHANNEL 1/2" GA. COLD ROLLED STEEL SUSPENSION CHANNEL (BLACK IRON) APPROX. 4'-6" O.C. INSTALLED PER SECTION OF N.Y.C. CODE (NOTE: LARGER OR HEAVIER CHANNEL MAY BE USED WHEN REQ'D BY BUILDING CODE) METAL FURRING CHANNEL CLIP. TYP. AT EACH CONNECTION 5/8" THICK GYPSUM WALL BOARD 7/8" THICK METAL FURRING CHANNEL AT 16" O.C. MAX. SCHED. CLNG. SEE RCP B.O. EXISTING STRUCTURE ABOVE PARTITION AS SCHEDULED SCHED. CLNG. SEE RCP SCHEDULED GYP BD CEILING METAL HANGER ROD SCHEDULED GYP BD PARTITION TO STRUCTURE EXISITING EPOXY GROUT EXISTING FACADE EXISTING ALUMINUM STACK MULLION EXISTING CONTINUOUS FIRE STOP SILL WALL, PNT-1, REFER TO PARTITION TYPES PROVIDE CONTINUOUS CONCEALED ANCHORS FOR INTERIOR GWB FRAMING 1" 1/2" GYP, BEAD, TAPE, SPACKLE, AND FINISH CORNERS AS REQUIRED, TYPICAL. ALIGN EXISITING CONCRETE SLAB RUBBER BASE, UON PAINTED METAL SHADE POCKET EXISITING GLASS EXISITNG SHADOW BOX PANEL EXISTING INTERMEDIATE HORIZONTAL MULLION 1/2" REMOVABLE CLOSURE 5/8" MTL STUD SECURED TO STRUCTURE ABOVE CONTINUOUS LEVEL BLOCKING FOR SHADE POCKET ATTACHMENT 2 1/8" EXISTING FACADE EXISTING TYPICAL VERTICAL MULLION 0" 2' 1" EDGE OF SLAB BELOW LINE OF SILL WALL FULL HEIGHT GYP BD COLUMN ENCLOSURE, SEE PARTITION SCHEDULE FURRING CHANNEL ATTACHED TO EXISTING METAL DECK ACOUSTIC PANEL ATTACHED TO FURRING CHANNELS EXISTING METAL DECK 1' 4" 11 3/4" ALL-IN-ONE SELF STOP FASTENER B.O. EXISTING STRUCTURE ABOVE 4" 2' ACOUSTIC PANEL ATTACHED TO FURRING CHANNELS C ALL-IN-ONE SELF STOP FASTENER FURRING CHANNEL ATTACHED TO EXISTING METAL DECK 3/4" PARTITION, AS SCHEDULED RUBBER BASE, AS SCHEDULED LINE OF FINISH FLOOR M STATIC DISSIPATIVE VINYL COMPOSITION FLOOR TILE, AS SCHEDULED RUBBER TRANSITION REDUCER DOOR WHERE OCCURS EQEQ F4 T.O. SLAB TRANSITION STRIP M EXISTING CONCRETE SLAB CARPET TILE AS SCHEDULED RUBBER TRANSITION REDUCER DOOR WHERE OCCURS EQEQ F4 T.O. SLAB TRANSITION STRIP M EXISTING CONCRETE SLAB PARTITION, AS SCHEDULED ALUMINUM CHANNEL BASE WITH RETURN EDGE LINE OF FINISH FLOOR CORK WALL FINISH 1/2" FINISHED FLOOR AS SCHEDULED GLASS WALL SYSTEM BOTTOM MULLION 1/2" EXISTING CONCRETE SLAB T.O. SLAB ROOM INTERIOR GLASS WALL SYSTEM 1/2" LAMINATED GLASS FUTURE 1/2" LAMINATED GLASS AS NEEDED POST OCCUPANCY LO MULLION BEYOND GLASS PARTITION SYSTEM WITH 1/2" LAMINATED GLASS BLOCKING AS REQUIRED FOR GLASS PARTITION SYSTEM SUPPORT C PARTITION AS SCHEDULED LO MULLION BEYOND GLASS WALL SYSTEM TOP MULLION ROOM INTERIOR FUTURE 1/2" LAMINATED GLASS AS NEEDED POST OCCUPANCY 4" 1/8" TRANSPARENT POLYCARBONATE BUTT JOINT GLASS PARTITION SYSTEM WITH 1/2" LAMINATED GLASS LO MULLION BEYOND ROOM INTERIOR FUTURE 1/2" LAMINATED GLASS AS NEEDED POST OCCUPANCY 1/2" GLASS PARTITION SYSTEM WITH 1/2" LAMINATED GLASS LO MULLION BEYOND GLASS WALL SYSTEM VERTICAL MULLION ROOM INTERIOR FUTURE 1/2" LAMINATED GLASS AS NEEDED POST OCCUPANCY GLASS PARTITION SYSTEM WITH 1/2" LAMINATED GLASS LO MULLION BEYOND GLASS WALL SYSTEM VERTICAL MULLION ROOM INTERIOR FUTURE 1/2" LAMINATED GLASS AS NEEDED POST OCCUPANCY 4" 111 FLOORS NEW +1 DRAWN PROJ. DATE: DWG. DWG. D G MARKDATEDESCRIPTION ISSUE NYC PAGE NYC DOB CORNELL WEST NEW MEP JB&B 80 PINE NEW SEAL OWNER: KEY PLAN STRUCTURAL LERA 40 WALL NEW LIGHTING SBLD 575 BLOOMFIELD MONTCLAIR, ACOUSTICAL CERAMI 1001 NEW 0102/08/2023100% 02 03 04 05 6/1/2023 5:28:07 PM Autodesk Docs://103015.00 Cornell Tech Tata Innovati on Center Fit Out R22/ARCH-CORNELLTECH_TATA-INTERIOR.rvt TYPICAL CORNELL A-504.00 NEW 1/2" 1'-0" C8 TYP CAL ACOUSTIC CE LING T LE DETA LS 1/2" 1'-0" C3 TYP CAL SUSPENDED CE L NG HANGER CONNECT ON 3" 1'-0" E3 TYPICAL FLUSH ACCESS PANEL IN GYP BD 1/2" 1'-0" F6 TYP CAL SECT ON @ AV WALL 1/2" 1'-0" B1 GYP BD HEADER TO GYP BD CLNG 1/2" 1'-0" C1 GYP BD HEADER @ DEMOUNTABLE TO ACT 1/2" 1'-0" D1 GYP BOARD SOFFIT AND CE L NG 1/2" 1'-0" C6 TYP CAL GYP BD CE LING DETA LS 1'-0" B3 TYP CAL GYP BD CE LING TO WALL 1/2" 1'-0" E8 TYP CAL SECT ON DETA L AT S LL WALL 1/2" 1'-0" E6 TYP CAL SECT ON DETA L AT W NDOW SHADE 1/2" 1'-0" E5 TYP CAL PLAN DETA L AT COLUMN ENCLOSURE 1/2" 1'-0" C5 TYP CAL DETA L AT ACOUST C PANEL 1'-0" F8 TYP CAL RUBBER BASE 1'-0" G8 FLOOR TRANS TION AT SDVCT 1'-0" G7 FLOOR TRANS TION AT CARPET T LE 1'-0" F7 ALUM NUM BASE AT CORK G6 TYP CAL SECT ON @ GLASS WALL S LL G4 TYP CAL SECT ON @ GLASS WALL HEADER F2 GLASS WALL @ BUTT JOINT F3 GLASS WALL JO NT @ VERT MULL ON E2 GLASS WALL @ HOR Z MULL ON
A-206.00
SUSPENSION POINT REFER TO DETAIL 4/A202 MECHANICAL DUCTWORK ABOVE EXISTING STRUCTURE ABOVE 0° 9 0° 0° -508.00 C6 -508.00 C4 1/8" 10" 10" 7/8" EXISTING MECHANICAL EXISTING STRUCTURE ABOVE SUSPENSION POINT REFER TO DETAIL 4/A202 0° 0 0° 0° -508.00 -508.00 C4 ACOUSTICAL CEILING PANEL ABOVE 1/2" THREADED ROD HANGER, TYP TWO HEX NUTS. PROVIDE LOCTITE TO SECURE PLACE, TYP P1000, TYP 1/2" CHANNEL NUT, TYP P1000 BRACE, TYP EVERY VERTICAL HANGER 1/2" CHANNEL NUT, 1 HRCN COUPLING NUT 1/2" THREADED ROD 1/2" HILTI KB-TZ2, MIN EFFECTIVE EMBEDMENT (HOLE DEPTH= 5/8"). ANCHORS MAY BE INSTALLED FLUTES OR VALLEYS, TYP. 1/2" CHANNEL NUT, TYP D 111 5TH AVENUE FLOORS 10 AND 11 NEW YORK, NY, USA 10003 +1 (212) 989-3993 DRAWN BY: PROJ. NO.: DATE: PROJ. ARCH.: DWG. ISSUE NYC DOB STAMP PAGE NO. CORNELL TECH WEST LOOP RD NEW YORK, NY 10044 MEP ENGINEER: JB&B 80 PINE STREET NEW YORK, NY 10005 SEAL OWNER: KEY PLAN STRUCTURAL ENGINEER: LERA 40 WALL STREET, FLOOR 23 NEW YORK, NY 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, NJ 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE OF THE AMERICAS, 4TH FLOOR NEW YORK, NY 10018 0102/08/2023100% SD 03/31/2023100% CD 100% DD 05/12/2023 50% CD 05/31/2023100% CD ADDENDUM 03/10/2023 50% CD Author 103015.00 05/25/23 Designer F4 UNISTRUT DETAILS CORNELL TECH TATA INNOVATION CENTER A-508.00 11 EAST LOOP RD NEW YORK, NY 10044 1/2" 1'-0" C8 RESEARCH SUSPENDED C G GR D-ENLARGED PLAN 1/2" 1'-0" G8 RESEARCH 3 SUSPENDED CLG GR D-ENLARGED P AN 1/2" 1'-0" C6 TYP - SUSPENDED CLG GR D - HANGER DETA AT NTERSECT ONS 1/2" 1'-0" C4 TYP -SUSPENDED CLG GR D - BRAC NG DETA 1'-0" G4 TYP - F4 SUSPENDED CLG GR D HANGER TO SLAB 10' -0" AFF TRACK BY OPERABLE PARTITION MANUFACTURER LAYERS 5/8" GWB ON 1/2" MTL STUD FRAMING, BOTH SIDES. BRACE AS REQ'D. ACOUSTICAL BATT INSULATION TO DECK PROVIDE -L6X3-1/2X5/16 ANGLES HANGER LONG LEGS BACK BACK. WELD WITH 5/16" FILLET WELD ALL AROUND CONNECTING PLATES. LOCATION OF STACKED (FOLDED) PARTITION, PROVIDE (2) HANGERS SPACED - APART. ACOUSTICAL SEALANT ALL JOINTS AND/OR PENETRATIONS PROVIDE MC10X25 CHANNEL HANGER BRACKET AND HANGER RODS OPERABLE PARTITION MANUFACTURER MOVABLE PARTITION WITH PAINTED CORK FINISH DROP SEAL PER MOVABLE PARTITION SPEC WHEEL BALLBEARING TROLEYS PROVIDE BLOCKING AS REQUIRED 5/8" GYP, BEAD, TAPE, SPACKLE AND FINISH CORNERS REQ'D (TYP). MOVABLE PARTITION, HANGER AND STEEL CHANNEL EXISITING METAL DECK GAGE 1/2" EQ EQ 1/2" BAFFLE JOINTS MUST BE TAPED AND SPACKLED. HANGER BRACKET BY MODERNFOLD 5/8" DIA HILTI -TZ2, MIN EFFECTIVE EMBEDMENT (HOLE DEPTH -1/2"). INSTALL ANCHORS BOTTOM OF DECK VALLEYS ONLY. SPACE ANCHORS APART. BASE PROVIDE BLOCKING WITHIN WALL AS REQUIRED BY MOVABLE WALL MANUFACTURER ACOUSTICAL CAULKING BETWEEN WALL AND JAMB DISCONTINUOUS GYP BD WITH ACOUSTICAL CAULKING PAINTED CORK FINISH WOOD DOOR, PAINT SCHEDULED MATCH SURROUNDING WALL (COORD WITH OPERABLE PARTITION MFR) 1/4" -503.00 C7 -509.00 PROVIDE BLOCKING WITHIN WALL REQUIRED BY MOVABLE WALL MANUFACTURER ACOUSTICAL CAULKING BETWEEN WALL AND JAMB, BOTH SIDES JAMB FINISH SAME AS PANELS DISCONTINUOUS GYP BD WITH ACOUSTICAL CAULKING MIN MAX EXPANDABLE NOSE PANEL PER MOVABLE WALL MANUFACTURER PAINTED CORK FINISH 111 5TH AVENUE FLOORS 10 AND 11 NEW YORK, NY, USA 10003 +1 (212) 989-3993 DRAWN BY: PROJ. NO.: DATE: PROJ. ARCH.: DWG. ISSUE NYC DOB STAMP PAGE NO. OF CORNELL TECH WEST LOOP RD NEW YORK, NY 10044 MEP ENGINEER: JB&B 80 PINE STREET NEW YORK, NY 10005 SEAL OWNER: KEY PLAN STRUCTURAL ENGINEER: LERA 40 WALL STREET, FLOOR 23 NEW YORK, NY 10005 LIGHTING DESIGNER: SBLD STUDIO 575 BLOOMFIELD AVE MONTCLAIR, NJ 07042 ACOUSTICAL DESIGNER: CERAMI 1001 AVE OF THE AMERICAS, 4TH FLOOR NEW YORK, NY 10018 0102/08/2023100% SD 02 03/31/2023100% CD 100% DD 03 05/12/2023 50% CD 05/31/2023100% CD ADDENDUM 03/10/2023 05 50% CD Autodesk Docs://103015.00 Cornell Tech Tata Innovati on Center Fit Out R22/ARCH-CORNELLTECH_TATA-INTERIOR.rvt Author 103015.00 05/31/23 Designer OPERABLE PARTITION DETAILS CORNELL TECH TATA INNOVATION CENTER A-509.00 11 EAST LOOP RD NEW YORK, NY 10044 1'-0" G5 MODERNFOLD HEADER DETA L 1'-0" E2 MODERNFOLD JAMB DETA L 1'-0" E8 MODERNFOLD ENLARGED PLAN 1'-0" C2 MODERNFOLD JAMB DETA L
While working as a graduate Architect for ANA group Ltd in Nairobi, I worked in a team of two to prepare schematic drawings of the interior spaces, detailed design of some of the spaces and attending consult and site meetings on behalf of the office.
While working as a graduate Architect for ANA group Ltd in Nairobi, I worked in a team of two to prepare schematic drawings of the interior spaces, detailed design of some of the spaces and attending consult
While working as a graduate Architect for ANA group Ltd in Nairobi, I worked in a team of
1000 600mm Lowered PVC Skirting. 4780 plumbing and drainage comply with councils EXISTING BEER ROUTE LOBBY ELEVATION 01 LOBBY ELEVATION 02 VISUAL IMAGE OF ENTRANCE VISUAL IMAGE LOBBY ELEVATION 03 Parking Yard Mechanical Workshop Walkway All reinforced concrete works to structural eng ply bituminous felt to be provided All plumbing and drainage to be approval and All dimensions are shown mm unless otherwise All soils on cut enbarkment to be established and the slope not to exceed the natural angle responce Depth foundations to be determined on site to be reinforced with hoop iron at every alternative course works and masonry walls to be tied All plumbing and drainage to comply with councils buildings to be encased mm thick concrete surround All testing pipes must be completed before plastering ordinated with commercial managers 00100 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD BEER ROUTE PHASE 1 LAYOUT PLAN 170 200 interior designers ENTRANCE ELEVATION 02 ENTRANCE ELEVATION 03
1 1 8 7500 600mm Lowered PVC Ceiling. Existing Masonry Wall Plastered and Painted To Approval. 1000x1500mm Display Proposed Directional Signage Wallaper. 100mm High Epoxy Concrete Epoxy Floor 1100 1500 170 1000 Existing Masonry Wall Plastered and Painted To Approval. 1000x1500mm Display Board. 600mm Lowered PVC Ceiling. Proposed Directional Signage To be Approved. 100mm High Epoxy Skirting. Concrete Epoxy Floor Finish. 840 330 10060 1000 910 400 990 Lighting Fixture To Specs. Proposed Wall graphic To Be Approved. Existing Masonry Wall Painted and Plastered. 100mm High Epoxy Skirting. Concrete Epoxy Finish. 1230 510 GENERAL All dimensions are in mm Any dicrepancies All reinforced concrete All single layer of between masonry and R All plumbing and drainage satisfaction of M PV denotes permanent All dimensions are shown Drawings are not to be CONSTRUCTION All slabs ground level polythene sheeting 50 CIVIL All soils on cut enbarkment slope not exceed the natural STRUCTURAL Depth of foundations to structural eng approval Concrete blocks stone be reinforced with hoop All adjacent works with straps irons at every MECHANICAL All plumbing and drainage speci cations Drain passing under driveway with minimum 150mm thick Minimum slope the All testing pipes must All mechanical works must electrical and any con ict begins ELECTRICAL All conduits must be laid Client signature Scale Checked by No Descriptions REVISIONS Drawing title Project title Client Date architects +interior & commercial O Box NAIROBI INN Developer signature Job No: Consult: Location C1 FOR EAST AFRICAN P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE COVERED CANOPY FACTORY EXISTING BEER ROUTEDrawing Type: FOR CONSTRUCTION. LOBBY ELEVATION 01 LOBBY ELEVATION 02 VISUAL IMAGE OF ENTRANCE VISUAL IMAGE A102[ LOBBY ELEVATION 03 ] PART B ELEVATIONS 1:20 Mechanical Workshop Basement General Store Clinic& Offices C02 Recovery Pre & Post Filter Sugar Store Walkway Walkway C All soils on cut enbarkment to be established and the slope not to exceed the natural angle responce Depth of foundations to be determined on site to approval Concrete blocks mm thickness to be reinforced with hoop iron at every alternative course works and masonry walls to be tied with straps irons at every course All plumbing and drainage to comply with councils specifications Drain passing under driveway buildings to be encased 150 Minimum slope in the drain pipes to be All testing pipes must be completed before plastering All mechanical works must be co electrical and any con work All conduits must be laid before plastering architects & P Developer signature EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTE Drawing Type: FOR CONSTRUCTION. 300 1440 2540 250mm Lowered PVC Lighting Fixture to Specs. 1440 Existing Masonry Wall Painted and Plastered Door Frame Painted and Plastered to Approval. Concrete Epoxy Floor LED Lighting Fixture to Specs. Proposed Directional Wallpaper Signage. Proposed Aluminium Framed Notice Board. Existing Wall Painted and Plastered To Approval. 100mm High Epoxy Skirting. Concrete Epoxy Floor Finish. New Door To Schedule. 100 800 780 250mm Lowered PVC Ceiling. Client signature Scale Checked by Drawing title Project title Client architects +interior & commercial O Box NAIROBI INN Developer signature Job No: Consult: Location EAST AFRICAN P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE COVERED CANOPY FACTORY EXISTING BEER ROUTEDrawing Type: FOR CONSTRUCTION. ENTRANCE ELEVATION 01 A101[ ENTRANCE ELEVATION 03 1:20
two to prepare OPTIONS A 2270 1680 7500 510 11970 600mm Lowered PVC Ceiling. Existing Masonry Wall Plastered and Painted To Approval. 1000x1500mm Display Board. Proposed Directional Signage Wallaper. 100mm High Epoxy Skirting. Concrete Epoxy Floor Finish. 70 430 160 500 170 420 2280 1100 850 170 510 160 510 160 510 1500 1500 1500 1500 1500 500 0 5 KBL POLICIES 600 1000 1000 1000 1000 1000 1000 1000 2080 9680 Existing Masonry Wall Plastered and Painted To Approval. 1000x1500mm Display Board. 600mm Lowered PVC Ceiling. Proposed Directional Signage To be Approved. 100mm High Epoxy Skirting. Concrete Epoxy Floor Finish. 840 570 180 330 10060 600 1000 1000 1000 1000 1000 1000 990 570 170 340 100 910 290 400 300 110 990 3 Lighting Fixture To Specs. Proposed Wall graphic To Be Approved. Existing Masonry Wall Painted and Plastered. 100mm High Epoxy Skirting. Concrete Epoxy Finish. 3980 4780 8720 170 850 180 510 150 510 160 510 920 1560 180 500 160 500 170 500 400 0 0 GENERAL Any dicrepancies be veri reinforced concrete works structural eng single layer between masonry and plumbing and drainage be approval and satisfaction denotes permanent vents Drawings are not be scaled only CONSTRUCTION All slabs ground level be poured over mm gauge polythene sheeting 50mm thick blinding CIVIL All soils cut enbarkment established and the slope not exceed the natural angle responce STRUCTURAL Depth foundations be determined site structural eng approval Concrete blocks stone walls below 200mm thickness to be reinforced with hoop iron every alternative course adjacent works and masonry walls tied with straps irons every course MECHANICAL All plumbing and drainage comply with councils speci cations Drain passing under driveway buildings be encased 150 Minimum slope the drain pipes be testing pipes must be completed before plasteringelectrical and any con ict must claimed before work begins ELECTRICAL All conduits must be laid before plastering Client signature Drawn by Scale Checked by No Descriptions REVISIONS Drawing title Project title Client Date Initial date MMK architects interior designers project & commercial managers O Box 49274- 00100 NAIROBI INN Developer signature CON Job No: Stage: Rev: Consult: Location C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTEDrawing Type: 14/11/2019 17:37:16 A102[ LOBBY ELEVATION 01 A102[ LOBBY ELEVATION 02 A102[ VISUAL IMAGE OF ENTRANCE A102[ VISUAL IMAGE A102[ LOBBY ELEVATION 03 PART B ELEVATIONS 1:20 Parking Yard Mechanical Workshop Engine Room Engine Room Boiler House Basement General Store Offices Clinic& Offices Hops Store C02 Recovery Plant Filter Room Line No.2 Pre & Post Filter Dosing Plant Open Paved Yard Sugar Store Sugar Plant BREWHOUSE Walkway Walkway Walkway A104 A104 A104A105 A C2 B C D G NOTES GENERAL All dimensions are mm All dimensions to be checked on site Any dicrepancies be veri ed with architects All reinforced concrete works to structural eng details All single layer of ply bituminous felt to be provided between masonry and works 4 All plumbing and drainage be approval and satisfaction of M PV denotes permanent vents All dimensions are shown in mm unless otherwise speci ed Drawings are not to be scaled only gured dimensions be used CONSTRUCTION All slabs ground level to be poured over mm gauge polythene sheeting on 50mm thick blinding on hardcore CIVIL All soils on cut enbarkment be established and the slope not to exceed the natural angle responce STRUCTURAL Depth of foundations to be determined on site to structural eng approval Concrete blocks stone walls below 200mm thickness to be reinforced with hoop iron at every alternative course All adjacent works and masonry walls be tied with straps irons at every course MECHANICAL All plumbing and drainage to comply with councils speci cations Drain passing under driveway buildings to be encased with minimum 150mm thick concrete surround Minimum slope in the drain pipes to be 4 All testing pipes must be completed before plastering All mechanical works must be -ordinated with electrical and any con ict must be claimed before work begins ELECTRICAL All conduits must be laid before plastering Client signature Drawn by Scale Checked by No Descriptions REVISIONS Drawing title Project title Client Date Initial date Plot date MMK architects +interior designers+project commercial managers O Box 49274- 00100 NAIROBI INN Developer signature C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTE Drawing Type: FOR CONSTRUCTION. BEER ROUTE PHASE LAYOUT PLAN 170 780 170 190 300 470 540 1440 560 1300 470 2540 1300 4320 250mm Lowered PVC Ceiling. Lighting Fixture to Specs. LED Light to Specs. Brew House Signage to Detail. 1440 Existing Masonry Wall Painted and Plastered To Approval. 500 3300 490 Door Frame Painted and Plastered Approval. Concrete Epoxy Floor Finish. Proposed Directional Wallpaper Signage. 380 920 100mm High Epoxy Skirting. 1500 580 1500 600 1500 2120 7860 1500 LED Lighting Fixture Specs. Proposed Directional Wallpaper Signage. Proposed Aluminium Framed Notice Board. Existing Wall Painted and Plastered To Approval. 100mm High Epoxy Skirting. Concrete Epoxy Floor Finish. 400 130 400 130 400 3 250mm Lowered PVC Ceiling. 7860 LED Lighting Fixture to Specs. Proposed Directional Wallpaper Signage. Proposed Aluminium Framed Notice Board. Existing Wall Painted and Plastered To Approval. 100mm High Epoxy Skirting. Concrete Epoxy Floor Finish. New Door To Schedule. 3970 1830 300 1000 770 3250 630 160 800 160 460 300 1000 140 610 550 170 780 170 390 250mm Lowered PVC Ceiling. reinforced concrete works structural eng single layer ply bituminous felt be provided between masonry and works plumbing and drainage be approval and satisfaction denotes permanent vents dimensions are shown mm unless otherwise speci Drawings are not be scaled only gured to used CONSTRUCTION All slabs ground level be poured over mm gauge polythene sheeting 50mm thick blinding on hardcore CIVIL slope not exceed the natural angle responce STRUCTURAL Depth foundations be determined site structural eng approval Concrete blocks stone walls below mm thickness to be reinforced with hoop iron every alternative course adjacent works and masonry walls tied with straps irons every course All plumbing and drainage comply with councils speci cations Drain passing under driveway buildings be encased with minimum 150mm thick concrete surround Minimum slope the drain pipes be testing pipes must be completed before plastering mechanical works must -ordinated with electrical and any con ict claimed before work begins ELECTRICAL All conduits must be laid before plastering Client signature Drawn by Scale Checked by No Descriptions REVISIONS Drawing title Project title Client Date Initial date Plot date MMK architects interior designers project & commercial managers O Box 49274- 00100 NAIROBI INN Developer signature CON Stage: Rev: C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTEDrawing Type: FOR CONSTRUCTION. 14/11/2019 17:36:50 A101[ VISUAL IMAGE OF ENTRANCE A101[ ENTRANCE ELEVATION 01 A101[ ENTRANCE ELEVATION 02 A101[ ENTRANCE ELEVATION 03 A101[ PART A ELEVATIONS 1:20
and site
EABL | Nairobi, Kenya
meetings on behalf of the office.
East African Breweris Ltd | Nairobi
The
The premise of the project was to redesign their walkways into galleries to showcase their major brews which would allow them to open up the factory to the public for visits.
11 Proposed Display Boards 440mm Lowered Aluminium Mesh Ceiling. 960 12590 Proposed Wall Graphics LED Lighting Fixture to Proposed Safety Sign Signage Detail. 100mm High Epoxy Skirting Concrete Epoxy Floor Finish. 980 1500 LED Lighting Fixture soils on cut enbarkment to established and the slope not to exceed the natural angle responce Depth foundations be determined site reinforced with hoop iron every alternative course works and masonry walls to tied All plumbing and drainage to comply with councils Minimum slope the drain pipes be testing pipes must be completed before plastering Drawn by Initial date Plot date interior designers commercial managers 49274 NAIROBI 14/11/2019 VISUAL IMAGE 02 A106[ ELEVATION 03 ELEVATION 05 1550 440mm Lowered PVC Proposed Wall Graphic 100mm High Epoxy LED Lighting Fixture Proposed Safety Signage ply bituminous felt provided dimensions are shown mm unless otherwise soils on cut enbarkment to established and the Depth foundations be determined site reinforced with hoop iron every alternative course works and masonry walls to tied All plumbing and drainage to comply with councils testing pipes must be completed before plastering Initial date
20450 120 Existing Column Painted and Plastered Approval. 3170 770 3310 290 4000 570 4620 3110 570 200 570 750 130 2720 110 570 200 570 4010 570 200 570 390 730 3670 220 360 3770 570 200 570 4010 570 200 570 LED Lighting Fixture To Specs. Proposed Directional Signage Wallpaper. 20370 plumbing and drainage comply with councils speci Drain passing under driveway buildings be encased with minimum mm thick concrete surround Minimum slope in the drain pipes to testing pipes must completed before plastering mechanical works must -ordinated with electrical and any con begins ELECTRICAL All conduits must be laid before plastering Client signature No Descriptions REVISIONS Drawing title Project title Date architects interior designers project & commercial managers O Box 49274- 00100 NAIROBI Developer signature C1 FOR CONSTRUCTION PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTE Drawing Type: FOR CONSTRUCTION. A103[ VISUAL IMAGE 01 A103[ VISUAL IMAGE 02 A103[ VISUAL IMAGE 03 11 100 1010 460 460 400 390 10 390 10 390 10 290 2250 200 400 2140 2410 130 1390 400 80 1810 80 1390 12940 Proposed Display Boards Proposed Wall Graphics To be Approved. 100mm High Epoxy Skirting. 200mm Thick Masonry wall painted and plastered to Approval. 440mm Lowered Aluminium Proposed Door Tag Signage to Detail. 1530 100 980 1930 740 1570 5220 Proposed Directional Signage To Detail. 440mm Lowered Aluminium Mesh Ceiling. LED Lighting Fixture To Detail. All dimensions are in mm Any dicrepancies to be veri All reinforced concrete works to structural eng All single layer of between masonry and All plumbing and drainage to be approval and satisfaction of M PV denotes permanent vents All dimensions are shown in mm unless otherwise Drawings are not to be scaled only to be used CONSTRUCTION All slabs ground level to be poured over mm gauge polythene sheeting on 50mm thick blinding on hardcore All soils on cut enbarkment to be established and the slope not exceed the natural angle responce STRUCTURAL Depth of foundations be determined on site to structural eng approval Concrete blocks stone walls below mm thickness be reinforced with hoop iron at every alternative course All adjacent works and masonry walls be tied with straps irons at every course MECHANICAL All plumbing and drainage to comply with councils cations Drain passing under driveway buildings be encased with minimum 150mm thick concrete surround Minimum slope the drain pipes to be All testing pipes must completed before plastering All mechanical works must be co-ordinated with electrical and any con ict must claimed before work ELECTRICAL All conduits must be laid before plastering Descriptions REVISIONS Date FOR CONSTRUCTION A106[ VISUAL IMAGE 01 VISUAL IMAGE 02 VISUAL IMAGE 03 ] PART E ELEVATIONS A106[ ELEVATION 03 A106[ ELEVATION 04 1090 440mm Lowered PVC Existing Window to Be Retained. 200mm Thick Masonry Wall Painted and Plastered to Approval. LED Lighting Fixture to Specs. Directional Floor Pattern 1010 1490 1490 1550 990 400mm Lowered PVC Proposed Wall Graphic To be Approved. Proposed Safety Signage to Detail. LED Lighting Fixture To Specs. 100mm High Epoxy Skirting. 100 1900 880 440 370 370mm Thick Column Painted and Plastered 100mm High Epoxy Skirting. 200mm Plastered and Painted to Approval. 1040 1040 CONSTRUCTION All slabs ground level to be poured over100mm gauge polythene sheeting on 50mm thick blinding on hardcore All soils on cut enbarkment to be established and the slope not exceed the natural angle responce STRUCTURAL Depth of foundations be determined on site to structural eng approval Concrete blocks stone walls below 200mm thickness be reinforced with hoop iron at every alternative course All adjacent works and masonry walls be tied with straps irons at every course MECHANICAL All plumbing and drainage to comply with councils cations Drain passing under driveway buildings be encased with minimum 150mm thick concrete surround Minimum slope the drain pipes to be All testing pipes must completed before plastering All mechanical works must be co-ordinated with electrical and any con ict must claimed before work ELECTRICAL All conduits must be laid before plastering Client signature Drawn by Checked by Descriptions REVISIONS Drawing title Project title Date Initial date Plot date MMK architects +interior designers project & commercial managers O Box 49274- 00100 NAIROBI INN Developer signature CON Stage: Rev: Consult: No. Location FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTE AR Drawing Type: FOR CONSTRUCTION. 14/11/2019 17:38:01 A104[ ELEVATION 01 A104[ ELEVATION 02 A104[ 1040 120 120 1040 120 120 1040 120 100 2150 100 120 1040 120 120 1040 120 100 2150 100 120 1040 120 100 2150 120 1030 120 100 2150 100 120 1030 120 120 1150 100 2150 100 Proposed Wall Graphics To Be Approved. Existing Column Painted and Plastered Approval. Existing PVC Ceiling To be Retained. Wall Painted Plastered to Approval. NOTES GENERAL All dimensions are mm All dimensions to be checked on site Any dicrepancies be veri with architects All reinforced concrete works to structural eng details All single layer ply bituminous felt be provided between masonry and works All plumbing and drainage be approval and satisfaction of M O PV denotes permanent vents All dimensions are shown in mm unless otherwise speci ed Drawings are not to be scaled only gured dimensions to be used CONSTRUCTION All slabs ground level to be poured over100mm gauge polythene sheeting on 50mm thick blinding on hardcore CIVIL All soils on cut enbarkment be established and the slope not exceed the natural angle responce STRUCTURAL Depth of foundations determined on site to structural eng approval Concrete blocks stone walls below 200mm thickness be reinforced with hoop iron every alternative course All adjacent works and masonry walls be tied with straps irons every course MECHANICAL All plumbing and drainage to comply with councils speci cations Drain passing under driveway buildings to be encased with minimum 150mm thick concrete surround Minimum slope the drain pipes be All testing pipes must be completed before plastering All mechanical works must be co-ordinated with electrical and any con ict must be claimed before work ELECTRICAL All conduits must be laid before plastering Descriptions REVISIONS Date C1 FOR CONSTRUCTION A103[ ELEVATIONS 19 11 3320 200 400 460 10 460 10 1200 10 1200 10 1200 130 460 460 10 460 400 80 290 2250 200 400 2140 2410 130 1390 400 80 1810 80 1390 12940 Proposed Display Boards Proposed Door Signage To Detail. Proposed Wall Graphics To be Approved. 100mm High Epoxy Skirting. 200mm Thick Masonry wall painted and plastered to Approval. LED Lighting Fixture To Specs. 440mm Lowered Aluminium Mesh Ceiling. 50 1030 2680 1720 1990 80 5780 1500 1550 1080 960 1720 12590 Proposed Wall Graphics To be Approved. 440mm Lowered PVC Ceiling. LED Lighting Fixture to Specs. Proposed Safety Sign Signage to Detail. Proposed Wall Graphic To be Approved. 100mm High Epoxy Skirting Concrete Epoxy Floor Finish. Proposed Door Tag Signage to Detail. 430 1250 1530 100 980 1930 740 1570 5220 1500 1280 870 Proposed Directional Signage To Detail. 200mm Thick Masonry Wall Painted and Plastere Approval. 440mm Lowered Aluminium Mesh Ceiling. LED Lighting Fixture To Detail. dimensions are mm Any dicrepancies to be veri All reinforced concrete works structural eng All single layer between masonry and All plumbing and drainage approval and satisfaction PV denotes permanent vents All dimensions are shown in mm unless otherwise Drawings are not scaled only used CONSTRUCTION All slabs at ground level be poured over mm gauge polythene sheeting on 50mm thick blinding on hardcore All soils on cut enbarkment established and the slope not to exceed the natural angle responce STRUCTURAL Depth of foundations to be determined on site structural eng approval Concrete blocks stone walls below mm thickness be reinforced with hoop iron every alternative course All adjacent works and masonry walls be tied with straps irons every course MECHANICAL All plumbing and drainage to comply with councils speci cations Drain passing under driveway buildings to be encased with minimum mm thick concrete surround Minimum slope the drain pipes to be All testing pipes must be completed before plastering All mechanical works must be co-ordinated with electrical and any con be claimed before work begins ELECTRICAL All conduits must laid before plastering Client signature Drawn Scale Checked by No Descriptions REVISIONS Drawing title Project title Client Date Initial date Plot date MMK architects +interior designers project & commercial managers P O Box 49274- 00100 NAIROBI INN Developer signature CON Job No: Stage: Rev: Consult: No. Location C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTEDrawing Type: FOR CONSTRUCTION. 14/11/2019 17:38:59 A106[ VISUAL IMAGE 01 A106[ VISUAL IMAGE 02 A106[ VISUAL IMAGE 03 ] PART E ELEVATIONS A106[ ELEVATION 03 A106[ ELEVATION 04 A106[ ELEVATION 05 600 680 300 420 880 1010 1550 1300 1090 1520 1990 990 370 3850 5960 600 1400 880 1990 440mm Lowered PVC Ceiling. Existing Window to Be Retained. 200mm Thick Masonry Wall Painted and Plastered Approval. Proposed Wall Graphic To Be Approved. 100mm High Epoxy Skirting. LED Lighting Fixture to Specs. Directional Floor Pattern to be approved. 100 1010 400 1220 1680 80 1490 80 600 3110 200 3110 200 2940 1550 640 5130 Proposed Safety Signage to Detail. Proposed Wall Graphic to be Approved. 100mm High Epoxy Skirting. 100 1900 880 440 120 910 1960 2840 370 6220 440mm Lowered PVC Ceiling. LED Lighting Fixture to Specs. 370mm Thick Column Painted and Plastered to Approval. 100mm High Epoxy Skirting. 200mm Plastered and Painted to Approval. 1040 1910 1740 1160 1040 1390 570 930 1910 880 2000 Client signature Drawn Scale Checked by Drawing title Project title Client Initial date Plot date MMK architects +interior designers project & commercial managers P O Box 49274- 00100 NAIROBI INN Developer signature CON Job No: Stage: Rev: Consult: No. Location C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTE A17- AR Drawing Type: FOR CONSTRUCTION. 14/11/2019 17:38:01 A104[ ELEVATION 01 A104[ ELEVATION 02 A104[ ELEVATION 03 A104[ VISUAL IMAGE
premise of the project was to redesign their walkways into galleries to showcase their major brews which would allow them to open up the factory to the public for visits.
510 1690 270 120 1040 120 270 120 1040 120 270 120 1040 120 270 120 1040 120 270 120 1040 120 270 120 1040 120 270 120 1030 120 270 120 1030 120 270 120 1020 120 10 270 690 1820 1530 20450 120 1040 120 100 2150 100 100 120 1040 120 100 2150 100 100 120 1040 120 120 1040 120 100 2150 100 100 120 1040 120 120 1040 120 120 1030 120 100 2150 100 100 120 1030 120 120 1150 100 2150 100 100 Proposed Wall Graphics To Be Approved. Existing Column Painted and Plastered to Approval. LED Lighting Fixture To Specs. Existing PVC Ceiling To be Retained. Existing Wall Painted and Plastered to Approval. Existing Wall Painted and Plastered to Approval. 3170 770 570 3310 290 190 570 190 570 4000 570 200 570 190 570 4620 3110 570 200 570 750 130 2720 110 570 200 570 4010 570 200 570 390 730 3670 90 220 360 1230 840 220 160 3770 570 200 570 200 570 4010 570 200 570 200 280 3310 570 200 570 Proposed Wall Graphics To Be Approved. LED Lighting Fixture To Specs. Existing PVC Ceiling To be Retained. Proposed Directional Signage Wallpaper. Existing Wall Painted and Plastered to Approval. 20370 NOTES GENERAL All dimensions are mm dimensions to be checked on site Any dicrepancies to be veri ed with architects All reinforced concrete works to structural eng details All single layer of ply bituminous felt to be provided between masonry and works plumbing and drainage approval and satisfaction PV denotes permanent vents dimensions are shown mm unless otherwise speci ed Drawings are not scaled only gured dimensions used CONSTRUCTION All slabs ground level be poured over100mm gauge polythene sheeting on 50mm thick blinding on hardcore CIVIL All soils on cut enbarkment to be established and the slope not to exceed the natural angle responce STRUCTURAL Depth of foundations to be determined on site structural eng approval Concrete blocks stone walls below 200mm thickness be reinforced with hoop iron every alternative course All adjacent works and masonry walls be tied with straps irons at every course MECHANICAL All plumbing and drainage to comply with councils speci cations Drain passing under driveway buildings to be encased with minimum 150mm thick concrete surround Minimum slope the drain pipes to be testing pipes must be completed before plastering All mechanical works must be co-ordinated with electrical and any con must be claimed before work begins ELECTRICAL All conduits must laid before plastering Client signature Drawn by Scale Checked by No Descriptions REVISIONS Drawing title Project title Client Date Initial date Plot date MMK architects +interior designers project & commercial managers O Box 49274- 00100 NAIROBI INN Developer signature CON Job No: Stage: Rev: Consult: No. Location C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTEDrawing Type: FOR CONSTRUCTION. 14/11/2019 17:37:33 A103[ VISUAL IMAGE 01 A103[ VISUAL IMAGE 02 A103[ VISUAL IMAGE 03 A103[ ELEVATION 01 A103[ ELEVATION 02 A103[ ] PART C ELEVATIONS 1:20
Existing Aluminium Mesh be painted approval. Overview East African Breweries Limited (EABL) East Africa's leading branded alcohol beverage business with an outstanding collection brands that range from beer, spirits and adult alcoholic drinks (ANADs) reaffirming our standing total adult beverage (TAB) company. With breweries, distilleries, support industries and distribution network across the region, the group's diversity an important factor delivering highest quality brands East African consumers and long African investors. Celebrating life every day, everywhere. To create the best performing, most trusted and respected consumer products company Africa. be the most celebrated business every market EABL's diversity robust regional company revealed subsidiaries, which are: Kenya Breweries Limited, Uganda Breweries Limited, Serengeti Breweries Limited, United Distillers Vintners, East African Maltings Limited and East African Breweries International. With this vast distribution markets, knowledge and manpower 'Celebrating Life Every EABL's diversity robust regional company revealed in its subsidiaries, which are: Kenya Breweries Limited, Uganda Breweries Limited, Serengeti Breweries Limited, United Distillers Vintners, East African Maltings Limited and East African Breweries International. With this vast distribution markets, knowledge and manpower 'Celebrating Life Every Ex masonry Wall Plastered and painted to approval. Display Board detail. Barley Wallpaper graphic. LED Lighting Fixture to Manufacturer's Specs. Proposed Wallpaper LED Lighting Fixture 100mm High Screed Skirting Finished to match Floor Finish. Floor Finish To Specifications. All reinforced concrete works to structural ply bituminous felt All plumbing and drainage to be approval All dimensions are shown mm unless gured slabs ground level poured over mm thick blinding All soils on cut enbarkment to be established slope not exceed the natural angle responce Depth of foundations to be determined be reinforced with hoop iron at every alternative works and masonry walls plumbing and drainage to comply with buildings mm thick concrete surround All testing pipes must be completed before ordinated claimed ELECTRICAL All conduits must be laid before plastering commercial managers 00100 FOR CONSTRUCTION EAST AFRICAN BREWERIES COVERED CANOPY FOR EABL A107[ EISC ELEVATION A ] EISC ELEVATIONS EISC ELEVATION B EISC ELEVATION D Concrete Epoxy Floor Finish. LED Lighting Fixture 100mm High Safety Marking to Specifications. Concrete Epoxy Floor Finish. 500mm Lowered Gypsum Proposed Display Boards commercial managers 00100 EAST AFRICAN BREWERIES COVERED CANOPY FOR EABL Scale 1:20 Scale 1:20 2120 80 910 80 1360 80 910 80 820 9050 15480 440mm Lowered Aluminium Mesh Ceiling. Existing Cable Systems. Existing Windows To Be Retained. Proposed Wallgraphics. 100mm High Epoxy Skirting. Concrete Epoxy Floor Finish. LED Lighting Fixture To Specs. Existing Masonry WallPainted and Plastered To Approval. 740 50 1100 940 1600 1270 350 3350 5490 370 15790 440mm Lowered Aluminium Mesh Ceiling. Existing Cable Systems. Proposed Wallgraphics. 100mm High Epoxy Skirting. LED Lighting Fixture To Specs. 200mm Deep Niche Existing Column To be Retained. 50mm Thick Timber Slats finished Approval. Proposed Display Boards. 370mm Thick Gypsum Walling. dimensions to be checked All reinforced concrete works to structural eng ply bituminous felt be provided All plumbing and drainage be approval and All dimensions are shown in mm unless otherwise All slabs ground level be poured over mm thick blinding All soils on cut enbarkment to be established and the slope not to exceed the natural angle responce Depth of foundations to be determined site mm thickness to be reinforced with hoop iron at every alternative course works and masonry walls to be tied All plumbing and drainage to comply with councils buildings to be encased Minimum slope in the drain pipes All testing pipes must be completed before plastering All conduits must be laid before plastering INN EAST AFRICAN BREWERIES LTD COVERED CANOPY FOR EABL 14/11/2019 A105[ ELEVATION 01 A105[ ELEVATION 02 Existing Aluminium Mesh to be painted to approval. Our Companies East African Breweries Limited (EABL) East Africa's leading branded alcohol beverage business with outstanding collection of brands that range from beer, spirits and adult alcoholic drinks (ANADs) reaffirming our standing total adult beverage (TAB) company. With breweries, distilleries, support industries and distribution network across the region, the group's diversity an important factor delivering the highest quality brands Celebrating life every day, everywhere. To create best performing, most trusted and respected consumer products company Africa. To the most celebrated business every market EABL Group at Glance EABL's diversity robust regional company revealed its subsidiaries, which are: Kenya Breweries Limited, Uganda Breweries Limited, Serengeti Breweries Limited, United Distillers Vintners, East African Maltings Limited and East African Breweries International. With this vast distribution markets, knowledge and manpower 'Celebrating Life Every day, Everywhere' EABL's way life. EABL's diversity as robust regional company revealed its subsidiaries, which are: Kenya Breweries Limited, Uganda Breweries Limited, Serengeti Breweries Limited, United Distillers Vintners, East African Maltings Limited and East African Breweries International. With this vast distribution markets, knowledge and manpower 'Celebrating Life Every Ex masonry Wall Plastered and painted to approval. Display Board to detail. Barley Wallpaper graphic. A.05 Directional Signage LED Lighting Fixture to A.05 Directional Signage to Detail. 700mm Lowered Aluminium Proposed Wallpaper Graphic be Approved. A.05 Directional Signage 600mm Thick R.C Column Painted and Plastered To 100mm High Screed Skirting Finished to match Floor Finish. Floor Finish To Specifications. dimensions are mm Any dicrepancies to be veri All reinforced concrete works to structural eng ply bituminous felt provided between masonry and All plumbing and drainage be approval and PV denotes permanent vents All dimensions are shown mm unless otherwise Drawings are not be scaled only All slabs ground level be poured over 50 soils on cut enbarkment to be established and the slope not exceed the natural angle responce Depth of foundations to be determined site approval stone walls below reinforced with hoop iron at every alternative course works and masonry walls to be tied with straps irons every course All plumbing and drainage to comply with councils speci cations Drain passing under driveway mm thick concrete surround Minimum slope in the drain pipes be All testing pipes must be completed before plastering All mechanical works must be co ict conduits must be laid before plastering No Descriptions REVISIONS Drawing title Date FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTE Drawing Type: A107[ EISC ELEVATION A ] EISC ELEVATIONS EISC ELEVATION B 2410 LED Lighting Fixture Specs. Proposed Wall Graphic be Approved. 100mm High Safety Marking Specifications. Concrete Epoxy Floor Finish. Gypsum Walling Painted and Plastered To Approval. 100mm High Safety Marking 500mm Lowered Gypsum Proposed Display Boards All plumbing and drainage to comply with councils speci cations Drain passing under driveway mm thick concrete surround Minimum slope in the drain pipes be All testing pipes must be completed before plastering All mechanical works must be co ict conduits must be laid before plastering No Descriptions REVISIONS Date interior designers commercial managers Box NAIROBI Location FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL EXISTING BEER ROUTE FOR CONSTRUCTION. VISUAL IMAGE_TO PACKAGING A ELEVATION 20 ELEVATION 21 Scale 1:20 VISUAL IMAGE_TO PACKAGING B 1100 820 2120 80 910 80 1360 80 910 80 820 9050 15480 1520 100 660 120 770 820 1060 80 440mm Lowered Aluminium Mesh Ceiling. Existing Cable Systems. Existing Windows To Be Retained. 100mm High Epoxy Skirting. Concrete Epoxy Floor Finish. Proposed Door Signages To Schedule. LED Lighting Fixture To Specs. Existing Masonry WallPainted and Plastered To Approval. Proposed Wall Graphics To be Approved. Existing Masonry Wall Painted and Plastered To Approval. 740 50 1940 440mm Lowered Aluminium Mesh Ceiling. Existing Cable Systems. LED Lighting Fixture To Specs. 200mm Deep Niche 50mm Thick Timber Slats finished to Approval. Proposed Display Boards. 370mm Thick Gypsum Walling. All dimensions be checked architects details ply bituminous felt to be provided All dimensions are shown in mm unless otherwise dimensions CONSTRUCTION All slabs at ground level to be poured over100mm gauge polythene sheeting on mm thick blinding hardcore CIVIL All soils on cut enbarkment established and the slope not to exceed the natural angle responce STRUCTURAL Depth foundations determined on site to structural eng approval Concrete blocks stone walls below mm thickness be reinforced with hoop iron every alternative course All adjacent works and masonry walls to be tied with straps irons at every course MECHANICAL All plumbing and drainage to comply with councils speci cations Drain passing under driveway buildings be encased with minimum 150mm thick concrete surround Minimum slope the drain pipes be %. All testing pipes must be completed before plastering All mechanical works must be co-ordinated with electrical and any con ict must be claimed before work begins ELECTRICAL All conduits must be laid before plastering No Descriptions REVISIONS Drawing title Project title Client Date C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTE Drawing Type: A105[ VISUAL IMAGE 02 A105[ VISUAL IMAGE 03 ELEVATIONS 7400 1070 12180 Existing Aluminium Mesh to be painted to approval. Overview Our Values Our Companies Leadership East African Breweries Limited (EABL) East Africa's leading branded alcohol beverage business with outstanding collection brands that range from beer, spirits and adult -alcoholic drinks (ANADs) reaffirming our standing total adult beverage (TAB) company. With breweries, distilleries, support industries and distribution network across the region, the group's diversity important factor delivering the highest quality brands East African consumers and longCelebrating life every day, everywhere. create the best performing, most trusted and respected consumer products company Africa. the most celebrated business every market EABL's diversity robust regional company revealed subsidiaries, which are: Kenya Breweries Limited, Uganda Breweries Limited, Serengeti Breweries Limited, United Distillers Vintners, East African Maltings Limited and East markets, knowledge and manpower 'Celebrating Life Every day, Everywhere' EABL's way life. EABL Group Glance EABL's diversity robust regional company revealed subsidiaries, which are: Kenya Breweries Limited, Uganda Breweries Limited, Serengeti Breweries Limited, United Distillers Vintners, East African Maltings Limited and East markets, knowledge and manpower 'Celebrating Life Every day, Everywhere' EABL's way of life. Ex masonry Wall Plastered and painted to approval. Display Board to detail. Barley Wallpaper graphic. A.05 Directional Signage LED Lighting Fixture to Manufacturer's Specs. 170 750 1450 12140 LED Lighting Fixture Specs. F.02 Fire Safety Signage to detail. Wall Plastered and Painted Proposed Wallpaper A.05 Directional Signage to Detail. 4260 2910 700mm Lowered Aluminium Proposed Wallpaper Graphic 100mm High Screed Skirting Finished to match Floor Finish. Floor Finish To Specifications. A.05 Directional Signage B.05 Door Signage 600mm Thick R.C Column Painted and Plastered To LED Lighting Fixture 100mm High Screed Skirting Finished to match Floor Finish. 4mm Thick Linoleum Floor Finish To Specifications. All dimensions are in mm Any dicrepancies be veri reinforced concrete works structural eng single layer of ply bituminous felt to be provided between masonry and works All plumbing and drainage be approval and satisfaction M PV denotes permanent vents All dimensions are shown mm unless otherwise speci Drawings are not to be scaled only gured dimensions to be used CONSTRUCTION All slabs at ground level to be poured over100mm gauge polythene sheeting mm thick blinding on hardcore CIVIL All soils on cut enbarkment established and the slope not to exceed the natural angle responce STRUCTURAL Depth foundations determined on site to structural eng approval Concrete blocks stone walls below 200mm thickness be reinforced with hoop iron every alternative course adjacent works and masonry walls be tied with straps irons at every course MECHANICAL All plumbing and drainage comply with councils speci cations Drain passing under driveway & buildings encased with minimum 150mm thick concrete surround Minimum slope the drain pipes to be %. All testing pipes must be completed before plastering All mechanical works must be co-ordinated with electrical and any con ict be claimed before work begins ELECTRICAL All conduits must laid before plastering Client signature Drawn by Scale Checked by No Descriptions REVISIONS Drawing title Project title Client Date Initial date Plot date MMK architects +interior designers+project & commercial managers O Box 49274- 00100 NAIROBI INN Developer signature CON Job No: Stage: Rev: Consult: No. Location C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTEDrawing Type: FOR CONSTRUCTION. 2/3/2020 3:20:37 PM EISC ELEVATION A EISC ELEVATIONS A107[ EISC ELEVATION B EISC ELEVATION C A108[ EISC ELEVATION D 1690 920 1920 100mm High Safety Marking to Specifications. Concrete Epoxy Floor Finish. LED Lighting Fixture to Specs. 100mm High Safety Marking to Specifications. Concrete Epoxy Floor Finish. 24Inch Keg Bottles cut and fitted to detail. 500mm Lowered Gypsum Wall Painted and Plastered to Approval. Ramp Walkway 1160 Client signature Drawn by Scale Checked by Drawing title Project title Client Initial date Plot date MMK architects +interior designers+project & commercial managers O Box 49274- 00100 NAIROBI INN Developer signature CON Job No: Stage: Rev: Consult: No. Location EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTE A17-02 AR Drawing Type: FOR CONSTRUCTION. 1/21/2020 4:42:35 PM ] ELEVATION 20 ] ELEVATION 21 Scale 1:20 100 2780 40 1100 820 2120 80 910 80 1360 80 910 80 820 9050 15480 900 1020 820 1060 80 2300 80 3200 70 2260 440mm Lowered Aluminium Mesh Ceiling. Existing Cable Systems. Existing Windows To Be Retained. Proposed Wallgraphics. 100mm High Epoxy Skirting. Concrete Epoxy Floor Finish. Proposed Door Signages To Schedule. LED Lighting Fixture 240 1000 1980 100 50 3250 50 440 800 2080 20 350 200 3350 5490 370 15790 440mm Lowered Aluminium Mesh Ceiling. Existing Cable Systems. Proposed Wallgraphics. 100mm High Epoxy Skirting. LED Lighting Fixture To Specs. 200mm Deep Niche Existing Column To be Retained. 50mm Thick Timber Slats finished to Approval. Proposed Display Boards. 370mm Thick Gypsum Walling. All dimensions to be checked ed All reinforced concrete works structural eng ply bituminous felt to be provided All plumbing and drainage to be approval and dimensions are shown mm unless otherwise All slabs ground level be poured over mm thick blinding All soils on cut enbarkment to be established and the slope not exceed the natural angle responce Depth foundations to be determined on site to be reinforced with hoop iron at every alternative course works and masonry walls tied All plumbing and drainage comply with councils Drain passing under driveway buildings be encased mm thick concrete surround Minimum slope the drain pipes to be All testing pipes must be completed before plastering ordinated with claimed All conduits must be laid before plastering Client signature Drawn by Scale Checked by Descriptions REVISIONS Drawing title Project title Client Initial date interior designers project commercial managers 00100 Developer signature Job No: No. FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD COVERED CANOPY FOR EABL Drawing Type: VISUAL IMAGE 01 A105[ VISUAL IMAGE 02 A105[ VISUAL IMAGE 03 A105[ ELEVATION 01 A105[ ELEVATION 02 ] PART E ELEVATIONS 1:20 2630 1070 7400 1070 12180 Existing Aluminium Mesh be painted to approval. Overview Our Values Our Companies Leadership East African Breweries Limited (EABL) East Africa's leading collection brands that range from beer, spirits and adult -alcoholic drinks (ANADs) reaffirming standing distribution network across region, group's diversity important factor delivering the highest quality brandsPurpose: Ambition: consumer products company Africa. most celebrated business every market EABL Group Glance EABL's diversity robust regional company revealed subsidiaries, which are: Kenya Breweries Limited, Uganda Distillers Vintners, East African Maltings Limited and East markets, knowledge and manpower 'Celebrating Life Every day, Everywhere' EABL's way life. EABL Group Glance EABL's diversity robust regional company revealed subsidiaries, which are: Kenya Breweries Limited, Uganda Distillers Vintners, East African Maltings Limited and East markets, knowledge manpower 'Celebrating Life Every day, Everywhere' EABL's way life. Ex masonry Wall Plastered and painted to approval. Display Board detail. Barley Wallpaper graphic. A.05 Directional Signage to detail. LED Lighting Fixture to Manufacturer's Specs. LED Lighting Fixture Specs. F.02 Fire Safety Signage to detail. A.05 Directional Signage to Detail. 2910 580 2330 700mm Lowered Aluminium Ceiling to Detail. Proposed Wallpaper Graphic be Approved. 100mm High Screed Skirting Finished to match Floor Finish. 4mm Thick Linoleum Floor Finish To Specifications. 580 1300 1030 2910 A.05 Directional Signage to Detail. B.05 Door Signage to Detail. 600mm Thick R.C Column Painted and Plastered To Approval. LED Lighting Fixture to Specs. 100mm High Screed Skirting Finished to match Floor Finish. 4mm Thick Linoleum Floor Finish To Specifications. All dimensions are mm Any dicrepancies be veri reinforced concrete works structural eng single layer ply bituminous felt provided between masonry and plumbing and drainage be approval and satisfaction of denotes permanent vents speci ed Drawings are not be scaled only gured dimensions CONSTRUCTION All slabs ground level poured over mm gauge polythene sheeting mm thick blinding CIVIL soils on cut enbarkment established and slope not exceed the natural angle responce Depth foundations be determined site structural eng approval reinforced with hoop iron every alternative course adjacent works and masonry walls tied with straps irons every course MECHANICAL All plumbing and drainage to comply with councils speci Drain passing under driveway buildings encased with minimum mm thick concrete surround Minimum slope the drain pipes be testing pipes must be completed before plastering mechanical works must be -ordinated with electrical and any con ict be claimed before work begins ELECTRICAL conduits must laid before plastering Client signature No Descriptions REVISIONS Drawing title Project title Client Date architects +interior designers project commercial managers Box 49274- 00100 NAIROBI Developer signature C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTE Drawing Type: A107[ EISC ELEVATION A EISC ELEVATIONS A107[ EISC ELEVATION 400 2410 300 1170 2400 630 2410 1690 920 1920 14250 LED Lighting Fixture to Specs. Proposed Wall Graphic to be Approved. 100mm High Safety Marking to Specifications. Concrete Epoxy Floor Finish. Gypsum Walling Painted and Plastered To Approval. 90 990 80 530 1230 20 930 150 6820 9690 LED Lighting Fixture Specs. 100mm High Safety Marking Specifications. Concrete Epoxy Floor Finish. 24Inch Keg Bottles cut and fitted detail. 500mm Lowered Gypsum Ceiling. Proposed Display Boards Detail. Wall Painted and Plastered Approval. Ramp Walkway NOTES GENERAL All dimensions are mm dimensions checked Any dicrepancies be veri reinforced concrete works structural eng details single layer ply bituminous felt provided between masonry and plumbing and drainage be approval and satisfaction of denotes permanent vents speci ed Drawings are not be scaled only gured dimensions CONSTRUCTION All slabs ground level poured over mm gauge polythene sheeting mm thick blinding CIVIL soils on cut enbarkment established and slope not exceed the natural angle responce Depth foundations be determined site structural eng approval reinforced with hoop iron every alternative course adjacent works and masonry walls tied with straps irons every course MECHANICAL All plumbing and drainage to comply with councils speci Drain passing under driveway buildings encased with minimum mm thick concrete surround Minimum slope the drain pipes be testing pipes must be completed before plastering mechanical works must be -ordinated with electrical and any con ict be claimed before work begins ELECTRICAL conduits must laid before plastering Client signature Drawn by Scale Checked No Descriptions REVISIONS Drawing title Project title Client Date Initial date Plot date MMK architects +interior designers project commercial managers Box 49274- 00100 NAIROBI INN Developer signature CON Stage: Rev: C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTEDrawing Type: 1/21/2020 4:42:35 PM VISUAL IMAGE_TO PACKAGING A A109 ELEVATION 20 Scale 1:20 A109[ ELEVATION 21 Scale 1:20 VISUAL IMAGE_TO PACKAGING B VISUAL IMAGE_TO PACKAGING A 1100 820 2120 910 80 1360 80 910 820 9050 15480 820 1060 80 2300 3200 2260 2290 80 3200 80 440mm Lowered Aluminium Mesh Ceiling. Existing Cable Systems. Existing Windows To Be Retained. Proposed Wallgraphics. 100mm High Epoxy Skirting. Concrete Epoxy Floor Finish. Proposed Door Signages To Schedule. LED Lighting Fixture To Specs. Existing Masonry WallPainted and Plastered To Approval. Proposed Wall Graphics To Approved. Existing Masonry Wall Painted and Plastered To Approval. 50 3250 350 6040 200 3350 5490 370 440mm Lowered Aluminium Mesh Ceiling. Existing Cable Systems. Proposed Wallgraphics. 100mm High Epoxy Skirting. LED Lighting Fixture To Specs. 200mm Deep Niche Existing Column To be Retained. 50mm Thick Timber Slats finished Approval. Proposed Display Boards. 370mm Thick Gypsum Walling. NOTES dimensions are mm All dimensions be checked site Any dicrepancies veri with architects All reinforced concrete works structural eng All single layer bituminous felt to provided between masonry and works All plumbing and drainage to approval and satisfaction PV denotes permanent vents All dimensions are shown mm unless otherwise speci Drawings are not scaled only gured dimensions slabs ground level to poured over100mm gauge polythene sheeting mm thick blinding hardcore soils cut enbarkment be established and the slope not exceed the natural angle responce Depth foundations determined on site to structural eng approval Concrete blocks stone walls below mm thickness reinforced with hoop iron at every alternative course All adjacent works and masonry walls be tied with straps irons every course plumbing and drainage comply with councils speci cations Drain passing under driveway buildings to encased with minimum 150mm thick concrete surround Minimum slope drain pipes All testing pipes must completed before plastering All mechanical works must co-ordinated with electrical and any con must claimed before work begins ELECTRICAL conduits must laid before plastering Client signature No Descriptions REVISIONS Drawing title Project title Client Date architects interior designers project commercial managers Box 49274- 00100 NAIROBI Developer signature C1 FOR CONSTRUCTION EAST AFRICAN BREWERIES LTD P.O BOX 30161 00100 RUARAKA, NAIROBI KENYA PROPOSED WALKWAYS, BRANDING, SIGNAGE AND COVERED CANOPY FOR EABL FACTORY EXISTING BEER ROUTE Drawing Type: FOR CONSTRUCTION. A105[ VISUAL IMAGE 01 A105[ VISUAL IMAGE 02 A105[ VISUAL IMAGE 03 A105[ ELEVATION 01 A105[ PART E ELEVATIONS
House Scherezade | Kilifi
Building Bridges Not A Wall
Layout Diagram
SPRING SEMESTER;
The Taita Apalis is a bird that exists only in the Taita Hills, Kenya and has been marked as a critically endangered species due to its rapid decline over the past few years. From 2001 to
THE TAITA APALIS GSAPP SPRING SEMESTER; ADVANCED STUDIO VI; INSTRUCTOR; JUSTIN G
The Taita Apalis is a bird that exists only in the Taita critically endangered species due to its rapid decline 2017 it was recorded to have significantly dropped and unfortunately continues to decline.
KEY 1. Access 2. Administration 3.Meeting Roms 4. Workshops 1. 2. 3. 4. 5. 6. 7. 8. 8.. 9. 10. Site Plan
THE
GSAPP
Key 1. Taita Hills 2. Community Center 3. Farm 4. Butterfly Farming 5. Grazing Land 1. 2. 3. 3. 4. 5. Taita Hills Siteplan Community Center Farming Zone Sectional Elevation
TAITA APALIS
Key 1. Taita Hills 2. Community Center 3. Farm 4. Butterfly Farming 5. Grazing Land 1. 2. 3. 3. 4. 5. Taita Hills Siteplan Community Center Farming Zone Sectional Elevation
FORM DEVELOPMENT THE PROCESS
The form of the market was inspired by the local architectural character and is designed to be regionally sound by adopting the use and interplay of local materials such as brick and timber to create an archtype similar to the context. It mimics the use of courtyards similar to the residential houses as mentioned before to be points of interaction and orientation.
The towers are the orientation points of the market. The concept of the towers were influenced by the islamic souqs where they have been articulated to define transitional points within the route. They have been incorporated in the design to reflect the swahili culture that is widely spread within the region.
01 .VOI
Concept | Development | Masterplan INTRODUCTION Market infrastructure is influenced by many factors, the most fundamental of which is the size and use of selling space and its relationship to traffic circulation and parking. The project has two main components: i). Masterplanning ii). Scheme and Detailed Design. LOCATION MASTERPLAN 1:1000 EXISTING CEREALS BOARD EXISTING RAILWAY HOUSES UNDEVELOPED LAND 8. GENERAL RETAIL SPACES This section highlights the the general retail spaces such as kiosks and supermarkets that are used regularly by customers. 6. LIVESTOCK SECTION This sector is in response to the CIDP of the region to increase agricultural and livestock produce within the county. 4. LIGHT INDUSTRIES This section requires frequent servicing due to the types of good sold and hence positioned adjacent to the service yard. 3. SERVICE YARD This section of the site was the most dormant part as compared to the remaining 3 and was best positioned to be the service yard for the market. is strategically placed for easy of servicing within the market. 2. ANCILLIARY SPACES This include support facilities for the market i.e. administrative offices, banks, Atms, Post office and storage spaces. 5. RESTAURANTS AND EATERIES The site at this point offered excellent views towards Saghalla hills and Voi River and was the ideal location for leisure activities. Its form is in response to the river. SECTOR DEVELOPED Farm produce is the main produce sold within the region and is an anchor point for the entire market. 1. RETAIL SPACE Located at the entrance of the market to channel people into the interior parts within the market. The sector has both inbuilt stalls that sell new items and open air stalls for second hand goods. 3D IMAGE BELOW SITEPLANNING | FORM DEVELOPMENT Kantai Mark Melita UP Service Yard Eateries Service Yard Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Entrance from Visitors Car Park Main Market Entrance Walkway Amphitheatre Bus Terminus Bus Terminus Traders Parking and Taxi Area Traders Parking and Taxi Area Loading Area Loading Area Loading Walkway Walkway Bus Parking Bus Parking Bus Parking Visitors Car Park Visitors Car Park Motorbicycles parking area Tuk Tuk's and parking area EXIT ENTRANCE Walkway Walkway Walkway Walkway Walkway Walkway Walkway Walkway Retail Open Spaces Lightweight Industry Walkway Retail Open Spaces Retail Open Spaces Open Air Farm Produce Stalls Walkway Walkway Walkway Walkway Walkway Walkway Open Stalls Hand Craft Hand Craft Fruit Vendors Retail Open Spaces Open Air Farm Produce Stalls Open Air Farm Produce Stalls Ancilliary Spaces Retail Spaces Retail Spaces Retail Spaces Retail Spaces Retail Spaces Livestock Section Retail Spaces Retail Spaces Ancilliary Spaces Farm Produce Livestock Section Lightweight Industry Storage Landscaping UP UP UP Toilets Restaurant Area Restaurant Area Restaurant Area Restaurant Walkway Area Kitchen Area Kitchen Area Kitchen Area
MARKET
SITE PLAN 1:500 SITEPLANNING
ZONNING ii). SERVICE DISTRIBUTION v). LANDSCAPING i). CLUSTERING ii). HIERARCHY iii). DOMINANCE iv). OUTCOME Reducing the number of courtyards to ease wayfinding and spatial definition between different sectors within the market. Massing of the blocks to different heights to define the focal point within the market visually. This was done by raising the central courtyard. In such of the markets character visually dominant points within the market were raised to be distinct for orientation and transitional purposes. The result was regional archtype that is sensitive to the functions that occur within a market and to its context. iii). VEHICULAR CIRCULATION SERVICE ROAD CAR PARK Massing
i).
CONCEPT | DEVELOPMENT | MASTERPLAN Kantai Mark Melita B02/34413/2013 vii). Building designs should also allow the maximum amount of flexibility for change. The design for the market was influenced by the recur ring challenges experienced in the existing markets within the region. The major design issues identified include wayfinding, service distribution, circulation among others. The market layout is inspired by the circulation pat terns that run from north to south within the region, the use of courtyards for environmental and social func tions and efficient service distribution. To enhance is sues on wayfinding, circulation and service distribu tion the following design principles were applied. i). Use of courtyards ii). Nodes as points of orientation. iii). Hierarchy for space definition iv). Material change for space definition B. USE OF NODES The use of courtyards enabled for clustering different market activities into different sectors within the market and enabled the spaces to receive maximum natural lighting and ventilation. A. COURTYARD’S Ancilliary Courtyard Juakali Courtyard In response to wayfinding issues in Voi Old Market, the design of the market employes nodes as points of orientation within the market. The nodes are further highlighted by being the most dominat points within the market. Points of orientation Within the market. Dominant visual points for orientation and wayfinding. Bigger in size to emphasize the focal point/destination point of the market. In response to way finding, some points within the market are visually dominant compared to the others this is to aid in one’s orientation within the market. The open air stalls are differ in size to visually put emphasis on the dominant activities within the market. C. HIERARCHY Amalgamation of courtyards to improve wayfinding. Use of courtyards as breakout spaces, social spaces and for environmental purposes. Response to River. Design response to the river and termination of the axis. MASTERPLAN 1:1000 UNDEVELOPED LAND PERSPECTIVE VIEW OF MASSING CONCEPT OF THE MARKET. Dominant Points of Orientation and vertical circulation points. Farm produce sector visually higher than the rest for emphasis on the focal point the market. 10m wide circulation routes for sufficient movement people and goods. Open retail stalls. The space multi-functional can used second hand goods during scheduled dates and can be pavilions for public funcproposal bus terminus enables market destination place for region and focal point urban development due site’s Open air retail stalls. Have portable handcarts that can be stored during scheduled days and enable space used Rectangular 300mm thick brick arch painted plastered white break monotony the front elevation market.tilation internal walkways open stalls within. timber struts support mimic the local The brick arch’s are preliminaryements market identity. They 300mm thick and 4000mm high complement archway used define The soft landscape used provide emphasis different parts within market. instance trees used define entrance and walkway into market.open stalls raised 150mm from ground plane for space definition and are further delineatedferent hardscape materials. stalls from the ground plane space definition are further delineated useferent hardscape materials. The stalls are shletered under pergola protect traders and goods excessive heat experienced region. slope supported corrugated iron sheets steel GENERAL RETAIL SECTION WALKWAY ALONG BUS TERMINUS WALKWAY WALKWAY ENTRANCE RETAIL SECTION ANCILLARY SPACES RETAIL SECTION New items and second-hand goods. The open stalls selling second selling items.stalls buffer different goods being within the market. stalls also increase interactionMAIN ENTRANCE WALKWAY LIVESTOCK SECTION RESTAURANT AND EATERIES SECTION WALKWAY FARM PRODUCE SECTION FARM PRODUCE SECTION GENERAL RETAIL SECTION OPEN RETAIL STALLS have been left open sufficient ventilation. 300mm thick brick arch painted plastered white highlight farm produce that differs 900mm high timber balustrade mimic local architectural character using brick timber accentuate exterior facades residential units. such meetings. ELEVATION B 1:100 WALKWAY WALKWAY WALKWAY WALKWAY LIVESTOCK SECTION LIGHT INDUSTRIES points within market and highlight transition from one sector market Entrance from Voi River. open rectangular arch’s ventilation industrial look response the types good thats are sold there. Arch way used define entrance market. 200mm thick brick walling articulated natural lighting the pedestrian ramp. Storage spaces open lighting local architectural character. Metal door that swings overhead stall display goods.and the customers within market. support and enables sufficient movement within the stalls. REFERENCE: ELEVATION REFERENCE: ELEVATION REFERENCE: ELEVATION towards Saghalla River. The ceiling the market open allow for sufficient natural ventilation interiors due excessive heat experienced the region. The archway towers node points within market highlight transition sector market another. towers the market terminus and along major highway. 300mm thick brick arch painted and plastered white highlight farm produce differs Open farm produce stalls, enable passerby’s interact goods without necessarily going into market. Thisaccessed from internal courtyard control such meetings. spaces while upper levels mentioned earlier have been open sufficient ventilation. The rectangular arch 300mm thick break monotony facade and accentuate the livestock section. livestock section open facilitate sufficient cross ventilation RESTAURANT AND EATERIES SECTION LIVESTOCK SECTION WALKWAY MAIN ENTRANCE FARM PRODUCE SECTION GENERAL RETAIL SECTION OPEN RETAIL STALLS WALKWAY Elevation detail 03. Part Elevation detail
VRAY