KA CHUN NG, MARK Architectural Design Portfolio 2023 Part II Architectural Assistant Application
MARK
KA CHUN NG
A highly-motivated Part II Architectural Assistant graduated from the Bartlett School of Architecture in 2023 who is passionate about taking an integrated approach with architecture, urban design and landscape.
Part II Architectural Assistant London / Hong Kong
(+44) 07826038379
https://markngkc.com/
markngarchi@gmail.com
E D U C AT I O N University Colledge London, London
Sept 2021 to Jun 2023
MArch Architecture in Bartlett School of Architecture 2-Year Postgraduate Programme (Distinction)
Newcastle University, Newcastle Upon Tyne
TABLE OF COTENTS
Sept 2016 to June 2019
BArch Architecture in School of Architecture, Planning and Landscape
PART II Academic Works | (2021-2023)
3-Year Undergraduate Programme (First Class)
EXPERIENCE
In-between Goodsyard Estate
Oval Partnership Ltd., Hong Kong
Sept 2019 to Aug 2021
Part I Architectural Assistant Worked on several mixed-use master planning projects in Asia Pacific Regions, and have assisted in the production of design packages from schematic, design development and construction processes (RIBA Stage 1-3), and the use of digital-placemaking simulation tools such as the depth map to provide insights in planning and urban design strategies. I was also involved in the use of BIM modelling for the tehnical stage of the projects.
Casting Redcar Cultural | Environmental | Institutional | Adaptive Reuse PART I Academic Work | (2018-2019)
Krispace Design Consultancy Co Ltd., Hong Kong
Jul 2018 to Sept 2018
Designer
Greenwich Archipelagos Heritage Preservation | Cultural | Institutional
Worked on several interior design projects ranging from residential to commercial sectors. I have contributed to the project documentation in the conceptual, design development and construction processes with experiences from site visits.
PART I Professional Works | (2019-2021)
Faulknerbrowns Architects., Newcastle Upon Tyne
Sept 2017 to Jun 2018
Participants of RIBA Mentoring Scheme Through personal contact and regular involvement, I was given opportunities to discuss and develop a joint understanding of professional practice.
Swire Xi’an Small Wild Goose Pagoda Mixed-used | Retail | Heritage Preservation
Laud Ltd., Hong Kong
Jun 2017 to Aug 2017
Designer Assisted in the Hong Kong House Architectural Design Proposal for the Echigo Tsumanrin Art Triennale 2018, and worked on several residential and office design projects, and assisted in material selection through contact with local suppliers.
P RO J E C T S
Mixed-used | Residential | Commercial | Recreational
Jingzhou Riverside Water Garden Retail | Residential
Wuyangli Cultural District Retail | Cultural | Heritage Preservation
REFERENCES
Swire Xi’an Small Wild Goose Pagoda | 269200 m 2
Dr. Lin Hao
(Stage 0-2 equivalent) | Xi’an, China
Oval Partnership Ltd. | linhao@ovalpartnership.com
Jungfa Kuming City
Jingzhou Riverside Water Garden | 64200 m 2
Prof. Laura Allen
Tecnical Skills
(Stage 0-2 equivalent) | Jingzhou, China
Bartlett School of Architecture | l.allen@ucl.ac.uk
Wuyangli Cultural District | 103300 m 2
Prof. Mark Smout
(Stage 0-2 equivalent) | Chengdu, China
Bartlett School of Architecture | m.smout@ucl.ac.uk
Jungfa Kuming City | 41400 m
Dr. Josep Maria Garcia-fuentes
2
(Stage 3 equivalent) | Kuming, China
Newcastle University | josep.garciafuentes@newcastle.ac.uk
SKILLS Technical
Language
Visa Status
2D | Photoshop, In-design, Illustrator, Autocad 3D | Rhinoceros, Sketchup, Revit Rendering | Enscape, Lumion, V-ray
English | Professional working proficency Cantonese | Native or bilingual profiency Mandarin | Professional working proficency
British National (Overseas) Visa | Eligible to work in the UK without visa sponsorship
Part II Academic Works
In-between Goodsyard Estate
Location: Project Year:
Shoreditch, London 2022-2023
Masterplan/ Community/ Residential
Aerial View of the Goodsyard Estate
Against the background of the growing gentrification of London’s neighbourhood, the project challenges the orthodox master planning strategy that has contributed to the homogenisation of cities and displacement of local communities. Situated within the gentrified area of Shoreditch, the design interrogates the traditional terraced house typology by deliberately blurring the boundaries between architecture, urban structure,
and landscape. The project aims to redefine the roles of gardens, terraces, hedges, gabled walls, and facades, ultimately creating a new public-private gradient and urban scenery that embody diversity and inclusivity.
Part II Academic Works
With the current proposal of Bishopsgate Goodsyard in Spitalfields privatising public spaces and segregating communities by transforming the site into a corporate plaza of offices, high-end retail and luxury home studio spaces, the new proposal questions the conventional arrangement of dwellings in relation to the urban environment with the introduction of in-between spaces into the community.
In-between Goodsyard Estate Masterplan/ Community/ Residential
Conceptual collages reimagining spitalfields nieghbourhood
Goodsyard Estate Masterplan
Part II Academic Works
In-between Goodsyard Estate Masterplan/ Community/ Residential
With the study of massing with physical models, the “banana” typology allows the front facade and gabled walls to open to all directions and thus maximises the views in all four housings. The triple aspects of the dwellings enable a 270-degree view of the greenspaces on the Goodsyard site. The vertical circulation, which can lead inhabitants to the rooftop spaces is placed at the exterior corners to allow more sunlight and views to the landscape.
Part II Academic Works
In-between Goodsyard Estate Masterplan/ Community/ Residential
The triple aspect and shared terraces of the quarterly-detached house allows for multiple views towards the landscape and the community.
Part II Academic Works
In-between Goodsyard Estate Masterplan/ Community/ Residential
In the project, the traditional terraced house typology is questioned with the concept of gardens, terraces, hedges, gabled walls, and facades blurred and redefined to foster more unexpected interactions between different groups of communities to produce a truly open and diverse community.
Part II Academic Works
In-between Goodsyard Estate Masterplan/ Community/ Residential
Left: A rear facade showing the diverse hanging plants as well as the rear communal garden surrounded by hedges. Right: Residents in the house and at the communal back garden are able to overlook the lower ground trading activities.
Part II Academic Works
In-between Goodsyard Estate Masterplan/ Community/ Residential
The faience shops with different self-customised shopfronts adds vibrancy and vitality to the already gentrified Spitalfield area.
Part II Academic Works
In-between Goodsyard Estate Masterplan/ Community/ Residential
Left: The gabled walls are opened up with apertures that foster interactions between residents in different blocks of the terraced house. Right: The apertures of different sizes at the gable and the communal courtyard foster interactions between residents and the wider community.
Part II Academic Works
In-between Goodsyard Estate Masterplan/ Community/ Residential
Local recreational facilities such as the skatepark becomes integral with the existing brick structure. Existing football pitches are also kept in catering for local needs.
Part II Academic Works
In-between Goodsyard Estate Masterplan/ Community/ Residential
Gabled walls are opened up as shared spaces by residents and “folded out” as communal courtyards; hedges become part of the urban scenery and spaces for interactions between community members; small independent businesses are integrated with the housing and the urban landscape in multiple ways to create vibrant street life and distinct urban character; meandering footpaths lead people to different pocket spaces in the multi-layered landscape.
Part II Academic Works
Casting Redcar
Location: Project Year:
Redcar, North Yorkshire 2021-2022
Culture | Environmental | Institutional | Adpative Reuse
Aerial View of the Landscape Archive and Research Centre
In response to the demolition of the Redcar Steelworks Complex by 2022, the project envisages a landscape archive and research centre where Redcar’s industrial heritage will be celebrated and remediation of soilscapes will be carried out throughout a 50-year span. Sited in the unique slag landscape of South Gare, the design explores the idea of landscape casting and tiltup construction both as ways of revealing the industrial scars of the contaminated site and as an opportunity for phytoremediating the polluted landscapes.
Slag Landscape
Part II Academic Works
Casting Redcar Culture | Environmental | Institutional | Adpative Reuse
The design explores the idea of tilt-up construction both as a way of celebrating the industrial slag landscape of the site and as an opportunity for phytoremediating the polluted soil, thus responding to Redcar’s paradox of preserving industrial heritage and developing a green economy.
Tilt-up Construction Sequence
Part II Academic Works
Casting Redcar
This series of diagrams show how the concrete panel are gradually cast and tilted up to form the façade panels of the huts. The original casting plot will then become a testing phytoremediation plot.
Culture | Environmental | Institutional | Adpative Reuse
1. COURTYARD OBELISK TILT-UP PANELS - Part of the glulam structure is first constructed and the 2. STEEL OBELISK TILT-UP PANELS - The steel obelisk concrete is then casted on ground together with gutters and downpipes for rainwater collection before titling up. obelisk concrete panel facing the courtyard area is cast on ground and titled up as facade panel.
3. CONSTRUCTION OF REMAINING GLULAM - The remaning glulam structure is constructed before the tilting up of the remaining concrete panels.
4. OBELISK TILT-UP PANELS - The concrete obelisk panels are cast and tilted up on the two sides. The 5. FLEXIBLE TILT-UP PANELS - The concrete tilt-up panels is cast on ground and is integrated with the timber stud formwork of one of the panels leaves a gap of the thickness of the steel obelisk concrete, allowing pully system after tilting up, which becomes flexible to fold up and down. the concrete panels to be slotted in after the tilt-up process.
6. PHYTOREMEDIATION PLANTING AFTER TILT-UP - With all concrete panels tilted up as walls or facades, the cast soilscape will be phytoremediated where indigenous plants will be grown to remove contaminants in the soil. Gabion wall filled with slag forms the boundary of the existing casting plots.
Part II Academic Works With the site enjoying a rather constant wind from the southwest throughout the year, it is expected that roof and facade panels facing or orientating towards the southwest would likely have a higher rate of corrosion. Therefore, as time passes, the roofscape of the complex will gradually change from mostly pink and brown shades into brown for the northeast panels and patina for the southwest ones, to finally fully patinated.
Casting Redcar Culture | Environmental | Institutional | Adpative Reuse
Unexposed
6 months
2 years Building in 6 months
5 years
10 years
20 years
COPPER PATINATION COLOUR PALETTE
Building in 2 years
Building in 5 years
Building in 10 years
COPPER PATINATION ON ROOFSCAPE
COPPER PATINATION OVER TIME
Part II Academic Works
Casting Redcar
The reclaimed reddish water pipe is framed and revealed as a downpipe cast into the concrete panel which, together with the pipes sit on the balustrade, helps collect rainwater to the water filtration system.
Culture | Environmental | Institutional | Adpative Reuse
Diagonal Bracing for openings in corners
PVC Pipe Connector
GROUND SOIL
Aditional Obelisk Formwork
Radiating Heating Mat Lifting Insert
Original Formwork as Concrete Base Plate
CONCRETE SLAB Down Pipe Gutter GROUND SOIL
Metal Dowel
Part II Academic Works
Casting Redcar Culture | Environmental | Institutional | Adpative Reuse
The aim of the physical casting experiment is to simulate the real-life concrete casting process and test out the desired texture for the concrete panels. The test aims to create 1 to 50 landscape cast panels, thus providing a reference for my later rendering of the concrete panels in achieving the right scale and finishes that match real-life situations.
Cardboard forming the perimeter and openings of the concrete cast.
Cobbles and pebbles added into formwork.
Lifting inserts added into formwork.
Steel wire inserted into formwork. Extra reinforcement in corners of openings.
Concrete poured into formwork and waited for 24 hours to allow it to be set.
Cardboard formwork removed and landscape cast finish obtained.
Part II Academic Works
Casting Redcar Culture | Environmental | Institutional | Adpative Reuse
The flexible concrete panel located on the periphery of the complex is cast with silhouettes of different industrial fragments and materials, thus serving as evidence of Redcar’s industrial heritage.
Part II Academic Works
Casting Redcar
The elevated walkways penetrate these little huts and connect the indoor and outdoor. With the permeability and openness of the complex, visitors are allowed to view the different slag landscapes presented on site.
Culture | Environmental | Institutional | Adpative Reuse
Longitudinal Section of the Landscape Archive and Research Centre
Part II Academic Works
Casting Redcar Culture | Environmental | Institutional | Adpative Reuse
The complex itself becomes an exhibit of Redcar rich geological and material history with the ongoing development of phytoremediation. However Redcar changes, the memories of Redcar will be “cast” into the site and the collective memory of people from Redcar.
Part I Academic Work
The Greenwich Archipelagos
Location: Project Year:
Greenwich, London 2018-2019
Heritage Preservation| Cultural | Institutional
Exploded Axonometric of the British Centre for Architecture
The project celebrates the rich layers of the Greenwich Heritage Site and recreates a new public space for Greenwich through a contemporary intervention of the classical Queen’s House by redefining its imagery and thus evolving into a master plan for the new British Centre for Architecture. The new extension, together with the newly intervened Queen’s House forms a layer of archipelagos under Greenwich Park. These
complex layers of site intervention not only serve as a backdrop of placemaking but become powerful and poetic event-changing spaces for the creation of multiple stories and a more organic relationship between the visitors and the existing Greenwich Park and the House.
“Hills”. For many picturesque paintings of Maritime Greenwich, the hills at the southeast were always one of the viewing angles that overlooks Greenwich Park, the Queen’s House and the River. Therefore, it is important to understand the relationship between the hills and the House if the importance of the House is to be manifested as the perception of it is shaped by people viewing at different heights from the hills.
“Grotto”. As Queen Henrietta Maria was fond of flowers, a garden was initially intended to build at the Queen’s House, and Inigo Jones actually would like to have a Grotto at the Queen’s Garden, but the plan was not realised in the end. This intention of creating a cavelike vibe informs the later stage of my extension strategy in trying to recreate that sort of atmosphere of serenity and a place for contemplation.
Part I Academic Work
The Greenwich Archipelagos Heritage Preservation| Cultural | Institutional
The project did not follow the orthodox approach of doing historical preservation by mainly focusing on the building itself but tried to get a broader picture of the greater relationship between the building and the existing urban fabric and site history.
Part I Professional Works
Swire Xi’an Small Wild Goose Pagoda Mixed-used | Retail | Heritage Preservation
Location: Client: Project Year: Scale: Stage:
Xi’an, China Swire Properties 2018 - (2025) 269200 m2 0-2
Xi’an Small Wild Goose Pagoda Roofscape Masterplan
The project is situated on a UNESCO Heritage Site in Xi’an, China, featuring a pagoda located within the heart of a historical park. The project aims to transform the nearby site into an open-air retail centre which blends with the surrounding neighbourhood and at the same time frames the historical pagoda. By understanding the principles in urban design and master planning, such as promoting diversity, enhancing walkability,
and permeability, and cultivating points of interest, I contributed to the design process by utilising physical and digital modeling, simulation tools, and conducting view studies through renderings.
# Design / Research / Feasibility Study/ Digital Placemaking and Bioclimatic Simulation/ Physical and Digital Modelling/ Rendering / Presentation Bird Eye View of Xian Small Wild Goose Pagoda (Coordination with outsource renderer)
Part I Professional Works
Swire Xi’an Small Wild Goose Pagoda
I have assisted in designing the overall massing and how the eaves becomes a component for deconstructing the massing by paying close attention to the 1:1 dimensions of Chinese buildings, as well as the appropriate street width and plaza size. This was accomplished through both physical modeling. I have also assisted in formulating a control matrix of the overall masterplan in terms of the the different roofscapes, lanes, plazas, building scales, and building relationships with the pagoda.
THE PATTERN LANGUAGE
Mixed-used | Retail | Heritage Preservation
ART & CULTURE AVENUE 艺文大街
PARK CRESENT 园畔
GALLERIA 购物廊
MAIN PLAZA 主广场
INSIDE 内
18.8m
14.0m 11.5m
55.5m
11.5m
55.5m
55.5m
11.5m
11.5m
图底关系 FIGURE-GROUND
街道 LANES
尺度 SCALE
OUTSIDE 外
ANCHOR STREETS 主力店街
尺度 SCALE
55.5m
QUALITY LIVING 品质生活
天空步道 SKYWALK
Space 空间类型 SPACE TYPE 空 | Type 间类型
Zones 街区分区 ZONES |街区分区
30
32
39
36
70m 10m
36
48
74
86
74
视线走廊 VISUAL CORRIDOR
34
尺度 SCALE
广场 PLAZAS
56
21
13
20 14
4 65
12
20
40
12
12
10
14
33
20
21
13 45
10 14
10
14
33
14
32
8
12
25
8
68
16
5
10
25
8
10
32
8
42
16
8
5
12 42
13
11 26
8
11
10
15 12
10
12
40
10
4
4 55
25 10
院中风景 VIEW FROM COURTYARD
院落 COURTYARDS 顶蓬 ROOFS
Conceptual Masterplan Modelling
4
40
18
8
55
6
16
10
10
6 32
6
9
32
10
14.0m
Design Control Matrix
75
7
Part I Professional Works
LINKAGE STUDY | L2 OPTION COMPARISON
LINKAGE STUDY | L2 OPTION COMPARISON
I have also assisted in the pagoda view studies to test up different design options to ensure the design satisfy client’s requirement on GFA and the upper linkage PAGODA PROMENADE | LINKAGE VIEW STUDY OPTION 1 LINKAGE STUDY| L3 OPTION COMPARISON VERSION 2021.02 OPTION 1 LINKAGE STUDY| L3 OPTION COMPARISON VERSION 2021.02 between the urban blocks, heritage assessment requirement on the pagoda views, and also from the architectual and urban design perspective the unifying CONNECTION @L3 2021.02 CONNECTION @L2&3 OPTION 1 cascading language of the masterplan. Renderings also helps visualised how L2 L3 L2 L3 the street view of the complex frames the historical pagoda.
Swire Xi’an Small Wild Goose Pagoda
VERSION 2021.02
OPTION: L2 LOOP
VERSION 2021.02
LAYOUT PLAN | CURRENT SCHEME L2
OPTION: L2L3LOOP LAYOUT PLAN | CURRENT SCHEME
LAYOUT PLAN | CURRENT SCHEME L3 LAYOUT PLAN | CURRENT SCHEME L2
TO/FR L1
TO/FR L3
TO/FR L2
TO/FR L1
B3 - L5
TO/FR L4
TO/FR L3
TO/FR L3 TO/FR L2
B3 - L5 TO/FR CARPARK
TO/FR L1
TO/FR L4
TO/FR L3
TO/FR L4
TO/FR L1
TO/FR L2
TO/FR L1
TO/FR L1
Mixed-used | Retail | Heritage Preservation
B2-L4
B2-L4
TO/FR L3
B3-L3
L1-L4L3 TO/FR
L1-L4
B3 - L6 (BYPASS L2)
TO/FR L1
BYPASS L2
B3 - L6 (BYPASS L2)
B3-L3
B3-L3
TO/FR L3
TO/FR L1
TO/FR L2 TO/FR L4 TO/FR L3
L1-L4
TO/FR L4
B1-L5
B1-L5
TO/FR L1
B3 - L6
L2
Certificate No: CC5553
ISO 9001
GLOBAL ESCALATORS
0
15
30
60m
LOCAL LIFT PASSENGER STAIRS
The area schedule is an approximation for indicative purposes only, and is subject to further changes such as design developments, government policies and regulatory approvals. 此面积表之概算仅做示意用途,实际数值有待深 化设计和相关政府部门的批准及确认。
SKY WALK
0
15
Certificate No: CC5553
L2 30
LEGEND B3 图例 - L5
0
1560m 30
TO/FR L4
60m
TO/FR L4 The areafor schedule is an approximation for The area schedule is an approximation indicative purposes only, and is indicative subject topurposes only, and is subject to changes such as design developments, further changes such as designfurther developments, government policies and regulatory approvals. government policies and regulatory approvals. TO/FR L2 此面积表之概算仅做示意用途,实际数值有待深 此面积表之概算仅做示意用途,实际数值有待深 化设计和相关政府部门的批准及确认。 化设计和相关政府部门的批准及确认。
L2 DE
B2-L4 TO/FR CARPARK
L2
N
TO/FR CARPARK
GLOBAL LIFT
GLOBAL LIFT
OPTION 3
GLOBAL ESCALATORS
LOCAL LIFT
LOCAL LIFT
PASSENGER STAIRS
PASSENGER STAIRS
SKY WALK
SKY WALK
0
15
CK
B2-L4 TO/FR CARPARK
B1-L5
SKY WALK
B3-L3 TO/FR CARPAR
L1
TO/FR L2 TO/FR L4 SKY WALK
VANTAGE BALCONY
VANTAGE BALCONY TO/FR L2
TO/FR L2
B3-L4 B3-L4 TO/FR CARPARK TO/FR CARPARK L1-L4
L3 BRIDGE
VANTAGE BALCONY
L3 BRIDGE
VANTAGE BALCONY
B3-L4 TO/FR CARPARK
B3-L4 TO/FR CARPARK
B3-L4 TO/FR CARPARK
L3
L1-L4 TO/FR L2
L3 L2
L2 BRIDGE
L2 BRIDGE
Certificate No: CC5553
LOBBYING LOBBYING STRATEGY STRATEGY
ISO 9001
TO/FR L2 TO/FR L4 SKY WALK
L1-L4
L3
TO GALLERIA
L2 SKY WALK
VANTAGE BALCONY
B3-L4 TO/FR CARPARK
B3 - L6 TO/FR CARPARK
L1
VANTAGE BALCONY
L3 BRIDGE
B3-L4 TO/FR CARPARK
TO/FR L4 TO/FR L1
TO/FR L2
B3-L3 TO/FR CARPAR
B3 - L6 TO/FR CARPARK
TO GALLERIA
VANTAGE BALCONY
TO/FR L2
ISO 9001
B3 - L6 TO/FR CARPARK
B1-L5
TO/FR L4
L1-L4
TO/FR L2
L1-L4
Certificate No: CC5553
TO/FR L2 TO/FR L4 SKY WALK
CK
TO/FR L1
SKY WALK
VANTAGE BALCONY
TO/FR L2
B3-L4 TO/FR CARPARK
TO/FR L1
L1
VANTAGE BALCONY
L2 DE TO/FR L2
TO/FR L4
TO/FR L2
L3 BRIDGE L3 BRIDGE
VANTAGE BALCONY
B1-L5
TO/FR L4
B3-L3 TO/FR CARPAR
L2 BRIDGE
VANTAGE BALCONY
L3 BRIDGE
L2 BRIDGE
TO/FR L2 TO/FR L4 SKY WALK
L3
B1-L5
SKY WALK
SKY WALK
TO/FR L2
B2-L4 TO/FR CARPARK
L2 TO GALLERIA
L2
TO GALLERIA
L2
VANTAGE BALCONY
B3 - L5 TO/FR CARPARK
TO/FR L4
TO/FR L4
L1-L4 B3-L3 TO/FR CARPAR
B3 - L6 TO/FR CARPARK
TO/FR L2
TO/FR L4
CK
TO/FR L2
L1-L4
L1
ISO 9001
L2 DE TO/FR L2 TO/FR L4
TO/FR L1
TO/FR L2
L1-L4
PASSENGER STAIRS
TO/FR L2
CK L2 DE B2-L4 TO/FR CARPARK
TO/FR L2
TO/FR L4 TO/FR L4
TO/FR L4 LOCAL LIFT
TO/FR L4
PROPOSED ESCALATOR LOBBY
3
L3
GLOBAL ESCALATORS TO/FR L4
60m
OPTION 3
B3 - L5 TO/FR CARPARK
GLOBAL LIFT
3
30
B3-L4 TO/FR CARPARK L1-L4
TO/FR L2
TO/FR L1
L2
TO/FR L2
TO/FR CARPARK
TO/FR L4 The area schedule is an approximation for indicative purposes only, and is subject to further changes such as design developments, government policies and regulatory approvals. TO/FR L2 此面积表之概算仅做示意用途,实际数值有待深 化设计和相关政府部门的批准及确认。
TO/FR L2
TO/FR L2
PROPOSED ESCALATOR LOBBY
TO/FR L3
LEGEND B3 图例 - L5
L2 L3
GLOBAL ESCALATORS
B3-L4 TO/FR CARPARK
B3-L4 TO/FR CARPARK
Connection L2 and L3 Deck
TO/FR L1
OPTION 2
TO/FR L2
LEGEND 图例
N
N
VANTAGE BALCONY TO/FR L2
B3-L4 TO/FR CARPARK
B3-L4
L1-L4
TO/FRTO/FR L2 L3
TO/FR L1
TO/FR L3
VANTAGE BALCONY
L2 BRIDGE
ISO 9001
GLOBAL LIFT
TO/FR L2 TO/FR L4 SKY WALK
VANTAGE BALCONY
L3 BRIDGE
TO/FR L3 TO/FR L1 TO/FR L1
TO/FR L3
TO/FR L1
TO GALLERIA
L2
VANTAGE BALCONY
TO/FR L2
L1-L4 TO/FR L2
B3 - L6 TO/FR CARPARK
SKY WALK
B3-L4 L1-L4 TO/FR CARPARK
B3-L4
L1-L4
OPTION 2 LEGEND 图例
N
B3-L4 TO/FR CARPARK
B3-L4 TO/FR CARPARK
B3-L4
B3-L3 TO/FR CARPAR
L1
VANTAGE BALCONY
TO/FR L2
L1-L4
TO/FR L1
TO/FR L2
L1-L4 B3 - L6 TO/FR CARPARK
SKY WALK
TO/FR L2 TO/FR L4 SKY WALK TO/FR L3 SKY WALK
B3-L4
TO/FR L4
B1-L5
TO/FR L4
TO/FR L1
BYPASS L2
B3 - L6 (BYPASS L2) TO/FR CARPARK
B3 - L6
CK
TO/FR L2
TO/FR L4
TO/FR L1
TO GALLERIA
B3-L3 TO/FR CARPAR
TO/FR L4 VANTAGE BALCONY
TO/FR L2
TO/FR L2 TO/FR L3
TO/FR L1
B3-L3 TO/FR CARPAR
L2 BRIDGE
Connection L3 Deck
TO/FR L3
B1-L5
TO/FR L2
L3 BRIDGE
TO/FR L3 TO/FR L1
TO/FRB1-L5 L4
TO/FR L1 TO/FR L4
SKY WALK TO/FR L1
TO/FR L3 SKY WALK
L2 DE
B2-L4 TO/FR CARPARK
TO/FR L4
B3-L3
L1
L1-L4 B3-L4
B3-L4
CK
TO/FR L2 L1-L4 TO/FR L3
L1-L4
TO/FR L2
B3-L4 TO/FR CARPARK B3-L4
L2 DE
TO/FR L2
B1-L5
TO/FR L4
Pagoda Promenade Linkage View Study L1-L4
CK
TO/FR L3
BYPASS L2
B3 - L6 (BYPASS L2) L1-L4 TO/FR CARPARK
SKY WALK TO/FR L1
TO/FR L2
B3-L4
TO/FR L4
TO/FR L2
DE
B2-L4 L2 TO/FR CARPARK TO/FR L3
B3-L3 TO/FR CARPAR
TO/FR L3
TO/FR L4
TO/FR L4
TO/FR L1
B2-L4 B2-L4 TO/FR CARPARK TO/FR
B1-L5
BYPASS L2
TO/FR L1
B3 - L5 TO/FR CARPARK
B3 - L5 TO/FR CARPARK
TO/FR L2
CK
TO/FR L3
TO/FR L3
B1-L5
L1-L4
TO/FR L1
TO/FR L2
DE
TO/FR CARPARK TO/FR L3 TO/FR L2
TO/FR L3
B3 - L5 TO/FR CARPARK
TO/FR L4
TO/FR L1
TO/FR L1
B2-L4
TO/FR L3
TO/FR L3
TO/FR L1
B3 - L5
TO/FR L4
B2-L4
TO/FR L2
TO/FR L2
TO/FR L1
B3 - L5
B3 - L5
4
L3
Certificate No: CC5553
14
Heritage Conservation Lobbying Strategies 50m-wide Visual Corridor Height Control
Lobbying Strategy
50m-wide 50m-wide Visual Visual Corridor Corridor Height Height Control Control 24m24m 36m36m height height height height control control control control zonezone zonezone
4
Lobbying Lobbying Strategy Strategy
36m36m
36m36m 50m50m 50m50m
33m33m
30m30m 24m24m
21m21m
12m12m
12m12m
12~15m 12~15m
15m15m
36m36m Height Height Control Control ZoneZone
36m36m Height Height Control Control ZoneZone
24m24m
24m24m 50m50m
50m50m
12m12m
12m12m
12m12m
12m12m
24m24m Height Height Control Control ZoneZone
Placemaking Views (Rendeering)
24m24m Height Height Control Control ZoneZone Section Section 2019.12.04 2019.12.04 | Pages 15 | Pages of 16 15 of 16
Section Section 2019.12.04 2019.12.04 | Pages 15 | Pages of 16 15 of 16
Section Section 2019.12.04 2019.12.04 | Pages 15 | Pages of 16 15 of 16
Section Section 2019.12.04 2019.12.04 | Pages 15 | Pages of 16 15 of 16
ISO 9001ISO 9001 Certificate Certificate No: CC5553 No: CC5553
ISO 9001ISO 9001 Certifica
ISO 9001ISO 9001 Certifica
25
11 M
Part I Professional Works
12 M
11 M
M
22M
TRIPLE HEIGHT
1
I have also assisted in designing the shopfront expression of various types of shops in different areas of the masterplan with quick view studies and renderings to test out the image of shops and urban atmoshphere of the project from eye-level.
Swire Xi’an Small Wild Goose Pagoda Mixed-used | Retail | Heritage Preservation
ENTRANCE PLAZA FACADE DEVELOPMENT | VISIBILITY STUDY ENTRANCE PLAZA FACADE DEVELOPMENT | VISIBILITY STUDY
Entrance Plaza Facade Development Visibility Study Chamfered Block
DOUBLE HEIGHT ANCHOR
16M
PREVIOUS OPTION: CHAMFERED BLOCK
PREVIOUS OPTION: CHAMFERED BLOCK
25
13
M
19M
12 M
11 M
22M
M
TRIPLE HEIGHT
TRIPLE HEIGHT
11 M
18M
M
12 M
M
28
25
11 M
22M
11M
16M
AREA: + 64 M2
DOUBLE HEIGHT
AREA: - 64 M2
19M 17M
17M
ENTRANCE PLAZA FACADE DEVELOPMENT | VISIBILITY STUDY
PREVIOUS OPTION: CHAMFERED BLOCK
DOUBLE HEIGHT ANCHOR AREA: + 64 M2
16M
Double Height Anchor
TRIPLE HEIGHT
11 M
18M
M
12 M
M
11M
28
25
22M
13
DOUBLE HEIGHT
AREA: - 64 M2
M
19M 17M
19M
2
17M 2
Placemaking Views (Rendeering)
10M
2
2
10M
2
10M
2
2
10M
2
VISUAL AXIS & RICHNESS ANALYSIS Central Plaza
Part I Professional Works
- High quality and high flow of visitors in Central Plaza to bring customers to the anchor stores - Potential public space for hosting events to increas vitality of the Central Plaza and the retail facing it
Swire Xi’an Small Wild SIDE SIDE SIDE BYBY SIDE BY SIDE SIDE SIMULATION SIMULATION SIMULATION COMPARISON COMPARISON COMPARISON Goose Pagoda VISUAL AXIS & RICHNESS ANALYSIS
Connectivity Connectivity Connectivity Pedestrian Pedestrian Pedestrian Movement Movement Movement SPATIAL SPATIAL SPATIAL NETWORK NETWORK NETWORK ANALYSIS ANALYSIS ANALYSIS Mixed-used | Retail | F&B/ Heritage Preservation Image Sote and View to Pagoda TIVITY ECTIVITY CTIVITY 400M 400M 400M
OVAL OVAL OVAL
Frontage Frontage Frontage Visibility Visibility Visibility Visual Richness
3
In this project, I have assisted in the placemaking evaluation by utilising tools such as depth maps to gain insights for further improvement of our team’s planning strategy and urban design, including considerations such as visual field, visual steps, and axial connectivity.
CFD CFD CFD Analysis Analysis Analysis Visual Field
4
Visual Steps
5
Findings Findings Findings 3
2
Pagoda Axial Connectivity (Pagoda)
Visual Visual Visual Richness Richness Richness
The The The Oval Oval Oval museum museum museum layout layout layout hashas has a series a aseries series of of highly ofhighly highly connected connected connected spaces spaces spaces that that that integrate integrate integrate 4 with with with thethe surrounding thesurrounding surrounding land land land uses, uses, uses, creating creating creating a aa continuation continuation continuation of of the ofthe fine thefine fine 1 urban urban urban grain grain grain into into into thethe the southern southern southern section section section of of the ofthe the 5 masterplan masterplan masterplan area. area. area.
Frontage Visibility
A
Visual Field
Visual Visual Visual Step Step Step
连接度* 连接度* 连接度* (400米, (400米, (400米, ~5分钟步行距离) ~5分钟步行距离) ~5分钟步行距离) Proposed Proposed Proposed connectivity connectivity connectivity (400m, (400m, (400m, ~5 ~5~5 MinsMins walk) Mins walk) walk)
A
Axial Connectivity
Axial (Central Plaza) (A) RichConnectivity Visual Experience in Central Plaza
Visual Visual Visual Field Field Field
A
ISO 9001
Insolation Insolation Insolation Analysis Analysis Analysis
(A) High Visual Field in Central Plaza
(A) High Visual Steps in Central Plaza
Certificate No: CC5553
Visual Steps
在400米步行距离内的经过的 在400米步行距离内的经过的 在400米步行距离内的经过的 SIDE SIDEBY BYSIDE SIDESIMULATION SIMULATIONCOMPARISON COMPARISON 店面长度(以米计算) 店面长度(以米计算) 店面长度(以米计算) Metres Metres Metres of frontage of frontage of frontage within within 400m within 400m 400m walking walking walking catchment: catchment: catchment:
Pedestrian Movement Potential (400m)
- Pagoda as a Backdrop for Image Store Less Less than Less than 2,500 than 2,500 2,500 - Visual Richness along the routes to Pagoda 2,500 2,500 to 2,500 5,000 to to 5,000 5,000 5,000 5,000 50 5,000 7,500 5050 7,500 7,500 - Continuous reframing of Pagoda along the routes 7,500 7,500 to 7,500 10,000 to to 10,000 10,000
10,000 10,000 10,000 toMOVEMENT 12,500 to to 12,500 12,500 PEDESTRIAN POTENTIAL PEDESTRIAN MOVEMENT POTENTIAL(400M): (400M): 12,500 12,500 12,500 to 15,000 to to 15,000 15,000 2 EXTERNAL PEDESTRIAN FLOW (400M): PEDESTRIAN FLOWEXPOSURE EXPOSURE (400M): 15,000 15,000 15,000 to 17,500 to to 17,500 17,500 MP12 OPTIMISED SCENARIO, TKL TKL MP12 EXTERNAL OPTIMISED SCENARIO, TKLCHENGDU, CHENGDU, TKLSANLITUN SANLITUN ERNAL OPTIMISED SCENARIO Greater Greater Greater than than 17,500 than 17,500 17,500 TERNAL OPTIMISED SCENARIO
1
XI’ AN XI’ ANEXTERNAL EXTERNALLINKS LINKSSCENARIO, SCENARIO,TKL TKLCHENGDU, CHENGDU,TKL TKLSANLITUN SANLITUN
空间数量(连接点数量);连接点越多,该区的连接度值就越高。 间数量(连接点数量);连接点越多,该区的连接度值就越高。 量(连接点数量);连接点越多,该区的连接度值就越高。 onnecting ly tely connecting connecting a space a space a space of origin ofof origin origin (pedestrian (pedestrian (pedestrian connections) connections) connections) within within within a catchment. a catchment. a catchment. TheThe more The more more ectivity tivity y
Connectivity Connectivity
Axial Connectivity
XI’ AN XI’ ANSMALL SMALLWILD WILDGOOSE GOOSE PAGODA PAGODAMASTERPLAN MASTERPLAN XI’AN SMALL WILD GOOSE PAGODA TAIKOO LI CHENGDU EXTERNAL LINKS SCENARIO Pedestrian Movement Visibility XI’AN XI’AN SMALL SMALL WILD WILD GOOSE GOOSE PAGODA PAGODA TAIKOO TAIKOO LIFrontage LI CHENGDU CHENGDU EXTERNAL LINKS SCENARIO Pedestrian Movement Frontage Visibility MP12 EXTERNAL SCENARIO MP12 MP12 EXTERNAL EXTERNAL OPTIMISED OPTIMISED SCENARIO SCENARIO Visual Field OPTIMISED
TAIKOO TAIKOOLILICHENGDU CHENGDU
Environmental EnvironmentalCFD CFDAnalysis Analysis
TAIKOO LI SANLITUN TAIKOO TAIKOO LI LI SANLITUN SANLITUN
Visual Steps
TAIKOO TAIKOOLILI SANLITUN SANLITUN
Pedestrian movement potential Pedestrian Pedestrian movement movement potential potential is defined by overlaying the is is defined defined byby overlaying overlaying the the pedestrian routes for all possible pedestrian pedestrian routes routes for for allall possible possible pedestrian connections within a pedestrian pedestrian connections connections within within aa catchment. catchment. catchment. People naturally chose their People People naturally naturally chose chose their their routes based on the shortest routes routes based based onon the the shortest shortest and most direct route. and and most most direct direct route. route.
ISO 9001 ISOISO 9001 9001 Certificate Certificate Certificate No: CC5553 No: No: CC5553 CC5553
Zhuque St. Park
Xi’an Museum ORANGE Park Crescent
Jianfu Temple Pagoda Park
人行流量潜力是步行距离内所有行 人行流量潜力是步行距离内所有行 人行流量潜力是步行距离内所有行 人连接中会重复的路线。人们自然 人连接中会重复的路线。人们自然 人连接中会重复的路线。人们自然 会选择最短和最直接的路线路线。 会选择最短和最直接的路线路线。 会选择最短和最直接的路线路线。 ISO 9001
Connectivity (400m)
Hotel Courtyard
Sky Walk
Sky Museum
Central Plaza Silk Road Bontanics
The Xi’an Museum Extension
MTR Plaza
Yizi Heritage Street & Agora Plaza
The 8th Heritage Street
Certificate No: CC5553
Zhongmao Plaza
L3 Corridor
Urban Boulevard
Xi’an Hotel Shanxi Stadium
Pedestrian movement potential Pedestrian Pedestrian movement movement potential potential (400m) (400m) (400m)
Bookstore
人行流量潜力(400m) 人行流量潜力(400m) 人行流量潜力(400m)
The 7th Heritage Street & Sunken Plaza
More strategic route More More strategic strategic route route
More More strategic strategic routes routes More strategic routes
Immersive Theatre
Pedestrian Movement Potential (400m) FrontageVisbility Meters Meters Metersof ofoffrontage frontage frontagewithin within within400m 400m 400m walking walking walkingcatchment catchment catchment Pedestrian flow exposure (400 m) -- a Pedestrian Pedestrian flow flow exposure exposure (400 (400 m)m) a- measure measure a measure of visual exposure of frontage depending on ofof visual visual exposure exposure ofof frontage frontage depending depending onon 在400米步行距离内的经过的店面长 在400米步行距离内的经过的店面长 在400米步行距离内的经过的店面长 its position in relation to potential pedestrian itsits position position inin relation relation toto potential potential pedestrian pedestrian 度(以米计算) movement within a m range from the 度(以米计算) 度(以米计算) movement movement within within a 400 400 a 400 mm range range from from the the frontage frontage frontage
ISO 9001 Certificate No: CC5553 ISOISO 9001 9001 Certificate Certificate No: No: CC5553 CC5553
Less Less Lessthan than than2,500 2,500 2,500 2,500-5,000 2,500-5,000 2,500-5,000 5,000-7,500 5,000-7,500 5,000-7,500 7,500 7,500 7,500to toto10,000 10,000 10,000
ISO 9001 Certificate No: CC5553 ISOISO 9001 9001 Certificate Certificate No: No: CC5553 CC5553
Pedestrian Pedestrian Route Route Hierarchy Hierarchy (Metres) (Metres) within 800m 800m walking walking catchment catchment Pedestrian Route Hierarchy (Metres)within within 800m walking catchment Less Less strategic strategic routes routes Less strategic routes
Connectivity (400m)
Less strategic route Less Less strategic strategic route route
Pedestrian movement potential Pedestrian Pedestrian movement movement potential potential (400m) (400m) (400m)
More strategic route More More strategic strategic route route
High exposure High High exposure exposure
人行流量潜力(400m) 人行流量潜力(400m) 人行流量潜力(400m)
Less strategic route Less Less strategic strategic route route
Low exposure Low Low exposure exposure
Marketplace
Axonometric View of DIgital Placemaking Strategy
BIOCLIMATIC STRATEGY SUMMARY
1. AIR QUALITY MANAGEMENT 1. AIR QUALITY MANAGEMENT 3. VENTILATION GREENERY CLEANER SEASONS AIR 1.FLEXIBLE INTERVENTIONS FORFOR DISTINCT GREENERY FOR CLEANER AIR ROOFTOP GARDEN 1.FLEXIBLE INTERVENTIONS FOR DISTINCT SEASONS
OCLIMATE RECOMMENDATION
2.PASSIVE STRATEGIES Cascading rooftop garden drawing in breeze To reduce physical and psychological effects of air pollution at Chang An North Road. BIOCLIMATE RECOMMENDATION OCLIMATIC STRATEGY SUMMARY OPEN STREETS 2.PASSIVE STRATEGIES 2. SHADING 2.PASSIVE STRATEGIES BIOCLIMATIC STRATEGY SUMMARY 3. LANDSCAPING FLEXIBLE SHADING
FLOW EXPOSURE (400M): HENGDU, TKL SANLITUN
3. LANDSCAPING
To reduce physical and psychological effects of air pollution at Chang An North
2.VENTILATION WIND BREAK
3. LANDSCAPING
4. ADAPTIVE COMFORT
1.FLEXIBLE INTERVENTIONS FOR DISTINCT SEASONS 4. ADAPTIVE COMFORT green urban environment within the complex. I conducted simulations Xi’an Small Wild NAL LINKSSwire SCENARIO, TKL CHENGDU, TKL SANLITUN of prevailing winds and daily average insolation to assess the thermal SUMMER STRATEGIES Goose Pagoda LEXIBLE INTERVENTIONS FOR DISTINCT SEASONS comfort provided in different areas of the urban spaces. These findings To reduce physical andSUMMER psychological effects ofSTRATEGIES air pollution at Chang An North Road. 2.PASSIVE STRATEGIES 1.FLEXIBLE INTERVENTIONS FOR DISTINCT rooftop garden drawing in breeze influenced design and the overall planning strategy. To reduce physical and psychological effects of air pollution at Chang Anthe North Road. of urban blocksCascading OMMENDATION SUMMER STRATEGIES GOOSE TAIKOO LI CHENGDU TAIKOO LI SEASONS Part I Professional Works
4. ADAPTIVE COMFORT Bioclimatic considerations are also crucial in developing a sustainable and
1. AIR QUALITY MANAGEMENT Open streets with unobstructed wind flow 3. SHADING VENTILATION 2. Y SUMMARY LAN SANLITUN 2. SHADING Summer Strategies ASSIVE STRATEGIES 1. AIR QUALITY MANAGEMENT ROOFTOP GARDEN GREENERY FOR CLEANER AIR FLEXIBLE SHADING 2.PASSIVE STRATEGIES 3. LANDSCAPING 1. AIR QUALITY MANAGEMENT 3. VENTILATION FLEXIBLE SHADING GREENERY FOR CLEANER AIR Shading Air Quality Management CENARIO TAIKOO LI SANLITUN 4. EVAPORATIVE COOLING Potentialresponding wind channel diverting breeze to galleria Pedestrian axis aligned to wind direction Flexible awnings seasonal solar levels. BIOCLIMATE SIMULATION GREENERY CLEANER AIR ROOFTOP GARDEN and mainFOR plaza to naturally ventillate urban blocks in draws wind deeper into the main spine CDF Analysis (Prevailing Wind Simulaation) Prevailing wind simulation GREENsummer SHADING ANDSCAPING Pedestrian movement potential BIOCLIMATE SIMULATION Mixed-used | Retail | Heritage Preservation Prevailing wind simulation
sibility
Environmental CFD Analysis
BIOCLIMATE RECOMMENDATION
3. LANDSCAPING is defined by overlaying the
4. ADAPTIVE COMFORT
Potential wind channel diverting breeze to galleria
ADAPTIVE COMFORT
4. ADAPTIVE COMFORT
IONS FOR DISTINCT SEASONS
SUMMER STRATEGIES
OPEN STREETS
Cascading roof
W
OPEN STR 1. AIR QU GREENE
3. VENTILATION 1. AIR QUALITY MANAGEMENT ROOFTOP GARDEN Elevated canopy can be added on upper floors as a wind break. GREENERY FOR CLEANER AIR
Potential mixing of wind
SUMMER STRATEGIES Potential mixing of wind
SUMMER STRATEGIES
WINTER STRATEGIESWINTER STRATEGIES Open streets w
Open streets with unobstructed wind flow 人行流量潜力是步行距离内所有行 1. AIR QUALITY MANAGEMENT 3. VENTILATION 1. AIR QUALITY MANAGEMENT 人连接中会重复的路线。人们自然 GREENERY FOR CLEANER AIR ROOFTOP GARDEN 1. AIR QUALITY MANAGEMENT 3. VENTILATION 3. VENTILATION GREENERY FOR CLEANER AIR 1.Cascading AIR QUALITY MANAGEMENT QUALITY MANAGEMENT 3. HEATING 3.Trees HEATING 4. EVAPOR Cascading rooftop garden drawing in breeze garden drawing in solar breeze Street furniture can also act as to wind barriers 会选择最短和最直接的路线路线。 Greenery for Cleaner AirRoad. along the maineffects road. of air Flexible awnings responding seasonal solar levels.levels. provide shading adaptive the seasons. To physical and psychological pollution atrooftop Chang An North Road. To reduce physical and psychological effects 1. of AIR air pollution atreduce Chang An North Flexible awnings responding seasonal 4. EVAPORATIVE COOLING To reduce ph Water feature such as water fountain misting Flexible awnings responding seasonaland solar levels. provide shading adaptive to the seasons NE Prevailing wind , GREENERY FOR CLEANER AIR ROOFTOP GARDEN SOLAR HEATIN OPEN STREETS GREENERY FOR CLEANER AIR NE Prevailing wind , Trees ROOFTOP GARDEN SOLAR HEATING GREENERY FORgarden CLEANER AIR OPEN STREETS Cascading rooftop drawing in breeze Ventilation Evaporative Cooling GREEN SHADING To reduce physical and psychological effects of air pollution at Chang An North Road. To reduce physical and psychological effects of air pollution at Chang An North 20km/h 20km/h SHADING GREEN2. SHADING 2. SHADING
1.FLEXIBLE INTERVENTIONS FOR DISTINCT SEASONS
AIR QUALITY MANAGEMENT REENERY FOR CLEANER AIR
2. SHADING FLEXIBLE SHADING
L CHENGDU, TKL SANLITUN
T
BIOCLIMATIC STRATEGY SUMMARY
Pedestrian axis aligned to wind direction draws wind deeper into the main spine
and main plaza to naturally ventillate urban blocks in pedestrian routes for all possible summer pedestrian connections within a catchment. People naturally chose their routes based on the shortest and most direct route.
3. VENTILA ROOFTOP G
BIOCLIMATE SIMULATION
Sky gardens and cascade of skywalk provides good wind penetration Sky gardens and cascade of
Daily Average Insolation人行流量潜力(400m)
DU TAIKOO LI BIOCLIMATE SIMULATION SANLITUN SEASONS Daily Average Insolation 3. VENTILATION BIOCLIMATE SIMULATION
SUMMER STRATEGIES
2.VENTILATION WIND BREAK
3. LANDSCAPING
Pedestrian movement potential (400m)
BIOCLIMATE SIMULATION Daily Average Insolation
OPEN STREETS 2.PASSIVE STRATEGIES FLEXIBLE SHADING
FLEXIBLE SHADING
2.VENTI WIND BR
4. ADAPTIVE COMFORT
WINTER STRATEGIES
wind Water features at the main plaza could Intersection of skywalk galleriaprovides couldgood be shaded More strategic route Water features at the penetration main plazaincould lower ground heat in Summer Intersection of galleria could be shaded with temporary shading Summer
lower ground heat in Summer
with temporary shading in Summer
SUMMER STRATEGIES
More strategic routes
3. HEATING Breaking down of massing on the West side of the 1. AIR QUALITY MANAGEMENT Open streets with unobstructed wind flow side allows SW wind to penetrate deep into the site Water feature s Cascading rooftop garden drawing in breeze SW Prevailing windof air pollution at Chang Trees provide shading adaptive to the To reduce physical and psychological effects An North Road. Daily Average Insolation Cascading rooftop garden drawing in breeze. Open streets with unobstructed wind flow.seasons Water feature such asNorth water fountain and misting. Cascading rooftop garden drawing in breeze Open streets with unobstructed wind flow To reduce physical and psychological effects of air pollution at Chang An Road. Water feature such as water fountain and misting Solar heating of expos SOLAR HEATING GREENERY FOR CLEANER AIR To reduce physical and psychological effects of air pollution at Chang An North Road. Trees provide shading adaptive to the seasons ISOrooftop 9001 garden Certificate CC5553 , 20km/hCascading drawingNo: in breeze To reduce and psychological effects of air p Openphysical streets with unobstructedeffects wind flow OPEN STREETS Solar heating of exposed groundphysical and greenhouses To reduce and psychological of air pollution at Chang An North Road. OPEN STREETS RADIANT HEAT EVAPORATIVE COOLING 2. SHADING Breaking down of massing the West sidecould of the OPEN STREETS 1.Flexible AIR QUALITY MANAGEMENT 3.4.VENTILATION Winter Strategies awnings responding seasonal solar levels. Water features at theonmain plaza ofmain galleria WaterIntersection features at the plazacould couldbe shaded Intersection of galleria could be shaded Pedestrian potential 2. SHADING side allows SW wind to penetrate deep into the site RADIANT HEATING 2.VENTILATION Insolationmovement Analysis (Daily Average Insolation) SW Prevailing wind 4. EVAPORATIVE COOLING lower ground heat in Summer FLEXIBLE SHADING temporary shading in Summer Flexible awnings responding seasonal solarwith levels. Elevated can GREENERY FOR CLEANER AIR Ventilation GREEN ROOFTOP GARDEN Air Quality Management lower with ground heat in Summer temporary shading in SHADING Summer 4. EVAPORATIVE COOLING is defined by overlaying the 2.VENTILATION Flexible awnings responding seasonal solar levels. Elevated canopy can2.VENTILATION be added on upper floors as a wind break. , 20km/h WIND BREAK Less strategic route
ROOFTOP GARDEN ironmental CFD Analysis educe physical and psychological effects of air pollution at Chang An North Road.
LITUN
ISO 9001
SHADING EXIBLE SHADINGpedestrian routes for all possible
FLEXIBLE SHADING
Pedestrian Route Hierarchy (Metres) within 800m walking catchment Less strategic routes
0 m) - a measure depending on ntial pedestrian ge from the
Certificate No: CC5553
ISO 9001
pedestrianmovement connections within a Pedestrian potential catchment. (400m) People naturally chose their routes based on the shortest 人行流量潜力(400m) and most direct route.
Certificate No: CC5553
More strategic route
人行流量潜力是步行距离内所有行
SUMMER 人连接中会重复的路线。人们自然 Areas vulnerable ER STRATEGIES Less strategic route Cascading rooftop garden drawing breeze tointhe heat季
SUMMER
会选择最短和最直接的路线路线。 air pollution at Chang An North Road.
3. VENTILATION ROOFTOP GARDEN
OPEN STREETS
Areas vulnerable
the heat季 Highly shadedtoareas could cool the breeze before it reaches the plaza Low exposure
Open streets with unobstructed wind flow
WIND BREAK
WIND BREAK
Highly shaded areas could cool the breeze before it reaches the plaza
WINTER STRATEGIES
Open streets with unobstructed wind flow
of exposed No: ground and greenhouses ISOSolar 9001heatingCertificate CC5553 To reduce physical and psychological effects of air pollution at Chang An North Road. Trees provideNo: shading adaptive to the seasons ISO 9001 Certificate CC5553
Water feature such as water fountain and misting
4. EVAPORATIVE COOLING RADIANT HEATING Flexible awnings responding seasonal solar levels. 1. AIR QUALITY MANAGEMENT 3.reduce HEATING canopy be on floors as a wind break. Cascading rooftop garden drawing in breeze Street furniture can also act as to wind barriers Greenery for Cleanerand Airpsychological along the maineffects road. of airElevated Canopy added oncan upper floors aupper wind break. Trees provide shading adaptive the seasons. To physical pollution at Chang Anadded Northas Road. Water feature such as water fountain and misting 2.VENTILATION Water feature such as water fountain and misting Trees provide shading adaptive to the seasons Trees provide shading adaptive to the seasons GREEN SHADING OPEN STREETS SOLAR HEATING GREENERY FOR CLEANER AIR Assisted heating in alfresco zones Radiant Heating 4. EVAPORATIVE COOLING Areas vulnerable Elevated canopy be added on upper floors as a wind break. Highly shaded areas could cool the WIND BREAK 2.can SHADING
xible awnings responding seasonal solar levels.
REEN SHADING
GREEN SHADING
GREEN SHADING High exposure
SUMMER
Pedestrian movement potential (400m)
Open streets with unobstructed wind flow
toseasonal the heat季 solar levels. breeze before it reaches the plaza SUMMERAreas vulnerable Flexible awnings responding Highly shaded areas could cool the
to the heat季
4. EVAPORATIVE COOLING FLEXIBLE SHADING
GREEN SHADING breeze before it reaches the plaza
Assisted heating in alf
Street furnitu
Elevated canopy can be added on upper floors as a w
人行流量潜力(400m)
62
More strategic route
More strategic routes
Open streets with unobstructed wind flow Trees provide shading adaptive to the seasons
Open space of main plaza enables high Galleria setback can reduce excessive Street furniture can also act as wind barriers ISO 9001 Certificate No: CC5553 Water feature with such the as water fountain and misting solar exposure, ground heating self shading of ground up the area heatingininalfresco alfresco zones Solar heating of exposed ground and greenhouses. Assisted Assisted heating zones. Street furniture Elevated canopy can be added on upper floors as a wind break.can also act as wind barriers
Cascading rooftop garden drawing in breeze 4. EVAPORATIVE COOLING Areas vulnerable ISO 9001 Certificate CC5553 els. Open spaceNo: of main plaza enables Galleria setback canRoad. reduce excessive To reduce physical and psychological effects ofhigh air pollution at Chang An North Water feature such as water fountain ISO 9001 Certificate No: CC5553 es provide shading adaptive to the seasons toand themisting cold OPEN STREETS
WINTER
Less strategic route
Pedestrian Route Hierarch Less strategic routes
WINTER
More strategic route ISO 9001
Certificate No: CC5553
ISO 9001
High exposure
to the cold
WINTER ISO 9001
solar exposure, with the ground heating up the area
2.VENTILATION Trees provide shading adaptive to the seasons Areas vulnerable
Certificate No: CC5553
Certificate No: CC5553
WIND BREAK
Areas vulnerable
self shading of ground
Open space of main plaza enables high solar exposure, with the ground heating up the area
Open spaceto ofthe main coldplaza enables high solar exposure, with the ground heating up the area
Solar heating of exposed ground and greenhouses
Flexible awnings responding seasonal solar levels. RADIANT HEATING
Water featureSHADING such as water fountain and misting GREEN Galleria setback can reduce excessive self shading of ground
Galleria setback can reduce excessive self shading of ground
Concentrated indoo
Open streets with unobstructed wind flow Concentrated indoor heating Concentrated indoor heating.
4. EVAPORATIVE COOLING
Street furniture can also act as wind barriers
Part I Professional Works
Jingzhou, China Qujiang Cultural Industry Investment (Group) Co. Ltd. Project Year: 2018 64200 m2 Scale: Stage: 0-2 Location: Client:
Jingzhou Riverside Water Garden Retail | Hospitality | Residential
瘴云梅雨不成泥, 十里津楼压大堤。 - 【唐】王建 《江陵即事》
云连蜀道三千里,柳拂江堤十万家。
THE WESTERN PIER
- 【明】 袁宏道 《古荆篇》
CRAFTSMANSHIP VICTORY STREET BANK & CANAL
LOCAL CUISINE WATER CULTURE
巴国山川尽,荆门烟雾开。 城分苍野外,树断白云隈。
CHU OPERA
沙津为三楚名镇 , 通南北诸省, 贾客扬帆而来者,多至数千艘 , 向晚蓬灯远映,照耀常若白昼。
CHU FLORAL ART
- 【唐】陈子昂 《度荆门望楚》
鱼鳞屋兮龙堂,紫贝阙兮珠宫。 灵何为兮水中,乘白鼋兮逐文鱼。
- 【清】 《江陵县志》
- 【战国】 屈原 《九歌·河伯》
明末极盛、列巷九十九条, 每行占一巷,舟车辐辏、繁盛甲宇内。
秋兰兮麋芜,罗生兮堂下。 绿叶兮素华,芳菲菲兮袭予。
- 【清】 刘献廷《广阳杂记》
- 【战国】 屈原《九歌·少司命》
THE RIVERSIDE WATER GARDEN
THE THREE LANES
EXPERIENCE
THE CULTURAL LANE
READING PLACE
READING
Meandering Street
THE NATURAL LANE
THE LIVING LANE
RELAXING
SHOPPING
TASTING
JOGGING
The Riverfront
The Island
PATTERN LANGUAGE
Garden
LEARNING
WALKING BUSINESS POSITIONING
CELEBRATING
The Lakefront
The Bar Street
The Pier Agora
ARCHITECTURAL LANGUAGE
BOOKSTORE
WATER SHOW
RIVERSIDE BOULEVARD
CULTURAL RETAIL
CULTURAL PERFORMANCE
RIVERSIDE BAR
CREATIVE WORKSHOP
FOOD & BERVERAGE MARKETPLACE
Jinzhou Riverside Water Garden Design Matrix
This project is a resort/tourist-oriented project located in Jingzhou, China. Its aim is to connect the local culture with the site’s rich water history. This particular project significantly influenced my design methodology. It involved gathering various historical fragments of the location and establishing contemporary relationships with the business positioning and architectural languages in different zones of the project. I have assisted from site and
narrative research, develop building typologies, through digital modelling. I was also responsible for communicating with strategic planning, landscape design and rendering consultants which sharpen my communication skills and foster collaborative problem-solving abilities.
# Design / Research / Feasibility Study / Physical and Digital Modelling/ Rendering / Presentation / Site Visit Bird Eye View of Jinzhou RIverside Water Garden (Coordination with outsource renderer)
Part I Professional Works
概念模型 -空间体验 空间体验 概念模型 --空间体验 概念模型 Jingzhou Riverside
I assisted in testing the overall master planning strategy and the size of the urban blocks through the making of physical models.
Water Garden
概念模型-- -空间体验 空间体验 概念模型 空间体验 概念模型
I assisted in the deisgn of the different typologies of the urban blocks with regard to the overall master planning strategy and requirements of different tenants.
Retail | Hospitality | Residential
1. 由北区停车场下车, 向南区出发。 1. 1. 由北区停车场下车, 向南区出发。 由北区停车场下车, 向南区出发。
2. 穿越中央大街, 体验文创生活。 2.2. 穿越中央大街, 体验文创生活。 穿越中央大街, 体验文创生活。
3. 大桥连接对岸。 3.3. 大桥连接对岸。 大桥连接对岸。
5. 由南区出发, 欣赏娱乐庆典。 5.5. 由南区出发, 欣赏娱乐庆典。 由南区出发, 欣赏娱乐庆典。
1. 由北区停车场下车, 向南区出发。 1.1.由北区停车场下车, 向南区出发。 由北区停车场下车, 向南区出发。
2. 穿越中央大街, 体验文创生活。 2.2.穿越中央大街, 体验文创生活。 穿越中央大街, 体验文创生活。
3. 大桥连接对岸。 3.3. 大桥连接对岸。 大桥连接对岸。
5.由南区出发, 由南区出发, 欣赏娱乐庆典。 5. 5. 由南区出发, 欣赏娱乐庆典。 欣赏娱乐庆典。
Roofscape Masterplan of Jinzhou Riverside Water Garden
模型
文创生活。
3. 大桥连接对岸。
5. 由南区出发,欣赏娱乐庆典。
5.5. 体验传艺工坊与户外野营。 5. 体验传艺工坊与户外野营。 体验传艺工坊与户外野营。
6.6. 享受尝鲜市集美食。 6. 享受尝鲜市集美食。 享受尝鲜市集美食。
7. 7. 观赏文化演绎, 欣赏内湖风景。 7. 观赏文化演绎, 欣赏内湖风景。 观赏文化演绎, 欣赏内湖风景。
5. 体验传艺工坊与户外野营。 5.5.体验传艺工坊与户外野营。 体验传艺工坊与户外野营。
6. 享受尝鲜市集美食。 6.6.享受尝鲜市集美食。 享受尝鲜市集美食。
9001 No: CC5553 ISO Certificate No: CC5553 7. 观赏文化演绎, 欣赏内湖风景。 ISOISO 90019001 Certificate No: CC5553 7. 7. 观赏文化演绎, 欣赏内湖风景。 8.越艺书公园。 8.Certificate 穿 越艺书公园。 观赏文化演绎, 欣赏内湖风景。 8. 穿穿 越艺书公园。
1626-00 -STU-CD-001-Stage 1Visioning PlanPlan Report REV 2 REV 1626-00 -STU-CD-001-Stage 1Visioning Plan Report 1626-00 -STU-CD-001-Stage 1Visioning Report REV 2 2 2010.09.23 | Pages 83 of 2010.09.23 | Pages 8383 of 83 2010.09.23 | Pages 8383 of
1626-00 -STU-CD-001-Stage 1Visioning PlanREV Report 1626-00 -STU-CD-001-Stage 1Visioning PlanReport 2 REV2 1626-00 -STU-CD-001-Stage 1Visioning 2010.09.23 | Pages 83 of 83 PlanReportREV2 2010.09.23 | Pages 83 of 83 2010.09.23 | Pages 83 of 83
。
入口广场
8.8. 穿8. 穿越艺书公园。 越艺书公园。 穿 越艺书公园。
ISO 9001Certificate Certificate No: CC5553 ISO 9001 No: CC5553 ISO 9001 Certificate No: CC5553
5. 由南区出发,欣赏娱乐庆典。 7. 观赏文化演绎,欣赏内湖风景。
8. 穿越艺书公园。
庭院
工艺坊
ISO 9001
Certificate No: CC5553
Conceptual Masterplan Modelling
水畔
Elevation Views of Typical Street Frontage
混
Part I Professional Works
混 地
砖
6
7
混
混
42
6
混 75
9.
42
混 7
混
70
9.
42
混
地
6
混
砖
混
6
混
7
商业
商业
商业
混
商业
商业
混
商业
商业
42
75
9.
42
6
72
9.
42
混
23
混
0.
商业
商业
混
混 43
61
9.
7
中庭
商业
混
7
混
混
混
混
6
混 2
混
1
2 9.
泥
42
17
9.
42
水
泥
水
混
混
7
风井
风井
城
贸
农
北
城
商业
42
泥
水
6
风井 风井
6
混
泥
业 业 返迁商
混
泥
业 返迁商 业 返迁商
业
4
42
泥
混
水
混
7
6
79
9.
业 返迁商
42
7
04
73
8.
03
9.
42
混
9.
42
砖 42
6
混
80
8.
7
混
混
6
混
04
42
8 9.
业
6
混 6
17
. 29
4
42
返迁商
返迁商
风井
96
8.
42
6
混
混
6
9.
42
01
. 29
69
8.
42
77
8.
42
泥
商业
商业
6
混
混
7
混
中庭
混
商业
张学英 商业
商业
陈洪 陈洪 返迁商业
陈顺福 陈顺福
返迁商业
92
地
8.
42
张群花
返迁商业
卢琪芬
95
8.
42
地
砖
混2
返迁商业
张群花
地
砖
90
8.
42 返迁商业
商业
商业 商业
砖
商业
商业
7
混
返迁商业
商业 商业
商业 商业 商业
返迁商业
陈洪
返迁商业
商业
商业
陈洪
返迁商业
陈洪
返迁商业
商业 商业
混
一层平面图1:200
张学英
商业 中庭 商业
商业 商业
商业 商业
商业
混 混
6
85
8. 砖地
42
混
梁泽云
返迁商业
地 8.9 砖 42
73
8.
42
江
粼
张建成
返迁商业
张建成
返迁商业
张建明
返迁商业
混
返迁商业
邓学明 邓学明
返迁商业 返迁商业
赵翠华
赵翠华
赵翠华
商业
42
49
9.
42
混
混 6 .7
砖 地
商业 王福华 徐建均
徐建均
费大红 返迁商业 返迁商业 返迁商业
曾昌明
周淑珍
周淑珍
返迁商业
商业 商业
周淑珍
周淑珍
商业 商业
商业
混
混
商业
61
4
31
返迁商业 返迁商业
2
18
. 28
04
8.
4
42
29 9
2 .2
0 8.
8
混
返迁商业
6
混
6
8.
42
42
42
混 混
返迁商业
水
混
4
返迁商业 返迁商业
胡平
返迁商业
胡平
胡平
5
水
6
19
0
6 7.
. 17
42 返迁商业 陶学清 返迁商业 陶慧
混
59
7.
42
4
78
60
7.
7.
42
69
6.
42
2
05
8.
42
混 混
肖光华 返迁商业
混
13
8.
42
3
返迁商业
赵秀群 赵秀群
混
返迁商业 陶学清
曾雪琴
曾雪琴
返迁商业
王继英
混
8.
42
厕
返迁商业
王继英
混
48
42 83
7.
42
地
地
砖
砖 73
7.
2
混
管理用房
混
42
砖 彭 42
卫生间 卫生间
返迁商业 杨志全
返迁商业
混 混
冯丽君
周维祥 返迁商业
返迁商业
返迁商业 冯丽君
返迁商业 冯丽君
何利娜 返迁商业
返迁商业
何畏
返迁商业 牟富元
蔡代云 许娅梅
返迁商业
返迁商业
商业
钟国芳 陈玉书
卢晓梅 返迁商业 返迁商业 返迁商业
92
7.
60
7.
44
6 12
8.
7.
42
42
地
砖
22
7.
42
Masterplan of Wuyangli Cultural District
2
5
6.
51
6.
42
14
8.
42
6
商业
中庭
6
混
39
返迁商业
冯翠华
返迁商业 冯翠华 返迁商业
返迁商业
谢晓群
地 砖 428.
混
马卫东 商业
32
. 28
水 428.
水
76
5.
43
水
8
42
44
8.
42
7 .2
8
42
32
8.
42
42
35
8.
14
18
8.
24
8.
42
42
1.
43 57
8.
42
1 .5
42
马卫东
商业 商业 商业
混
6
42
42
47 8. 42
51
商业 商业
42
8.
30
8.
42
返迁商业
商业 商业 商业 商业 商业 商业
42
混 混2
32
8.
0
4 8.
24
6.
41
地
砖
8.
商业 商业 商业 商业 商业
6
水
29
8.
42 42
地
商业
混
4
42
8.
地
砖
7
.2
8 42
. 28
砖
商业
商业 商业
商业
商业 商业
商业
商业 商业
商业 商业
商业
地
45
8.
42
37
8.
42
38
水
砖
45
2
8
42
泥
混
商业
商业
商业 商业 管井
返迁商业
混
混 2 .7
42
43
6
9 .3
8
11 砖
0.
2
8.
42
4
混
66
8.
42
地
4 47
8.
42
43
8.
60
. 28
12
0.
43
47
. 28
45
42
混
51
8.
42
48
8.
42
8.
42
65
8.
返迁商业
商业 商业 商业 商业
商业
商业 商业
84
8.
42
返迁商业
商业
商业 商业
商业 商业 商业
商业
商业
混
30
42
返迁商业
商业
商业 商业
返迁商业
王福华 商业
商业 商业 商业
管井 商业 商业 商业 商业 商业 商业 商业 商业
混
6
84
8.
2
8.
混
2
混 42
6
商业
混
42
6
简
地
8
42
商业 商业 商业 梁玉珍15.56 商业
33
9.
42
42
返迁商业
11
9.
42
32
9.
42
45
9.
42
混 混
返迁商业
赵翠华
商业
地
砖
砖 66
8.
混
返迁商业
商业
6
地
商业
商业
混
6
返迁商业
商业 商业
商业 商业
商业
商业
混
8
42
62
7.
44
2
混混 2
6
混
商业
商业
商业
商业
商业
商业
商业 商业
43
砖 1 .8
12
2.
地
混
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
商业
景
枫
8
商业 商业
2
42
柴敏科
返迁商业
6
返迁商业
商业
返迁商业
中庭 商业 商业 商业 商业 商业 商业
混
6
砖
返迁商业
张菊林78.344
混
42
返迁商业 郑志君125.556
7
混
7
混
混
返迁商业 黄智勇126.504
7
混
混 地 砖
返迁商业 祝思源
返迁商业
6
混
混
商业 返迁商业 黎新强
返迁商业 黎新琼 返迁商业
谢小丽
返迁商业 返迁商业
杨群利
返迁商业
杨蓉
返迁商业
卓金华
返迁商业
汪桂容
返迁商业
田敬蓉 倪术明
返迁商业
晏树清2
返迁商业
返迁商业
刘成金 张杰
返迁商业
张志勇
返迁商业 返迁商业
商业
宴树清1 张学芳
王景玉
王冠华
刘静
张德宇
宴树清1
返迁商业 返迁商业 返迁商业 返迁商业 返迁商业 返迁商业 返迁商业
张李伟 张德安
混
14
水
简
返迁商业
风井 风井
风井 风井 风井
混
6
8.
返迁商业返迁商业
李永鹏 张东平 张继英 吴树明
# Design / Research / Feasibility Study / Digital Modelling / Rendering / Presentation
42
04
9.
42
7
9
业 返迁商
大堂 宴会厅
黄桂华
返迁商业
周定国
返迁商业
唐洋君
返迁商业
唐平康
返迁商业
何双文
返迁商业
何双全 廖文宣
返迁商业 返迁商业 商业
管德华 返迁商业 唐平君 刘玉权
区 42
置
安
景
混
98
8.
泥
8
6
混
6
7
9.
42
42
8 .9
42
混
水
区
小 二1 第 9.0
枫 江 粼 .11
混
混
返迁商业 返迁商业
唐平本
返迁商业 返迁商业 返迁商业 返迁商业
刘玉如-1 李万全 刘玉如-2 刘保全
返迁商业
吴斌
返迁商业
返迁商业
李朝全
返迁商业
黄学彬
黄学彬
返迁商业 返迁商业
李朝军
返迁商业 李朝军 李杰
返迁商业 返迁商业 返迁商业
李寿廷
返迁商业
李寿廷
返迁商业 返迁商业
马晓波
00
9.
42
简
88
9.
42
返迁商业
商业 商业
风井
戏台
简
返迁商
风
水井
风
返迁商
业
办公大
堂
水
混
6
混
6
水
商业
retail street alongside serene courtyards, creating a harmonious environment for the market. The multifaceted approach exemplifies the vision of a dynamic and inclusive city that embraces diverse experiences and caters to the well-being of its residents.
返迁商业 返迁商业 返迁商业
The project in Pengshan embodies the concept of a “happy city” by combining elements of a “playground city,” “market city,” “garden city,” “healthy city,” and “open city.” It blends indigenous culture with contemporary living, showcasing both small blocks and towering structures. The project tells a compelling narrative by integrating a new theater with historically significant buildings, and offers a vibrant, bustling
混
混
混
混
泥混
商业
风井
风井
风井
风井
商业
风 风
电井
混
地
7
砖
混
Views of the Central Street (Coordination with outsource renderer)
2
6
混
7
09
9. 42 2
混 混6
混 混
泥
水
2
混
商业
风井
混
9.
42
42
1 9.
建 民 路
商业
风井 风井
风井
风井
简
混
01
9.
7
11
建 民 路
风井
风井
商业
混
混
商业
商业
风井
风井
风井
风井
电井
风井
贸
北
市
21
9.
42
商业
合用前
室
商业
堂 酒店大
风井
电井
水
农
场
泥
消防电梯 兼客梯
客梯
合用前 风井
水井
商业
场
市
客梯
室
后勤通道
厕
风井
17
9.
42
混
混
货梯
7
6
混 混 2
泥混
Retail | F&B | Cultural | Heritage Preservation
67
9.
混
Chengdu, China Pengshan Group 2021 103300 m2 0-2 商业
Wuyangli Cultural District
Location: Client: Project Year: Scale: Stage:
中 区 山
Part I Professional Works
Wuyangli Cultural District Retail | F&B | Cultural | Heritage Preservation
I have helped in the whole process from conceptual research to detailed architectural and urban design and finally coordinate with the Local Design Institute (LDI) in planning submission. Various typologies of urban blocks are proposed that responses the diverse trade mix of the area and the complex conditions of the site.
LDI 参考号 LDI_RE 注意事项: 1. 此图之版权为欧华尔顾问有限公司所有,若无 书面许可,不得部分或全部翻印、公开或应用 2. 除特别说明外,所有尺寸均以毫米为单位,不 可使用于图纸中直接量度之尺寸; 3. 只可使用图示之尺寸及信息。若有矛盾或遗 漏,应即向欧华尔顾问有限公司报告及求证; 4. 此图为提供资料和辨识之用,不可作施工用 途; 5. 此图仍待相关政府部门、设计院及各专业顾问 的核实和认可。
Part I Professional Works Kuming, China Junfa Group 2018 41400 m2 3
Location: Client: Project Year: Scale: Stage:
Jungfa Kuming City Mixed-use | Retail | Heritage Preservation
PORTFOLIO
07
THE JUUFA CITY TECHNICAL DRAWINGS “Profesional Work”
WEST ELEVATION LDI 参考号 LDI_REF
C1栋(商业)
C2栋(商业)
注意事项: 1. 此图之版权为欧华尔顾问有限公司所有,若无书 面许可,不得部分或全部翻印、公开或应用
+17.02 m
+15.83 m +14.61 m
+13.45 m
+14.98 m
+13.69 m
+13.40 m
+13.99 m
+13.91 m
+13.14 m
2. 除特别说明外,所有尺寸均以毫米为单位,不可 使用于图纸中直接量度之尺寸;
+15.03 m
+14.61 m
+13.70 m
+13.73 m
3. 只可使用图示之尺寸及信息。若有矛盾或遗漏, 应即向欧华尔顾问有限公司报告及求证;
+13.72 m
4. 此图为提供资料和辨识之用,不可作施工用途; 5. 此图仍待相关政府部门、设计院及各专业顾问的 核实和认可。
C2栋_L3_FFL (8.90)1921.60 A1栋_L3_FFL (8.90)1919.65
+7.50 m
+7.50 m
+7.37 m
+7.17 m
+8.10 m
+7.50 m
+7.46 m
+7.41 m
+7.41 m 4200
4350
+7.26 m
C2栋_L1_FFL (4.55)1917.15
+4.06 m
+4.06 m +3.08 m
+4.08 m
+3.53 m
+4.06 m
A1栋_L2_FFL (4.70)1915.45
+4.06 m
+3.23 m
+4.06 m +2.88 m 4700
4550
C3栋(商业)
C2栋_L1_FFL (±0.00)1912.10
A1栋_L1_FFL(±0.00)1910.75
C4栋(商业) C2 -5
C2 -4
C2 -3
8400
1 快街西面 1 : 200
C2 -1
8400
24
8400
23
10500
1/2 1
6300
1/2 0
6300
19
8400
18
25800
17
6300
16
8400
1 / 14
8400
1 / 13
8400
1 / 12
8400
1 / 11
8400
1 / 10
8400
1/9
2100
1/8
1/7
8400
8400
6
8400
5
8400
4
8400
3
2
1
A2栋(商业)
中央广场
+16.81 m +14.85 m
+15.83 m
+14.85 m +13.45 m
+10.70 m
+9.97 m
+13.69 m
+9.85 m C1栋_L3_FFL ( 8.90)1920.55
+7.15 m
4200
+7.50 m
C4栋_L2_FFL (4.70)1917.85
+4.06 m
+4.06 m +3.91 m
C1栋_L2_FFL ( 4.70)1916.35
+3.91 m +2.93 m 4700
4700
B4栋(商业)
A3栋(商业)
+3.91 m
C4栋_L1_FFL (±0.00)1913.15
C1栋_L1_FFL (±0.00)1911.65
A1栋(商业)
B5栋(商业) 300 2100
2 快街北面 1 : 200
AAA
2850
3450
2 /A
4950
BB
3450
B
4200
CC
750
C
3450
4950
1/CDD
3450
D
EE
4950
3450
E
4950
FF
8400
F
8400
GG
HH
8400
C3 -A
8400
JJ
8400
KK
8400
LL
8400
MM
3450
NN
PP
4950
3450
Q
4950
NORTH ELEVATION
3450
R
RR
S
T
EAST ELEVATION
B3栋(商业) A4栋(商业) B6栋(商业)
+12.74 m
+12.74 m +12.12 m +10.19 m
+12.32 m
+12.32 m +10.94 m
+10.90 m
+10.50 m
+10.50 m
+10.19 m
+9.64 m
+11.47 m
+10.27 m
+10.05 m
+11.47 m +10.70 m
+9.45 m
C4栋_L2_FFL (4.70)1917.85
+4.06 m
+4.06 m
+4.06 m
+4.06 m
+3.08 m
+3.08 m
4850
+2.03 m
4700
B1栋_L2_FFL (4.85)1916.65
B2栋(商业)
C4栋_L1_FFL (±0.00)1913.15
B1栋_L1_FFL (±0.00)1911.80
B1栋_L1_FFL (±0.00)1911.80
B7栋(商业)
入口广场
8400
8400
8400
4200
4200
4200
4200
4200
2100
6300
2100
6300
2100
6300
2100
6300
2100
8400
8400
8400
8400
40500
6300
4200
2100
6300
8400 LDI 参考号 LDI_REF
1
2
3
4
1/4
5
1/5
6
1/6
7
2 /8
8
2 /9
9
2 / 10
10
2 / 11
11
12
13
14
15
20
1/2 0
21
1/2 1
22
23
24
3 快街东面 1 : 200
B1栋(商业) +17.02 m +15.52 m +13.27 m +13.72 m +14.03 m
+12.12 m +11.90 m
+11.70 m
+11.70 m +11.70 m
+10.62 m
+10.19 m
+10.19 m
+9.64 m
+9.50 m
A1栋_L3_FFL (8.90)1919.65
+7.22 m +7.41 m
+7.06 m
4200
+7.41 m
B1栋_L2_FFL (4.85)1916.65
+4.21 m
A1栋_L2_FFL (4.70)1915.45
+4.21 m
+3.23 m
+4.06 m
+3.23 m
修改记录
YYYY/MM/DD 版本
4700
4850
+4.06 m
设计示意图 顾问団队
B1栋_L1_FFL (±0.00)1911.80
设计院 - / 建筑/结构/机电 - / 景观 - / 灯光 - / 幕墙 - /
A1栋_L1_FFL(±0.00)1910.75
修改记录
YYYY/MM/DD 版本 建设单位
云南俊发宝云房地产有限公司
设计示意图
项目名称
俊发名城N-2-b、N-8地块项目 位置
中国 昆明市 盘龙区
8400
4 快街南面 1 : 200
T
8400
8400
S
4200
A1R-C
Q
6300
2100
1/P
P
4200
1/N
6300
8400
N
6300
M
L
8400
5400
顾问団队
K
7200
8400
8400
8400
8400
1050
7350
6300
2100
设计院 - / J
H
G
F
E
D
C 1/B
B
2 /A
LDI 参考号 LDI_RE
注意事项:
注意事项:
1. 此图之版权为欧华尔顾问有限公司所有,若无
1. 此图之版权为欧华尔顾问有限公司所有,若无
书面许可,不得部分或全部翻印、公开或应用
书面许可,不得部分或全部翻印、公开或应用
2. 除特别说明外,所有尺寸均以毫米为单位,不
2. 除特别说明外,所有尺寸均以毫米为单位,不
可使用于图纸中直接量度之尺寸;
可使用于图纸中直接量度之尺寸;
3. 只可使用图示之尺寸及信息。若有矛盾或遗
3. 只可使用图示之尺寸及信息。若有矛盾或遗
3. 只可使用图示之尺寸及信息。若有矛盾或遗
漏,应即向欧华尔顾问有限公司报告及求证;
漏,应即向欧华尔顾问有限公司报告及求证;
漏,应即向欧华尔顾问有限公司报告及求证;
4. 此图为提供资料和辨识之用,不可作施工用
4. 此图为提供资料和辨识之用,不可作施工用
4. 此图为提供资料和辨识之用,不可作施工用
途;
途;
途;
建筑/结构/机电 - /
注意事项:
景观 - /
书面许可,不得部分或全部翻印、公开或应用
5. 此图仍待相关政府部门、设计院及各专业顾问
5. 此图仍待相关政府部门、设计院及各专业顾问 的核实和认可。
2. 除特别说明外,所有尺寸均以毫米为单位,不
幕墙 - /
可使用于图纸中直接量度之尺寸;
建设单位
制图
--
设计
--
工程编号
1547
审核
--
审定
--
CAD参考编号 比例
SOUTH ELEVATION
1. 此图之版权为欧华尔顾问有限公司所有,若无
灯光 - /
的核实和认可。
A
LDI 参考号 LDI_RE
LDI 参考号 LDI_RE
Roofscape Masterplan of Junfa Kuming City
标题
沿街(快街)立面图
1 : 200
@A0
图号
版本
1547 - A11-106
5. 此图仍待相关政府部门、设计院及各专业顾问 的核实和认可。
云南俊发宝云房地产有限公司 项目名称
俊发名城N-2-b、N-8地块项目
8400
1/5
1/6 8400
E
8400
坡道往L1
1
8400
2
8400
4
8400
5
6300
6
8400
7
8400
8400
后勤机电
8
8400
9
8400
10
8400
11
2 /8
8400
12
13
8400
14
6300
15
20
6300
21
6300
22
2 / 10
2 /1 1
+0.15 m
+0.30 m
FF
+4.85 m
EE 2 /8
2 /9
2 / 10
2 / 11 DD
1/C +4.70 m
1/B
CC
1
2
3
BB 2 /A
4
5
6
7
8
9
10
11
12
13
14
15
20
21
22
23
24
8400
8400 8400 8400 8400 8400 8400 8400
1 /1 0
室外退台
JJ
12600
17
18
10500
8400
8400
HH
19
8400
8400
8400
Jungfa Kuming City Entrance Plaza View 1/2 0
1/4 4200
1/5 8400
GG
1 /2 1
1/6 8400
FF
2100
6300
8400
2 /8 2 /C
1/B
A
AA
2 /A
A
8400
24
1/9
16
8400
23
1/8
8400
2 /9
8400
2 / 10
EE 2 /1 1 1/C
DD
CC
B
BB
2 /A AA
8400
C3 -A
C
+4.70 m
B
+0.15 m
1/7
D
2 /C +4.70 m
+0.15 m
8400
8400 8400
GG
1/2 1
+4.70 m
A
8400
J
F
CC +0.15 m
2100
E
C -0.15 m
-0.15 m
LL
KK
K
HH
19
+4.70 m
DD
1/C
-0.15 m
1/B
8400
8400
18
1/6
D
2 /C +0.00 m
BB
8400
2 /9
MM
+9.50 m
G
1/5
EE
+0.00 m
-0.30 m
文物保护控制线
H 17
1/2 0
+4.70 m
1/4
FF
B
货梯
JJ
16
GG
1 /2 1
+0.00 m
12米屋檐控制线
1 / 10
E
C
AA
8400
3
后勤机电
1/9
C3 -A
F
D
5250
6300 8400
货梯
客梯
1/2 0
1/6 +0.15 m
DD
2100
8400
2 /A
A
1/5
CC 货梯
B
1/4
E
8400
1050
4200
1/C
1/8
J
HH
19
G -0.15 m
F
EE 垃圾房
2 /1 1
后勤机电
停车场
7350
8400
1/B 后勤机电
8400
2 / 10
7350
8400
2 /C 扶梯大堂 货梯
C
8400
2 /9
4200
8400
2 /8
1050
8400
停车场收费处 6300 后勤机电
D
18
G
FF
卸货区
KK
H 17
NN
L
K 1/7
JJ
16
LL
+4.55 m
1 /1 0
C3 -A
GG
1 /2 1
货梯
2100
8400
8400
1/9
PP
XA
1 /1 4
8400
1/2 0 1/4 4200
8400
8400
G
F
1/8
J H
HH
6300
1 /1 3
8400
8400
8400
8400
1 /1 2
M
+4.55 m
+4.70 m
L
8400
1 / 11
8400
8400
8400
8400
10500
19
MM M
KK
1547 - A10-101
室外退台
8400
18
8400
12600
17
1 /P
P 1 /N N
LL
K
Q PP
NN
+9.50 m
XB
版本
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
20
21
22
23
24
1
8400
2
BB 5250
7200
16
8400
5400
预留后勤通道 8400
XA
1 / 14
MM
+0.15 m
1/7 JJ
C3 -A
1 / 13
N
-0.30 m
+4.70 m
8400
后勤机电
1 /1 0
-6.00 m
1 / 12
RR
XC
室外退台
@A1
4200
1/9
1 / 11
图号
+9.50 m +9.50 m
4200
1后勤机电 /8
1/7
J
1/P
P 1/N
L KK
8400
H
+0.15 m
M
8400
8400
8400
PP
NN
--
1050
8400 6300
客梯
-6.60 m
2100
XA
1 /1 4
LL
停车场
K
-0.15 m
MM
货梯
后勤机电
货梯
1 /1 3
# 3D Modelling / Tender Submission
N
货梯
L
1 /1 2
-0.15 m
--
审定
1547
1 : 800
Q
1 / 11
8400
货梯
1 /P
P 1 /N
审核
--
7350
4200 2100
收费处
Q PP
NN
--
设计
CAD参考编号 比例
1050
扶梯大堂
X7 8400
7350
收费处
X6 8400
6300
8400
停车场
坡道往L1
XB
制图 工程编号 R QQ
X4 8400
2100
客梯
XA
1 /1 4
+4.70 m
4200
6300
1 /1 3
RR
XC
X3 6300
XD
6300
6300
8400
1 /1 2
停车场
+4.70 m
X2
Z1
4200 2100
8400
1 / 11
扶梯大堂
+0.15 m
XB
8400
8400
8400
后勤机电
S +4.70 m
R QQ
场地红线
8400
S RR
XC
+0.15 m
地面建筑退线(退既有建筑6米)
X7
6300
8400
8400
8400
XB
X6
XD
-0.15 m
+0.15 m
X4
X1
T
XD
-0.15 m
地下室退线(退既有建筑10米)
地面建筑退线
彩色总平面图 X3
Z1
T
R QQ
后勤机电
X2
X7
S
RR
货梯
M
文物保护控制线
-0.15 m
XC
后勤机电
X6
Z1
T
8400
8400
客梯
X4
场地红线 地下室退线(5米)
X1
8400
8400
X3
6300
8400
货梯
客梯
停车场
6300
N
8400
X7
XD
货梯
4200
Q
1 /P
X6
-6.00 m
S
R
P 1 /N
X4
8400
X2
8400
Z1
T
6300
X1
5400
8400
X3
标题
7200
X2
位置
中国 昆明市 盘龙区
8400
X1
tender documents, including orthographic drawings and details. This experience allowed me to develop expertise in creating technical drawings, including those related to facade systems and roof structures.
8400
场地红线
8400
地面建筑退线(退既有建筑6米)
8400
地下室退线(退既有建筑10米)
地面建筑退线
8400
场地红线
地下室退线(5米)
8400
Jungfa Kuming City is an open-lane mixed-use project that caters to the local trading experience and embraces the site’s cultural history. It incorporates the preservation of three clusters of historical buildings, aiming to transform the site into a place that embraces diversity and inclusivity. I was involved in constructing and refining the technical details of the project using BIM. Additionally, I contributed to the production of
AA
8400
3
8400
4
8400
5
6300
6
8400
7
8400
8
8400
9
8400
10
8400
11
8400
12
8400
13
8400
14
6300
15
20
6300
21
6300
22
8400
23
24
1/6
7
1
2 /A
3
1/B
+4.70 m
+4.70 m
4
1/4
5
1/5
+4.85 m
+4.70 m
6
1/7
Z1
2
Part I Professional Works
LDI 参考号 LDI_REF
Jungfa Kuming City
1
LDI 参考号 LDI_REF
LDI 参考号 LDI_REF
注意事项:
A
B
C
D
E
F
G
H
J
L
M
N
P 1/N
1/P
R
S
T
Q
Mixed-use | Retail | Heritage Preservation
K
LDI 参考号 LDI_REF
注意事项:
1. 此图之版权为欧华尔顾问有限公司 面许可,不得部分或全部翻印、公开
1. 此图之版权为欧华尔顾问有限公司所有,若无书 面许可,不得部分或全部翻印、公开或应用
2. 除特别说明外,所有尺寸均以毫米 使用于图纸中直接量度之尺寸;
2. 除特别说明外,所有尺寸均以毫米为单位,不可 使用于图纸中直接量度之尺寸;
3. 只可使用图示之尺寸及信息。若有 应即向欧华尔顾问有限公司报告及求
3. 只可使用图示之尺寸及信息。若有矛盾或遗漏, 应即向欧华尔顾问有限公司报告及求证;
4. 此图为提供资料和辨识之用,不可
5. 此图仍待相关政府部门、设计院及 核实和认可。
4. 此图为提供资料和辨识之用,不可作施工用途; 5. 此图仍待相关政府部门、设计院及各专业顾问的 核实和认可。
B5栋±0.00=1912
AA
BB
+14.97 m
+14.55 m
+13.80 m
+12.00 m
+12.00 m
+10.82 m
+10.39 m +8.91 m
24
餐饮 A1栋_L3_FFL (9.50)1920.25
A1栋_L3_FFL (9.50)1920.25
+8.65 m
商业
商业
/
+3.43 m
道
4900
5200
走
21
商业
商业
走道
修改记录
B5栋_L1_FFL (0.00)1912.85
顾问団队
停车场
设计院 - / LDI 参考号 LDI_REF 建筑/结构/机电 - / 景观 - / 灯光 - / 幕墙 - /
B5栋_B1_FFL (-6.00)
建设单位
注意事项:
云南俊发宝云房地产有限
1. 此图之版权为欧华尔顾问有限公司所有,若无书 建设单位 面许可,不得部分或全部翻印、公开或应用
项目名称
18
云南俊发宝云房地产有限公司
2. 除特别说明外,所有尺寸均以毫米为单位,不可 使用于图纸中直接量度之尺寸;
4200
项目名称
俊发名城N-2-b、N-8地 6300
8400
LDI 参考号 LDI_REF 位置
17
X2
3. 只可使用图示之尺寸及信息。若有矛盾或遗漏, 俊发名城N-2-b、N-8地块项目 应即向欧华尔顾问有限公司报告及求证;
中国 昆明市 盘龙区 注意事项:
位置
4. 此图为提供资料和辨识之用,不可作施工用途;
中国 昆明市 盘龙区
A 1- A
A 1 -B
A 1 -C
A 1- D
B5 -D
B5 -C
B5 -B
5. 此图仍待相关政府部门、设计院及各专业顾问的 核实和认可。 标题
A 1 -E
标题 1. 此图之版权为欧华尔顾问有限公
面许可,不得部分或全部翻印、公 B5_建筑单体剖面图_A
B5 -A
2. 除特别说明外,所有尺寸均以毫 使用于图纸中直接量度之尺寸;
16
8400
15
1547 - B02-521 B3栋±0.00=191
版本 --
1547 - A11-105
商业
后勤
商业
走道
B3栋_L2_FFL (5.05)1917.30
+3.45 m
5050
疏散/ 商业
商业
商业
B3栋_L2_FFL (5.05)1917.30 A3栋_L2_FFL (5.05)1916.10
5050
@A1 1 : 500
图号
--
1547
审定 --
工程编号
审核 --
设计
CAD参考编号 比例
制图
标题
平面图_B1
项目名称
位置
+7.00 m 商业
5050
建设单位
中国 昆明市 盘龙区
俊发名城N-2-b、N-8地块项目
云南俊发宝云房地产有限公司
幕墙 - /
疏散/ 商业 LDI 参考号 LDI_REF
B3栋_L1_FFL (0.00)1912.25
修改记录
A3栋_L1_FFL (0.00)1911.05
YYYY/MM/DD 版本
后勤
商业
走道
LDI 参考号 LDI_REF
B3栋_L1_FFL (0.00)1912.25
5250
设计示意图
4650
灯光 - /
景观 - /
建筑/结构/机电 - /
+10.61 m
+7.00 m
停车场
A3栋_B1_FFL (-4.65)1906.40
A3栋_B1_FFL (-4.65)1906.40
B3栋_B1_FFL (-6.00)
顾问団队
设计院 - / 建筑/结构/机电 - / 景观 - / 灯光 - / 幕墙 - /
停车场
修改记录
设计示意图
顾问団队 注意事项:
建设单位
9
6300
A 3 -E
6300
8400
A3 -D
A 3 -C
A 3 -B
设计院 - / 1. 此图之版权为欧华尔顾问有限 建筑/结构/机电 - / 面许可,不得部分或全部翻印、公 景观 - / 灯光 - / 幕墙 - / 2. 除特别说明外,所有尺寸均以
8400
1. 此图之版权为欧华尔顾问有限公司所有,若无书 面许可,不得部分或全部翻印、公开或应用
项目名称
6300
俊发名城N-2-b、N-8地块项目 位置
A3 -A
B3 -C
中国 昆明市 盘龙区
3. 只可使用图示之尺寸及信息。若有矛盾或遗漏, 应即向欧华尔顾问有限公司报告及求证;
8
2 /C
YYYY/M
B3栋_B1_FFL (-6.00) LDI 参考号 LDI_REF
-0.15 m
设计院 - /
+11.03 m +9.33 m
A3栋_L1_FFL (0.00)1911.05
2 /9
1/8
2 /8
-0.15 m
1/9
+0.15 m
-0.15 m
图号
版本
+8.67 m
4650
11 10
设计示意图
YYYY/MM/DD 版本 修改记录
12 +0.15 m
1/C 2 /1 1 2 / 10
+0.15 m
1 /1 0
顾问団队
13
+0.00 m
1 /1 2 1 / 11
L1 PLAN
14 -0.15 m
1 /1 4 1 /1 3
+0.15 m -0.15 m
审核
@A3
1 : 200
5050
+0.15 m
XA
XB
XC
XD 的核实和认可。
1547
5. 此图仍待相关政府部门、设计院 CAD参考编号 核实和认可。 比例
@A3
1547 - B01-121
使用于图纸中直接量度之尺寸;
B3 -B
3. 只可使用图示之尺寸及信息。 应即向欧华尔顾问有限公司报告及
B3 -A
建设单位
4. 此图为提供资料和辨识之用, 云南俊发宝云房地产有
标题
4. 此图为提供资料和辨识之用,不可作施工用途;
5. 此图仍待相关政府部门、设计
5. 此图仍待相关政府部门、设计院及各专业顾问的 核实和认可。
俊发名城N-2-b、N-8地
A3_建筑单体剖面图_A
7
+0.15 m
+14.55 m
6
1/6
项目名称 核实和认可。
A4栋±0.00=19
1547
审定
标题
--
B3_建筑单体剖面图_A
CAD参考编号 比例
@A3
5
版本
1547 - B01-321
+12.32 m +10.82 m
餐饮 A2栋_L3_FFL (9.50)1920.55
1/4
+10.82 m
4450
4 2 /A
洗手间(女)
商业
--
工程编号
1547
审核 审定
@A3
图号
1547 - B02-321
+7.00 m A2栋_L2_FFL (5.05)1916.10
商业
+7.00 m
商业
A4栋_L2_FFL(5.05)1915.80
A4栋_L2_FFL(5.05)1915.80
+4.42 m
后 勤
2
商业
-0.30 m
A2栋_L1_FFL (0.00)1911.05
疏散/ 商业
后勤
5050
道
A2栋_L1_FFL (0.00)1911.05
5050
商业
5050
走
5050
+0.30 m
+0.00 m
+0.15 m
商业
走道
A4栋_L1_FFL(0.00)1910.75
修改记录
修改记录
设计示意图
A2栋_B1_FFL (-6.60)
A4栋_B1_FFL (-4.35)1906.40
顾问団队
4350
4350
4650
1
停车场
顾问団队
停车场
设计院 - / 建筑/结构/机电 - / 景观 - / 灯光 - / 幕墙 - /
YYYY
A4栋_L1_FFL(0.00)1910.75
YYYY/MM/DD 版本
设计示意图 4650
-0.15 m
散 /
+4.41 m
3
1/B
-0.15 m
商业
A2栋_L2_FFL (5.05)1916.10
--
设计
1 : 200
+9.12 m +7.85 m +7.00 m
疏
制图
CAD参考编号 比例
A2栋_L3_FFL (9.50)1920.55
4450
+0.15 m
--
工程编号
图号
+12.00 m
+12.00 m
中国 昆明市 盘龙区
A2栋±0.00=1911.05 审核 ---
设计
1 : 200
-0.15 m
+0.00 m
1/5
1/7
Z1
制图
A2栋_B1_FFL (-6.60)
A4栋_B1_FFL (-4.35)1906.40
设计院 - / 建筑/结构/机电 - / 景观 - / 灯光 - / 幕墙 - /
建设单位
云南俊发宝云房地产有
建设单位
8400
8400
云南俊发宝云房地产有限公司 4200 6300
8400
8400
项目名称
俊发名城N-2-b、N-8
项目名称
A2 -D
A
B
C
D
E
F
G
H
J
L
K
M
N
P 1 /N
1 /P
Q
R
S
T
俊发名城N-2-b、N-8地块项目
A 2 -C
A 2 -B
A2 -A
位置
中国 昆明市 盘龙区
位置
A4-D中国 昆明市 盘龙区 A 4 -C
A 4 -B
A4 -A
标题
A4_建筑单体剖面图_A
标题
A2_建筑单体剖面图_A
Jungfa Kuming City Ground Floor Plan
制图
--
审核
--
设计
--
审定
--
工程编号
1547
AA
BB
CC
DD
EE
FF
GG
HH
1547 - B01-221
8400
23 6300
22
1
@A3
图号
24
8400 货梯
8400
MM
LL 8400
NN
KK 8400
8400
PP
JJ 8400
1 : 200
8400
8400
RR
Jungfa Kuming City Sections
CAD参考编号 比例
8400
8400
5. 此图仍待相关政府部门、设计院及各专业顾问
+11.24 m
+7.85 m
8400
4. 此图为提供资料和辨识之用,不可作施工用
--
1 : 200
+7.00 m
--
工程编号
位置
8400
途;
--
审定
1547
2. 除特别说明外,所有尺寸均以毫米为单位,不可 使用于图纸中直接量度之尺寸;
8400
漏,应即向欧华尔顾问有限公司报告及求证;
审核
--
工程编号
注意事项: 云南俊发宝云房地产有限公司 8400
8400
3. 只可使用图示之尺寸及信息。若有矛盾或遗
--
设计
LDI 参考号 LDI_REF
8400
可使用于图纸中直接量度之尺寸;
制图
CAD参考编号 比例
A3栋_L2_FFL (5.05)1916.10
制图
4. 此图为提供资料和辨识之用,不 设计 审定 --
图号
+11.24 m
5250
2. 除特别说明外,所有尺寸均以毫米为单位,不
3. 只可使用图示之尺寸及信息。若 应即向欧华尔顾问有限公司报告及
8400
C3 -A
8400
5250
X1
A1_建筑单体剖面图_A
A3栋±0.00=1911.05 4200
YYYY/MM
设计示意图 顾问団队
设计院 - / 建筑/结构/机电 - / 景观 - / 灯光 - / LDI_REF LDI 参考号幕墙 - /
B5栋_B1_FFL (-6.00)
A1栋_B1_FFL (-6.60)
修改记录
YYYY/MM/DD 版本
5850
5850
4500
4200
20
停车场
19 +0.15 m
后勤
设计示意图
X4
-0.15 m
B5栋_L2_FFL (5.05)1917.90
疏散/ 商业
LDI 参考号 LDI_REF
B5栋_L1_FFL (0.00)1912.85 A1栋_L1_FFL (1.50)1910.90
A1栋_L1_FFL (-1.50)1910.60
1/2 0
X6
走道
5050
22
勤
A1栋_B1_FFL (-6.60)
X3
商业
后勤
B5栋_L2_FFL (5.05)1917.90
A1栋_L2_FFL (5.05)1915.80
后
商业
+7.00 m
疏散/ 商业
4450
4450
23
+0.15 m
1 /2 1
-0.30 m
X7
散
A1栋_L2_FFL (5.05)1915.80
+7.00 m
+8.05 m
疏
5050
CC
DD
EE
FF
GG
HH
JJ
KK
LL
MM
NN
PP
RR
A1栋±0.00=1910.75
版本
制图
--
设计
--
工程编号
1547
审核 审定
CAD参考编号 比例
1 : 200
@A3
图号
1547 - B01-421
Part I Professional Works
Jungfa Kuming City Mixed-use | Retail | Heritage Preservation
Shop Frontages (BIM Modelling - Revit)
Part I Professional Works
Jungfa Kuming City Mixed-use | Retail | Heritage Preservation
Technical Drawings