06.
News
Attention! pg. 4
Technology
The heartbleed bug pg. 5 Security pg. 6 Goal line technology pg. 7 The art of communication pg. 10
Design German made pg. 16
25. 27.
Features
State of the nation pg. 20 Dubai's power pg. 28 The fuel cell technology pg. 31 Powering the future pg. 32 The Vactrian pg. 34 Utility mapping pg. 35 Towards sustainable energy pg. 38 What powers a modern aircraft carrier? pg. 41 Where the wind blows pg. 42
Social Commentary
45.
Alcoholism and drug abuse pg. 44 It all counts! pg. 45 Kenyan universities pg. 46 The inanimate player pg. 47
ESA
AAK career day pg. 52 General Electric career fair pg. 53 The Student Engineer
1
CHAIRLADY'S MESSAGE
Editor's Note people. And what is nobler than enriching humanity? With the reinvestment in the Geothermal sector, the grandiose plan of having more energy, as much as 5GW in our grid within three years are splendid. With the optimism that this shall come to pass we anticipate an invigorated economy and with engineers smiling all the way to the bank. And not just that, we shall edge
T
closer to the achievement of the very elusive Kenyan Dream.
hank you for taking time off to read through this edition of The Student Engineer, the first issue for the academic year 2014/2015. As we look ahead to the
For those with interest in the energy sector, we cannot fail to
year 2014/2015, we at ESA are determined to continue
appreciate that Turkana is now our haven. Olkaria projects are
to build on the dreams of this student body that is now 31 years
giving us headway and Kenya is on the move. We are a country
young.
replete with ambition and this we exploit and try to carry an incisive look into the energy situation in the country.
With each passing day your favourite journal continues to renew its sincere commitment to bring you refreshing stories in the
We have by all means carried out analysis of our sectors, their
world of engineering and beyond.
viability and usage on sustainable levels. We suggest, as our work is defined. We leave the judgement to the reader.
I take opportunity to sincerely thank engineering students for electing a new board in April 2014. We are entering this
Much of these we leave to the government. History will be our
academic year a more proficient and more efficient organization
final judge. As to whether the government commits to fulfilling
determined to put engineering students in the lead. I therefore
the Kenyan Dream or stumbling upon the past shall be the
urge you all to take advantage of the activities ESA has in store
question to behold.
for you to have a better connection to the industry, to broaden your knowledge beyond academics so as to put yourselves on
Finally I have to pass my sincere gratitude to The editorial board
the fast track to career success.
for the work well done and having come this far. The ESA chair
has not been in vain. Through the activities you have supported,
A
all round engineers have been churned out, engineers who have
sector to gain a greater understanding about the on going projects
a clear view of the industry. Without you ESA would not have
and the alternatives we have as a country.
To our sponsors, Jyoti Structures, Kalpataru Power Transmissions Ltd., Parsons Brinckerhoff Ltd, ACEK, KEVIAN Ltd.,I sincerely thank you for believing in us and in supporting us over the years by way of mentorship and financial support. I assure you that it
as we are about the energy sector. In this issue, we
We are very grateful for our sponsors in this issue, The University
appreciate the gesture that our government is committed
of Nairobi, The ICT authority Kenya, Power Technics and many
to ensuring that the energy sector is ablaze once again.
others we have not mentioned. Individuals and the larger student
We have engaged various stake holders in providing a view into the
This is a period where everyone understands that any nation's energy muscle is a show of its ability to sustain its economic manoeuvres. And
I wish to thank our patron, Prof Odira, office of the College
body, we thank you for your overwhelming support. Special thanks to the The Institution of Engineers of Kenya and Kenya Engineers team for their unwavering support through our
been the success that it was in the year2013/2014. Thank you for making it happen!
and your executive board, thank you for your support too.
ll indications suggest that the government is as concerned
the better your economy, the higher your status and the status of the
Principal,office of the Dean School of Engineering and Dr. Mativo
toughest of time. I wish you a nice read ahead.
K K e n n edy
i ma ni
(Ketraco) .Without your generous support we wouldn't be where we are today. We look forward to engaging with you at the varied number of events planned for the year aimed at bridging the gap between industry and academia. Enjoy your read!
The Student Engineer
Editor-in-Chief -Kennedy Kimani Managing Editor - Lewis Sakwa W Editors - Caleb Juma, Kevin Odongo, David Chege, Vallary Owino Design & Layout - Daniel Wakaba Ndung’u
The Student Engineer @StudentEng
The Student Engineer P.O Box 30197 - 00100, Nairobi KENYA Tel: +254 722 600 392
Copyright Š Student Engineer 2014 Reproduction of any article in part or full without permission from The Engineering Students Association is strictly prohibited.
2
The Student Engineer
The Student Engineer
3
///// NEWS
TECHNOLOGY \\\\\
Attention!
The heartbleed bug The most dangerous threat to Android yet
Big brother is listening - The National Intelligent Service (NIS) feud
by Mwaniki A. Ngari
autonomy that is meant to be associated with an Intelligence Organ. I want to believe that even the infamous Special Branch had more coordination than our current liberal NIS. That is in terms of information gathering. There many more men out there in the Kenyan jungle willing to sacrifice for the right cause of this nation. Not to spy against innocent citizens of this great nation but to help us deal with the problem of intelligence gathering once and for all. But sacrifice, if there must be, must have a worthy reason. For life is sacred. NIS therefore needs to open its eyes for a professional touch and re-brand itself, not in name but in recruitment of the individuals into the sector. If only they realised how much Kenyans love their country, they would never toy around as they do...
I
am a disappointed man. A disappointed
While we may want to discredit the rumours
Kenyan in an acrimonious country. A
that this art of eavesdropping is targeting
country which a decade ago had the
the dissidents of politics or so to say, there is
most hopeful people on the planet but as
much ground to believe so. Times gone have
we evaluate the decade gone, with mischief
shown without prejudice that our intelligence
and intolerance we have sunk into despair,
masters have only but served the interest of The
hopelessness and God knows if anarchy is the
master. And helped him maintain what he has;
next state.
and that is power. Therefore before I am given
Despicable I would say, the plan to tap
valid reasons that the guys in The August House
into Kenyan private lives and dig up their
have reason to pass this motion I shall not rest
communication seems to be the next
on the fence or fear the blatant mark of a leftist.
gentlemanly move with the weird NIS and Army bill being introduced into the Kenyan
I shall however state categorically that the bill
Parliament. Me thinks this is not a security
is a Scourge that must not be allowed to see
measure as it is probably being said but a ploy
the doors of Parliament at this time when the
to legitimize intrusion into our normal life.
inefficiency of the Statutory body mandated with securing Kenyan lives is busy sleeping on
What the National Intelligence Service seeks
the job. I shall not shy away to mention that NIS
to do is rudimentary just like all its action
has no clue on how to handle the intelligence
beforehand. Just that the National Security
gathering process. And until such time as
Agency of The United States is rumoured to be
when it shall be able to detach itself from the
listening to the American Nation at large and
influence of Government then shall its mandate
without notice does not mean that the Kenyan
be effectively executed.
partners can do the same. You would only take a look at the inefficiency of curbing crime and
Secondly, the elites of this nation waste away
terrorism. It plays right into their priorities. They
in menial jobs. Computer Scientist, Engineers,
are clueless and have no idea when Kenyan lives
efficient intellects of all sorts would not want
are at stake.
to work for NIS. Reason is there seems to be no
4
The Student Engineer
Unlike NSA, CIA, MOSSAD and many more advanced organisation... even terrorist organisations, there is a basically no difference between working for NIS and the Kenya Police. The Police shouldn't take offence because of the notoriety that now enshrouds them after a floundered recruiting process. If we can revamp the Intelligence of this country by incorporating the best we have; train them well and let them
A
nyone who keeps up with the
million people worldwide using devices running
The Heartbleed bug has already been exploited
technology news will probably
on thus version of Android are at risk, this is
by Cybercriminals to steal tax information of
have heard HeartBleed bug in
excluding hundreds of millions of handsets in
thousands of Canadians from the Canadian Tax
the popular Android version 4.1.1
China running Android without Google services,
Authority Computers.
,which came about after July 2012 after another
which would not show up on Google systems.
less serious bug in the Nexus tablets.
know the cause they are committed to then we
The good news is to pull off a Heartbleed bug Hackers can exploit this high profile bug and
attack involves a complex process and only
shouldn't have a problem in tackling the security
Discovered in April 7 2014 by a software
obtain credit card information, browsing history
experienced hackers with sufficient resources
issue. But when recruiting is basically an affair
security firm in Finland, the Heartbleed bug
and login information of anyone using a device
can pull it off. Furthermore, a hacker cannot
of a few people, and the guys who qualify
is as result of the error in version's code. All
running on this version of Android. Sensitive
hack multiple devices at once.
hardly show any passion for the job other than
the devices running on this Jellybean version
transactions such as online banking on tabs or
monetary expectations (which is right of course)
are vulnerable to a hack described as 'reverse
tablets running on this version should highly be
A free app has been developed by Lookout,
then we remain a hopeless nation in so much
Heartbleed' - where a malicious server would
avoided as per software security experts. The
an American software Security firm, to test
as we want to tap all lines of communications.
be able to exploit the flaw in OpenSSL to grab
Blackberry Messaging Service running on this
whether a device is vulnerable; the app is
data from the phone's browser, which could
version of Android is also at the mercy of this
available on the Google Play Store. Germany
Let us therefore embrace reality and actually let
include information about part sessions and
bug. Blackberry is lining up an update to fix the
is the most affected Country where 20% of the
time have its toll. We have to begin low but with
logins. Amazingly, Google has known about the
bug though the company has not provided a
devices in use there run on the vulnerable OS
precision, both of action and mind. Otherwise
error for about a month but didn't speak about
time frame.
version.
we shall be a country torn apart by the very
it. However, a fix for the bug has already been
organs meant to protect the coat of arms we
issued by the company though it depends on
The number of devices and website vulnerable
Luckily, only version 4.1.1 uses the vulnerable
swear to. I dare say, that was a Juvenile; a rather
the device manufactures and wireless carriers
to this bug is expected to grow due to flawed
version of OpenSSL. Examples of the famous
infantile move for NIS to try to spy on me. God
on how this fix will reach the millions of the
encryption software. Any internet connected
mobile devices that are vulnerable include
Bless Kenya.
affected users.Owing to the popularity of the
device including smart TVsare also vulnerable
Samsung Galaxy S3,Samsung Galaxy Note
Open Source Operating System ,an estimated 50
to this bug.
2,Motorola Photon Q, and Huawei Ascend Y300.
The Student Engineer
5
///// TECHNOLOGY
TECHNOLOGY \\\\\
Security;
Are you secure; do you feel secure?
G
Goal line technology
by Kevin Odongo
oal line technology, sometimes
by Kevin Omondi Gor
referred to as Goal Decision System, is a method used to determine when the ball has completely
crossed the goal line with the assistance of electronic devices, hence assisting match officials award a goal. The technology comes in various system forms such as: Cairos GLT System Developed by Cairos Technologies AG, a German company alongside Adidas. It uses a magnetic
O
ne cannot hide from the daily
without faulting them are under motivated,
reports of insecurity that make
more often than not ill equipped and have been
the headlines in our news, within
known on occasion to protect their own lives
and without our borders. Nor can
than those of the mwananchi.
one ignore the host of guards posted outside
The government was set to award a multi-million dollar surveillance system, theIntegrated Public Safety Communication and Surveillance System' IPSCSS)tenderto the country's largest mobile network company;
buildings, who usher you with a casual flick
Technology. We need to invest in modern
of a garret against your body, hoping that
policing technology. The Governors of Mombasa
you haven't concealed a weapon or explosive
and Machakos have invested in a few items
on your person. Immediately after an attack,
off of the IG's strategic plan. They acquired a
security forces in our country are remarkably
fleet of high tech security vehicles, complete
Playground", and have been the hardest hit and
vivid. Yet, social media, the dailies opinion
with imaging and tracking capabilities; Closed
most targeted by our enemies. 60 and 20 eLTE,
pages, radio talk shows, one or two public
Circuit Television Cameras, 500 units have been
enterprise Long Term Evolution base stations in
rallies have Kenyans decrying what the security
installed in Machokos; gun detectors and police
Nairobi and Mombasa will be set up, which will
situation in the country.
dogs for policemen. Indeed, there has been
incredibly improve police communication on the
criticism meted out against such investment,
network that provides faster speeds than the
A trip to the JKIA will have you tugging at the
but if reports suggesting that the mere presence
current 3G network peak as well as the ability to
end of line of patience; the security detail
of a patrol corner round the corner reduce
seamlessly handle more data-hungry activities,
does its job- thoroughly but to the public's
crime rates by upto 15 % are anything to go
say live video streaming. Close to 200 police
inconvenience; need we have so many of them?
by, then more county governments should take
stations will be connected to this network, and
Which leads me to the question: "Can't we use
the members of their assemblies on trips to
finally 6000 high tech walkie-talkies will provide
technology to stifle the scourge of insecurity?"
Machakos instead of the US and Israel.
relief from the 1940 Motorolla -based versions that the police use today.
A guard with a garret doesn't inspire any
The government was set to award a multi-million
confidence in me, and neither should it in
dollar surveillance system, theIntegrated Public
These just form the initial investment in modern
you? A few attacks have exposed the gadgets
Safety Communication and Surveillance System'
policing that we need to make, as a country to
inefficiency; more importantly they do not
IPSCSS)tenderto the country's largest mobile
eliminate our vulnerability that comes from the
protect that particular Kenyan's life should
network company; although suspended, the
weakness humans are prone to, as we combat
something explode. Given, the Inspector
system is expected to have about 2000 ultra-hd
Insecurity in this country. a lot more needs to
General released a strategic plan that includes
CCTV cameras, in Nairobi and Mombasa, Kenya's
be done to make us feel secure and be secure
deployment of more security officers, who
two cities which are considered "A Terrorists
in our country.
6
The Student Engineer
field to track a ball with a sensor suspended in
and match officials are notified in less than one
FIFA decide on using it in the 2014 world cup.
the ball. If the ball crosses the goal line, a radio
second whenever the ball crosses the goal line.
Thanks to the goal line technology used in
signal is sent to the referee's watch within a
The question of use of goal-line technology
the 2014 world cup tournament, the question
second.Goal minder. The system was created
began arising in the year 2000 when a referee
of controversial goal has been put to rest and
by two Bolton Wanderers fans, Harry Barnes
did not awardVictor NosaIkpeba's (Playing for
Benzema's goal became the first world cup goal
and Dave Parden after their favorite team was
Nigeria) goal in the penalty shootouts during
awarded with the help of the technology. The
relegated due to a wrongly disallowed goal. It
the Africa cup of Nations final between Nigeria
goal line technology, dubbed the Goal Control
uses high speed cameras built into the goal
and Cameroon. Television replays, however,
4D, was developed and installed by GoalControl,
posts and crossbar to record images at 2000
showed that indeed the ball had crossed the
a German company. The system used 14 high
frames per second and deliver visual evidence
goal line after bouncing off the crossbar.
speed cameras located around the pitch and
to the referee in less than five seconds. The
directed at both goals with seven pointing at
system is thought to be cheaper because less
Previously, in the FIFA world cup of 2010 and
each of the goals. The cameras continuously
expensive cameras are required and the field
others before it, whether the ball crossed the
captured the position of the ball in 3D whenever
does not have to be dug into.
line or not would entirely depend on the referee
it neared either ends of the pitch. All the 12
and his assistants. Many such controversies over
stadiums in Brazil used in the tournament
GoalRef
goals have been reported. In 2008, FIFA out-
were equipped with the system of cameras
GoalRef was developed by German research
rightly rejected the technology having tested
which were responsible for tracking the ball
institute Fraunhoferin association with Select
a system by Adidas in which a football with an
movements on the field and with high accuracy,
Sport. It entails a passive electronic circuit
embedded microchip would send a signal to the
determined if the ball had crossed the goal line
embedded in the ball and a low frequency
referee when it crossed a sensor on the goal
or not. Every time the ball crossed the goal line,
magnetic field around the goal. Any change in
line, with FIFA president, Sepp Blatter saying it
the system detected this and sent encrypted
the field on or behind the goal is detected by
was only 95% accurate. The technology seemed
alert to the watch of the match official. It is
coils embedded in the goal frame. As soon as
to be on its last death bed when International
worthy to note that the final decision to award
the ball crosses the goal line between the posts,
Football Association Board (IFAB), which is
a goal or not still fell on the official of the match.
a change in magnetic field is detected. A goal
responsible for the laws governing soccer games
alert is then instantaneously sent to the game
voted 6-2 against the use of the technology.
officials.
The technology however, did not go through
However, after several refereeing errors
without criticisms especially after it caused
at the 2010 FIFA world cup, especially
confusion in the Honduras Vs France group
Hawk-Eye
Frank Lampard's disallowed goal against
match in the 2014 tournament. The initial video
It was first developed in 1999 by Dr. Paul
the Germans, Blatter announced that they
replay showed that the ball had not crossed the
Hawkins and engineers at Roke Manor Research
would re-open the goal-line technology
line. The technology however, sent the referee
Limited-a subsidiary of Siemens. It is based on
discussion.
an alert that the ball had crossed the line. This
the principle of triangulation where high frame
caused confusion with fans booing. There have
rate video cameras track the ball in flight. The
Finally after testing and deliberations, FIFA
been criticisms especially with some saying
software calculates the ball's location in each
in December 2012 announced they would
that the technology slows down the match
frame by identifying the pixels that correspond
introduce the technology in the 2012 Club
and it takes away the human element which
to the ball and is able to predict and record
world cup in Japan. It also featured in the
is more exciting when the official has to make
its flight path. The system is almost real time
2013 Confederations Cup, a success that saw
his decision without the aid of any devices.
The Student Engineer
7
ADVERTORIAL \\\\\
vi si tor invitation East and Central Africa‘s L e a d i n g t r a d e Fa i r for the Security and Protection Industry incL. HigH cLass conFerence program witH internationaL speakers Visit us at our stand No No. Company Name
20th – 22nd August 2014 KICC, NAIROBI, KENYA daily 10:00 am to 6:00 pm www.secproteceastafrica.com
KENYA SECURITY INDUSTRY ASSOCIATION Taking Care
REPUBLIC OF KENYA MINISTRY OF TRADE
The Student Engineer
9
///// TECHNOLOGY
TECHNOLOGY \\\\\
The Art of Communication Health Perspective
by Lewis Sakwa
Base stations
Y
from their back surfaces or towards the top or bottom. This is particularly
interference between mobile phone calls and also prolongs battery life
ou look around you and wonder what the continuity of the
sites called 'base stations.' Base stations use radio signals to enable
relevant as there is a public perception that exposure is stronger directly
and, hence, extends talk time. The output power of mobile phones is very
masts is for? What is the name given to all the infrastructure
communication of mobile networks. They are made up of three main
under antennas. Therefore, when antennas are mounted on buildings,
low. During a call, and depending on whether it is a 3G or 2G handset,
that while we communicate efficiently, companies reap profit
elements which include
the exposures in rooms directly below the antennas are lower than
the output power can vary between a minimum level of less than 1 μW
in the area in front of the antenna. Base station antennas generally
up to a peak level of 2 W. The maximum average power of a handset is however less than 0.25 W.
from? Basically the series of masts intervalled at distance are called base stations.
••
Antennae
transmit outwards and not from their back, top or bottom surfaces so
Mobile networks are made up of an interconnected series of antenna
••
Supporting structure
exposures are lower in those directions. Mobile phones on the other
••
Power source
hand have antennas that are almost equally effective in all directions
The area served by a base station is termed a 'cell'. When the caller
to ensure reception, regardless of the phone's position. Whatever the
moves from one cell to another, the system hands over the call from one
Base station transmitter power levels may vary considerably, depending
equipment, the strength of a radio wave (called power density) decreases
base station to another seamlessly, so the caller is unaware of the change
on the size of the region, or cell, that it is designed to service. The output
dramatically as it travels away fromthe antenna. In free space, the power
of base station and the associated output power fluctuations caused by
power of indoor base stations is even lower and similar to that of a
density decreases to one fourth when the distance is doubled. In reality,
moving either closer to or further from a base station.
mobile phone. Base station antennas are typically about 15-30 cm in
the power density levels reduce much quicker than that due to obstacles
width and up to a few metres in length, depending on the frequency of
such as, trees, buildings, etc. Although it may be considered desirable
Base Station antennae types
operation. They are usually mounted on buildings or towers at a height
that base station equipment is placed in industrial areas or areas remote
There are many types of antennae used at base stations but we shall
of 15 to 50 metres above the ground.
from habitation there has to be a balance. Equipment placed too far
highlight only six.
from the users not only gives poor communication quality but also cause the phones to increase their output power to sustain the connection,
(also called radio waves) in patterns that are typically very narrow in
thus decreasing battery life and talk time.14 Also, each base station can
energy to a narrow angular sector in the forward direction.
the vertical direction (height) but quite broad in the horizontal direction
only support a limited number of simultaneous calls. As the number of
Antenna output power is typically 10 - 80 watts, and the
(width). Because of the narrow vertical spread of the beam, the RF field
subscribers grows more base stations are needed and these need to be
compliance boundary for the public may then extend 1 - 8 meters
intensity at the ground directly below the antenna is very low. The RF
close to where people want to use their phones.
The Student Engineer
Micro cell antennae: Typically a small sector antenna with
from the base station and then decreases at greater distances from
Site design considerations
output power of a few watts for providing coverage over short
the antenna. For a few meters, directly in front of the centre of the
During the last decade the design of mobile communications equipment
distances (typically 300-1000 meters). It is often mounted on an
antenna, the RF fields may exceed the permitted exposure levels. In order
has developed significantly, with a general trend to smaller, more
existing building, where it can be disguised as building features.
for the public to be prevented from entering areas where the permitted
efficient equipment offering equal or greater functionality. Creative
The compliance boundary has the same shape as for a sector
exposure levels may be exceeded, the antennas are elevated, and when
antenna and mast design is capable of significantly reducing the visual
necessary fences, locked doors, or other means of restricting access
profile of mobile communications infrastructure. This has proven to be
(with appropriate signs if needed)may be implemented.
a popular approach especially where the base station will be located in
together on masts. The combination illustrated here is that of
an aesthetically or environmentally sensitive area. It is not suitable in all
an omni-directional antenna mounted above a cluster of three
Directivity of base station antennas
locations because there may be some reduction in technical performance
sector antennas. The compliance distance may be larger than
So, where there is a greater concentration of the electromagnetic
when using smaller antennas. In addition, some community groups
for the individual antennas.
radiations? On what side of the base station of the telecommunication
have criticized mobile network operators for 'hiding'antennas.This is
mast are you safe?
not always possible for base station antennas as radio engineers can
concentrates its RF energy into a narrow beam in the forward
antenna ••
••
Antenna farms (or clusters) Antennas are often grouped
Radio relay antenna (or fixed point-to-point link) it
achieve optimum performance when antennas are mounted on high
direction. Power levels are typically low, less than 1 watt, and
Base station antennas are designed to transmit the radio signals in a
structures (or the top of buildings) away from physical obstruction such
safety distances a couple of centimeters.The parabolic dish
reasonably flat beam to optimize coverage. Antennas have 'gain, that
as other buildings and trees.
antenna is one example ••
is to say that the transmitted energy is directed towards area where
10
Sector antennae: Restricts most of its radiated electromagnetic
from the front face of the antenna. ••
field intensity on the ground increases slightly as one moves away
A television transimission mast
••
These antennas transmit Radio Frequency (RF) electromagnetic fields
Omni-directional antenna: This type of antennae radiates
people use phones so as to maximize coverage with the lowest possible
Mobile phones
electromagnetic energy equally in all horizontal directions.
output power.
When a mobile phone is switched on, it listens for specific control signals
Output power is typically 10 - 80 watts, and the typical
from nearby base stations. When it has found the most suitable (usually
compliance boundary for the public is 0.5 - 2 meters from the
At ground level the maximum measured exposure is generally a small
the nearest) base station in the network to which it subscribes, it initiates
antenna.
fraction of the exposure limit and will typically occur at distances between
a connection. The phone will then remain dormant, just occasionally
50 and 300 m from the base station. The distance is dependent on
updating with the network with information such as location, until the
localized coverage inside buildings where coverage is poor
characteristics of the site such as the antenna, the height and surrounding
user wishes to make a call or is called. Mobile phones use Adaptive
or where there are a high number of users such as airport
buildings and the surrounding terrain. In general, base station antennas
Power Control as a means of reducing the transmitted power to the
terminals, train stations or shopping centres. The power level
direct their power outwards, and do not transmit a significant amount
minimum possible whilst maintaining good call quality. This reduces
is similar to that of a mobile phone. The compliance boundary
••
Indoor antenna: Also sometimes termed Pico cells and provide
The Student Engineer
11
///// TECHNOLOGY continued from pg. 11.... is located within a few centimeters of the antenna. Regulation In the end of it all there must be a regulatory body charged with responsibility
TECHNOLOGY \\\\\
Thin sim Technology at the Centre of SafaricomFinserve wars
by Kevin Odongo
based tech company F-Road. The successful application of the technology in China with an estimated population of about 1.5 billion people is a clear indication that the technology can
Why Python?
be used to make banking and other financial services available to a large number of people with maximum returns.
to ensure that the radiations from the base stations are not harmful and that they
Kenya has an estimated mobile subscriber
do not interfere with the health of the
base of about 30.5 million people accounting
residents of the environs.
for about 93% of the total population. Another 73% are estimated to be users of mobile money.
Another concern is bourne by the service
Furthermore, 23% are said to use mobile money
provider. The Cells of communications
at least once a day. The number of mobile
need to be close enough to enhance
subscribers continue rising and so is the number
reliability. While the building of many of
of mobile money users as people seek more
base stations closer to aid in the speed of
available banking services without having to
communication is a recommended choice
visit the banks. Cash payments are rapidly
for the telecommunication companies, the
being replaced by mobile-phone payments in
balance must be struck.
virtually all sectors of the economy.
The size and shape of each cell is determined by the topology of the area
Now I think the introduction of the thin
of coverage and other environmental
SIM technology by Finserve is promising
factors that could block signals. Cells are
ve r y i nt e re s t i ng t i m e s a h e a d fo r t h e
largest in flat open landscapes, where they can cover a radius of several kilometres. Cells in urban areas typically cover up to a two kilometre radius. The smallest cells, covering a few tens or hundreds of metres, are in built up areas, where micro-
E
quity Bank , through its wholly
SIM, hence enabling other providers to provide
telecommunication and banking industries.
owned mobile vir tual net work
services through the overlay SIM network
It has the potential of doing better than
o p e r a t o r ( M V N O ) s u b s i d i a r y,
without interfering with the operations of the
Safaricom's MPESA if well implemented. It
Finserve Africa, is planning to roll
primary SIM.
promises better services at better costs. These wars are going to be beneficial to the customers
out thin sim overlay technology which would compete with safaricom's money transfer
Once the thin SIM is stuck onto a primary SIM
in the end. Safaricom will have to improve or
cell base stations are used to provide extra
and telecommunication services. These plans
card, users can access services on both the thin
see its customers prefer Finserve's product.
coverage and capacity. They serve to boost
however, did not go well with Safaricom who
SIM network and the network of the original
the network coverage.
wrote to Communications Authority of Kenya
SIM card onto which it is laid. The company
Meanwhile, it seems Safaricom is also not left
saying the thin SIM would pose great risks to
providing the thin sim technology is Taisys
behind in trying to bridge gap between banking
Each base station can only handle a limited
the privacy of mobile subscribers and interfere
Technology Ltd Company of Taiwan which also
services and clients:
number of connections at a time. In areas
with normal operations of the primary SIM
holds the patent for the technology.
of high demand, additional antennas are
cards onto which they will be planted. Safaricom
sometimes added to a base station to
had also asked the communications regulatory
SIM overlay technology was initially developed
send and receive more calls and other
body to ban Finserve from using the thin SIM
by Chinese Mobile Network Operators as a
mobile services, or an extra base station
technology. Finserve refuted the claims by
mobile phone solution to support multi operator
Safaricom and Kenya Commercial Bank signed
is installed.
writing to the regulator saying Safaricom's
access, designed to avoid roaming fees- a
a deal that will see line between banking and
allegations were "little more than attempts to
concept that Roamly, a Canadian company has
telecommunication continue to blur. Under
quash competition".
successfully applied globally to solve roaming
the agreement, safaricom and KCB will jointly
problems that arose when a user travelled
roll out different products with financial and telecommunications features.
All this means a large number of base stations are needed to allow more
Biashar@Smart: Safaricom-KCB deal to target Small firms
people to use more mobile services, from
A thin SIM is an ultra-slim layer of plastic with
across countries. A situation that always forced
more locations, and for coverage to be
a circuit printed on it. A user can stick it on
them to buy local sim cards of the countries
continuous when they move around. Most
to an existing SIM Card to continue accessing
they were visiting or incur higher charges in
First off was the launch of Biashar@Smart,
people welcome improved coverage and
the original network, but with the added
transferring to the mobile operator network of
a product targeting small and medium
services. But we recognize that expanding
functionality of the secondary provider. It
the country they are visiting. This technology
Enterprises (SMEs), and that has different
our network can cause concern, usually
ideally converts single SIM device into a dual-
has made it unnecessary to carry two phones
financial and telecommunication aspects. The
about the visual impact of base stations or
SIM device. Touch points built into the overlay
while on a foreign trip.
product will give businesses access to credit,
health issues concerning radio frequency
filters information between the two. The
(RF) fields.
hardware enables a means to store and carry
Use of the thin SIM technology for financial
data storage, domain hosting and professional
programs logic independent of the primary
solutions was pioneered by the Shanghai
email services.
12
The Student Engineer
insurance services, business advisories, online
W
hile majority of us think of a large
software, read its source code, make changes
tropical snake, Google and other
to it and use it in new programs. This makes
dozen blue chip companies are
python even better since its based on concept
making billions using this new technology. Still,
of community which shares knowledge. This
others are shunning from it citing its simplicity
community constantly improves the language
and beginner oriented. Python programming
and provide valuable documentation.
language has recently gained popularity among developers, hackers, academia and
Its Portable
other communities world wide. In this article
Owing to its open-source nature, Python has
we the ins and outs python and what makes
been ported to all major platforms by many
such a darling.
developers all over the world. All your Python programs can work on any of these platforms
Guido van Rossum, the creator of the Python
without requiring any changes at all if you are
language, named the language after the BBC
careful enough to avoid any system-dependent
show "Monty Python's Flying Circus ". Python
features. Thats write once and deploy to all
is an easy to learn, powerful programming
platforms: Windows xp, 7 and 8, Linux, Apple's
language. It has efficient high-level data
Mac OS.
structures and a simple but effective approach to object-oriented programming. Its elegant
Its interpreted
syntax and dynamic typing, together with its
While programs written in compiled languages
interpreted nature, make it an ideal language
like C/C++ need to be conver ted from
for scripting and rapid application development
source code to binary and linked to execute,
in many areas on many platforms.
interpreted languages on the other hand need only to be run from their source code. Python
Its simple
being interpreted is thus much easier since
As already mentioned, the simple and
the user not need worry about compiling and
minimalistic language is its greatest strength.
linking. This process is handled internally. This
Reading a python program feels like reading
make python ideal for prototyping and rapid
English. In short, it allows you to concentrate on
application development.
the problem solving rather than the language itself.
Its object oriented In object-oriented languages, the program is
Its free
built around objects which combine data and
Moreover, python is an open source software.
functionality. Python has a very powerful but
It means you can freely distribute copies of this
simplistic way of doing OOP, especially when
The Student Engineer
13
///// TECHNOLOGY
INFORGRAPH \\\\\
CGI, FTP, email, XML, XML-RPC, HTML, WAV files, cryptography, GUI (graphical user interfaces) and much more. All this are always available wherever Python is installed! This is called the 'Batteries Included' philosophy of Python. At its website (www.python.org) , success stories section: 'Python is part of the winning formula for productivity, software quality, and maintainability at many companies and institutions around the world. ' You can read the enlisted 41 real-life Python
Library (ies)
Notes
Pandas
Statistics and data analysis
success stories, classified by application domain. Among the top companies using python:
Numpy Scipy
Includes modules for graphics and plotting, optimization, integration, special functions, signal and image processing, genetic algorithms, ODE solvers, and others. (Scipy + Numpy are talternate to Matlab)
Google, Mozilla, CERN( Large Hadron Collider ), Nasa, Objexx Engineering, ForecastWatch, Esri, bitly among among hundreds others.
Django/Flask/Bottle
Web development frameworks
GIS Web services
Packages to access to Google Maps, Yahoo! Maps and more information
us to produce maintainable features in record
. (geopy & googlemaps)
times, with a minimum of developers' Cuong
'Python is fast enough for our site and allows
Source: https://pypi.python.org/pypi
Do - Software Architect, YouTube.com Python has been an important part of Google
compared to big languages like C++ or Java.
since the begin-ning and remains so as the
Combining the advantages of OOP and its
Guido van Rossum, the creator of
system grows and evolves. Today dozens of
simplicity, gives the language a big plus.
the Python language, named the
Google engineers use Python, and we're looking
language after the BBC show "Monty
for more people with skills in this language -
Extensible
Python's Flying Circus ". Python is an
Peter Norvig - Director of Research at Google
If you need a critical piece of code to run very
easy to learn, powerful programming
Inc
fast or want to have some piece of algorithm
language.
not to be open, you can code that part of your
Python is indeed an exciting and powerful
program in C or C++ and then use them from
language. It has the right combination of
your Python program.
performance and features that make writing Extensive Libraries
programs in Python both fun and easy. What
Embeddable
The P y thon Standard Librar y is huge
more? Its my hope that I've convinced you
You can embed Python within your C/C++
indeed. It can help you do various things
somehow and that you're yearning to learn
programs to give 'scripting' capabilities for
involving numerous functionalities as regular
some python. Of course go learn: who knows
your program's users. Blender and AutoCAD are
expressions, documentation generation, unit
what next big thing you could bring fourth...
example program's using python for scripting.
testing, threading, databases, web browsers,
14
The Student Engineer
The Student Engineer
15
///// DESIGN
DESIGN \\\\\
ome to the legendary Adolf Hitler the Nazi leader. This is the image that comes
One of the very interesting brand of the Volkswagen Company known as the
to anyone's head at the mention of the word Germany. Ironically Germany is
Volkswagen beetle. It "froglike/bug like" appearance makes it one of the most
home to the world's most precise engineering in the automobile industry. It
interesting cars admire. The car basically originates from the earlier mentioned
has been traced that the perfection has been drawn from, the ages of Adolf
Adolf Hitler. Hitler wanted a cheap, simple car to be mass-produced for the
and world war. Now let's see how necessity is the mother of invention.
new road network of his country. He contracted Porsche in 1934 to design and
Let's take a review on some of the leading brands in the world
build it to his exacting standards. Ferdinand Porsche and his team took until 1938 to finalize the design. This is one of the first rear-engine cars. With over 21 million manufactured (21,529,464) in an air-cooled, rear-engine, rear-wheel
16
The Student Engineer
Volkswagen
drive configuration, the Beetle is the longest-running and most-manufactured
Commonly known as the VW in most parts of the world, but in Kenya it is known
car of a single design platform, worldwide. The rules were very simple he
as the Passat (of which Passat is a brand of the Volkswagen. This is so because
assembled all engineers available in Germany at that time and then he would
it is the dominant brand of the Volkswagen group in the region and also it has
ask them, "how many think it is not possible to build a car that is air-cooled,
been known as a favorite choice government officials for its high performance
rear-engine and with rear-wheel drive configuration?" whoever raised his/
power and fuel efficiency. It has three cars in the top 10 list of best-selling
her hand was just a bullet in his/her head. And that was the birth of the
cars of all time compiled by the website 24/7 Wall St: the Volkswagen Golf,
Volkswagen Beatle. German historians estimated that 80% of Volkswagen's
the Volkswagen Beetle, and the Volkswagen Passat.
wartime workforce was slave labor.
The Student Engineer
17
///// DESIGN Audi's slogan is Vorsprung durch Technik, meaning "Advancement through Technology".Recently in the United States, Audi has updated the slogan to "Truth in Engineering. Commonly known in the transporter movie is the Audi A8, A7 in the movie Iron man and Q7 which is the dominant SUV brand in Kenyan streets. Ford Germany Ford-Werke is a German car manufacturer headquartered in Niehl, Cologne, North Rhine-Westphalia and a subsidiary of Ford of Europe, which in turn is a subsidiary of Ford Motor Company. Not well known but when one meets a ford ranger where the roads end, the mouth goes agape. Mercedes-Benz It is also a German automobile manufacturer, a multinational division Bayerische Motoren Werke (BMW)
of the German manufacturer Daimler AG. The Mercedes is the most
Bayerische Motoren Werke English: (Bavarian Motor Works), commonly
luxurious official car in Kenya, preferred by most top-ranking officials in
known as BMW or simply Beemer and even some call it the ultimate
the country. You will find it as the most dominant brand in the presidents
driving machine. Founded in 1916. One of the most iconic brands in
escort team. Mercedes-AMG, McLaren Mercedes, Maybach are some
the world, known for sheer driving pleasure high power and efficient
of the super cars in the world sprinting from 0 to 100 km/h in just 3
driving dynamics. Is headquartered in Munich, Bavaria, Germany. It also
seconds. The E class and S class are filled with technology beyond their
owns and produces Mini cars, and is the parent company of Rolls-Royce
scope, an S class for instance can detect a bump ahead and adjust its
Motor Cars. BMW produces motorcycles under BMW Motorrad, which
suspension to compensate for the rough ride, and in fact you can drive
holds several world racing titles.
through a rough road as if you were swimming in butter.
BMW is part of the "German Big 3" luxury automakers, along with Audi
Adam Opel (Opel) is a German automobile manufacturer
and Mercedes-Benz, which are the three best-selling luxury automakers
headquartered in Russelsheim, Hesse, Germany and a subsidiary of the
in the world. One of the most known brand is the BMW m3 which has
American General Motors Company. The company designs, engineers,
dominated in most rally championships and received as the car with the
manufactures and distributes Opel-branded passenger vehicles, light
best handling according to top gear. Another upcoming BMW product in
commercial vehicles and vehicle parts.
Kenyan streets is the BMW X6 the show stopper, statistics have shown that 7 out of 10 people must comment whenever the Machine passes by.
A sports car that could be simply defined as a son to the famous
Some of the tech advancements brought by the BMW are the
Volkswagen beetle. In August 2009, Porsche SE and Volkswagen
antilock brakes, X drive, I drive, electronic stability control and many
AG reached an agreement that the two companies would merge in
more.
2011, to form an "Integrated Automotive Group". The management of Volkswagen AG, which had resisted relinquishing the power to control,
Audi
agreed to be owned (50.7% of Volkswagen AG ordinary shares with
Audi is a German automobile manufacturer that designs, engineers,
voting rights) by Porsche SE in return for VW acquiring control of
manufactures and distributes automobiles. Audi oversees worldwide
Porsche AG.
operations from its headquarters in Ingolstadt, Bavaria, Germany. Audibranded vehicles are produced in nine production facilities worldwide.
Alpina Burkard Bovensiepen GmbH is an automobile manufacturing
Audi has been a majority owned (99.55%) subsidiary of Volkswagen
company based in Buchloe, in the Ostallgau district of Bavaria, Germany
Group since 1966, following a phased purchase of AUDI.
selling their own cars, based on BMW cars. Alpina works closely with BMW and their processes are integrated into BMW's production lines,
The four rings of the Audi logo each represent one of four car companies
thus Alpina is recognized by TUV as an automobile manufacturer, in
that banded together to create Audi's predecessor company, Auto Union.
contrast to other performance specialists which are aftermarket tuners. For instance, the Alpina B7 is produced at the same assembly line in Dingolfing, Germany, along with BMW's own 7-Series. And now this will be home to the world's most popular trophy, the FIFA world cup. This was after beating Argentina 1-0 in Brazil July 2014. Well done #teamgermany
18
The Student Engineer
Energy State of the Nation Dubai’s power The fuel cell technology Powering the future Towards sustainable energy
///// FEATURE
State of the nation Where do we stand in the energy sector?
T
FEATURE \\\\\ there is safe and sufficient provision of energy to its populace. That in
Kenya Power Company as of now. The industry is headed by the Energy
the end the Energy harnessed during their eras see the nation through a
Regulatory Commission which has been mandated to license sector
monumental shift to enable people drive their lives to yet another level.
entities, regulate tariffs, ensure service quality and coordinate the planning process.
We take an incisive look into the Kenyan energy sector. Instead of who by Lewis Sakwa
owns Kenya, we might ask who powers Kenya?
How energised is the country is a question that beckons... The country has a Hydro Electric capability of about 745MW, an approximated
he nation is on the move; industries must arise and economy
he has. While doing so he must ensure that the conversion of energy
must be built and rebuilt despite the political turmoil and
from one form to another is such that there is a utility it shall achieve
exasperation observed here and there... because we know
in changing the life of a people.
this too shall pass. For it is like chasing the wind. Unlike this matter which is most discussed in all avenues probably
With this, he must strive to understand that, energy being inherently
because it affects only today which is everyday, we have to subscribe
multiform must be used with care to ensure that the environment from
to simple principle of Conservation of energy- Energy, just like matter
which it is being harnessed or converted to yet another form is not
can neither be created nor destroyed. So what must man do? Man must
endangered. That the ecosystemic balance is maintained at all costs.
find a way, a method to harness, and conserve for posterity the energy
In modern day governments are tasked with this role. To ensure that
The Kenyan energy sector rotates about the following players: There
300MW of Geothermal Production and 398MW of thermal power
are those who are charged with the mandate to of policy formulation
production, 5MW of Wind energy 31MW of co-generated energy as well
and planning and funding who include The Ministry of finance, Ministry
as 16MW of off the grid energy supply. It is estimated that this country
of Energy and the Development partners. The other players include the
has a 6000MW potential for hydro electric generation
Geothermal Exploration and production mainly under the Geothermal Development Corporation (GDC), there are also those involved in the
Major sources of commercial energy in Kenya are petroleum,
electricity generation which mainly done by Ken Gen and Independent
geothermal and hydro energy. 75 % of population use traditional solid
Power Producers (IPPs). There is the Transmission and Distribution
fuels such as fuel-wood and charcoal in residential sector for heating,
companies; a role that is played by Kenya Transmission Company and
light and cooking. The residential sector contributed 81 % of energy consumption in 2009. Further development of the use of biomass and extension of national electricity grid would reduce this consumption greatly. Electricity demand in the country is significantly rising mainly due to the accelerated productive investment and increasing population. Electricity capacity It is however true to state that Kenya has weak and restricted transmission and distribution network. Kenya's electricity mix is dominated by hydro generation (over 50%) and thus highly vulnerable to weather conditions and climate change. The climatic conditions of 1998-2000 and 2008-2009 curtailed hydro power generation and led to severe energy shortages which culminated into power rationing. Currently the electricity demand is 1,191 MW against an effective installed capacity of 1,429 MW under normal hydrology. The peak load is projected to grow to about 2,500MW by 2015 and 15,000 MW by 2030 which means huge changes in energy sector. Government has formulated strategies whose objectives are to rapidly expand installed electricity capacity, expand and upgrade the transmission and distribution networks, and develop renewable energy sources: geothermal, solar, wind, biomass and small hydro power General situation in Energy sector Heavy reliance on hydro electricity has costed us much including the infamous power rations. These require a solution. Hydro electricity despite its heavy investment is too dependent on the climatic patterns and if there be a shift in climatic conditions then the country shall suffer a massive setback in its desire to develop and achieve the blue prints of 2030. It is the desire of the government to be able to produce more than 5000MW by 2030. it is also the current government's encapsulation that it should be able to scale to those heights in the next three years plans we are so proud of. Given the fact file stating that only 15% of the rural population has access to power as of 2011, it would be appreciated that the government has got market for the power. However, if this is to succeed then it follows that there is need to ensure that the rates of transmission and distribution are let to be lower to enhance the capability of the common man accessing the power.
A geothermal power plant
20
The Student Engineer
The Student Engineer
21
///// FEATURE
FEATURE \\\\\ 2009
1990
Total energy consumption
217.6TWh
127.2 TWh
Energy consumption per capita
5.5MWh/capita
3.2MWh/capita
Electricity consumption
5.81TWh
2.75TWh
Electricity consumption per capita
147kWh/capita
Access to electricity
16%
Access to electricity urban population
51%
Access to electricity rural population
4%
Energy imports (% of energy use)
17%
Electricity imports (% of electricity use)
0.16%
Power production capacity
1621 MW
723 MW
Hydro power production capacity
747 MW
498 MW
Electricity production
6.88TWh
3.23TWh
Hydro electricity production
2.85TWh
2.54TWh
Share of population using solid fuels
75%
Fossil fuels % of total energy
17.5%
Sustainability
18%
16.8%
power and probably control like 70% of the nuclear resources.
It is therefore out of question that this country can rely on hydro electricity given the foiling of our weather patterns. The players in the
Nuclear investment is a magnanimous venture. It requires not only the
sector, researchers and all stakeholders must give a thought to other
financial muscle but also preparedness that is missing in this country.
sources of energy. Nuclear energy would be a clear way to go. If this
There is need to develop efficient disaster management capacity to be
country is to achieve the belated MDGs and eventually culminate to
able to handle any unforeseen calamities that may come with such a
vision 2030 we need to embrace a rapid initiative that would propel us
hefty investment. This we can not run away from it; that this country
to the heights of industrialisation. To be able to carry out this we need
has a pathetic system of handling disasters even those of miniature
an overhaul of the system of generation of power. We need to defy all
levels. And if this is not improved, then our quest to join the "League
odds against the anti nuclear messengers who of course have nuclear
of Nations" can not be authenticated. That shall be for safety and
A section of Olkaria III geothermal power plant in Kenya
as a precautionary measure. South Africa long joined these nations.
generating approximately 212 MW, compared to a potential estimated
It is up to the incoming performers to ensure this happens even to
at 7,000 MW to 10,000 MW. As forecasted in Vision 2030, Kenya
our beloved Kenya. The advantage being, the energy is renewable and
aspires to generate a total of 15,000 MW, 5,000 MW of which will come
its continuity provides for the maintenance and recovery of the initial
from geothermal. In pursuant of this goal, Geothermal Development
capital investment. There is need for The Kenya Nuclear electricity
Corporation (GDC), plans to drill 1,400 steam wells to provide steam
Board to carry out awareness and demystify the misconceptions held
for the generation of 5,000 MW of geothermal power by 2030. This will
by many of us, scholars included.
require a reported $18 billion in capital investments in the geothermal
Nuclear energy is clean energy. It has lesser implication on the ozone
sector in the coming years.
and there are hardly emissions that go with it. With the advancement in technology, there is more improved measures to ensure that there
Consumption of electricity in Kenya is extremely low at 121 kilowatt
is no repeat of the incidents of nuclear related accidents.
hours (KWh) per capita. Only about 29% of Kenyans are connected to electricity while the connection rate in the rural areas is estimated
While that is said, there is need to understand that Nuclear Energy is not
at 15%. Fortunately, this situation is rapidly changing as the country
completely 100% emission free. It should be recognised also that the
invests more resources in power generation, transmission, and
plants cannot run without government subsidies and also while carrying
distribution. Kenya is quickly developing its geothermal resources with
out the investment, development partners would not easily come into
22 developing projects, three of which are under construction and
play because of the risk that is involved. This may serve as a deterrent
expected to be operational in late 2014. This country is one of the fastest
to the sector development. However with the right mechanism in place,
growing geothermal markets in the world. The government is moving
the sector can run the national grid non-stop
a substantial amount of resources into building up its geothermal
As earlier indicated, the sustainability of nuclear energy is relatively in
infrastructure. GDC is developing the steam resource at three primary
higher standings as compared to the other sources of clean energies.
resource areas (Menengai, Bogoria-Silali and Suswa). Through GDC, the
This is because of constant technological advancements that are making
Kenya government is planning on contracting with Independent Power
sure that the whole process is better and safer. If this is adopted then
Producers (IPP's) to sell geothermal steam/brine at the plant fence for
any country can safely adopt this form of energy for posterity. However,
use by the IPP's to convert the resource to energy through a power
there is a greater medical risk whenever we have a nuclear reactor
conversion contract.
explosion or destruction. People have to be evacuated and the land becomes a wasteland contagious in nature and therefore inhabitable.
GDC is also evaluating potential joint development agreements with private developers to assist in the development of the new steam fields.
Koeberg Nuclear plant - South Africa
22
The Student Engineer
Geothermal Exploitation and Sustenance
In addition, the Kenya government is encouraging private development
According to the 2013 Geothermal Power: International Market Overview
of additional resource areas through concession agreements with
Report, Geothermal exploration began in Kenya in 1957 and is presently
private IPP's.
The Student Engineer
23
///// FEATURE Right now 296 MW of the over ~1,000 MW of geothermal under
FEATURE \\\\\ Region
Installed capacity
Potential
Africa
0.2
143
Nort America
4.1
218
Latin America
0.5
132
It would therefore seem that the way forward is Geothermal which is
Europe
1.6
51
renewable and available in the country given our geographical location.
Middle East
0.0
32
With a capacity of close to 300MW against the probable capacity of
Pacific
1.2
62
7000MW we have an approximate 96% of our resources unexploited
Developing Asia
3.2
195
which should serve to set task upon mind to be able to exploit these
Transition Economics
0.1
166
development in Kenya are physically under construction. If all projects are completed on time we will lead the world with substantial additions to the existing geothermal infrastructure over the next decade and become a centre of geothermal technology on the African continent.
resources. It would therefore be right to say that the sustainability of Geothermal Power in Kenya has a better outlook than the other sources
It is conclusive that Africa as a continent has unlimited capacity in terms
of energy especially the Hydro electricity. The government therefore
of geothermal energy potential which has not been invested in.
ought to develop the capacity of manpower specialised more in the Geothermal exploration and do more on ensuring that this sector of
there are however a number of reasons that may be attributed to the
energy, is fully harnessed for the provision of clean energy.
slow investment in this sector which require immediate tackling. Some of them include but are not limited to:
Geothermal Power: State of The world
••
Large Upfront cost of geothermal exploration and development
Only 0.1-0.3 % of world energy demand is met by geothermal, despite
••
High Risks Associated with Resource Exploration and Power
a theoretical 1 TW power potential and 30-60 TW in direct use . The industry is slowed down by green field risks, large
development ••
Inadequate skilled manpower and equipment for geothermal
New Strathmore university green building
Resource Exploration and development upfront capital investment, and power generation costs exceeding
••
Limited national budgetary allocation and donor funding
other locally available options .The human resource pool, number of
at which we are harnessing this form of energy. The GDC must
••
Inadequate Private Sector Participation in the region
development companies and investors willing to enter the industry are
come up with ways through which they can mitigate to provide more
••
Lack of Supportive government policy and Regulatory
opportunities to train and if possible include in the tertiary, more
While this is being done, Strathmore University has gone solar a trend
framework
specifically, Engineering curriculum Geothermal technologies to be
that now places them on another level of quick and efficient imagination
able to confront the cases of manpower shortage
unlike its competitors whoa re still stuck to the old easy and accepted
also limiting factors . Rising prices of fossil fuel is changing the scene . Current growth rate is few hundred MW per year while the potential is in the GW range
There is therefore a need for capacity building to improve the rate
upon it by other consumers.
methods of energy harnessing. This has been an initiative of Prof. Da Solar Energy Development
Silva, the Director of Energy research Centre at Strathmore University.
While there is a general acceptance that solar energy harnessing can
According to the researcher, Kenya only accounts for 2% of the solar
be one of the most consistent sources of energy for this country, there
installation yet it sits on the Equator with the sun all through. 98% of
is a general lax in the way the energy stakeholders are taking up this
the installations are in countries that are out of the equatorial belt.
challenge. Kenya has more than half of the 580367 sq. Kilometres of
There is a challenge when it comes to solar in that there is lack of
land as an ASAL areas. Solar farms would go a long way to providing
awareness and there is no specific solar industry in this country.
for almost all the homestead energy requirements. There are few solar
Nevertheless, Strathmore University has installed a total of 2400 PV
farms in this country one of them being The SOS farm in Mombasa
solar cells and a total of 30 inverters, a venture which is costly but
which has close to 132 PV solar cells. If there is the use of the mono-
commendable in all respects. This is set to provide a total of 600KW of
crystalline technology, then there would be an assured continuity of
power enough to power the whole institution. The project was funded
power generation in these sites. Development partners involved in
under the Green Fund by the Cooperative Bank of Kenya.
such projects would want to often be aware that they can be able to be enjoined in the national grid so as the venture is beneficial. Africa
It can be seen that our energy options are wide and many. Many of
is endowed with the sun as a resource for development of energy.
them are unexploited and yet to be put to full utility for the advantage
However, it can be introspected that lack of funds in these projects
of the citizens. However as engineers and innovators, there is need to
that require heavy initial capital set up has been the hindrance towards
inquire of ourselves if the trend that has been set is the one we seek to
ensuring that this clean energy is tapped.
maintain or if there is a way, revolutionary yet accepted through which we are going to facilitate the industrial growth by harnessing the energy.
Vents at a geothermal power plant
24
The Student Engineer
Plans are however under-way to ensure that the solar capacity of this
Are we bound to work in all day long in the office with the acceptance
country are bolstered. Kenya has identified nine sites to build solar
of the inefficiency that is seen in the energy systems or are we going
power plants that could provide more than half the countries electricity
to change the trend. While we accept the truth that as individuals we
by 2016. Construction of the plant is set to cost an approximate of $1.2bn
do not have the financial muscle to make corporations that shall solely
and is on going as of 2014. There are plans by the Rural electrification
run the Kenyan energy sector, we must prepare ourselves to do the
authority to put up a solar plant of about 50MW in Nanyuki Kenya. This
practical jobs, of checking
shall go along way in relieving the national grid of the demand placed
The Student Engineer
25
ADVERTORIAL \\\\\
Huawei internship and training program for engineering students
T
he ICT Authorit y in par tner ship
Or any other engineering course in the
How can I apply?
with Huawei Technologies Ltd are
telecommunications field.
Visit www.icta.go.ke for the application form.
offering internship opportunities to
The application process has 4 Parts;
engineering students starting August 2014.
Which University and what year should the
The programnamed "Telecom Seeds for The
student be in?
Part 1: Consists of Non-Technical Questions on
Future" will run for a period of three years. The
The student applying must be from any
an online application form, published on the
partnership aims to increase employability of
accredited and Chartered university and in 3rd,
ICTAuthority website - ALL applicants must
university engineering students by extending
4th or 5thyear of their engineering course.
complete all questions in Part1.
How long will the program take?
Attachments: You will need to attach
This internship will be for a period two months.
the following documents to your online
Below are some basic facts about the
The program will be ongoing for the next three
application:
Program:
years and is expected to benefit atleast 100
i)
studentswithin the three years.
ii) Copy of your latest transcript certified
training and internship opportunities to them and subsequent consideration for employment.
To apply go to www.icta.go.ke
by your university What is the duration of the training and
What is the name of the program?
internship?
The program is known as the Huawei "Telecom
Two months (8 weeks)
Seeds for the Future" and will run for a period of three years (August 2014- August 2017).
Copy of your student ID
iii) Copy of National ID Note: Only Shortlisted candidates will be contacted to move on to the next stages
When is the program expected to commence?
Part 2: Consists of Simple Multiple Choice
What is the program about?
The call for applications will be in August 2014.
Questions
The Huawei Telecom Seeds for the Future
Interns will be expected to start working at
Part 3: Consists of Detailed Knowledge based
program is an internship and training program
Huawei at the start of September 2014. Full
questions
targeted at 3rd, 4thand 5th year University
details of application are available on www.
Part 4: Face-to-Face interview
students pursuing undergraduate degrees
icta.go.ke
in Engineering. Students must be Kenyan Nationals.
Are there additional benefits for the
After successfully completing the program,
students?
students will begiven a certificate. Successful
The initiative will see top ten internsoffered a
students will also get professional mentorship
chance to further their skills in China, through
opportunities by Engineers at the Institute of
Provide students with an
a cultural exchange program. Details will be
Engineers of Kenya (IEK) with the possibility of
opportunity to learn about the latest
shared at the time of joining.
becoming a registered engineer by IEK
What is the aim of the program? ••
What do I get after completion?
Telecommunications technologies ••
Develop local ICT talent
Do I expect a job after completion?
Who are the sponsors of the program?
••
Applyknowledge gained in class to a
We do not guarantee jobs but we will do our
It is an initiative by Huawei Technologies Kenya
field setting.
best to assist interns by linking them up with
Co. Ltd in partnership with ICT Authority.
Promote a greater understanding of
ICT companies and other potential employers.
and interest in the telecommunications
Huawei will also give priority to the best students
Where will be the internship be based?
sector
and consider them for employment depending
Interns will be based at Huawei Technologies
Build a regional understanding of
on available opportunities at thecompany upon
Ltd Nairobi office.
ICTand a network of digital professionals
the student's completion of the internship.
••
••
Contact Details: Which courses should thestudents be
This will be based on Huawei's business
If you need more information write to:
undertaking?
and project needs upon completion of the
skills@ict.go.ke or kenyaintern@huawei.com
••
Electrical Engineering
internship/training and other Terms and
••
Computer Science
conditions.
••
Telecommunications
The Student Engineer
27
///// FEATURE
FEATURE \\\\\
Dubai’s power
"
Some of the coolest features of the Dubai mall are Kidzania by David Chege
It will be built with the state of the art technology to reduce
Quite a number of major Malls in Kenya could easily be parked inside
energy consumption and carbon footprint, ensuring high
the currently world's largest shopping mall still in Dubai, a 20 billion
levels of environmental sustainability and operational
dollar project with more than 1200 shops inside. It is the world largest in
efficiency," says Byat, Chief Executive Officer of Dubai holding.
retail history. However it is not the largest in gross leasable space, and
This comes shortly after the vice president and prime minister
is surpassed in that category by a few malls like the, south China mall,
of the UAE and ruler of Dubai after His Highness sheikh Rashid Al
goldenresource mall, and SM mall of Asia. Sprawling over 12 million
Maktoum, launched the world's first temperature controlled city, mall
sq.ft. slightly more than 50 soccer pitches.
Dubai Aquarium
This is a city specifically made for kids to run and enjoy themselves. Here
This is the key center piece the largest tank of its kind inside a mall. The
the kids can do all sorts of things that adults do in meticulous detail.
aquarium stands at 51m x 20m x 11m and features the world's largest
They can fly aeroplanes, drive cars even buses, work as cashiers, work
viewing panel at 32.8m wide and 8.3m high. Over time the , the Dubai
in the restaurants and many more. This is where children live their
Aquarium will have more than 33,000 living animals, representing more
dreams before they even dream.
than 85 species including over 400 sharks and rays combined. Dubai aquarium's 270 degree glass walkthrough tunnel makes it possible for incredible close counter experiences.
of the World. It will be the largest occupying 48million sq. ft. it will compose of the largest indoor theme park in the world, which will be covered by a glass dome that will be open during winter months.
The sega republic Here you enter a nation addicted to adrenaline. This is the regions first SEGA indoor theme park a mind altering, visually stimulating, adrenaline-pumping attraction. Here rebel against the senses on go into system overdrive.
28
The Student Engineer
The Student Engineer
29
///// FEATURE
FEATURE \\\\\
Reel cinemas
The fuel cell technology
Imagine a whopping 22 screen all under one roof, a redefined cinematic experience with sensory overload. Now let's leave the world offantasy for a while and ask ourselves just one simple question.Where does Dubai get power to feed this mall which is
by David Chege
just but a very small fraction of what it actually generates? Let's solve which can be dispensed at hydrogen stations
it by elimination.
in about the same time as gasoline. Nuvera a Bear in mind that hydro-electricity power can simply not exist in a desert.
company preparing for the future in the United
Dubai has no rivers of its own not even an oasis. However it does have a
States is setting up fuel ports for fork lifts in
natural inlet, the Dubai creek which has no possibility of HEP production.
anticipation of the larger passenger car market in incubation.
Solar panels simplycannotbe reliable in places such as the 24hr mall especially at night and in winter with the massive consumption of
The lack of hydrogen fuelling infrastructure
megawatts. Being also in the desert the sand storms may cover the
means that fuel cell vehicles will likely be
panels and the small size of Dubai which can't handle the large surface
targeted at a few niche markets, such as
area required by enough panels to feed the whole city.
fleet vehicle operators or environmentally minded consumers in cities equipped with a
Ice Rink In Kenya you will only find one at Panari but not as large as the one in Dubai mall. It's the magical winter wonderland Ice Rink now imagine one so big just next to one of the world largest sandy deserts, where mercury easily pass the 40 degree mark on the thermometer, and its temperature must remain slightly below 0 degrees Celsius. Whether you want to learn ice skating, perfect your technique, play ice hockey, socialize with friends or just have a great time its open any time of the year.
Another source of power is tidal energy. This is where tides are allowed
few hydrogen fueling stations. Although car
to rise water gets trapped and then released as it turns the turbines to
manufacturers are showing a lot of interest
produce electrical energy. This however is limited by small size of the Dubai coast and the quest for land reclamation for construction. Intact the world's most luxurious hotel rests on land reclaimed from the sea at the coast of Dubai, the burj Al Arab. Another activity that could rule out the use of tidal energy would be the placing of the world in Dubai. These are islands being constructed at the coast of Dubai with the shape of the world. Wind energy could be a major consideration but on the other side of the coin Dubai's winds are seasonal and at times very destructive. This makes wind energy highly unreliable for high and consistent megawatts of electricity. We are almost out of ideas for the source of power for such a great consumer city. The secret behind the source of energy is natural gas as the main source of fuel for power generation. But still a problem lies behind the story. Natural gas is non-renewable. Can it really last forever? Can it cope with the ever growing demand for electricity? Definitely no and it will therefore have come up with a plan to protect the future generations. Researchers and engineers in Dubai are currently studying plans on how to start power generation from clean coal by 2020 and nuclear energy by 2030. Those will make up about 30% of on Dubai's electricity generation capacity, while also seeking to cut 30 % from overall demand by implementing efficiency measures.
in ecofriendly sources of fuel and more so the
Chevrolet volt fuel cell concept
I
fuel ell. The costs are higher than conventional
t's amazing how time is zooming against
atoms to form water. In the process electrons
technology, but now technology is already
are released and flow through an external
past time and its waiting for the slow
circuit as an electric current.
moving time to hit 2015 for it to show what
it does have for the world. This comes after the
It's amazing that fuel cells can vary from tiny
leading car manufacturer Toyota announces
devices producing only a few watts of electricity,
the fuel cell technology, though the world is
right up to large power plants producing
not ready for it so it has to wait until 2015 for
megawatts.
the grand unveiling. The design of the fuel cell is two electrodes Basically a fuel cell is a battery that produces
separated by a solid of liquid electrolyte that
electricity from an electrochemical reaction. In
carries charged particles between them. A
both a fuel cell and a battery chemical energy
catalyst normally platinum is often used to
is converted to electrical with heat energy as
speed up the reactions at the electrodes.
a byproduct. However a battery holds a closed store of energy within it and once it is depleted
Fuel cell types are generally classified according
it is either recharged using an external supply of
to the nature of the electrolyte used.
electricity to drive the electrochemical reaction in the reverse direction or discarded.
Fuel efficiency standards and carbon emissions limits set by governments around the world
According to this new era of the fuel cell that
have forced automobile companies to invest
is about to shift how thing work, an external
in new technologies which is really expensive.
supply of chemical energy rather than electrical
To lower the cost of research and development
and can run indefinitely with a source of
automobile companies are creating a number of
hydrogen and oxygen (air).
shared development plans. Ford and Toyota for example have a partnership to develop hybrid
This gives a promising future for Kenya’s petroleum industry, which is heavily pregnant currently. 30
The Student Engineer
The source of hydrogen is generally referred
power trains.
to as the fuel and this gives the fuel cell its name although there is no combustion
Especially in North America, natural gas can
involved. Oxidation of the hydrogen takes place
be, the demand for fuel cells is pretty high
electrochemically in a very efficient way. During
and favored by the low cost of natural gas.
oxidation, hydrogen atoms react with oxygen
Natural gas can be reformed into hydrogen
vehicles. If global collaborators can reduce the cost subsidiary the appeal for fuel cells could grow. Regardless of how fast each approach is adopted, it looks like the auto industry route to electrification will ride on battery-electric, fuel-cell and hybrid vehicles. We are expected to see the launch of the first fuel-cell powered vehicle later this year and land in the market in 2015 which will happen to be Toyota Japan having the honors. Hyundai promises to follow the same route and have their first fuel cell in 2017, Ford, Renault-Nissan and Daimler will also join hands and develop technology to make "affordable mass- market" fuel cell vehicles by 2017. GM and Honda will be pushing on a partnership that will work on production of fuelcell powered vehicles. Since 2009 the cost of the fuel cell vehicles have fallen. The prototypes that Toyota and GM built in a few years ago cost well about ksh 100 million each about the cost of most high end super cars. Now Toyota says its goal is to sell its fuel-cell sedan for less than ksh 1 million. The costs fell as Toyota found ways to reduce the number of parts in its fuel cell system and decrease the amount of costly platinum needed. The company says it is pushing hard on R&D for manufacturing technology, among other things to lower the cost ahead of the launch.
The Student Engineer
31
///// FEATURE
FEATURE \\\\\
Powering the future Economic priorities and its implications
of every Kenyan.
This would mean that the cost of the energy powering the industries be cheap as well. While
by Lewis Sakwa
However, the modalities of power plant
in Ethiopia power production and distribution
construction are best left to those who have
from the dam is almost begun, Kenya has not
been in the industry and probably handled
begun the construction and neither is there
projects in that sector to be able to foretell the
a ground breaking focus to cope with this
success of the project. An additional five Giga
competition. It remains unlikely too that it is
watts production will cost the government 330
very necessary for the project to be given the
billion Kenyan shillings. That is probably one
go on. This does not mean that it should not
quarter of our current budgetary needs. This
go on. While it should go on, evaluation of an
will in turn require that we have donors willing
alternative way of power sourcing ought to be
to invest in this project.
in place to ensure that our upcoming projects would be well catered for.
An insight into this was given by Eng. Julius
I
Riungu, the Chief Executive Officer of Tsavo
When queried about why Ethiopia was more
Power Company Limited. In his languid office
likely to replace this nation as an economic hub,
from where everybody in the city is below you,
Eng. Riungu was particular about the cost of
we had a chat with him. Eng. Riungu appreciates
living and labour in our neighbors in the North.
the ambition but he has probably a reserved
While a CEO in Kenya bags about 0.7million
doubt about the validity of the project. In the
Kenyan shillings, the Ethiopian counterpart
course of the chat we sought to know why he
probably takes home an equivalent of Kshs.
felt the plan might not be wholly achieved.
70,000/= . he further says that in a production
According to this long time Kenya Power
system where both production of power and its
executive, we would require donors who would
distribution under the same body, there is heavy
in turn seek to see the ability of loan repayment
government subsidy which brings the cost of
by the government. On this he argues that while
production down. The two factors are key to
we may be convinced that we could have the
the conquest of our dear country by Ethiopia.
ability to consume the produced power, he hints
However, it is good to note that the country
at a situation where the market would not be
in the North is still dependent on us. This is
able to consume all the power produced. This is
where innovation, good will and intuition ought
because, despite the industrial capacitation that
to come in. Ethiopia for long has not had the
we are witnessing in this country, the growth
capacity to produce its own goods. It relies on
of the industries within the next three years to
imports from overseas which are not in any way
consume an extra five Giga watts of power is
brought in through a port. With the relations
fully doubted. Also, the prospect of building a
between Ethiopia and Eritrea severed we stand
five Giga watt plant in the same period of time
to benefit from it. Not long ago, the Government
is not feasible. He postulates that the project
of Kenya set up an ambitious project called the
could be spread in given timelines and phases
LAPSSET. This seeks to build a new and larger
that would lead to project evaluation and
port at Lamu to serve not only Kenya but also
market ability analysis.
increase the handling ability of cargo with the
t has been a tough climbing for sub Saharan
developed the idea of powering industries on
Kenya included. It is the economic viability of
ambitious plan to revolutionize the energy
countries struggling to break free from the
electricity. This brought in Tesla who in the end
the engagement.
sector. There are plans to have an injection
Further the cost of electricity in this country is a
enough clients to use it. It would be recognized
savagery of war that has torn the region
strove not just to transmit and power, but to
of 5 Giga watts of power into the national grid
little more expensive than in the other countries,
that many of our neighbors are landlocked
and made it inhabitable. But we however
transmit the electricity in a better way such
The same debates of powering industry are still
in the next three years. As of now our power
Ethiopia for example. There is a worry on his
among them being Rwanda, DRC, Uganda, South
must agree that Kenya's consistency in the
that it would not only be safer but also cost
with us here as we struggle to move Kenya to
generation ability stands at 2 Giga Watts on
face with this project since Ethiopia has unitary
Sudan and now Ethiopia. Under the LAPSSET
effective in its production and transmission.
a middle class economy. Projections indicate
the higher side of approximations. The target
system of power generation and distribution
project there are :
We are still at issue with the very essentials
that Kenya might be the fastest growing nation
is not an extra 3 Giga Watts. It is an ambition
which has consolidated the sector and in which
Energy drives the economy. Energy powers our
Tesla looked into. We seek to produce power
as relates to the movement to the middle class
that seeks to put up power plants which in that
case has made the cost of power lower. Further,
••
Lamu Port and Mandi Bay
daily lives. In the earlier days of the American
safely; for posterity of human kind, in which the
economy. However, to spur this we need to
case should swell our production to about 8
the construction of a mega dam on River Omo
••
Standard Gauge Railway from Lamu to
industrial fathers, the likes of Cornelia Van Der
focus would be coined Green Energy, a debate
power our way to a different industrial level all
Giga watts. Very ambitious plans that will of
would and as expected has aggravated the
Bilt powered the country on steam from coal.
for another day. The very issue that led to JP
together. In which case the government is fully
course not just see us rise to a different level
situation. On an introspective level, investors
The industry was pushed further with Edison's
Morgan abandoning Edison is of importance to
aware of. And its ambitions are large enough.
of industrial achievement but also spur an
and industrial moguls would look for a country
discovery who with the help of J P Morgan
both micro and macroeconomics of any state,
The government of Kenya has put in place an
exponential economic growth. This is the dream
where the cost of production is cheaper.
recent past is indication to better days.
32
The Student Engineer
expectation that upon completion we shall have
Juba ••
Oil Pipeline to South Sudan, Kenya and Ethiopia
••
Oil Refinery
The Student Engineer
33
///// FEATURE
FEATURE \\\\\ vision 2030 where we have new cities coming up
and in reasonable phases implement the 5GW
for specifics like manufacturing- Tatu City and
project in an amicable way such that the built
As it can be seen here, these are ambitious
for technological empowerment- Konza City. If
Railway can be powered, The communication
projects which when finished, will not only set
we refocus and put our energy in achieving this
systems, 1600KM of NOFB is functional and
us on the path of prosperity but will assert us as
we may rediscover that it would be possible to
that we can power our oil refinery in Turkana
the economic power house in the region. The
convince or even lure investors in any sector,
and help South Sudan export its oil through
Government therefore has to take another look
especially energy to come in and help us power
our pipeline. All these can be achieved but
at its priorities and in this case throw pundits
our future.
under a moderate plan that can be realistic to
••
Airports at Lamu, Isiolo and Lokichogio
Utility mapping
“Energy is one of the infrastructural enablers of the three pillars of vision 2030…” by Caleb Juma analysis can help a maintenance crew to know
sustainable funding.
aside and begin the construction of the SGR.
the shortest path to an affected(black out) area
Alongside these, we must as a country seek to
Before this goes down, we lack the authenticity
build manufacturing and industrial towns and
in our claim that the market in this country
Let us therefore focus and harness the talent to
and a buffer zone can be used to estimate the
empower them to be able to produce more
can consume five Giga watts of power without
bring forth the Kenya we want, not in a hurry
number of consumers being served by any
products especially finished end products for
having a problem. Definitely, we need a re-
but through agreeable means that as a nation
particular transformer.
the consumption in Ethiopia. We have to move
ignition in the industrial sector to give credibility
we can sustain and be proud of. In the words
from exporting the raw agricultural products
to our desire to power them. We need to fulfill
of President J.F. Kennedy, let us work together
To carry out the above, data on the area of
to other countries and set focus on processing
the market need; we need the demand first and
knowing that God's work,down here on earth
interest has to be collected and stored in a
them in the near future. This may be achievable
then we can get as easily as possible the supply.
must truly be our own.
Geodatabase. If the data is in analogue form
if we still give another look at the blue prints of
However, it would be necessary to forecast
e.g. topographical maps, then the same has to be scanned and georeferenced. Once this has been done, digitization is carried
Vactrian;
out to create layers as well as generate tabular information to establish relationships between
The future of travel?
various electrical assets and the consumers. All of these will be used in analysis.
by Mwaniki N Ngari One of the software solutions in this field is the ArcFM UT.
through the sound barrier, because there'd be no air for them to create sonic vibrations in.
ArcFM UT is a versatile platform for carrying out spatial processes. It provides extensive
The vactrain are considered a good way of enhancing transcontinental travels. It could allow for rapid intercontinental travels and establish routes to form a global network. With such transport system installed in Kenya, it would take you less than four minutes to travel to Mombasa from Kisumu and possibly less than ten minutes to travel to neighboring Uganda or Tanzania.
I
f you think the 500MW plan by the
of up to 6400, or 5-6 times the speed of sound
However, the cost of building such systems
government is ambitious then probably you
at standard conditions. At this speed, brake
is extremely high. Elevated concrete tubes
have not heard of the Vactrian.
failure is something no one would ever want
with partial vacuums have been proposed as
to think about. Giant pumps would be used to
alternatives to the vacuum trains.
The vactrain is a Vacuum Tube Train capable
keep a near vacuum in the tube, probably 30-
of cruising at a speed of 2KM per second that
40km apart. The main areas for leaks would
One can never guess right where technology
is 7200KM per hour!!.It is the future of rail
be end stations. The trains would pass through
will have our current systems in the future;
transport.
a series of airlocks that progressivelyreduce
innovation is clearly unpredictable at times.
the pressure until the train enters the fully
The Vactrian idea is still in the pipeline though.
The vactrain ,technically, is a maglev line
evacuated tunnel where it could accelerate to
While Kenya is celebrating getting at the
run through evacuated (air-less) or partly
top speed.
standard gauge railway stage, some nations are
evacuated tubes or tunnels. The lack of air
looking at the possibility of railway transport
resistance allows the vactrain to use little
Operating in a vacuum, these "vehicles" would
power and to move at extremely high speeds,
make almost no sound, even as they smashed
34
The Student Engineer
on other levels.
functionality covering network documentation,
T
asset management, maintenance, customer
his is one of the most important
according to the World Bank) of citizens can
information management as well as planning.
statements in Kenya's blue print on
access electricity. This means that more than
It can be used to:
socio economic development.In one
three quarters of the population, a large share
way or another, the energy source
of which is rural, is in the dark. Nairobi, the
••
Capture data
stressed above is Electricity. This 'clean' form
capital city too has its own power problems
••
Document the electricity line network
of energy will go a long way in ensuring that
with blackouts being the order of the day during
••
spatially view data
certain months.
••
aid in the maintenance of the network
••
plan and design new networks
Kenya becomes a middle income nation by the year 2030.
Vandalism on the existing power lines and Electricity has a myriad of uses. It can be
transformers has further deteriorated the
All in all, the software is easy to implement,
used to light households, start computers
situation. In the end, national electricity utility
maintain and customize to an organization's
and photocopiers at the office, move rollers
companies such as Kenya Power and KETRACO
preference. The software also provides uniform
in industrial establishments as well as power
find themselves besieged with expanding their
handling of common objects across a number
Posho mills in local villages around the country.
network and maintaining the existing lines.
of utility branches i.e. water, electricity, waste water and telecommunications.
In addition to this, the use of electricity has an added advantage of combating the ever
Utility mapping is a modern day geospatial
increasing global warming associated with
technolog y that enables companies to
It is my hope that KETRACO and Kenya power
burning fossil fuel like Kerosene.
visualize (i.e. showing the whereabouts of
will utilize this technology in their upcoming
various utility lines) and analyze their data
projects and fulfill the crucial objective of
Even though Kenya stands to benefit from this
within a spatial context with an aim ofmaking
connecting every household to the grid faster
great commodity, only a small number (16.1%
informeddecisions. For example, proximity
and more efficiently.
The Student Engineer
35
Faculties, Schools, Institutes and Centres. UNIVERSITY OF NAIROBI
UNIVERSITY OF NAIROBI 00
Centre for Biotechnology & Bioinformatics
00
School of Biological Sciences
00
Open and distance e-learning centre
00
School of Physical Sciences
00
Faculty of Arts
00
School of the Arts and Design
00
Faculty of Agriculture
00
S c h o o l o f t h e B u i l t Environment
00
Fa c u l t y o f Veter i n a ry Medicine
00
School of Engineering
00
Institute of Anthropology, African and Gender Studies
00
School of Business
00
Institute for Development Studies
00
School of Economics
00
Institute of Diplomacy and International Studies
00
School of Journalism and Mass Communication
00
Institute of Nuclear Science
00
School of Law
00
Institute for Climate Change and Adaptation
00
School of Continuing & Distance Education
00
Institute for Tropical and Infectious Diseases
00
School of Education
00
Population Studies Research Institute
00
School of Dental Sciences
00
Wangari Maathai Institute for Peace and Environmental Studies
00
School of Medicine
00
School of Mathematics
00
School of Nursing Sciences
00
School of Computing and Informatics
00
School of Pharmacy
00
School of Public Health
Vision A world class university committed to scholarly excellence Mission To provide quality university education and training and to embody the aspirations of the Kenyan people and the global community through creation, preservation, integration, transmission, and utilization of knowledge.
FACT FILE Student Population • 62,000 Staff • 5500 Research fund • Kshs 3B Alumni • 146,000 Courses • 517 International links • Over 400
Contact: P.O Box 30197,00100 - Nairobi | Tel: +254-020-318262 Ext: 263 | Fax; +254-020-245566 email: pr@uonbi.ac.ke www.uonbi.ac.ke
///// FEATURE
FEATURE \\\\\
Towards sustainable energy Long term perspective of nuclear energy
A
by Lewis Sakwa
frican states have to move to
2015 knocks they have not been achieved to
It is a fact that no single source of energy
curb the spread of fear of Clean
the later.
generation is devoid of shortcomings. So is the
Nuclear Energy. To be able to
nuclear sector. Kenya has vast lands that are
sustain the industrial needs of
An economy is driven by energy. It is therefore
unoccupied ranging from the scantily populated
a country there is a need for a
mandatory that we move away from usage
counties of North Eastern Kenya to the South
stable power production system. Nuclear Power
of traditional sources of energy such as the
rift. Under proper expatriate guidance and
plant would be one such investment. Kenya in
biomass which is relied upon by most of the
with the right policies which require of course
particular bathes itself in the blueprint of vision
sub Saharan population. In this regard there is
political goodwill there are possibilities of
2030 which unless handled with the efficacy
need for us to dispel any fear thereof cultivated
developing nuclear reactors stable enough to
that is required shall be a sham just as the
either out of fear or ignorance so that we set
solve the county's long lasting energy problem.
global millennium development goals which as
this country moving.
Coupled with the other subsidiary energy
production sector the implementation of such
power. Nuclear energy brings a combination of
neutron and splitting. The result of the fission
a project would take this country to another
strengths and weaknesses.
of these large atoms is the creation of new,
level and it would bring the vision 2030 closer
smaller atoms as byproducts, radiation and
than it looks.
Nuclear Power Basics
It is therefore necessary to elaborate at
A nuclear Power Plant
creating a chain reaction. The chain reaction is
length the nuclear energy sector from an new
Nuclear power is generated inside a plant called
controlled by neutron moderators, which vary
perspective while reflecting on its pros and
a reactor. The power source is the heat produced
depending on the design of the reactor. This can
cons to decisively enable the forthcoming crop
by a controlled nuclear fission chain reaction,
be anything from graphite rods to simple water.
of engineers a different outlook in order to spur
either of uranium or plutonium. Uranium is the
Once the heat has been released, a nuclear
industrial growth in this country.
major source of the nuclear energy consumed in
reactor produces electricity in exactly the same
the world. Uranium was discovered by Klaproth
manner as any other thermal-based power
Concerns over global warming and the spike in
in Germany in 1789 and named after the newly
plant. The heat converts water into steam, and
oil prices have renewed worldwide interest in
discovered planet Uranus. Uranium was largely
the steam is used to turn the blades of a turbine,
nuclear energy, and with it renewed concerns
a scientific curiosity for many years and only
which runs the generator.
over nuclear safety. As a growing commercial
used as a yellow pigment in glass and ceramics.
industry, nuclear power had been moribund in
Uranium was first confirmed in Australia as a
A nuclear accident that resulted in loss of
the United States since the 1970s. Yet 15 percent
mineral in a cobalt deposit in Carcoar, NSW,
control over the fission chain reaction would
of the world's electricity comes from nuclear
in 1894. Becquerel discovered radioactivity in
be extremely hazardous. The danger is that the
uranium minerals in Paris in 1896 and uranium
heat produced would outstrip the ability of the
and its daughter product radium quickly rose
reactor coolant to cope, potentially allowing
to fame. The main use for uranium for the next
the nuclear reaction to run wild. This could
40 years was as a source of radium for cancer
cause system failures which would release
therapy and luminous paint.
radioactivity into the environment. In the case
more neutrons. Those neutrons speed out and strike other uranium/plutonium atoms,
of an extreme failure, the result would be a Nuclear power has a very good safety record
nuclear meltdown, where the reacting nuclear
except for Chernobyl where 31 died in 1986
material burns or melts its way through its
and controversy still rages about how many
containment vessel into the ground and then
have died since or will die. Three Mile Island in
into the water table. This would throw a huge
the United States was a total loss but not one
cloud of radioactive steam and debris into
person died or was injured. Deaths from fossil
the atmosphere. Accidents of this type have
fuel industries are very high. Comparing the rate
the potential to release radioactivity over an
of deaths in nuclear power plant generations as
immense area. A small, well-contained accident
compared with the other potential sources of
might just contaminate the power plant, while
energy, the deaths are very low. At Chernobyl
a major one could result in fallout being spread
31 died immediately though the argument rages
worldwide. While nuclear power has become
as to how many hundreds or thousands may
progressively safer with the introduction of new
die in the future. It is estimated that more than
reactor designs and technologies, it still carries
6,000 coal miners died in China in the recent
with it a risk that no other source of power does
past. Hundreds have perished in the Australian coal industry in the last 25 years ! Yet the
According to the U.S. Department of Energy,
industry does not receive as much criticism as
when all costs are factored in, nuclear power
the nuclear sector does. While long term effects
costs an estimated $59.30 per megawatt hour.
are there, the death rates are not as sporadic
This is expensive when compared to other
and appalling as in the coal mining industry.
means of generating electricity. For example,
These are very worrying statistics and make
clean wind power is $55.60/MWH; coal $53.10/
you realize that coal industry is a dangerous
MWH; and natural gas $52.50/MWH. While a
place to work.
country like Kenya might want to base on the argument of high initial cost which solely an
An illustration of a nuclear turbine
38
The Student Engineer
A nuclear reaction involves elements, such
econometric concern there are more befitting
as uranium or plutonium, being struck by a
benefits that would otherwise warrant the
The Student Engineer
39
///// FEATURE investment.
FEATURE \\\\\ strictly local area.
they are heightened by the fact that the nations have not undertaken enough research on the
It is agreeable that capital costs are high due
On the other hand, we can derive advantages
nuclear waste management and disposal. While
to high level of quality and redundancy for
of using nuclear energy. We take a look at a few
it may be argued that waste from the reactors
safety but are coming down;especially with
listed below.
such as plutonium may pose a big risk countries
the technological advancement in the power
What powers a modern aircraft carrier? by Caleb Juma
interested in clean energy cannot be tamed
production and management. Fuel costs are
Nuclear fuels are derived from uranium and
because there is a phobia of plutonium reaching
much lower than coal or gas over the plant
plutonium. Uranium is available in plentiful
the hands of the terrorists.
lifetime. Therefore lifetime costs are lower in
quantities in the United States, and plutonium
many countries, for example France, Finland,
is created as a byproduct of the nuclear fission
Plutonium is claimed by some to be the most
Japan, China, Korea, Russia, eastern states of
process (indeed, breeder reactor designs
dangerous substance on earth, and is too big
Canada and USA.
maximize plutonium production). Replacing oil
a risk to counteract the benefits of nuclear
burning power plants with
power. The basic fear arises from its use in
Cost of waste management is not high and is
the bomb on Nagasaki. Very few scientists, or
T
funded by a charge on every kWh produced; it
nuclear power plant would therefore be
the public, realize that plutonium is generated
is factored into the cost not like coal and gas.
helping with achieving energy independence.
inside the fuel in every nuclear power reactor
Cost of air pollution with coal is very high and
Indeed, France gets more than 75 percent of
and provides 20-30% of the heat and electricity
potential cost of global warming is enormous.
its electricity from nuclear power precisely
produced. It has been used safely in reactors
The power generated and its stability should
because of a national energy independence
for 50 years.
be a factor to consider over other sources of
policy. It is therefore a prerequisite that for
energy referred to as clean sources such as the
such projects to be established we must have a
Plutonium has also been processed in tons
football fanatics, the 4th was when Germany
hydro power. This is especially in developing
policy in hand that can ensure that the success
amounts over that time without any serious
made mincemeat of the French in the
nations that have to rely on climatic patterns in
is guaranteed. The high capital cost of nuclear
accident
quarterfinals run of the world cup. To naval
order to generate the power for their industries.
plants is claimed by some to make nuclear
The adoption of the nuclear power generations
power uneconomic, but the lower fuel costs
to the public. Of course it is dangerous, but
naming of United Kingdom's largest warship,
would do better for the sub-Saharan Africa and
are often overlooked. When all costs are taken
there are many more dangerous substances in
the HMS Queen Elizabeth.
Africa as a whole.
into account, the leveled cost of electricity from
common use which can and have killed many
a nuclear plant is economic against many other
people including act of 'God'.
Spent fuels from a nuclear power plant are
in the hearts of individuals across the globe. To the Americans this is their Jamhuri day, the day they
got free from the shackles of colonialism. To
enthusiasts, this date will remind them of the makes any self-respecting political leader of an
subjected to in the primary coolant loop.
opposing country to think twice before waging UK is in the process of building two aircraft
war. Although the carrier is a darling of all world
The water is then pumped around the core by
carriers, the 65,000 ton HMS queen Elizabeth
navies, only a few can afford it with the USA
powerful pumps. After picking up heat, the
Anti-war and anti-nuclear critics claim that if a
and its sister ship, HMS prince Wales. Even
forms of energy in many countries
radioactive and highly toxic. They also pose
he 4th of July will remain embedded
taking a large share of this exclusive club with
primary coolant transfers this energythrough
security risks, as a terrorist who acquired a
Nuclear energy does not involve burning
country has nuclear power and uranium and a
though HMS Queen Elizabeth will begin its
10 active carriers. The entry barrier to this big
the walls of the tube to a lower pressure
substantial amount of nuclear waste could
fossil fuels, and therefore does not in any
research program then these will lead inevitably
Royal service in 2020, a lot of pomp and
boy club is simply the costs associated with
secondary coolant, evaporating it to pressurized
construct a so-called "dirty bomb," with the
way contribute to greenhouse gas emissions.
to nuclear weapons. The facts are that only 5
colour went into the naming ceremony. The
building, powering and servicing the ship.
steam for use in a steam turbine. The steam
purpose of spreading radioactive materials over
In this respect, it is as clean as solar, wind,
major and 2 other countries have developed
Queen even got a chance to participate in an
The modern aircraft carrier is powered via a
is fed through a steam turbine connected to a
a large area. An accident or attack involving
geothermal and hydro power. The problem
nuclear weapons over 50 years whereas over
old English tradition by smashing a bottle of
nuclear reactor. The reactors in US carriers
set of speed reduction gears then to a shaft
radioactive waste would likely contaminate a
before developing nations look immense but
100 have signed the Non Proliferation Treaty
whisky onto the hull of the ship, via a button
are pressurized water reactors(PWR) that
used for propulsion. Direct mechanical action
and agreed not to develop them. A decision to
of course. About 3,500 people were present
can run on low enriched uranium or on high
by expansion of the steam can be used for a
have nuclear weapons is a political decisions
including the incumbent prime minister, David
enriched uranium. Unlike commercial land
steam powered aircraft catapult, the ones used
not a technical one. If that decision is taken
Cameron who described it as a 'proud day' for
based reactors, the fuel rods are not UO2 but a
to launch aircraft from the decks of the carrier.
it is possible for a state to develop weapons
his country. However, the cost of this pride was
metal zirconium alloy. The reactor sizes range
The cooled light water in the primary circuit
relatively easily, but not a terrorist group. This
a whopping 6.2billion pounds!
up to 500 megawatt with refueling after ten or
is then returned into the reactor vessel to be
more years. This reduces the hustle that most
heated again.
decision does not rely on having nuclear power.
40
The Student Engineer
Developing nations therefore have to take up
The aircraft carrier is the single most
ships have with regards to fuelling at the ports
the role. And in so doing they ought to harness
menacing ship in any blue water navy of the
they call.
this power of nature to better the lives of the
world. Its main purpose is to carry, deploy and
people. Kenya in particular shall enjoy this in
recover aircrafts. One such carrier, the Nimitz
The nuclear fuel in the reactor vessel undergoes
of the warship. Due to its high radioactivity,
a more special way. Understanding that any
class can carry up to ninety aircraft! In other
a fission chain reaction releasing heat in the
it requires special handling which is always
nations achievement industrially are based on
words, this chunk of metal is a mobile ocean
process. Light water is used as the primary
expensive. Two schools of thought are used in
its energy reliability then it is a high time we
going military airbase. This military island
coolant in a pressurized water reactor. It
such scenarios. One, after defueling, the reactor
took a look at this sector of energy generation
has the capability to operate thousands of
enters the bottom of the reactor core via a
section of the vessel is cut from its ship and
and not overlook it at the behest of developed
miles from its homeport, acting as an off
primary coolant tube and is heated as it flows
disposed into shallow graves as low level waste.
nations disguise of proliferation of nuclear
shore headquarters and wreaking havoc on
to a temperature of about 300 degrees Celsius.
On the other hand, the entire ship can be sealed
weapons.
any unlucky enemy further inland. Its size
This 'special' water remains liquid at such high
and the nuclear material allowed to stay afloat
alone (it is as long as twenty five buses) will
temperatures due to the high pressure it is
indefinitely.
The major disadvantage with this energy source is its disposalafter decommissioning
The Student Engineer
41
///// FEATURE
Where the wind blows by Agoi Anzweni & Kanyeki Gicheha nominal wind speeds of 25 m/s and 14m/s respectively. The GE 4.1-113 however has a huge frame with blade radius of 113 meters and is the company's only offshore model at the moment. As it occurred to me and to most of you, many regions in our magical Kenya have the required wind speeds required to install these machines. And that it's very possible to see numerous numbers wind stations sprout all over the country to try and supplement the current electrical power deficit witnessed in the various parts of the nation. The vision 2030 states that Kenya requires roughly 2GW of power in 2030 from wind generation alone. According to the KenGen Ngong Wind Power turbines at Ngong Hills
J
website, a feasibility study conducted on
ust go where the wind blows. This phrase
speeds of 4m/s which is generally a breeze.
had no other meaning to me before May,
The nominal speed of this turbine is 21m/s of
other than its colloquial or proverbial
wind and cut out at 28 m/s which in normal
meaning, in which case anyway it would
conditions are hardly achievable. The turbines
be an unwise advice. May is when I visited the
stand on average 60 meters high with a blade
magnificent wind power station in Ngong Hills in
a blade radius of 52m, which provides optimum
sub-urban Nairobi. That is when my perception
conditions for power production. With each
of the phrase changed, though in terms of
tower producing 850kW of power reportedly
renewable energy sources.
a full capacity being developed is capable of generating 30.6 MW of power assuming the
Founded in 1993 with two turbines as a donation
whole farm uses the same turbines.
from the Belgium government, ngong hills was re-commissioned in August 2009 with new 6
An interest General Electric to develop or set
Vestas V52-850kW Wind Turbines installed.
up a wind farm in Kinangop in the coming years
These until now produce a staggering combined
led me to try and find out what GE wind energy
5.1 MW of electrical power on an acreage of land
divisions' wind turbines had in store for us. What
not more than 10 acres. Masinga in its own
I found out was quite impressive. The GE 1.5-77
right as the biggest dam in Kenya, produces 40
turbine is capable of producing 1.5MW of power
MW of power on peak season, this of course is
at lower cut in wind speeds of 3.5m/s, nominal
highly subject to season and climate changes.
wind speeds of 11.5 m/s and cut out speeds of
Currently, and at the time KenGen and vestas
20m/s and smaller hub height of 80 meters.
were carrying out an upgrade on the wind farm
The GE 2.5-100 is well capable of producing 2.5
of about 36 more turbines on the northern side
MW of power at the same cut-in speeds; it has
of the hills. This would in turn increase installed
higher nominal and cut out speeds of 12.5 m/s
capacity of wind energy at the station to an
and 25m/s respectively. The most spectacular
impressive 25.1MW all throughout the year.
of them all, the GE 4.1-113 turbine produces an impressive 4.1MW of power, only 1MW shy of
The Vestas v52-850kW turbines used at the
the total capacity of the Ngong power station!
current farm in Ngong, produce each on average
All this at lower cut in speeds of 3.5m/s of
850kW of power operating at cut-in wind
wind speeds, and of course higher cut out and
42
The Student Engineer
Ngong Hill states that the site is well capable of generating up to 14.9GWh of energy per annum on average from a 5.1MW farm. If all this energy could be harvested in Ngong alone, the energy target of our vision 2030 would be well in reach, without breaking a lot of sweat! With eminent wind projects to be developed in Turkana and Marsabit by KenGen , and so
Social Commentary
far in Kinangop and Kipeto by GE , we would have the wind energy increase its current share of contribution to the national grid. Further development of this sector would even see it easily surpassing the current big two contributors to the grid HEP and Thermal, which currently stand at 761MW and 527.5 MW respectively. Kipeto alone would see 47 GE 1.6100 and 16 GE 1.6-82.5 wind turbines installed; leading to an installed capacity of 102.06 MW power. Whereas Kinangop upon its completion will generate 381.6MW of electrical power, as
Alcoholism and Drug abuse in varsities It all counts! Kenyan Universities The inanimate player ESA
the figures suggest, this four stations would be well above the current number one energy provider in Kenya, the HEP. Numbers don't lie, as we grow towards our precious vision 2030, let's just trust the wind like the sailors and go where it blows. Then, our vision 2030 energy goals are well over in reach!
The Student Engineer
43
///// MENTORSHIP
MENTORSHIP \\\\\
Alcoholism and drug abuse in varsities
by John Gachinu
It all counts!
by Ken Kimani
L
oud Jamaican dance-hall and riddim
(IEBC) way? Even our very own government is
music blasts from a sub-woofer
digitalized. In Theory of Structures, he can't see
system. Bottles of alcohol are popped
why we have to learn four strenuous methods
in the semi-dark room. There is a lot
of calculating deflections while one is sufficient.
of excitement, telling from the hearty laughter
Do you suppose he's right? Are some of our
and talk in the room. A group of about a dozen
units insignificant? I beg to differ.
youth are lost in the frenzy of their dance which involves the ladies gyrating their hips in
It is a fact, society has changing needs. The world
a rhythmic synchronization with the tunes, while
is rapidly changing as factors like technology
being held closely in a sensual manner by their
take over our lives. But one maxim forever
male partners. This is a picture of most rooms
holds, 'The more things change, the more they
in the university halls of residence on a Friday
stay the same.' For example, if I may digress,
night. The partying that has come to be known
people are spending beyond their means to get
as 'raving' around students' quarters goes
the flashiest phones and spend countless hours
on till dawn, and at times, through the whole
engaging in faceless conversations whereas in
weekend. The week has been long and stressful.
the long run, nothing will take away the primal
The stress has to be let out before the start of
face to face communication between two or
the next week.
more people; minus the phones. No matter how successful or powerful a woman gets,
A few months ago, Christian Organizations in the university had campaigns against drug abuse and sexual immorality. This was informed by the fears of increase in cases of violent fights and new HIV infections and even deaths that were linked directly to alcoholism and reckless sexual behavior that results from the intoxication. The campaign wasn't very popular among the students and just a few number of students visited the booths that were set up for counselling and possible rehabilitation of students who grapple with addiction to alcohol and other drugs use. Well, it is said that experience is the best teacher but in such a case it is obvious that experience would be the most painful way to learn, unless of course you are learning from the experience
of others. I'm going to share a story that I came
was feeling powerful behind the steering wheel.
across in a book. Hopefully we get to learn from
I was enjoying my liberty and I was going to
the writer's 'experience'.
have fun...The last thing I remember is that I was trying to overtake an old lady who was driving
I Can't Be Dead!!!
very slowly. I then felt a violent crash that made
'The day of my death was a day like any other...
me fall unconscious...
It was a Friday. I recall that I asked a friend to lend me his car. The classes ended at 16 00 hrs...
Then I heard the echo of my own moan. At a
I was going to be free the whole weekend. Being
moment's notice, I 'woke up' from that terrible
just 3 weeks into the semester, I was still loaded
lethargy. A policeman was by my side. There
with money thanks to HELB loan that was just
was a doctor on the other side.My body was
about a week-old in my account. I had to go
covered in blood. But I couldn't feel anything.
'raving'.
"Don't place that sheet on my face. I can't be dead! I'm just 20!! I'm picking my girlfriend for
aren't any different from the people who lived in
S
past centuries. Maybe life has become simpler.
o you're in this afternoon lecture.
We've all been there haven't we? There are
Maybe I&M bank wasn't there for Pharaoh to
It's been one hour since the lecturer
those units we take in certain semesters that to
stash his money. But humans: nose, eyes, ears,
walked in- this particular one is
us seem to make no sense. We can't wait for the
legs, emotions, habits, the nature and the world
invariably very punctual. No matter
semester to end so we can light our home jikos
is just as it was in Jesus' times.
how hard you try to concentrate, you can barely
with the lecture notes! Show me a student who
make out what the lecturer is 'rambling about.'
enjoys and appreciates each and every unit in
Our curriculum was developed with the end as
The sun is out, scorching, you've had a heavy
the engineering curriculum and I'll show you the
the beginning which is: what you'll become in
lunch and you're vigorously fighting off sleep.
'I' in 'liar.' Like for instance, the common units
society with all the knowledge you've accrued
You know that you drool generously so taking
we take in our first years of study. Up until this
over the years. Engineering is an arcane, yet
a nap in class is out of the question. Friends
point, I've never figured out why I had to take
very vital field in yesterday's, today's and
have picked on you enough for that. Looking
Philosophy. On meeting one of my Philosophy
tomorrow's world. Engineers are probably the
a party tonight. I'm going to be an Engineer!! I
I noticed, to my surprise, that my friend had left
need to grow up and enjoy life. I can't be dead!!!"
around, you see everyone is either busy texting
lecturers in first year, I was convinced that
most awesome people ever. The Coliseum,
away or gabbing with friends; technically doing
there was only one way I could attain an A- if I
one of the most iconic marvels of Roman
The funeral was a strange experience. I saw my
everything but following the lecture. Of course
proved that my lecturer did not exist. And since
engineering was built in 70AD and has survived
with the exception of the 'focused students'
I couldn't, he didn't disappoint me. He simply
to date withstanding all the earthquakes and
who take the front row in the lecture hall. Time
seemed that stingy with good grades.
other nature's demons and maintaining its
a bottle of liquor on the rear seat. I opened it, drunk quite a bit and drove off at full speed. I
by one. They looked at me sadly. The girls would
distinguished status as the largest amphitheatre
touch my hand and start crying.
seems to stay still! You feel that it's been a waste of your time coming to this lecture. But
There's a friend I know who's lost interest in
in the world. What else has lived that long? A
"Please don't bury me, as I'm not dead!! My
you remember that it were your friends who
classes. He laments that the current curriculum
doctor can't extend a life to more that averagely
dragged you here. So you let your mind drift
is old fashioned and ought to be revised by
120 years. I could list a million others case
away to petty things till after what seems like
the senate. The look on his face when he's
studies. And do you know what the geniuses
an eternity, the lecturer declares that he'll
carrying a T-square to class is as if he just got
who developed the syllabuses had in mind?
pick from where (s)he's left next time. Phew!
sold to slavery and his first assignment is to
'We want to develop an engineer with highly
However, your joy is short-lived since you know
carry animal feeds with a yoke fastened on his
cognitive abilities' - Theory of Structures with
there is more agony in waiting in the subsequent
shoulders. After all there's AutoCAD right? So
all its complexities. Strength of materials and
lectures. Nevertheless, you savour the moment.
why spend sleepless nights doing it the manual
others.
whole life is ahead of me! I want to laugh, run and live. I want to sing and dance. Don't put me six feet under. Oh, God, I promise that if you give me another chance, I'll be more careful. I just need one more chance. Let me live! Please, God I'm just 20!! Sadly, there wasn't that other chance."
The Student Engineer
man. Think about it. Nothing really changes. We
I ran to the car park. Before starting the engine,
relatives and friends approach the coffin, one
44
she'll never be entirely satisfied in life without a
The Student Engineer
45
///// MENTORSHIP
MENTORSHIP \\\\\
'We want an engineer who will have financial
how to design using computers before you can
I've seen engineering drawings that utilize the
They have no permanent masters, they switch
skills to enjoy the sweat of his labour.'
draw by hand.
same formats in terms of border lines and title
allegiance according to the depth of pockets.
Economics.
blocks etc; not only in Kenya but also around
They are quick to use their body muscles in
I've leaned towards civil engineering because
the world. Moments of inertia are calculated
whatever scenario they are presented with.
"We want an engineer to understand health
that's what I do, but this spans across all
the same way even in Australia. And they're
Their brain muscles remain un-utilized.
risks both to himself and to the society. And at
disciplines particularly in engineering. Each
completely real-world in the field. Appreciate
Looking backwards, you would wonder what
least have some knowledge outside his scientific
and everything we study gears us to becoming
all what you're learning today. And you'll see
changed, a very bright, visionary student
abilities." Public health.HIV/AIDS.Philosophy.
fully fledged professionals in society; capable
how easily you'll blend in the engineering
reduced to sycophancy and boot-licking of
Drawing: Can you learn how to key in 1+1 into the
of building the Coliseums of our generation. It
world, solving problems and creating unique,
godfathers, someone with no independence,
calculator before you can calculate it yourself?
may not be interesting. It may take up tons of
magnificent structures. It all counts.
very poor-not able to even think for themselves!
What happens when the calculator is taken
our time. But it all counts. Those who've been
Points to one thing, there is something terribly
away? Exactly. In the same vein, you can't learn
in industrial attachments can attest to this.
wrong with our universities. We are so busy
The inanimate player by John Gachinu
being proud of being in the university that we do not pause to think if the university is really serving us right.
Kenyan Universities Where did we go wrong?
I do not have to mention that most top
by Kevin Odongo
outs, several successful business are by college drop-outs. It may be because college wastes great brains! These people may have just escaped from the 'mass-wastage.' I'm in
The motorists using roads around the university
no way suggesting that university education is
bear the students frustrations. Rocks are hurled
not helpful, but I'm saying that there may be
at the cars. A motorist is never allowed to go
something wrong with our universities.
peacefully until they appease the hungry, angry students. One thousand Kenyan shillings
Take an example of University of Nairobi.
or about does the trick. Yes! One thousand
Although, a leading university in the region,
shillings! The students are happy. They've got
it takes in very bright students, the students
free cash. And Oh, God! It's so much!
who top in the country. Students who make headlines when high school test results are
University of Nairobi American wing
Yes! That's how myopic the student becomes.
released. Yet that becomes the end of the
They do not realize the millions of opportunities
news making, which shouldn't be the case.
around them. They do not realize they could
The great brains should become better at the
make millions just by utilizing that dark
university and should make bigger headlines in
moment-in the right way. They just see the
the world. There are students who still manage
quickest way- robbing their potential employers
to make headlines worldwide but if you asked
since they have lost the brains to help them be
them,it is unlikely they will mention being in a
entrepreneurs and employers themselves.
particular Kenyan university as a factor. Kenyan universities do very little to engage students
S
o it is the second decade of the 21st
improve service delivery across different fields,
century, a Kenyan privileged enough
increase productivity and generally improve
to go to University still has lots of
lives, but alas! The visionary has lost all hopes of
bragging rights. They have succeeded,
ever making something big. They have reduced
nay, survived through high school. They may
their dreams to reality. They have learnt how
still be the first people to make it to university
to play their cards. Know someone who knows
from their villages. They look very innovative
someone-that's what they have learnt. They
and visionary.
have learnt the government does not listen to sound reasoning and ideas-neither does their
Two or three years down the line, the visionary
university!
student has undergone radical changes. Having
So the student starts being very 'creative!' Very
been in the university for that time, they are
opportunistic. A blackout in the evening when
expected to have learnt a lot to help create jobs,
the student is busy making ugali is fully utilized.
46
The Student Engineer
Maracana stadium in Brazil
innovations worldwide were by College drop-
The student remains a campus survivor,
outside the classroom. They concentrate most in
drunk seven days a week, playing computer
the classwork, some of which aren't presented
games, watching movies and smoking unholy
in a way that would help the student come up
substances in their free time. Always looking for
with something. The lecturers never challenge
a dark opportunity to exploit. There is no study
the students to try out something new, they are
in their lists of to-do. They believe the number
always told to follow set standards!
one danger to human life is study-it kills the brain! Resulting in a coma!
The government does nothing meaningful in the universities to promote innovation and
Elections and campaign periods provide another
entrepreneurship. It always wants you to take
leeway for these hoodlums. They 'benefit' a lot
the painful steps through its offices to be
during these periods. All the politicians require
listened to. Now with all these odds against
their services. They are employed to punish
the students, we still wonder why Kenyan
political opponents and guard their masters.
universities are innovation deserts!?
T
he World Cup is here with us! For a whole
The stadium face lift was also done to
month, all eyes will be fixed on Brazil as
LEED specifications.To be certified by LEED
the football nation erupts into sporting
(Leadership in Energy and Environmental
frenzy. Tickets have been booked, jerseys have
Design), Maracana's architects and engineers
been tagged and boots have been polished.
had to adhere to certain standards. The sludge
Thirty two teams, the finest the world can
removed from the area was not simply dumped
produce will be battling it out for the coveted
by the side. It was analyzed by soil engineers
trophy, the golden world cup.
who discovered it had bentonite with high iron content making it suitable for ceramic mixtures.
The stadiums too have not been left behind.
It was then processed into bricks and used in
From Estadio do Maracana to Castelao,
Masonry buildings.
refurbishment and good engineering practices have left them looking more like national
Steel, that was part of the original structure was
monuments rather than soccer fields. Maracana
crushed, moulded and recycled in the precasting
for instance looks like a shiny silver wedding
of new bleachers and access ramps. To ensure
ring from a bird's eye view, a ring probably to
rational water use, an elaborate network of
symbolize the eternal marriage between the
channels covering the pitch was actualized to
Brazilian people and the football bonanza. This
capture rain water and take advantage of the
doyen of modern architecture will host the
heavy rains common in the South American
opening and closing matches of the World's
country.
greatest sporting event. In the case of energy use, the stadium has been Maracana (or Estadio Journalista Mario as it
fitted with photovoltaic panels to generate
is officially known) can trace its roots to the
solar energy, taking advantage of the hot Rio
1950s when it was constructed to host the 1950
de Janeiro sun. Photovoltaic panels are made
World Cup. However, with the changing times
from layers of semi conducting material, usually
and advancement in technology, this historical
silicon. When light shines on it, it creates an
masterpiece had to be modernized. The original
electric field across the layers, even during
stadium's roof was removed and replaced
cloudy days.
with fibre glass tension membrane coated with polytetrafluoroethylene (hydrophobic
Hence, when you are shouting yourself hoarse
fluorocarbon meaning that water cannot wet it).
thanks to Messi's magic or simply watching in
Its two tier sitting bowl was demolished giving
astonishment at Germany's well-oiled midfield,
way to a one tier sitting configuration.
don't forget to cheer for the inanimate player, the round hulky silver ring.
The Student Engineer
47
///// INTERVIEW
INTERVIEW \\\\\
In his own perspective Engineer Julius Riungu by Lewis Sakwa and Kevin Odongo
Comparing The Engineering field now and when you were in school and the time you began yourcareer four decades ago, what elaborate differences can you point out? I would say that the incorporation and the strides in ICT have changed the field tremendously. During our times we had mainframes using vacuum tubes in the university. At that time they were the sophistication of the day. We would write our FOTRAN programs, punch them on cards and feed them into the computer. The whole process of correcting the errors would take us like 3 days. Then came the era of desktops which were a reserve of just a few in offices. As we look back now, we can appreciate the changes that have been effected with the improvements in the information technology. When you take a look at the Power Generation, you can confidently say that the process and even the machinery have changed. We used to have the steam turbines but right now we have improved diesel generators. Hydro generation has not changed much however although there has been lots of improvements in the efficiency of machines that are used and so on. During out time, harnessing of wind was out of option but as we speak, that has changed a lot. You can see thepopularity with which the solar technology has swung into the market. We can therefore say without doubt that improvements in technology have brought lots of change in the profession and its practice.
Would you say that there are any innovations from Kenya?
Eng. Julius Riungu (circled) with fellow IEK members at a past IEK conference
I
n this issue we profiled Engineer Julius Riungu; Currently The CEO
actions as a profession you seek to improve the life of individuals. This
There are two levels from which we can look at a nation as regards
of Tsavo Power. Formerly Deputy MD for Kenya Power. Eng. Julius
is something I have done and I am so proud of.
technology. We can be a technology producer or technology consumer.
Riungu has a long standing proficiency in the field of engineering. He is a reflection of an all-round engineer and as he sits back you
can see one self -actualized person in terms of Engineering.
Do you mean to say that Engineering is better than accounts or in general, other careers?
Kenya stands in the latter. Reason is we do not have research going on. For actualization of innovation, we need to have research facilities equipped with modern equipment that in the end will spur technological advancement. We may also say that what our Universities receive for
Having begun his career way back in 1970 as a 'bursar' with Kenya Power
Yes. I canconfidently say it is better. The reason is that, there is no
and Lighting after his Form six, he has experience stretching into more
monotony of work in Engineering. One has to consistently keep thinking
than four decades. However his easy going nature might lie that he is
of ways to solve the problems at hand and times change, new solutions
Nevertheless, we can say that innovative research has not been
not as he seems. We took an incisive look at his long career, probing
must be found for the new problems that arise. There is motivation
harnessed. What we have witnessed is majorly academic research. This
and inquiring of what he felt about the state of engineering in Kenya,
therefore, which is seen by the impact one creates. One can therefore
has not been able to put us in a situation where we can develop. We
the place of the Kenyan engineer in the economy and more pertinently,
think of engineering as a world of innovation where things have to keep
need actual partnerships between the Industrial sector players and the
the energy situation and its future. Here is how the interview went on:
changing from the way they were always done.
Universities offering engineering in this country to be able to come up
You realize too that in Engineering, it's easier to question and improve
with solution; innovative solutions to the problems that are particular
unlike in other professional cadres.
to this country.
What led you to pursuing the Electrical Engineering and not the other disciplines of engineering?
If the Universities could come up with memoranda for the industries,
How would you describe yourself? Who is Engineer Riungu? What motivated you to be an engineer? I am an Engineer by profession something that I am proud of and has been fulfilling to me. Reflecting on this again, I would say I wanted to
research is very minimal and this can curtail the process.
several companies could fund the building and equipping of laboratories of these institutions. In return industrial solutions could be carried out by
be an accountant but at form four I changed my mind and as I went to
When I decided to pursue engineering, I was not sure of which one but
the Universities and in so doing we would come up with new products.
the A levels, with the advice of my teacher I ended up taking chemistry
I liked electricity and to add on it I was a handy person. I was thrilled
When you regard a country like Germany, it is a technology producer.
Physics and Mathematics. I am delighted to say that from that day my
by the idea of the invisible electrons resulting into electricity. In quest
Siemens has a university which they support in the research and is
fortunes were changed as I entered a defining phase of life.
to know much I delved into it and the only sure discipline was Electrical
therefore very easy to develop new products. As of now we are simply
The pleasant thing about engineering is that in your thought and
engineering.
a technology consuming country.
48
The Student Engineer
fiber optic cables mounted at communication port
What would be your recommendation on this situation? This has got to change. And as I said, we are aware the government is putting in 2% of the GDP into research. Partnership between universities and the industry is a mandatory undertaking. Universities may offer lots of solution to recurrent problems faced in the industry as they have all the time. But the University must take the initiative. Nigeria is already doing this. Who are we not to?
What would you therefore say is the problem? What has made these partnerships difficult? It boils down to a silo mentality. When the University and other academic institutions think that they are totally independent of the industry and they centrally place teaching above the rest then we have a problem. The teaching institutions alone cannot do any worthwhile job without modern equipment which unfortunately they cannot procure. The African Development Bank is trying this through the government but that alone cannot be enough. The heads of these institutions hence need a memorandum with the industrial players, based on a mutual agreement and with benefit for both sides. The Engineering department needs to show what they can do. If you take a look at Kenyatta National Hospital and the fact that it has incorporated the University in its program, we can successfully say there are a larger number of trained doctors, proficient even in delicate processes like kidney transplant. Something we did not have earlier. The engineering field must also take after the same to see good engineers being produced.
Let's take a look at your experience in the profession? How has it been? I can say I started off as a hands-on engineer to rise to the Deputy
The Student Engineer
49
///// INTERVIEW
INTERVIEW \\\\\
Managing Director of Kenya Power and Lighting Company. This is a career
of a different level from the Young Engineers Chapter. Each of these
is bright for those coming into the profession. You shall be smiling all
stretching from 1973 to 2008 when I retired after those years of service.
groups require a different attention and have different interests. We
the way to the bank.
One thing my ascendancy has taught me is that one must gain experience
are forming the Military chapter from the observation that many more
and work in all sectors of the industry before he can look down and
military engineers are joining us as reflected in the last conference.
appreciate the functionality of the Company he is working for. I can attest that I practically worked in all departments of KPLC before I was
Do you have a student chapter?
promoted to being the Deputy MD. I have to also advise that experience is core if you want to work well. Otherwise one might not be able to
We have not seen much of student involvement but I would say the most
handle the intricacies of management.
we have witnessed is Engineering Students Association of University of
clinching what others say are all contracts; what is your take? I believe that the contracted companies meet the threshold of
We also have to consider projects that are going on under the LAPSSET
requirements for the particular contracts. They must also prove that they
project There is a pipeline all the way to Lamu from South Sudan carrying
are up to the task. However, we must know that the Chinese companies
crude oil which means we shall require constant heating at intervals.
especially the ones in construction are supported by their government
This will in turn require massive power input and hence the investment
and the subsidy helps them to be able to complete the projects in time
is worth it.
and do an efficient job. They bid lower than our local companies even when the 15% allowance is given to the local contractors. In that case
Nairobi. It's the largely present body of students we see. We support
There is also a project going on in the Tana Delta which seeks to irrigate
One must understand and be conversant with all sectors of the industry,
them and have always done so. However there have been recent
one million acres of land. Through this initiative we can develop food
be it legal requirements to customer service. You must be able to handle
development of Associations of Engineering Students having the desire
processing industries that would consume the power and in the end
The other thing is, that they would complete the project on time and
it well. And it is by working through all these departments that you
to come together as one and have representatives. This would be good
create more employment both in the production and in the processing.
wait for the payment later. This is because of the subsidy. This, our locals
realize its importance.
for in that case we can include at least their member in the executive committee of IEK to be representing them.
cannot keep up with and the project would stall. It is therefore true to
Do we produce enough energy as of now?
Was KPLC your first place of work? Yes it was. And again it was the only one till when I retired at the age of 55 years. I joined it straight from form six and left for three years to pursue my degree at London University. I came back in 1973 and worked
one is but obliged to contract them.
say that there is not much financial muscle from our local contractors. Again when you compare the quality of work done by the Chinese and
Now to a different matter altogether, you are a senior stakeholder in the energy sector by the virtueof your position, what would you say of the Energy situation in the country? Give a perspective into thefuture.
there till 2008. After that I was a consultant with the Ministry of Energy
Demand of energy is propelled by industrialization. Even the GDP related
the one by our local contractors, there is a great contrast. Even the
to the energy levels in a country and so is economic growth. In that light I
Tanzanian contractors do a better job than our very own. So they would
wouldn't say yes. All I think is that we need to industrialize more in order
up their game or watch as the government outsources for other efficient
to spur the growth of the energy sector. You cannot produce what you
and ethically apt companies.
cannot sell. We need to encourage industries at the point of production.
handling a world Bank Financial Project. After that I later joined Tsavo
I chair the Energy Sector Board for The Kenya Private Sector alliance
We would in the end produce on large scale and instead of exporting raw
But the government policy is tilting towards them again. All projects of
Power, where I now work today.
and I can tell you that going forward the energy sector is promising.
materials we could do it in form of finished products.
one billion and below are being awarded to local contractors and they
The government is planning to put up a total of 5 Giga-watts in the next
Do you think it was a good idea to stay in one company as you did?
are not restricted from bidding against other foreign companies.
three years. This I would say is a good Vision which if implemented shall
The problem of our energy system is probably in the transmission and
steer this country to a different economic level. There is investment in
distribution network. Our transmission and Distribution Network is
what is your take about the training offered to the Kenyan Student Engineer and whether this couldpropel us to achieving the vision 2030?
the Geothermal Power; there is a 600MW gas power station. We also
generally weak and unstable and not until that is efficiently handled
I wouldn't advise so, but I know that what is important is job satisfaction
have 900MW coal plant in Lamu and another one in Kitui. There is the
we might not be receiving power as desired. They need to carry out
and if you are getting that then you have no reason whatsoever that
Turkana Oil Plant coming up soon. So in my view, the best times for this
reinforcement and maintenance. Privatization wouldn't change much as
would make you quit. It would be good to mention that I never worked
country in terms of Energy are approaching in the near future. As for
the same KETRACO lines are being used for transmission and generation
The response we have from the industry is a sad one. We do not produce
in one station or department for more than two years and therefore my
the employment in the energy sector it is tremendous. There is plenty of
is still under the same body. Again it doesn't always work. Take a look at
quality for the industry. Yet our curriculum is good. As I said before, we
work was not monotonous. So I enjoyed it.
market for Petroleum Engineers and Chemical Engineers too. The future
what happened to Kenya Refineries.
have fewer resources. We have fewer lecturers who switch their time between different universities. We no longer have tutorial fellows as it
You are the immediate former chairperson of The Institution of Engineers of Kenya, what is IEK andwhat would you say you do?
Do you think that there are plenty of opportunities for young people in the energy sector?
proper infrastructural support. And if there is infrastructure then it is outdated and irrelevant for the industry as of today. These loopholes
Yes. There are plenty of opportunities in terms of employment. There IEK is a professional body that caters for the welfare of its members. It
are many upcoming projects that offer lucrative job opportunities for
also is also tasked as an advisory body to the government on matters that
young people.
concern Engineering field. We liaise with Universities as well. While EBK is a regulatory body, we as the IEK ensure that our members, upcoming
used to be. We have too many universities offering engineering without
must be filled if we so desire to move forward. The industries have a feeling that the student sometimes do not know what to do. There is a need to build a compulsory curriculum that
what of on the investment part? Do you think it is easy?
in the Colleges are well trained.
incorporates a time not less than 6 months of an internship to industry so as to keep the student up to date with the industry. If we do not train
As for investment, I would doubt that. A power plant installation costs
professionals and still hope to achieve vision 2030 then we shall have
We speak for our members and we have as said advised the government
about $130 million while the license fee on an annual basis is around
no option but to outsource.
and we are still engaging them in projects undertaken like the Konza City,
$200000/=. Where would a young graduate from the university get that?
the Standard Gauge Railway and others that concern the development
Unless you have come into property... and it should be lots of it. All I
of this country.
would say is that the jobs in the sector are really promising and all you
We are so grateful for your time Sir, now to conclude, what is your parting shot to the Engineering Students??
have to do is work hard and get those. Otherwise, not even one investor
Are there chapters of IEK?
can set up a power plant. They need to come together...and they as
You are lucky to have chosen engineering. All you have to do is Train
always are multinational corporations.
and Excel. Put your best effort to give you a good employment. There
Yes. During my tenure we introduced the women's chapter to facilitate
is a lot of potential but you must come out as the best. Engineering is
their own discussions on affairs affecting them that they cannot raise
There have been concerns about the continued influx of foreign
a rewarding as well as a satisfying career. I have to say I have enjoyed
whenever we are together. The forum is functional at the moment. We
companies in the Kenyan economyand it is causing ripples even in
all that I have done. It is challenging however and you must know that
also have the Association of Consulting Engineers who have problems
the students. This is especially related to the Chinese companies
that is what spices life.
50
The Student Engineer
The Student Engineer
51
///// ESA
ESA \\\\\
AAK career day
General Electric career fair by Cynthia Mukabana
T
by Evans Kimutai Chelal
he GE career Fair this year took
the best and brightest individuals to help create
One thing however was resonant- GE can afford
p l a c e o n 2 1 s t J u n e 2 0 14. A n
a better future for the continent. It does give
you. It can empower You. All you need is the
important meeting officiated by ESA
you a feel of what Africa is made of, its potential,
Big Mind.
Chairperson, Cynthia Mukabana . In
where it came from and where it is heading to
attendance were students, many of course due
- making this a great career destination. To put
The emphasis at GE is based on ingenuity
to the profile of the company which graced the
it simply, it is promoting Africa for Africans.
and intelligence fused with imagination.
occasion. The meeting was officially opened at
So what does it take? What is the The gem GE
An individual is the content and not the
2:45pm.
seeks?
encapsulation. Your worth is rated as per what
•• Gracing the occasion were the General Electric staff. With their imaginative slogan "Imagination at Work," seized the moment.
Do your homework: Know what the
you are not on merits of career choice. There it
company is all about so as to have an
is... everybody has a chance.
idea what you'll be experiencing. ••
Network with people: Get to know and
At GE environmental issues are handled by
make friendship with those in GE.
trainings to ensure they are compliant with
Participate in university
the Environmental Health and Safety (EHS)
Electrical Engineering Dr. Absalom Heywood
competitions- not just for GE but all
regulations as they partner with Shell in the oil
Ouma.
other companies. It put you to the
and gas portfolio.
The Meet up was further spiced by the ESA Patron Prof. Odira and the Chairman Dept. of
••
limelight General Electric, herein referred to as GE, set
O
engineering career while still in school.
School of Engineering stepped
Alex Kibet, who is now part of the GE staff
to do whatever life throws at us. A fundamental
three years they undertook a curriculum known
participated in the GE universities competition.
aspect otherwise known as Flexibility was the
as flag planting. This is basically studying the
He had a project through which electrolysis of
Dean's advice. Development of skills suitable to
environment to know what to invest and where
chicken dropping was to produce electricity.
the market was also an emphasis that echoed
to invest so as to have a maximal impingement.
With all ridicule of having to electrolyze chicken
throughout the speeches.
Sandra Wajero facilitated a session known
an opportunity at GE with immediate effect.
Conclusively, for those who missed, that was a
the world of Structural Engineering, and the
as Destination Africa. Destination Africa
His narration of the life thereafter is left to our
Day worth it and a company that you have to
importance of taking heed of all that we learn
is a platform that creates opportunities to
admiration and imagination as well.
follow up. For with their imagination at Work
thousands of Africans as they bring together
away f ro m t h e i r b u s y c l a s s
The presentations struck a chord with the
in class because it is the foundation of the real
schedules and projects on 26th
students and one had this to say "the talk was
thing. This went down well with Nafula Wekesa,
March 2014, to take part in the AAK-Engineers
captivating especially on how to network and
a final year student in Civil engineering, as
Chapter Career day hosted by ESA. Eng. Grace
eliminate the need to 'tarmac' after graduating.
she had this to say "I feel encouraged and
Kagondu (Chair-Engineers Chapter) Eng. Goro,
Engineer Nderitu has made me look at the
determined knowing that the industry needs
Eng Ben Nyawade, Eng. Anthony Wahome, Eng.
Industry in a different perspective."
engineers, so am not here in vain. To see female
Nderitu and Eng. Matalanga were the featured speakers, inspiring students to better their
base in Kenya 5 years ago and within the first
dropping, Alex carried the day. He was offered
A section of participants at the AAK career day
ver a hundred students from the
There is need to have an open mind and be ready
comes Prosperity For Posterity.
Engineers like eng. Grace, I was inspired to Eng. Nyawade journeyed the students through
complete my my race and join the workforce, It has been done before so nothing is impossible." It was truly a day to remember with KEVIAN Ltd facilitating the much awaited cooling break after the talk. The Students networked with professionals while sipping down a bottle of Afya and Mt. Kenyan water after the talk as they seeked mentors and Internships opportunities. We wish to thank KEVIAN Ltd for facilitating the Cooling break.
A group photo of the participants
52
The Student Engineer
The Student Engineer
53
IEK \\\\\
Institution of Engineers of Kenya Student fair dignitaries who saw it during its presentation Students from various universities within
including the head of state honorable Uhuru
the country presented their papers to IEK on
Kenyatta and cabinet secretaries Joseph
28th April 2014, among them was Mr. George
Kaimenyi,Ann Waiguru,Najib Balala during the
Ouma, a fourth year student from University
launch of Uwezo Fund for Youths and Women
of Nairobi in the Department of Electrical and
that was held on 8th September 2013.
Information Engineering. Mr. George Ouma who was number one was given a tablet. The top
The same project was presented during the
3 George Ouma, Sally Musonye(UoN), Robert
youth Enterprise trade fair at KICC on 25th to
Giteya (Moi University) were given opportunity
27th November 2013 organised by the chairman
to present during the 21st annual International
Evans Gor Semelango and also on 15th annual
Engineers' conference which was held at
IEEE Kenya Engineering competition held on
Leisure Lodge Resort, Kwale County that started
7th to 8th November at Oshwal Centre where
on May 7 th - 9th 2014.George was declared
IEEE President Roberto approved it. George
the winner of the first ever IEK Engineering
has also managed to meet Kenya's youngest
students competition as a result of his Auto-
billionaire Mr. Heshan Da Silva of Desilva group
Run Cellphone innovation which was the most
at Westlands and demonstrate his auto-run
outstanding innovation designed by a student.
cellphone to him. currently George is working
The Auto-Run Cellphone is an innovation that
on several projects based on innovation to be
enables your cellphone to charge itself as you
released next year when finalizing his studies
make phone calls, texting and browsing. The
in university.
device uses radiation emitted by the phone,
I
which it converts into electrical energy and
George also has registered a company called
regulated based on the phone's specifications.
Amuo technologies which will deal with
The more you use your phone, the more energy
production of the innovative projects and
your battery gets hence it becomes an auto-run
own them including handling the Intellectual
nstitutions of Engineers of Kenya
phone. The presentation was graded based on
properties of the innovations. George has
(IEK) decided to engage students in
technical content,
been invited in several institutions to talk
their activities by organizing for IEK
with people or students and encourage them
Engineering Students Competition . This
overall presentation and oral and visual
top institutions include Technical university,
was intended to encourage members
performance. Being that George's presentation
Kenyatta university, Chandaria innovation and
of Engineering Student Associations to
was the best, he was chosen to attend the
business Centre, JKUAT, National commission for
prepare and present meaningful papers and
World Engineers Summit to be held in Abuja
science innovation and technology NCST,mobile
presentations on subjects related to the various
Nigeria to represent the country in Student
planet sponsored by Google,Huawei Kenya,
engineering disciplines. Design Competition
engineering International presentations
Kenya Nuclear Board by engineer Collins Juma
provides a platform for Student Members to
from 2-7 November fully sponsored by IEK.
and recently he was in Nakuru visiting various
present their solutions to a range of design
He is going to be handed the sponsorship
children homes including his sponsors Street
problems - from everyday household tasks to
at IEK office at Transcom house by the new
children assistance network of Nakuru SCANN
groundbreaking space exploration. Each of the
IEK chairman Engineer Reuben Kosgei.
chaired by Shamsher Gilanis which is sponsored
student is required to design, construct and
54
The Student Engineer
by cedar foundations and rotary club. Also he
operate a prototype meeting the requirements
The same project has also been demonstrated
went to Eldoret he managed to visit testimony
of eradicating human determined problem
to H.E the President Uhuru Kenyatta during
faith homes started and managed by John
statement. This was organised by the IEK Young
the launch of Uwezo Fund. George has also
Green and SOS children's home in Eldoret.
engineers chapter chaired by Engineer Grace
designed a project based Home Security System
Onyango.
that has been presented and approved by many
The Student Engineer
55