a
Martek Contracts Ltd Bespoke Joinery & Specialist Fit Out Portfolio
Ames House
Kew Riverside, St James Homes On the banks of the Thames and close to the Royal Botanical Gardens, Kew Riverside from St James Homes is one of the most prestigious riverside developments so far. Set in 26 acres, the development provides a sumptuous selection of apartments, town houses and detached properties.
Incorporating the highest standards of workmanship and fittings, we were proud to have been selected for the fit out of 230 luxury bathrooms and other specialist areas, across 13 residential styles.
Each of the 230 ‘mini’ fit outs have embraced all of our core disciplines and drawn upon the whole range of Martek’s planning, manufacture, installation and management skills. With elements of ceramic and marble fitting, plumbing and electrical works, specialist joinery and solid surface fabrication: the project, which has spanned most of 2003 and 2004, has followed a complex programme of both construction and occupancy.
The completed project has won a number of awards and we are pleased to have been able to contribute to the success of the development.
Kew Riverside, St James Homes On the banks of the Thames and close to the Royal Botanical Gardens, Kew Riverside from St James Homes is one of the most prestigious riverside developments so far. Set in 26 acres, the development provides a sumptuous selection of apartments, town houses and detached properties.
Incorporating the highest standards of workmanship and fittings, we were proud to have been selected for the fit out of 230 luxury bathrooms and other specialist areas, across 13 residential styles.
Each of the 230 ‘mini’ fit outs have embraced all of our core disciplines and drawn upon the whole range of Martek’s planning, manufacture, installation and management skills. With elements of ceramic and marble fitting, plumbing and electrical works, specialist joinery and solid surface fabrication: the project, which has spanned most of 2003 and 2004, has followed a complex programme of both construction and occupancy.
The completed project has won a number of awards and we are pleased to have been able to contribute to the success of the development.
Salters Hall
Kew Riverside, St James Homes On the banks of the Thames and close to the Royal Botanical Gardens, Kew Riverside from St James Homes is one of the most prestigious riverside developments so far. Set in 26 acres, the development provides a sumptuous selection of apartments, town houses and detached properties.
Incorporating the highest standards of workmanship and fittings, we were proud to have been selected for the fit out of 230 luxury bathrooms and other specialist areas, across 13 residential styles.
Each of the 230 ‘mini’ fit outs have embraced all of our core disciplines and drawn upon the whole range of Martek’s planning, manufacture, installation and management skills. With elements of ceramic and marble fitting, plumbing and electrical works, specialist joinery and solid surface fabrication: the project, which has spanned most of 2003 and 2004, has followed a complex programme of both construction and occupancy.
The completed project has won a number of awards and we are pleased to have been able to contribute to the success of the development.
Kew Riverside, St James Homes On the banks of the Thames and close to the Royal Botanical Gardens, Kew Riverside from St James Homes is one of the most prestigious riverside developments so far. Set in 26 acres, the development provides a sumptuous selection of apartments, town houses and detached properties.
Incorporating the highest standards of workmanship and fittings, we were proud to have been selected for the fit out of 230 luxury bathrooms and other specialist areas, across 13 residential styles.
Each of the 230 ‘mini’ fit outs have embraced all of our core disciplines and drawn upon the whole range of Martek’s planning, manufacture, installation and management skills. With elements of ceramic and marble fitting, plumbing and electrical works, specialist joinery and solid surface fabrication: the project, which has spanned most of 2003 and 2004, has followed a complex programme of both construction and occupancy.
The completed project has won a number of awards and we are pleased to have been able to contribute to the success of the development.
Verdi Restaurant, Royal Albert Hall
Howard de Walden Estate
Kew Riverside, St James Homes On the banks of the Thames and close to the Royal Botanical Gardens, Kew Riverside from St James Homes is one of the most prestigious riverside developments so far. Set in 26 acres, the development provides a sumptuous selection of apartments, town houses and detached properties.
Incorporating the highest standards of workmanship and fittings, we were proud to have been selected for the fit out of 230 luxury bathrooms and other specialist areas, across 13 residential styles.
Each of the 230 ‘mini’ fit outs have embraced all of our core disciplines and drawn upon the whole range of Martek’s planning, manufacture, installation and management skills. With elements of ceramic and marble fitting, plumbing and electrical works, specialist joinery and solid surface fabrication: the project, which has spanned most of 2003 and 2004, has followed a complex programme of both construction and occupancy.
The completed project has won a number of awards and we are pleased to have been able to contribute to the success of the development.
Knight Frank
Kew Riverside, St James Homes On the banks of the Thames and close to the Royal Botanical Gardens, Kew Riverside from St James Homes is one of the most prestigious riverside developments so far. Set in 26 acres, the development provides a sumptuous selection of apartments, town houses and detached properties.
Incorporating the highest standards of workmanship and fittings, we were proud to have been selected for the fit out of 230 luxury bathrooms and other specialist areas, across 13 residential styles.
Each of the 230 ‘mini’ fit outs have embraced all of our core disciplines and drawn upon the whole range of Martek’s planning, manufacture, installation and management skills. With elements of ceramic and marble fitting, plumbing and electrical works, specialist joinery and solid surface fabrication: the project, which has spanned most of 2003 and 2004, has followed a complex programme of both construction and occupancy.
The completed project has won a number of awards and we are pleased to have been able to contribute to the success of the development.
St Pancras Renaissance Hotel, Manhattan Loft Corporation
Argent Marketing Suite, Kings Cross
100 Pall Mall
48 Pall Mall
Ascot, Parade Ring Restaurant
Selfridges, London
Lillie Square
Brompton Road
Kew Riverside, St James Homes On the banks of the Thames and close to the Royal Botanical Gardens, Kew Riverside from St James Homes is one of the most prestigious riverside developments so far. Set in 26 acres, the development provides a sumptuous selection of apartments, town houses and detached properties.
Incorporating the highest standards of workmanship and fittings, we were proud to have been selected for the fit out of 230 luxury bathrooms and other specialist areas, across 13 residential styles.
Each of the 230 ‘mini’ fit outs have embraced all of our core disciplines and drawn upon the whole range of Martek’s planning, manufacture, installation and management skills. With elements of ceramic and marble fitting, plumbing and electrical works, specialist joinery and solid surface fabrication: the project, which has spanned most of 2003 and 2004, has followed a complex programme of both construction and occupancy.
The completed project has won a number of awards and we are pleased to have been able to contribute to the success of the development.
Jones Day, London
St Pancras Apartments, Manhattan Loft Corporation
CIMA, London
Kew Riverside, St James Homes On the banks of the Thames and close to the Royal Botanical Gardens, Kew Riverside from St James Homes is one of the most prestigious riverside developments so far. Set in 26 acres, the development provides a sumptuous selection of apartments, town houses and detached properties.
Incorporating the highest standards of workmanship and fittings, we were proud to have been selected for the fit out of 230 luxury bathrooms and other specialist areas, across 13 residential styles.
Each of the 230 ‘mini’ fit outs have embraced all of our core disciplines and drawn upon the whole range of Martek’s planning, manufacture, installation and management skills. With elements of ceramic and marble fitting, plumbing and electrical works, specialist joinery and solid surface fabrication: the project, which has spanned most of 2003 and 2004, has followed a complex programme of both construction and occupancy.
The completed project has won a number of awards and we are pleased to have been able to contribute to the success of the development.
sales@martek.co.uk www.martek.co.uk T: 01689 808 600 Martek Contracts Ltd High Point Mill King Henry’s Drive New Addington Surrey CR0 0AE
WINNER Best Green Business Best Overall Business