201 1-201 4
CONTENTS:
HOUSE IN ROW
1-2
DETAILS / HOUSE IN ROW
3-4
BUILDING
5-6
APARTMENT
7-8
HOTEL
9-10
STUDENTS DORMITORY
11-12
KINDERGARTEN
13-14
URBAN FURNITURE
15-16
URBAN PLANNING
17-18
ADMINISTRATIVE BUILDING
19-20
AB - RESTAURANT & OFFICES
21-22
ELDERLY HOME
23-24
The house is located in the central area intended for individual housing. The house contains P+2 and basement. It therefore is adapted as ground enterance hall, first floor means parental zone - parental bedroom, living room and kitchen. second floor rooms intended for children, each room with it's own terrace.
2011 / 2014
6
5
4
3
2
1
HOUSE IN ROW A
A 19x20 20x20
13x20 14x20
4 4
6
3 3
5
2 2
B 1
B
6
1
GROUND FLOOR PLAN
A
A 19x20 20x20
13x20 14x20
2
3
4
5
6
2
3
4
5
6
B 1
B
1
FIRST FLOOR PLAN
A
A
7.00
SECOND FLOOR PLAN
AXONOMETRIC PROJECTION
6
5
4
3
2
B 1
B
1
AP Individual Housing
6
5
4
3
1
2
A
B
B
A
B
A
D3
+7.00
+7.00
+4.00
+4.00
0.00
0.00
D2
0.00
D1
ELEVATION 1 -2.80
-2.80
-2.95 -3.55
SECION A
ELEVATION 2
-2.95 -3.55
SECION B
2
The details are substracted and noted from the project of the House in Row. There are segments of details of the basement wall and foundation, the detail of window, the detail of door, the detail where are connected the floor with the wall, the detail of connectingnthe floor of the living room with the floor of the kitchen and the detail of connecting the floor of the bath room with the floor of the bedroom. Also substracted as a segments the kitchen and the bathroom with all necessary sections - elevations.
2011 / 2014
DETAILS / HOUSE ON ROW
DETAIL 1
DETAIL 2
DETAIL 3
STUCCO FACADE 2cm STYROFOAM 5cm HOLLOW BRICK 12cm STONE WOOL 5cm VAPOR BARRIER HOLLOW BRICK 12cm EXTERNAL FINISHING 2cm
DETAIL 4
STUCCO FACADE 2cm STYROFOAM 5cm HOLLOW BRICK 12cm STONE WOOL 5cm VAPOR BARRIER HOLLOW BRICK 12cm EXTERNAL FINISHING 2cm
BASEBOARD FLOOR 9cm REINFORCED CONCRETE SLAB15cm EXTERNAL FINISHING 1.5cm HOLLOW BRICK 12cm EXTERNAL FINISHING 1.5cm
CONCRETE 5cm
PARQUET FLOOR 2,5cm ADHESIVE FOR PARQUET CEMENT COVERAGE 5cm STYROFOAM 5cm REINFORCED CONCRETE SLAB15cm EXTERNAL FINISHING 3cm
TERRACE
REINFORCED CONCRETE SLAB15cm GRAVEL 25cm PACKED SOIL
EXTERNAL FINISHING 1.5cm HOLLOW BRICK 12cm EXTERNAL FINISHING 1.5cm
FLOOR REINFORCED CONCRETE SLAB 15cm HIDROISOLATION EXTERNAL FINISHING
DETAIL 5 T-FLOOR BASEBOARD
BASEBOARD LIVINGROOM EXTERNAL FINISHING 2.5cm
KITCHEN
PACKED SOIL
REINFORCED CONCRETE WALL 30cm
GRAVEL 25cm
HIDROISOLATION
CONCRETE 15cm HIDROISOLATION
BRICK 12cm
REINFORCED CONCRETE SLAB 15cm STYROFOAM 2cm
STUCCO FACADE 2cm STYROFOAM 5cm HOLLOW BRICK 12cm STONE WOOL 5cm VAPOR BARRIER HOLLOW BRICK 12cm EXTERNAL FINISHING 2cm
CEMENT COVERAGE 5cm FLOOR 3cm -2.75
CERAMIC TILES 45x45 1cm ADHESIVE CEMENT COVERAGE 8cm HIDROISOLATION REINFORCED CONCRETE SLAB EXTERNAL FINISHING 3cm
BASEBOARD 3cm PARQUET 2.5cm ADHESIVE FOR PARQUET CEMENT COVERAGE 5cm REINFORCED CONCRETE SLAB15cm STYROFOAM 1+1cm EXTERNAL FINISHING 3cm FLOOR REINFORCED CONCRETE SLAB 15cm CEILING EXTERNAL FINISHING 1cm
-2.95
DETAIL 6 WOODEN THRESHOLD 5x20cm
-3.55
BEDROOM
BATHROOM
CONCRETE 10cm SECION
SECION
GRAVEL 25cm
SECION
PARQUET 2.5cm ADHESIVE FOR PARQUET CEMENT COVERAGE 5cm STYROFOAM 1+1cm REINFORCED CONCRETE SLAB15cm EXTERNAL FINISHING 3cm
CERAMIC TILES 30x30 1cm ADHESIVE FOR TILES 1cm HIDROISOLATION CEMENT COVERAGE 5cm STYROFOAM 1+1cm REINFORCED CONCRETE SLAB EXTERNAL FINISHING 3cm
3
4
BATHROOM
3
Detail of Architecture
1
1
4
2
3
2
SECION 3-3
SECION 4-4
SECION 2-2
SECION 1-1
KITCHEN 2
1
1
SECION - ELEVATION 2-2
SECION - ELEVATION 1-1
2
4
The multiple family building wich is located in the centre of the city Skopje contains of two blocks - two secctions with two vertical comunications. The building consist of three types of apartments; apartments with two bedrooms, three bedrooms and four badrooms. The two blocks are connecting in each floor. In the area appear common spaces wich are used for recreations for the people living there and development of neighborhood life.
2011 / 2014
BUILDING
x 30 x 15.3
x 30 x 15.3
x 30 x 15.3
GROUND FLOOR PLAN
comunication space for rent
1st, 2nd and 3rd FLOOR PLAN
four badroom three badroom two badroom common spaces comunications
housing sanitary acess
comunications terraces common spaces
ROOF FLOOR PLAN
TRAJECTORY
5
AP Collective Housing
SECTION 1
SECTION 3
SECTION 2
SECTION 4
ELEVATION B
ELEVATION A
6
The project proposes the reconstruction of an apartment. In this case the task was to convert the two separate flats into one apartment for family of four members where we can include all their needs. We had the chance to destruct walls and make them as needed.
2011 / 2014
RENOVATION & RECONSTRUCTION OF APARTMENT
1
6 2
5
3
7
4
4
3
2
1
8
7
Interior Design
5
6
7
8 AXONOMETRIC PROJECTION
8
The hotel is located in the center of Skopje and is called the city hotel. The hotel is adapted for the variety of guests needs, providing for the city overview, the unforgetable scenery off the city and it's surroundings. It is divided into three sectors; economic-technical, administrative and residental sector. The hotel has a capacity of 200 rooms, of wich 8 apartments, 6 conference halls, restaurant, hall room, fitness center and recreation area. Tipology - Tower (P+17)
2011 / 2014
HOTEL
VERO
GROUND FLOOR PLAN
FIFTH FLOOR PLAN
FIRST FLOOR PLAN
THIRD FLOOR PLAN
1 - 13 FLOOR PLAN
FOURTH FLOOR PLAN
9
AP Collective Housing
ELEVATION 1
SECION 1
10
It is great locaton in the center of the city with amazing views of the whole city. The project enables the students to live integrated becouse on each level there is a common rooms where they can socialize with each other. They also have privacy in their rooms with all the necessary elements. Sprecial emphasis is given to accessibility and community development.
2011 / 2014
1
9x17 8x28.5 9x17 8x28.5
2 1
1
1
2
9x17 8x28.5 9x17 8x28.5
2
1st, 2nd, 3rd and 4th FLOOR PLAN
1
FIFTH FLOOR PLAN
2
GROUND FLOOR PLAN
1
9x17 8x28.5 9x17 8x28.5
1
2
1
2
9x17 8x28.5 9x17 8x28.5
2
STUDENTS DORMITORY
SIXTH FLOOR PLAN
11
AP Collective Housing
SECION 1
SECION 2
social area common spaces / space for work and socialization housing
12
Prototipe for Kindergartens designed according to the standards for kindergarten, consisting of four areas,two wich are intended for preschool children and two that contain common multi-functional spaces. The kindergarten is situated in a new building area in the suburb of Skopje, overlooking the river. The form of the Kindergarten is following the form of the location. All the contains are placed in Isosceles triangle, which in the center are forming inner courtyard.
2011 / 2014
KINDERGARTEN N
FORM - ISOSCELES TRIANGLE k4 Bloc k3 Bloc
k2
B
Bloc Blo
B
ck 1
A river Vardar
1-1
2
VENTILATION
ROOF LIGHTING GROUND FLOOR PLAN
2-2
1
CIRCULAR WINDOWS ON THE FACADE
SECTION 2-2
13
AP Collective Housing
ELEVATION 1
ELEVATION 2
SECTION 1-1
SECTION 2-2
14
The task of this project was to give life in this dead end street wich is situated in between old buildings so it will become a place for socializing, a place where the people can spend their free time. The form of the whole street is obtained with before hand analyses of the enterance of the houses, the movements and the needs. With this form, with situated urban equipment and green parks the whole urban block appears with a new look. Now the dead end street becomes STREET - PARK.
2011 / 2014
URBAN FURNITURE built-up area / free area positive / negative 1
boundaries of location
pedestrian zone driving zone
acces to internal courtyards
buildings pedestrian zone streets green spaces parking zone internal courtyards fountain 1
SECION 1-1
SECION 2-2
15
Urban Design BENCH 1
2
1
2
ELEVATION A
ELEVATION B
AXONOMETRIC PROJECTION SECION 2-2
SECION 1-1
BIN
1
1 2
2
A
SECION 2-2
ELEVATION A SECION 1-1 AXONOMETRIC PROJECTION
1
FOUNTAIN
SECION 1-1 1
AXONOMETRIC PROJECTION
16
This plan represents one block of the suburb Aerodrom in Skopje. We were asked to prepair synthesis plan of the whole location through analysis. The whole task was to familiarized with the location (the existing buildings) and the needs of the peopleliving there. To choose a focal point of the location and to intervent as needed.
2011 / 2014
URBAN PLANNING
a
houses buildings garage
built-up area / free area positive / negative
sidewalk street pathway bike informal garage transformer station hedges entranes to buildings high foliage (trees) low foliage muddy surface bench
low housing structure (houses and garages) residential buildings streets sidewalk pathway bike
ELEVATION 2 - 2
SECION 2 - 2
17
SYNTHESIS PLAN OF RECONSTRUCTED BASES
1 Park for pets 2-3 Park for recreation 4-5 Park for planting agriculture 1
sidewalk street pathway bike new sidewalk
Basics Of Urbanism 2
3
ELEVATION 1 - 1
4
5
SECION 2 - 2
18
Menagement building of corporation for design, manufacturing and sales for furniture. The location elements are the main motive for solving the architectural task. Consist of elements wich are forming the basic structure of the complex. The building is situated in industrial zone of Skopje (P+1). The ground floor constist of four pavilions, on the first floor all the pavilions are connected into one. Even though it's lightly pollutin industry the vertical communications are indicated and the scenery wich is created reminds us of an industry.
2011 / 2014
ADMINISTRATIVE BUILDING IDEA output of materials input materials P
OBJECT 1. designers and workshop exhibition and sale
manufacturing plants line of the river
1. workshop for roughly cutting
OBJECT 2. atrium and main processing
2. workshop for tailoring
3. workshop for main processing
4. show room and salling
isolation of noise OBJECT 3. passageway and restaurant
connection with the river bank OBJECT 4. show room and business suites atrium architectural offices brand and marketing
administration and commercial service
restaurant and lobby bar
business suites
GROUND FLOOR PLAN
FIRST FLOOR PLAN
19
Public Buildings
ELEVATION 1
ELEVATION 2
ELEVATION 3
ELEVATION 4
SECION 1
SECION 2
20
This two basses are segments from the administrative building for manifacturing furniture. They display the interior solution of the restaurant and architectural offices of the building. Bouth functiones are situated on the second floor at the building.
2011 / 2014
ADMINISTRATIVE BUILDING - RESTAURANT & ARCHITECTURAL OFFICES RESTAURANT
SECION - ELEVATION 1-1
SECION - ELEVATION 2-2
21
Interior Design ARCITECTURAL OFFICES
SECION - ELEVATION 1-1
SECION - ELEVATION 1-1
22
The elderly home is situated in the perifery of the city Bitola. The whole complex contains four separated buildings wich are connected with a glass made corridor. The complex consist of all needed premises in wich elderly people will be cared for. In the free space between every building is formed park and all parks are connected.
2011 / 2014
ELDERLY HOME 5
4
6
4
0.00
EAST ELEVATION
3
3 0.00
WEST ELEVATION
SOUTH ELEVATION
0.00
0.00
2
2
NORTH ELEVATION
0.00
1
1
5
6
23
Graduate Labor 5.00
4.20
0.00
SECION 1
6.00
0.00
SECION 2
4.20
0.00
AXONOMETRIC PROJECTION SECION 3
THERAPIES
COMMON AREAS
SECION 4 ADMINISTRATION
4.00
0.00
SECION 5
RESTAURANT HOUSING SECION 6
24
THANK YOU