MARTINA BUNINO _ ARCHITECTURE PORTFOLIO

Page 1

martina bunino architecture porfolio →


CV

/ Education Master in Architecture with Merit Architecture Construction and City Polytechnic of Turin, IT Sept 2015 - Jul 2017 Score: 110L /110 with publication as meritorious argument Erasmus Exchange METU of Ankara, TR Sept 2015 - Jan 2016

Martina Bunino 04 October 1992 +39 347 7013288 martina.bunino@gmail.com Madrid, Paseo de Extremadura 120

Bachelor Degree In Architecture Polytechnic of Turin, IT Sept 2011 - Jul 2014 Scientific High School Marie Curie of Pinerolo (Turin), IT Sept 2006 - Jun 2011

/ Pubblications Honor Master Thesis – “Settle Into. Inclusive Strategy For The New Inhabitants” Polytechnic of Turin, IT, 2017 → Click here Book – “Doha 2020, Rem Koolhaas Ultimo Atto” in “La Descrizione Del Mondo. Reportage Immaginari Dalla Città Asiatica” Polytechnic of Turin, IT, 2013 → Click here


/ Working Experience Cronoslab Arquitectura Architect Madrid, ES, Aug 2018 - ongoing Ensamble Studio Assistant architect Madrid, ES, Jan - Jul 2018

S. Rocco Genoa Summer School 3 With The Royal Danish Academy Mallorca, ES, 9 - 19 Sept 2015 Civico 13 Architetti Associati Intern Torino, IT, Mar - Aug 2015

Exhbition Set Up – Adriano Sicbaldi. La Riservatezza Lagear Architettura dell'arte è bellezza infinita Competition - Freelancer architect Archivio di Stato, Torino, IT, Torino, IT, Sept - Nov 2017 11 - 14 Sept 2017 Exhbition Set Up – City Streets2 Mobile Exhibition – Routes Valentino Castle, Torino, IT, 11 - 14 Sept 2017 Conference – City Streets2 Notre Dame University – Louaize, Beirut, LB, Nov 2016

Autodesk Archicad

FR

Autodesk Revit

Microsoft Office

SP

Sketchup

Grassoppher

Rhinocheros 5

International Competition – 10m² Periferica – Top 10 Finalists 2016

ENG

Adobe Premiere

International Workshop – Urban Conservation and Tourism along Shantang River Xi’an - Jiaotong University and Liverpool University Suzhou, CN, 21 - 28 Feb 2016

IT

Adobe PS,ID, AI

International Workshop – Border Conditions Notre Dame University - Louaize, Beirut, LB, Apr 2016


00 / Index

01 Sharma Climbing Madrid

02 Ensamble Fabrika

05 Cooperativa Naturan Bizi

06 Sport Club Olimpico Leòn


03 Ca'n Terra

07 Scaffoldereams

04 Two Hundred Meters WalkAlong Mondrago

08 Beirut Border Conditions


01 / Sharma Climbing Madrid The new Chris Sharma Climbing gym has been designed inside an existing industrial building implanted in 1960. The design includes the complete reconstruction of the first volume that divides over 4 floors all the program related to the activity of the climbing wall: restoration area (240 sqm), gyms, activity rooms, offices and changing rooms (298 sqm). The old industrial space with steel sheds roof is divided in two parts; a volume in which the roof

( with a new structure) rises until 18 meters to adapt to custumer needs for the climbing walls. A second area that conserves and rehabilitates the original industrial space to integrate the boulder walls. The building of vaulted ceilings is completely rehabilitated to integrate a second boulder space, creating a differentiated space through the control of light. The total sqm of the complex are 5000 sqm.


Cronoslab Arquitectura Industrial Site Reuse Realized project 2020 / Architect and Constuction Supervisor Assistant Concept Drawing Executive Drawing (BIM Archicad) Installation Drawing ( MEP ) As-Built Drawing Interior Design Project / Project area Calle Julian Camarillo 55, Madrid, Spain / Work with Ivan Cristòbal

Climbing wall view


03 - 04

Elevation ↑

After ↑

Before ↑


→

Interior project


1

2

3

3'

4

5

6

7

8

9

10

11

12

84,83

0,35

7,60

7,58

7,63

7,64

7,38

7,60

7,60

4,20

4,93

7,27

6,03

F

0,13

3,02

5,24

3,65

3,79

8,06

0,24

5,03

E 0,13

6,72

0,13

9,30

0,17

0,13

D

2,33

2,63

2,94

0,13

9,70

10,68

5,16

12,99

17,94

6,79

0,87

3,97

6,57

B

5,08

0,17

23,66

17,54

5,92

27,79

0,70

3,08

2,88

2,57

2,00

2,77

19,43

12,00

23,47

G

2,37 0,13 1,60

7,44

0,13 2,25 0,13

0,17

5,40

49,59

1,60

10,28

0,13

10,21

3,17

0,13

7,81

0,80

5,97

4,12

C

15,05

2,38

3,04

1

2

3

3'

4

5

6

7

8

9

10

12

11

A

1,20

1,86

0,17

2,15

47,60

2,87

0,24

2,02

1,46

GSPublisherVersion 0.1.100.100

12

11

10

9

8

7

6

5

4

3

3'

2

1

84,37 14,95

2,33

7,60

7,60

7,38

7,64

7,63

7,58

0,35

7,60

7,27

6,44

+19,76

+18,50 5 cubierta

1,70

1,69

+18,61

+17,20 +16,15

+16,00 4 azotea

+12,11

18,20

+12,00 3 nivel 3

+8,00

+8,00 2 nivel 2

0,59

+8,36

16,83

17,83

3,96 2,79

+12,00

+4,00

+4,00

+4,00 1 nivel 1

7,12

7,27

8,88

+6,06

+0,80

PTE 14 % ±0,00

±0,00

±0,00 0 nivel 0

Sección S-01

A

D 2,38

E

B

2,33

8,06

F 27,56 3,02

G

C

A

B

C 27,12

6,03

12,77

5,74

14,34

1,23 1,05

+17,20 +16,15

+18,50 5 cubierta

+16,00 4 azotea

+12,00

+12,00 3 nivel 3

3,43

0,57

+12,00 3 nivel 3

8,95

3,43

0,72

+16,00 4 azotea

1,78

+19,71

+18,50 5 cubierta

+8,00

+8,00 2 nivel 2

+4,00 0,57

+4,00 1 nivel 1

8,88

3,43

0,57

+8,00 2 nivel 2

+4,00

+4,00 1 nivel 1

3,43

+2,60

±0,00

±0,00 0 nivel 0

Sección S-03

Sección S-02

GSPublisherVersion 0.1.100.100

Structure

±0,00 0 nivel 0

±0,00


Work in progress →

07 - 08


02 / Ensamble Fabrica This is the main project I was involved in Ensamble Studio, an architecture office based in Madrid and Boston. With a team of young architects, we were responsible for the performance of different tests on an innovative pre-fabrication method. We built off-site a 1:1 scale model of part of a building, using steel profiles as main material and started performing different methods on material behaviour, connectivity and spatial value. On site, then, my task increased: I worked on foundation, concrete-casting, metal- woriking, insulating, frames, slabs, finishing. “Ensamble Fábrica es el laboratorio y espacio de fabricación que desarrollará los espacios que soñemos, entregando las partes del edificio para ser ensamblados rápida, segura y eficientemente in-situ, en cualquier lugar del mundo. Ya no usamos una parte, un ladrillo, un perfil, o conducto que transportamos para su unión en obra, sino un “componente” de un sistema, fabricado con las herramientas, la conciencia y la eficiencia de hoy."


Ensamble Studio Wharehouse Woho prefabricated module

Realized project 2018 1200 sqm built

/ On-site assistant

/ Work with Javier Cuesta (Master Builder) Borja Soriano Anton Garcia-Abril Debora Mesa Molina

Executive planning Design and implementation of work Work supervision Prototipe realization on site / Project area

Work in progress →

07 - 08

Pinto, Madrid, Spain


09 - 10

Pre-fab elements assembled on site ↑

01 / Ensamble Fabrica



03 / Ca’n Terra Ca’n Terra is the house of the earth: first just that, earth, after quarried with industrial logic, voided and abandoned, to be rediscovered one hundred years later and come to be architecture. If the history of civilization has evolved transforming ideas into matter, here the process is inverted. We enter the space like explorers would do, equipped with the technology that expands our vision in the dark; scanning the solid structure that was built for us.

11 - 12

Behind the scan, the architect’s eye, directing, interpreting, creating the space again, completing it with operations that are familiar to the stone mass: new cuts to build using air and light. Architecture appears. Then we can inhabit. In lieu of the imposing action that we often exert on the environment, we propose a trip to the interior being of matter, and recognize the beauty of the spaces that are waiting to be lived.


Ensamble Studio Ca' n Terra / Concept design and implementation of work / Project area Pinto, Madrid, Spain

Realized project 2018 / Work with Javier Cuesta (Master Builder) Borja Soriano Anton Garcia-Abril Debora Mesa Molina


01 - 02

13 - 14 On site


07-08 11 - 12

Axonometric Ludic nature view ↑

Didascalia della foto →


04 / Two Hundred Meters Walk Along Mondrago

15 - 16

This unconventional hotel is a walking experience through the natural park of Mondrago, from the hill to the sea, following the line of an ancient traditional wall, for two hundred meters. The twelve “rooms� we provided are twelve experiences for the visitor completely inside the nature. Walking in landscape becomes a creative and cognitive act that allows the symbolic and phisical transformation of both the natural territory and the visitors.

Masterplan →


San Rocco Genoa Summer School 3 Unconventional hotel / Project assistant Concept drawings / Project area Portopedro, Mallorca, Spain / Work with Havi Navarro Silvia Lantieri / Professors Carmen Andriani Stephanie Akkaoui Huges Andreas Lechner Simona Malvezzi Morten Meldgaard Vittorio Pizzigoni Valter Scelsi Guro Sollid Pier Paolo Tamburelli Konstantinos Pantazis



17 - 18

Ludic nature ↑

Rooms of experiences →


05 / Cooperativa Naturan Bizi Naturan Bizi is a residencial project of 68 apartments in the new Arechabaleta area in Vitoria Gasteiz in Spain. One quality makes it really unique- it has been founded as a cooperative community by Cronoslab for people wanting to live in a highquality standard apartments, personalized from themselves and in affordable prices. It was designed to be as much energy efficent as possible, starting with the orientation through doble skin facade, shape of the building and installations inside. https://www.cronoslive.com/

Cronoslab Arquitectura Residencial Project Realized project 2020 / Architect Assistant Concept Drawing Executive Drawing Installation Drawing Graphic Design / Project area Aretxabaleta, Vitoria- Gasteiz, Spain / Work with Ivan Cristòbal






PLANTA BAJA SUR

PORTAL 4. PLANTA BAJA

OE

Dormitorio I: 14,71m2

Dormitorio II: 10,65m2

Dormitorio I: 14,71m2

Dormitorio I: 13,93m2

Dormitorio II: 10,97m2

Dormitorio I: 14,71m2

Dormitorio III: 13,87m2

Dormitorio III: 13,87m2

S. ÚTIL (m ) S. CON. (m )

Acceso Portal

50% de 5,05

Dormitorio II: 10,65m2

Dormitorio III: 11,46m2

VIVIENDA "E"

Dormitorio II: 10,65m2

Dormitorio IV: 13,76m2

TOTAL ZONAS COM.

Salón-Comedor

Local Comunidad: 59,80m2

Distribuidor Dormitorio I Aseo I Dormitorio II Dormitorio III C.Baño

Aseo I: 4,69m2

Aseo I: 4,69m2

Aseo I: 4,58m2

Distribuidor: 7,55m2

Distribuidor: 4,89m2 C.Baño: 4,95m2

Cocina

Aseo I: 4,69m2

Levac. = 9,2m < 25m

Distribuidor: 4,89m2

Despensa: 3,04m2

Terraza-Tendedero

Levac. = 9,2m < 25m

C.Baño: 4,95m2

TOTAL VIVIENDA "E" PORTAL 4

Instalaciones: 2,13m2

Cocina: 10,79m2

5 ocupantes Salón-Comedor: 19,10m2

Instalaciones: 2,13m2

C.Baño: 5,60m2

"D": 117,07m2

"E": 89,98m2

5 ocupantes

OE

Instalaciones: 2,13m2

Levac. = 8,40m < 25m

OE

"E": 89,90m2

Salón-Comedor: 19,10m2

OE

"E": 89,90m2

Cocina: 10,79m2

5 ocupantes Salón-Comedor: 19,10m2

Entrada-Distribuidor: 16,56m2

Hall Escaleras: 6,66m2

50 ocupantes

44 ocupantes SALIDA

SR

salida a espacio exterior

Aseo I

Dormitorio II

Dormitorio III

7,00

Dormitorio IV Despensa

Terraza-Tendedero

150,40

TOTAL VIVIENDA "D"

Aseo I

Dormitorio III C.Baño Cocina

Hall Escaleras: 6,66m2

44 ocupantes

SR

SR

SALIDA salida a espacio exterior

espacio tendedero

espacio tendedero

39 ocupantes Terraza-Tendedero: 50% de 8,93m2

Acceso Portal: 5,05m2

39 ocupantes Terraza-Tendedero: 50% de12,50m2

OE

PORTAL 5

TIPO D

C.Baño

Dormitorio I

98,00

105,00

6,66

PORTAL 6

TIPO E

Terraza-Tendedero: 50% de12,50m2

Acceso Portal: 5,05m2

OE

PORTAL

D

TIPO E

25,74

42,30

45,4

27,24 7,55 5,60

13,93 4,58

10,97 11,46

13,76 3,04

14,47

50% de 8,93

117,07

127,30

5,35

132,6

S. ÚTIL (m ) S. CON. (m 19,10 4,89

14,71 4,69

10,65 13,87 4,95

10,79

50% de 12,50

PORTAL 5

salida a espacio exterior espacio tendedero

45 ocupantes

TIPO A

89,90

3,10

16,56

S. ÚTIL (m ) S. CON. (m

TOTAL VIVIENDA "E"

Entrada-Distribuidor: 16,56m2

PORTAL 4

4,95

Salón-Comedor

Distribuidor

Dormitorio II

SALIDA

Salón-Estar: 27,24m

Acceso Portal: 5,05m2

4,69

10,79

VIVIENDA "D"

Terraza-Tendedero

Entrada-Distribuidor: 16,56m2

SALIDA

14,71 10,65 13,87

50% de 12,50

50% de 5,05

TOTAL ZONAS COM.

Dormitorio I

Cocina: 10,79m2

OE

SALIDA

2

Terraza-Tendedero: 50% de12,65m2

4,89

S. ÚTIL (m ) S. CON. (m

Acceso Portal

Hall Escaleras

S. ÚTIL (m ) S. CON. (m ) 19,10

ZONAS COMUNES

Entrada-Distribuidor

45,40

VIVIENDA "E"

Cocina-Comedor: 14,47m2

espacio tendedero

3,10 42,30

Distribuidor

Levac. = 8,40m < 25m

OE

SALIDA

Hall Escaleras: 6,66m2

25,70

Salón-Comedor

Levac. = 8,40m < 25m

OE

6,66

Cocina-Comedor

Distribuidor: 4,89m2

C.Baño: 4,95m2

16,56

21 - 22 Section ↑

Dormitorio III: 13,87m2

PORTAL 5. PLANTA BAJA

ZONAS COMUNES

B´ Hall Escaleras

Entrada-Distribuidor

B

Ground Floor Plan ↑

D'

OE

89,90

98,00

7,00

105,0

283,0


06 / Sport Club Olimpico Leòn

23- 24

The facilities of the new Sport Center of Olimpico the Leon consist of more than 35 hectares with a total built area of ​​8,650 sqm distributed in six buildings. An eight football field covered with a free height of 17 meters and a policarbonate facade. An eleven soccer field and two indoor eight soccer fields. Football changing rooms and two more for referees. The golf practice (20,000 sqm), 18 covered places, outdoor area, practice bunker and a school with covered box for improvement classes. The social building: 1,500 sqm of gymnasium, which will add more than 400 sqm of restoration area and more than 1,400 sports supplementary equipment such as club room, changing rooms, engine rooms, among others.


Cronoslab Arquitectua Sports Center Realized project 2019 / Project assistant Concept Drawing Executive Drawing Installation Drawing Graphic Design / Project area Leòn, Castilla y Leòn, Spain / Work with Ivan Cristòbal


LEYENDA

Límite parcela topografico Hacia edificio maquinaria golf

20,37

1

2 3

3,01 5,00

3,45

5,00

PROYECTO

OBRA NUEVA

COMPLEJO DEPORTIVO GOLF LEON

3,41

4,00

LEÓN

7

EDIFICIO SOCIAL Y PADEL

7,16

PLANO

Sitación

33,55

6

31,89

29,07

7,81

E A.01.1 arquitectura

17,55

ESCALA

2,86

8,38

2,83

7,61

10,94

1:500

4

FECHA miércoles, 13 de febrero de 2019

1

2

3

27,01

HIELO

25,09

9,45

4

5

6

7

8

9

REVISION

10

11

10,94

5

6,00

6,00

6,00

6,00

6,00

6,00

6,00

6,28

NOTAS

5,81

6,00

4,00

60,55 6,27

Peto (Hmax edificio)

cotas en M

3,99

+19,60

Fin policarbonato 20mm

Fin cercha +18,00

+870,500 1 Cubierta

Inicio policarbonato 20mm

+17,75

Fin policarbonato 40mm

Inicio cercha +15,00

CRONOS 22, 28037 MADRID

Terreno

Tel. 917 41 39 30/ 686 92 49 53 cronoslab.com

AGENTES

Iván López Cristóbal Colegiado 20.764 COAM Arquitecto - proyectista -

Luengo Manjón S.L.U./B24357345 C/ Gregorio P. María "El Cainejo", 2, Planta 24010 León (León) - peticionario -

Planimetry ↑

8,57

11,93

6,57

8,45

12,57

6,00

4,12

12,89

GSPublisherVersion 0.0.100.100 +7,00

Fin muro hormigón

+6,90

Inicio policarbonato

5,50

5,50

5,50

5,38

5,25

5,12

4,99

7,00

4,86

5,73

5,50

Rejilla aluminio Dim6,005 x 0,975

muro HA fachada este

854,72 (1er Nivel de Referencia)

+1,40

HA muro

+1,27 HA muro (+13cm)

LEYENDA

+1,14 HA muro (+13cm)

+1,01 HA muro (+13cm)

+0,88 HA muro (+13cm)

+0,75 HA muro (+13cm)

+0,62 HA muro (+12cm)

+0,50 HA muro

+0,50

+0,50

+852,500 0 Planta Baja

LEYENDA

11

10

9

8

7

6

5

4

3

2

1

60,55

6,28

6,00

6,00

6,00

6,00

6,00

6,00

6,00

6,00

6,27

Peto (Hmax edificio) +19,60

PROYECTO Inicio policarbonato 20mm +17,75

OBRA NUEVA

COMPLEJO DEPORTIVO GOLF LEON

Fin policarbonato 40mm

LEÓN

EDIFICIO DE FUT8

2,21

+15,00 Inicio cercha (cara inferior cordón inferior)

PLANO

2,21

Alzados Norte y Sur

N

E 1.2

2,21

arquitectura

ESCALA

1:100

GSPublisherVersion 0.11.100.100

6,17

cotas en M

FECHA miércoles, 20 de junio de 2018

REVISION

NOTAS 855,52

Fin rejilla +4,00 Fin panel hormigón Rejilla aluminio Dim6,002 x 0,975

Inicio policarbonato +3,90 Inicio rejilla3,00 +3,00 Fin marco vidrio3,00

Ventana Dim 5,700 x 2,500 Vidrio Laminado 6x6 MarcoAluminio

1

2,55

Ventana Dim 6,002 x 2,500 Vidrio Laminado 6x6 MarcoAluminio

CRONOS 22, 28037 MADRID

+0,50

Tel. 917 41 39 30/ 686 92 49 53 cronoslab.com

AGENTES

Inicio marco vidrio0,50

0,50

0,00

Luengo Manjón S.L.U./B24357345 C/ Gregorio P. María "El Cainejo", 2, Planta 1 24010 León (León) - peticionario -

6,27

Iván López Cristóbal Colegiado 20.764 COAM Arquitecto - proyectista GSPublisherVersion 0.11.100.100

2

GSPublisherVersion 0.11.100.100

19,48

+870,500 1 Cubierta

+852,500 0 Planta Baja

6,00

S-01 852,60

3

3,00

A

H

5,76

2,79

5,76

55,00

2,50

4

B

G

6,00 5,76

5,76 5

F

C 6,00 5,76

5,76 6

60,55

E

D 6,00

S-02

5,80

1

±0,000

S-02

5,80

40,36

40,36

35,00

7 D

E 6,00 5,76

5,76 8

C

F 6,00 5,76

5,76 9 B

G 6,00 5,76

5,76

2,04

Dim10,84 m x 1,50 m x 0,80 m Banco corrido

Dim17,85 m x 1,50 m x 0,80 m Banco corrido

Puerta seccional Dim1,700 x 2,000 Aluminio

Dim17,85 m x 1,50 m x 0,80 m Banco corrido

10

Puerta seccional Dim4,000 x 4,000 Aluminio

A

2,21

2,21

2,21

2,21

2,21

H

3,00

2

±0,000

6,28

Football 8 Camp ↑

6,00

1,50

Puerta seccional Dim1,700 x 2,000 Aluminio

6,28

6,00

6,00

6,00

6,00

6,00

6,00

6,00

6,00

6,27 +870,500 1 Cubierta

+852,500 0 Planta Baja

60,55

5

4

3

2

1

11

S-01

+18,000 1 Cubierta

±0,000 0 Planta Baja

LEYENDA

LEYENDA

PROYECTO OBRA NUEVA

LEÓN

cotas en M

5,76

COMPLEJO DEPORTIVO GOLF LEON

EDIFICIO DE FUT8

PLANO

arquitectura

E 1.4

Secciones

1:100

ESCALA

N

Tel. 917 41 39 30/ 686 92 49 53 cronoslab.com

FECHA miércoles, 20 de junio de 2018

REVISION

NOTAS

Arqueta 80x80

Luengo Manjón S.L.U./B24357345 C/ Gregorio P. María "El Cainejo", 2, Planta 1 24010 León (León) - peticionario -

CRONOS 22, 28037 MADRID

Iván López Cristóbal Colegiado 20.764 COAM Arquitecto - proyectista -

AGENTES

A

Dirección aguas Pozo de registro general

11

10

9

8

7

6

S-01

B 5,76

PTE 5%

C

PTE 5%

PTE 5%

PTE 5%

PTE 5%

5,76

D

S-02

S-02 5,80

40,36

E 5,76

F

PTE 5% 5,76

Aireador mixto (Estático Dinámico) Caudal 3.100m3/h-15.000m3/h

Aireador mixto (Estático Dinámico) Caudal 3.100m3/h-15.000m3/h

G 5,76

H

Bajante Ø110

6,28

6,00

6,00

6,00

6,00

6,00

6,00

6,00

Sistema sifónico HDPE PTE 0%

Sistema sifónico HDPE PTE 0%

Sistema sifónico HDPE PTE 0%

Canalón aguas lluvias

Sumidero

6,00

6,27

60,55

1

2

3

4

5

S-01

6

7

8

9

10

11



07 / Scaffoldream

/ International competition Periferica 10m2


27 - 28


08 / Beirut Border Contitions When I took these pictures back in Beirut, I could not stop thinking about the two dimensional problems the city had. One physical, with the shape of the city, and one social, regarding the people. My biggest concern was the social problem. The tough reality of millions of refugies running from Siria.

/ Suburb of Nabaa 2016 Photography Exhibition Valentino Castle, Torino, IT, 11 - 14 Sept 2017





thank you!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.