martina bunino architecture porfolio →
CV
/ Education Master in Architecture with Merit Architecture Construction and City Polytechnic of Turin, IT Sept 2015 - Jul 2017 Score: 110L /110 with publication as meritorious argument Erasmus Exchange METU of Ankara, TR Sept 2015 - Jan 2016
Martina Bunino 04 October 1992 +39 347 7013288 martina.bunino@gmail.com Madrid, Paseo de Extremadura 120
Bachelor Degree In Architecture Polytechnic of Turin, IT Sept 2011 - Jul 2014 Scientific High School Marie Curie of Pinerolo (Turin), IT Sept 2006 - Jun 2011
/ Pubblications Honor Master Thesis – “Settle Into. Inclusive Strategy For The New Inhabitants” Polytechnic of Turin, IT, 2017 → Click here Book – “Doha 2020, Rem Koolhaas Ultimo Atto” in “La Descrizione Del Mondo. Reportage Immaginari Dalla Città Asiatica” Polytechnic of Turin, IT, 2013 → Click here
/ Working Experience Cronoslab Arquitectura Architect Madrid, ES, Aug 2018 - ongoing Ensamble Studio Assistant architect Madrid, ES, Jan - Jul 2018
S. Rocco Genoa Summer School 3 With The Royal Danish Academy Mallorca, ES, 9 - 19 Sept 2015 Civico 13 Architetti Associati Intern Torino, IT, Mar - Aug 2015
Exhbition Set Up – Adriano Sicbaldi. La Riservatezza Lagear Architettura dell'arte è bellezza infinita Competition - Freelancer architect Archivio di Stato, Torino, IT, Torino, IT, Sept - Nov 2017 11 - 14 Sept 2017 Exhbition Set Up – City Streets2 Mobile Exhibition – Routes Valentino Castle, Torino, IT, 11 - 14 Sept 2017 Conference – City Streets2 Notre Dame University – Louaize, Beirut, LB, Nov 2016
Autodesk Archicad
FR
Autodesk Revit
Microsoft Office
SP
Sketchup
Grassoppher
Rhinocheros 5
International Competition – 10m² Periferica – Top 10 Finalists 2016
ENG
Adobe Premiere
International Workshop – Urban Conservation and Tourism along Shantang River Xi’an - Jiaotong University and Liverpool University Suzhou, CN, 21 - 28 Feb 2016
IT
Adobe PS,ID, AI
International Workshop – Border Conditions Notre Dame University - Louaize, Beirut, LB, Apr 2016
00 / Index
01 Sharma Climbing Madrid
02 Ensamble Fabrika
05 Cooperativa Naturan Bizi
06 Sport Club Olimpico Leòn
03 Ca'n Terra
07 Scaffoldereams
04 Two Hundred Meters WalkAlong Mondrago
08 Beirut Border Conditions
01 / Sharma Climbing Madrid The new Chris Sharma Climbing gym has been designed inside an existing industrial building implanted in 1960. The design includes the complete reconstruction of the first volume that divides over 4 floors all the program related to the activity of the climbing wall: restoration area (240 sqm), gyms, activity rooms, offices and changing rooms (298 sqm). The old industrial space with steel sheds roof is divided in two parts; a volume in which the roof
( with a new structure) rises until 18 meters to adapt to custumer needs for the climbing walls. A second area that conserves and rehabilitates the original industrial space to integrate the boulder walls. The building of vaulted ceilings is completely rehabilitated to integrate a second boulder space, creating a differentiated space through the control of light. The total sqm of the complex are 5000 sqm.
Cronoslab Arquitectura Industrial Site Reuse Realized project 2020 / Architect and Constuction Supervisor Assistant Concept Drawing Executive Drawing (BIM Archicad) Installation Drawing ( MEP ) As-Built Drawing Interior Design Project / Project area Calle Julian Camarillo 55, Madrid, Spain / Work with Ivan Cristòbal
→
Climbing wall view
03 - 04
Elevation ↑
After ↑
Before ↑
→
Interior project
1
2
3
3'
4´
4
5
6
7
8
9
10
11
12
84,83
0,35
7,60
7,58
7,63
7,64
7,38
7,60
7,60
4,20
4,93
7,27
6,03
F
0,13
3,02
5,24
3,65
3,79
8,06
0,24
5,03
E 0,13
6,72
0,13
9,30
0,17
0,13
D
2,33
2,63
2,94
0,13
9,70
10,68
5,16
12,99
17,94
6,79
0,87
3,97
6,57
B
5,08
0,17
23,66
17,54
5,92
27,79
0,70
3,08
2,88
2,57
2,00
2,77
19,43
12,00
23,47
G
2,37 0,13 1,60
7,44
0,13 2,25 0,13
0,17
5,40
49,59
1,60
10,28
0,13
10,21
3,17
0,13
7,81
0,80
5,97
4,12
C
15,05
2,38
3,04
1
2
3
3'
4´
4
5
6
7
8
9
10
12
11
A
1,20
1,86
0,17
2,15
47,60
2,87
0,24
2,02
1,46
GSPublisherVersion 0.1.100.100
12
11
10
9
8
7
6
5
4
4´
3
3'
2
1
84,37 14,95
2,33
7,60
7,60
7,38
7,64
7,63
7,58
0,35
7,60
7,27
6,44
+19,76
+18,50 5 cubierta
1,70
1,69
+18,61
+17,20 +16,15
+16,00 4 azotea
+12,11
18,20
+12,00 3 nivel 3
+8,00
+8,00 2 nivel 2
0,59
+8,36
16,83
17,83
3,96 2,79
+12,00
+4,00
+4,00
+4,00 1 nivel 1
7,12
7,27
8,88
+6,06
+0,80
PTE 14 % ±0,00
±0,00
±0,00 0 nivel 0
Sección S-01
A
D 2,38
E
B
2,33
8,06
F 27,56 3,02
G
C
A
B
C 27,12
6,03
12,77
5,74
14,34
1,23 1,05
+17,20 +16,15
+18,50 5 cubierta
+16,00 4 azotea
+12,00
+12,00 3 nivel 3
3,43
0,57
+12,00 3 nivel 3
8,95
3,43
0,72
+16,00 4 azotea
1,78
+19,71
+18,50 5 cubierta
+8,00
+8,00 2 nivel 2
+4,00 0,57
+4,00 1 nivel 1
8,88
3,43
0,57
+8,00 2 nivel 2
+4,00
+4,00 1 nivel 1
3,43
+2,60
±0,00
±0,00 0 nivel 0
Sección S-03
Sección S-02
→
GSPublisherVersion 0.1.100.100
Structure
±0,00 0 nivel 0
±0,00
Work in progress →
07 - 08
02 / Ensamble Fabrica This is the main project I was involved in Ensamble Studio, an architecture office based in Madrid and Boston. With a team of young architects, we were responsible for the performance of different tests on an innovative pre-fabrication method. We built off-site a 1:1 scale model of part of a building, using steel profiles as main material and started performing different methods on material behaviour, connectivity and spatial value. On site, then, my task increased: I worked on foundation, concrete-casting, metal- woriking, insulating, frames, slabs, finishing. “Ensamble Fábrica es el laboratorio y espacio de fabricación que desarrollará los espacios que soñemos, entregando las partes del edificio para ser ensamblados rápida, segura y eficientemente in-situ, en cualquier lugar del mundo. Ya no usamos una parte, un ladrillo, un perfil, o conducto que transportamos para su unión en obra, sino un “componente” de un sistema, fabricado con las herramientas, la conciencia y la eficiencia de hoy."
Ensamble Studio Wharehouse Woho prefabricated module
Realized project 2018 1200 sqm built
/ On-site assistant
/ Work with Javier Cuesta (Master Builder) Borja Soriano Anton Garcia-Abril Debora Mesa Molina
Executive planning Design and implementation of work Work supervision Prototipe realization on site / Project area
Work in progress →
07 - 08
Pinto, Madrid, Spain
09 - 10
Pre-fab elements assembled on site ↑
01 / Ensamble Fabrica
03 / Ca’n Terra Ca’n Terra is the house of the earth: first just that, earth, after quarried with industrial logic, voided and abandoned, to be rediscovered one hundred years later and come to be architecture. If the history of civilization has evolved transforming ideas into matter, here the process is inverted. We enter the space like explorers would do, equipped with the technology that expands our vision in the dark; scanning the solid structure that was built for us.
11 - 12
Behind the scan, the architect’s eye, directing, interpreting, creating the space again, completing it with operations that are familiar to the stone mass: new cuts to build using air and light. Architecture appears. Then we can inhabit. In lieu of the imposing action that we often exert on the environment, we propose a trip to the interior being of matter, and recognize the beauty of the spaces that are waiting to be lived.
Ensamble Studio Ca' n Terra / Concept design and implementation of work / Project area Pinto, Madrid, Spain
Realized project 2018 / Work with Javier Cuesta (Master Builder) Borja Soriano Anton Garcia-Abril Debora Mesa Molina
01 - 02
13 - 14 On site
07-08 11 - 12
Axonometric Ludic nature view ↑
Didascalia della foto →
04 / Two Hundred Meters Walk Along Mondrago
15 - 16
This unconventional hotel is a walking experience through the natural park of Mondrago, from the hill to the sea, following the line of an ancient traditional wall, for two hundred meters. The twelve “rooms� we provided are twelve experiences for the visitor completely inside the nature. Walking in landscape becomes a creative and cognitive act that allows the symbolic and phisical transformation of both the natural territory and the visitors.
Masterplan →
San Rocco Genoa Summer School 3 Unconventional hotel / Project assistant Concept drawings / Project area Portopedro, Mallorca, Spain / Work with Havi Navarro Silvia Lantieri / Professors Carmen Andriani Stephanie Akkaoui Huges Andreas Lechner Simona Malvezzi Morten Meldgaard Vittorio Pizzigoni Valter Scelsi Guro Sollid Pier Paolo Tamburelli Konstantinos Pantazis
17 - 18
Ludic nature ↑
Rooms of experiences →
05 / Cooperativa Naturan Bizi Naturan Bizi is a residencial project of 68 apartments in the new Arechabaleta area in Vitoria Gasteiz in Spain. One quality makes it really unique- it has been founded as a cooperative community by Cronoslab for people wanting to live in a highquality standard apartments, personalized from themselves and in affordable prices. It was designed to be as much energy efficent as possible, starting with the orientation through doble skin facade, shape of the building and installations inside. https://www.cronoslive.com/
Cronoslab Arquitectura Residencial Project Realized project 2020 / Architect Assistant Concept Drawing Executive Drawing Installation Drawing Graphic Design / Project area Aretxabaleta, Vitoria- Gasteiz, Spain / Work with Ivan Cristòbal
PLANTA BAJA SUR
PORTAL 4. PLANTA BAJA
OE
Dormitorio I: 14,71m2
Dormitorio II: 10,65m2
Dormitorio I: 14,71m2
Dormitorio I: 13,93m2
Dormitorio II: 10,97m2
Dormitorio I: 14,71m2
Dormitorio III: 13,87m2
Dormitorio III: 13,87m2
S. ÚTIL (m ) S. CON. (m )
Acceso Portal
50% de 5,05
Dormitorio II: 10,65m2
Dormitorio III: 11,46m2
VIVIENDA "E"
Dormitorio II: 10,65m2
Dormitorio IV: 13,76m2
TOTAL ZONAS COM.
Salón-Comedor
Local Comunidad: 59,80m2
Distribuidor Dormitorio I Aseo I Dormitorio II Dormitorio III C.Baño
Aseo I: 4,69m2
Aseo I: 4,69m2
Aseo I: 4,58m2
Distribuidor: 7,55m2
Distribuidor: 4,89m2 C.Baño: 4,95m2
Cocina
Aseo I: 4,69m2
Levac. = 9,2m < 25m
Distribuidor: 4,89m2
Despensa: 3,04m2
Terraza-Tendedero
Levac. = 9,2m < 25m
C.Baño: 4,95m2
TOTAL VIVIENDA "E" PORTAL 4
Instalaciones: 2,13m2
Cocina: 10,79m2
5 ocupantes Salón-Comedor: 19,10m2
Instalaciones: 2,13m2
C.Baño: 5,60m2
"D": 117,07m2
"E": 89,98m2
5 ocupantes
OE
Instalaciones: 2,13m2
Levac. = 8,40m < 25m
OE
"E": 89,90m2
Salón-Comedor: 19,10m2
OE
"E": 89,90m2
Cocina: 10,79m2
5 ocupantes Salón-Comedor: 19,10m2
Entrada-Distribuidor: 16,56m2
Hall Escaleras: 6,66m2
50 ocupantes
44 ocupantes SALIDA
SR
salida a espacio exterior
Aseo I
Dormitorio II
Dormitorio III
7,00
Dormitorio IV Despensa
Terraza-Tendedero
150,40
TOTAL VIVIENDA "D"
Aseo I
Dormitorio III C.Baño Cocina
Hall Escaleras: 6,66m2
44 ocupantes
SR
SR
SALIDA salida a espacio exterior
espacio tendedero
espacio tendedero
39 ocupantes Terraza-Tendedero: 50% de 8,93m2
Acceso Portal: 5,05m2
39 ocupantes Terraza-Tendedero: 50% de12,50m2
OE
PORTAL 5
TIPO D
C.Baño
Dormitorio I
98,00
105,00
6,66
PORTAL 6
TIPO E
Terraza-Tendedero: 50% de12,50m2
Acceso Portal: 5,05m2
OE
PORTAL
D
TIPO E
25,74
42,30
45,4
27,24 7,55 5,60
13,93 4,58
10,97 11,46
13,76 3,04
14,47
50% de 8,93
117,07
127,30
5,35
132,6
S. ÚTIL (m ) S. CON. (m 19,10 4,89
14,71 4,69
10,65 13,87 4,95
10,79
50% de 12,50
PORTAL 5
salida a espacio exterior espacio tendedero
45 ocupantes
TIPO A
89,90
3,10
16,56
S. ÚTIL (m ) S. CON. (m
TOTAL VIVIENDA "E"
Entrada-Distribuidor: 16,56m2
PORTAL 4
4,95
Salón-Comedor
Distribuidor
Dormitorio II
SALIDA
Salón-Estar: 27,24m
Acceso Portal: 5,05m2
4,69
10,79
VIVIENDA "D"
Terraza-Tendedero
Entrada-Distribuidor: 16,56m2
SALIDA
14,71 10,65 13,87
50% de 12,50
50% de 5,05
TOTAL ZONAS COM.
Dormitorio I
Cocina: 10,79m2
OE
SALIDA
2
Terraza-Tendedero: 50% de12,65m2
4,89
S. ÚTIL (m ) S. CON. (m
Acceso Portal
Hall Escaleras
S. ÚTIL (m ) S. CON. (m ) 19,10
ZONAS COMUNES
Entrada-Distribuidor
45,40
VIVIENDA "E"
Cocina-Comedor: 14,47m2
espacio tendedero
3,10 42,30
Distribuidor
Levac. = 8,40m < 25m
OE
SALIDA
Hall Escaleras: 6,66m2
25,70
Salón-Comedor
Levac. = 8,40m < 25m
OE
6,66
Cocina-Comedor
Distribuidor: 4,89m2
C.Baño: 4,95m2
16,56
21 - 22 Section ↑
Dormitorio III: 13,87m2
PORTAL 5. PLANTA BAJA
ZONAS COMUNES
B´ Hall Escaleras
Entrada-Distribuidor
B
Ground Floor Plan ↑
D'
OE
89,90
98,00
7,00
105,0
283,0
06 / Sport Club Olimpico Leòn
23- 24
The facilities of the new Sport Center of Olimpico the Leon consist of more than 35 hectares with a total built area of 8,650 sqm distributed in six buildings. An eight football field covered with a free height of 17 meters and a policarbonate facade. An eleven soccer field and two indoor eight soccer fields. Football changing rooms and two more for referees. The golf practice (20,000 sqm), 18 covered places, outdoor area, practice bunker and a school with covered box for improvement classes. The social building: 1,500 sqm of gymnasium, which will add more than 400 sqm of restoration area and more than 1,400 sports supplementary equipment such as club room, changing rooms, engine rooms, among others.
Cronoslab Arquitectua Sports Center Realized project 2019 / Project assistant Concept Drawing Executive Drawing Installation Drawing Graphic Design / Project area Leòn, Castilla y Leòn, Spain / Work with Ivan Cristòbal
LEYENDA
Límite parcela topografico Hacia edificio maquinaria golf
20,37
1
2 3
3,01 5,00
3,45
5,00
PROYECTO
OBRA NUEVA
COMPLEJO DEPORTIVO GOLF LEON
3,41
4,00
LEÓN
7
EDIFICIO SOCIAL Y PADEL
7,16
PLANO
Sitación
33,55
6
31,89
29,07
7,81
E A.01.1 arquitectura
17,55
ESCALA
2,86
8,38
2,83
7,61
10,94
1:500
4
FECHA miércoles, 13 de febrero de 2019
1
2
3
27,01
HIELO
25,09
9,45
4
5
6
7
8
9
REVISION
10
11
10,94
5
6,00
6,00
6,00
6,00
6,00
6,00
6,00
6,28
NOTAS
5,81
6,00
4,00
60,55 6,27
Peto (Hmax edificio)
cotas en M
3,99
+19,60
Fin policarbonato 20mm
Fin cercha +18,00
+870,500 1 Cubierta
Inicio policarbonato 20mm
+17,75
Fin policarbonato 40mm
Inicio cercha +15,00
CRONOS 22, 28037 MADRID
Terreno
Tel. 917 41 39 30/ 686 92 49 53 cronoslab.com
AGENTES
Iván López Cristóbal Colegiado 20.764 COAM Arquitecto - proyectista -
Luengo Manjón S.L.U./B24357345 C/ Gregorio P. María "El Cainejo", 2, Planta 24010 León (León) - peticionario -
Planimetry ↑
8,57
11,93
6,57
8,45
12,57
6,00
4,12
12,89
GSPublisherVersion 0.0.100.100 +7,00
Fin muro hormigón
+6,90
Inicio policarbonato
5,50
5,50
5,50
5,38
5,25
5,12
4,99
7,00
4,86
5,73
5,50
Rejilla aluminio Dim6,005 x 0,975
muro HA fachada este
854,72 (1er Nivel de Referencia)
+1,40
HA muro
+1,27 HA muro (+13cm)
LEYENDA
+1,14 HA muro (+13cm)
+1,01 HA muro (+13cm)
+0,88 HA muro (+13cm)
+0,75 HA muro (+13cm)
+0,62 HA muro (+12cm)
+0,50 HA muro
+0,50
+0,50
+852,500 0 Planta Baja
LEYENDA
11
10
9
8
7
6
5
4
3
2
1
60,55
6,28
6,00
6,00
6,00
6,00
6,00
6,00
6,00
6,00
6,27
Peto (Hmax edificio) +19,60
PROYECTO Inicio policarbonato 20mm +17,75
OBRA NUEVA
COMPLEJO DEPORTIVO GOLF LEON
Fin policarbonato 40mm
LEÓN
EDIFICIO DE FUT8
2,21
+15,00 Inicio cercha (cara inferior cordón inferior)
PLANO
2,21
Alzados Norte y Sur
N
E 1.2
2,21
arquitectura
ESCALA
1:100
GSPublisherVersion 0.11.100.100
6,17
cotas en M
FECHA miércoles, 20 de junio de 2018
REVISION
NOTAS 855,52
Fin rejilla +4,00 Fin panel hormigón Rejilla aluminio Dim6,002 x 0,975
Inicio policarbonato +3,90 Inicio rejilla3,00 +3,00 Fin marco vidrio3,00
Ventana Dim 5,700 x 2,500 Vidrio Laminado 6x6 MarcoAluminio
1
2,55
Ventana Dim 6,002 x 2,500 Vidrio Laminado 6x6 MarcoAluminio
CRONOS 22, 28037 MADRID
+0,50
Tel. 917 41 39 30/ 686 92 49 53 cronoslab.com
AGENTES
Inicio marco vidrio0,50
0,50
0,00
Luengo Manjón S.L.U./B24357345 C/ Gregorio P. María "El Cainejo", 2, Planta 1 24010 León (León) - peticionario -
6,27
Iván López Cristóbal Colegiado 20.764 COAM Arquitecto - proyectista GSPublisherVersion 0.11.100.100
2
GSPublisherVersion 0.11.100.100
19,48
+870,500 1 Cubierta
+852,500 0 Planta Baja
6,00
S-01 852,60
3
3,00
A
H
5,76
2,79
5,76
55,00
2,50
4
B
G
6,00 5,76
5,76 5
F
C 6,00 5,76
5,76 6
60,55
E
D 6,00
S-02
5,80
1
±0,000
S-02
5,80
40,36
40,36
35,00
7 D
E 6,00 5,76
5,76 8
C
F 6,00 5,76
5,76 9 B
G 6,00 5,76
5,76
2,04
Dim10,84 m x 1,50 m x 0,80 m Banco corrido
Dim17,85 m x 1,50 m x 0,80 m Banco corrido
Puerta seccional Dim1,700 x 2,000 Aluminio
Dim17,85 m x 1,50 m x 0,80 m Banco corrido
10
Puerta seccional Dim4,000 x 4,000 Aluminio
A
2,21
2,21
2,21
2,21
2,21
H
3,00
2
±0,000
6,28
Football 8 Camp ↑
6,00
1,50
Puerta seccional Dim1,700 x 2,000 Aluminio
6,28
6,00
6,00
6,00
6,00
6,00
6,00
6,00
6,00
6,27 +870,500 1 Cubierta
+852,500 0 Planta Baja
60,55
5
4
3
2
1
11
S-01
+18,000 1 Cubierta
±0,000 0 Planta Baja
LEYENDA
LEYENDA
PROYECTO OBRA NUEVA
LEÓN
cotas en M
5,76
COMPLEJO DEPORTIVO GOLF LEON
EDIFICIO DE FUT8
PLANO
arquitectura
E 1.4
Secciones
1:100
ESCALA
N
Tel. 917 41 39 30/ 686 92 49 53 cronoslab.com
FECHA miércoles, 20 de junio de 2018
REVISION
NOTAS
Arqueta 80x80
Luengo Manjón S.L.U./B24357345 C/ Gregorio P. María "El Cainejo", 2, Planta 1 24010 León (León) - peticionario -
CRONOS 22, 28037 MADRID
Iván López Cristóbal Colegiado 20.764 COAM Arquitecto - proyectista -
AGENTES
A
Dirección aguas Pozo de registro general
11
10
9
8
7
6
S-01
B 5,76
PTE 5%
C
PTE 5%
PTE 5%
PTE 5%
PTE 5%
5,76
D
S-02
S-02 5,80
40,36
E 5,76
F
PTE 5% 5,76
Aireador mixto (Estático Dinámico) Caudal 3.100m3/h-15.000m3/h
Aireador mixto (Estático Dinámico) Caudal 3.100m3/h-15.000m3/h
G 5,76
H
Bajante Ø110
6,28
6,00
6,00
6,00
6,00
6,00
6,00
6,00
Sistema sifónico HDPE PTE 0%
Sistema sifónico HDPE PTE 0%
Sistema sifónico HDPE PTE 0%
Canalón aguas lluvias
Sumidero
6,00
6,27
60,55
1
2
3
4
5
S-01
6
7
8
9
10
11
07 / Scaffoldream
/ International competition Periferica 10m2
27 - 28
08 / Beirut Border Contitions When I took these pictures back in Beirut, I could not stop thinking about the two dimensional problems the city had. One physical, with the shape of the city, and one social, regarding the people. My biggest concern was the social problem. The tough reality of millions of refugies running from Siria.
/ Suburb of Nabaa 2016 Photography Exhibition Valentino Castle, Torino, IT, 11 - 14 Sept 2017
thank you!