PORTFOLIO
LIBRARY EXTENSION
WAY THROUGH VÅ ETATY
-1-
-5-
BACK TO THE FUTURE
HOUSE BY THE VINEYARD
- 11 -
- 15 -
DISTRICT LIBRARY
MOUNTAIN HUT
- 19 -
- 21 -
THREE SONS
ON GOLDEN RIVER
- 25 -
- 29 -
bc. Martin Houska December 4th, 1991 Prague, Czechoslovakia
martin.houska@email.cz +420 723 250 670
EDUCATION 2016 National Taipei University of Technology, Taiwan since 2015 Master studies on Faculty of Architecture, CTU Prague 2011-2015 Bachalor studies on Faculty of Architecture, CTU Prague 2009-2011 Art school Olešská, Prague 2007-2011 Grammar school, Prague 1998-2007 Elementary school, Prague
INTERNSHIP since 2016 - OK Plan Architects, Prague
ACHIEVEMENTS 2013 - Competition for Primary School, Roztoky CZ 1st place ex auquo 2014 - House on the Vineyard, Prague 2nd place (1st place not awarded) 2015 - Award for Complex Work in BIM (ArchiCAD)
Bachelor Thesis Project
WORKSHOPS 2014 - Summer school of Architecture in Kopřivnice CZ 2015 - Vision for cult place in 21st century, Pustevny CZ 2015 - Summer school of Architecrure in Litomyšl CZ 2015 - Tree houses for Horečky CZ 2016 - Summer school of Architecture in Ostrava CZ 2016 - Politecnico di Milano IT
Continuity and Transformation in Theatre Design
SKILLS ArchiCAD BIM, AutoCAD, Rhinoceros, V-ray, Artlantis Studio, Adobe Photoshop, Adobe Indesign, Adobe Illustrator, UCL Depthmap (Space Syntax Analysis), Filmora
1
TOWN LIBRARY EXTENSION “New volume of extension, seems abstract in company of its neighbourhood. A soft bubble what was aerated and squeezed between grown trees and old houses”
2
3
LOCATION - ROŽNOV POD RADHOŠTĚM CZ CO-WORKERS - J. CHALOUPEK COMPETITION - SUMMER 2016
PROPORTION
SITEPLAN
VOLUME
ENTRANCES
TERRAIN MODELING
CROSS SECTION
4
Pending Nomination
5
for University Award
WAY THROUGH VŠETATY “Urbanistic and architectural proposal strikes to transform Všetaty into a vibrant local centre for surrounding villages. To achieve this goal, it is necessary to eliminate excessive space of roads in advance of diverse public space that encourages random happenings”
6
7
LOCATION - VŠETATY CZ CO-AUTHORS - O. ČÁP, M. SCHINKO FA CTU - WINTER 2016
COMPOSITION
SQUARE TRAFFIC SCHEME
SQUARE
CHURCH
50 ZONE MAIN SQUARE
30 ZONE
PEDESTRIAN ZONE
CHURCH
GSEducationalVersion 0.3.100.100
SLOPING NATURE OF THE SQUARE ALLOWED US TO DEVIDE SPACE INTO A SMALLER UNITS. NEW LEVELED CENTRAL AREA, AN OUTSIDE LIVING ROOM COVERED BY BOSQUE WITH A VIEW OF CROSS STATUE
ENTRANCE OF THE CHURCH RECIEVES A DIGNIFYING PAVED ASSEMBLY LOOKED OVER BY ST. AGNES STATUE. LITTLE SQUARE BEHIND, CREATED BY SHIFT IN ROAD PATH, IS A NEW HOME FOR CHAPEL, FOUNTAIN AND A LINDEN TREE
8
9
10
11
BACK TO THE FUTURE “Where will our steps in protecting of the Earth lead us in a distant future? Should we restore old industrial areas or let them fall into ruin? After all, is it not the ending that awaits everything?�
12
13
LOCATION - FUTURE OSTRAVA CZ WORKSHOP - 2016 SUMMER SCHOOL OF ARCHITECTURE, OSTRAVA CZ CO-AUTORS - J. CHALOUPEK, V. FIŠEROVÁ, R. SMIČKOVÁ
PARALLEL SITE PLANS - OSTRAVA BROWNFIELD
IT IS YEAR 1850 WHEN CONSTRUCTION OF VÍTKOVICE STEEL FACTORY STARTS IN OSTRAVA. COMPOUND MADE OF SLEEK AND STRONG STEAL LOOKS LIKE FROM OUTER SPACE. EVERYTHING IS IN DECAY ONE HUNDRED YEARS LATER, BUT IT GETS A NEW LIFE AT BEGINNING OF 21ST CENTURY AS A NEW CULTURE DISTRICT. WHAT WILL HAPPEN IN A FUTURE? NOT JUST WITH INDUSTRIAL AREAS, BUT WITH THE WORLD AS A WHOLE?
NOW
FUTURE
14
2nd Place
15
1st Place Not Awarded
HOUSE BY THE VINEYARD “House acts like a buffer between vinery and new development. It lowers itself to allow for undisturbed views on vineyard and valley from one side, but elevates its sharp corners from the other�
16
17
LOCATION - PRAGUE CO-AUTHORS - J. CHALOUPEK, A. CHOTÄšBOR STUDENT COMPETITION - SUMMER 2014
CONCEPT
SITEPLAN
CROSS SECTION
Entrance Bedrooms Living r. Wellness
18
19
2013/14 YEARBOOK
DISTRICT LIBRARY FLORENC “Heavy volume is lifted in the air by its light translucent glass shell. It is moved like books by energy of the public space to connect with levels of proposed city stairs, that are attached to a building” LOCATION - FLORECN, PRAGUE FA CTU - WINTER 2013
FLOORS ALIGNED W/ STAIRS
MOVEMENT
STAIRS CONTINUE INSIDE
20
21
AWARD - COMPLEX WORK IN BIM
MOUNTAIN HUT “Burned wooden facade of the building recognizes its destroyed predecessor. During day it is a solid, impenetrable , dark volume, at night a smouldering ember giving light to travellers�
22
1
C
1
D07
3 060
245 25
4 305
1 530
1 530
15
1 500
15
15
1 500
15
O 02
245
K2
K1
75
355
A
15
110
130
415
130
160
425
965
865
D 03 P
1 230
Z4
Z4
O 01
900
920
960
1 600 870
110
3 350
450
D 13 P
1 230
Z4
Z4
880
160 405
4 830
625
1 750
625
1 340
Z4
195
4 950
1 800
20
450
M
80 625
M
M
515
1 120
900
D 03 L
195
290
1 230
Z4
Z4
880
450
1 265
70
860
960
P
870
900
O 01 920
1 170
D 05 L 2 720
D 12 P
1D200 02 P
585
135
680
1 230
Z4
20
B
15
20
390
31
105
D 03 P
900
890
Z5
200
200
980
1 165
625
20
890
Z5
Z5
880
450
2 700
450
+1,600
2 160
345
435
405
100
450
1 230
1 230
890
450
50
4 950
880
165
450
SDK
5 470
4 830
4 770
4 770
900
625 50 727
20
Z4
880
450
Z4
8 700
20
450
2 305
sv.: 2 760 mm
1.24
900
960
Z5
C
450
sv.: 2 500 mm
Z4
880
450
450
3 000
1.22
450
3 900 900
Z4
15
20
390
165
60 60
15
880
390
200
450
290
678
105 105 345
800 2 450
120 105
900
Z5
160
30
235
21
165
220
390
165
60 60
200
390
795
130
450
20
980
sv.: 2 500 mm
880
Z5
2 580
2 205
1 015 220
1.21
450
980
980
555
105 110
105
120
15
880
390
190 585
L
190
L
L385
1 100
465
120
1 170
O 03
1 260
1 200 1 260
sv.: 2 760 mm
1.16
195
B
600
900 840 60 60 390
180
1 060 135
Z4
180
725
480
1 000
sv.: 2 775 mm
1.20
1 360
Z4
960
900 960
sv.: 2 760 mm
1.13
7 070
370
160
450 390
sv.: 2 775 mm
1.19
1 360
435
sv.: 2 500 mm
1.15
450
110
500
D 05 P
180
2 400 2 460
2 460
sv.: 2 760 mm
sv.: 2 775 mm
1.18
705
Z4
1.14
sv.: 2 775 mm
105 325
570
880
195
285 130
1.17
625 265
900
998
890
T1
792
D 02 P
1 060
960
3 615
625 165
1 280
495
Z4
1 250 965
360
5%
2 400 2 770
255
125
110
D 03 P
Z4
20
1 170
195
1 230
Z4
960
900
880
450 20
450
2 295
1 230
Z4
Z4
880
450
D
10
200
60
D
15
600
60 60 285
15
390
170
165 800 2 450
1 200
420
120
500
500
200
1 065 810 60 60 329
390
600 165
310
sv.: 2 760 mm
1.25
80
sv.: 2 760 mm
Z4
450
1 200 1 800 O 03 1 260
1.23
700
625
345
425
Z4
555
C
135
315
135
O 09 1 000
1 230
Z4
Z4
O 05
1 000
760
Z4
125
520
625
130 320 305
1 230
Z4
Z4
4 605
4 950
4 790
1 230
Z4
Z4
O 08 3 460
O 06
3 460
1 230
Z4
Z4
15
E
15
200
200
200
E
1 230
Z4
Z4
O 05
1 000
4 750
14 030
1 230
Z4
Z4
4 950
14 070
O 10 4 750
4 950
1 230
Z4
Z4
sv.: 2 770 mm
1.02
D06
14 030
2 750 O 07 14 101
1 230
Z4
Z4
O 05
1 000
15
200
200
200
F
F
15
105 70
Z4
900 2 770
900 2 450
625
425
3 615
165
625
625
625
95
245
115
870
115
1 100
750 2865
520
625
625
625
625
1 230
Z4
Z4
1 230
Z4
Z4
O 08 3 460
Z4
4 950
4 605
1 230
Z4
O 05
O 06
4 790
1 000
3 460
Z4
Z4
1 230
O 09 1 000
90 90
135
G
15
665
70
410
165
15
100 665
285
1 000 2 720
120
200
450
1 830
450
450
900
450
900
sv.: 2 500 mm
2 370
SDK
20
900
1.03
1 470
1 450
360 900 60 60 300 390 450
G
900 20
B
555
3 615
2 610
625
95
800 2 450
10 x 160/290
900 2 450
800 2 450
700 2 100
800 2 450
700 2 100
900
4 305
245
10 x 160/290
1 100
165
1 800
160
1 655
425
2 850 765
640 80
625 625 625
3 615 160 1 110 165 3 605 430
285 985
160 8 840 160
Z6 Z6
Z6
1 230
Z6
Z6
Z6
Z6 Z6
Z6
445
Z4
1 230
235 5 175
900
4 950
-0,050
4 400
4 400
4 730
4 400
2 100
Z4
Z6 Z6 Z6 Z6 Z6 1 230
Z6 Z6 Z6 Z6 Z6 1 230
-0,050
D 06 L
45
300
390
15
880
390
11
1 350
900
180
890
Z5
Z5
20
450
1 150
1 350
1 350
880
890
Z5
Z5
3 635
20
450
2 700
450
+1,600
880
450
890
Z5
10
15
I
880
2 335
570
60
7 515
2 475
1 230
Z4
Z4
180
O 01
900
920
960
870
210
sv.: 2 775 mm
2 335
1 770
625 270
1 495
900
900
450
490
900
Z8
1 255
855
900
D 07 L
900
920
960
Z8 1 230
Z4
Z4
965
880
J
245
75
245 255
110
255
410
110
15
360
555
1 005
210
160
625 130
sv.: 2 775 mm
1.10
2 275
2 495
2 515
1 710
625
2 275
2 965
625
1 230
Z4
Z4
880
630
820
570
J
120 360
1 250 965 495
sv.: 2 775 mm
Z7
4 950
1 800
20
130
130
360
660
600
O 04
195 660
1.08
D 03 P
1 230
Z4
Z4
880
130
850
450
1 095
1 650 450
4 830
450
865
D 03 P
980
700
435
495
D 03 L
sv.: 2 770 mm
1.05
1 785
1.09
600
390
15
120
90
1
2 740
120
390 20
Z5
sv.: 2 500 mm2 500
200
110
1 150
1 705
2 230
2 580
1.11
1 150
1 065
660
600
O 04
195 660
sv.: 2 775 mm
380
645 450
1.07 165
600
390
1 800 1 095 60 60 390
sv.: 2 760 mm
1 170
195
I
1.06
D 03 P
D 08 P 1 455
1 260
1 200 O 03 1 260
sv.: 2 775 mm
100
H
910
105
460
345
345
760 1.12 190
460
200
100
15
70
405
2 160
110
90
1 000 2 720
90 90
120
480
2%
1 530
1 310
H
900 60 60
165
500
390
2 100
±0,000
Z4
2 265
845
450
1 345
900
SDK
450
sv.: 2 500 mm
D 03 P
4 830
500
920
20
450
1.04
900
900
450
135
6 165 450
sv.: 2 770 mm
Z6
450
500
1.01
Z4
2%
2 000
450
2 180
D 03 L
900
900
425
800 2 450
245 4 305
A
O 02
A 1 820 135 1 660
3 615 165
1 820 135 1 660
515 625 625
80 3 029 95 60 960 60 95
2 860 1 440 2 860 760
415 8 680 415
800 2 450
415 3 790 1 100 3 790 415
285 450 450 520 270 110
450 450 450 450 450
3 030 80 305
320 130
3 790
450 450 450 450
3 865 800 2 450
625 625 625
410 3 645 150
900 1 790
1 100 1 990
240 8 680 240 70 105
2%
800 2 450 700 2 450 10 x 160/290
3 090 375
D 04 P 340 110 450 450 340 110
2 610 1 180
D 04 L 2 100 2 725
10 x 160/290
115 870 115
800 2 450 800 2 450
95 95 625 625 625 625 625 515 130
1 180
B
306 306 306 306 306
A
800 2 675
1 270 3 865
1 100 150 3 645 410
570 900
50 80 370 450 450 450 380 520 450 450
900 900 870 30 900 30
420 960 420 450 450 520
870 900 900 900
380 450 450 450 205130 370
900 4 305 25 245 3 060
9 000 575 1 480 1 480
135 570 1 530 1 530
15 1 500 15 15 1 500 15
1
1
C
23 9 510
D 03 L
10 000
LOCATION - BIELÉ PLESO SK, TATRY FA CTU - SPRING 2015 BACHELOR THESIS PROJECT
CONCEPT
SITEPLAN
THE NEW DESIGN OF KEŽMARK HUT FILLS THE EMPTY SPACE AFTER ITS 1970S BURNED DOWN PREDECESSOR. THAT DESTRUCTION LEAD TO THE BREAK IN RELATIONSHIP BETWEEN LOCAL PEOPLE AND THIS CULT PLACE. DETAILS
24
25
HOUSE FOR THREE SONS “Structure of the house is grown like a village. It creates level of intimacy and places of identification for whole clan and family, from central area on the main entrance axis and altar, to private ones�
26
27
LOCATION - BEIPÚ, TAIWAN NTUT TAIWAN - SPRING 2016
BEIPÚ
PRIVATE | SHARED
SITEPLAN
INNER COMUNICATIONS
HISTORICAL LAYOUT
CROSS SECTION
28
29
ON GOLDEN RIVER “Flow of pedestrian movement washes of yellow limestone in calmer bays and shows brass bricks in surface of pavement. This panned gold commemorates the most prosperous and intellectual age in the medieval history of Písek and leads you on its forgotten golden trade path” LOCATION - BIG SQUARE, PÍSEK CZ - TRANSLATES TO SAND COMPETITION - FALL 2015 CO-AUTHOR - O. ČÁP, J. CHALOUPEK MOVEMENT HEATMAP
TRAFFIC SCHEME
GOLDEN BRICKS
PUSHED-DOWN PARKING
30
Martin Houska Š 2017