Portfolio - American University of Sharjah - Undergraduate school

Page 1

ARCHITECTURE PORTFOLIO 2012-2017

AMERICAN UNIVERSITY OF SHARJAH - UNDERGRADUATE

MARWAN SALAH SAKSOUK - SELECTED PROJECTS


CIRRICULUM VITAE PERSONAL INFO: NAME: MARWAN SALAH SAKSOUK NATIONALITY: LEBANESE ORIGIN / SEIRRA LEONE PASSPORT HOLDER SCHOOL EDUCATION: AL NAJAH SCHOOL ABU DHABI BRITISH SYSTEM UNIVERSITY EDUCATION: AMERICAN UNIVERSITY OF SHARJAH NAAB ACCREDITED STATUS: SINGLE

EXTRA CURRICULAR ACTIVITIES: AIAS 2013-2015 TAU SIGMA DELTA HONOUR SOCIETY 2016-2017 PARTICIPATED IN CHRISTO AND JEANNE CLAUDE COMPETITION 2016

D.O.B: 29th JULY 1993 PROFESSIONAL INFO: SOFTWARES: RHINO ADVANCED + GRASSHOPPER BASICS AUTOCAD MAYA ZBRUSH BASICS ADOBE PHOTOSHOP ADOBE INDESIGN ADOBE ILLUSTRATOR EXPERIENCE: ON SITE INTERNSHIP KHATIB AND ALAMI ABU DHABI BRANCH OFFICE INTERNSHIP KHATIB AND ALAMI DUBAI BRANCH RAW NYC INTERNSHIP DUBAI BRANCH

ACADEMIC AWARDS DEAN’S LIST 2013 CHANCELLOR’S LIST BRONZE 2014 CHANCELLOR’S LIST SILVER 2015 CHANCELLOR’S LIST GOLD 2016


TABLE OF CONTENTS PROJECT 1 - LIVE / WORK SECOND YEAR - SPRING PROF. MICHEL HUGHES

PG 1-4

PROJECT 2 - INHABITATION SECOND YEAR - SPRING PROF. MICHEL HUGHES

PG 5-6

PROJECT 3 - ARCHITECTURE+ THIRD YEAR - FALL OTHER THINGS PROF. GEORGE KATODRYTIS

PG 7-10

PROJECT 4 - TOPOLOGICAL FORMATIONS

THIRD YEAR - SUMMER PROF. FAYSAL TABARAH

PG 11-12

PROJECT 5 - ARTS CENTER+ FOURTH YEAR - SPRING STUDIOS PROF. GEORGE NEWLANDS

PG 13-16

PROJECT 6 - GESTALT FOURTH YEAR - FALL INSTALLATION PROF. MATHEW TRIMBLE

PG 17-20

PROJECT 7 - COASTAL WETLAND

FIFTH YEAR PG 21-24


LIVE / WORK - PROJECT 1 A PROJECT AIMED TO HAVE TWO SECTIONS, ONE FOR WORK (PUBLIC) AND ONE FOR LIVING (PRIVATE). MAINTAINING THRESHOLDS BETWEEN SPACES IS ESSENTIAL WITHIN THE PROJECT REQUIREMENTS.

1


PLAN - GROUND FLOOR

A

B

C

D

D'

LIVE-WORK PROJECT A3 MARWAN SAKOUK - 47090 PROF.HUGHES

E'

E

1-DATUM

2-VOLUME FORMATION

3-ADDITION OF MASS

F

F'

N

A'

1

LIVE-WORK PROJECT A3 MARWAN SAKOUK - 47090 PROF.HUGHES

m

4-MASS SUBTARCTION

2-VOLUME FORMATION

C'

5 SCALE 1:100

1-DATUM

B'

5-TRASNPARENCY

6-LINE SYSTEM

3-ADDITION OF MASS

DIAGRAMATIC PROGRESSION 4-MASS SUBTARCTION

5-TRASNPARENCY

6-LINE SYSTEM

2


SECTIONS

SEC CC'

SEC DD'

5

1 SCALE 1:50

1 m

SCALE

3


EXPLODED PERSPECTIVE

SEC AA'

SEC EE'

GALLERY

SEC BB'

SEC FF'

LIVING + SLEEPING ZONE

DINING + LIBRARY

5

1 SCALE 1:50

5 1:50

m

m

4


INHABITATION - PROJECT 2 DESIGNED A BRICK WALL ENCLOSURE USING A PARAMETRIC SOFTWARE RESULTING IN INTENSIFYING THE ATMOSPHERICS OF A BATHING SPACE.

5


6


ARCHITECTURE + OTHER THINGS - PROJECT 3 AN ARCHITECTURAL INSTITUTE GENERATED BY MODULES INTERLOCKING EACH OTHER TRANSFERING LOADS DOWN TO THE GROUNG AT SIX POINTS WHILE ALLOWING LIGHT THROUGH THE PERIPHERALS.

7


8


9


330

200

TOP OF COPING +27.0m

130

COPING SLOPING SCREED

110

SKY LIGHT ROOF MEMBRANE ROOF SLAB REBAR LIGHT FIXTURE HVAC SYSTEMS

690

550

DOUBLE GLAZING FLUORESCENT LIGHT PERFORATED STEEL PANELS 1660

BLOCKING

ROOF TERRACE

STUDD WALL TOP OF SLAB +20.0m 30

WOOD FLOORING

SLEEPERS FIRST FLOOR SLAB

600

630

WHITE GYPSUM PANEL

MDF PANEL STEEL TUBE

30

FIRST FLOOR / STUDIOS AND OFFICES

CONCRETE FORMWORK

600

2700

PLENUM SPACE

940

EMBEDDED GLASS PANELS

TOP OF SLAB +2.6m

GROUND FLOOR

WAFFLE FLOOR SLAB

150

35

60

40

INSULATION WATER BARRIER

GLASS RAILING

GRADE LEVEL 0.0m

600

1090

845

EXPANSION JOINT

15

DIVIDER JOINT

30

TOP OF SLAB -6.2m

TERRAZO FLOORING

UNDERGROUND BASEMENT

CLEAVAGE MEMBRANE

60

245

140

CONCRETE BED GRAVEL VAPOR MEMBRANE FOOTING

10


TOPOLOGICAL FORMATIONS - PROJECT 4 DESIGNED AND MODELLED IN MAYA THIS PROJECT EMBODIES A CITY WITH NO WALLS BUT WATER PIPES FLOWING AND CHANGING IN FORM INTO BASINS WHILE MAINTAINING SOME SORT OF STRUCTURAL INTEGRITY.

11


12


ARTS CENTER + STUDIOS - PROJECT 5 - TEAMMATE: OMAR EL-SALEH A COMPREHENSIVE PROJECT THAT DELT WITH THE ARTICULATION OF ALL BULDING SYSTEMS FROM SCHEMATICS TILL CONSTRUCTION DOCUMENTS.

13


A

B

C

W-SECTION STEEL BEAM

D

E

F

TOP OF SCREEN +19m

W-SECTION STEEL BEAM SCREEN CONNECTION STEEL FRAME

STEEL PIPE CONNECTION TO THESCREEN SCREEN STEEL

TOP OF SCREEN +19m

EMBEDDED CONNECTION

TERRACOTTA LOUVRES

TERACCOTTA LOUVRES

TOP OF SLAB +15m

LOUVRES CONNECTION TO THE SCREEN

TOP OF SLAB +11m

TOP OF SLAB +7.7m

STEEL COPING TOP OF SLAB +3.7m

DRAINAGE BLOCKING SCREED ROOF MEMBRANE CONCRETE SLAB

TOP OF SLAB +15m 1

STEEL BEAM (BACK ELEVATION)

A-253

A

SECTION BB

GRADE LEVEL 0.0m

SCALE 1:150

B

C

D

E

F

WOODEN SHELF WOODEN DESK

TOP OF SCREEN +19m

SKYLIGHT TYP.

TOP OF SLAB +11m

SECOND FLOOR SLAB

TOP OF SLAB +15m

ANCHOR PLATE TOP OF SLAB +11m

W-SECTION STEEL BEAM (BACK ELEVATION) ELECTRICAL SERVICE DUCT TOP OF SLAB +7.7m

TOP OF SLAB +3.7m

W-STEEL SECTION

STEEL MULLION BACK ELEVATION

GRADE LEVEL 0.0m

PERFORATED PLYWOOD PANEL

2

A-253

SECTION CC

WELDED CONNECTION WELDED CONNECTION TO W-SECTION

SCALE 1:150

CONNECTION PIECE FROM W-SECTION TO STEEL FRAME

DOUBLE GLAZING

PIVOT CONNECTION TO FRAME

HORIZONTAL STEEL MULLION

1

CONCRETE BEAM SUPPORTING STAIRS

SKYLIGHT FOR OFFICES FROSTED GLAZING

NO.

DESCRIPTION

2

3

4

LIGHT GREEN TERRACOTA LOUVRES

DATE

SECTION

TOP OF SCREEN +19m

AUS CAMPUS - SITE B

STEEL TUBE (BACK ELEVATION

S-2 ARCHITECTS

MARWAN SAKSOUK OMAR SALEH

A4

C - 72475

STEEL FRAME (BACK ELEVATION)

OMAR SALEH - MARWAN SAKSOUK PROF. GEORGE NEWLANDS

TERACCOTTA COMPONENT 1

TOP OF SLAB +15m

A-253

TOP OF SLAB +11m

STEEL HOOK IN THE FRAME CONNECTION PIECE

s2@ss-architects.com

CONNECTION FIXTURE TO LOUVRES TERACCOTTA COMPONENT TWO

INSULATION

TOP OF SLAB +7.7m

STEEL RAILING

DRYWALL

A-300

BLOW UP DETAIL

SCALE 1:5

TOP OF SLAB +3.7m

STEEL ANGLE

WOOD PLANKS

1

A-251

SECTION DD

TOP OF SLAB +3.7m

GRADE LEVEL 0.0m

SCALE 1:200

RAFTERS

FIRST FLOOR SLAB

4

3

CONCRETE COLUMN (BACK ELEVATION)

2

1

DARK GREEN TERRACOTA LOUVRES

TOP OF SCREEN +19m

ELEVATOR DOOR (BACK ELEVATION)

TOP OF SLAB +15m

BRICK PAVING COMPACT SAND CONCRETE CURB

TOP OF SLAB +11m

CURB

GRADE LEVEL 0.0m

CONCRETE SLAB CONCRETE SLAB

TOP OF SLAB +7.7m

CONCRETE BED GRAVEL STEP FOOTING FOUNDATION

GRAVEL

DRAINAGE TOP OF SLAB +3.7m

EARTH

GRADE LEVEL 0.0m

EARTH

2

A-251

SECTION EE

SCALE 1:200

14



BRIDGE ESCAPE

GREY WATER TANK TYP.

DOOR WIDTH 2M

CORRIDOR WIDTH 2.5M

CORRIDOR WIDTH 2.5M

F.C.U. TYP.

DOOR WIDTH 1.5M

ESCAPE TO MAIN STREET

STAIR WIDTH 2M STAIR WIDTH 6M

1 A-901

AUS COLD WATER LINE

SECOND FLOOR EGRESS AXO.

3 A-901

MEZANINE + FIRST FLOOR EGRESS AXO.

1 A-902

FIRST FLOOR HVAC AXO.

AUS COLD WATER LINE

2 A-902

SECOND FLOOR HVAC AXO. COLD WATER SUPPLY

HOLDECK REFERENCE

F.C.U. REFERENCE

GREY WATER TANKS GREY WATER PIPES TO TANKS RETURN DUCTS

FIRST FLOOR PATH

RETURN REGISTERS

ESCAPE DOORS

SUPPLY DUCTS

VERTICAL EGRESSES

2 A-901

NO.

DESCRIPTION

DATE

F.C.U. GREY WATER TO LANDSCAPE PIPES

N.T.S.

MUNICIPALITY SUPPLY PIPES

SECTION AUS CAMPUS - SITE B

S-2 ARCHITECTS

SUPPLY REGISTERS

MEZZANINE + SECOND FLOOR PATHS

BRIDGE EGRESS BLOW UP AXO.

A4 OMAR SALEH - MARWAN SAKSOUK PROF. GEORGE NEWLANDS s2@ss-architects.com

MARWAN SAKSOUK OMAR SALEH

C - 72475

A-901

NO.

DESCRIPTION

DATE

SECTION AUS CAMPUS - SITE B

S-2 ARCHITECTS

A4 OMAR SALEH - MARWAN SAKSOUK PROF. GEORGE NEWLANDS s2@ss-architects.com

MARWAN SAKSOUK OMAR SALEH

C - 72475

A-902


SITE PLAN

GESTALT INSTALLATION - PROJECT 6 - TEAMMATE: BARU

SITE ANALYSIS SCALE 1:100

SCALE 1:50

SUN PATH

A

MAIN CIRCULATION

WIND PATH

A

KEY PLAN OF AUS

OVERALL ANALYSIS

1

3

2

4

WHY THE COURTYARD SITE ? 1 - AD2 1- PRESENCE OF THE VENTURI EFFECT ABOVE THE SITE. 2 - AD1

3 - STUDENT CENTER

4 - STUDENT CENTER

2- SITE HAS A COURTYARD CONDITION WITH CIRCULATION HAPPENING AROUND IT. 3- SITE IS UNPROTECTED FROM THE HARSH SUN AT NOON. 4- CURRENT SITE CONDITIONS (BENCHES) DO NOT MAKE MUCH USE OF THE SITE OPPORTUNITIES IT PROVIDES. 5- LOCATION OF SITE IS NEAR CAAD LABS, THEREFORE IT IS EASY TO FABRICATED AND TRANSPORT MATERIALS. 6- BASED ON OBSERVATIONS, STUDENTS GO THERE TO RELAX DESPITE THE CURRENT SITE CONDITIONS.

17


3 - STUDENT CENTER

4 - STUDENT CENTER

3- SITE IS UNPROTECTED FROM THE HARSH SUN AT NOON. 4- CURRENT SITE CONDITIONS (BENCHES) DO NOT MAKE MUCH USE OF THE SITE OPPORTUNITIES IT PROVIDES. 5- LOCATION OF SITE IS NEAR CAAD LABS, THEREFORE IT IS EASY TO FABRICATED AND TRANSPORT MATERIALS. 6- BASED ON OBSERVATIONS, STUDENTS GO THERE TO RELAX DESPITE THE CURRENT SITE CONDITIONS.

IMAGE REFERENCES TO SITE

SITE SECTION AA - WITHOUT PROJECT

SCALE 1:80

18


SITE SECTION BB SCALE 1:80

SITE SECTION BB SCALE 1:80

SITE SECTION CC

SITE SECTION CC SCALE 1:80

SITE SECTION DD


SITESITE SECTION CC CC SECTION SCALE SCALE 1:80 1:80

SITESITE SECTION DD DD SECTION SCALE SCALE 1:80 1:80

SITE SECTION EE

SITESITE SECTION EE EE SECTION

SCALE SCALE 1:80 1:80


COASTAL WETLAND INSTITUTE - PROJECT 7 COASTAL INSTITUTE PROJECT DESIGNED WITHIN 3-4 WEEKS. THE PURPOSE WAS TO INTEGRATE THROUGH BUILDING FORM THE URBAN ZONE AND THE MAN-MADE MANGROVE AREA FOR BOTH ENTERTAINMENT AND RESEARCH PURPOSES.


SECTION BB

SCALE 1 : 200 10

0

SECTION CC

30 M

SECTION DD

0

2

5 M

SCALE 1 : 100

SECTION EE

0

2

5 M

SCALE 1 : 100

0

2

5 M

SCALE 1 : 100


SITE PLAN - COASTAL WETLANDS INSTITUTE ARC 501 - FINAL REVIEW MARWAN SAKSOUK - 47090

UAE, ABU DHABI , MANGROVES AREA

END OF LAND NODES INDUSTRIAL ZONE

PROJECT LOCATION

RESIDENTIAL ZONE CONCRETE BRIDGE

0

40

120 m

SCALE 1:2000CM

PUBLIC PARK

MANGROVE NURSERY

DWELL UNITS

EXISTING PARKING INFRASTRUCTURE

PERFORATED STEEL BRIDGES

RESIDENTIAL HOTEL + RECREATIONAL FACILITIES

SITE ANALYSIS - THESE EXISTING SITE CONDITIONS AND INFRASTRUCTURES WERE THE DRIVING FACTORS OF THE PROJECTS FORM, LOCATION, MATERIALITY, AND REACTION TO THE SITE.


PROGRESSIVE DIAGRAMS REGULATING ZONES

REGULATING BUILDING FORM

REGULATING PLATFORM FORM

LINK PRIMARY BUILDINGS

ESTABLISH EXTERIOR ZONES

TARGET OF THE PROJECT

PROJECT MIRRORING + VERIENDEEL ARTICULATION

VIA ITS FORM THAT HAD BEEN

c a

a

a

DERIVED FROM ITS CONTEXT,

a

WIND IS REGULATED, SUN IS

RESEARCH BUILDING

MANIPULATED, VIEWS ARE

a

b

a

a

LIGHT + WIND

a

IMPLEMENTED, AND FINALLY SHADE + VIEWS

PRIVATE VS. PUBLIC

PROCESSIONAL SEQUENCE

ACCESS TO THE MANGROVE PARK HAS BEEN CREATED.

b c

MAIN BUILDING

b

c c

c

a

c REGULATING STRUCTURAL GRID

c

a

c

c

a

COMPONENT TWO: FROM THE URBAN AREA INTO THE MANGROVES

DIRECTED, PUBLIC SPACES ARE

COMPONENT ONE: FROM THE RESIDENTIAL AREA INTO THE PROJECT

c

c

a

a

THICKNESS ARTICULATION

REGULATING STRUCTURAL GRID

MAIN BUILDING EXTRUSION

RESEARCH BUILDING

MAIN BUILDING

STEEL BEAMS

MAIN BEAM DEPLOYMENT

CABLE SUSPENSION + SCREEN


CONTACT INFORMATION EMAIL : marwan.saksouk@gmail.com b00047090@aus.edu


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.