Moonlight Basin has several guidelines to ensure that the buildings reflect the distinct mountain setting and at the same time reflect the individual style and preferences of residents. To ensure sustaiability, one must Incorporate salvaged materials into the building design as practical. The architect must also consider using building materials that

WASTE MANAGEMENT GUIDELINES

Efforts to reduce construction waste are also encouraged. All building projects are encouraged to recycle or reuse a minimum of 50 % of unused or leftover building materials reduce the emission of Volatile Organic Compounds (VOC’s) and other pollutants.

DESIGN FOR ECONOMY AND ENERGY

COTE SPREADSHEET

DESIGN FOR ENERGY

The The architectural costs of this project are determined by price per square foot. It is estimated that the construction costs will be from 10-12 Million. The average cost per square foot to build in Montana is currently $200 and in Big Sky, Montana the average cost per square foot has skyrocketed to $900 per square foot. This project is estimated to cost $538 per square foot which is a 40% reduction from the benchmark.