Mason Bolen - Post-Graduate Architecture/Design Portfolio 2020

Page 1

BOLEN


MASONBOLEN Mason Phillip Bolen, Assoc. AIA Architectural Designer Bachelor of Architecture Graduate College of Architecture + Design University of Tennessee, Knoxville masonbolen@gmail.com Copyright Š 2020 All rights reserved.


PROFESSIONAL WORK 04–29

PERSONAL WORK 30–55


NAGA 3 PLAZA &

HUN SEN PARK


NAGAWORLD 11°33'20.5"N 104°56'09.4"E

With over half a million square meters of built area, 70 stories, and multiple hotels and entertainment offerings, the Naga 3 Development will be the most prominent and exciting building in Phnom Penh. Naga 3 Plaza and Hun Sen Park act as the front yard of the

SelectedWorks / Architecture – Urban Design

Phnom Penh, Cambodia

Its site, in close proximity to the Naga World Resorts and Preah Sihanouk Boulevard, is an ideal location for a highly visible, vibrant destination within Cambodia’s capital city, and will surely capture the imagination of its users, and attract visitors from all over the world.

*Property of Skidmore, Owings & Merrill (SOM), designed under Culligan-Alpers Studio in Chicago, USA*

5


THE TERRACES

PLEATED GARDEN

WATER FEATURE

PLEATED LANDSCAPES

PARKING ENTRANCE

6


LAYERED EXPERIENCES PLAN OF HUN SEN PARK The central feature of Hun Sen Park is The Terraces, a multi-level circulation space that integrates all the levels of the project both visually and physically. Its shape and vegetation work to naturally shade pedestrians, providing a great experience while descending to the lower floors of the development. PARKING EXIT

PLEATED LANDSCAPES

WATER FEATURE

PLEATED GARDEN

DROP-OFF

HUN SEN PARK

7


PARK GROUND LEVEL

LOWER LEVEL 1

PLEATED GARDEN

LOWER LEVEL 2

PARKING

8


24

23

26

25

EQ

7.60 EQ

EQ

EQ

EQ

207 CARS EQ

EQ

16

15

14

13

12

11

RETAIL

EQ

7.60 EQ

EQ

EQ

EQ

EQ

4.30

4.30

6

5

4

3

10

9

8

7

DNDN

2

UP UP

1

12

11

16

15

14

13

20

19

18

17

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

5.15

26

25

EQ

EQ

7

11

10

EQ

EQ

EQ

10

9

EQ

11

7.60

EQ

EQ

EQ

EQ

13

12

14

16

17

18

EQ

EQ

EQ

EQ

16

15

19

EQ

EQ

EQ

19

18

EQ

EQ

6

7

8

BOH

4.30

5

3EQ

4

EQ

EQ

5

EQ

6

EQ

EQ

EQ

7

EQ EQ

16

15

14

EQ

228.31

8EQ

EQ

9

EQ

18

17

EQ

11

10 EQ

EQ

EQ EQ

20

19

12

EQ

9

10

EQ

11

EQ

12

EQ

13

EQ

14

EQ

15

EQ

16

EQ

EQ

17

18

EQ

EQ

13EQ

EQ

14

EQ

EQ

24

EQ

15 EQ

16

EQ

26

25

20

EQ EQ

17

EQ

29

28

27

EQ

EQ

EQ

EQ

EQ

SERVICE 10.60 CORRIDOR 8.20

EQ

B H

R1

W.C.

16

15

S1 VEST

A

EQ

BOH 3

2

BOH

EQ

EQ

EQ

207 CARS EQ

EQ

EQ

7.60 EQ

20

0

5

10

EQ

EQ

EQ

5

10

20

6.36

20

7.80 7.80 7.80 6.367.04

7.046.36 7.80

SERVICE CORRIDOR

7.80 7.80 7.04 6.36

6.36 7.04 7.80 7.80

50182

7.80 7.04 6.366.36 7.04

6.36 7.04

6.366.36

7.80 7.80

SERVICE CORRIDOR

7.80 7.04 6.36

7.04 7.80 50182

6.36

7.80 7.80

7.04

7.04

7.80 7.80

SERVICE CORRIDOR

6.36 6.36 7.04

7.80 7.04

7.80

6.36

7.80

50182

7.80

5.15

7.04 6.366.36

4.30

7.04 7.80

50182

7.80

EQ

4.30 7.04

EQ

7

26

EQ

EQ

7.80

27

EQ

EQ

EQ

7.04

F

EQ

EQ

7.80

6

SERVICE CORRIDOR

H

25

7.80

E

6.36

7.80 7.04 6.36

50182

7.80

24

4.30

DNDN

7.80 7.80

50182

7.80 7.04 6.36

6.36 7.04 7.80 7.80

50182

7.80 7.04

50182 50182 50182

7.80 UP UP

7.04

7.04 7.80 7.80

50182

7.80 6.367.04

7.046.36 7.80 7.80

50182

SERVICE CORRIDOR

UP UP

7.80 7.04

6.36

6.36 7.04 7.80

DNDN

7.80

UP UP

SERVICE CORRIDOR

7.80 7.04

6.36 6.36 7.04 7.80 7.80

SERVICE CORRIDOR

UP UP

7.80 6.36 7.04 7.04 6.36 7.80 7.80 7.80 6.36 6.36

M&E

SE

M&E

W.C.

W.C. BOH 21

SERVICE CORRIDOR

19

BOH EQ

EQ

EQ 5

10

H 22

EQ

EQ

24

23

20

EQ

EQ

EQ

EQ

26

25

27

EQ

228.31 EQ

EQ

EQ

EQ

EQ

EQ

40 M

EQ

5

10

20

40 M

ATRIUM PROPERTY LINE

RETAIL EQ

A

8.20

A

BOH

BOH

29

28

27

H

EQ

16

15

14

13

12

11

EQ

EQ

G

26

25

A

BOH

B C

G J 18

17

20

19

7.60 EQ

EQ

EQ

EQ

EQ

H

BOH

24

23

22 D

21

A

K

EQ

W.C.

BOH

I

0

0

7.04

EQ

A

F B

5

G

I

40 M

20

M&E 18

17

23

RETAIL

EQ

EQ

RETAIL

W.C.

EQ

24

23

22

21

EQ

H

BOH

A EQ

BOH

W.C.

F

ATRIUM

0

EQ

G

EQ

8.20

BOH M&E

16

15

EQ

0

F10

9

8

7

EQ

M&E

W.C.

BOH

BOH

EQ

EQ

8.20

G

4 22D

21

MA

PROPERTY

EQ BOH

228.31 EQ

E

6

5

4

7.60 EQ

8.20

6.91

EQ

EQ

BOH

14

13

EQ

RETAIL

1

UP UP

7.04

SERVICE CORRIDOR

12

EQ

EQ

D19

18

17

40 M

228.31

EQ

6.36

8.20 5.40

EQ

RETAIL RETAIL

11

SERVICE CORRIDOR

EQ

EQ

E

C

320

19

RETAIL

228.31 EQ

A

EQ

40 M

29

28

27 D

EQ

A B

5.56

VEST

EQ

TO. NCW

6.36

8.20 5.40 10.60

DNDN

DNDN

DNDN

DNDN UP UP UP UP

SERVICE CORRIDOR UP UP

10.60 8.20

SERVICE CORRIDOR 8.20 8.20 5.40 10.60 SERVICE CORRIDOR

UP UP

8.20 B F&

UP UP UP UP

UP UP

7.80 7.80

50182

7.80

UP UP

DNDN

7.04 7.04

EQ

218

17

6.91

BOH

10

9

8

26

EQ

40 M

7.80

4.30

4.30

SERVICE CORRIDOR

7.80 7.80

50182

6.36

F&

1

EQ

20

7.04

5.15

4.30 4.30

5.15

14

13

12

11

0 5 10 20 RETAIL A EQ EQ CARS EQARE SHOWN EQ EQ 207 PARKNG

E

EQ

EQ

26

25

EQ

27

EQ

EQ

EQ

F G

M&E

H

J 5

27

K 10

20

40 M

207 PARKNG CARS ARE SHOWN

40 M

G C H D

EQ

22

21

EQ

21

EQ

23

EQ

22

F

23

25

24

EQ

EQ

27

26

EQ

24

EQ

25

26

28

EQ

29

EQ

31

30

EQ

EQ

28

27

29

32

EQ

7.04

23

A G

EQ

RETAIL

16

ATRIUM

F&B

EQ

33

EQ EQ 18

H

EQ

19

20

8.20

EQ

EQ

35 36

34

EQ

8.20

4.57

1

2

6

5

4

3

7

PROPERTY LINE

G 22

21

A 15

14

13 B

F&B EQ

EQ 8.20

6.36

7.80 6.36

DNDN

SERVICE CORRIDOR

4.30

5.15

4.30 4.30

EQ

A

EQ

EQ

21

EQ

23

22

EQ

EQ

25

24

EQ

EQ

27

26

EQ

28

EQ

B C

EQ

EQ

EQ

EQ

EQ

EQ

EQ

29

EQ

6.91

8.20

31

30

BOH

BOH

286.42 EQ

7

EQ

EQ

EQ

EQEQ

A G B H

6.36

13

12

EQ

EQ

F

EQEQ

EQ

10

Level B3: Pa C

H 25

24

2923

2822

2721

F

EQ

5

32

BOH EQ

EQ

EQ

A34

33

EQ

EQ

B

35 36

M&E M&E

8.20

8.20

EQ

EQ

9

UP

UP

4

EQ

8.20

11.25

3

2

EQ

11

10

9

EQ

6.36

1

EQ

10

4.30

8.20

EQ

9

8

5.15

6.91

&E

BOH EQ

7

2

EQ

6

4.30

EQ

5

4

3

5.15

EQ

8.20

2

6

5

EQ

12 ATRIUM

EQ

0

E EQ

228.31 1

RETAIL

M&ESERVICE CORRIDOR BOH

4

3

8.20

4.57

11

E A

20

A

286.42

7.60

17

2

6.91

8.20

D

7.04 7.04

15

14

13

12

7.60

4.30

8

9

8

4.30

6

UP UP

6.36

29

8.20

40 M

4.30

5

4

50182

7.80 7.04

28 H

27

EQ

20

EQ

SERVICE CORRIDOR

C

4.30

8.20

7

EQ 10

BOH

W.C. 1

8 7 ATRIUM

EQ

RETAIL

A

B

4.30

4.30

11.25

6

5

EQ

5.56

207 PARKNG CARS ARE SHOWN

NAGA 31 PLAZA 3 2 CONCEPT DESIGN 5

EQ 0

5.56

4

24

23

22

21

EQ

EQ

8.20

A

A EQ

EQ

EQ

W.C. BOH SERVICE CORRIDOR

BOH

H

BOH

6.36 7.80

EQ

UP UP

EQ

EQ

6

5

4

3

8.20 M&E

M&E

E8.20

G

M&E

EQ

E10

PROPERTY EQ LINE EQ EQ

F&B

G 29

D

228.31 EQ 8.20PARK 6.91 SEN HUN CONCEPT DESIGN

DNDN

A

EQ

F& EQ

EQ

F

7.60

DOWN

BOH

A

28

27

EQ

2

6.91

F

F

DOWN

BOH

BOH

EQ

DOWN

SERVICE CORRIDOR

26

25

7.60 EQ

EQ

RETAIL

BOH

3

24

23

22

21

EQ

1

E

B

A SERVICE CORRIDOR

EQ

EQ

W.C.

BOH

H D

A

C

20

19

18

17

228.31 EQ

A

TO B1

F&B 10

9

8

7

EQ

8.20

BOH

4.30

EQ

EQ BOH

6.36 7.80

4.30

EQ

EQ

RETAIL BOH

4.30

4.30

6

5

4

3

8.20

7.80

29

28

27

EQ

7.04

2

SERVICE/STORAGE

PUBLIC CIRCULATION SERVICE/STORAGE

EQ

7.80

RETAIL

6.91

4.30

1

5.56

B

F&

DNDN

PUBLIC CIRCULATION

A

EQ

BOH

UP

DNDN

UP

5.15

EQ

F&B

F&B

RETAIL

35 36

34

RETAIL

9

E

EQ

EQ

5.15

EQ

B

EQ

D

33

EQ

8

7

40 M

4.57

4.30

ATRIUM

22

21

EQ

EQ

EQ

8.20

EQ

Level B3: Parking (207 Spaces)

4.30

EQ

7.80

EQ

ATRIUM

RETAIL

50182

EQ

32

A EQ

296

F B

PROPERTY LINE EQ

EQ

EQEQ

SERVICE CORRIDOR BOH 0 5 10 20 BOH W.C. 207 PARKNG CARS ARE SHOWN

27

50182

20

19

18

17

EQ

31

5

EQEQ

C

G C

6.36 7.80

16

RETAIL E A

7.80

EQ

EQ

4 28

RETAIL

7.04

EQ

6.36

EQ

7.04

EQ

7.80

EQ

7.80

EQ

7.04

EQ

B F&

Key:

EQ

RETAIL

3

RETAIL

W.C.

BOH

RETAIL

30

7.60

VEST

6.36

15

14

13

12

11

S2 W.C.

DNDN

10

DNDN

9

8

7

EQ

50182 40 M

VEST

BOH

6.91

EQ

D

6.36

EQ

7.80

20

UP UP

EQ

C

29

8.20

ATRIUM

EQEQ

EQ

26

6.36

10

EQ

29

RETAIL

EQ

2 27

1

2620

2519

M&E

7.04

5

EQ

28

EQ

26

EQEQ

7

D

W.C.

PROPERTY LINE

EQEQ

7.60

RETAIL

EQ

EQEQ

RETAIL A

UP UP

AEQ

8.20 M&E

M&E

28 H

27

A

EQ

EQ

EQEQ

SERVICE CORRIDOR

6

C

EQ EQ 24 E 25 23 SERVICE CORRIDOR

7.80

26

25

EQ

A

EQ

EQ

25

EQEQ

RETAIL

B

H D29 22

EQ 8.20

7.80

0

EQ

W.C.

27

26

EQ

2418

2317

2216

2115

2014

228.31 EQEQ

A H

5

B F

G

M&E

40 M

7.80

EQ

EQ

24

ATRIUM

C1913

1812

40 M

A

20

BOH

20

7.04

EQ

EQ

1711

EQEQ

7.60

RETAIL

23

RETAIL

EQ

EQEQ

4.57

BOH

W.C. 10

G

RETAIL C

21 28

TO. NCW MATCHLINE EQ EQ EQ EQ

M&E EQ EQ

10

4

PROPERTY

8.20

F

8.20

W.C. 7.60 EQ

29

28

EQ

E

6.36

24

23

22

21

EQ

1610

159

EQEQ

SERVICE CORRIDOR

M&E

25

24

EQEQ

8.20

EQ EQ

M&E 5

8.20 10.60 SERVICE CORRIDOR

W.C.

20

EQ

EQ

B

20

EQEQ

EQ

5

G

2027

8.20

EQ

23

EQ

22

EQEQ

EQ EQ 0

0

29

28

EQ

ATRIUM

40 M

E A

M&E

8.20

M&E

C 27 D

A

ATRIUM PROPERTY LINE D

A

EQ

B H W.C.

EQ

RETAIL

7.60

EQ EQ

5.40 10.60

EQ

228.31 6.91

EQ

F

RETAIL EQ

EQ

EQEQ

EQ EQ MATCHLINE

3

BOH

19 26 18 25 BOH

TO. NCW 228.31

8.20

EQ

W.C.

22

EQEQ

EQ

K

BOH

EQ EQ

8.20

BOH

J2

8.20

EQ

EQ

M&E

A

G M&ER SERVICE CORRIDOR

10

148

137

126

11 5

5

EQ

I

RETAIL SKY LIGHT ABOVE EQ EQ

5.40

EQ

H

E8.20

RRIDO

RETAIL

19

EQ

ICE CO

G

A

EQ

SERV

21

EQ 8.20

SERVICE CORRIDOR M&E

6.36

EQ

EQ

A EQ

F

EQ

21

EQ EQ

29 EQ

VEST EQ

W.C.

7.80

EQ

To NCW

BOH

RETAIL

18

17

EQ

EQ

EQ EQ

RETAIL

A G

26

EQ

A

C

17 24

DOWN

DNDN

EQ

EQ

20

286.42

EQ EQ

7.04

EQ

EQ

SERVICE CORRIDOR

16

15

14

13

EQ

228.31

RETAIL EQ

19

29 20

EQ6.91

A H

EQ EQ

DOWN

12

11

EQ

D

EQ

DOWN

EQ

EQ

EQ

28

6.36

EQ

DNDN

EQ

EQ 228.31

EQ

EQ

27 19

7.04

EQ

B C

EQ

26

7.80

EQ

EQ

UP

10

9

8

7

EQ

50182

18

7.60

EQ

25 18

24

SERVICE CORRIDOR SERVICE CORRIDOR

7.80

SERVICE CORRIDOR

6.36 7.80

17

16

EQ

17

23

RETAIL EQ

DOWN

EQ

UP UP

6

5

UP UP

4 ATRIUM

UP UP

3

EQ

EQ

8.20

6

5

4

3

Key: 6.91

2

EQ

RETAIL

2

Level B1: Retail

EQ

BOH

SERVICE CORRIDOR

1

ETAIL

EQ

RETAIL

W.C.

BOH

A

1

EQ

EQ

7.04

EQ

F&

F&B

22

ATRIUM

EQ

5.56

7.80

EQ

F&B EQ

16

228.31

B

EQ

EQ

21

7.80

4.30

To NCW

EQ

EQ

15 20

19

EQ

7.60

EQ EQ

E

F

EQ

B

28

27 EQ

BOH 6.91

EQ

E

H 25

24

26RETAIL 27

7

BOH

D A

29

8.20

EQ

RETAIL

25

6

C

ATRIUM D

G 2923

8.20

BOH

W.C.

A

PROPERTY

EQ

B

5

B

F

EQ 8.20

BOH

BOH

16 23

15 22

14 21

28

EQ

SERVICE CORRIDOR 20 BOH

29

28

27

EQ

PROPERTY LINE

24H

RETAIL

13 20

DNDN

EQ

EQ

EQ

EQ

1418

104

93

EQ

EQ

1

A

40 M

A H

EQ

W.C. W.C.

SERVICE CORRIDOR

EQEQ

10

K

RETAIL

12 19

B

EQ

17

0

EQ

EQ

RETAIL

7.60

11 18

10 17

F&

EQ

EQ

EQ

1316

EQ

9 16

DNDN

EQ

EQ

15

14

207 CARS EQ

7.80

15

7.04

4.30

7.60

EQ

14 12

13

7.80

EQ

11

ATRIUM 12

11

82

EQ

EQ

5 W.C.

26 EQ

25 EQ

SERVICE CORRIDOR

EQ EQ

228.31

A

M&E

50182

EQ

10

10

7 1

6

5

4

3

8.20

E

40 M

7.80

EQ

9

BOH

2

6.91

A

SERVICE CORRIDOR

EQ

9

DNDN

8

7

1 D

A

8.20

EQ

B

EQ

13

12

EQ

EQ

F&

EQ

8.20

EQ

BOH 5 10 20 BOH W.C. 207 PARKNG CARS ARE SHOWN

RETAIL

EQ

C H

29

28

27

EQ

EQ

SERVICE CORRIDOR

26

25

EQ

0

11

10

EQ

50182

9

EQ

6.36 7.80

8

EQ

7.04 7.04

RETAIL

7

6

EQ

EQ

UP UP

8

DNDN

SERVICE CORRIDOR

5

EQ

SERVICE CORRIDOR

EQ

EQ

BOH

G

BOH

8 15

207 CARS 228.31

EQ EQ

BOH

24 EQ

27

EQ

2822

2721

G J

EQEQ

23

F&B

B

MATCHLINE

BOH

30 BOH

0

ATRIUM

SKY LIGHT ABOVE EQ EQ

EQ

F

UP

RETAIL

6

B

EQ

BOH

EQ

EQ

EQ

EQ

BOH RETAIL

M&E

2620

EQEQ

A22

21

23 EQ

22 EQ

To NAGA 233& Hun Sen35Park 36 31 32 34

TO. NCW MATCHLINE EQ EQ EQ EQ

7.60

29

7 14

6 13

5 12

2519

EQEQ

SERVICE CORRIDOR

RETAIL

PROPERTY LINE

SERVICE CORRIDOR M&ESERVICE CORRIDOR 7.60 8.20

4 11

8.20 EQ

UP

8.20

F&

6.91

W.C. BOH

BOH

EQ

3 10

BOHEQ EQ

EQ 27 EQBOH6.91 28

EQ

EQ

RETAIL

EQ

2 9

18

DNDN

24

23

22

21

PROPERTY LINE EQ

EQ BOH

EQ W.C.

4.30

20

19

18

17

EQ

RETAIL

75

4

4

3

2

11.25

63

2

ATRIUM

SERVICE CORRIDOR

&E

EQ

RETAIL

EQ

8.20

EQ

EQ

RETAIL

BOH SERVICE CORRIDOR

W.C.

7

EQ 25EQMATCHLINE 26

EQ

TO. NCW

UP UP

A

EQ

DNDN

1

51

4

UP UP

3

EQ

UP

W.C.

M&E

.56

EQ

6.36

EQ

7.80

EQ

7.04

EQ

SERVICE CORRIDOR

6.36

EQ

UP UP

EQ

UP UP

EQ

UP UP

AEQ

8.20 M&E

EQ

G

24

8.20

VEST

4.30

16

228.31 6.91

EQ

6

40LIGHT M ABOVE SKY EQ EQ

29

20

50182

15

14

13

12

11

EQ

M&E

7.80

10

EQ

6.91 23

EQ

21 EQ ATRIUM

26

M&E

I

EQEQ

RETAIL 20

19

20 EQ

EQ

EQEQ

RETAIL

18

EQ

BOH

W.C.

2418

2317

2216

EQEQ

SERVICE CORRIDOR

17

E19

18 EQ

17 EQ

F&B

TO. NCW

22

286.42

B

7.80

9

8

EQ

21

EQ

5

4

SERVICE CORRIDOR

EQ

A

BOH

EQ

EQ

28

5.15

EQ

3

EQ

27

4.30

EQ

20

RETAIL

BOH

EQ

2

228.31

20 EQ

26

4.30

EQ

F

4.30

EQ

RETAIL

SERVICE CORRIDOR 5.56

1

10

EQ

RETAIL

W.C.

5.56

19

8.20

40 M

ATRIUM RETAIL 0 5 SKY LIGHT ABOVE EQ EQ

EQ

25

4.30

EQ

EQ

A

E

EQ 18

EQ

20

A

EQ

4.30

EQ

EQ

10

BOH

UP UP

EQ

EQ

5

7.80

EQ

7.04 7.04 EQ

EQ

24

RETAIL BOH

EQ

7.04

EQ

EQ

23

RETAIL

EQ

29

28

7.60

EQ EQ MATCHLINE

4.30

4.30

EQ

A

TO. NCW

EQ

EQ

8.20 M&E

22

C G

EQ H D

27

ATRIUM

RETAIL

6.91

M&E

7.80

EQ

21

SERVICE CORRIDOR

EQ

BOH

BOH M&E

DOWN

4.30

EQ

7.80 6.36

F& B

4.30

11

10 EQ

26

To 314Mezzanine 15 12 NAGA 16Level17 13

7.60 EQ

EQ

25

7.80

9

EQ

24

7.04

228.31 EQ

BOH

M&E

W.C.

20

6.36

8EQ

EQ

RETAIL 228.31 RETAIL EQ EQ EQ 23 20 22 21 19 SERVICE CORRIDOR

MATCHLINE

7

UP UP

6

5

4

3

EQ

8.20

A

B F

50182

7

RETAIL

18

17

DOWN

Level B1: Retail Concourse

BOH

BOH

2

UP UP

B

F&

EQ

DNDN

SERVICE CORRIDOR SERVICE CORRIDOR

DNDN

EQ

EQ

D E A

19

50182

4.30

207 CARS

6

EQ

16

15

0

11.25

1

EQ

14

13

12

TO. NCW

BOH

BOH EQ

SERVICE CORRIDOR

11

4.30

4.30

5.15

5.15

5

EQ

PROPERTY LINE

A

BOH

16

15

EQEQ

25

RETAIL

EQ

EQ

EQ

EQ

E

26

EQ

A

4

2

27 11.25

EQ

ATRIUM G

8.2025

EQ

EQ

26

25

D

UP

4

EQ

18

D

228.31

16 EQ

15 EQ ATRIUM

EQ

DNDN

3EQ

EQ

8.20

BOH

BOH

14 EQ

13 EQ

SERVICE CORRIDOR

PARK

EQEQ

B

EQ MATCHLINE

RETAIL EQ

EQ

17

12 EQ

11 EQ

23

EQ

8.20

SE

40 M

M&E

1

C

10

7

11.25

G

24

EQ

2

F

29

EQ 24

EQ

3

BOH

VEST

G 24

H

F&

EQ

10

7.60

2

EQ

EQ

C1913A 2 &20HUN 14 SEN2115

TO NAG

EQEQ

DNDN

1

EQ

16

10 EQ

9 EQ

8 EQ

A 14

DOWN

8.20

UP

6.91

EQ

15

BOH RETAIL

EQ

TO. NCW

5.56

EQ

F&B

14

7 EQ

B

9

8

SKY LIGHT ABOVE EQ EQ

EQ

13

6 EQ

5 8.20

4 6.91

3

EQEQ

40 M

RETAIL 13

EQ

RETAIL

228.31

EQEQ

RETAIL

12

11

EQ

F&B

8.20

10

F&B

RETAIL

1812

1711

22

21

B

F&

EQ

BOH

4.30

RETAIL

20

19

18

EQ

6.91

5.40

9

8

RETAIL 7

20

F&

EQ

EQ

F&B

2

EQEQ

5

EQ

EQ

B H

20

PROPERTY LINE

EQ 8.20

RETAIL

4.30

10

UP UP

7

EQ

1

RETAIL

2

W.C.

ATRIUM

4.30

5

DOWN

6

EQ

11 RETAIL 12

29

28

27

UP

EQ

EQ

DNDN

5

4

EQ

B

BOH

EQ

EQ

10 DOWN

RETAIL

RETAIL

EQ

RETAIL

26

25

1610

159

228.31

EQEQ

EQEQ

6

RETAIL

EQ A

EQ

EQ

28

2923 EQ

2822 EQ

RETAIL

BOH

5

C

B H

SERVICE CORRIDOR

W.C.

0 6

5

4

3

EQEQ

17

EQ

2721 EQ

EQEQ

4.30

2

EQEQ

RETAIL

ATRIUM

4.30

1

SERVICE CORRIDOR

148

137

126

BOH EQ EQ

EQEQ

23 A

27

4.30

SKY LIGHT ABOVE

EQEQ

M&E

M&E

UP UP

EQ

9

8 DOWN

RETAIL

SERVICE CORRIDOR

EQ EQ 1 2 3 SERVICE CORRIDOR

A

SKY LIGHT ABOVE EQ EQ

EQ

7

W.C.

BOH

&E

EQ

B

EQ

6

24

23

22

21

ATRIUM

228.31 EQ

UP

RETAIL BOH

20

19

18

17

ATRIUM

F&

EQ

5

16

15

14

13

F&

M&E

12

11

7.80 7.04

ATRIUM

S1 VEST 104 115

W.C.9 3

BOH EQ 8.20

EQ6.91

EQEQ

1

B

EQ

EQEQ

RETAIL

UP UP

N

EQ

W.C.

M&E

B

DOW

RETAIL

EQ

10

G

40 M

26

DN

F

H 22

EQ

8.20 EQ

1

W.C.

EQ

20

25

SERVICE CORRIDOR

F&

7.80

50182

M&E

40 M

RETAIL

W.C. BOH SERVICE CORRIDORR1

82

7 1

Level B2: Retail

10

24

2620 EQ

2519 EQ

A

EQEQ

4.30

BOH

UP

EQ

EQ

EQ

5

F

A G

228.31

EQ

EQEQ

4.30

20 SERVICE CORRIDOR

DNDN

ATRIUM EQ

8.20

4

M&E

10

9

8

7

RETAIL

6.91

W.C. EQ

8.20 BOH

6

5

4

3

UP UP

A

3

2

6.36

7.04 7.80

EQ

EQ

F&B

5 RETAIL

27 PROPERTY

BOH

C

E

EQ F

0

21

4.30

BOH

10

A

B

F&

F&B EQ

VEST

16

15

14

13

12

EQ

M&E BOH

BOH

6

5

4

3

8.20

11

EQ

RETAIL

W.C.

BOH

2

6.91

A

EQ

RETAIL

C 1

7.04

6.36

SERVICE CORRIDOR SERVICE CORRIDOR

7.80 50182

1

8.20

BOH

EQ

EQ

UP

5 W.C.

W.C. W.C.

EQEQ

UP UP

0

EQ

EQ

6.366.36

EQ

2418 EQ

2317 EQ

2216 EQ

2115 EQ

EQEQ

23

22

21

4.30

SERVICE CORRIDOR

RETAIL

EQ

PROPERTY LINE

RETAIL

EQ

EQEQ

E

SERVICE CORRIDOR

4.30

EQ

RETAIL

ATRIUM

EQ

4.30

EQ

8.20

7.80

EQ

10

9

8

7

EQ

ATRIUM

7.80

EQ

ATRIUM

RETAIL

EQ

EQ

B

D

E

TO. NCW MATCHLINE

0

20

19

2014 EQ

EQ

EQEQ

29

28

MATCHLINE EQ

A

W.C. 20

26

EQ BOH

W.C.

29

8.20

40 M

M&E

EQ

EQ

ATRIUM D

EQ

EQ

RETAIL

19

EQ EQ

A 25

+ 11.25M

H C

4 28

A

M&E

18

17

TO. NCW 228.31 EQ

G B

27

EQ

20 BOH

228.31

EQEQ

50182

EQ

SERVICE CORRIDOR

6.10

16.60 EQ

EQ

1812 EQ

1711 EQ

EQEQ

DNDN

EQ

F& B

7.80

50182

7.04

EQ

8.20

EQEQ

7.80

EQ

6.36

SERVICE CORRIDOR

EQ

7.04

EQ

SKY LIGHT ABOVE

RETAIL

BOH

RETAIL

A

6.91

A

6

5

4

3

SERVICE CORRIDOR

A

228.31

10

16

15

F A

EQ EQ

A

29

28

27

24

23

0

D1913

228.31

1610 EQ

159 EQ

EQEQ

RETAIL

EQ

SERVICE CORRIDOR RETAIL H

H

29

28

27

2

RETAIL

EQ

ATRIUM

EQEQ

SERVICE CORRIDOR

7.04

26

25

EQ

EQEQ

5

26

EQ

8.20

26

8.2025

E

EQ

3

VEST

25

W.C. M&E

EQ

18

17

DNDNUP

DNDN

EQ

UP

NAGA 3

W.C.

F

A

EQ

RETAILRETAIL 1

27

W.C.

PROPERTY LINE EQ

26

M&E

EQEQ

6.36

24

23

22

EQ

A

G

M&E

W.C.

SERVICE CORRIDOR

21

25

G

F

148 EQ

137 EQ

126 EQ

11 5 EQ

EQEQ

6.36

20

19

18

E

E

TO NAGA 3 MEZZANINE LEVEL

17

24

D A

EQ BOH

D

EQEQ

EQ 8.20

MA

+ 11.25M

UP UP

EQ

EQ

104 EQ

93 EQ

EQ 8.20

2

EQ

6.91

DOWN

EQ

7.80

W.C.

A

N

W.C.

EQ6.91

SERVICE CORRIDOR M&E

0

EQ

EQ24

BOH

RETAIL SKY LIGHT ABOVE

EQ

D OTB

21 PROPERTY LINE22

SERVICE EQ EQ CORRIDOR

EQ BOH

24

23

EQ

DNDN

UP DOW

RETAIL

23

22

M&E

C

EQ

ATRIUM

EQ

14

13

4.57

B

EQ

21

EQ

2923 EQ + 0.5M 20

19

EQEQ

EQ W.C. PLAZA

RETAIL

F&

EQ

20

EQ

22

21

EQ

DN

TO. NCW

Level B2: Re

29

28

UP UP

W.C.

RETAIL

SERVICE CORRIDOR RETAIL RETAIL

82 EQ

RETAIL EQ

8.20 M&E

EQEQ

EQ

RETAIL

12

EQ

C

16

15

14

13

12

11

EQEQ

SERVICE CORRIDOR

DNDN

EQ

B

S2

EQ

1

7 EQ

10

9

8

7

ATRIUM

6 EQ

5 8.20

4 6.91

3

6

5

4

3

DOWN

16

15

VEST

EQ

EQ

EQ

EQ

A

OTB

35 RETAIL 36

8.20

2822 EQ

18

1

EQ

F&B

EQ

27

RETAIL

20

19

EQ

11

+ 0.5M

26

DROP OFF

BOH

34

EQ

DNDN

EQ

EQ

7.04

EQ

ATRIUM

2

UP UP

EQ

EQ

EQEQ 228.31EQEQ EQ EQ SERVICE CORRIDOR

+ 11.25M

B

11.25M

K

17

11.25M

ATRIUM 4.57

18

EQ

B10

9

7.80

RETAIL

2

6.91

B

UP

EQ

6.36

7.80

7.62

BOH

DOWN

RETAIL

14

13

12

19

18 RETAIL

33

BOH

8

7

EQ

EQ

EQ

8.20

6

TO. NCW EQ MATCHLINE

B F&

B

F&

F&B

A

C

EQ

BOH

RETAIL

11

EQ

UP UP

10

9

W.C.

228.31

EQ

ATRIUM

M&E

SERVICE CORRIDOR

EQ

DOWN

EQ

UP UP

EQ

8

7

Ground Level

EQ

M&E

ETAIL

6

5

4

3

8.20

EQ

6.91

EQ

32

RETAIL

SERVICE CORRIDOR SERVICE CORRIDOR

5

4

EQ

A

PROPERTY LINE

R

8.20

BOH

1

1

RRIDO

EQ

17

F&B

W.C.

BOH

2

SERV

EQ

16

15

EQ

MATCHLINE

H

29

28

27

EQ

RETAIL

EQ RETAIL

ATRIUM

B F&

BOH

6.91

26

25

EQ

228.31 F&B

EQ

SERVICE CORRIDOR RETAIL

EQ

7.04

UP UP

EQ

RETAIL

1

14

B

F&

EQ

F&B

EQ

8.20

A

RETAIL

31

30 BOH

29

3

EQ

PROPERTY

SERVICE CORRIDOR

A

RETAIL

DNDN

EQ

W.C. W.C.

BOH

EQ

DNDN

SERVICE CORRIDOR

RETAIL

EQ

13

12

11

EQ

SERVICE CORRIDOR

EQ

TO. NCW

17

EQ

VEST

25

2620 2721 EQ EQ TO B1 RETAIL

SKY LIGHT ABOVE

EQ

UP

EQ

EQ

F&B

BOH

2

UP UP

EQ

ATRIUM

EQ

1

7.80

24

23

22

21

ICE CO

EQ

A

EQ

UP UP

EQ

10

7.80

ATRIUM 20

19

18

17

EQ

EQ

EQ

16

15

EQ

EQ

RETAIL

BOH SERVICE CORRIDOR

A

BOH

EQ

14

228.31

27W.C. W.C.28

26

BOH

UP UP

A

UP UP

A

&E

EQ

EQ

DNDN

RETAIL

EQ

8.20

EQ

RETAIL EQ

EQ

25

24 SERVICE CORRIDOR

EQ

EQEQ

8.20

C

RETAIL + 11.25M

EQ

RETAIL

OTB

35 36

PROPERTY LINE

UP

9

8

7

EQ

40 M

7.04

EQ

DNDN

EQ

13

EQ

50182

16

15

14

13

12

11

EQ

ATRIUM

VEST

G

DNDN

6

5

W.C.

EQ

20

23

W.C.

BOH

F

29

UP UP

EQ

SERVICE CORRIDOR

DNDN

EQ

B

4

EQ

F&

M&E

EQ

UP

3

EQ

8.20 M&E

10

29

12

EQ

8.20

RETAIL

22

BOH

EQ

8.20

EQ

11

EQ

EQ

16

EQ

29

28

27

EQ

EXIT FROM PARKING

I

DROP OFF

SKY LIGHT ABOVE

EQ

EQ

EQ

RETAIL

RETAIL

21

E

Property Line

228.31 6.91

5

EQ

28 EQ

10

9

EQ

2519 EQ

15

EQSERVICE CORRIDOR EQ

PLAZA

34

7.80

10

9

8

7

ETAIL

28

EQ

ATRIUM

EQEQ

EQ11.25M

15 % slope

7.04

6

5

4

27

26

DNDN

ATRIUM

25

EQ

27EQ

8

EQ% slope 50 + 1M

33

6.366.36

24

23

EQ

D

20

6.36

22

21

20

EQ

EQ

7

EQ

EQ

EQEQ

+ EQ 0.5M

2418 EQ

14

EQ

UP UP

3

19

EQ

26

EQ

RETAIL SKY LIGHT ABOVE

EQ

EQEQ

EQ

DNDN

EQ

6

5

EQEQ

32

RETAIL

2317 EQ

13

OTB EQEQ

DNDN

2

18

UP UP

1

17

16

7.80

6.36

EQ

25

EQ

EQ

31

7.04

MATCHLINE EQ EQ

EQ

4

EQ

RETAIL 11.25M

7.80

EQ

EQ

EQ

EQ EQ SERVICE CORRIDOR

50182

DNDN

EQ

EQ

3

8.20

EQEQ

2216 EQ

228.31

7.80

EQ

EQ

24EQ

ATRIUM

EQ

EQ

30

12

6.36

EQ

EQ

2

6.91

EQEQ

15 % slope

29

STREET LIGHT ENTRANCE PARKING

2115 EQ

11

OTBEQEQ

6.36

EQ

TO. NCWEQ

EQ

1

EQEQ 50 EQ % slope + 1M

8.20 + 0.5M

+ 11.25M

28

7.04

EQ

EQ

23

EQEQ

6.91

2014 EQ

10

OTB

EQ

PROPERTY LINE

-2.5 M WATER FEATURE

1913 EQ

9

8

7

8.25M EQEQ

DNDN

EQ

EQ

EQ

EQ

EQEQ

W.C.

RETAIL

7.80

EQ

EQ

A

29 286.42

7.80

EQ

EQ 228.31

19

H

6.36

EQ

EQ

28

27

7.80

EQ

EQ

26

SERVICE CORRIDOR

EQ

EQ

G

18

M&E

25

A RETAIL

EQEQ

27

26

C

F

SERVICE CORRIDOR

17

16 24

7.80

EQ

EQ RETAIL

40 M

15 W.C. 23

22

6.36

EQ

21

22

EQ

EQ

EQ 8.20 M&E

M&E

25 10.75M PARKING ENTRANCE

40 M

VEST63M 228.31

5

EQ

UP UP

EQ

EQ

SERVICE CORRIDOR

20

7.04

10

14

20

19

A A B

EQ

7.80

12 RETAIL13 18

17

21EQ

EQ

E

4

7.04

11

10 16

15

20

D

137 EQ

3

27

EQ

EQ

W.C.

BOH

24 J

23

OTB

26

25

EQ

26

25

EQ

K

BOH

OTB

22

21

OTB

WATER FEATURE

DNDN

9

14

EQ6.91 DN

EQ

126 EQ

2

50 % slope

20

19

18

17

DNDN

8 13

12

EQ

EQ

24

148 20 EQ

10

OTB

EQ 8.20

G J

+ 0.5M

OTB

16

15

B

5

RETAIL RETAIL

7RETAIL

11

A

EQ

11.25M

23

14

F&

RETAIL 8.20

10

9

8

7

19

EQ

EQ

EQ

W.C.

22

OTB

TO B1 RETAIL

13

228.31 WATER FEATURE 0.25M 1812 1610 1711 159 EQ EQ EQ EQ

EQEQ

24

2923

2822

2721

I

EQEQ

H

15 % slope + 1M

UP

EQ

ATRIUM

11.25M

+ 0.5M

DNDN

0

EQ

EQ

8.20 M&E

EQEQ

+ 11.25M

OTB

115 EQ

1

M&E

21

20 286.42

2620

2519

EQEQ

EQ

RETAIL

40 M

-2.5 M

12

11

DOWN

6

18EQ

EQ

29 EQ

6.91

19

EQEQ

EQ

24

23

22

21

EQ

H

EXIT FROM 10.75M PARKING

50 % slope

3M OTB 0.25M

OTB

10

9 OTB

DOWN

5

EQ MATCHLINE

15

G B H C

5

UP UP

14

13

EQ

18

104 EQ

0EQ9 3

82 EQ

1

8.25M

20

OTB

8

WATER FEATURE

B F&

F& B

17

EQ

ATRIUM

28

EQ

UP UP

12

11

EQ

17

RETAIL

27

EQ BOH

6

UP

UP UP

EQ

228.31

26

F&B

5

BOH

16

15 EQ

EQ

25 EQ

0

0

F A8.20

8.20 EQ BOH

16

6.36

14

EQ

24

EQ

UP UP

DNDN

EQ

23

EQ

RETAIL

4

22

SERVICE CORRIDOR

EQ

8.20

EQ EQ BOH

W.C.

EQEQ

EQ

G

UP

ATRIUMEQ

21 EQ

DNDN

3

2 4

3

11.25 TO. NCW 6.91

EQ EQ

15

7 EQ

EQEQ

UP

13

12 EQ

11

EQ

20 EQ

B F&

DOWN

1 2

EQ EQ

14

6 EQ

5 8.20

4 6.91

3

EQEQ

H

15 % slope

DNDN

19

EQ

SERVICE CORRIDOR RETAIL

RETAIL

EQ

13

2

+ 0.5M

29

10

5

7

+ 11.25M

A

UP UP

10

EQ

SKY LIGHT ABOVE

18

EQ

SERVICE CORRIDOR

1

RETAIL

0 OTB

6

5

4

3

-2.5 M

EQEQ

DROP OFF

11.25M

DOWN

9 EQ

EQ

17

16 EQ

W.C.

A

BOH

12

10.00M

PLAZA

UP UP

15

EQ

EQ

EQ EQ SERVICE CORRIDOR

EQ

11.25M

11

DROP OFF

SKY LIGHT ABOVE

14

13 EQ

EQ

EQ

PLAZA

1

E

28 27 PROPERTY LINE

26

7.80

DNDN

EQ 11.25M EQ

EQ

10

+ 0.5M

25

2

MATCHLINE OTB

DOWN

EQ

9

29

28

27 24

23

6.36

EQ 228.31 EQ EQ

8

7

26

25 22

21

EQEQ

PLAZA DN

1

11.25M

2418

2317

2216

2115

EQ

228.31

F

EQEQ

2014

1913

1812

1711

EQEQ

G

M&E

+ 11.25M

TO. NCW + 0.5M

7.04

EQ

RETAIL 11.25M

20

W.C.

A

7.80

EQ

EQ EQ EQ SERVICE CORRIDOR

6

24

23

22 19

OTB EQ

EQEQ

11.25M

50182

EQ

15 % slope

21 18

6.367.04

EQ

EQ% slope EQ 50 + 1M

5

20 17

OTBEQ

EQEQ

DROP OFF

UP UP

8

8.20

RETAIL

W.C.BOH

EQ + EQ 0.5M

4

16

15

A EQEQ 005

EQ

20

19

18

17

EQ

E 1610

159

148

137

EQEQ

M&E

RETAIL

11.25M

G

STREET LIGHT

7

11.25

ATRIUM

EQ EQ

8.25M EQ

19

18

17 14

13

3M 228.31

DNDN

SERVICE CORRIDOR SERVICE CORRIDOR

EQ EQ

3RETAIL

16

15 12

11

UP

6

5

4

12

EQ

&E

EQ EQ

2

10.75M

PARKING ENTRANCE UP UP

A

11

8.20

EQ EQ

DOWN

3

0

EQ EQ

1

10

9

OTB

14

13

12

11 8

7

A

EQEQ

RETAIL

D 11.25M

-2.5 M

7.046.36

UP UP

11.50

EQ 8.20

W.C. 11.25M

6

5

EQEQ

EQ

A

228.31

VEST

EQEQ

EQ

UP UP

EQ 6.91

M&E M&E

10

9

8

7

4

3

+ 0.5M OTB WATER FEATURE

F

126

11 5

104 + 0M

93

EQ 8.20

EQ

UP UP

EQ

8.20

2

82

EQ6.91

A

DNDN

1

7 1

EQ

WATER FEATURE

DNDN

6.91

6

5

4

3

EQ

F B

OTB

UP UP

2

+ 0.5M

40 % slope

6

5

EQ

E

-2.5 M

0.25M

+ 2M

4

50 % slope

EQ

8.20

D

UP

OTB

WATER FEATURE

3

+ 0M

BOH

C

3M 0.25M

DNDN

1

2

6.91

SERVICE CORRIDOR

+ 0.5M

+ 2M

25 % slope

1 B 25 % slope

+ C3M

A

8.25M OTB

OTB

-2.5 M

+ 0M

A 40 % slope

EQ

EQ

UP

50 % slope

MATCHLINE

OTB

slop

+ 1.5M

PROPERTY LINE

11.25M

15 % slope

PLAZA

TO. NCW

Ground Level

11.25M

%

STREET LIGHT

RETAIL EXIT FROM 10.75M PARKING SERVICE CORRIDOR

11.25M 11.25M

+ 0.5M

e

50

+ 2M

8.20

50 % slope

DROP OFF

11.25M

A

5.40

29

28

11.50

+ 0M

27

SEATING AREA EQ EQ

EQ

SERVICE CORRIDOR

EQ

EQ

EQ

D

DNDN

26

25

EQ

E

16

15

14

13

12

11

228.31

EQ

DNDN

F&B EQ

EQ

10.00M

SERVICE CORRIDOR

24

23

22

21

EQ

RETAIL

EQ

C10

9

8

7

EQ

D

SERVICE CORRIDOR

EQ

EQ

B

EQ

EQ

F&

EQ

BOH

W.C.

BOH

EQ

6

5

4

3

8.20

14.30

20

19

18

17

EQ

RETAIL

7.04

RETAIL

EQ

DOWN

RETAIL

EQ

7.80

EQ

2

Property Line40 M

20

6.91

7.04

EQ

10

ATRIUM

SKY LIGHT ABOVE

6.36

EQ

F& B

16

15

14

13

12

11

EQ

7.80

EQ

5

+ 0.5M

13.50

EQ

OTB

7.80

EQ

0 F

50182

EQ

1

E

8.20

11.50

6.10

EQ

EQ

PLAZA

5.40

11.50

10

9

8

7

228.31 EQ

8.20

EQ

6.36

+ 0M

F

6

5

4

3

6.91

29

28

27 + 3M

G

DNDN

2

B F&

1

26

25

SEATING EQ EQ AREA

EQ

DNDN

EQ

DNDN

EQ

UP UP

EQ

SKY LIGHTE ABOVE

16.60

24

23

22

21

EQ

ATRIUM

SERVICE CORRIDOR

EQ

SERVICE CORRIDOR

EQ

UP UP

20

19

18

17

EQ

EQ

UP UP

EQ

WATER FEATURE

EQ

7.80

16

15 228.31

EQ

7.04

EQ

14

13

12

11

EQ

D

6.36

EQ

EQ

7.04

10

9

NAGA 3

TO LOWER LEVEL 1

EQ

EQ

13.50

8

7

EQ

50182

EQ

DNDN

EQ

UP UP

UP UP

ETAIL

6

5

4

3

8.20

14.30

2

6.91

NAGA 3

1

ATRIUM


NAGA 3 PLAZA In order to create a succesful public space in a hot-humid climate like Phnom Penh’s, it is imperative to consider air movement, shading, and evaporative cooling. By allowing air flows to run unobstructed through the ground level, and introducing canopies and water features in the design, this plaza properly addresses such considerations. In addition to the structurally expressive canopy, the architecture features a series of berms that transform into bleachers. These elements delineate a plaza where small public events can occur. At strategic locations, the plaza connects pedestrians with the underground retail concourse, and serves as a connector to the Naga Walk.

PLEATED LANDSCAPES

TO NAGA 3 DROP-OFF EVENT PLAZA

ABOVE GROUND RETAIL

10


NAGA'S FRONT DOOR PLAN OF PLAZA

LOWER LEVEL ENTRANCE

11


LOWER LEVEL 1

LOWER LEVEL 2

LOWER LEVEL 3 PARKING

12


EQ

EQ

EQ

5

10

20

EQ

EQ

22

23

EQ

23

26

25

24

EQ

EQ

EQ

24

25

27

EQ

26

28

EQ

29

EQ

27

7.60

8.20

32

29

EQ

4.57

EQ

E

8.20

35 36

4.57

EQ

EQ

EQ

8.20

F A G B H

11 RETAIL 12

10

9

RETAIL

5.56

BOH EQ EQ SERVICE CORRIDOR

EQ

F&B

16

15

17

228.31 RETAIL EQ EQ EQ SERVICE CORRIDOR SERVICE CORRIDOR

EQ

TO. NCW MATCHLINE

8.20 M&E

BOH M&E

BOH

EQ

W.C. BOH

EQ

EQ

7 1

104

93

82

126

11 5

7.60

EQ

EQ6.91

EQ 8.20

EQEQ

EQEQ

EQEQ

EQEQ

W.C.

RETAIL

6.36 7.04

EQEQ

40 M

EQEQ

EQEQ BOH

SERVICE CORRIDOR

EQ EQ RETAIL

8.20 EQ

EQ

SERVICE CORRIDOR M&E BOH SERVICE CORRIDOR RETAIL

EQEQ

EQEQ

RETAIL

EQEQ

EQEQ

RETAIL

BOH

VEST

ATRIUM

24

23

22

21

RETAIL

RETAIL EQ SERVICE EQ CORRIDOR EQ

EQ

0

ATRIUM

5 10 RETAIL SKY LIGHT ABOVE

26

25

EQ

RETAIL

7.60

2014

1913

20

EQ

EQEQ

EQEQ

EQEQ

EQEQ

W.C. M&E

EQ

EQEQ

5

10

EQEQ

RETAIL

EQ

2721

7.60

0

2923

EQEQ

EQEQ

EQEQ

W.C.

EQEQ BOH

8.20 EQ

EQ

M&E BOH

RETAIL

0

5

G

5

10

26

M&E

F

20

EQ

EQ

W.C.

F A G B H

A

40 M

40 M

DNDN

B

DNDN

8.20 8.20

5.40

UP UP

DNDN

7.62

7.62

7.62

EQ RETAIL RETAIL

7.62 7.62

7.62

EQEQ

1

DNDN

DNDN

B

228.31 F&B

SERVICE CORRIDO

EQ

7.62

ATRIUM

SERVICE CORRIDOR

B F&

RETAIL

7.62

F&B

BOH EQ

To NAGA 3 B4 EQ EQ LevelEQ

22

21

RE

RETAIL

EQ

14

13

12

11

EQ

BOH

EQ EQ SERVICE EQ CORRIDO ATRIUM

EQ

10

20

19

RETAIL 18

17

EQ

EQ

EQ

6

5

4 207 CARS

1610

159 8.20

148

G

EQEQ

M&E

EQ

5.15

EQ

BOH

J K

F

8.20

EQEQ

TO B1 RETAIL

WATER FEATURE

ATRIUM

OTB

G J

B

F&

F&B

VEST

K

6

+ 0.5M

B

F&

ATRIUM

F&B

7

H

10

RETAIL 9

8 RETAIL

12

11

F&B

50 % slope + 1M

F&B

15 % slope

14

13

BOH

PARKING ENTRANCE

EQ

RETAIL EQ EQ SERVICE CORRIDOR

EQ

EQ

EQ

EQ

EQ

RETAIL

EQ SERVICE

SERV

I RETAIL

K

EQ RETAIL

8.20 BOH 228.31

EQ

EQ

EQ

EQ

M&E

SERVICE CORRIDOR

18

17

W.C. EQ

VEST

A

RETAIL

SKY LIGHT ABOVE

16

15

14

20

19

22

21

EQ EQ SERVICE CORRIDOR RETAIL EQ

EQ

EQ

EQ

BOH

M&E

6

5

4

3

DNDN

J2

SERVICE CORRIDOR

EQ

R

SERV

TO

4.30

Level B

TO. NCW MATCHLINE

C 4.30

D

34

EQ

E

8.20

207 CARS

7.60

1 35 36

2

EQ

8.20

4.57

A

7.60

10

9

8

7

14

13

12

11

BOH EQ

EQ

EQ

1

M&E W.C.

M&E

6

5

4

3

EQ

2

EQ

5.56

SERVICE CORRIDOR

EQ

EQ

EQ

4

3

EQ

EQ

EQ

6

5

RETAIL

F A G

A

B H

2

6.91

7

EQ

8.20

EQ

EQ

EQ

G

M&E

8

BOH

EQ

VEST

EQ

10

9

EQ

EQ

EQ

RETAIL EQ

A

EQ

14

13

12

11

W.C. BOH

EQ

EQ

EQ

SERV

M&E

R

W.C. W.C.

BOH M&E BOH

SERVICE CORRIDOR RETAIL

ATRIUM RETAIL

A

E

VEST

RETAIL

I

RETAIL

W.C.

G

2

TO. NCW MATCHLINE

K BOH

6

5

4

3

6.91

8.20

EQ

M&E M&E

W.C.

EQ

EQ

SERV

SERVICE CORRIDOR

G J

H

1

R

BOH

SERVICE CORRIDOR

BOH

A

ATRIUM

SKY LIGHT ABOVE

RETAIL

H

F

H

EQ

8.20

6

5

4

3

BOH M&E

C D

6.91

ATRIUM RETAIL

1

BOH

40 M

22

EQ2115 EQEQ

RETAIL

VEST

G

8.20

EQEQ

SERVICE CORRIDOR

OTB

DNDN

DNDN

BOH

4.57

RETAIL

40 M

2014

EQ1913

EQEQ

W.C. OTB W.C.

OTB UP UP

RETAIL

RETAIL

BOH 6.91

EQ

W.C. BOH

7.60

ATRIUM

5.40

SERVICE CORRIDOR

EQ

1812

OTB

13

12

11

DROP OFF

PLAZA EQEQ

EQEQ

I

EQ

ATRIUM

10

1711 EQ

228.31 EQEQ

BOH

8.20 EQ

8.20

E

40 M

BOH

6 22 F&

F&B

2115

228.31

SERVICE CORRIDOR 8.20 8.20 5.40 10.60 SERVICE CORRIDOR

EQ

C

B

20

EQ

1

SERVICE

3

EQEQ

RETAIL

9

A

B H

5

14 50 %20 slope + 1M

15 % slope EQEQ EQEQ BOH

DNDN

7.80

E

29

BOH

21

EQ

SKY LIGHT ABOVE

9

8

2

10.60

4.30

SERVICE CORRIDOR

EQ

4.30

6.36 7.04

H

M&E

28

EQ

F&

SERVICE 10.60 CORRIDOR 8.20 8.20 5.40 10.60

16.60 11.50

SERVICE CORRIDOR

SERVICE CORRIDOR

5.15

4.30 4.30

A H B

50182

D

D

K

20

27

DNDN

UP UP

UP UP

SERVICE CORRIDOR

50182

7.04 7.80 7.80

50182

7.04

50182

6.36

8

7

7.80 J G

I

RETAIL

ATRIUM

7.80 7.04

6.366.36 7.04

50182

7.80 7.80

50182

7.80

EQ

W.C.

PROPERTY LINE

A G

10

G

B

C 0

EQ

A

1

6.91

A

EQ

H

D

10

DNDN

50182

6.36 7.80 7.04 7.80 7.80 7.04 6.36 7.80 7.80

H

I

E 25

24

5

BOH

BOH

40 M

2822

7.04 6.36 7.04 7.80 7.80 7.04

6.36 7.80 7.80

G

BOH M&E

RETAIL 20

5

RETAIL

M&E

6.36

8.20

BOH

16

15

TO. NCW MATCHLINE EQ

13 7 6.91

+ 11.25M

4

3

W.C. 6.91 8.20 BOH SERVICE CORRIDOR

7.80 7.04

29

B

20

A

2620

2519

2

PROPERTY LINE

PROPERTY LINE

W.C.

W.C. 2418

SERVICE CORRIDOR RETAIL

6.36

6.36

I

J

W.C. W.C.

ATRIUM D

TO. NCW MATCHLINE

EQ

33

C

28K

EQ

228.31 RETAIL EQ EQ EQ SERVICE CORRIDOR SERVICE CORRIDOR

PROPERTY LINE

PROPERTY LINE

SERVICE CORRIDOR

6.36

G J

M&E BOH EQ

A G

SERVICE CORRIDOR

7.04 7.80 7.80 7.04

6.36 6.36 7.04

27

DN

7.04

K

A H BOH BOH

7.80

10.60

8.20 8.20 10.605.40 8.20

EQ

BOH

8.20

B H

S1 VEST

MATCHLINE

50182

7.80

8.20 5.40 10.60 8.20 8.20

5.40

F

PROPERTYRETAIL LINE

R1

8.20

8.20 BOH

I

RETAIL

EQ

32

A

29

F

RETAIL

EQ BOH

8.20 10.60 8.20 8.20 8.20

8.20

5.40 10.60 8.20

EQ

ATRIUM

BOH

6

40 M

H

EBOH 26 25

40 M

29

28

27

BOH

EQ W.C.

TO. NCW

2317

2216

2115

5.40

13.50

SERVICE CORRIDOR

10.60

8.20 5.40

SERVICE CORRIDOR

10.605.40 8.20

8.20 10.60 SERVICE CORRIDOR

SERVICE CORRIDOR

4.57

0 5 10 0 5 A 10 20 ERETAIL 207 PARKNG CARS ARE SHOWN

RETAIL

EQ

8.20 SERVICE10.60 CORRIDOR 8.20

5.40 10.60

EQ

ATRIUM D

24

W.C.

228.31

SERVICE CORRIDOR

SERVICE CORRIDOR 8.20 8.20 10.60 5.40 SERVICE CORRIDOR 8.20

8.20

BOH

EQ

BOH

C

F&B

20

19

BOH

1812

1711

8.20 5.40

B EQ

PROPERTY LINE

BOH

W.C. W.C.

A

SERVICE CORRIDOR 1610

159

10.605.40

8.20 8.20

EQ

EQ

2923

2822

EQ

EQ

28

W.C. 35 36

34

F&B

7

H

K RETAIL

SERVICE CORRIDOR

EQ

VEST

2721

31

+ 0.5M1913

EQEQ

W.C.

SERVICE CORRIDOR

OTB

EQ

7.80

EQ

29

28

EQ

DNDN

EQEQ

5.40

7.80 7.04

7.80

6.36

7.80

EQ

11.50

6.367.80 7.80 7.80 7.04

13.50

SERVICE CORRIDOR

SERVICE CORRIDOR

SERVICE 10.60 CORRIDOR 8.20

5.40

EQ

7.60

EQA

27 33

40 M

RETAIL

EQ

207 CARS

EQEQ

6.36 6.36

6.10 5.40 6.10

7.80

50182

7.80 7.04

6.36 6.36 7.04 7.80 7.80

50182

7.80

6.36

7.04

7.04

6.366.36

7.80

50182

7.80

7.80

50182

7.04 7.80 7.04

6.36

6.36 7.04

50182

7.80

UP UP

7.80 7.04

6.36

6.36

7.04 7.80

50182

7.80

EQ

20

2620

27 30

4.57

H

EQ

H

32

7.80

6.36 7.04 7.80 7.80

50182

7.80 7.04 6.36

14.30

6.36 7.04 7.80 7.04 7.80 7.80 7.04

7.04

6.36 7.80

50182

7.80

7.80

7.80

50182

7.04

7.80

6.366.36 7.04

EQEQ RETAIL

RETAIL

ATRIUM

BOH

SERVICE CORRIDOR M&E M&E

13.50

7.80

10

2519

26

C

RETAIL 18

BOH EQ

To NAGA 3 B4 Level

148

137

7.04

6.36 7.04 7.80

6.36

7.80

50182

7.04 7.80

7.80 7.04

7.80

50182

6.36

7.80 7.04

13.50

EQ

RETAIL

RETAIL RETAIL

228.31 6.91

SERVICE CORRIDOR

7.80

EQEQ

EQ

EQ

2631

30

20

EQ

ATRIUM 5 0

2418

SKY LIGHT ABOVE

SERVICE CORRIDOR

MATCHLINE

50182

5.40

EQ

10

BOH

6

5

4

3

6.10

14.30

TO B1

VEST

14

13

RETAIL

EQW.C.

EQ BOH

EQ

5

8.20

PROPERTY LINE

BOH

29

207 PARKNG CARS ARE SHOWN

EQ

2317

SERVICE CORRIDOR

SKY LIGHT ABOVE

TO. NCW

2

SERVICE CORRIDOR

UP UP

DNDN

EQ

29

VEST

14

8.20 10.60 SERVICE CORRIDOR

F&B 8

EQEQ BOH

EQ

20

EQ

STREET LIGHT

I

W.C.

BOH

10

9

8

7

EQ

J

EQ

EQ

EQ

13 11

EQ

K

RETAIL

14

13

12

EQ

EQ

SERVICE CORRIDOR UP

M&E BOH

EQ

DOWN

W.C.

EQ BOH

5.40

6.36

ATRIUM

EQEQ

8.20 EQ

EQ

BOH

B

2216

25

EQ

G

F&

F&B

2115

F

24 28

EQ

BOH

EQ

SERVICE CORRIDOR RETAIL

UP

RETAIL

EQ

EQEQ

W.C.

Level B3: Parking (215 Spaces)

4.30

EQ

7.04

EQ

EQEQ

EQ

S2

ATRIUM

F&

UP

RETAIL

EQ

6.366.36

EQ CORRIDOR

DOWN

IDOR SERVICE

7.04

EQ

ICE CORR

4.30

EQ SERV

EQEQ

SERVICE CORRIDOR RETAIL RETAIL

EQ

RETAIL

EQ

EQ

ATRIUM

25 28

W.C.

27

228.31 F&B RETAIL EQEQ

SERVICE CORRIDOR

NAGA 3

EQ

2014

1913

1812

7.62

RETAIL

F&B

A

1

6.10

7.62

EQEQ

RETAIL

PROPERTY LINE EQ

DNDN

6.36

EQEQ

1711

EQEQ

S1 VEST

0

34

EQ

7.62

F& UP UP

EQEQ

B

EQ BOH

EQ

EQEQ

2923 27

2822

M&E EQEQ

EQ EQ SERVICE CORRIDOR

2426 R1

25

5.15

5.40

M&E

RETAIL

5.40

7.62

7.04

EQEQ RETAIL

RETAIL D

33

SERVICE A CORRIDOR EQ

EQEQ

EQ

CORRIDOR

1610

159

VEST

RETAIL SKY LIGHT ABOVE

RETAIL

EQ EQ SERVICE CORRIDOR

C

40 M

31

30

EQ

28

EQEQ

4.30

22

EQ

21

EQ 8.20

ATRIUM

SERVICE CORRIDOR

DNDN

8.20

B EQ

7

RETAIL W.C. EQ

EQ

26

EQ

41812

EQEQ

RETAIL

8.20

10.60 8.20

SERVICE CORRIDOR 8.20 8.20 5.40 10.60 SERVICE CORRIDOR

7.80 7.80

50182

7.80 7.04

EQ

6

5

4

3

8.20 BOH M&E

EQ

2721

EQ

1711

RETAIL EQEQ

7.62

BOH M&E

+ 11.25M

SEN PAR

SERVICE CORRIDOR

SERVICE CORRIDOR

SERVICE CORRIDOR

7.80 7.80 7.04

EQ

J2 K BOH 6.91

EQEQ

24

RETAIL

EQ

2620 25 BOH

EQ

23 23

EQ

EQ

40 M

5.56

G

19 50 % slope 286.42 + 1M

EQ

7.62

EQEQ

8.20

EQ

EQEQ

F

J K

20

3 1610

F&

F&B

159

VEST

RETAIL RETAIL

6

5.40 10.60

EQ

ATRIUM

RETAIL

I

EQ

20 10 A

5

7.60

RETAIL

A 2 & HUN

M&E

35 36

34

EQEQ

8.20

EQ

H

EQ

EQEQ

24 2519

0

33

B

8.20

EQ

1

G

6.36

SERVICE/STORAGE

EQ B

F&

R SERVICE F&B

148

7.62

K

EQ

EQ

10

126

11 5

EQEQ

5.40

EQ

RRIDO

M&E W.C. W.C. BOH SERVICE CORRIDOR

7.80

21

20

20

50182

7.80

UP UP

EQ

MATCHLINE

7.80

19

EQ

ICE CO

137

7.80

19

EQ ATRIUM

SERV

126

11 5

BOH M&E

4.30

EQ

50182

18

EQ

ATRIUM

104

93

VEST

A H

To NAGA 233& Hun Sen35Park 36 31 32 34 7.04

EQ

4.30

EQ

4.30

7.60

30 BOH

TO. NCW

EQ

286.42 EQ

29

W.C.

17 BOH

18

M&E 8.20

EQ

BOH

6.36

EQ W.C.

27 BOH 28

26

EQ

EQ

40 M

32

18

EQ

B

EQ

25

EQ

D

5

31

EQ

EQEQ

DOWN

PROPERTY LINE

EQ

EQ

30

EQ

EQEQ

F&

F

29

28

27

A

E

PUBLIC CIRCULATION 24

EQ

RETAIL

G J

22

B

EQ

23

EQ6.91

RETAIL

23

EQEQ

EQ

2221

286.42

EQ

DOWN

22

D

40 M

A

40 M

EQ

20

2418

2317

EQ

EQI

E

DNDN

UP UP

20

20

EQ

EQEQ

EQ

19

F&

&B

RETAIL

EQ

EQEQ

EQ

DNDN

16

EQ

To NAGA EQ 3 B4 Level EQ

EQ

W.C. W.C.

BOH

EQEQ

21 18

SERVICE CORRIDOR

17

DOWN

17

EQ

DNDN

15

EQ

B

EQ

21

0

BOH 207 CARS

EQ

BOH

DOWN

EQ

EQ

EQ

228.31

EQEQ

EQ

2016

0 A

29

EQ

UP UP

10

10

EQ

8.20 M&E

UP

EQ

EQ

RETAIL

RETAIL

B

EQ

EQ

F&

5

RETAIL

EQ

20 286.42

EQ

EQ

I SEN PARK

15

RETAIL

RETAIL

EQEQ

EQ 14

EQ

UP

5

RETAIL

G

BOH M&E

H

2 & HUN

EQEQ

19 13

RETAIL

EQ

DOWN

BOH

6.91

A

B H C

EQEQ

EQ

7.62

12

228.31 F&B

RETAIL G

TO NAGA

RETAIL

EQ

1811

UP UP

0

RETAIL 24 26 25

23

22

21

EQ

19

EQEQ

7.60

EQ

10

222216

2115

21

0

82

7 1

F&

BOH

EQ

18

EQ A

6

5

UP UP

UP UP

DNDN

20

19

EQ

EQ

ATRIUM

4

3

EQEQ

SERVICE CORRIDOR

9

286.42

2014

EQ

UP

UP

ATRIUM

8.20

M&E BOH

S1 VEST

SKY LIGHT ABOVE

0

EQ

EQ RETAIL

2

8

EQ

286.42

DOWN

DOWN

UP

18

SERVICE CORRIDOR

EQ BOH

7.04

EQ

R1

6.366.36

EQ

W.C. W.C.

ATRIUM

SERVICE CORRIDOR

EQ

1

F

SERVICE CORRIDOR

EQ

BOH

Mezzanine 15 16Level17

EQ

A

EQ

EQEQ

EQ

17

7

EQ

20

28

TO

22

2115

EQ

B F&

EQ

Key: W.C.

4

EQ

E

EQ

228.31

EQ

166

W.C.

228.31

1913 20

1812

10

27

26

DOWN

EQ

RETAILRETAIL

SERVICE CORRIDOR

DOWN

EQ

D

EQEQ

EQ 5

4

19

EQ

EQ

7.04

8.20

11.25

207 CARS EQEQ

EQEQ

M&E

1711

25

24

DNDN

EQ

SERVICE CORRIDOR RETAIL

17

EQ

29

28

27

EQ 8.20

15

M&E 3

2

EQ

5

7.60

23

EQ

50182

4.57

EQ6.91

EQSERVICE CORRIDOR EQ

MATCHLINE

22

21

EQ

6.36

EQ

14 1

EQ

B

EQ BOH

RETAIL

BOH

PROPERTY LINE

RETAIL

EQ

8.20

EQ

EQ

EQ

20

F&

EQ

W.C.

UP DOWN

EQ

19

C

EQ

ATRIUM

EQ

1

W.C.

M&E

E

H

6.366.36

B EQ

EQ

13

EQ

W.C.

1610 18

17 159

148

EQ

DNDN

S2

EQ

W.C.

RETAIL

26

25

16

EQ

B

EQ

EQ

4.30

EQ

ATRIUM

24

EQ

F&

VEST

NE LEVEL

4

EQ

UP

DNDN

EQ

BOH

23

22

21

W.C. BOH

EQ

18

17

S2

EQ

TO. NCW MATCHLINE

104

EQEQ

1

F

EQ

7.04

EQ

A SERVICE CORRIDOR

20

19

137

15126

11 5

16

VEST

EQ

J G

K

H

7.80

EQ

EQ

7.60

EQ

12

M&E M&E

EQ

EQ

15 % slope

EQEQ

UP UP

EQ

IDOR

EQ

UP UP

EQ

ICE CORR

RETAIL

14

EQ

EQ

MATCHLINE

EQ

8.20

M&E M&E

M&E

50182

EQ

BOH 8.20

6.91 BOH

EQ

UP UP

EQ

8.20 SERV

M&E 18

17

EQ

EQ

TO. NCW

EQ 8.20

To NAGA 233G& Hun Sen35Park 36 31 32 34

30 BOH

W.C.

4.57

H

7.80

EQ

29

BOH M&E

EQ

7.60

15

8.20

50182

EQ

11

C

6.91

104

93 13

82

14

B

EQ

7.80

EQ

8.20

13

12

EQ

EQ

7.04

EQ

BOH

EQ

EQ

6.91

A34 RETAIL35 BOH 36 G 29

33

EQ

A

EQ

8.20

6.36

EQ

12

7.62

11

32

27 BOH 28

M&E

EQ

TO B1 RETAIL EQ

7.04

EQ

7 1

11.25

18 10

26 BOH

EQ

7.80

RETAIL EQ

EQ

207 CARS

17 9

16 8

31

30

W.C.

EQ

7.80

EQ

11

EQ

F

8.20 RETAIL

29

25 BOH

BOH

EQ

16 OTB 17

15

14

+ 0.5M

228.31 F&B

13

EQ

5

D

E5

7.80

EQ

6

10 5

4

EQ BOH

28

24

2

148

EQEQ

+ 11.25M

EQ6.91

D

4

7.04

EQ

10

35 36

EQ

EQ

26RETAIL 27

EQ

TO. NCW

286.42

2014

Level B

EQEQ

WATER FEATURE

M&E

RETAIL

4

SERVICE CORRIDOR DN M&E

H

PROPERTY LINE 3

I

6.366.36

EQ

EQ

34

EQ

EQ

25

EQ

G

H

7.04

EQ

7.04

EQ

9

23

2

13OTB

EQ

VEST

137

11 RETAIL 12

7.80

A

EQ

933

286.42 EQ

3

EQ

24

1 M&E 8.20

EQ

7.80

32

EQ

22

40 M

RETAIL

E4.57

EQ

21

SERVICE CORRIDOR

SKY LIGHT ABOVE

BOH EQ EQ SERVICE CORRIDOR

3

93

82

7 1

EQ

B

7.80

31

EQ

EQ RETAIL

23

22 RETAIL

SERVICE CORRIDOR EQ EQ EQ

20

35 36

RETAIL

12

EQ

OTB

SERVICE CORRIDOR

EQW.C.

6.91

A

40 M

7.04

EQ

30 BOH

EQ

21

21 EQ

10

ATRIUM D

8.20

EQ

EQEQ

UP

8

29

EQ

5

EQ

11

EQ

EQEQ

MATCHLINE

6.36

8.20

RETAIL

BOH

EQ BOH

20 286.42

0

34

A

EQ W.C.

EQ

20

228.31

M&E

2

A

6.36

EQ

8.20

7

27 W.C.28

EQ

286.42

0

15 7

14 6

PROPERTY LINE

EQ

11.25 26

EQ

19

20

EQ

33

EQ

PROPERTY LINE

1913

1812

+ 3M PLAZA EQEQ + 2M

+ 1M OTB

PARKING ENTRANCE SERVICE CORRIDOR

PROPERTY LINE

7.04

EQ

6

25

82

13 5

32

EQ

8.20

EQ

24

4.57

12 4

31

29

8.20

EQ

523

22

1

7

6

8.20

11 3

10 2

EQ

EQ

10.60 5.40

EQ

21

EQ

19BOH

UP

4

9 1

VEST

30

EQ

28

8.20

EQ

20

5

EQ

EQ

18

17

16

18

EQ

7.60

8

29

EQ

27

EQ

F6 A G

C

C

8.20

EQ

19

4

7

28

RETAIL SKY LIGHT ABOVE RETAIL EQ

26

5.40

EQ

318

SERVICE CORRIDOR

17

EQ

6

EQ

40 M

29

DROP OFF

EQ

EQEQ

PARKING ENTRANCE ATRIUM

6.91

10

9

EQ BOH

1

TO NAG

A

BOH

28

1711

EQ

WATER FEATURE

EQEQ

RETAIL SKY LIGHT ABOVE

8

EQ BOH

EQ

F

W.C.

8.20 BOH

I

J K

SERVICE CORRIDOR

EQ

5.56

16

29

5

4

UP

2

EQ

3

27

EQ

25

H

A

10.60

EQ

15

3

EQ

TO. NCW MATCHLINE

ATRIUM

26

EQ

7.80

EQ

4

EQ

RETAIL EQ

EQ

15

18

EQ

EQ

24

EQ

DOWN

29

28 EQ

27 2

EQ

EQ

EQ

23

C

29

K

BOH

EQ

BOH

27

G

28J

EQEQ RETAIL

ATRIUM

B H

D

ATRIUM

G

8.20

26

EQ

EQ

22

EQ

W.C.

40 M

40 M

DN

8.20

EQ

EQ

14

RETAIL

SERVICE CORRIDOR EQ EQ EQ EQ SERVICE CORRIDOR

EQ

EQ

EQ

26

20

RETAIL

I

8.20 10.605.40 SERVICE CORRIDOR

1

EQ

13

12

EQ

EQ

21

25

F&B

F&B

EQ

11

EQ

17

16

25

24

SKY LIGHT ABOVE

EQ

20

A

E

H

20

EQ

C

8.20

25

EQ

EQ

10

15

23

10

BOH

RETAIL

5.40

24EQ

9

BOH SERVICE CORRIDOR EQ EQ

14

22

21

20

20

EQ

RETAIL

ATRIUM

19 286.42

EQ

19

5 10

EQ

A B

10

1

126

11 5

EQEQ

TO. NCW

B

EQ

W.C. BOH

K

G

SERVICE CORRIDOR

EQ

18

EQ

18

24

0

5

7.04

23

17

EQ

EQ

0

EQ

H

5

RETAIL

6.36

EQ

EQ

16

EQ

17

EQ

40 M

BOH

6.36

EQ

EQ

13

8.20 EQ

SERVICE CORRIDOR

BOH

20

W.C.

0

23

22

MATCHLINE

5.56

2

8

EQ

12

G

M&E EQEQ

EQEQ

10

7.04

A

35 36

34

33

32

EQ

TO. NCW

7

W.C. EQ BOH

EQ

11

Level B2: Retail Concourse

J K

40 M

31

30

6

5

BOH

EQ

16

5

26 2027 25 HRETAIL 8.20 4.57

EQ

7.80

20

29

EQ

VEST EQ

EQEQ W.C.

0

7.80

10

28

27

26

RETAIL

4

EQ

10

15

14

EQ

15

228.31

EQEQ

EQ

50182

22

21EQ

EQ

25

RETAIL EQ RETAIL

EQ

EQ

EQEQ

SERVICE CORRIDOR

34+ 11.25M35 36

33

F 24 10

PROPERTY LINE

UP UP

286.42

24

EQEQ

RETAIL

7.62

20

23

EQ

14

EQ

To 314Mezzanine 15 12 NAGA 16Level17 13

3

8.20

9

BOH

ATRIUM

13

12

11

EQ

13

7.62

EQ

22

EQ

EQ

10

EQ

DNDN

EQ

21

20

EQ

EQ

9

EQ

12

EQ

EQ

7.80

MATCHLINE

5

11.60

19

18EQ

EQ

19

11.60

17

18

17

6.36

EQ

16

4.30

15

EQ

2

11 8

BOH

EQEQ EQEQ SERVICE CORRIDOR

21

SKY LIGHT ABOVE

EQ

EQ

7.04

7.62

0

1

4

EQ

7

ATRIUM

8

EQ

32

29235

EQ

A

F

6.366.36

EQ

BOH EQ

RETAIL 1

10

7

6

EQ

EQ

RETAIL

20

31

30

0 2822

2721

EQ

EQ

+ 11.25M

4.57

G

7.04

EQ

EQ

11.25 SERVICE CORRIDOR

6

RETAIL

EQ

ATRIUM 28 29

DROP OFF

EQ

8.20

7.80

EQ

W.C.

5

4

EQ

8

27

BOH 2620

2519 EQ

E

BOH

E

RETAIL

7.80

7.04

EQ

40 M

5.40

4.30

MATCHLINE

-14.7 M

EQ

8.20 20

10

5

EQ

9 BOH

3 I

5

4

228.31 SKY LIGHT ABOVE RETAIL 10 11 9 EQ EQ SERVICE CORRIDOR

8.20

7

BOH

EQ

BOH

228.31

SERVICE CORRIDOR

19

18

2418 EQ

11.25M 26

25

24

EQ

A

M&E

35 36

34

EQ

D

50182

UP UP

7.80 6.36

14.30

5.15 11.25 0

TO. NCW

EQ

G J

8

K

BOH

H

2

11.25

EQ

EQ

PLAZA

I

BOH M&E

EQEQ

Level B3: Parking (215 Spaces) E

5 A

4

H3

DN J

D

33

EQ S1 VEST

EQ

40 M

104

93

RETAIL

PROPERTY LINE PROPERTY LINE

8.20

OTB

C

A 32

R1

K

5.56

EQ

228.31 EQEQ

+ 10.75M

NAGA 3

7

D

EQ

19

OTB

EQ 8.20

4.57

EQ

18

17

16

UP

-11.5 M

8.20

M&E

M&E

H

6

5

EQEQ

23

2317

RETAIL

S1 VEST

W.C.

2

1610

EQ

153M +

DOWN

5G

EQ

EQEQ

RETAIL

B H

31

+ 0.5M EQ

EQ

OTB

A

J G

6

5

I

6.91

M&E BOH

8.20

EQ EQ SERVICE CORRIDOR

H

8.20

8.201

C

EQ

RETAIL

EQ

UP

4

4

EQEQ

SERVICE CORRIDOR

DOWN

Level B1: Retail Concourse

1

UP

-6 M

6.91

7

3 M&E

RETAIL

I

EQEQ

EQ

22

2216

2115

EQ

RETAIL

16 NAGA 3 17

15

NAGAATRIUM 31 PLAZA 3 2 CONCEPT DESIGN

G

H

BOH3 EQ

2

6

2 W.C.

TO. NCW

LOWER LEVEL 2 - RETAIL LOWER LEVEL 3 - PARKING

F

1

UP

1

EQ

F&B

DOWN

RETAIL

EQ

A 005

M&E

RETAIL

0M

LOWER LEVEL 1 - RETAIL

A

E

EQEQ

EQ

EQ

UP UP

VEST

WATER FEATURE

D A

EQ

+21 11.25M

20

BOH DROP OFF

11.25M

30

29

EQ

5 10 20 OTB RETAIL 207 PARKNG CARS ARE SHOWN

M&E

+ 11.25M

BOH

W.C.

+ 0.5M

VEST

TO B1 RETAIL

EQ

0

R1

4.57

A EQ B

A W.C.G

EQ

M&E W.C. W.C. BOH SERVICE CORRIDOR

B

14

159

148

J

10

+OTB 11.25M

EQ

SERVICE CORRIDOR

+ 2M

K

9

EQ

EQ

PLAZA

+ 1M

RETAIL EQ

ATRIUM

RE

14

B F&

+ 3M

BOH

F

EQ

+ 0M

19

286.42 2014

1913

EQ

B

+ 2M 50 % slope

M&E

EQ

40 % slope

18

15 % slope

1812

EQ

8.20

F

M&E BOH

27 FEATURE 28 26 M WATER -2.5

EQ

ATRIUM

W.C.

SKY LIGHT ABOVE

BOH

OTB

25

24

EQ

E

EQ

8

+ 1M EQ

35 36

RETAIL

W.C. EQ

EQ

13

12

EQEQ

To NAGA 3 B4 Level

DN

EQ6.91

34

EQ

29G

EQ

BOH

+ 0M

EQ

EQ

RETAIL

SERVICE CORRIDO

RETAIL 13

12

11

W.C.

SERVICE CORRIDOR

BOH M&E

33

4

3

8.20 BOH

A

EXIT FROM PARKING

EQ

7.80

5.40 6.10 5.40

TO LOWER LEVEL 1

D

E

+ 2M

+ 0M

M&E GROUND LEVEL

RETAIL RETAIL

+ 2M

25 % slope

50 % slope

25 % slope

RETAIL EQEQ EQEQ

EQEQ

RETAIL

14

13

11 RETAIL 12

10

EQEQ

17

16

1711

CORRIDOR EQ EQ SERVICEEQ

EQ

228.31

EQ

EQ

11

UP UP

+ 0M

EQ EQ SERVICE CORRIDOR

40 % slope

C

9

EQEQ

W.C.

15

14

EQ

11.25M

PLAZA

EQ

PROPERTY LINE

W.C.

OTB

50 % slope + 1M

EQ

29 EQ 8.20

OTB

23

EQ

DNDN

slo

+ 1.5M

EQEQ

M&E M&E

EQ

F&

%

EQ6.91 EQ 8.20 SERVICE CORRIDOR

EQ

DNDN

&B

40 M

ATRIUM

RETAIL

SKY LIGHT ABOVE

W.C. EQ pe

50

EQ

UP DOW EQ N

EQ

1610

159

148

137

EQ

STREET LIGHT ENTRANCE PARKING

B F&

8.20 BOH

EQ

11.25M 12 13 11 10 SERVICE CORRIDOR F&B

9

15 % slope

126

EQ

UP UP

7Property Line8

EQ

22

EQ

28

EQ

UP

20

8

+ 11.25M

11 5

RETAIL

EQ

OTB

TO B1

+ 0.5M

UP

10

EQ

W.C.

UP UP

DNDN

+ 0M

SEATING AREA

6

DOWN

OTB

PLAZA

STREET LIGHT

5

AREA

+ 0.5M

+ 0M

BOH 6.91

0

EQ

M&E M&E

B

+ 3M

SEATING

5

4

3

W.C. 8.20

6.91 BOH

B

F

EQ

EQ

RETAIL

DNDN

E

7

104

93

EQ

8.20

6

5

4

82

1

F&

UP

2

BOH

A

BOH

7 10.75M

11.25

PARKING ENTRANCE

8.20 D

BOH

6

5

RETAIL

EQ

7.60

H

MATCHLINE EQ

10

EQ

EQ F&B

DROP OFF

+ 11.25M

EQ

C

J2 K

29

7.04

EQ

8.20

W.C.

11.25M

SERVICE/STORAGE

EQ

EQ

27 EQ

11.25M

6.36

EQ

EQ

PUBLIC CIRCULATION 1 3 2 4

3

EQ

EQ

26

6.36

EQ EQ

2

21

286.42 EQ

OTB

EQ

25 EQ

15 % slope + 1M

EQ EQ + EQ 0.5M SERVICE CORRIDOR 50 % slope

SERVICE CORRIDOR RETAIL RETAIL OTB

18 WATER 19FEATURE 20

17

S2

EQ

24

UPEQ

EQ

40 M

7.04

EQ EQ

EQ

1

4.57

50 % slope + 1M

EQ

7

6

EQ

+ 11.25M

82 4.57

7 1 8.20

EQ

H

I

EQ

PROPERTY LINE

7.80

EQ

8.20

6.36

EQ

SERVICE CORRIDOR

7.80

EQ

EQ

RETAIL

7.80

EQEQ

EQ

SERVICE CORRIDOR

EQ

EQ

6.10

EQ

EQ

H

16

VEST

EQ

8.25M

B

F&

F&B

EQ

3M

A EQ EQ EXIT FROM PARKING 10.75M

EQ

23 EQ

RETAIL + 11.25M RETAIL

EQ

28 35 36

34

K

EQEQ

14

EQ

BOH

10

9

8

RETAIL

A

RETAIL

H

M&E

EQ

4.57

27

D

33

EQ 6

W.C.

RETAIL

EQ

35 36

A

ATRIUM

K

28

27

RETAIL

8.20 EQ

C

40 M

32

EQ

32

BOH 6.91

EQ EQ

EQ

26 31

30

RETAIL SERVICE CORRIDOR SERVICE CORRIDOR

7

BOH TO. NCW

-11.5M + 11.25M

EQ

BOH

DOWN

EQEQ

EQ

EQ

SKY LIGHT ABOVE

PROPERTY LINE

EQ

VEST RETAIL

DOWN

EQ

EQ

NAGA 3 EQ

DNDN

7.80

EQ

UP UP

7.80

EQ

+ 0.5M

ATRIUM

OTB

RETAIL TO B1 RETAIL

13WATER FEATURE 15 14 0.25M

ATRIUM EQ

EQ EQ 8.20

20

5

4

EQ

8.20

34

W.C. W.C.

BOH

31

G J

50182

EQ

136.60

EQ

EQ

50182

7.80

EQ 18

DN

DNDN

EQ 17

29

28

27

EQ 16

RETAIL

DNDN

EQ 15

-2.5 M

12

W.C. EQ

7.62

26

25

EQ 14

11

10

EQ

B

EQ 13

9

EQ

EQ

22

CORRIDOR

OTB

8

EQ

EQ

EQ EQEQ

25 29

EQ

EQEQ

ATRIUM

SKY LIGHT ABOVE

13

12

11

EQ RETAIL

B

24

23 EQ 12

11

35 36

EQ

21EQ

EQEQEQ

EQ

10

28

EQ

EQ

EQEQ

RETAIL

F&

EQ

EQ

OTB

5

27

G J 6

137

12OTB 6

11 5

EQ

EQEQ

10

EQ

DNDN

EQ 10

EQ

EQ EQEQ

24

0

M&E 40 M

BOH M&E

EQ

1

To NAGA 233& Hun Sen35Park 36 31 32 34

30 BOH

M&E 3

2

11.25

F 5

4EQ

EQ

DOWN

ATRIUM

22

21

EQ

EQEQ EQ

26

25

A 20

26

25

+ 0.5M EQEQ

A

EQ

I

G

B EQEQEQ

24

EQ

1

PROPERTY LINE

8.20

G

H

4.57

10

EQ 3

104

EQ + 11.25M EQ

EQ 8.20

EQ

EQEQ

ATRIUM

9

VEST

EQ F&B

B

286.42

EQDROP OFF EQ 8 9

7

EQ

EQ

EQ + 0.5M

OTB

29

5

A 24 H

2923

2822

2721

BOH

27 BOH 28

26

23 23

EQ 8.20 ATRIUM

2620

EQ

0

8.20

F

M&E

EQ W.C.

2519

8.20

F C G D

K DN

EQ6.91

SERVICE CORRIDOR DN M&E

E 33 ATRIUM

32

J

EQ

8.20

EQ

93

82

7 1

11.25

EQ

9

EQ

SERVICE CORRIDO

SKY LIGHT ABOVE

8

7

I

EQ

EQ + 11.25M

8

7

22

2115

DROP OFF

EQ

EQEQ

RETAIL

6

+ 1M

6

EQ

EQEQ

ATRIUM

F&

20

19 EQ

EQ

8.20

EQ

EQ 20 BOH

19

25

TO. NCW EQ EQEQ EQ MATCHLINE

EQ EQ EQ

22

UP

EQDOWN

IDOR SERVICE

3M OTB 0.25M

OTB

NAGA 3 MEZZANINE LEVEL + 11.25M 3 TO 5 7 4 6 WATER FEATURE

2

A 11.25

40 M

29

28

EQ

EQ

E

20

27

EQ

2418

24

22 21

15 % slope

EQ50 % slopeEQ

ICE CORR

DNDN

6

G34

33

ATRIUM

EQEQEQ

EQ

20

SERV

DOWN

EQ

32

RETAIL

1

-2.5 M

+ 0.5M RETAIL

B

RETAIL

5

31

30

29

28

11.25M

A

DOWN

EQ

A

F

F

8.20

4.57

EQ 18

PLAZA EQ

EQ 8.25M

OTB

10

A

PROPERTY LINE

EQ

2317

23

228.31

EQEQEQ

19 286.42

DROP OFF 7.60 EQ

EQ

S2 17

W.C.

DOW RETAIL N

22

21 18

17

11.25M

EQ BOH

UP

EQ EQ EQ

20

EQ

EQ16

W.C.

EQ

5

26

25

EQ

2216

F&

6.10

EQ

27

UP UP

18

17 4

Key: OTB

35 36

8.20

SERVICE CORRIDOR

EQ

26 11.25M

E

EQ VEST

EQ

15

228.31

OTB

4.30

EQ

25

7.04

EQ

24

6.36

EQ

23

50182

EQ

22

21

EQ

EQ

F&

OTBEQ

EQ

20

4.30

7.04

6.10 5.40

EQ

11.25M

PLAZA 19

18

RETAIL 34

7.04

OTB EQ

EQ

17

33

EQ

5.40

DNDN

EQ

16

A 32 EQ

14 EQ

EQ

21

20 286.42

EQ EQEQ

EQ

16

EQ

2115

40 M

40 M

EQ

DEQ

EQ

6

E B

5 + 0.5M

4

286.42 2014

1913

EQ

EQEQ

DNDN

EQ

15

31

+ 0.5M EQ

EQ

EQ

13

19

DOWN

EQEQEQ

15

14

10.00M 207 CARS EQ

EQ

EQ

EQ

EQ

EQEQ

RETAIL

UP UP

EQ

4

11.25M

30

29

EQ18 E 40 M

7.60

EQ

12 EQ

EQ

20

20 RETAIL

EQ

EQ

G

H

G

30 BOH

35 36

D5 A EQ

UP UP

EQ17

20

EQ

11 OFF DROP RETAIL 11.25M

10

EQ

29

34

A

I

EQ

8.20

EQ

EQ

+21 11.25M

20

228.31 EQEQ

I 3

2

15 % slope

1812

1711 EQ

19

228.31 EQEQ

UP

28

EQ16

10

EQ

EQ

18 UP

EQEQ EQ

19

13

12

5 10

EQ

EQ

UP UP

EQ15

5

+ 0.5M

D

27

26 M -2.5

EQ14 0

10 EQ

0

5

EQ

RETAIL

EQ

2014

UP UP

EQ13

EQ

EQ

0

EQ

BOH

SEN PARK

6.91

40 M

W.C.

K

RETAIL

292

6.91

EQ

2 & HUN

31

5

4

3

MATCHLINE

1

H + 11.25M

1EQ

BOH SERVICE CORRIDOR

W.C.

2

UP

25

24

EQ12

EQ

9

EQ

SERVICE CORRIDOR PLAZA RETAIL RETAIL OTB

EQ

UP

23

EQ 11

UP UP

EQ10 136.60

228.31 F&B

EQ

8EQ

ATRIUM

24

23

22

EQ

1913

DNDN

22

D

EQ 9

UP UP

EQ 8

RETAIL

EQ

W.C. BOH

BOH

SERVICE CORRIDOR

+ 0.5M

21

286.42 EQ 7

BOH M&E

8.20

7

EQ EQEQ

18 RETAIL

+ 11.25M

EQ

SERVICE CORRIDOR DN

M&E

C

F

18 WATER 19FEATURE 20

EQ 6

EQ

EQ EQEQ EQ

11

10

RETAIL EQ

EQ

21

BOH

EQ

1812

RRIDO

EQEQ EQ

17 9

11.25M

EQ

EQ

1711

EQ

7.80

EQ EQEQ

EQ

8

EQ

RETAIL EQ

1610

RVNAGA To 314Mezzanine ICE 13 15 12 16Level17 CO

11

20

19

18

17

EQ

159

148

228.31R

EQEQ

EQ

7

6

EQ

EQ

DOWN

OTB

17

16

EQ 5

11.25

6 EQ

EQ 5

M&E + 1M

A

BOH

EQ

PLAZA

18

RETAIL

EQ

RETAIL

Level B2: Retail Concourse H

EQ

J G

EQ

TO. NCW

A

4

3

I

DN

EQ

17

16

OTB

SERVICE CORRIDOR

C

H

+ 0.5M 8.20 M&E

28

27

C

RETAIL

7.04

10

SKY LIGHT ABOVE

EQ

UP

E

S1 VEST

4

EQ

8.20

2+ 11.25M

6.91

30

1

G

PROPERTY LINE

+ 0.5M

29

EQ

B

40G M

+ 11.25M

2731 W.C. 32 28 33

30

BOH

K

1

RETAIL

SERVICE CORRIDOR

PROPERTY LINE

8.20

J

20

F

RETAIL

I

EQ

A4.57 -11.5M

8.20

6.366.36

EQ EQ EQ

9

DNDN

BOH

15

EQ 4

2 EQ 3 RETAIL 6.91

26

7.04

B

EQ EQ 8.20

5

4

EQ

0

16

15

228.31 RETAIL EQ EQ SERVICE CORRIDOR

137 SE

DOWN

W.C. W.C.

R1

W.C.

5.56

EQ 1

EQ A B

OTB

4

EQ

A

EQ

D

4.30

EQ

8.20

5.15

EQ

4.30

18

EQ

EQ

EQ

10

28

27

SERVICE CORRIDOR

EQ6.91EQ

EQ

3

2

4.30

17

16

EQ

EQ

EQ

5

SERVICE CORRIDOR

8

7

6

EQ

29

5

4

3

8.20

RETAIL

W.C.

BOH

28

20

EXIT FROM PARKING D OTB EQ

SERVICE CORRIDOR

EQ 8.20

MATCHLINE

K

BOH

+ 1M

35 36

34

TO NAGA

SERVICE CORRIDOR

5

4

EQ

DNDN

3

TO. NCW EQ 11.25

EQ

DNDN

FROM PARKING 15 14 10.75M

EQ

UP

SERVICE CORRIDOR

EQ

SERVICE CORRIDOR

EQ

6.36

EQ

SERVICE 10.60 CORRIDOR 8.20

EQ

11.25M EQ

EQ

F&B

14

EQ

126

11 5

UP

BOH M&E

RRIDOR

13 EXIT

12

11

EQ

136.60

RETAIL

+ 0.5M

M&E

8.20

10

9

EQ

50 % slope

5.40 10.60

8

8.20

EQ

TO B1

33

11.25M EQ

2629

28

BOH

BOH

EQ

UP UP

2

5.15

1

1

8.20

IDOR

7

EQ 15 % slope

EQ

EQ

13

EQ

104

Level B1: Retail Concourse F& F&B 16 15 14 13

EQ

8.20

12

11

EQ + 11.25M

B

PROPERTY 10 LINE

5

32 + 0.5M

EQ

25 27

S1 VEST

26

UP UP

EQ

BOH EQ

EQ

93

82

EQ

UP

EQ

28 11 RETAIL 1229

10

ATRIUM EQ

EQ

7 1

26

EQ

24

UP UP

10

9

8

E

27

9

EQ

6

EQ

4.30

6.91

D8.20

0

PROPERTY LINE

4.30

EQ

7

8.20

29

EQ

25

R1

24 25

W.C.

23

286.42

286.42

CORRIDOR EQ EQ SERVICEEQ

EQ

4.30

18 EQ

EQ

28 EQ

27EQ

25

EQ

23

22

UP UP

EQ 17

16

6

EQ

EQ

5

8.20

ICE CORR

S2 6

W.C.

EQ

22

21

20

B

EQ

15

EQ

SERV

VEST 5

EQ

EQ

21

F&

EQ

PROPERTY LINE

L

EQ

DOWN

EQ

F

6.91

5.40 6.10

EQ

19

4.30

EQ

6.10

14

5

EQ

27

M&E

A

EQ

40 M

UP

26

2

6.91

G J

H

W.C. EQ

8.20 EQ

31

30

WATER FEATURE

4.30

EQ 13

12

EQ

5.40

EQ

EQ

DNDN

EQ

ATRIUM

EQ

EQ

2018

17

4.30

DNDN

4

1916

RETAIL

15

4.30

EQ

11

4

136.60

EQ

EQ

EQ

UP

DOWN

1814

13

UP UP

26 8 RETAIL

RETAIL

EQ EQ SERVICE CORRIDOR

4.30

EQ

10

3

EQ

24

23

UP UP

25 7

6

6.10 5.40

M&E

3

4.57

PROPERTY 24 LINE 25 H

1

DOWN

W.C. EQ

2

A 005

ATRIUM

8.20

UP

EQ 9

8

EQ

EQ

SERVICE CORRIDOR

17 12

11

4.30

524

234

3

8.20 BOH

M&E

EQ

EQ

B

EQ

EQ

16 10

9

DOWN

EQ

7

1

OTB 26

24

4.30

22

2

BOH 6.91

29

22

21

B

211

20

F

EQ

-2.5 M 11.25M MATCHLINE

23

F&

19

E

20

22

4.30

18

D

28

I

NAGA 3A RETAIL SKY LIGHT ABOVE

EQ

DOWN

17

27

F&

EQ

6

2

EQ

EQ

15

8

7

8.20

16

25

EQ

29

4.30

EQ

26

25

TO. NCW

24EQ

EQ

4.30

EQ

15

UP

EQ 5

RETAIL

EQ

SKY EQ LIGHT ABOVE

EQ

21

20

DNDN

EQ

24

EQEQ + 1M

20

28

27

26

EXIT FROM 10.75M PARKING

23

-+8.75m 11.25M

7.62

EQ

14

23

25

UP UP

EQ

19

19

7.62

EQ

ATRIUM

EQEQ

8.20

H

RETAIL

E

29

28

EQ

C 24

29

EQ

14

6

7.62

EQ

13

22

EQ

EQ

ATRIUM

RETAIL

EQ

EQEQ

21

EQ

11.25M

B

EQ

21

EQEQ 11.25M

EQ

35 36

M&E

GEQ

EQ

2923

EXIT FROM PARKING 40 M + 10.75M

20

+50.5M 10

EQ

34

EQ

EQEQ

1610

159

148

137

EQ

STREET LIGHT ENTRANCE PARKING EQEQ

50 % slope + 1M

F&

EQ

12

20

19

UP UP

18

17

EQ

2822

EQ

EQEQ

W.C.

B

EQ

EQ

28

5

NAGA 3

8.20

11.25

18

17

18

17

EQ

12 RETAIL 3 4 13

RETAIL

EQ

EQ

M&E

EQ

EQEQ

D A

G

15 % slope

126

11 5

EQ

EQ 8.20 M&E

M&E

F&

EQ

11

ATRIUM

EQ

22OTB

EQ

WATER FEATURE

DNDN

A EQ

EQ RETAIL

10

5

EQEQ EQEQ 15 % slope + 1M 50 % slope 0

UP

7.62

EQ

18

0

EQ

7.62

17

16

27

EQ

2

16

B

RETAIL40 M EQ 8.20

20

15

16

228.31

26

11 1

15

B

14

SERVICE CORRIDOR SERVICE CORRIDOR

13

EQ

RETAIL 2620 2721

- 3M

22- 11.5M 23

21EQ

EQ

EQ

W.C.

2519

- 6M - 8.75m

+ 4.5 M

286.42

20

EQ

EQ

0

F&

5.40

12

11

EQ

EQ

2418

A F27

26

25

EQ

F

32 VEST33

EQ6.91

15

14

EQ

DNDN

10

25

10

14

13

15

EQ

9

EQ

2317

EXIT FROM PARKING 10.75M

DNDN

EQ

24

EQ

W.C. W.C.

8

12

14

EQ

B

EQ

10

23

EQ

BOH

EQEQ

21

20

15 % slope

28

EQ

F&

EQ

9

22 M&E

BOH M&E

7

19

19

18EQ

EQ

WATER FEATURE 11.25M 0.25M

27

26

EQ

7.62

EQ

6

EQ

7.62

7.80 7.04 6.36 7.80 6.36

DNDN

7.80 7.04

13.50

6.10 5.40 6.10

21

20

EQ

5

4

DROP OFF

17

EQ

EQ

24 E EQ

31

E

4.57

EQ

11.25M 13

OTB

286.42

EQ

15 % slope

UP

3

-2.5 M

EQ

TO. NCW EQEQ EQEQ + 11.25M MATCHLINE

+3M

18

17

2923

8.20

EQ

12

11

10

9

EQ

18 WATER 19FEATURE 20 50 % slope

OTB STREET LIGHT

+ 0.5M

UP UP

10

8.20

EQ

RETAIL

+ 1.5 M

16

A

8.20 EQ

30

29

WATER FEATURE

2216 2115+ 10.00M

35 36

34

EQ

EQ

W.C.

UP UP

5

F

2

EQ

EQ

RETAIL

33

EQ

EQ

8.20 M&E 40 M

M&E

D

32

EQ

+ 0M

EQEQ A 005

28

RETAIL

2014

EQEQ EQEQ EQEQ 15 % slope + 1M 50 % slope + 0.5M

PLAZA

M&E

27

EQ

8

+ 11.25M

EQ

B

19

EQ

SERVICE CORRIDOR

EQ

+ 2M

F

EQEQ

VEST

20

D

2822

2721E

EQEQ

EQ

8.20

7

104

93

82

1

6

5

50 % slope + 1M

EQ

F&

18

18 E 40 M

EQ

EQ

RETAIL + 2M

40 % slope

26

25

WATER FEATURE

10

C 31

EQ

EQ

+ 0M

EQEQ

+ 0M 24

23

2620

2519

50 % slope EQEQ

RETAIL

+ 3M286.42

1913

EQEQ

22

228.31

EQEQ

+ 1M

EQ

228.31

EQ

2418

40 % slope

+ 0M

21

EQ

7 10.75M 11.25

C

4

EQ

OTB

W.C.

DOWN

1

EQ

136.60

EQ

5 EQ

EQ

11

25

24

23

11.25M EQ + 4.5 M EQ PLAZA +3M

6

5

3

2

EQ

DNDN

EQ

22

21

20

1

11.25M

M&E

+ 0.5M

6

PAR

+ 1M EQ

8.25M

DNDN

40 M

EQ

EQ

EQ

1812

EQEQ

20

EQ

30

29

D EQ

++ 2M 2M

+ 2M

50 % slope

BOH

28

27

EQ

5

B

Property Line40 M

20

26

25

EQ

25 23% 17slope

25 % slope

228.31 EQEQ + 3M

10

DN

EQ

170.5M +

16

0.25M

EQ

VEST 3M

M&E

+ 10.75M

UP

EQ

EQEQ 11.25M

3M 0.25M

OTB 16

15 EQ

EQ

+ 0M

19

DROP OFF

8.25M

24

EQ

2216

2014 + 0M 2115

EQEQ 25 % slope

18

0

-2.5 M

12

EQ

1

+ 11.25M

5

OTB

EQ 8.2013WATER FEATURE 15 14

11

EQ

PARKING ENTRANCE

DOWN

EQ

19

+ 0.5M EQ

EQ

UP UP

9

8

13

12 EQ 4

3

8.20

14

EQ

SKY LIGHT ABOVE

25 % slope

BOH

EQ

1711

10.00M + 153M 14

13

5

23

EQ

EQ + 11.25M EQ

+ 0.5M

+ 3M OTB

+ 2M TO B1 RETAIL + 1M

OTB

6.91 10

9

EQ

PARKING ENTRANCE

Property Line40 M

6.91

F

EQ

8

EQ

OTB

4

3

EQ

DOWN

EQ

11.25 7

6

112EQ

UP

EQ

0 5

4

RETAIL

6.91

18

2

EQ

B

17 D

17

16 20

10

H

17

EQ

1

4.57

7

+ 1M

B

A

15 % slope 29 + 3M E + 1M + 3M PLAZA + 0.5M B EQ EQ EQ50 % slopeEQ EQ + 4.5 M EQ EQ EQ EQ 8.20 + 0.5M UPEQ -EQ 6M + EQ 0.5M 3M + 2M + 2M 50 % slope +3M A 8.25M - 3M SERVICE CORRIDOR 8.25M + 1M BOH + 1M + 1.5 M 21 F 36 3M OTB C 1 3 5 OTB 6 2 4 8OTB 9 11 18 19 12 RETAIL13 17 31 15 16 25 10 14 33 22 27 W.C.28 35 23 34 32 20 24 29 30 26 BOH OTB OTB 0.25M + 0M OTB B 286.42 + 0.5M + 0.5M 50 % slope 50 % slope 11.25M OTB + 0.5M +VEST 1M RETAIL -2.5 M + 1M + 1M RETAIL TO B1 EQ EQ RETAIL EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ RETAIL EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ 8.20 8.20 11.25 4.57 PLAZA EQ + 1M G PLAZA D OTB OTB 11.25M OTB11.25M OTB + 11.25M OTB+ 11.25M 11.25M +OTB 11.25M 15 % slope 15 % slope 11.25M C + 11.25M WATER FEATURE -2.5 M WATER FEATURE WATER FEATURE A 10.75M A 18 24 22 25 + 10.75M 15-2.5 M 16 27 17 26 28 0.25M 29 19 21 FEATURE 20 WATER 23 DROP OFF DROP OFF STREET LIGHT ENTRANCE STREET LIGHT E PARKING TO B1 RETAIL PARKING ENTRANCE + 0.5M ATRIUM ATRIUM D VEST 3M SERV OTB ICE OTB OTB OTBCORRIDOR RETAIL A 286.42 8.25M OTB OTB B F F& F&B DN E 23 EQ 24 29 26 EQ 27 25 22 21 18 16 EQ 17 15 14 12 9 EQ 10 8 6 EQ 7 + 0.5M 13 50EQ RETAIL + 0.5M19EQ 50 %20 % slope EQ EQ11 EQ EQ EQ EQ EQ EQ28 EQ EQ EQ EQ slope EQ11.25M + 1M + 1M PLAZA G + 11.25M PLAZA PROPERTY LINE 11.25M 11.25M + 11.25M 228.31 F&B 11.25M 159% slope10 15 % slope 1 7 + 11.25M8 3 11 18 19 21 22 20 5 4 23 2 31 28 29 32 F 33 30 12 13 25 35 36 24 14 27 34 15 26 6 17 16 VEST S2 EQ EQ10.75M EQ EQ EQ EQ EQ EQ EQ EQ RETAIL EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ 8.20 RETAILRETAIL BOH DROP286.42 RETAIL OFF DROP OFF H W.C. W.C. AEQ 0 5 10 20 40 M STREET LIGHT EQ EQ EQ EQ EQ EQ PARKING EQ ENTRANCE EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ 8.20 8.20 11.25 4.57 SERVICEEQCORRIDOR SERVICE CORRIDOR PARKING ENTRANCE BOH G RETAIL M&E BOH 0 5 10 20 W.C. RETAIL W.C. B SERVICE CORRIDOR SERVICE CORRIDOR RETAIL H RETAIL TO NAGA 3 MEZZANINE LEVEL

10

ATRIUM

G

16 20

EQ

15

5

9

EQ

-11.5M + 11.25M

8.20

OTB

11.25M

4

50 % slope

WATER FEATURE

3M OTB 0.25M

F&

14 0

14

13

8

+ 0.5M

13

OTB 12 EQ

11 EQOFF DROP

EQ

WATER FEATURE

H

5 6 WATER FEATURE

EQ

3

8.25M

OTB

OTB

3 + 11.25M 4

8.20

11.25

UP DOWN

15 % slope

PLAZA

2

UP UP

1510

5

EQ

13

12

11

EQ 1

EQ

12

11

10

7

A

+ 1M

11.25M

A 9

+ 4.5 M

10

EQ + 11.25M

EQ

20

E

1

-11.5M

4.57

2

A

A

UP UP

10

EQ

W.C.

10

F

9 EQ

8

+ 0.5M

9 EQ

EQ

BOH

F EQ

DN

OTB + 0.5M

1

-2.5 M

G

PROPERTY LINE

40 M

BOH

ATRIUM EQ

40 % slope

+ 1.5M

17 50 % slope

UP

9 136.60

EQ

EQ

DOWN

EQ

8

EQ

+ 0.5M

7

6

8

8.20

16

EQ

+ 1.5 7 M

W.C.

M&E

6

5E

7

11.25

15

EQ

EQ

8.20

10D

20 BOH

UP UP

14 0

13

EQ 7

6

EQ

EQEQ

12

EQ

EQ

8.20

5

10

ATRIUM 0

22

21

EQ

pe

slo

%

EQEQ

+ 2M

16

DNDN

12

11

8.20 M&E

EQ

EQ

F

EQ

DOWN

10 5

4

M&E

8

8.20

E

EQEQ

11

B

11.25 11.25M

DROP OFF

EQ

F&

9

EQ

7

D

EQ

SERVICE CORRIDOR DN

G D 5

4

4

3+ 0.5M

2 8.20

6

5

3A

2

1

18

EQ

14

13

EQ

M&E

10

EQ

11.25M

+ 0.5M

E

35 36

8.20

PROPERTY LINE

+ 1M

D

OTB

+ 11.25M PLAZA

H

UP

17

EQ

PLAZA BOH

6.91

11.25M

-2.5 M

16

1

OTB

4

R111.25M S1 VEST

15

EQ

12

+ 0.5M

8.20

OTB 6

-2.5 M 11.25M

11

10

5

4

3

11.25M

9 6.91

DOWN

3

14

EQ

EQEQ

9

EQ

EQ

0

5

RETAIL

EQ

1913 50

EQEQ

50 % slope

+ 0M

8

7

1812

OTB

40 % slope

+ 1.5M

15

1610 159 10.00M

148

EQ

UP UP

BOH

13

EQ

2

8

EQ EQ 0

DNDN

EQ

1 7

6

B

UP UP

EQ

UP UP

EQ

OTB

2

12

11

136.60

EQ

+ 0.5M

+ 1M OTB 11.25M

WATER FEATURE 9 DROP10 OFF

8

EQ

EQ

RETAIL

DOWN

7

EQ

EQ

DNDN

S2 6

EQ

+ 0.5M

D A 5E

4

F C

11.25M

PLAZA VEST 5

16.60

7.80

3

2

+ 0.5M

8.20

DOWN

OTB

EQ

50

e

slop

+ 0M%

EQEQ

SERVICE CORRIDOR

137

+ 1M 11.25M

6

UP UP

1

18

6.36 7.80

11.25M

MATCHLINE

17

16

EQ

EQ

EQEQ + 11.25M

1711

PLAZA

EQ

SEATING AREA

142M +

13

228.31

DROP OFF EQEQ EQEQ

EQ 8.20

5

4

3

2

11.50

15

EQ

11.50

14

EQ

EQ

126

11 5

SERVICE CORRIDOR

7.04 13

EQ

EQEQ

12

+3M

SERVICE CORRIDOR

UP

EQ

EQ

104

EQ 18

11.25M

EQ

E

F OTB

A8.20

+ 11.25M

BOH

G34

33

UP

EQ

1610

+ 0M

EQEQ

11

+ 1.5 M

7.04 7.80

12

11

EQ

+ 1.5 M

EQ

BOH

STREET LIGHT

EQ6.91

159

228.31 EQEQ F&B

9 10 SEATING AREA

EQ 17

29

28

27

EQ 16

32

UP

EQ

50182

+ 0.5M

OTB

Ground Level -2.5 M 11.25M

+ 4.5 M 10

9

+ 0.5M

EQ

EQ

MATCHLINE

1

EQ 15

EQ EQ

EQ

286.42 + 0.5M EQ

PLAZA

50182

EXIT FROM 10.75M PARKING

8

136.60 + 3M EQ

EQ

Ground Level

+ 1M

PROPERTY LINE

TO. NCW

+ 4.5 M

WATER FEATURE

50 %7slope

6

EQ

EQ

8.20

EQ

C

15 % slope 5

6.91

B

+3M

EQEQ

8

26

25

EQ 14

EQ

EQ

W.C.

DNDN

A

8.20

+ 1.5 M

EQ 13

EQ

EQ

+ 3M 16

AREA

7.62

EQ + 1M

EQ

93

RETAIL

TO. NCW EQ 11.25M

24

EQ 12

11

EQEQ

EQ

18 ABOVE 19 20 SKY17LIGHT

15

SEATING

EQ

7.62

EQ

BOH

EQEQ

6RETAIL 7

EQ

STREET LIGHT

82

7 1

137 + 0M148

126

EQEQ

OTB

EQ

7.62

EQ 11.25M

6

5

4

EQ

B

EQ

UP

SERVICE CORRIDOR

EQ

EQ

F&

EQ

3

EQ

UP UP

EQ

SERVICE CORRIDOR

W.C.

2

EQ

14

13

12

PLAZA ATRIUM

DNDN

EQ

BOH

6.36

EQ

+ 0.5M

1

EQ

8.20

11.25

BOH

EQ

EQ

7.62

PROPERTY LINE

EQ

31

30

29

28

EQ

4.57

PLAZA

+ 3M

DOWN

29

28

27

EXIT FROM PARKING 10.75M

W.C.

EQ

BOH

26

25

EQ 10

27

26 11.25M

F G 8.20

W.C.F

D EQ

11.25M

+ 11.25M

DOWN

EQ EQ 15 % slope + 1M 50 % slope

24

11

10

9

EQ

11 5

EQEQ

5

4

DOWN

EQ

RETAIL

RETAIL 23

22

21

DOWN

BOH

20

19

F&B

RETAIL

RETAIL

EQ 8.20

3

RETAIL

23

22

21

25

24

+ 0.5M

35 36

348.20

E

EQ

50182

EQ6.91

2

8

EQ

104

93

82

F

EQ

23

SERVICE CORRIDOR

TO LOWER LEVEL 1

SKY LIGHTE ABOVE

7 1

EQ

+ 0M EQ

33 EQ

EQ

6.36 7.80

EQ

RETAIL 18

EQEQ

EQ

DNDN

EQ

1

17

286.42

EQDROP OFF EQ 9 8

7

EQ

EQ

8.20

SERVICE CORRIDOR

6.10 5.40

6

5

4

3

8.20

EQ

EQ

TO LOWER LEVEL 1

2

6.91

EQ

EQ

+ 3M

7.62

8.20

7

6

EQ

+ 0.5M EQ

EQ

EQ

35 36 + 0.5M

136.60

EQ 8.20

5.40

DNDN

EQ

EQ

6

22

SERVICE CORRIDOR

RETAIL SEATING AREA

7.62

1

5

EQ

16.60

EQ

9.96

EQ

EQ

5

21

20

+ 0.5M

4

D EQ

EQ18

DROP OFF

EQ

EQ

G34

33 11.25M

B

EQ

EQ

4

20

19

18

17 EQ

3

A 32

+ 1M

PLAZA

EQ17

EQ EQ 31

11.25M

30

28 11.25M

EQ

+ 11.25M

EQ

+ 0.5M

D

EQ EQ +290M

EQ27

EQ16

EQ

29

28

-11.5M

EQ E 18

32

+ 0.5M

+ 2M

F&

EQ

EQ

2

PLAZA 19

18

228.31 EQ

C

NAGA 3

8.20

EQ15

EQ

A

B

3

2

11.25

EQ14

SERVICE CORRIDOR

EQ

+ 0M + 1M DROP OFF

DROP OFF

DNDN

EQ

EQ

1

17

16

F RETAIL

1

26 M EQ -2.5

25 EQ

24

EQ13

12

EQ

31

30

29

D OTB

27

EQ 17 C

+ 1M

OTB

23 EQ

+ 11.25M EQ

EQ 11

+ 11.25M + 1M 10.00M

C

B

EQ

EQ

EQ

ATRIUM

ATRIUM

EQ10

DROP OFF OTBEQ EQ

+ 0.5M

F

B

F&

EQ

16

15

14

EQ

EQ

B

EQ

EQ

EQ

15

14

11.25M

F&

EQ

C

13

EQ

STREET LIGHT EQ

13

12

E

RETAIL

PLAZA

B

EQ 16 + 0.5M

11.25M

11

15 % slope

12 EQ

B

10

D

B

EQ

9

8

EQ

EQ

F&

EQ

50 % slope + 1M

11

EQ

EQ

8.20

EQ 9

OTB EQ EQ STREET LIGHT

11.25M

EQ + 3M 15

14.30

10

EQ

18

7

6

286.42

EQ 8

15 % slope

EQ

22

11.25M

+ 1M EQ 7

EQ

+ 0.5M

26

25

WATER FEATURE

14.30

5

9 EQ

17

EQ

-2.5 M

EQ 14

+ 2M

136.60

EQ

OTB

EQ 13

- 3M

EQ21EQ

18 WATER 19FEATURE 20 EQ 50 % slope

EQ + 0.5M

EQ 6

+ 1.5 M

EQ

17

EQ

EQ 5

EQ

DNDN

SERVICE CORRIDOR SERVICE CORRIDOR

8.20

EQ EQ

EQ

16 EQ

15

4

8.25M8.20

A

+ 0.5M

DNDN

6.10

9.96

EQ

EQ

136.60

+ 1M

11.25M EQ

EQ 3

3M

+ 1M

C

UP UP

5.40

EQ

EQ

EQ 2

1

A

+ 11.25M

B

UP UP

A

F

29

28

27

EQ EQ

EQ

W.C.

EQ

- 6M

A

8.20

A 28

27

26 11.25M

+3M

+ 10.75M

DNDN

26

25

16

RETAIL

8.25M

EQEQ 14

13

0.25M

EQ

15 % slope

STREET LIGHT ENTRANCE5.40 PARKING

PARKING ENTRANCE EQ

EQ

EQ12

50 % slope + 1M

+ 11.25M EQ

NAGA 3

24

23

22

21

4

8

7 10.75M

11.25 15

14

13

3

OTB

11 EQ

10 EQ

EQ

11

25

24

EQ 12

UP UP

6

5

12

2

C

UP UP

20

19

18

17

EQ

- 8.75m

7.62

11

8.20

M&E

M&E

D

SKY LIGHTE ABOVE

8 EQ

EQ

EQ

UP UP

11.25M

4

3

EQ

9 EQ+ 0.5M

7

+ 1M EQ

OTB UP

EQ +10 4.5 M

24

11.25M

23

22

WATER FEATURE

UP UP

1

10

EQ 6.91

EQ

EQ

5 68.20 5.40 WATER FEATURE

EQ

PARKING ENTRANCE

DNDN

5.40

14.30 6.10

EQ

18

8.20

B

2 9

8

7

EQ

4

EQ

SERVICE CORRIDOR OTB

F& B

6

EQ

-2.5 M

+ 1.5 M

EQ

17

EQ

23

- 11.5M

21

OTB

EQ

UP PROPERTY LINE

UP

C

8.20

+3M

DROP OFF

+ 10.75M EQ

F

+ 1M

UP

UP UP

ATRIUM RETAIL

16

EQ

6.10

5.40

1

5

NAGA 3

40 M

B

NAGA 3

A

20

3

2

A

B

EQ

136.60

10

EQ

8.20

5.40

5

EQ

11.25M1511.25

EQ

5.40

EQ

WATER FEATURE

EQ

+ 3M + 2M

F&

EQ

7

3M

286.42 + 0.5M

20

EQDROP OFF EQ 9 8

EQ

11.25M

+ 0.5M

DOWN

13.505.40

14

13

5

EQ

22

21

20

+ 4.5 M

50 % slope

WATER FEATURE 0.25M

EQ

15 % slope + 1M 50 % slope

- 3M - 6M EXIT FROM 10.75M PARKING - 8.75m

DOWN

6.10

1

-2.5 M

12

4

19

OTB

EQ8.25M 3M 6 0.25M

+3M

10.75M

EQ

DOWN

4

3

2

11

10

EQ

E

EQ

UP

15 % slope

DNDN

5.40 EQ

-11.5M

EQ

OTB 3M + 4.5

WATER FEATURE

EQ

F RETAIL 1

OTB

EQ + 1M

9

136.60

EQ

E

C

0

5.40

UP UP

EQ

11.25M

+ 0.5M

8

7

5.40

6.10

6

EQ

A

B

6.10

7.04

14.30

AEQ

D

2

18

17

OTB

EQ

EQ

+ 11.25M

+ 1.5 M

PLAZA 19

18

+ 3M

-2.5 M

OTBEQ

EQ

+ 0.5M

11.25M

UP UP

5

EQ

16

WATER FEATURE

228.31

EQ

15 % slope + 1M 50 % slope

PLAZA

UP

W.C.

M&E

1 + 0.5M OTB

STREET LIGHT

EQ

4

EQ

8.20

EQ

11.25M

+ 2M

UP UP

3

2

DROP OFF 5.40

EQ

17

16

+ 4.5 M

11.25M

+ 11.25M PLAZA

EQ

+ 0.5M

G 1

15

14

-2.5 M

+ 0.5M

F

EQ

8.20

+ 1M

C

OTB

EQ

15

14

+3M

11.25M

+ 0.5M

+ 1M

DNDN

EQ EQ

EQ

11.25M

13

EQ

+ 0M

3M 0.25M

DOWN

EQ

EQ

15 % slope

11.25M

EQ

11.25M

8.25M

DNDN

EQ

EQ

12

11 EQ

EQ

10.00M

DOWN

EQ EQ

EQ

11.25M

PLAZA

10 EQ

E

13

12

DOWN

EQ

EQ

EQ

18

17 + 0.5M

D

9

11

10

11.25M

6.10

16

PARKING ENTRANCE

+ 1.5 M

8.20

EQ

M&E

EQ

+ 0.5M

EQ

+ 1.5 M

DNDN

136.60

11.25M

8.20

9

8

EQ

+ 11.25M

PLAZA

DROP OFF

11.50

11.25 15

+3M

EQ 6.91

-2.5 M

14

13

12

8

7 10.75M

OTB

7.80

6

5

7

6

EQ

+ 1M 11.25M

B

10.75M

OTB EQ

DROP OFF

F

A

50 % slope + 1M

14.30

+11 4.5 M

10

11.25M

4

WATER FEATURE

5

7.80

3

4

+ 0.5M

7.04

2

3

2

+ 0.5M

C

DROP OFF

8.25M8.20

5.40

11.25M

+ 1M

B

DOWN

1

+3M + 4.5 M

9

A

8.20

14.30

EQ

+ 1M

6.10

EQ

11.25M

5.40

EQ

UP

11.50

EQ

6.36

EQ

7.80

EQ

+ 1.5 M

50182

EQ

+ 0.5M

6.36

EQ

15 % slope + 1M 50 % slope

6.36

E

10.75M

EQ

EQ

EQ


REIMAGINING TONGZHOU


TONGZHOU DISTRICT 39°54'34.8"N 116°39'10.6"E In Collaboration with SOM Chicago Urban Design

As the city of Beijing seeks to energize their Tongzhou district, SOM offered a vision of a new experience, encouraged by the lineage of impactful design work throughout the communities of China. In collaboration with SOM Chicago's Urban Design arm, members of the architecture studio were tasked to further characterize the place and quality of the environments idealized for the reimagined district.

SelectedWorks / Architecture – Urban Design

Beijing, China

*Property of Skidmore, Owings & Merrill (SOM), designed under Culligan-Alpers Studio in Chicago, USA*

15


16


GATEWAY TO THE RIVER AERIAL OF TONGZHOU

Reimagining Beijing's Tongzhou district began with prioritizing access to the river. Throughout a range of building types that occupy the district —including residential, hotel, retail, office, etc. — the architectural expression follows the flowing, curvilinear gesture carved within the urban fabric into the Tongui River.

TONGUHI RIVER

Within the network carved within the landscapes lie a series of lush gardens, fields, pedestrian networks and bodies of water that create an energizing user experience to unify the city's district.

TONGZHOU BEIJING 17


PUBLIC PAVILION

THE GARDENS

18


EXPERIENTIAL DIVERSITY PEDESTRIAN WALK Throughout the development lies a series of lush landscapes for public gatherings and community events. Driven by the uidity of the water towards the city center, diverse building types organize a prioritized promenade that connects the many zones of hte development. The pedestrian experience is further enhanced with outdoor seating, lush landscapes, and layered seating along the riverfront.

PEDESTRIAN WALK

RETAIL WALK

19


As the development uidly opens towards the Tonghui River, the user experience is expanded with open landscapes, designed for a diverse set of activities for the public. Access to the river's internal network within the development lead to lush, open ďŹ elds, ecologically natural bodies of water, and pedestrian paths and pavilions. These organized public spaces activate the riverfront and beyond, energizing the development from the inside out.

RIVER NETWORK ACCESS

20


EXPANDING LANDSCAPES ACCESSIBLE NETWORKS

PUBLIC PAVILIONS RECREATIONAL FIELDS

21


CENTRAL BARANGAROO


SelectedWorks / Architecture

Sydney, Australia CENTRAL BARANGAROO 33°51'38.1"S 151°12'04.7"E In collaboration with Obendorf Studio

Sydney's Central Barangaroo district acts as an integral threshold between the continued developments along its famed Darling Harbour and the northern urban fabric. Planning to connect its northern urban fabric to the Harbour, NSW allowed SOM to further develop its vision for future developments in Australia, challenged to unify the central Barangaroo district through cohesive massing, urban design and architectural strategies. Inspired by the rich, urban fabric of Sydney, the materials, lines of sight, vegetation and light levels are all curated to create healthy public realm environments that create diverse, intimate, grand and active spaces nestled within the walls of Barangaroo Central.

*Property of Skidmore, Owings & Merrill (SOM), designed under Culligan-Alpers Studio in Chicago, USA*

23


A

fine-grained

pedestrian

paths

network in

of

primary,

secondary and tertiary laneways lead the pedestrian to anchor gardens. Such a network invites a vibrant experience within each node,

giving

way

to

unique

addresses for all parcels. The faรงade design for the development sought to be solar responsive, masking harsh sunlight on the exterior faces, while maintaining high window to wall ratios along the interior faces.

24


RETAIL ARCADE MARKET PLAZA SYDNEY STEPS

D

OA

NR

SO

K HIC

CULTURAL PLAZA HARBOUR PARK

NAWI COVE DARLING HARBOUR

BARANGAROO CENTRAL

25


CULTURAL PLAZA

26


ACTIVATING THE NEW FRONT VIEW FROM HARBOUR PARK

RETAIL ARCADE

MARKET PLAZA

SYDNEY STEPS

INTO RETAIL ARCADE

HARBOUR PARK

27


BRIDGE TO SYDNEY STEPS

CULTURAL VENUE

28

HOTEL LOBBY


NEW FRONT DOOR VIEW FROM HICKSON ROAD

TRANSIT CONNECTION

HICKSON ROAD

29


Art Urbain International Student Design Competition


VIA PAPALIS 41°53'58.9"N 12°27'59.4"E In collaboration with J. McReynolds c/o A. Kranis

The streets of Rome are lively during the daytime, but as the sun fades, the city transforms into a ghost town.

SelectedWorks / Architecture – Urban Design

Roma, Italia

Under the prompt to design a network of public spaces, accessible to all, La Boucle de Lumière is a network that fosters daytime life and activity during the night. A system of strategic lighting along the immediate and surrounding urban context creates places of engagement and unified pedestrian corridors, inviting nighttime use of the central areas of the city to match its legendary daytime street life.

*Finalist — 2018 Art Urbain International Student Design Competition — Paris, France

31


VIA PAPALIS INTERSECTION

TIBER RIVER

32

PIAZZA NAVONA


NETWORK OF PUBLIC SPACE LOCATION PLAN

THE PANTHEON

ROMA ITALIA

33


THREADING PUBLIC SPACES WAYFINDING PLAN

PAOLA TRANSIT SITE

R

O

C SO O RI O

TT VI AN

EM U EL E II INTO URBAN CORRIDOR

34


ACTIVATING PUBLICPAOLA SPACE PAOLA TRANSIT STATION VISUAL ICONS TRANSIT STATION

The network provides series of strategic lighting elements that define space throughout the urban fabric of the city. Embedded within the framework of the Roman cobblestone, the lighting elements provide contextual clarity through minimal intervention, respecting and celebrating the existing fabric of the historic city.

35


36


VISUAL ICONS ENERGIZING THE NIGHT

PAOLA TRANSIT STATION

37



XXXXX XXXXX

SelectedWorks / Identity – Graphic Design

Chicago, IL

As the first of multiple ongoing brand identity and graphic design projects, the opportunity to create the visual identity and conceptual work for Powtrans — an emerging full-service logistics company based in Chicago, IL — was birthed out of the desire to establish a modernized framework for the standard logistics model. With an intent to create separation between existing, famed entities, the ideation for Powtrans relies on simplicity, effieciency, clarity — shaping a dynamic set of principles that will inform the present evolution of the industry.

39


40


41


42


43


44


45


T I M B E R

H I G H - R I S E


SelectedWorks / Architecture

Nashville, TN 718 CHURCH ST 36°09’42.2”N 86°47’01.1”W In collaboration with O. Poston + N. Dutch c/o T. Shelton

The Governor’s Chair for Energy + Urbanism studio was introduced to cross-laminated timber as an innovation in engineering, utilizing and expanding upon the developing research of structural engineer, Benton Johnson of SOM. To further project the impact of such innovation, the studio was given the opportunity to apply the work to the evolving and relevant context of Nashville's urban fabric. In response to the growing density of the city, a residential highrise building became the focal point of the site, possessing dynamic mixed-use program throughout the ground floors. The intention was centered on providing aspects of living for a wide range of demographics, offering a culture of diversity and dynamism. That intent was translated into various housing typologies, offering microhousing units, shared living environments across entire floors of cohousing, and multi-floor residences within family and studio loft units.

As part of the 2017 Governor’s Chair for Energy + Urbanism Studio Supported research c/o Benton Johnson (SOM)

47


The first three levels of the Timber High-Rise are denoted as the Gallery Floors, extending a variety of public spaces to the surrounding context and highlighting the energy and activity within in a framed, gallery-like manner. The Gallery Floors operate as a series of dynamic spaces that change throughout the seasons, offering countless experiences within the many transitional spaces across the site.

48


PUBLIC ENGAGEMENT FRAMING LIFE X ACTIVITY

49


MOVEMENTS PROCESS DIAGRAMS

4

3 2 1

ORGANIZING TYPOLOGIES

50

MAXIMIZING LEVELS

ACTIVATING SITE X INTERIOR

UNVEILING PUBLIC ZONES


PROGRAMMATIC ASSEMBLY SECTION

microhousing + lofts residential 7-20

co-living floors residential 5-6

residential commons office + residential 4

gallery floors mixed-use1-3

51


INTERSECTING COMMUNITIES SECTION PERSPECTIVE

52


FRAMEWORK SECTION DETAIL

1" vision glass

Level 2 Gallery Floors Open Installation Floor

timber floor panel

steel connector timber column

timber finish wall metal stud batt insulation

Sidewalk

finish floor sleeper

Level 1 Gallery Floors

turn-down slab pile cap pile

53


TIMBER BEAM

HVAC EXCHANGE

54


INTEGRATED SYSTEMS MICROHOUSING LIVING

HVAC RUN

INTEGRATED STORAGE WALL

55


56


57



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.