1 minute read
OUR MISSION & VISION
MMA employs an Integrated Project Delivery System (IPD) utilizing Design for Manufacturing & Assembly (DfMA) approach which incorporates prefabricated clinical walls, building systems, HVAC, lead shielding, magnet technology, vacuum plumbing systems, and any other innovation the job requires. Our streamlined approach offers measurable goals and quantifiable outcomes that address space complexity, create build consistency, and enhance speed to market. Our regulatory compliant solution has low life cycle costs, is clean, durable, and dependable, with potential for future repurposing and adaptability.
MMA are the architects behind inbox health clinics nationwide. We are not only the designers; we are the manufacturers, assemblers, builders, and sourcing team for every component and system of the project. The prefabrication, modularization and standardization of construction processes and assets within factorycontrolled environments, supported by DfMA techniques, offers a viable solution to traditional build challenges. By presenting transformative improvements across the asset lifecycle in time, cost, quality, health, and safety, off-site construction offers predictability, accuracy, and consistency.