MANUFACTURED STRUCTURED SCHEDULING SYSTEM

MMA, in collaboration with our collective team members, focuses on a Manufactured Structured Scheduling System.

Our objective is:

To transform our project sites to a factory floor.

To develop a structured schedule for every vendor.

To ensure that all vendors complete their required work within our designated time frames.

To instill a “consistent pattern of behavior” mindset in our installers.

Production schedules are more important than ever before, especially considering the increased sophistication in manufacturing methods and the software necessary to manage production in a more precise manner, while also accounting for the increased complexity of global supply chains. Utilizing our well-defined production schedule that is based on accurate data inputs, our production schedules can be changed and adjusted to address temporary shifts in production requirements caused by seasonality, rapidly evolving consumer preferences, and other disruptions.

The basic components of Production Scheduling include Planning, ‍Routing, Scheduling, ‍Dispatching, and ‍Execution.‍