master thesis landscape architecture posters

Page 1

ANALYSIS: WIEN UMWELT STADT VIENNA: ECOLOGICAL SYSTEM AND EXTERNAL CONNECTIONS 0

2.5

5

VIENNA: DISTRICT SUBDIVISION AND INTERNAL CONNECTIONS

10Km VIENNA

Source: city of Vienna, data.gv.at

Ringstrasse

Grüngürtel: local recreation area and viennese woods public parks and green areas

Schematic representation of the rings system and the radial connections

Gürtel radial road connections

water system

local street

railways system

l rte gü ün r G

districts borders

train stations

1.

districts

train s-bahn stops fast connection road

21.

tel Gür

alte do na

Rin

19.

gstrasse

u

18.

franz-j.bhf

a

8.

14.

wienmitte

22.

9.

16.

u na do

uk do n a

nal

westbhf wien

20.

17.

15.

hauptbhf

2.

1.

7.

3. 6.

4. 5.

meidlingbhf 12.

13.

10.

11.

23.

TRANSPORTATION MODE SHARE

MAIN CITY MOBILITY STRATEGIES: FROM 1968 TO STEP 2025 Source: city of Vienna, wien.gv.at

SUBWAY EXPANTION

PARKING MANAGEMENT: PAY PARKING ON THE STREET

1969-1982

1993

1989-2000

1995-1999

2006-2010

2012

2013-2017

2013-17

from 1993 to 2018 source: Wiener Linien, 2018. wienerlinien.at +4

7

2018

2019-ongoing -2

3

38

199

29

3

26

+9

28

40

29 -11

STEP 2025: ONGOING CITY PLAN source: city of Vienna, 2014. wien.gv.at

2025

80

20

CURRENT MOBILITY SYSTEM Source: city of Vienna, data.gv.at

PUBLIC TRANSPORT

BIKE CONNECTIONS

COMMUNITARIAN AND ENVIRONMENTAL OUTCOMES Annual ticket public transportation 46% city population 1 € / DAY

subway

bike lanes

tram bus

Bike lanes

+63%

1993: 190Km 2018: 1200 Km

Bike mode share +6% in the last 25 years

TEMPO 30 street limit speed 30 km/h

PARKING MANAGEMENT districts with paying parking on streets

Fatal accidents along streets

-70% probability

Parking fee and increes pay car park

almost 100 million euro every year destinated among other things to public transportation and bycicling

reduction of carbon dioxide emissions

CO2 -9% cars in the last 15 years

-10% in last 15 years


0

2.5

5

mastic asphalt (a: o,15) permeable surface (a: 0,2-0,4)

10Km

concrete asphalt (a: 0,05-0,2) Source: Ecoten Urban comfort, 2019. urban-comfort.eu

Quarter: Cottageviertel District: 19th Density: 29 dw/ha Cars: 399/1000dw

VALUE INCLUDED FROM ONE TO ZERO

Trees along streets

Figure-ground diagram

pa th st re et pa rk in co g lo nt ts in sid uo ew us gr al ee k n

URBAN HEAT VULNERABILITY INDEX

ca r

materials and albedo

pr iv at e sid g ew ard en al k co nt in uo us pa rk gr in ee g n lo pa ts th

ANALYSIS: CONTEXT

Environmental matrix

0.21-0.3 0.31-0.4

0.47

0.41-0.5 0.51-0.6 0.61-0.7

Cottagegasse 16 m bright 20% permeable surface 80% waterproof

0.71-0.8 0.81-0.9

mastic asphalt

mastic asphalt a: 0,15

rivers and st

concrete asphalt a: 0,05-0,2 concrete-cement panels a: 0,10-0,35 cobblestone with sealing compound a: 0,20-0,4 granite blocks a: 0,20-0,4

gr ee n

pa rk sid ing ew lo al t s k

st re et ca r

sid ew al k

Quarter: Strozzigrund District: 8th Density: 233 dw/ha Cars: 305/1000dw

ya rd

permeable surface a: 0,2-0,4

rivers and streams

permeable surface 0,20-0,40

concrete-cement panels 0,10-0,35

0.77

natural stone 0,30-0,40

mastic asphalt

Strozzigasse 12 m bright 100% waterproof

mastic asphalt a: 0,15

rivers and st

permeable surface a: 0,2-0,4

rivers and streams

concrete asphalt a: 0,05-0,2 mastic asphalt

mastic asphalt concrete-cement panels a: 0,15 a: 0,10-0,35 permeable surface cobblestone with sealing a: 0,2-0,4 compound a: 0,20-0,4

la rg e

0.90

natural stone 0,30-0,40

ya rd

granite blocks a: 0,20-0,4

concrete-cement panels 0,10-0,35

gr ay

cobblestone with sealing compound a: 0,20-0,4 permeable surface 0,20-0,40

sid ew al k

sid ew al k

concrete-cement panels a: 0,10-0,35

st re et s

concrete asphalt a: 0,05-0,2

lin es

granite blocks a: 0,20-0,4

tw o

rivers and streams

lo ts

rivers and st

pa rk in g

Quarter: Fasanviertel District: 3th Density: 124 dw/ha Cars: 419/1000dw

permeable surface 0,20-0,40

concrete-cement panels 0,10-0,35

natural stone 0,30-0,40

Fasangasse 18 m bright 100% waterproof

CONTEXT: LERCHENFELDERSTRASSE AS THRESHOLD PROJECT SITE’S SELECTION CRITERIA 0

1

0.5

2 km

Source: city of Vienna, wien.gv.at

planned projects

district park

site project

city park

streets

Gürtel

Ringstr asse

ia Mar

rstra hilfe

s se

CAR PROPORTION AND POPULATION DENSITY Alserstrasse

200,8 dwellers/ha 315,1 cars/1000 dwellers 233,6 dwellers/ha 301,6 cars/1000 dwellers

Josefstä dters tras se

se

Ziglergasse

Vienna: 29,6% SPÖ 30,8% FPÖ

Lerc hen feld erst

rass e

Vienna: 46 dwellers/ha 373,8 cars/1000 dwellers

m eu us M se as str

asse erg Zoll e gass hen Kirc

Gürtel

Museumsquartier

Kunsthistorisches Museum

Gürtel

se as str

Burggasse

se

se as str

m eu us M

HOT SPOTS

gasse Lange

project’s site

Lerc hen feld erst ras

rass e

Burggasse

gas Neubau se

se

Ringstr asse

Parliament

Lerc hen feld erst

se as str

streets

30,5% ÖVP 27,2% Grüne

Josefstä dters tras se

Josefstä dters tras se

green street-island

41% Grüne 24,7 % SPÖ

Alserstrasse

se

8th district. Josefstadt

m eu us M

Lerc hen feld erst ras

Town hall

7th district. Neubau

climate change adaptation

m eu us M

Josefstä dters tras se

built shared street

se

University

1st district. Innere Stadt

s tga Stif

Alserstrasse

POLITICAL MAJORITY

Ringstr as

SHARED STREETS AND CLIMATE CHANGE ADAPTATION STREET

Ringstr as

LANDMARKS AND GREEN AREAS

Gürtel

Burggasse

s stra ilfer h a i Mar

tras fers iahil Mar

se

se

ia Mar

rstra hilfe

s se

LOW GREEN DENSITY

ROAD NETWORK

BIKE NETWORK

PUBLIC TRANSPORT NETWORK

transverse connection radial connection local street

Alserstrasse

street

Alserstrasse

streets

Alserstrasse

existing bike lanes

subway tram

running way

bus stops

se

Burggasse

Gürtel

Burggasse

se

se as str

Gürtel

m eu us M

se as str

se as str

tras fers iahil r a M

se

m eu us M

m eu us M

Burggasse

Lerc hen feld erst ras

Gürtel

se

HIGH POPULATION DENSITY

Lerc hen feld erst ras

Ringstr asse

Ringstr asse

Lerc hen feld erst ras

Josefstä dters tras se

Josefstä dters tras se

Ringstr asse

Josefstä dters tras se

s se rstra hilfe a i r Ma

ia Mar

s se rstra hilfe

LERCHENFELDERSTRASSE: SURFACES

PUBLIC SURFACE OCCUPATION

Gürt e

felde r s t ra sse

City center

e ss

Driveway surface approx. 50% Concrete/asphalt a: 0,05-0,35

Lerc hen

Rin gst ra

Vienna woods

l

CAR DOMAIN

LERCHENFELDERSTRASSE: HOT SPOTS Environmental simulations were made using the software ENVI_MET

Parking > 13% Cobblestone with sealing compound a: 0,2-0,4

AIR TEMPERATURE AT 12 O’CLOCK ON THE 30TH JUNE 2019 < 27.5 °C 28.1 28.5 28.8

PEOPLE DOMAIN

29 > 29.2

Pedway <40% mastic asphalt a: 0,15

TREES CAGES

SURFACE TEMPERATURE AT 20 O’CLOCK ON THE 30TH JUNE 2019

< 24.0 °C 26.0 27.5

Permeable <1% naked soil a: 0,2-0,4

28.3 29.0 > 30. 2


ANALYSIS: LERCHENFELDERSTRASSE SITE PROJECT: LERCHENFELDERSTRASSE SIDEWALKS

TRAFFIC LIGHTS AND PEDESTRIAN DIS-CONNECTIONS

sidewalk

19 MINUTES 20 % WAITING TIME

0

0 ,5

1 km

PARKING LOTS

PHYSICAL AND VISUAL BARRIER

CONTINUOUS PARKING LOTS REPRESENT AN INSURMOUNTABLE BARRIER BOTH VISUAL AND PHYSICAL

parking lots

PEDESTRIAN ROUTES, GREEN AREAS AND BARRIERS

CENTRALITIES

new pedestria routes according to STEP 2025

private green

barrier to green areas

public green

GROUND FLOOR ACTIVITIES

DYNAMISM

shops

bank/post

gastronoies

hotel/event room

garages

church and clergy house

market

public transport stops

LERCHENFELDERSTRASSE: SECTIONS, MATERIALS AND MOBILITY HIERARCHY

SCHEMATIC REPRESENTATION OF STREET FLOWS AND HIERARCHIES

materials and albedo mastic asphalt a: 0,15 permeable surface a: 0,2-0,4 concrete asphalt a: 0,05-0,2 concrete-cement panels a: 0,10-0,35 cobblestone with sealing compound a: 0,20-0,4

RANGE 16-18 M

granite blocks a: 0,20-0,4 cars + tram 8 m

Pedway 3 m

Pedway 2,5 m

parking 2 m

parking 2,5 m

RANGE 30-40 M cars + tram 11 m

Pedway 3 m

Pedway and church square 22 m

parking 2 m

RANGE 14-15 M

cars + tram 6.5 m

Pedway 3 m parking 2 m

RANGE 19-23 M

Pedway 2 m parking 1.8 m

cars + tram 11 m

Pedway 3 m parking 2.7 m

Pedway 3,4 m parking 2,5 m

P


0. Actual situation

PHASES

PROGRAMS

compactmechanical parking systems

Paris agreement: net zero CO2 emissions

Vienna city plan

integrated transportation system

car sharing

15% 2030 Special errands Small trips

Sub-surfaces‘ reorganisation

Sponge system

O2

More and bigger trees

1. No parking in public space

CO2

2. New vital space

Reorganisation of flow hierarchies

Heat island tackle

water management

public space - public life

empower the community

playing evapotranspiration and shadow

heavy rain sink

stay and relax

increased albedo

parklets for people and gastronomies

water spray

3. From cars to people

canopy

self expression

new perspective

plants as filter and attraction


CONCEPT

CONCEPT: REORGANISATION OF FLOWS’ HIERARCHIES

MAIN CAR CONNECTION

BIKE CONNECTIONS

Alserstrasse

Alserstrasse

transverse connection radial connection local street

street existing bike lanes e lanes new bike

Josefstä dters tras se

Lerc hen feld erst ras

Josefstä dters tras se

se

Ringstr asse

proposed one way

cars can only drive one way and on the tram tracks

Ringstr asse

running way

SCHEMATIC REPRESENTATION OF THE PROPOSED INTERVENTION

Burggasse

Gürtel

Gürtel

se as str

se as str

m eu us M

m eu us M

Burggasse

evenly paved piazzas prioritize pedestrians and make bicycle connections with cross roads easier thanks to speed reduction and the use of a gum tecnology in the tracks tras fers iahil r a M

se

tras fers iahil r a M

se

PRIORITY TO PEDESTRIAN: PIAZZAS AND LOADING AREAS piazzas: speed reduction bike connections

car un-/loading areas

the street has got loading and unloading areas for cars, which will always have a distance between them to increase street porosity.

ACCESSIBILITY: ONE LEVEL STREET one level street prioritized and smooth path

HEAT ISLANDS TACKLE light colour pavement green surfaces and trees

sponge system heavy rain sink

PUBLIC SPACE - PUBLIC LIFE benches

streets terraces

market

community gathering

play areas decorative trees

canopy

less design - self expression

water feature

new points of view


FROM CARS TO PEOPLE

CONCEPT: CENTRALITIES + DYNAMISM

CONCEPT: POROSITY AND BREAKS

PLAN AND CUT 1:500

STAY CONNECTED

CURRENT SITUATION

THE PATH FOR A POROUS STREET

PARKING LOTS: ~200 BIKE PARKING: 93 SEATING POSSIBILITIES: 19

THE PIAZZAS AS INTERVALS ALONG THE STREET

PROJECT SITUATION

LOADING CAR LOTS: 50 BIKE PARKING: 100 SEATING POSSIBILITIES: OVER 200

WATER CONCEPT Heavy rainfall containers

The path

slab-on-ground concrete

1,5 m deep 200 m3 water Pavement

0,8 m deep 900 m3 water

light granite

1,5 m deep 1600 m3 water

Flower beds 0,5 m deep 650 m3 water

SPONGE SYSTEM

Refreshing fontain

stored water is evapotranspired by plants

s tor lec l o c ter wa

Refreshing fontain: from stay cool surplus water stored in the sponge system

ter wa

s tor ec l l co

GÜRTEL AND SUBWAY

STAY CONNECTED

MARKET’S PIAZZA

PLAYGROUND

+193 m

s‘ ro ots

+193 m

+196 m

Heavy rainfall containers: from green transition

heavy rainfall is stored locally

mo re s pac e fo r pl ant

rain water stored in the sponge system

stored water evapotranspired by plants

Flower bed: from stay connected

PIAZZA

URBAN LIFE


PROJECT: MASTERPLAN

PUBLIC SPACE - PUBLIC LIFE PIAZZA

FUNCTIONS, ACTIVITIES AND DESIGN FOR A WELCOMING OPEN SPACE TO LIVE AND CONNECT THE COMMUNITY Community gathering point

MARKET’S PIAZZA

stairs to the lawn

Tram stop

PLAYGROUND

green roof

Pavement

Tram stop

light granite

roof terrace

Tram platform

Playground

gentle slope

bench as divider

Playground

Market’s stands

multi activities area

under the trees

Shading roof

Outdoor terrace

net to climb

designed parklets

URBAN LIFE

PIAZZA: STAY COOL

Piazza

old Vienna cobble

Foggy fountain

Outdoor terrace

cooling hot wave

seat-back as divider

Safe biking

gum technology in the tram tracks

Piazza pavement

The path

old Vienna cobble

slab-on-ground concrete

Piazza

Tram stop

PIAZZA

GREEN TRANSITION

+189 m

CHANGE IT!

+190 m

+191 m

+191 m

PIAZZA: STAY COOL

+185 m

wooden platform

green roof

MUSEMSTRASSE


PROJECT: MATERIALS AND VEGETATION STRATEGIES AGAINST URBAN HEAT ISLANDS

VEGETATION SELECTION

CUT’ KEYPLAN

TREES SUITABLE FOR THE SPONGE SYSTEM

CUTS AND PLANS’ SCALE 1:100 MARKET’S PIAZZA: CUT AA’ A

RAIN WATER BASINS

A‘

C B‘

PIAZZAS

C‘

B TREE ROW

air temperature difference between current state and project‘s one: ENVI_MET simulation >0,6� C

IN PLACE

0,2 � C

surface temperature and albedo comparison between current state and project’s one: ENCI_MET simulation current

current project

Relax and water collector area: 16 m

Tram and car: 6 m

project

25

0,15 10 6

11

16

21

Market‘s piazza: 41 m

surface temperature (C)

35

albedo

0,2

Safe biking

gum technology in the tram tracks

FUNCTIONAL CRITERIA

Piazza

old Vienna cobble

(hour) TREE ROW

air temperature difference between current state and project‘s one: 12 O’CLOCK ON THE 30th June 2019 ENVI_MET simulation

PIAZZAS

Acer platanoides L. Tilia cordata Mill. Sorbus aria Crantz

below -0.32 °C -0.32 to -0.23 -0.23 to -0.14 -0.14 to -0.05 -0.05 to 0.03

RAIN WATER BASINS Fraxinus excelsior L. Betula pendula Roth Ulmus minor Mill.

Magnolia kobus DC. Idesia polycarpa Maxim.

CANOPY: DIAMETER >10m

CANOPY: DIAMETER 5-7m

CANOPY: DIAMETER 6-15m

DECIDUOUS: WINTER SUN

DECORATIVE VALUE

DECIDUOUS: WINTER SUN

NTEGRATION WITH EXISTING SPECIES

DECIDUOUS: WINTER SUN

0.03 to 0.12

COMPOSITIONAL CRITERIA

piazza stay cool: 23 m Foggy fountain cooling hot wave

the path: 2,5 m

tram and car: 6m

the path: 8,5 m

green transition: 31 m

Piazza

old Vienna cobble

boardwalk: 3 m

STAY COOL

canopy to climb: 9,5 m

MARKET’S PIAZZA

tramway and car: 6 m

TREE ROW

GREEN TRANSITION: CUT CC’

PIAZZAS

PIAZZA: STAY COOL: CUT BB’

The path

slab-on-ground concrete

Pavement

Boardwalks

light granite

Pavement

steel

light granite

TECHNICAL SECTION. SCALE 1:20 Source: Anika Stelzl, TU Graz - Institute for Urban Water Management and Landscape Water Engineering

cobbles (10cm) continuous support 0-15mm (4 cm) base layer (25cm) undergravel mat (3cm)

plant soil type A-C plant soil type D loosening of the existing soil (20 cm)

tree grate concrete cube (140*140*70 cm) gravel 2-4 mm

STAY CONNECTED: THE PATH. GRANITE PAVEMENT AND SPONGE SYSTEM

cobbles (8cm) continuous support 0-15mm (4 cm) base layer (15cm)

geotextile class 3 air permeable base layer gravel 32-63 mm (20cm) skeleton soil gravel 100-150mm (60-80 cm) loosening of the existing soil (20 cm)

laying concrete (15 cm) sliding fabric gravel 0-32 mm (10 cm)

street drain with sand filter overflow outflow

plant soil type A-C plant soil type D

waste water pipe tree grate concrete cube 140*140*70 cm strip foundation C 20/25

street drain spacer ring concrete air holes at the height of the air-permeable base layer gravel 2-4 mm

cobbles (8cm) continuous support 0-15mm (4 cm) base layer (15cm)

WATER BASIN

PIAZZAS: OLD VIENNA COBBLES, TRAM WAY AND SPONGE SYSTEM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.