KIM MINGYUN
2013-2016 ARCHITECTURE PORTFOLIO
Kim Mingyun 2013 - 2016 Architecture Portfolio Printed 2017. 01. 01.
"Erfinde dich selbst"
PRIZE
I answered "Ich erfinde mich selbst als Architekt"
Name
Kim Mingyun
Nationality
South Korea
Date of Birth
06 November 1990
Education
SeoulTech Architecture Bachelor +82-10-2951-9845 Mingyun17@naver.com Instagram.com/massless_
2013. 4 - 8
2013. 12 우수래포트 경진대회 - 최우수 2014. 6 3학년 2학기 교내 설계강평회 - 최우수
ENGUARD 3D INTERNSHIP - 시흥 소래산 마애불 3D Scanning 보조작업
2014
2014. 10 서울시 누리공간 공모전 - 장려상
대학연합 도시환경 개선 동아리 URBANGROUND - 동작구 공공벤치 프로젝트
2015
2015. 9 AUTODESK DESIGN FOR FUTURE - FIRST PRIZE
- 청춘박람회 참여
2015. 12 - 2016. 2 IARC ARCHITECTS INTERNSHIP - 동부생명 인재개발원 신축숙소동 BIM 프로젝트 참여 (리서치, 모델링, 디자인, 모형제작, 설계도서 작성 등)
2016. 2 현장실습 수기공모전 - 장려상
MODELING
VISUALIZATION
REVIT
ILLUSTRATOR
RHINOCEROS
PHOTOSHOP
AUTOCAD
INDESIGN
3DSMAX
Vray
SKETCHUP
MentalRay
T-SPLINE
PRAMETRIC
ANOTHER
DYNAMO
ARCGIS
GRASSHOPPER
3D PRINTING
- 코엑스 업사이클 트리마을 전시 - 양천100 프로젝트
2015. 10 경기도 건축문화상 - 입선
2016. 3 SKYSCRAPER COMPETITON - EDITORIAL150(14-16)
- P건설 제강공장 3D Scanning 보조 및 역설계 모델링
2015. 9 - 2016. 9
2016. 1 서울시 버스서비스개선 시민아이디어 공모전 - 장려상
PROGRAM AVILITY
- 태안화력발전소 3D Scanning 보조 및 역설계 모델링
- 대전화력발전소 3D Scanning 보조 및 역설계 모델링
2014. 12 전국공과대학 팀프로젝트 경진대회 - 은상 2015. 6 4학년 1학기 교내 설계강평회 - 최우수
CAREER
2013
2016. 1 - 2016. 4 AUTODESK STUDENT EXPERT
2016
2016. 5 양천구 지역디자이너 우수디자이너 표창
- Autodesk Panorama Seminar In Singapore
2016. 3 - 6
2016. 6 THE K DESIGN AWARD - WINNER
김기준 국회의원실 주최 양천구 지역디자이너 활동
2016. 9 경기도 건축문화상 - 입선
2016. 12 <'정말' 젊은 건축가들> 전시회
2016. 9 교내 우수졸업작품 선정 2016. 10 건축구조경진대회 대한건축학회 회장상
2017. 1 -
2017
창조건축 공채 27기 입사
"Landscape" "Surface"
"Technology"
"Locality" 08 CURVE AS MEDIUM
08 D.D.M
P 92-101
P 82-91
05 ABSORBER
P 38-47
09 SOCIAL ACTIVITIES P 102-115
"Digital Materiality" 03 SUPER FLOWING SURFACE
P 48-61
07 INFINITE HUMANCHAIN
06 WORMHOLE
P 62-69
P 70-81
02 MEDIASCAPE
P 24-37
INDEX
"Defamiliarization"
INTEREST MAP
During the school year, I interest about some kewords. There are Locality, Surface, Technology, Digital Materiality, Landscape. Summarizing those kewords, There is one important keword. "Defamiliarization"
01 DOUBLE GEOMETRY P 6-23
01
DOUBLE GEOMETRY Defamiliarization Classification : Individual Project Project time : 2016 May - September Role : All of task Prize : 건축구조경진대회 대한건축학회 회장상
"Landscape" "Surface"
"Technology"
"Locality"
"Digital Materiality"
"Defamiliarization"
1:100 SCALE MODEL
Project Info SITE LOCATION
Seoul, Gangseo-gu Gayang-dong 1456
SITE AREA
13,000m2
USAGE
Gallery, Library
BUILDING AREA
5,101m2
GROSS AREA
10,120m2
BCR
39.2%
FAR
128.5%
FLOOR
B2 - 5 Floors
STRUCTURE
Steel Structure
HEIGHT
24.5m
01 DOUBLE GEOMETRY
STEP. 02
STEP. 01 Factor Analysis
Set up the Roof Geometry
Physical Data
Contour Data
Curvature Analysis Vehicle Circulation
Hydrosphere
Connecting Circulation View Point
Building Structure Reinforcement
Mountain Road
Contour Line
Road Urban Plan
Buffer Garden for the main road Connecting between nearby circulation and nature Making view point to the Han-river
Bearing Wall Core
Exposed Elevator
Exposed Elevator
Bearing Wall Core
INTERPRETATION TO THE GEOMETRY I interpreted urban context in two-way. And each factors were formed to each geometry and architecture. There are Hyperbola curved shell and Tensegrity.
STEP. 02
STEP. 01 Set up the Geometry
Set up the Module
Node
Digital Data
Compressive Member
Supported by Compressive Member
Tension Member
Another Program
Easy Transforming by parameter Stability of Structure Culture
Hanged Volume Divide upper & lower Program
Operation of Space forming factors Node
Hanged Slab Public Space
Development
<Two stage assembly Tensegrity>
<Transforming by Balance of force> Ground Level Public Space
City Information
Invisible Data
By each structure, geometry which forming architecture is generated naturally. Geometries control and form the all of building space.
11
STEP. 03
STEP. 04
Generating Landscape
Overlapping Two Geomertries
Inside & Ountside of building interact each ohter Roof Promenade
Curved Seat
Buffer Garden
Welcoming Garden
Mountain Road
Contour Line Triangular Glazing by Uneven Inside
STEP. 03
Arrangement of each module
Library Zone
Gallery Zone
STEP. 04
Generating Circulation
Gallery Zone Entrance Zone
Inner Promenade
Hanged Volume
Inclined Slab Triangular Slab
Hanged Program Support Programs
Public Area
Inserting Small modules for Level connection
Vertical Circulation
All of space factors are designed by geometry naturally. Next, overlapping ,collision two geometries, each space by double geometry interact each other. Finally, unexpected and spectacle space is formed.
NORTH-SIDE OF BUILDING
North-side of building, there are landscape that connected to mountain of west side and roof promenade. These are used to the place of experience nature and scenery for users, neighborhood residents.
ON THE ROOF PROMENADE
Roof promenade connect site circulation to mountain road and give us the more good scenery of Han-river.
13
All of building factors are dominated two geometries. These are Tensegrity and Hyperbola. Builing is formed by the collision of two geometries. Two geometries interact each other that hang between outside of building, inside of building. Each building factor reflect this condition.
Triangular Glazing & Steel Louver
Roof Promenade
Stone-panel Finishied (Beige Grey)
Media Volume
Pre-cast concrete panel Finished
Triangular & Inclined Slab
Concrete deck slab, Paint Finished (Glossy White & Grey)
10 Tensegrity Module
Steel Pipe & Tension Cable (Matt white)
Exposed Elevater & Reinforcement Structure Sunken Garden & Curved Seat Bearing Wall Core
Welcoming Garden
Stone-panel Finished (Light Grey)
Triangular Glazing
ASSEMBLE DIAGRAM
01 DOUBLE GEOMETRY
Steel Pipe
Steel Pipe
Welding
Welding
Steel H-beam
We should think to fabrication process for construct Irregular formed architecture. So I suggested two detail models for the tensegrity structure. Two joints
Y
Tension Cable
Z Z
X
High Tension Bolt
can be controlled to three-direction(X, Y, Z Axis).
X
By these detail, I can make structure module in the Y
3-dimension.
High Tension Bolt
<Free-direction Joint for Tensegrity>
Welding
Anchor Bolt
<Free-direction Pin for Tensegrity>
Tension Cable
Floor Finish
Steel Pipe
Concrete Slab Deck Plate
T-bar for Ceiling Splice Plate Ceiling Finish Welding Joint Steel Beam
1:5 MOCK-UP MODEL
FABRICATION DETAIL OF TENSEGRITY MODULE
Roof Structure
Construction Process
01 10 Tensegrity Structure Module
02 Generating Space
Principal Stress (Vonmises)
Principal Stress (3rd Principal)
03 Roof Shell Structure & Core
04 Triangular Structure for the skin
XY-Shearing Force Diagram
Z-Axial Force
05 Generating Roof Promenade
06 Generaning Frame and Glazing
Deflection
Strain
Load
Bearing Wall Core Reinforcement
Internal Force
Bearing Wall Core
Free-direction Joint
Compression
Exposed Elevator
Free-direction Pin Tension Reinforcement
Internal Force
Free-direction Pin
<Free-direction Pin for Tensegrity>
<Roof Shell Structure Analysis>
01 DOUBLE GEOMETRY
3F LIBRARY VIEW Tensegrity Structures make the floating sense and light space. The triangular slabs that are made naturally by tensegrity geometry reinforce these sense. And the light of reflected between each floor, make dinamic and interesting space.
17
2F REST AREA & GALLERY ENTRANCE VIEW The "Gallery Volume" is designed to media wall. These volumes divide lower floors & upper floors. These intrude to the each circulation and give us visual attraction.
01 DOUBLE GEOMETRY
Reception Lv ±0
Library
Lv +5,000
Sub Ent.
Library
LV +12,500 FLOOR PLAN
Sub Ent.
Lv +8,500
Kids Zone
Utility Area
Lv ±0
Lv +4,500
Office Lv ±0
Newspaper & Magazine Area
Lv ±0
LV +16,500 FLOOR PLAN
Conference Room
Lv +8,500
Rest Area
Lv +5,000
Hall
Rest Area
Lv -3,000
Lv +5,000
Cafeteria Lv +1,000
LV +9,500 FLOOR PLAN
Cafeteria
Lv +3,000
Media Center
Lv +8,500
Gallery Reception Lv ±0
Main Ent. Lv +1,000
LV +2,500 FLOOR PLAN
LV +6,500 FLOOR PLAN
LV +9,000 FLOOR PLAN
19 Buffer Garden
Pond Study Room
Lv +12,000
Art Gallery
Lv +14,500
Art Gallery
Lv +10,500
Sunken Garden
Roof Promenade
Art Shop
Lv +9,500
Welcoming Garden
LV +13,500 FLOOR PLAN
LV +16,500 FLOOR PLAN
ROOF PROMENADE FLOOR PLAN
01 DOUBLE GEOMETRY
X01
X02
X03
X04
X05
LV +24,500
Hanged Volume Media Wall
LV +16,500
Inner Promenade Public Area
LV +13,500
ART GALLERY
MEDIA CENTER ROOF PROMENADE LV +9,000
LV +6,500
LV +2,500
MAIN ENTRANCE CAFETERIA
CROSS SECTIONAL VIEW There are multiple program which related to culture. Art gallery, media center, library. This building is used to cultural complex in nearby area. This building can accommodate local resident, visitor and another. Tensegrity structure can form roof promenade, hanged volume and triangular pattern are in harmony.
X06
Vertical Circulation Exposed Elevater
X07
X08
X09
Outer Promenade
Hanged Volume
View Point
Media Wall
ART GALLERY STUDY ROOM
LIBRARY
REST AREA
RESTAREA
KIDS ZONE
X10
01 DOUBLE GEOMETRY
1:100 GRADUATE EXHIBITION MODEL I think that Architecture model is very impressive presentation tool. So I made large size model which is 1:100 scale and 1,800mm*1,000mm size. I expressed all of space, furniture arrangement in this model.
23
02
MEDIASCAPE Surface #3 Classification : Team Project Project time : 2016 March - May Role : All of task Prize : 2016 경기도 건축문화상 - 입선
"Landscape" "Surface"
"Technology"
"Locality"
"Digital Materiality"
"Defamiliarization"
Project Info SITE LOCATION
Nonsan, Yonmu 450-480
SITE AREA
52,724m2
USAGE
Cultural complex, Theme park
BUILDING AREA
12,879m2
GROSS AREA
12,859m2
BCR
24.4%
FAR
24.4%
FLOOR
B2 - 3 Floors
HEGHT
13m
STRUCTURE
Steel Structure
FINISHED
THK34 Low-E double glass, Exposed concrete, AL Frame
PARKING LOT
313 (Included 11areas for disabled, 11areas for bus)
27
Urban Context
Hydrosphere
Circulation
Tophography
29
ANALYSIS OF CITY INFORMATION Neglected display objects
Obsolete Buildings
Lacking of convenient facilities
I analyzed site information that including owner, site use, floors, decrepit degree. And I discovered site weekness. So I decide development direction on city scale. As a result, I makes the new site use plan. And because of checking building program operation degree, I make virtual reservation time table for this building program.
신연무대역 힐링타운
마산천 먹거리장터 논산훈련소
주차장 7% 공공공지 25%
숙박촌
자연녹지지역 (자연취락지구) 52,724m2
밀리터리파크
Obsolete Visit-area
Lacking of Parking lot
일반상업지역
Gallery that opened specific time 공원용지 11%
<Owner>
<Floors>
<Site use>
<Decrepit degree>
용도지역
자연녹지지역
자연녹지지역
용도지구
자연취락지구
-
공공공지
-
16,917.9m2
공원용지
-
5,639.1m2
Before
After
<Site use plan>
REFLECTION IN THE WATER PLAZA In the water plaza, projected light makes the kind of reflection by water space, glass wall. This reflection makes uncanny atmosphere in the plaza. And this reflection phenomenon cause influence near of space atmosphere.
31
DESIGN PROCESS In design progress, I set up waterfront, countour line, circulation, building mass, programs and another architecture elements to each surface. And I organized each surface. At that time, I focused that all of circulation is felt experience elementes during walking on the promedane, outdoor landscape, indoor spaces.
01 Making waterfront rest area
02 Assigning program along circulation
03 Making patterns by program
04 Materialization outdoor landscape
05 Indoor circulation flowing that connect outdoor landscape
06 Building position that think
about waterfront, circulation
07 Interact with outdoor, indoor circulation
08 Planting on the promenade
09 Install media elements
02 MEDIASCAPE
BASEMENT GARDEN & OUTDOOR STAGE
FLOWER GARDEN
OUTDOOR EXPERIENCE ZONE
WATER PLAZA
HISTORY GARDEN
VISIT AREA
CULTURE CENTER
EXPERIENCE & EXHIBITION AREA
MASTERPLAN FOUNTAIN PLAZA
SPORT CENTER
35
Sub structure for water plaza
Tension cable structure for the overpass
Changed planting along roof-top circulation
Having many circulation options that across indoor and outdoor Making roof-top promenade
Stereoscopic circulation that crossing indoor, outdoor and each floor
Media that intervene into the circulation
Each program and media wall that Hanging in the large space
1Way steel ramen structure for maximum 25m long span
Hanging space in the large space and Circulation that near to water Vertical circulation & Service area B2-1F Parking lot 313 (Included 11areas for bus, 11areas for disabled)
6 CULTURE CENTER Sunlight, projected media light, glass, water reflection is overlapped on the borrowed light by ceiling structure. This makes uncanny atmosphere that meet various light.
3 VISIT AREA
1 MAIN ENTRANCE
Not just ornament, media is used to architecture element actively. In circulatio wall interact with exhibition, experience elements and other architecture el
Long way circulation and lamp across hall space. So many kinds of circulation and view are crossed. Besides, these elements make dynamic space atmosphere by interact with diagonal media walls.
B2 FLOOR PLAN
3 7
1
12
13
10
5
2 8 1
6 4
7
25 24
B1 FLOOR PLAN
A-A' SECTION
1st FLOOR PLAN
on, media lement.
INDOOR SPACE
SPORTS CENTER 10 SWIMMING POOL
14 WAR HISTORY
19 EXPERIENCE LAWN
2 HALL & REST AREA
11 BOWLING CENTER
15 BARRACKS HISTORY
20 HISTORY PLAZA
3 VISIT AREA
12 HEALTH CENTER
16 NEW BARRACKS ZONE
21 WATER PLAZA
4 EDUCATION ROOM
13 LOCKER ROOM
17 HIGH-TECH
22 ENTRY GARDEN
18 MILITARY FACILITIES
23 FOUNTAIN PLAZA
6 CULTURE CENTER
24 BASEMENT GARDEN
7 COMMERCIAL AREA
25 OUTDOOR STAGE
8 RECEPTION AREA
21 WATER PLAZA In the water plaza, projected light makes the kind of reflection by water space, glass wall. This reflection makes uncanny atmosphere in the plaza. And this reflection phenomenon cause influence near of space atmosphere.
9 MANY PURPOSE HALL
B
A'
11
2
2 17
14
21 19
15 2
OUTDOOR SPACE
1 MAIN ENT
5 OFFICE
9
EXPERIENCE ZONE
16
23
2 18 20
25 24
2nd FLOOR PLAN
B-B' SECTION
A
22
B'
ROOF PLAN
03
ABSORBER Technology Classification : Team Project Project time : 2015 December - 2016 January Role : All of task Prize : 2016 Evolo Skyscraper competition - Editoral board 150 (14-16)
"Landscape" "Surface"
"Technology"
"Locality"
"Digital Materiality"
"Defamiliarization
Human Catastrophe
Substitute to Law of conservation of motion
Think again about Human catastrophe in detail, it is that ‘huge group of people’ lose home and are propelled into ‘narrow space’ by the disaster mentioned above. The most worried and terrible thing of Natural disasters or wars, terrorism is secondary disaster, Human catastrophe. It eliminates house that people live in stable, makes the refugees and even threaten other people living commonplace. And then the group of homeless might stay in narrow area, it could be changed to slum and there would exist a criminal who exploited the panic situation. These people are massive, get panicked and they are moving constantly to find a place to survive.
So we tried to substitute the two features (Massive group of people, Unpredictable direction of refugees) for ‘momentum’ which used in physics.The momentum is expressed by the mass(m) and velocity(v). Let’s substitute ‘Massive group of refugees’ for ‘m’ and ‘Moving velocity to find new home’ for ‘v’. Then refugees(Human Catastrophe) can be considered the momentum mv, and our mission is to make the momentum as close to zero causing various problems. But since the momentum with refugees is preserved by the law of conservation of motion, it should share the momentum by the collision with other objects. Also we need to make velocity almost zero because of its large mass. So we need some building which has large mass that can take in refugee’s momentum. And that will be an inelastic collision. However, this building is followed by a number of constraints.
PROCESS OF INELASTIC COLLISION
Constraints
1)Massive group of people 2)Unpredictable direction of refugees. This Human Catastrophe with two features is going to occur over and over again, so it is duty of our humanity to prepare for this Catastrophe.
First, the building is not only simply increases the mass. If the building expands widely, we should use the large space for unpredictable disasters. Besides, it could make large area to slum. So we have first constraints that the building must have not only small space but also large mass. We must also not only consider the momentum but also ‘time’(t). Human Catastrophe doesn’t occur gradually. It is massive momentum that occurs by sudden disaster. In physics, momentum is equal to the impulse that multiplication of Force (F) and Time (t). Momentum generated in a short time has a huge Force. So we defined again momentum to impulse. The influence by refugees occurred can be defined F and the time that stay in the building can be defined t. If refugee occur and come to the building, it must receive the Force (F) at one time. As time goes by, let the people who become stable get out, then the Force is reduced and the building can get smaller gradually. Likewise, building performs a little task usual time. And it needs to get biggerin short time to receive refugee’s impact also needs to get smaller gradually when they become stable.
41
03 ABSORBER
43
Hot-air balloon Unit 1) 2) 3) 4) 5)
It is normally folded but it can be increased through the heat and air injection. It can be made only by air and heat cut off again as usual state. One household can live in one hot-air balloon unit. When floating a balloon in the air, it is possible to remove a significant dead load. We can quickly put in and out the Unit to adjust the number of hot-air balloon.
Considering above five functions, the hot-air balloon can be a key concept to accept Human catastrophe. In conclusion, our building shape has to become big in short time and also become small gradually at disaster situation. But in normal state, it just performs disaster management center. We found the idea which can perform above every function. It is Hot-air Balloon. Itâ&#x20AC;&#x2122;s one unit. The list is that the hot-air balloon how to perform certain functions.
Air Balloon Unit !
It can accommodate more people per the horizontal unit of area and also it can be prevented from the surrounding area to be slumed.
1Day Process Transforming
Universial Solution
We made a building by hot-air balloon as follows. First, envelope is air film structure and it is not stretched at normal state. When refugees occur, air film consisting of several layers of air tubes are blow up by injection of air and heat. This is connected with wire that involved electricity line and air conditioner duct and it opened together. At the same time, 9 Luffing tower cranes increase themselves and build deck plate which people can walk. Finally, hot-air balloons (stored at 4~6 floor) are launched on the roof. It will be connected with electric wire and become to shelter. This process has to be done quickly. It is designed by tower cranes and hot-air balloon which can be installed within 24 hours. We call it a 1day process.
One skyscraper cannot be a solution itself to Human Catastrophe. This sky scraper needs to be placed on the earth everywhere. Then they have to constitute disaster management network and prepare to Human Catastrophe. Looking at the process, people come to the nearest skyscraper in the disaster area. Through this network over received skyscraper can distribute to other skyscraper, it could prevent excess acceptance of a skyscraper and be more quickly to stabilize the refugees
Expansion
Install Support-Unit
Install Units
Scale-down
SHARING OF PAIN
03 ABSORBER
STRUCTURE Our crane is important as hot-air balloon. It can be built upward really fast speed. And it performs three important roles. First, it can go upward by itself. Next is lifting anything. The last one is put the deckplate which is the path of people. And all the materials are on the sixth floor. In roof floor, hot-air balloon is launched. lines. Purification and sewage line that supply water and drain sewage.
Self Levling
Lifting Facility
NETWORK OF UNIT The units can connect with the bridge involved itself below. First unit connect with long deck plate at the tower crane. Then it can connect with other hot-air balloon units by the bridge. By connecting with each other, they consist of living space in the air.
Installing Dsckplate
Connect
Supply
Infra unit
Security
Another sector
Rescue
Connector Meeting center
Residence unit
45
DETAIL ENVELOPE
ETFE & Solar panels Two layerd air tube
Air filter Exhaust air (Indoor air)
Supply air (fresh air) System plug ETFE & Solar panel
It will be the production of electricity in the skin film and the solar panel
Heat wire
Helium gas
RESIDENCE UNIT
Inlet
Air tube increases the envelope which is made of ETFE filmby expands itself. But it is anchored by the wire cable. This wire cable involves air paths (ductile) and electric line. It will connect with hot-air balloon units and exchange indoor air to fresh external air. Also it will supply the electricity. The electricity comes from machinery room and envelope. And the Envelope film has some photovoltaic panels that produce electricity.
UNIT
Outlet
Air tube consists of two-layers. Outer layer has helium gas,and inner tube has thermal wire. Then the tube rises because of the lighter helium gas and low density of the air inside tempered by the heat rays. Hold & Connect Power, Airline
Helium Hot wire
Outlet air
Power line Inlet air Helium air tube
Process of install Unit by filling the air, a spread structure.
Wire cable has two roles. It exchanges the indoor air to Fresh outdoor air and supply electricity. It is connected with plug.
The rise in the hybrid method of helium gas and hot air balloon with the support advanced to achievewhen the cable of purpose to allow fixed.
SUPPORT UNIT (SECURITY)
ENVIRONMENTAL SYSTEM
Water & Drainage facility Cable dispersion
Power Facility
HVAC System
Water & Drainage System
Air Circulation
And there is a machinery room at basement. There exists HVAC system, Water & Drainage system First, HVAC system is related to wire cable. In normal state, wire is winded in the system box. But in disaster situation, it is stretched out to the envelope. Water & drainage system has two stream lines. Purification and sewage line that supply water and drain sewage.
Secondary electric trasformer Winding the wire cable Air inlet ducts Water supply facilities
47
AIR-BALLOON UNIT PLAN
Dock
Entrance Connect
Unit Floorplan
Unit Section Unit Elevation
SUPPORT UNIT (TOILET & SHOWER)
SUPPORT UNIT (RESCUE) GARDEN
4-6F SUPPORT FACILITY 3F HEADQUATER 2F HOSPITAL 1F TEMPORARY SHELTER URBAN INFRA MACHANICAL AREA
04
SUPER FLOWING SURFACE Surface #2 Classification : Individual Project Project time : 2015 September - December Role : All of task Prize : 2016 The K design award - Winner
"Landscape" "Surface"
"Technology"
"Locality"
"Digital Materiality"
"Defamiliarization"
01 DOUBLE GEOMETRY
51
Project Info SITE LOCATION
London, United Kingdom
SITE AREA
6,605m2
USAGE
Library
BUILDING AREA
4,144m2
GROSS AREA
17,616m2
BCR
62.7%
FAR
266.7%
FLOOR
B3 - 7 Floors
STRUCTURE
Steel Structure
FINISHED
THK34 Low-E double glass, THK4 AL panel
PARKING LOT
201 (Included 12areas for disabled)
#01 What you want? Before starting project, I thought this. "What is the best library for the publc?" And I got the answer. This answer is "Each people's needs are not same". So I decided that put all of library space conditions in the one building.
#02 Various Posibilities by overlapping I was attracted the posibility of overlapping. If I overlap each of the various patterned skin, materials, I could get unexpected more various space conditions and regulate space opacity, density, atmosphere in the one building.
#03 Choosing my place You can have many options of circulation. So you can choice your favorite reading rooms, space. In this case, trip that choosing one's place is occured. Finally, you can get a sense of place in this building.
#04 Overlapping each surface I adopted some logic that zoning the program, making space atmosphere. This is a division of bright & active space, dim & silent space. And this is made by surface's patterns and materials.
53
Bright Bright
Dim & Silent
Dim & Silent
Glass
Solid material surfaces coil around silent and private space programs. These surfaces divide program boundary.
Glass
Metal Panel
Metal Panel
Metal Fabric
Glass surfaces for bright space
Metal Panel
View point for the Thames River
Solid Surfaces for privacy
Northside of building is made by glass material surfaces for the bright and active space.
Glass
Glass
Glass
Glass
Each surfaces are flowing dinamically, because of reacted each circulation.
Surfaces that reacted by circulation
<Input paramaters>
<Making surfaces that have each of character>
OVERLAPPING EACH SURFACE All of building form and space are made by surface study. Each surface has various patterns, materials. By overlapped these surfaces make specific form and space atmospheres.
<Overlapping similar surfaces>
04 SUPER FLOWING SURFACE
FINAL MODEL Final model was made by metal board and film paper. First, I made 3d modeling and made unfolded plan. Next, cut by knife cutting machine and finallym assembled each part. I made all of structure 3d modeling. So all of structure is included inside of model.
55
Making space condition by overlapping surfaces
Making atmosphere by various patterns
Surfaces can divide space condition and program by overlapping. Each surface has another materials. In overlapping process, I have regulated space density and transparency by material.
Each space and program have a well matched light condition. Light condition is made by overlapping various patterns. So you can always select an optimum reading room.
Assigning various circulation options You can have many options of circulation. So you can choice your favorite reading rooms, space. In this case, trip that choosing one's place is occured. Finally, you can get a sense of place in this building.
Program zoning by each surface Each surface can perform program zoning. More deap inside to the buiding space, there are more silent and dimmer space. But the other way of building space, there are more energetic space more bright open space.
CHOICE YO
You can have many options of circulation and spa garden, atmosphere and space. Now, you
SKY ROUNGE
SKY ROUNGE
ENCOUNTER AREA
ENCOUNTER AREA CHIRLDREN CENTER ENCOUNTER AREA
SHELF AREA
CHIRLDREN CENTER
PUBRIC
OUR PLACE !
ace. So you can choice your favorite reading rooms, u can get a sense of place in this building.
ENCOUNTER AREA ROOF GARDEN
INVESTIGATION ROOM
INVESTIGATION ROOM
VIDEO LIBRARY ROOM
OUTDOOR GARDEN
LEISURE CENTER OUTDOOR GARDEN
OFFICE
2
8 6
3 1
1
4
10 13 5
7 2
B3-B1 FLOOR PLAN 201 (Including 12areas for the disabled)
1st FLOOR PLAN
10
14
1
MAIN ENT
2
SUB ENT
3
MAGAZINE & NEWPAPER
4
LEISURE CENTER
5
RESTAURANT
6
REST AREA
7
FILE ROOM
8
HEADQUATER OFFICE
9
RECEPTION AREA
18
9
7
4
9
19
9
10
2
10
2nd FLOOR PLAN
WESTSIDE ELEVATION Flying steel louver
2
10 GARDEN & TERRACE
3rd FLOOR PLAN
Double skin layer by metal fabric
Vertical wooden louver
Layered complex patterns
17
11 ENCOUNTER AREA
15 11
11
12 COMPUTER ROOM
9
9
9
10
13 AUDITORIUM
15
11 10
12
12
14 CHIRLDREN CENTER 4th FLOOR PLAN
5th FLOOR PLAN
15 INVESTIGATION ROOM 16 SKY ROUNGE 17 SNACK BAR 18 GALLERY
10 16 9
15
19 VIDEO LIBRARY
11
10
6th FLOOR PLAN
EASTSIDE ELEVATION
10
7th FLOOR PLAN
Hanging flowerpot & Vines
Random patterned AL panel
Triangular patterned glazing
Layered complex patterns
CONSTRUCTION PROCESS
SPAN 10-14m
STRUCTURE
2Way Ramen + Tension cable reinforcement
SLAB
2Way Ramen structure & Core
Secondary structure & Mega-column
Deckplate + Cast-in-place concrete, Tile carpet finished
PEDESTAL Complete fix
ROOF Waterproofing layer concrete + Roof garden
MEGA-COLUMN O-700*14
Purlin for paneling & Tension cable reinforcement
Paneling main surface
Filling gaps of main surface
Adding details, landscape patterns, circulation factors
NOMAL-COLUMN H-400*400*13*21
1-3 FLOOR BEAM H-900*300*16*28
4-7 FLOOR BEAM
H-700*300*13*24 ~ H-800*300*16*25
61
Steel structure
X
Steel-pipe sub structure Paneling
Z
X
Y
Z
Y
<Free direction bracket>
FD bracket
FDP bracket
Water proof & Insulation
<Free direction panel bracket>
Insulation
Aspalt sheet
Sealant
Sealant
Arc pipe purlin Steel-pipe sub structure
Sealant
Waterproof sheet
AL panel FDP bracket
<Paneling System>
Fabrication We should think to fabrication process for construct Irregular formed architecture. So I suggested two bracket models and paneling system. Two brackets can be controlled to three-direction(X, Y, Z Axis). By these brackets, I can join structure and panel in the 2way-curved condition.
FD bracket
05
INFINITE HUMAN CHAIN Landscape Locality Classification : Team Project Project time : 2015 December - 2016 January Role : All of task
"Landscape" "Surface"
"Technology"
"Locality"
"Digital Materiality"
"Defamiliarization"
Prologue Baltic states get independence with nonviolence protest. It showed just how effctive nonviolent protest can be. We want to make Memorial which remind people that moment like a time machine. we want that they can see the moment beyond it. Remembering is thinking from specific part of moment. we set human chain & song of freedom as part. The parallel two mirrors reflect one people infinitely. The water which not stop but flow-ahead make sound. each thing can reflect human chain& song of freedom.
05 INFINITE HUMAN CHAIN
Coating
Containing
Density
It was not easy for baltic states to make human chain because they had few people than other similar size nations and traffic was not developed well. Including public bus, many cars was too busy to move people. Dispite of military threat of Soviet Union, they finally gather together at appointed time pm 7:00 and sing song of freedom. How much time marched on while all people go back home ?
PM 7:00 Ceremony
Time
Water
Green
Reflection
There was physical and political difficulty on baltic states. Nevertheless, they made proud moment. we decide to contain this effort into memorial. the long axis of site can be time line and middle of it can be hilight point. Long way can be not weakness but strength which make gradation. With mirror and water, this can be public park at the same time. It has sky-garden on the roof. the exhibition space, souvenir shop, cafe is undder it. people can stop by there befor or after hilight area.
Sealant
Glass
Frame
Can't see
Can see Paralled Mirror
Parallel special glass mirror We choose mirror coated with special glaze. through this mirror, people can see outside at inside but surface reflect the light from outside. when people walk waterside they meet infinite human chain. on the other hand, when they are in cafe they can see the effect on the mirror in which they are. it will give them see the same experience with different view.
Event
Highlight On the long site
4.2m
67
1 Set Circulation
2 Divide Area
3 Up & Triangle cut
Main experience way, two cross pass And preserve existing trees
Folded way make dividing area and avoid trees
Make mirror wall and cut by vertical triangle
4 Extrude
5 Make Trasition-point
6 Water Flow
Calculate angle that people see specially through
Water cause interest and make sound when people walk or not
Make mass with green roof
DESIGN PROCESS For the maximizing reflection phenomenon, many factors are considered. View point, angle, materials, circulation, and wall height are these.
05 INFINITE HUMAN CHAIN
Mirror door
Bridge view point Tree
Access view point
Calculated Angle Specific event will be offered to change area mood before people go to hilight area. Walking throught the bridge, they can see the tree. there is mirror door on the bridge so people can not only go to in but also see the various, anomalous views. At the access point, they can see the bridge, mirror door and waterfall.
7.4m
3.5m
7m
3.2m 2.8m
0.0m
Water Circulation The water cleaner and pump which is under the basement care water circulation. roofgarden support to gather rain. water level and distrivution avoid original trees. People should walk on stepping-stones but in the hilight area, they can go on without it because water level is low enough.
69
EXHIBITION AREA Inside of park, there is exhibition & rest area. You can see out of mirror but vice versa, can't see inside.
WATER & GRAVELS
INFINITE REFLECTION
At the highlight area, people walk not on stepping-stones, but gravels. wading
Infitite reflection of mirror reproduce 'human chain' and remind the meaning
across shoal, make sound as their foos step. If they donâ&#x20AC;&#x2122;t, there is white noise
of nonviolence protest.
from small waterfall beyong the mirror.
Preserve existing tree
20m
Entrance for the exhibition area
Parking area
Cross pass
Cross pass Outside of site is way for cross pass.
20m
28m
24m
25m
20m
46m
24m
Pass area
Introduction area
Development area
Highlight area
Development area
Introduction area
Pass area
06
WORMHOLE Digital Materiality Classification : Individual Project Project time : 2015 March - June Role : All of task Prize : 2015-I 교내설계강평회 최우수
"Landscape" "Surface"
"Technology"
"Locality"
"Digital Materiality"
"Defamiliarization"
73
Main road axis
Residential
Commercial 1
Site use
35(Floor)
14
Path axis
Building Floor
Main road axis Mt. choan Blocked by buildings
Jungnangcheon
0
75
Mt. Bonghwa
150(m)
Topography
Office use
Office use Buildings
Facade axis
View axis
Project Info
Green & View
1930
1980
Decrepit Degree
2011(Year)
SITE LOCATION
Seoul, Nowon-gu Gongreung-dong 680
SITE AREA
1,881.4m2
USAGE
Office(Including exhibition, education, commercial)
BUILDING AREA
860m2
GROSS AREA
11,561m2
BCR
45.7%
FAR
614.5%
FLOOR
B3 - 18 Floors
HEIGHT
72m
STRUCTURE
SRC Structure
FINISHED
THK34 Low-E double glass, THK18 Color glass
PARKING LOT
120 (Included 8areas for disabled)
01
Making void by 'Reference Axis'
02
Making path & Vertical circulation
03
Regenerating void for structure & Core
Void Circulation
04
Regenerating mass form by void
05
Making terrace that connected to void
06
Making 'Void tube' and inserting patterns
All of floors have void variation and irregular forms. As a result this building has not 'Standard floor' and occures some deadspace. So I adopted 'Shared floor' on the 5F, 18F. 'Shared floor' is shared public program in the building for example cafe, conference room, health area, library. So other floors have sufficient area.
CHAMELEON 'VOID TUBE' Technology & Digital materiality are very important motive in this project. So madia factor is adopted. 'Void tube' is this ! Between two layerd glasses on the void tube, LED light is inserted. So 'Void tube' is trasformed various color likes chameleon. These color is controled by many variable factors.
77 300。
315。 330。
285。
w Vie
W
345。
is Ax N
AM 07:00 255。 15。
240。 30。
Envelope PM 13:00
225。
Void Circulation 210。
Void Tube Envelope Envelope
Double Skin
195。 75。
PM 19:00 Double Skin S
E
Sustainable Envelope For the transparency, many parts of building skin are designed glass. So eastside and weside skin is designed double skin system by sunpath analysis. Specialy, System blind is adopted on the eastside skin.
e Facad
165。
150。 135。
Axis
120。
105。
06 WORMHOLE
11 1
1
HALL
2
MAIN ENTRANCE
3
REST AREA
4
OFFICE
5
CONFERENCE ROOM
6
EDUCATION AREA
7
CAFETERIA
8
COMMERCIAL AREA
9
GARDEN
2
8
10 GALLERY 11 MACHANICAL AREA
6
B4 - B1 Floor plan
1st Floor plan
Parking lot
Public Floor
4
4
4
7 3 9
7
10
3
4
10
2nd Floor plan
3rd Floor plan
4th Floor plan
Public Floor
Public Floor
Public Floor
5th Floor plan
3
4
6th Floor plan
3
4
7th Floor plan
79
4
5
4
3
4
4
3
3
4
3
3
7
4
3
8th Floor plan
4
9th Floor plan
4
10th Floor plan
4
11th Floor plan
4
12th Floor plan
13th Floor plan
Shared Floor
4
7
4
4
4 10
3
3
3
10 10 4
14th Floor plan
5
15th Floor plan Shared Floor
5
4
16th Floor plan
4
17th Floor plan
4
18th Floor plan
Roof plan Roof Garden
06 WORMHOLE
18F Rest Area 'Void tube' gives buliding members the feeling of solidarity. Void tube is used to public, circulation, rest areas. In the urban scale, void tube interact to pedestrian, urban scenery.
15F Shared Floor 8F, 15F floor are used to 'Shared floor'. Shared floor is used to bulding member's welfare, rest.
7F Office 'Void tube' makes problem of lacking floor area. But this problem is supplemented by 'Shared floor'. All of welfare, public uses are located in shared floor. As a result, this building's available area is same as grid system office.
1F Public Area Low floor areas are used to public area. There are Commercial area, garden, exhibition area and cafeteria.
FINAL MODEL All of skin and void tube was made by 3d diagonal surfaces. So I delicately made 3d modeling data. And I made unfolded plan for all of 3d diagonal surfaces by rhinoceroes. Finally I made acrylic model parts by laser cutting machine and assembled all of parts.
07
D.D.M Surface #1 Classification : Individual Project Project time : 2015 July - August Role : All of task Prize : 2015 Autodeks Design for future competition - First Prize
"Landscape" "Surface"
"Technology"
"Locality"
"Digital Materiality"
"Defamiliarization"
07 D.D.M
Building Usages
WHOLESALE CLOTH
DESIGNER'S CLOTH
Building Floors 1
12
34
READY-MADE
ORDER-MADE
MASS PRODUCTION
SMALL QUANTITY PRODUCTION
SALE ON THE WAREHOUSE
SALE ON THE BRAND STORE
NONE BRAND
BRAND IDENTITY
REPLICA
ORIGINAL
Decrepit Degree 1920
1980
2011
?
Building
IN THE SAME SPACE
Road
Subway
Project Info Site Use Commercial Area Residencial Area
Boundary
Program Network
Analysis Cultural Complex Wholesale Cloth Shops Old Markets Site Flowing to Node
SITE LOCATION
Seoul, Jung-gu, Bangsan-dong 42
SITE AREA
3,500m2
USAGE
Cultural complex (research, commercial, exhibition)
BUILDING AREA
2,134m2
GROSS AREA
4,231m2
BCR
59.4%
FAR
198%
FLOOR
5 Floors
STRUCTURE
Steel Structure
FINISHED
THK34 Low-E double glass, THK18 Color glass
85
07 D.D.M
MATERIAL FABRIC
Sewing of architectural fabric MASS SURFACE PLAN
Project main subject is sewing of architectural fabric. I substitute fashion design process for architecture design process. Many architecture raw materials, for example glass, steel frame and various light structure are expressed to architectural fabric. I make building form by ovelapping surface that made from architectural fabric. this process is looked like that sewing fabric in fashion design. So I implement the new architecture design process that not mass design base. this building form is made by surface base. the massless architecture.
PATTERN
DECORATION
FASHION DESIGN PRCESS
SKIN INTERIOR ORNAMENT DETAIL
ARCHITECTURE DESIGN PROCESS
Select design alt
Pure mass
Insert Design lines
Making space
Insert patterns
I made five mass alt that made by each separated concept. Next to select final one, I created 3d-printing mass model. And review design, skin patterns , structure, and space. Finally, I determined definite elevation design by sketch.
87
Random patterned panel
Triangular patterned glazing
Louver
Parametric patterned panel
Double voronoi frame
Punching metal
SURFACE BASE ARCHITECTURE Glass, metal panel, metal frame, steel beem, truss, louver... these are light materials in architecture. Each surface is made up by these various materials and patterns. Surfaces form the mass, space and skin. This process is looked like sewing fabrics in fashion design.
07 D.D.M
This building is the new cultural complex in fashion part that designers and customers are interact on each other. On the first floor, there are public usages. cafeteria, eventroom and main hall. Second and third floor are used to commerce. Fourth and fifth floor are used to designer's laboratory and exhibition area. Clothes that designed in these floor are sold in the lower floor.
1
2
3
8
3
4
6
8 2
11
10
6
7 11
9
6
4
5
9
12
1 HALL
2 MAIN ENTRANCE
3 SUB ENTRANCE
7 SHOW ROOM
8 ADMINISTRATIVE OFFICE
9 DESIGNER LABORATORY
4 EVENT HALL 10 OFFICE
5 EXHIBITION AREA 11 CONFERENCE ROOM
6 REST AREA 12 TERRACE
5
89
07 D.D.M
Among many of the modern technologies, 3d printing is very interesting and important technology in the contemporary architecture. 3d printing architecture model give us design inspiration, space information and form possibilities by very easy process. I checked my design, structure and space by the 3d printing models. I repeated this process. Printing... confirm... printing... confirm...printing... Finally, I got this design.
91
1:1 Scale detail mock-up We should think to fabrication process for construct Irregular formed architecture. So I practiced structure and joint detail in the 2way-curved condition by 1:1 scale mock-up model.
R150 STEEL PIPE
STEEL COLUMN
THK4 AL PANEL
None paralleled plane
R300 BANDING PIPE
THK4 AL PANEL
BRACKET
THK2 AL SHEET
WATER PROOF SHEET
THK15 WATER PROOF THK50 INSULATION
ASPALT SHEET WATER PROOF SHEET
THK3 WATER PROOF SHEET THK4 AL PANEL FDB SYSTEM (FREE DIRECTION BRACKET) THK18 COLOR GLASS
BRACKET
R50 PIPE PURLIN
THK34 LOW-E DOUBLE GLASS THK4 AL FRAME POLYURETHAN INSULATION POLYAMID STRIP
None paralleled plane
08
CURVE AS MEDIUM Landscape Classification : Team Project Project time : 2014 September - December Role : All of task Prize : 2014-II 교내설계강평회 - 최우수 2015 경기도 건축문화상 - 입선
"Landscape" "Surface"
"Technology"
"Locality"
"Digital Materiality"
"Defamiliarization"
08 CURVE AS MEDIUM
Group & Program
Green
Domain open Domain close
Residence
Link
Group & Program
One code for town identity & community
Commerce
Code Setting
Green axis
Locate Point
Grouping
Extend & Link
Commerce Reversed curve
2 Point inflection
TOWN ZONING PLAN
Rapid curvature Start point
Rider
Additional line
Courtyard Public facilities
Religion
Lighting
Parking Fountain
Green
Site
Deck
Car
01 Site
02 Position
03 Out-line
04 In-line
05 Overlap & Select
06 Apply
Low-rise housing Apartment
ANOTHER TRY In the new town, Commercial housing has some problem in the relation about many program, each housing building. I suggested an powerful alternative for mediate Connection, Seperation, Opening.
SITE USE
95
CONTROL SPACE RELATIONS BY CURVED LINE I suggested "Curved line" as mediation factor. This factor can control relation of program, units in the housing complex. For example, connection, seperation, opening degree about each territory.
08 CURVE AS MEDIUM
MAKING INDENTITY OF HOUSING COMPLEX In the housing complex, all of building unit share same code. This code is expressed to public park. And this give us an indentity of housing complex. So curved line, housing buildings, park are read on the large scale context.
97 ROOF GARDEN CENTER GARDEN
LARGE UPWARD TERRACE
MEDIUM
SMALL
COMMERCE
ENTERY WAY
Various units in the one building
Sequance by each wall
Small Grouping
Center fountain Scene light
Flower garden
Group Union
Project Info Scene light
Two colors marble panel
Flowing Elevation Building elevation is made by marble panel and galss. Marble panels are composed to two color. And these colors make elevation by randomizing two colors. As a result, this elevation draw in people to the center park
SITE LOCATION
Hanam, Misa hangang city R-2 block
SITE AREA
256m2 x 9Areas
USAGE
Multi-use housing
BUILDING AREA
125m2 (Unit)
GROSS AREA
372.8m2 (Unit)
BCR
48.8%
FAR
186.4%
FLOOR
4 Floors
STRUCTURE
RC Structure
FINISHED
THK5 Marble panel, Exposed concrete
99
UNIT FLOOR PLAN Many type of housing units are included one building. Each floor has various area housing units that small, medium, large. Each unit accommodates different family type.
1st FLOOR PLAN #1
1st FLOOR PLAN #2
2nd FLOOR PLAN
A_Type - Commercial Area 100m2
B_Type - Guest house Janitor's office 100m2
1Room Housing 26m2 2Room Housing 52m2
3rd FLOOR PLAN
4rd FLOOR PLAN 2
1Room Housing 26m 2Room Housing 46m2
ROOF GARDEN 2
3Room Owner's Housing 52m
101
UNIT SECTION Because of various family types, various life patterns make building more active atmosphere. And center garden gives fellowship for the inside of group. But It makes boundary for the outside of group.
09
ANOTHER ACTIVITIES Social Activity Prepare for BIM
"Landscape" "Surface"
"Technology"
"Locality"
"Digital Materiality"
"Defamiliarization"
SOCIAL ACTIVITIES 어반그라운드(URBANGROUND)는 건국대, 과기대, 세종대, 이화여대, 한성대 학생 10명에 의해 2015년 9월에 만들어진 대학연합 동아리이다. 이들이 의기투합한 이유는 도시 곳곳을 작은디자인을 통해 놀이처럼 유쾌하게 바꾸기 위해서다. 동아리 이름도 야심차게 '도시가 우리의 놀이터' 라는 뜻에서 어반(Urban)과 플레이그라운드(Playground)를 합 해 '어반그라운드' 라고 지었다. 놀이터에서 노는 시간은 정해져 있지 않다. 삭막한 철조망, 버려진 연탄, 성의 없이 놓인 헌옷수거함이 발견되는 순간이 놀이의 시작이다. 최근에 는 전국 14개 대학교 50여명의 학생이 참여하고 있는 큰 단체로 성장하여 왕성한 활동을 벌이고 있다.
2015. 9. 어반그라운드 창설 5개 대학교 12명으로 시작
2015. 10. 동작구 공공벤치 프로젝트 양천 ±100 프로젝트 시작 잡앤조이 잡지 등재
2015. 12. 코엑스 업사이클링 트리마을 전시회 아리랑TV 공익광고 촬영
2016. 2. 신입회원 모집OT 14개 대학교, 50여명으로 규모확대
2016. 4. 전반기 양천 ±100 프로젝트 서울시 청년허브 청년참 선정
2016. 5. 전반기 활동 발표회 서울시 청춘박람회 참여
105
동작구 공공벤치 프로젝트 '고정되지 않는 공공 벤치' 를 동작구 제비어린이공원에 설치해달라는 동작구청의 의뢰에 의한 어반그라운드의 대외적인 첫 프로젝트이다. 각각 동작구 제비어린이공원과 노원구 서울과학기술대학교에 설치되어있다. 놀이기구 같이 즐 길 수 있는 의자를 만들자는 컨셉으로 디자인하였으며, 실제로 의도대로 이용되고 있으며 그 만족도가 높다.
TETRIS BENCH 테트리스 모듈처럼 합치거나 분리할 수 있다. 현재 동작구 제비어린이공원에 설치되어있다.
WAFFLE TOP BENCH 몸의 중심에 따라서 자유롭게 돌아가지만 절대 넘어지지 않으며 놀이처럼 즐길 수 있다. 현재 노 원구 서울과학기술대학교에 설치되어있다
URBANGROUND X 양천구 지역디자이너 <양천구 지역디자이너>는 김기준 국회의원실에서 주최하고 복지국가청년네트워크에서 후원하는 양천구 내의 커뮤니티 맵핑 단체이다. 커뮤니티 맵핑이란 특정 이용자들이 원하는 지역의 정보를 지도에 발굴, 표기하여 지역성을 살리는 활동을 의미한다. 나는 양 단체에 소속되어 지역디자이너로서 지역 미관 개선이 필요한 구역에 대한 정보를 <URBANGROUND>에 제공했고, 그 구역을 개선하는 디자인을 실제로 설치할 수 있도록 협 업을 조율했다. 실제로 양천구 일대를 걷다보면 URBANGROUND의 다양한 설치물들을 발견할 수 있다. 또한 지역디자이너 활동을 통해 양천구 신월동 일대의 교육시설 지도를 제작하였으며, 양천구 내의 공공도서관 정책의 문제점을 지적하고 개선안을 제안하기도했다. 그리고 이를 인정받아 우수 디자이너 표창을 수상하였다.
설치작업
서울시청 청춘박람회
전반기 활동 발표회
우수 지역디자이너 표창
네가 한 일을 전봇대는 알고 있다.
레고블록
CPTED에 따라 '자연감시'를 증가시키는 방법을 응용했다. 전봇대를 의인화하여 전봇대가 우리를 항상 지켜보고 있는 것
도시 곳곳에서 발견할 수 있는 파손된 보도블럭에게 새로운 옷을 입혀주고자 했다. 이빨빠진 보도블럭을 채워서 걸려넘
같은 느낌이 들게 한다면 불법전단지의 부착이 줄어들고, 설치장소에 따라 범죄예방의 효과까지 기대할 수 있을 것이다.
어지는 일을 방지하고, 걷는 길에 소소한 재미를 부여하고자 했다.
팩맨 점자블록
자전거 주차장
시각장애인의 길잡이인 점자블록. 거리 곳곳에는 깨져서 제 기능을 못하는 점자블록들을 볼 수 있다. 여기에 픽셀 게임
서울시 양천구 신정동은 골목길이 많이 존재하고, 노변에 많은 자전거가 주차되어 있다. 노변에 무질서하게 놓여져 있는
을 심어서 지친 현대인의 삶에 소소한 재미를 불어넣고, 점자블록이 제기능을 할 수 있도록 했다.
자전거들은 위험을 초래하기에 사고예방과 미관개선 차원에서 자전거 주차라 주차장 라인을 그려보았다.
투기방지 배수구
커뮤니티 맵핑
배수구에 흩뿌려진 담배꽁초와 쓰레기는 배수구의 역할을 방해하고, 악취유발, 도시미관 저해를 일으킨다. 이를 예방하
양천구 신월동 일대의 교육시설 정보를 제공하는 지도를 제작해보고, 이를 통해 얻은 정보를 기반으로 양천구 공공도서
며 동시에 행인들에게 웃음을 제공할 수 있는 작업을 진행했다.
관 정책에 대한 제안을 했다. 또한 어반그라운드의 다양한 활동들을 만나볼 수 있는 지도를 제작하기도 했다.
UPCYCLING TREE 업사이클링(Upcycling)이란 생활 속에서 버려지거나 쓸모없어진 것을 수선해 재사용하는 리사이클링(Recycling)의 상위 개념으로, 기존에 버려지던 제품을 단순히 재활용하는 차원에서 더 나아가 새로운 가치를 더해(upgrade) 전혀 다른 제품 으로 다시 생산하는 것(recycling)을 말한다. 2015년 12월 10일부터 31일까지 서울시 삼성동 코엑스에서 열리는 '2015 무역센터 겨울축제' 행사장에 전시된 '업사이클 트리마을' 은 버려지는 환경부 주최로 업사이클링의 사회적 인식을 제고 하며, 의미있고 환경친화적인 크리스마스트리를 전시하자 라는 취지로 개최되었으며 URBANGROUND는 이 행사에 아티스트 자격으로 참가하였다.
코엑스 업사이클링 트리마을전시회
109
서울시 버스환경개선 시민 아이디어 공모 서울시에서는 시민들이 제안하고 참여하는 방식으로 버스 서비스를 개선하여, 버스 이용에 대한 시민 만족도를 높이고 나아가 버스 운수종사자 안전 운행을 위한 시민 공모전을 시행했다. 이에 대하여 출퇴근 및 혼잡시간대에, 버스의 뒷쪽에 도 충분한 공간이 있지만 앞문쪽에만 사람들이 몰려서 통행이 방해되는 현상을 해결하고자 '버스 속 체증을 해소할 소화제' 라는 이름으로 아이디어를 제출했하여 장려상을 수상했다.
1
출퇴근시간 등 버스가 혼잡한 시간대에는, 앞문 쪽에 승객이 몰리게 되는 현상 이 발생한다. 이는 탑승객이 올라탈 때, 기존 탑승객이 안쪽 여유공간으로 이동 해주고 좌석 쪽에 바짝 붙어 서서 가운데 통로를 열어줘야 보다 효율적인 공간 분배가 이루어져 쾌적한 운행이 가능함에도 불구하고, 한번 자리를 잡은 탑승객 들이 무의식적으로 제자리에 서있는 경우가 많기 때문이다. 이에 따라 하차승객 이 뒷문으로 갈수가 없어 하차 해야 할 정류장을 놓치기도 하며, 사이를 비집고 억지로 내리다가 분실물이 발생하기도 하고 뒷문승차로 인한 혼잡이 가중되는 등 추가적인 불편이 발생하고 있다.
3
승차 후 안으로 이동하지 않아 버스 앞 쪽이 혼란스러워 다른 승차객의 탑승이 어려움
2
버스 앞쪽은 혼잡하여 승 객이 승차하기 어렵지만 정작 뒤쪽은 자리가 남음
버스 안쪽은 상대적으로 승객이 적어 뒷문으로 승 차하는 승객 발생
통행을 위한 최소한의 폭을 확보할 수 있 도록 스탠딩라인을 지정, 심리적 유도
가이드 화살표와 안내문구를 통해 버스 안쪽으로 동선 유도
PREPARE FOR BIM 건축을 공부하며 비정형, 디지털건축, 파라메트릭 디자인, BIM 분야로 관심을 가지게 되었고, 관심사에 맞는 프로젝트를 다양하게 수행하며 다양한 툴들을 다뤄보 았습니다. 항상 최상난이도의 모델링 작업을 수행하며 각 툴(REVIT, RHINO, GRASSHOPPER, SKETCHUP, 3DSMAX 등)을 이용하여 어떠한 형태, 기하학에도 제 약이 없을 수 있게끔 갈고 닦아 왔습니다. 특히 학부생이 수행할 수 있는 범위 내에서, 모든 프로젝트를 실제 BIM을 이용한 프로젝트라 가정하여 정교한 모델링 작 업을 하였고, 이를 이용하여 구조모델링, 간섭체크, 디테일 도입, 일조분석 등을 수행했습니다.
<REVIT을 이용한 프로젝트 수행 - 3학년 상가주택 프로젝트>
<REVIT을 이용한 프로젝트 수행 - 3학년 학교 프로젝트>
<REVIT을 이용한 아파트단지 일조시간 분석>
<디테일 모델링을 통한 시공성 스터디>
111
ENGUARD 3D 2013년 4월 부터 약 4개월간, 3D스캐닝 기업 ENGUARD 3D에서 건축 및 문화재, 플랜트 분야에서 3D스캐닝 보조업무, 모델링 업무를 수행했다. 3차원 데이터의 다양한 응용가능성과 측량, 3D스캐닝 등 BIM과 관련된 다양한 기술들을 폭넓게 접할 수 있었다.
<세운상가 3D스캐닝 데이터>
<3D스캐닝을 기반으로한 모델링>
<대전 화력발전소 3D스캐닝 데이터 맵핑>
<태안 화력발전소 모델링>
<P건설 Furnace 3D스캐닝 보조 및 모델링>
<대전 화력발전소 모델링>
AUTODESK PANORAMA 2016 <AUTODESK PANORAMA>는 전 세계 각국에서 개최한 <DESIGN FOR FUTURE> 공모전의 각국 대상 수상자들을 대상으로 개최하는 부트캠프이다. 2016년에는 싱가포르에서 개최되었으며 본 프로젝트는 9시간의 제 한시간을 두고 각국 수상자들이 우열을 겨루는 헤카톤 프로젝트이다. 한국 대표로서 각각 기계시스템 디자인, 제품디자인 분야에서 대상을 수상한 2명의 팀원들과 함께 작업을 했다.
Presentation of domestic champion work in Singapore ITE college
Water saving
Reduce running cost
None motorized works
Smart network
Easy repair
Provent ground erosion
Global physical and economic water scarcity is serious. So we are many effort for the water saving. But out of our sight, too much water is leacked out from the watermain pipe. Besides, much construction cost is added. In worst case, ground erosion is happened. We propose "the smart water main infra"
ENERGY CHARGING SYSTEM Connector to network
Sensor
ALERT SYSTEM Bolt Ball-net Connector to body
Repair old pipe by coverage Top of coverplate
PVC pipe
Old iron pipe DRAIN
Can easily assemble and disassemble !
Bottom of coverplate
Short life Large cost Easy to rust <Irom pipe>
Weak by vibration Easy to leak <Flange>
Plastic ball
Sensor chip
Expanded polystyrene
SECTION & DETAIL OF PIPE
REALLY YOUNG ARCHITECTS <정말 젊은 건축가들> 전시회는 고려대학교, 동덕여자대학교, 서울과학기술대학교, 서울대학교, 이화여자대학교, 한양대학교 학생 9명이 모여서 시작되었다. 5년의 대학생활을 마무리하고 사회로의 첫발을 내딛으며 학교의 경계를 넘어 보다 자유롭고 다채로운 색깔의 졸업전시를 대외적으로 보여주려는 취지로 기획된 이 전시는 2016년 12월 17일 용 산구 후암동 <한국건축2064> 갤러리에서 개최되었으며, 4일간 약 200여명의 관람객을 동원하며 성황리에 마무리 되었다.
갤러리 공간을 전실과 전시공간으로 분할하여 이용하였다. 전실은 모임공간으로서, 플라스틱 빠레트 70개를 랜덤하게 쌓 고 페브릭으로 덮어, 여러 학교의 건축학도들이 자연스럽게 앉아 어우러질 수 있도록 구성하였다. 전실과 전시공간의 사이 에는 각 학생들이 걸어온 길을 보여주는 타임라인을 걸어 전시하였다. 전시공간은 각 학생들의 스튜디오 처럼 구성했다. 영 향을 준 책, 노트북, 작업복, 스터디모델, 포트폴리오 등 작가들이 경험한 학창시절을 느낄 수 있게하는 다양한 소품들로 꾸 며졌다. 갤러리 전체는 메인조명을 소등한 어두운 상태에서, 형광색의 장식조명을 이용하여 갤러리의 빈티지한 분위기가 더욱 강조되도록 구성했다.
115
Kim Mingyun 2013 - 2016 Architecture Portfolio Printed 2017. 01. 01.