Matej Jindrak architecture portfolio

Page 1

WELCOME TO MY WORLD

matej jindrak PORTFOLIO


Never do a job you don’t believe in. Do every job with the same enthusiasm as if it was your first and with as much attention to detail as it was your last. B y Hi - R e s


CON TEN T

draw in g s , p ain t in g s

c onta c t

s t r u c t u ral m o de l

biogra p hy p h o t o g rap h y

p roje ct of re siden t i a l ho us e c o n t ac t

OP P ro s t ejo v co n v ersi o n p ro je c t


CON TACT

matejindrak@gmail.com +420 732 771 248

Matej Jindrak Sv. Cecha 490 506 01 Jicin Czech Republic


BIOGRAPHY

photog

raph

y b icy c

le

cul

ty

of

ar

ch

it

tra

e

B

U

T

adv ve anc lin ed en g gli gr sh ap h

re ic

po ste

os

nt

ot

pe

te

ho

tiv

e t eam

p i ll

cre ible

s spon enthustiastic re ust hup rato ketc r autocad 3dsmax s work

nme

m

ati

nviro ecology e

ph

ve

ru

co

2 / 06/16

r s na

19

9

te

2

c

ol

l Jicin 2011 r schoo -Fa

u

9

th

si

ho

2

mma

ct

19

-4

ba

sc

c Ji

in

00

7-L

ra s g ar’ ep


PROJECT OF RESIDENTIAL HOUSE IN BRNO My third term project Supervisor: Ing. Arch. Pavel Jura

sketches

description

site plan

The main idea of this house is to create harmonic space, which is well set up in the location of its neghbourhood. The house is sustaining from solid mass levitating on slim collums. This solution gives rich contact to garden and apen space in living ground floor. In the center of the building is stairs hall which is connecting both floor. The connection is emphasized by open void, which si passing trough all building including roof. In roof is set up large rooflingt covered by glass, which gives light the best opportunity to enter.

ground plan 1st floor

ground plan 2nd floor

cross section


visualization

elevations E, W, N, S

perspectives


OP PROSTEJOV FACTORY CONVERSION PROJECT My fourth term project Supervisor: prof. ing. arch. Helena Zemankova, CsC.

This project is taking place in Prostejov city, which is between Brno and Ostrava My achievment was to design business incubator fits local circumstances. The original buildings are from 1965 and they were using for clothing industry. The factory was closed in 2010 and since that buildings are empty I tried to redesign the organism of the building, because the organisation will be very different. So i created new main entrance which is located in the center of inner side. I made new atrium and new staircase fits to new needs. In the other hand I wanted to preserve the “soul� of the building.


site documentation

new site plan

bird view

photos of original condition


ground plans

6th floor

3rd - 5th floor

2nd floor

1st floor


typology and communication scheme

space usage

table tennis/ fitcentrum roof garden incubators galerry/exhibitions atrium conference halls cafe/restaurant atrium with trees headquarters

communication diagram

emergency exit

main entrance

emergency exit


sections

cross section

longitudinal section


elevations

northern elevation

eastern elevation

western elevation


DRAWINGS



PAINTINGS


STRUCTURAL MODEL Pavillon Noir France Architect: Rudy Ricciotti This structural model describes monolitic concrete structure and shows us main principles of statics.


PHOTOGRAPHY



thank you for browsing my portfolio



PORTFOLIO


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.