Portfólio Matheus D'Almeida

Page 1

MATHEUS D’ALMEIDA

PORTFOLIO


MATHEUS D’ALMEIDA

PORTFOLIO

MATHEUS DE PAULA D’ALMEIDA SÃO PAULO, SP - BRAZIL matheusdepauladalmeida@gmail.com +55 (11) 99715-3822


PERSONAL INFORMATION

04 SESC Franca (executive design) Franca, SP - Brasil (2013)

06 [BUILT] Loja FERRI São Paulo, SP - Brazil (2012)

14 [COMPETITION] CAMPUS CABRAL Curitiba, PR - Brazil (2012)

18 DOCUMENTATION CENTRE Trindade, Oporto - Portugal (2013)

24


MATHEUS DE PAULA D’ALMEIDA SÃO PAULO, SP - BRAZIL matheusdepauladalmeida@gmail.com +55 (11) 99715-3822

BIRTH 26 Nov. 1990

NACIONALITY Brazilian

LANGUAGES Portuguese English Spanish

Mother language; Institution: Cultura Inglesa Level: B2; Level B2 (Cervantes Certificate);

SOFTWARES

Autodesk AutoCAD (2D and 3D interfaces) Autodesk REVIT Graphisoft ARCHICAD Abvent Artlantis Google SketchUp Adobe Illustrator Adobe Photoshop Adobe InDesign Adobe Lightroom Microsoft Office Apple iWork

OPERATIONAL SYSTEMS Microsoft Windows Apple Mac OS X

4


ACADEMIC EDUCATION 2009 - 2014

UNIVERSIDADE ESTADUAL PAULISTA, FACULDADE DE ARQUITETURA, ARTES E COMUNICAÇÃO, Bauru - Brazil Graduation Architecture and Urbanism

2012 - 2013

UNIVERSIDADE DO PORTO, FACULDADE DE ARQUITECTURA (FAUP), Porto - Portugal Master Degree Architect

COMPLEMENTARY EDUCATION 2007

Tecnical drawing / Cad 3D. (Workload: 120h) Serviço Nacional de Aprendizado da Industria (SENAI) - Escola Antônio Adolpho Lobbe.

2013

ARCHICAD 16 - Iniciação (Workload:21h) Claudio Lima, Lda.

2014

ARCHICAD 18 - Complete (Workload:30h) TI Lab

ACADEMIC ACTIVITIES 2009

Intern at Grupo de Arquitetura (GA). COORDINATION Prof. Dr. Cláudio Amaral. Academic scholarship: BAE I

2010

Book diagramming. COORDINATION Prof. Dr. Adalberto da Silva Retto Junior e Prof.ª Dr.ª Marta Enokibara Academic scholarship by FUNDEB

2010 - 2011

Scientific research “A Companhia Estrada de Ferro Noroeste do Brasil e a Ponte Sobre o Rio Paraguai” in 12 m . COORDINATION Prof. Dr. Nilson Ghirardello Academic Scholarship by Fundação de Amparo a Pesquisa no Estado de São Paulo (FAPESP)

2012 - 2013

International mobility to Universidade do Porto - FAUP (Oporto - PORTUGAL) International mobility academic scholarship (Master degree) by Program Santander Universidades - Academic Merit.

2016

2011

2012

COMPLEMENTARY ACTIVITIES GRAPHISOFT ARCHICAD certificated trainer ARCHICAD 20 Certificated trainer by GRAPHISOFT BRASIL (nov. 2016)

PUBLICATIONS

D'ALMEIDA, M. P. . Railway industrial heritage (N.O.B.) - Case study: Bridge on the Paraguai river. 2011. (Work presentation/Congress). First and second phases of the scientific research congress of UNESP “Railway industrial heritage: The concrete bridge “Presidente Eurico Dutra” on the Paraguai river” (Presentation at VI Latin American Colloquy - about the recovery and preservation of industrial heritage)

EXPERIENCE 2011 2013-2014

Architect intern at Ipê Amarelo Executive projects developement. Architect intern at Apiacás Arquitetos Construction acompanying, executive projects developement in different scales

2014-CURRENTLY

Architect, BIM manager and coordinator at Apiacás Arquitetos BIM software deployment (Graphisoft ARCHICAD), compettions,

2015-CURRENTLY

Assistant professor at Escola da Cidade - discipline: Vertical Studio (Estúdio Vertical) Planning classes and callendars, exhibiitons paticipation, student assistances.

SKILLS PERSONAL SOCIAL ARTISTICS

Determined, proactive and worker Team spirit and sociable Drawings and Photography

5


SESC UNIDADE FRANCA Location: Franca, SP - Brazil Educational and recreation centre (Serviço Social do Comércio – Social Service of the Commerce) 2013 Equipe: SIAA Arquitetos e Apiacás Arquitetos - Anderson Freitas, César Shundi e Bruno Salvador (Authors) Acácia Furuya, Pedro Barros, Bárbara Francelin, Gabriela Galuppo Parisi, Matheus de Paula D’Almeida, Marcelo Otsuka, Rodrigo Mendonza, Eduardo Gurian, Andrei Barbosa, Cecília Torrez, Fernanda Britto, Leonardo Nakandakari (Executive design team)

O seguinte projeto foi vencedor de uma competição para a unidade do SESC (Serviço Social do Comércio) da cidade de Franca, no interior do estado de São Paulo. O programa extenso deste centro de recreação se acomoda naturalmente às condições topográficas do terreno, relacionando os diferentes espaços de forma a atender os quesitos funcionais a eles exigidos. Á esquerda, no volume que se desenvolve como uma lâmina para a Av. Dr. Nelson Presotto, encontra-se o prédio administrativo que concentra as atividades administrativas do complexo, bem como o serviço de odontologia que a unidade possui. A direita e em maior destaque e proporções cúbicas se encontra o edifício principal que compreende todas as atividades públicas do complexo.

6

Unindo os edifícios por meio de níveis intermediários encontramos os estacionamentos, o complexo aquático e as quadras externas que se relacionam de forma contínua às lajes dos blocos isolados quase a confundir as relações entre interno e externo.


0 99

5 98

4

8 3

6 5

7 8 A

A

5 6 1

2

D

C

B

8

1 2 3

ESTACIONAMENTO BICICLETÁRIO DOCAS

4 5 6

5 98

SALA MULTIUSO ESTAR FUNCIONÁRIOS VESTIÁRIOS

7 8

D

C

B

0 99

ETE ÁREA TÉCNICA

0

5

10

20

NÍVEL +970,15

6

1

5 8 9 7

3

2

A 10

A

9 4

9

9

1 2 3

PRAÇA DE ACESSO EXPOSIÇÕES / VIVÊNCIA LEITURA INFORMAL

4 5 6

BIBLIOTECA 7 SALA DE APOIO AO TURISMO 8 SALA MULTIUSO 9

JARDIM LANCHONETE - PARQUE AQUÁTICO SANITÁRIO

10 10

DD

CC

BB

10

ÁREA TÉCNICA ÁREAS TÉCNICAS

0 0 99

5

10

20

NÍVEL +974,35

5 98

8

2

2

2

9

7

49 48 47 46 45 44 43

10

6 6 3

14 6

11

A

A 13

5

12

6 1

1 2 3

ATENDIMENTO AO PÚBLICO OFICINAS ESTAR

4 5 6

PARQUE AQUÁTICO PARQUE AQUÁTICO - DESCOBERTO VESTIÁRIOS / SANITÁRIOS

7 8 9

DEPÓSITO DO PALCO 10 RESERVATÓRIOS 11 DEPÓSITO DE BENS 12

DEPÓSITO DE LIXO ALMOXARIFADO MANUTENÇÃO

13 14

LIMPEZA / SEGURANÇA DOCA DE SERVIÇO

D

C

B

4

0

5

10

20

NÍVEL +977,50

7


8


D

C

B

0 99

5 98

13

13

173

4

5

172

171

12 170

169

9

168

6 3

167

166

7 7

11

49 48 47 46 45 44 43

2

8

7 10

7

1

A

A

7

FOYER CAMARINS OFICINAS INFANTIS

7 8 9

VESTIÁRIOS / SANITÁRIOS VIVÊNCIA AO AR LIVRE QUADRAS

10 11 12

CONSULTÓRIOS ODONTOLÓGICOS ACESSO PÚBLICO ESTACIONAMENTO FUNCIONÁRIOS

13

D

ÁREAS TÉCNICAS

0

5

10

20

NÍVEL +981,70

D

C

4 5 6

GINÁSIO PALCO PLATÉIA FOYER

B

1 2 3 4

C

B

7

0 99

5 98

4

6

8

8 3

2 5 11

10

8 8 6

A

A 6 7

8

1

9

1 2 3 4

ATIVIDADES FÍSICAS COMEDORIA COZINHA DOCA

4 5 6 7

DOCA PLATÉIA PASSADIÇOS VARANDAS

7 8 9 10

VARANDAS VESTIÁRIOS / SANITÁRIOS TÉCNICOS VIVÊNCIA AO AR LIVRE

10 11

VIVÊNCIA AO AR LIVRE ADMINISTRAÇÃO

7

D

C

B

7

0

5

10

20

NÍVEL +985,90

9


10


D

C

B

0 99

6

5 98

1

6

2

3

5 4 4

4

A

A

D

GALERIAS TÉCNICAS TERRAÇO ÁREAS TÉCNICAS

0

5

10

20

NÍVEL +988,70

D

C

4 5 6

B

VESTIÁRIOS - COZINHA PLATÉIA CAIXA CÊNICA

0 99

5 98

1

6

RS

RS

D

A

C

A

B

1 2 3

C

B

6

0

5

10

20

NÍVEL +991,50

11


12


0

5

10

20

CORTEA A CORTE

0

5

10

20

CORTE B

0

5

10

20

CORTE B B CORTE

0 0

5 5

10 10

20 20

CORTE C

CORTE C C CORTE

0 0

5 5

10 10

20 20

CORTED CORTE CORTE DD

13


[BUILT] LOJA FERRI UNIDADE VILLA LOBOS Location: São Paulo, SP - Brazil Shoe store 2015 Equipe: Apiacás Arquitetos - Anderson Freitas, Acácia Furuya, Pedro Barros, Matheus de Paula D’Almeida, Marcelo Otsuka

A antiga loja Ferri era subdividida em dois pavimentos, um para mostruário e vendas e outro para armazenamento dos calçados. Por conta desta questão pensamos o projeto de maneira a não separar estes espaços, ou seja, que a loja fosse de certa maneira, exposição, venda e armazenamento. Como um pequeno galpão para traquitanas, um lugar dinâmico. Assim, optamos por valorizar o espaço de permanência dos clientes aumentando o pé direito e naturalmente reduzindo o antigo mezanino para depósito. Consequentemente o espaço da loja acabou por se tornar mais franco para quem caminha pelo passeio central do shopping. Como em muitas situações que encontramos em lojas de espaços comerciais, as informações são sempre muito intensas e exageradas. Por isto procuramos trabalhar com poucos elementos para construir a arquitetura do lugar e não concorrer com o objeto em questão, os calçados. Para o fechamento um caixilho metálico composto de vidro, e um volume constituído de painel de madeira e estratificado de cimento, serve de expositor para o lado externo e móvel para uso interno. Possui a função de dar uma certa intimidade para quem experimenta os produtos sem necessariamente fechar o ambiente. O piso, mais neutro foi executado em revestimento cimentício resinado. Protagonista do espaço, o mobiliário ganhou outras funções, além de simples expositor. Agora cumpre o papel de depósito também, e acaba por ser determinante na característica da loja. O teto e as paredes laterais, com altura variada, são amparados por este novo suporte construído em painéis de madeira compensada, que ora fechado (guarda) ora aberto (expõe) ditam o ritmo do dia a dia da loja. É interessante pensar que as mudanças do repertório de produtos podem ser percebidas constantemente pelos clientes e pessoas que ali trabalham.

14


15


16


17


[COMPETITION] CAMPUS CABRAL Location Curitiba, PR - Brazil Competition project for a university campus 2012 Project team: Prof. Dr. Roberto Masseran, Prof.ª Dr.ª Cláudia Barbieri, Luciana Suemi Siguemoto, Lucas Vinicius Lopes Albano, Julian Monteiro Seifert, Juliana Yendo, Vitor Costa e Matheus de Paula D’Almeida

Para a compreensão dos conceitos utilizados na execução do projeto em questão desenvolve-se a seguir uma lista dos tópicos abordados. O desafio deste concurso é estabelecer uma nova estrutura de cursos em uma área anteriormente ocupada. Para estabelecer o contraponto entre o novo e o velho a principal premissa do concurso foi a de manter o maior edifício, da década de 1940, onde antes funcionava a faculdade de química. O prédio possui uma escala reduzida, servindo quase como um anteparo entre o bairro de Cabral, com residências térreas e prédios de 4 a 5 pavimentos, e o grande eixo viário na Avenida João Gualberto, com grande adensamento de prédios, um dos principais da cidade de Curitiba. O tecido urbano na área é bem peculiar, criando um desenho desen-

18

contrado das quadras no entorno, o lote do campus situa-se no encontro de duas malhas, uma triangular e outra quadrada, formando uma poligonal que divide e direciona um sistema de binários, levando ao centro do bairro e à avenida. A partir destas leituras da área, iniciou-se o processo criativo, baseando-se na idéia de contraponto entre o entorno e o projeto, entre o tradicional e o novo, procurando relações que gerassem outras vivências na área. O principal prédio, que materializa a idéia de relação novo-velho é o edifício ponte, que avança sobre a antiga escola de química, estruturado em aço, vidro e concreto em módulos que se repetem, desta maneira foi pensada uma modulação que permeou todas as etapas de projeto, tanto na concepção estrutural quanto na ordenação programática. Do outro lado situa-se o

anfiteatro estruturado em concreto que proporciona relações urbanísticas inesperadas, como acesso às suas áreas programáticas. A partir do edifício ponte outro bloco é estruturado conformando uma área central onde se cria um pátio permeável, a ligação entre estes edifícios é criada por passarelas. A extensão do programa exigiu a utilização máxima de todos os recursos de aproveitamento do solo fornecidos como base, resultando em uma composição bastante densa. Jogar com as escalas e com as forças estruturais, proporcionar novas perspectivas visuais a partir das aberturas, das transparências e das fendas, gerar percursos, áreas de convivência, romper os limites entre público e privado, foram alguns dos partidos adotados que podem ser observados na configuração final do projeto.


0

5

10

15

0

1. PLANTA PISO -2

5

0

0

5

10

15

5

10

20

15

4. PLANTA PISO 1

3. PLANTA PISO 0

0

5

10

0

15

5. PLANTA PISO 2

5

10

15

6. PLANTA PISO 3

0

7. PLANTA PISO 4

10

2. PLANTA PISO -1

0

5

10

15

5

10

15

8. PLANTA PISO 5

19


0

20

5

10

15


21


22


23


DOCUMENTATION CENTRE Trindade, Oporto - Portugal Academic project for a documentation centre 2013 Academic activity developed in the Projeto IV and Construção III lectures

No âmbito de assegurar a memória local e regional em meios materiais e documentais o projeto se apresenta em um simples volume referencial, que contrasta com as linhas oblíquas da edificação do metro, componente do entorno imediato, também busca uma proporção adequada ao relacionar-se com o entorno pré-existente de casas tradicionais do Porto do século XIX além da enfermaria e igreja da Ordem da Trindade. A composição arquitetônica é formada por um pódium, sob o qual se desenvolve o serviço de recepção, tratamento, reparação e catalogação dos

24

arquivos, esse atua como um espaço público de cota elevada, suportando o nível estabelecido pela entrada do volume referencial que recebe toda a parcela pública do programa e articula os principais fluxos possíveis provenientes das estruturas públicas: metro e a praça da liberdade (Av. dos Aliados) com duas entradas laterais (nordeste e sudoeste) que demarcam o espaço do átrio. Os topos do volume referencial, juntamente com a grande clarabóia interna que preenche átrio, promovem a iluminação necessária para as atividades que ali se desenvolvem.

A articulação das especificidades do programa de infra-estruturas com uma topografia acidentada em sete metros, na forma de uma pendente diagonal, aliada com o entorno histórico preservado revelam as complexas condicionantes do projeto desenvolvido.


R

112.34

99.65

99.41

98.65

101.83

105.99

95.36

112.34 105.01

89.52

131.66

99.17

109.41 99.93

101.45

107.45

102.24

98.92

109.68

98.88 128.62

102.24

90.11

102.24

102.42

106.22

102.24

93.45

102.45

R

98.65

90.12 101.83

101.14

112.34 105.01

89.52

101.45

99.48

107.45

102.24

90.11

90.25

102.45

92.28

102.45

97.48

103.53 CAMÕES

90.55

89.59

98.53

88.49

94.79

88.49

88.51

87.94

89.42

88.84

89.05

100.12

90.35 89.03

108.11 94.18

104.35

106.22

107.30

106.22

110.63

103.71

107.07

106.92

106.84

107.07

106.92

103.91

109.16

90.42

103.75

107.46

87.57

100.60

111.74

86.97

R

104.15

94.60

90.66

98.38

107.79 86.97

103.57

86.16

107.39

103.57

88.33

98.69

89.66

98.40

97.83

97.15

97.15 98.76

D

DA

102.72 84.74

84.74

84.44

96.89

84.55

84.44

83.61

96.89

84.55

RUA

103.32

102.72

83.61

105.24 106.43

105.88

106.38

109.55

DE

82.96 103.88

DOS

DAS

LICEIRAS

HERÓIS

E

MÁRTIRES

DE

ANGOLA

82.24

91.36

91.25

94.95

91.42

87.22 92.69

82.24

103.28

96.70 102.83

91.36

91.25

94.95

103.01

103.44

97.61 98.55

DO

98.71

99.55

88.32

95.34

94.80

95.99

95.40

110.39

R

100.01

90.88

104.36

101.49

101.87

82.49 CAMARA MUNICIPAL

79.34

106.83

93.59

RUA

DE

ANTÓNIO

LUÍS

98.83

91.68

RUA

89.93

98.35

93.98

94.89

ANTÓNIO

LUÍS

RUA

1:500

94.89

80.01

86.00

85.63

96.11

97.72 91.68

96.55

91.90

111.40

89.93

98.35

RUA

94.86

94.88

93.98

94.89

96.09

80.74

80.01

94.15

C.T.T. 12

99.55 12

IMPLANTAÇÃO

87.86

GOMES

95.57 96.15

1

83.26

80.17

FORMOSA

96.69 80.01

78.03

78.40

87.10

83.34

100.85

94.81 101.26 96.21

DE

8

90.91

90.83

91.72

87.43 83.42

83.64

BONJARDIM

93.59

RUA

97.63

91.53 91.78

DO

94.86

C.T.T.

108.97

101.87

88.73

97.72

97.61

98.35

94.15

95.65

100.16

96.11

96.09

80.74

106.83 99.55

85.63

82.49 96.55

91.90

111.40

79.34

78.03

78.40

86.00

107.42

98.37

91.75

GOMES

CAMARA MUNICIPAL 88.74

1:500 101.49

94.89

94.88

97.13

88.13

87.86

83.34

100.85

94.81

101.59

83

93.45

83.64

BONJARDIM

81.55

95.65

96.21

98.37

DO

83.26

121.19

91.78

RUA

86.04

95.22

96.69

81.78

83.76 84.48

89.84

84.84

108.97

101.26 88.73

IMPLANTAÇÃO

82.08

83.14

82.68

87.10

87.74 83.42

91.53

82.17

102.35

101.88

95.57

84.20

. 82,10

89.84 85.40 90.84

87.43

91.75

82.14

98.83

89.01

83.41

88.13

84.14

81.82

88.54

94.09

102.22

100.16

96.15

98.37

93.45

108.98

81.75

91.91

98.69

107.42

121.19

85.85

93.33

82.33

81.55

88.74

94.70

100.50

100.01

97.13

1

95.16 93.50

94.05 98.37 101.59

81.78

82.17

88.77

95.40

101.49

102.35

102.22

94.09

88.57 88.57

89.08

88.11

86.04 87.74

84.84

82.07

94.92 101.49

102.22

101.88

98.69

90.88

106.15

85.07

87.19

87.51

89.08

84.48

93.75

89.84

95.22

82.14

91.04

83.76

89.84 90.84

81.75

82.35

92.06

84.20

85.85 121.19

93.33

81.40

85.12

89.28 89.86

89.28

106.40

85.40

82.08

91.91

94.80

82.98

87.26 83.51

84.03 86.45 91.35 88.57

89.08

87.4

84.65

87.95 R 91.80

88.57 88.11

R

86.52 89.75

87.39

85.12

86.87

77.13

84.14

88.90

91.68

85.07

90.

86.64 88.54

86.90

106.38 87.19

87.51

89.80

87.43

89.28

91.04

93.75

108.98

88.32

88.54

97.18

94.70

101.14

100.50

95.16

101.14

93.50 94.05

D

86.56

89.86

87.26 91.35

86.11

89.08

111.33

89.01 86.46

87.84

84.65

91.80

89.28

106.40

81.82

90.42

88.77

101.49

102.22

106.38

84.83

121.19

82.05

82.35

94.85

94.92

R

87.53 86.52 89.75

87.95 R

86.87

82.07

92.06

R

88.90

86.90

91.68

86.11

82.98

87.35

87.24

87.92 90.65

87.11

86.62

81.40

82.33

94.76 97.18

106.08 101.49

85.78

90.95

88.90

86.64

89.86

81.81

D

101.14

101.14

92.44

89.60

89.82 87.11

ESTEVÃO

74.67

90.42

R

110.39

106.15

86.88 89.01 86.46

86.56

77.13

74.67

86.91

85.78

91.32

87.35

87.24

103.89

89.97

89.81 87.36

88.85

86.88

95.23

81.81

96.25

94.85

90.95

85.98

86.91

91.30

100.05

82.96 DO

87.06

89.82

ESTEVÃO

111.33

82.22

82.34

89.97

89.81

97.82 92.44

100.07

88.90

89.82

86.62 RUA

82.05

R

96.37

92.43

91.38

92.63

102.9287.36

96.89

89.60

89.45

95.23

95.51

82.96

PRAÇA DA82.32 TRINDADE

99.67 94.76 95.99

87.22

PRAÇA DA82.32 TRINDADE

82.33

102.83

R

103.89

91.42

91.99

93.82

88.85

91.30

96.97

87

90.47

91.60

98.77

96.89

89.82

94.30

92.69

82.23

82.22

82.34

LICEIRAS

91.07

91.52

89.98

91.99

87.06

87.53

82.38

96.25

100.72

95.34 106.08

98.57

101.02

98.71

DAS

97.82

88.15

104.25

89.88 87.93

98.53

100.05

95.79

84.83

R

101.86

99.55

99.24

93.62

99.63 88.15

95.79

82.51

97.61 98.55

99.67

99.24

104.25 104.25

105.34

104.15

90.47

91.60 107.76

91.38

92.63 93.82

98.77

92.35

92.35

100.07

92.43

95.51

82.23

103.45

98.50 98.73 95.27

102.92 TRAV. 96.89

103.91

RUA

100.72

107.60

103.44

104.25

100.10 102.90

107.76

96.37 97.40 96.89

96.97

89.45

103.01 101.42

108.00 101.86 103.45

93.62

G

83.48

82.96

107.60 82.33

TOM DES

NAN

FER

98.53

94.30

92.35

92.35

97.12

82.38

82.75

97.97

98.57

101.02

101.29

92.28 93.98

104.15

91.07

DE RUA

105.53

82.75

103.28

104.25 104.25 99.63

103.91

83.02

101.42

96.70

95.27

96.98

ANGOLA

105.53 82.51

102.45

108.00

F

E

MÁRTIRES

83.02

101.72

106.43 97.97

102.45 101.29

E

103.73

101.72

106.38

109.56

HERÓIS

97.12

105.79

103.43

104.97

109.55

DOS

103.73

101.59

105.88

RUA

RUA

105.79

103.43

104.97

109.56

103.88

96.98

105.11

105.00

101.59 105.24

105.11

105.00

102.19 105.89

89.13

86.57

ÁS

100.10 102.90

98.50 98.73 97.40

TRAV.

83.62

98.38

104.29

103.47

86.57

ÁS

TOM DES

NAN

FER

83.48 83.62

98.38

104.29

101.27

100.62

90.16

105.34

89.81

100.62

98.85

88.68

105.87

104.15

DE RUA

104.02

103.60

101.48 103.47

83.61

97.10

97.10

104.02 104.34

104.02 103.60

83.61

103.98 104.02

104.34

G

98.35

E

103.78

98.35

103.98

102.84103.24

100.60 100.60 100.60 100.60

98.85

104.15

84.19

84.19

F

103.78

102.31

102.31

102.84103.24

100.60

101.27

105.87 89.13

100.34

100.60

100.34

102.19

98.38

100.10

87.47

93.89 100.10

100.53

106.26

103.53

88.68

87.03

100.78 103.03

93.89

103.44

105.89

89.81

102.57

102.57

104.36

103.45

103.78 103.78

103.99 100.56

98.38

101.10 100.99

103.99 103.40

97.07

100.53

106.26

101.87 101.84

86.97

87.03

87.47

95.48

103.53 103.45

RUA

103.32

101.92

103.40

86.97

101.81

86.79

100.86 97.08

100.54

93.69 97.07

103.99 100.56

100.90

100.54

103.44 99.98

95.48

99.98

93.69

102.14

102.57 102.14

D

99.79

D

85.20

102.57

101.92

101.48

95.46

D 86.45

99.21

85.20

97.80

104.04 102.27

99.79

97.08

86.45

DA

97.80

95.82

86.79

86.78

100.06

100.06

101.81 101.87

101.84 Guarda

86.52

100.90

100.09

86.60

100.19

97.18 94.56

Anjo

da 103.99 95.46 100.86

Guarda

87.05

87.26

86.52

100.09

95.82 97.18

94.56

da

97.56 94.92

do

97.56 94.92

Anjo

99.21

TRINDADE

98.76

102.26

TRINDADE

97.83

102.87

104.04 102.27

105.60 91.40

Viela

93.53

do 98.40 85.67

102.26

88.33

85.67

103.61 102.87 97.93

91.36

86.93

100.19

105.60 91.40

BOLHÃO

86.93

113.04

89.66

Viela

DO

87.14

87.16

116.07 CORRECIONAL

93.02

97.69

93.53

93.02

97.69

97.93

103.61

98.01

103.28

91.25

113.04

97.88

91.36

97.88

.

85,77

BOLHÃO

87.14

87.16

116.07 CORRECIONAL

100.85

DO

92.98 105.64

100.85

103.28

104.06

105.18 103.95

105.18

90.47

105.64

98.01

103.95

103.60

TRIBUNAL

94.91

90.88

92.98

R

RUA

91.25

90.47

98.69

104.06

113.92

90.88

103.99

103.60

106.11

107.67

RUA TRIBUNAL

94.91

96.98

91.43

C

96.98

103.99

.

85,77

103.70

B 94.83

103.70

C 86.97

91.43 94.83

99.44

100.97 90.53

99.44

100.97

B

C

109.61 90.53

109.87

109.61 99.61

109.87

95.77

87.48

112.43

95.77

86.97

B

112.43

87.67

99.61 91.71

102.82

A

86.93

97.67

91.71

102.82

A

95.84

C

86.68

97.91

87.67 113.92

95.84 113.76

88.15

100.75

B

86.16

87.48

113.92

.

100.75

96.53

91.22

86.93

A

97.67

98.38

105.70

105.47 104.50

A

MALHEIRO

86.68 97.91

87.01 87.52

96.47

87.52

ALFERES

96.53

109.59

113.92

113.76

100.88

99.88

96.70

100.88

DO

111.49

96.47

107.39

88.17

87.43

106.11

107.67

90.90

91.22

95.46

93.58

89.32

RUA

104.15

105.70

105.07 105.49

94.60

90.66

MALHEIRO

94.81

111.49

104.42

109.16

103.91

88.17

87.43

109.61

93.03

98.26

98.33

95.22

ALFERES

99.88

96.70

95.70

87.41 87.23

87.32

108.50

105.49

DO

102.13

87.01

88.26

87.87

94.81

98.34

97.63

102.99

89.32

RUA

97.89

87.23 93.58

87.95

93.58

101.28

.

95.46

105.47

90.48

90.90 98.26

98.33

102.13 95.33

109.59

93.03

111.19

104.50 93.58

91.47

89.94

88.01

87.73

87.64

107.79 87.71

105.07

106.71

87.74

104.42 87.45

87.32

87.49

88.68

87.41

109.61

92.32

95.22

93.83

91.47 90.48

88.26 99.03

87.87

89.98

87.64 97.09

87.71

87.70

87.57

93.36 91.08

87.95 87.45

113.92 95.70

98.34

97.63

113.97 102.99

98.42

100.29 97.89

102.66

88.01

87.73

88.02

87.79

87.49 87.81

87.56

99.42

102.57

89.94

95.34

88.09

87.92

87.56

87.88

88.16

100.60

111.74 105.22

87.86

88.01

88.68

87.92

88.99

93.36

87.74

93.59

87.70

87.94

88.03

87.77 87.62

108.11 89.59

92.18

89.98

87.79

87.62

87.88

87.84 87.84

87.92 88.03

87.95

88.16

91.15

108.50

92.09

87.81

87.94

88.18

88.07

88.64 90.42

103.75

107.46 94.18

106.71

88.54

88.51

88.99

88.84

87.99

101.28

99.03

102.04

97.09

88.01

92.09 88.25

105.22

96.45

107.30

89.98

88.57

89.59

88.81

91.15

120.20

100.16 100.12

106.84

88.06

88.25

91.08

88.02

88.87 88.98

93.83

95.33

99.51

99.4893.36 97.36

87.86

87.77

88.64

121.05

96.45

104.02

87.95

88.07

120.20

99.78

DO

100.16

99.66

111.19

H

89.98

88.09

87.92

M

103.71

87.94

88.03 88.03

BONJARDI

110.63

102.66

DO

97.44

106.22

89.98

92.32

100.29

95.34

99.52

114.09

102.57

92.93

89.61

87.84 87.84

102.04

92.18 92.83

92.25

99.42

105.66

93.59

E

106.22

113.97

89.82

98.42

99.51

102.88

G

88.57

88.18

100.19

90.90

99.78 114.49

97.36

93.36

99.53

87.99

88.54

88.81

89.40

88.87 88.98

114.09

90.81

113.92

99.52

96.50

BONJARDIM

F

90.70

DO

97.18

121.05

89.91

104.35

RUA

89.98

90.06

E

99.22

92.83 116.56

89.04

99.48

104.74

107.84

88.06 96.23 90.35 89.03

89.93

104.02

97.76

96.56

89.05

110.01

91.62

116.32

116.53

92.93

103.55

104.25

95.07

89.42

89.98

93.17

98.53

114.49

92.25

99.53

H

90.55

89.04 91.59

96.50

100.75

89.40

97.44

CAMÕES

116.53

BANDEIRA

102.88 97.36

89.61

H

DE

99.66

BOLHÃO

106.38

BONJARDIM 92.57

105.66

106.82

91.15

96.46

DO

97.76

97.18

108.36

95.38

89.91 RUA 102.54

107.13

92.28

103.53

110.01 100.19

104.74 DO

93.23

90.06

G

101.80

100.28

DA

103.55

104.25

108.09

98.81

98.63

90.70

91.04 98.07

106.82

101.49

RUA

101.14

DE

100.75

99.48

94.79

RUA

116.47

97.36

109.23 95.78 99.68

97.55

107.84 99.48

101.25

96.03

89.93

91.37

106.48

99.22

103.87

89.93 90.25

RUA

91.00

108.36

93.10 98.17 108.35

107.99

96.25

96.56 96.23

93.17

97.30

98.95

92.57

93.23

107.13

BONJARDIM

DE

91.15

96.46

98.81

95.38

108.27

101.14

96.18 101.58

99.12

116.56

116.52

RUA

102.54

105.11

RUA

RUA

93.45

100.28

98.94

108.34

101.14

102.45

95.07

90.12

109.68

98.90

99.48

102.20

102.45

91.04 89.54 98.07

122.73

101.25

96.03

98.63

101.14

102.45

91.37

93.45

94.70

103.87

101.80

95.47

89.93

103.46

99.09

90.15 93.46

106.48

98.94

101.34

101.70

106.22

102.24

102.24

F

128.30

102.24

102.42

97.30

95.90

114.76

101.49 106.38

98.92

108.09

98.88 128.62

92.89

97.55

99.17

99.93

101.14

99.68

99.41

107.99

95.36

109.41 96.25

89.59 102.24

116.47

BOLHÃO

95.78

108.35

108.27

102.45

97.48

112.34

99.65 105.99

93.45

122.73

101.70

131.66

101.14

DO

109.23

98.17 102.45

RUA

91.00 93.10

108.34

102.45 89.54

H

94.70

101.58

99.12

98.95

101.14

102.45

93.46

101.34

96.18

98.90 105.11

103.46

99.09

90.15

95.47 102.20

102.24

95.90 128.30

CHILLER 11

13

10

14

10

14

9

13

15

9

15

8

16

17

7

17

18

6

18

5

19

5

19

4

20

4

20

2

127,54 m2

1

21

3

22

2

23

1

12

3

UTAS

23 x 0,17 = 4,00

16

23 x 0,17 = 4,00

8 7 6

21 22 23

45,74 m2

CISTERNAS E GRUPOS DE BOMBAGEM

CENTRAL TÉRMICA

66,52 m2

12

11

45,83 m2

CHILLER 13

10

14

10

14

9

15

9

15

8

16

8

16

7

17

7

17

6

18

19

5

19

4

20

4

20

21

3

3

127,54 m2

1

2

22

2

23

1

23 x 0,17 = 4,00

18

23 x 0,17 = 4,00

6 5

UTAS

45,74 m2

21 22 23

CISTERNAS E GRUPOS DE BOMBAGEM

CENTRAL TÉRMICA

66,52 m2

45,83 m2

1:100

17 18 19 20

3

EXPOSIÇÕES II

ARRUMOS EXPOSIÇÕES

226,26 m2

20,94 m2

2 1

18 17

16 15

14

21

12

23

13

10

14

9

15

8

16

7

17

6

18

5

19

4

20

3

13

22

11

ARRUMOS EXPOSIÇÕES

11

2 1

21 22

EXPOSIÇÕES I

23

370,28 m2

21,14 m2

10

A-08

16

23 x 0,17 = 4,00

15

5 4

23

24 14

7 6

22

13

10 9 8

21

11

20

1:100

19

COTA 100,17 - COBERTURA

23 x 0,17 = 4,00

3

11

12

COTA 100,17 - COBERTURA

13

12

3

11

9 8 24 x

0,17

7

= 4,00

6 5

19

4

20

3

1:100

EXPOSIÇÕES II

ARRUMOS EXPOSIÇÕES

226,26 m2

20,94 m2

2 1

23

18

17 16

15

14

21

12

23

13

10

14

9

15

8

16

7

17

6

18

5

19

4

20

3

13

22

11

ARRUMOS EXPOSIÇÕES

11

2 1

21 22

EXPOSIÇÕES I

23

370,28 m2

21,14 m2

10

A-08

18

23 x 0,17 = 4,00

17

21

24

16

20

15

6 5

19

14

8 7

23 x 0,17 = 4,00

COTA 96,17 - SEGUNDO PISO

13

10 9

22

1

2

12

3

12

4

5

11

Nome Zona

9

ARQUIVOS I.S. DEFICIENTES EXPURGO RECEPÇÃO E TRIAGEM OFICINA ARRUMOS POSTO DE TRANSFORMAÇÃO I.S. HOMENS (BALNEÁRIO) I.S. MULHERES (BALNEÁRIO) ARRUMOS GRUPO GERADOR DE EMERGÊNCIA REPARAÇÃO E TRATAMENTO REPARAÇÃO E TRATAMENTO SALA DE CATALOGAÇÃO SALA DE CATALOGAÇÃO UTAS ARQUIVOS ESTACIONAMENTO TRADUÇÃO TRADUÇÃO TRADUÇÃO TRADUÇÃO RECEPÇÃO RECEPÇÃO CONSULTA INDIVIDUAL CONSULTA INDIVIDUAL CONSULTA INDIVIDUAL CONSULTA INDIVIDUAL REGIE BENGALEIRO CONSULTA COLETIVA ÁTRIO AUDITÓRIO ESPAÇO PÚBLICO LIXOS I.S. DEFICIENTES I.S. DEFICIENTES I.S. HOMENS ARMAZÉM SECO I.S. MULHERES I.S. HOMENS I.S. MULHERES ARMAZÉM FRIO ATENDIMENTO GABINETE III RECEPÇÃO GABINETE I GABINETE II LIVRARIA COPA ESPLANADA REUNIÕES SALA CAFETARIA ARRUMOS EXPOSIÇÕES ARRUMOS EXPOSIÇÕES EXPOSIÇÕES II EXPOSIÇÕES I CHILLER CENTRAL TÉRMICA CISTERNAS E GRUPOS DE BOMBAGEM UTAS

8 24 x

0,17

6

GABINETE III

7

= 4,00

5

ESPLANADA

LIVRARIA

4

14,87 m2 3

51,00 m2

12

12

1

2

LIXOS

30,19 m2

I.S. DEFICIENTES

COTA 96,17 - SEGUNDO PISO

1:100

4,37 m2

7

17

6

18

5

19

4

20

3 2 1

3,35 m2

22

6,92 m2 20

19 18 17

16 15

14

21

14 15 16

7

17

6

18

5

19

4

20

2

12

23

13

9 8

3

13

22

11 10

1

I.S. HOMENS 11,98 m2

ARMAZÉM FRIO

COPA

12,93 m2

21

40,32 m2

22 23

A-08

5

16

23 x 0,17 = 4,00

30,32 m2

15

21

24

8,49 m2

GABINETE I

14

23 x 0,17 = 4,00

I.S. MULHERES

13

9 8

23

I.S. DEFICIENTES

11 10

A-07

GABINETE II

34,54 m2

11 10

REUNIÕES

9

61,61 m2

I.S. HOMENS

8

7,04 m2

24 x

0,17

7

= 4,00

6

ARMAZÉM SECO

5

8,22 m2

4 3

1

2

I.S. MULHERES

GABINETE III

ATENDIMENTO

12,01 m2

13,40 m2

14,87 m2

LIVRARIA

12

12

34,54 m2

LIXOS

RECEPÇÃO

PROJECTO IV

I.S. DEFICIENTES

30,32 m2

PROF. ARQUITETO CARLOS PRATA REUNIÕES

4,37 m2

MATHEUS DE PAULA D'ALMEIDA

14 15

8

16

7

17

6

18

5

19

4

20

3 2 1

23

22

13

10 9

18

17 16

15

14

21

13

22

12

23

11

13

10

14

9

15

8

16

7

17

6

18

5

19

4

20

3 2 1

2

11,98 m2

ARMAZÉM FRIO 12,93 m2

21 22

COPA 40,32 m2

23

11

01.07.13

Lista Zonas - QUADRO DE ÁREAS

10 9

61,61 m2

I.S. HOMENS

8

7,04 m2

0,17 24 x

7

= 4,00

ARMAZÉM SECO

6

5

8,22 m2

4

3

1

2

I.S. MULHERES 12,01 m2

RECEPÇÃO 20,75 m2

4

COTA 102,17 - PRIMEIRO ANDAR

1:100

Área

911,92 7,05 9,77 16,90 20,54 23,09 27,81 31,83 32,87 33,06 37,29 45,85 47,49 52,13 52,14 121,37 369,58 708,95 2,82 2,82 4,26 4,26 10,22 10,70 13,28 13,35 13,60 13,74 15,08 20,78 134,70 223,73 263,49 1.735,47 3,24 4,30 6,75 6,79 7,85 8,28 11,72 11,74 12,40 13,26 14,79 20,84 29,94 29,95 34,10 40,91 50,98 61,26 74,78 20,60 20,80 225,65 371,28 45,74 45,83 66,52 127,54

Nome Zona

6.399,78 m2

I.S. HOMENS

A-08

GABINETE I

CENTRO DE DOCUMENTAÇÃO

11

23 x 0,17 = 4,00

8,49 m2

21

24

I.S. MULHERES

20

1:100

P31 FL6

3,35 m2 74,91 m2

6,92 m2

19

COTA 102,17 - PRIMEIRO ANDAR

23 x 0,17 = 4,00

4

SALA CAFETARIA

I.S. DEFICIENTES

20,75 m2

A-07

GABINETE II 30,19 m2

Pavimento (Piso)

COTA 82,17 - ARQUIVOS COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 85,17 - ESTACIONAMENTO COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 88,17 - ENTRADA COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR ESPLANADA COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 51,00 m2102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 102,17 - PRIMEIRO ANDAR COTA 96,17 - SEGUNDO PISO COTA 96,17 - SEGUNDO PISO COTA 96,17 - SEGUNDO PISO COTA 96,17 - SEGUNDO PISO COTA 100,17 - COBERTURA COTA 100,17 - COBERTURA COTA 100,17 - COBERTURA COTA 100,17 - COBERTURA

ATENDIMENTO 13,40 m2

SALA CAFETARIA 74,91 m2

P31 FL6

01/06

ARQUIVOS I.S. DEFICIENTES EXPURGO RECEPÇÃO E TRIAGEM OFICINA ARRUMOS POSTO DE TRANSFORMAÇÃO I.S. HOMENS (BALNEÁRIO) I.S. MULHERES (BALNEÁRIO) ARRUMOS GRUPO GERADOR DE EMERGÊNCIA REPARAÇÃO E TRATAMENTO REPARAÇÃO E TRATAMENTO SALA DE CATALOGAÇÃO SALA DE CATALOGAÇÃO UTAS ARQUIVOS ESTACIONAMENTO TRADUÇÃO TRADUÇÃO TRADUÇÃO TRADUÇÃO RECEPÇÃO RECEPÇÃO CONSULTA INDIVIDUAL CONSULTA INDIVIDUAL CONSULTA INDIVIDUAL CONSULTA INDIVIDUAL REGIE BENGALEIRO CONSULTA COLETIVA ÁTRIO AUDITÓRIO ESPAÇO PÚBLICO LIXOS I.S. DEFICIENTES I.S. DEFICIENTES I.S. HOMENS ARMAZÉM SECO I.S. MULHERES I.S. HOMENS I.S. MULHERES ARMAZÉM FRIO ATENDIMENTO GABINETE III RECEPÇÃO GABINETE I GABINETE II LIVRARIA COPA ESPLANADA REUNIÕES SALA CAFETARIA ARRUMOS EXPOSIÇÕES ARRUMOS EXPOSIÇÕES EXPOSIÇÕES II EXPOSIÇÕES I CHILLER CENTRAL TÉRMICA CISTERNAS E GRUPOS DE BOMBAGEM UTAS

2

Lista Zonas - QUADRO DE ÁREAS

CENTRO DE DOCUMENTAÇÃO PROJECTO IV

PROF. ARQUITETO CARLOS PRATA

MATHEUS DE PAULA D'ALMEIDA

01.07.13

25


90.48

89.94

105.47

97.89

97.09

104.50

93.58

G

F

E

93.58

91.05

88.26 90.66

DO

MALHEIRO

ALFERES

89.32

H

RUA

88.17

2

1

3

4

5

6

8

7

9

10

11

13

12

14

15

16

17

19

20

18

20 x 0,15 = 3,00

CONSULTA COLETIVA 137,04 m2

12

12

CONSULTA INDIVIDUAL TRADUÇÃO

13,64 m2

7

17

RECEPÇÃO

6

18

5

19

10,83 m2

4

20

3

13,63 m2

2 1

23

20

18 17 16

15 14

21

13

22

12

23

11

13

10

14

9

15

8

16

7

17

6

18

5

19

4

20

ÁTRIO

RECEPÇÃO

224,41 m2

10,35 m2

2

3

1

23 x 0,17 = 4,00

16

19

15

23 x 0,17 = 4,00

CONSULTA INDIVIDUAL

14

21

24

A

87.52

13

9 8

22

4,40 m2

11 10

21 22 23

11

TRADUÇÃO 2,93 m2 A

REGIE

AUDITÓRIO

15,37 m2

264,57 m2

10 9

8 24 x

0,17

7

= 4,00

TRADUÇÃO

6

2,93 m2

5 4

CONSULTA INDIVIDUAL

3

1

2

13,62 m2

TRADUÇÃO

21,11 m2

4,40 m2

CONSULTA INDIVIDUAL

2

1

3

4

5

6

8

7

9

H

10

13

12

14

15

16

17

19

20

18

20 x 0,15 = 3,00

13,63 m2

86.93

11

P30 FL6

BENGALEIRO

9

8

7

14

13

6

5

11

12

4

3

10

2

B

1

B

ESPAÇO PÚBLICO

C

C

1.735,47 m2

15 x 0,17 = 2,50

86.97

Viela 88.33

93.53

do

Anjo

95.82

da

95.46

99.79

99.98

86.45

D

D

93.69

103.99

100.56 103.53

103.45

98.38

17 16 15 14 13 12 11 10

9

84.36

89.81

8 7 6

4 3 2

G

F

E

1

17 x 0,18 = 3,00

5

86.57

98.50

98.73

RUA

DE

FERNANDES

TOMÁS

97.40

95.27

83.48

96.89 TRAV.

DAS

LICEIRAS

94.30 92.35

1

COTA 88,17 - ENTRADA

1:100

02/06

CENTRO DE DOCUMENTAÇÃO PROJECTO IV

26

PROF. ARQUITETO CARLOS PRATA

MATHEUS DE PAULA D'ALMEIDA

01.07.13


H ARRUMOS

370,50 m2

33,31 m2

11

11

ARQUIVOS

10

12

9

13

8

14

7

15

10

12

9

13

14 15

16

6

16

17

5

17

4

18

4

18

19

3

3 2

20

2

21

1

UTAS

A

121,58 m2

19 20 21

H

1

21 x 0,14 = 3,00

8 7

6 5 21 x 0,14 = 3,00

A

ESTACIONAMENTO 709,98 m2

B

B

I.S. DEFICIENTES 7,20 m2 C

C

ARRUMOS 23,09 m2

I.S. MULHERES (BALNEÁRIO)

I.S. HOMENS (BALNEÁRIO)

32,97 m2

32,12 m2

OFICINA 20,84 m2

EXPURGO 10,03 m2

REPARAÇÃO E TRATAMENTO 46,26 m2

REPARAÇÃO E TRATAMENTO 47,91 m2

SALA DE CATALOGAÇÃO 52,57 m2

SALA DE CATALOGAÇÃO 52,57 m2

D

D

RECEPÇÃO E TRIAGEM 17,19 m2

17 16

GRUPO GERADOR DE EMERGÊNCIA

15 14

37,66 m2

13 12 11 10

9

POSTO DE TRANSFORMAÇÃO 8

28,14 m2

7 6 17 x 0,18 = 3,00

5 4 3 2

1

COTA 85,17 - ESTACIONAMENTO

G

F

E

1

1:100

ARQUIVOS

12

10

12

9

13

8

14

14

7

15

16

6

16

17

5

17

18

4

18

3

1

0 COTA 88,17 - ENTRADA

COTA 82,17 - ARQUIVOS

19

3

20

2

21

1

19 20 21

1:100

±0,00

±0,00 0 COTA 88,17 - ENTRADA

-3,00 -1 COTA 85,17 - ESTACIONAMENTO

-3,00 -1 COTA 85,17 - ESTACIONAMENTO

C

0 COTA 88,17 - ENTRADA

21 x 0,14 = 3,00

13

15

5 4

21 x 0,14 = 3,00

9 8

7 6

2

2

11

11

879,63 m2

10

CORTE

1:100

±0,00

±0,00 0 COTA 88,17 - ENTRADA

-3,00 -1 COTA 85,17 - ESTACIONAMENTO

-3,00 -1 COTA 85,17 - ESTACIONAMENTO

D CORTE 1:100

03/06

CENTRO DE DOCUMENTAÇÃO PROJECTO IV

PROF. ARQUITETO CARLOS PRATA

MATHEUS DE PAULA D'ALMEIDA

01.07.13

27


+16,00 4 IMPLANTAÇÃO

P13 FL6

P14 FL6

P15 FL6

P16 FL6

+16,00 4 IMPLANTAÇÃO

P18 FL6

P17 FL6

P19 FL6

P11 FL6

P12 FL6

P10 FL6

+12,00 3 COTA 100,17 - COBERTURA

P20 FL6

P25 FL6 P06 FL6

P03 FL6

+4,00 1 COTA 102,17 - PRIMEIRO ANDAR

P04 FL6

±0,00

±0,00 0 COTA 88,17 - ENTRADA

P02 FL6

P27 FL6

-3,00 -1 COTA 85,17 - ESTACIONAMENTO

-3,00 -1 COTA 85,17 - ESTACIONAMENTO

P01 FL6

P28 FL6

-6,00 -2 COTA 82,17 - ARQUIVOS

A

CORTE

P29 FL6

P26 FL6

P05 FL6

0 COTA 88,17 - ENTRADA

+8,00 2 COTA 96,17 - SEGUNDO PISO

P24 FL6

P07 FL6

+4,00 1 COTA 102,17 - PRIMEIRO ANDAR

+12,00 3 COTA 100,17 - COBERTURA

P23 FL6

P08 FL6

+8,00 2 COTA 96,17 - SEGUNDO PISO

P21 FL6

P22 FL6

P09 FL6

-6,00 -2 COTA 82,17 - ARQUIVOS

1:100

+8,00 2 COTA 96,17 - SEGUNDO PISO

+8,00 2 COTA 96,17 - SEGUNDO PISO

+4,00 1 COTA 102,17 - PRIMEIRO ANDAR

0 COTA 88,17 - ENTRADA

+4,00 1 COTA 102,17 - PRIMEIRO ANDAR

±0,00

±0,00 0 COTA 88,17 - ENTRADA

-3,00 -1 COTA 85,17 - ESTACIONAMENTO

-3,00 -1 COTA 85,17 - ESTACIONAMENTO

-6,00 -2 COTA 82,17 - ARQUIVOS

-6,00 -2 COTA 82,17 - ARQUIVOS

B CORTE 1:100

E

CORTE

1:100

F

CORTE

1:100

G CORTE 1:100

04/06

CENTRO DE DOCUMENTAÇÃO PROJECTO IV

28

PROF. ARQUITETO CARLOS PRATA

MATHEUS DE PAULA D'ALMEIDA

01.07.13


1

Alçado

1:100

2

Alçado

1:100

3

Alçado

1:100

4

Alçado

1:100

05/06

CENTRO DE DOCUMENTAÇÃO PROJECTO IV

PROF. ARQUITETO CARLOS PRATA

MATHEUS DE PAULA D'ALMEIDA

01.07.13

29


ACABAMENTO EM MADEIRA

ACABAMENTO EM MADEIRA

33 P32 Pormenor 1:2

35 P34 Pormenor 1:2

ACABAMENTO EM MADEIRA SARRAFO DE MADEIRA ACABAMENTO EM MADEIRA CAIXÃO METÁLICO COM POLIURETANO EXTRUDIDO NO INTERIOR ACABAMENTO METÁLICO PINGADEIRA EM GRANITO

ACABAMENTO METÁLICO

CAIXÃO METÁLICO

CANTONEIRA METÁLICA

ESPUMA DE POLIURETANO EXTRUDIDO NO INTERIOR

PINGADEIRA METÁLICA CAIXÃO METÁLICO

32 P33 Pormenor 1:2

34 P35 Pormenor 1:2

VIGA EM BETÃO (BRISE SOLEIL) SISTEMA PLUVIA DE DRENAGEM VIGA EM PERFIL METÁLICO "V" CAXILHO DA CLARABÓIA i=2%

DOBRA DA FOLHA DE ZINCO

DOBRA DA FOLHA DE ZINCO

DOBRA DA FOLHA DE ZINCO FOLHA DE ZINCO

FOLHA DE ZINCO

FOLHA DE ZINCO

FOLHA DE ZINCO

CAMADA DRENANTE`

CAMADA DRENANTE`

DOBRA DA FOLHA DE ZN

CAMADA DRENANTE`

CAMADA DRENANTE`

MANTA CORTA-VAPOR

MANTA CORTA-VAPOR

MANTA CORTA-VAPOR

MANTA CORTA-VAPOR

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

CAMADA DE PENDENTE EM BETÃO LEVE

CAMADA DE PENDENTE

CAMADA DE PENDENTE EM BETÃO LEVE

CAMADA DE PENDENTE EM BETÃO LEVE

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

PAREDE EXTERNA DE BETÃO

PAREDE EXTERNA DE BETÃO

LAJE EM BETÃO

LAJE EM BETÃO

LAJE EM BETÃO

LAJE EM BETÃO

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

PAREDE EXTERNA DE BETÃO

PAREDE DE BETÃO

CHAPA DE CAPEAMENTO

CHAPA DE CAPEAMENTO

PAREDE EXTERNA DE BETÃO

GRADIL METÁLICO COM CHAPAS DE 3mm PAREDE EXTERNA DE BETÃO

13 P11 Pormenor1:10

20 P18 Pormenor1:10

19 P17 Pormenor1:10

15 P13 Pormenor1:10

21 P19 Pormenor1:10

SISTEMA PLUVIA GODO

GODO

PINTURA BETUMINOSA

PINTURA BETUMINOSA

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

LAJE EM BETÃO

LAJE EM BETÃO

CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO NO INTERIOR

CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO DE ALTA DENSIDADE NO INTERIOR

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

INTERIOR

INTERIOR 12 P10 Pormenor1:10

22 P20 Pormenor1:10

14 P12 Pormenor1:10

SUPORTE PARA TECTO FALSO

P34 FL3

SUPORTE PARA TECTO FALSO

CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO NO INTERIOR

CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO DE ALTA DENSIDADE NO INTERIOR

VIGA DE CONCRETO

VIGA DE CONCRETO

16 P14 Pormenor1:10

ESTORE

17 P15 Pormenor1:10

18 P16 Pormenor1:10

ESTORE

36 P21 Pormenor1:10

TECTO FALSO

TECTO FALSO

INTERIOR

INTERIOR

CAIXILHO FIXO

CAIXILHO FIXO LAJE DE BETÃO

ALVENARIA CERÂMICA ALVENARIA CERÂMICA VIGA METÁLICA IPE400

11 P09 Pormenor1:10

ISOLAMENTO TÉRMICO PAREDE EXTERNA DE BETÃO

LAJE DE BETÃO

ALVENARIA CERÂMICA ALVENARIA CERÂMICA VIGA METÁLICA IPE400

23 P22 Pormenor1:10

ISOLAMENTO TÉRMICO PAREDE EXTERNA DE BETÃO P35 FL3

ESTORE

ESTORE

CAIXILHO FIXO

INTERIOR

PINGADEIRA EM GRANITO

BETONILHA COM ENDURECEDOR DE SUPERFÍCIE CAMADA REGULARIZADORA

10 P08 Pormenor1:10

PINGADEIRA EM GRANITO

BETONILHA COM ENDURECEDOR DE SUPERFÍCIE CAMADA REGULARIZADORA

LAJE EM BETÃO CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO DE ALTA DENSIDADE NO INTERIOR

CAIXILHO FIXO

INTERIOR

LAJE EM BETÃO CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO DE ALTA DENSIDADE NO INTERIOR

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

ISOLAMENTO TÉRMICO

INTERIOR

1

Alçado

1:20

2

Alçado

1:20

INTERIOR 24 P23 Pormenor1:10

SUPORTE PARA TECTO FALSO

CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO DE ALTA DENSIDADE NO INTERIOR

ESTORE

VIGA DE CONCRETO

TECTO FALSO

ESTORE

INTERIOR

TECTO FALSO INTERIOR

P32 FL3

VIGA DE CONCRETO

CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO DE ALTA DENSIDADE NO INTERIOR

CAIXILHO DE ALUMÍNIO SLIM-SLIDER

CAIXILHO 25 P24 Pormenor1:10

BLOCO DE GRANITO (11X11CM) GULA DE GRANITO 9

P07 Pormenor1:10

BLOCO DE GRANITO INTERIOR

ESTORE CAIXILHO FIXO

INTERIOR

PINGADEIRA EM GRANITO

BETONILHA COM ENDURECEDOR DE SUPERFÍCIE CAMADA REGULARIZADORA LAJE EM BETÃO

ESTORE

ISOLAMENTO TÉRMICO ISOLAMENTO TÉRMICO 8

P06 Pormenor1:10

SUPORTE PARA TECTO FALSO CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO DE ALTA DENSIDADE NO INTERIOR LEITO DE AREIA

CAMADA DE PENDENTE EM BETÃO LEVE

INTERIOR CAIXILHO

LAJE EM BETÃO INTERIOR (ESTACIONAMENTO)

7

IMPERMEABILIZAÇÃO

LAJE EM BETÃO

ALVENARIA CERÂMICA ISOLAMENTO TÉRMICO PINTURA ASFÁLTICA CAMADA DRENANTE GEOTÊXTIL

26 P25 Pormenor1:10

TECTO FALSO EM MADEIRA COM PROPRIEDADES ACÚSTICAS PLACAGEM DE MADEIRA ALVENARIA CERÂMICA

P05 Pormenor1:10

GULA DE GRANITO

ISOLAMENTO TÉRMICO

TECTO FALSO

PINTURA BETUMINOSA IMPERMEABILIZANTE

LAJE DE BETÃO

PLACAGEM DE MADEIRA

ESTORE

CAMADA DE BRITA

MACIÇO DE BETÃO

CAMADA REGULARIZADORA

VIGA DE CONCRETO

PINTURA BETUMINOSA IMPERMEABILIZANTE

P33 FL3

CAIXILHO SLIM-SLIDER

TERRENO CAMADA DE BRITA

CAMADA DE BRITA

BETONILHA COM ENDURECEDOR DE SUPERFÍCIE

CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO DE ALTA DENSIDADE NO INTERIOR

CUBO DE GRANITO (11X11CM)

LEITO DE AREIA

LEITO DE AREIA

30 P29 Pormenor1:10

ISOLAMENTO TÉRMICO

BETONILHA COM ENDURECEDOR DE SUPERFÍCIE

PINTURA ASFÁLTICA

CAIXÃO METÁLICO COM ESPUMA DE POLIURETANO DE ALTA DENSIDADE NO INTERIOR

CAMADA DRENANTE

CAMADA REGULARIZADORA

GEOTÊXTIL

LAJE EM BETÃO

BLOCO EM GRANITO

TERRENO

PINTURA BETUMINOSA PINTURA BETUMINOSA CUBO DE GRANITO (11X11 CM) LEITO DE AREIA DRENO DE PVC

VIGA METÁLICA IPE400

ARREMATE EM PVC CAIXA DE BRITA MANTA GEOTÊXTIL CAMADA DRENANTE TERRENO

5

P03 Pormenor1:10

6

P04 Pormenor1:10

27 P26 Pormenor1:10

INTERIOR DO AUDITÓRIO TERRENO

INTERIOR

MANTA GEOTÊXTIL

PAREDE EM BETÃO

CAMADA DRENANTE

BETONILHA COM ENDURECIMENTO DE SUPERFÍCIE

TELA IMPERMEABILIZANTE VERTICAL

CAMADA REGULARIZADORA LAJE EM BETÃO

VIGA METÁLICA IPE400

PALCO EM MADEIRA

TERRENO MANTA GEOTÊXTIL

PAREDE EM BETÃO

CAMADA DRENANTE

PLACAGEM DE MADEIRA

TELA IMPERMEABILIZANTE VERTICAL

CAMADA REGULARIZADORA LAJE EM BETÃO

ISOLAMENTO TÉRMICO REBOCO ALVENARIA CERÂMICA ISOLAMENTO TÉRMICO PAREDE EXTERNA EM BETÃO

4

P02 Pormenor1:10

TERRENO TERRENO GEODRENO CAMADA DE SEIXO MANTA GEOTÊXTIL CAMADA DRENANTE TELA IMPERMEABILIZANTE VERTICAL INTERIOR PAREDE EM BETÃO CIMENTO QUEIMADO CAMADA REGULARIZADORA LAJE EM BETÃO TELA DE POLIETILENO BETÃO DE LIMPEZA CAMADA DE BRITA

28 P27 Pormenor1:10

GEODRENO CAMADA DE SEIXO MANTA GEOTÊXTIL CAMADA DRENANTE TELA IMPERMEABILIZANTE VERTICAL ISOLAMENTO TÉRMICO PAREDE EM BETÃO CIMENTO QUEIMADO CAMADA REGULARIZADORA LAJE EM BETÃO TELA DE POLIETILENO BETÃO DE LIMPEZA CAMADA DE BRITA TERRENO

TERRENO

3

P01 Pormenor1:10

29 P28 Pormenor1:10

CENTRO DE DOCUMENTAÇÃO

30

PROJECTO IV

PROF. ARQUITETO CARLOS PRATA

MATHEUS DE PAULA D'ALMEIDA

01.07.13

P31 PLANTA P31 1:20


31


MATHEUS DE PAULA D’ALMEIDA SÃO PAULO, SP - BRAIL matheusdepauladalmeida@gmail.com +55 (11) 9 9715-3822


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.