Matthew Austin - Portfolio 2006-2014

Page 1

portfolio Matthew Austin 2006-2014


Interview Tell us a little bit about yourself. Hi! I’m Matt, 32 year old. I hold a bachelor degree in Architectural Engineering, Graduated in 2009. I started working in architecture from 2006. I love anything that’s related to design, from data visualisation, computer graphics, to Architecture itself. When did you become interested in Architecture? To be honest, I don’t know when. During my childhood, during the invention of “world wide web”, I fell in love with computers and programming. But as I became older, I got fascinated by car designs and industrial design. Next it was Architecture. The funny thing is when I think about it, I’m still in love with all of these things. The world of design fascinates me, no matter where it’s coming from. How do you define Architecture? That is a difficult question, in my mind I’m always struggling to come up with a definitive answer. I mean the reason that I’m pursuing Architecture is the fact that I didn’t have an answer for it. I’m constantly searching. If I ever had the answer I would probably would have stopped working in this field. The following along with the your question are just some of the questions that I still don’t have an idea to what they mean; In Architecture how do you define space? Does it exist in the real world, or at first it’s just an imagination? Can we claim that “there are many spaces within the existing space? Can we claim that “if two people with two different thoughts and behaviours stand in one room, they are in a single space? I believe that in every single space, there is an invisible creature living and justifying itself to its surroundings. This creature has the potential to become visible by translating itself to any definable space (e.g. Residential complex, sport complex, shopping mall, etc..). I describe this creature as “Architecture”. “Architecture” as a living creature, will choose the most suitable placement and form by adjusting to its surrounding. I guess what I’m trying to say is, “Architecture” already exists in every site and has the potential to become visible. Us as Architects will have to come up with a translation to interpret it in the given site. This translation needs to be done by a process, which the input is pure data that is gathered from the potentials of the site. The data may have architectural qualities such as views, relations or they can be natural quantities such as the amount of sun-light or rain. Austin 2 Matthew 2006-2014


How do you approach design? I believe design is a process. In order to have a good and solid design, specially in Architecture, you have to follow a “process”. You can’t just come up with a design with no logic. Sometimes the ugly might become beautiful if you the actual process and concept behind that thinking. In my opinion if the design doesn’t follow a process and if it’s not the result of a algorithmic thinking then it is not long lasting and it cannot full fill its needs.

Who are your favourite Architects and why? Hmmm, my favourite Architects, that’s a tough one. Well in order to answer this question, I have to categorise my favourite Architects, into two categories, those from the past, and those from the future. From the past, I would have to say Walter Gropius, Le Corbusier and Mies Van Der Rohe. I chose these three, because of the functional thinking towards Architecture. I chose Walter Gropius, because of his amazing architecture school ‘Bahaus”, where different thinking towards architecture was presented. The birth place of modern functional thinking towards architecture. From present, 3xn (Denmark), M.V.R.D.V (Netherland), Herzog & de Meuron (Switzerland) , Joshua Prince-Ramus (USA). To sum it up, my favourite Architects are ones who think about future and are visionary. Those who are willing to take risk to explore and extend the boundaries of design. Those who love to add new words and new definitions to the dictionary of design. Those who are revolutionary leaders in this field.

Matthew Austin

2006-2014

3


2920

TEHRAN ALANIA

MONTREAL

1

7665

14 7

LENS KUSADASI

4

ABU DHABI

7 KUALA LUMPUR

912 CANBERRA

11

TRAVELLED WISH TO TRAVEL

DAYS AROUND THE WORLD

LOCATIONS

381

16 sept, 1982

2014 INFO

months alive

PROJECT MANAGEMENT

SKILLS

MATTHEW AUSTIN AUSTRALIA

DESIGN 3D VISUALISATION

PHONE: +61 415 391 593 EMAIL: matthew.austinn@gmail.com

BA ARCH/ENGINEERING

COMMUNICATION

4.0

PROFESSIONAL EXPERIENCE

YEARS SKETCHUP

100

REVIT

GRASSHOPPER

PHOTHOSHOP 3DS MAX

AUTOCAD

COMPUTER SKILLS

000

YEAR

20

employment part-time/full-time company

04

05

06

07

08

09

10

11

PART-TIME

Soffeh AJAND Interior

Razineh Eng.Cons ARAN Eng. Cons.

Razineh Eng.Cons

Hootanpei Eng. Cons. R C C R

R Mazloomi Villa

4 2006-2014

Matthew Austin

13

14

FULL-TIME

R Niavaran Apartment L Kish Landscape Design

projects

12

R Pakdasht Housing R Fazli Apartment R BoN Apartment R C I C H

Sepehr Zaferanieh Tabnak Building Hotel Darband Saman Building

I O Salehi Office C Sadeghieh Centre C R Shirinoo Housing

Shaghayegh Affordable Housing Lashgarak Conservative Site Shervan Hotel Bane Private Hospital

Marchese Partners International H H H R R R R R R R C I O

Bellarine Community Centre Life Care Adelaide, 5 Sites Meru Community & Wellness Centre Crace Housing Blacket Street Stockdale Street Building Wilara, Woden Green Housing Observatory Living The Shoal Futra iApartment Canberra Outlet Centre Crimtrac


PROFESSIONAL FREELANCE

PROJECTS EXAMPLES

THE SHOAL FUTRA iAPARTMENT CANBERRA OUTLET CENTRE MERU IPOH CITY ADELAIDE LIFE CARE 5 SITE ANALYSIS BLACKET STREET RESIDENTIAL BUILDING

HOOTANPEI

SEPEHR RETAIL CENTRE TABNAK BUILDING DARBAND HOTEL SAMAN BUILDING SALEHI OFFICE SADEGHIE FACADE SHIRINOO HOUSING

H R C I O

RAZINEH Counsulting ArchitectsEngineers Group PROFESSIONAL FREELANCE

SHERVAN HOTEL ALMANSOUR HOTEL MELLI COMPETITION KOLAHI TOWER GRASSHOPPER LECTURE

Matthew Austin

2006-2014

5


LEVEL1-4 EXISTING BUILDING FOOTPRINT

LIMITATIONS

LEVEL1-4 BUILDING EXTENSION

LEVEL1-4 PROPOSED BUILDING FOOTPRINT

THE SHOAL APARTMENTS

We were first approached by a client to review the exisiting DA package for a site located in Newcastle, NSW. The scope of the project was, increase the yield of the project by increasing the size of the units, add an additional penthouse level and also redesign the outdated facade.

NORTH ELEVATION

The challenge was, we were very limited in terms of how much change we could make to the design. Another limitation was that ground level, level 1 and 25 % of level 2 was already built . Therefore, by our client’s request, we had to maintain what was already built, and we couldn’t move any structural walls. The end result was a 50 unit apartment building with a modern dynamic facade. SOUTH ELEVATION

Responsibilities • Architect Assistant • Facade Concept Designer • Architectural Documentation for S96 package - Revit • Liasing/Coordinating with the stakeholders • Coordinating/Reviewing the construction documentation of the project

NORTH ELEVATION

SOUTH ELEVATION

NOTE: PERSPECTIVE IMAGES IS FOR ILLUSTRATION PURPOSES ONLY. SOME LINES APPEARING ON FACADE ARE RESULT OF MODELING SOFTWARE. 1 VIEW FROM NORTH-EAST

Austin 6 Matthew 2006-2014


PREVIOUS FACADE - DESIGNED BY PREVIOUS ARCHITECT

PROPOSED FACADE - DESIGNED BY MARCHESE PARTNERS

Matthew Austin

2006-2014

7


2

ADA 500

1

ADA 401

2

ADA 500

WR

DESK/STORE

85 m²

LIVING

DINING

UW.09

RL 10.000

BED 02

WR

DN

69 m²

UW.07

RL 9.915

WR

WR BED 01

ENS.

WR

S

ENS.

BATH

BED 01

LDY

BATH

LOBBY

UP

KITCHEN

DINING

LIVING

BED 02

C

BED 01

WR

BED 02

BATH

LDY

KITCHEN

BED 02

WR

BED 01

BATH

LDY

KITCHEN

92 m²

92 m²

LIVING

UE.08

HIGHLIGHT WINDOW

UW.08

LIVING

HIGHLIGHT WINDOW

45.720 BOUNDARY

ENS.

S

BATH

WR

1 ADA 501

1

WR

UP

DN

DINING

LIVING

KITCHEN

E

RL 9.915

BED 01

ENS.

BATH

LOBBY

LDY

69 m²

UE.07

BED 01

BED 02

D

BED 02

WR

85 m²

UE.09

RL 10.000

80 m²

UE.06

LIVING

DINING

KITCHEN

RL 9.915

45.720 BOUNDARY

DESK/STORE

F

BED 02

WR

LDY

BATH

88 m²

UE.10

BED 01

WR

ENS.

KITCHEN

LIVING

RL 9.915

G

6

5

4

3

2

1

2 ADA 400

1 ADA 451

2 ADA 501

ADA 501

8

BED 02

WR

LDY

BATH

BATH

LDY

KITCHEN

80 m²

UW.06

LIVING

B

LDY

8

HIGHLIGHT WINDOW

1

HIGHLIGHT WINDOW

7

BED 01

ENS.

KITCHEN

88 m²

UW.10

LIVING

BED 02

WR

ENS.

WR

BED 01

STORE

ADA 400

45.720 BOUNDARY

7

6

5

4

3

2

RL 9.915

DINING

2

KITCHEN

EXTENT OF DA (DASHED MAGENTA)

DINING

ADA 501

LDY

DINING

1

A

STORE

1

DRESSER WR

DINING

WR

ADA 450

DRESSER WR

STORE

Austin 8 Matthew 2006-2014 DINING

TYPICAL LEVEL FLOOR PLAN - DA PLAN 2

ADA 500

1

ADA 401

1

ADA 500

A


C

A4.02

D

A4.02

8

7

6

5

4

3

2

1

A

203 D04

T2

FW

T1

KIT

FW

T3

BALCONY

203 W02

C1

R

2B+S TYPE D1

BED 1

ENS

P

C1

LIVING

H

104 W01

203 D03

FW

F

UNIT 203

203 W03

FFL XX.XXX SSL 09.915

FW

T3

BALCONY

C1

FW

203 D06

203 W01

C1

BED 2

R

T2

LDY FW

T2

BATH

FW

HWU

DINING

203 D05

S

204 D04

H

BED 2

STUDY

R

FW

FFL XX.XXX SSL 09.915

203 D02

H

FW

T2

ENS

R

C1

BED 1

204 W02

FW

H

P

T3

C1

LIVING

204 D06

T2

F

204 D05

202 W01

C1

FW

LIVING

2B TYPE E1

UNIT 202

DINING

T1

KIT

203 D01

FW

FW

T1

KIT

DINING

2B TYPE C1

BATH

HWU

P

F

FW

BALCONY

T2

LDY

R

204 D01

L2 D03

UNIT 204

204 W03

ENTRY

204 D03

204 D02

A

205 W01

H

C1

L2 D01

F

202 D01

202 D02

HWU

FW

T3

BALCONY

R

R

202 D05

T2

LDY

FW

FW

FW

T2

L2 D05

202 W03

C1

BED 1

T2

ENS

T2

L2 D06

C2

FW

H

R

205 W03

R

FW

FW

201 D02

201 D05

P

H

P

T2

206 W03 206 W02

206 D03

C1

BED 1

206 D02

206 D05

T2

LDY

206 D04

FW

FW

T2

ENS

FW

FW

S

206 D01

ENTRY

T3

201 W03

C1

H

FW

T2

BED 2

FW

206 D06

BATH

FW

C1

H

FW

HWU

BED 2

FW

HWU

F

FW

FW

45.720 BOUNDARY

5750

H

R

FW

210 D05

FW

FW

H

L2 D10

T2

ENS

FW

T2

207 W03

C1

FW

C1

LIVING

T3

BALCONY

207 D03

FW

FW 207 D04

L2 D02

207 D05

T2

210 D01

T3

S H

C1

BED 2

207 W02

207 D02

BALCONY

R

210 W01

HWU

FW

ENTRY

207 D01

LDY

R

F

10210

T2

LDY

R

209 D01

F

FW

FW

P

DINING

T1

2B TYPE E1

FW

207 W01

C1

LIVING

H

209 D03

209 D02

P

208 W01

208 D02

H

FFL XX.XXX SSL 09.915

C1

BED 2

R

T2

208 D05

T2

LDY FW

208 D06

FW

BATH

FW

DINING

HWU

F

STUDY

C1

BED 2

R

FW

FW

T2

ENS

R

C1

BED 1

109 D04

S

H

209 W02

ENTRY

KIT

208 D01

T2

BATH FW

HWU

UNIT 207

L2 D07

209 D06

209 D05

T1

KIT

DINING

2B TYPE C1

F

209 W03

UNIT 209

C1

LIVING

T3

BALCONY

FW

45.720 BOUNDARY

FFL XX.XXX SSL 10.000

FS02

207 D05

L2 D08

P

T1

KIT

DINING

2B TYPE B1

UNIT 210

E

H

BATH

L2 D09

BED 1

C2

LIFT LOBBY

LIFT A

T2

210 D03

210 D02

R

A4.01

B

2200

LDY

HWU

210 D04

R

T2

DINING

BALCONY

201 W02

FW

BATH

201 D06

T1

C1

BED 1

BATH

R

210 W03

T3

C1

BED 1

201 D03

T2

LDY

F

KIT

T1

2B TYPE A1

KIT

UNIT 206

C1

C1

2B TYPE A1

LIVING

LIVING

FW

T3

UNIT 201

201 W01

FFL XX.XXX SSL 09.915

FW

T3

BALCONY

201 D04

T2

ENS

FW

FW

S

201 D01

ENTRY

DINING

T2

R

H

205 D04

BATH

C1

HWU

FW

LIFT LOBBY

H

206 W01

210 W02

D

C1

BALCONY

5800

C1

12

BED 2 BALCONY

5800

BED 2

205 W02

C

BED 1

LDY

LIFT A

205 D05

205 D03

205 D02

R

2000

BATH

H

FW 202 D04

202 D06

L2 D04

P

202 D03

FS01

T1

KIT

DINING

2B TYPE B1

UNIT 205

C1

LIVING

T3

ENTRY

202 W02

BED 2

S

FW

BALCONY

FFL XX.XXX SSL 10.000

205 D01

ENTRY

A4.01

B

ENTRY

14910

ENTRY

6280

1910

3210

5470

5400

5400

ENTRY

TYPICAL LEVEL FLOOR PLAN - CD PLAN

Matthew Austin

2006-2014

9

C1

LIVING

T3 208 W03

BALCONY

208 D03

F

R

C1 208 W02

T3 FW

P

208 D04

T2

ENS

BED 1

FW

BALCONY

H

T1

KIT

2B+S TYPE D1

UNIT 208

FW

209 W01

FW

FFL XX.XXX SSL 09.915

4500

G

45.720 BOUNDARY

8

7

6

5

4

3

2

1

C

A4.02

D

A4.02


FUTRA iAPARTMENT

Futra iApartment is located in Mascot, NSW. This eleven story, 54 unit residential tower was already designed and it already had a DA approved package. The client had this project reviewed by another architect which also lodged a section 96 package. But they were not satisfied with the outcome. Therefore, they engaged Marchese Partners to re-evaluate the design. Our brief was to optimise the unit layouts, remix the unit distribution and simplify the facade. Responsibilities • Architect Assistant • Facade Concept Design • Architectural Documentation for S96 - Revit • Liasing/Coordinating with the stakeholders • Coordinating/Reviewing the construction documentation of the project • 3d modelling/rendering and presentation

Austin 10 Matthew 2006-2014


4

3 2

1

PREVIOUS DESIGN

PROPOSED DESIGN BY MARCHESE PARTNERS 1. STAIR LANDING FROM BASEMENT TO NATURAL GROUND LEVEL, WHEELCHAIR LIFT AND BALUSTRADES ARE CHANGED FROM ANGLED TO A RIGHT ANGLE (IN PLAN). 2. PLANTER REMOVED 3. FEATURED BLADE WALLS HEIGHT IN MAIN ENTRY INCREASED AND SIMPLIFIED FROM WIDE ANGLE TO RIGHT ANGLE (IN PLAN). 4. BALUSTRADES ON LEVEL 02 TO LEVEL 05 ARE CHANGED FROM SOLID TO FROSTED GLASS.

PREVIOUS DESIGN

PROPOSED DESIGN BY MARCHESE PARTNERS

PREVIOUS DESIGN

PROPOSED DESIGN BY MARCHESE PARTNERS Matthew Austin

2006-2014

11


#

EXTENT OF DA APPROVED (DASHED BLUE)

1 ADA 503

1

EXTENT OF S96-3 BALCONY (DASHED MAGENTA LIGHT)

ADA 500

1

Stair rotated 90 degrees

2 3 4

External wall modified (now orthogonal) Main Entry walls now orthogonal to related walls Internal unit layout changed

5 6 7

Balcony Chamfered & External wall modified Feature blade wall now orthogonal to related walls Balustrade now glass instead of solid wall - typical level 3-11 Screens in Balcony introduced Balcony outline changed

8 9

EXTENT OF S96-3 (DASHED MAGENTA)

REVISION CHANGES DRP Reference

Description

2.7 Amenity

Issue

Corridors to all towers floors to have natural light and ventilation - assists with verticaltiy by rotation of southern stairwell.

More fit for purpose bathrooms provided (services coordinated)

10 Roof terrace outline changed 11 Roofs outline changed 12 Extent of pergola to recreation area (south) amended

Emphasize vertically of building 2.7 Amenity 2.2 Scale

Some balconies not deep enough for table and 4 chairs.

2.3 Built form 2.3 Built form

Balcony tv A/C

A/C

Bath. Entry sh.

Balcony

Unit 31 Ldy

HYD

glazed end wall provides natural light to corridor

Dining

f

Bath. s

Entry

wr

P sh. Bath.

f

s

Media f

Unit 34 Dining

Living tv

P

Entry

Ldy

Entry

Kitchen

Bedroom

s Entry s

Kitchen

ADA 502

Gbg

Lift 2

Ldy

Lift 1

UP

ADA ---501

TV

COM MTR/RISER

CORRIDOR

1

Unit 33

tv Living

P

UP Bath.

Sh.

wr

Dining

Outdoor dining

Living

tv

wr

A/C

1

1 ADA 503

Balcony Ldy

Bath.

Bedroom

sh.

sh.

Bedroom 1 (Main)

ES. WIR

Balcony

Balcony

ADA 500

ADA 502

Unit 32

f

1

BBQ

Dining

Bedroom 2 s

Balcony

A/C

1-

Study Living

A/C

s

f

s

ADA ---501

wr

Kitchen

Unit 30 Bedroom

1-

Balc ony

P

Bedroom

Kitchen

Dining

wr

P

Ldy

media

Kitchen

Living

LEGEND

1 : 200

EXTENT OF DA APPROVED (DASHED BLUE)

DA-07

DA-12

DA-04 EXTERNAL FINISHES LEGEND

EXTENT OF S96-3 (DASHED MAGENTA)

Max. height RL 51000

1580

DA-21 RL +50.81

Roof level

RL +48.42

DA-01 DA-02

RL 49420 DA-03

3000

1

Extent of S96 (rev.3) Extent of DA

S96/4 Level 6

RL +47.02

Roof terrace level

DA-04

RL 46420

3050

DA-05 DA-06

Level 11 3050

RL 43370

DA-07

DA-08

Level 10 3050

RL 40320

DA-09

DA-10

Level 9 3050

RL 37270 DA-11

Level 8

DA-12

RL 34220

3050

DA-13

Level 7

DA-14

3050

RL 31170 DA-15

Level 6 3050

RL 28120

DA-16 DA-18 DA-19

Level 5 RL 25070 DA-20

3050

DA-11

DA-21

DA-01

Level 4

PRECAST CONCRETE (COLOUR TO MATCH COLORBOND WALLABY) PRECAST CONCRETE TO PODIUM (COLOUR TO MATCH COLORBOND WALLABY) COLORBOND METAL DECK ROOF TO STAIR PRESS (COLOUR TO MATCH COLORBOND SHALE GREY) TEXTURE RENDER TO SOLID BALCONY UP-STAND (COLOUR TO MATCH COLORBOND WALLABY) TEXTURE RENDER TO U/S OF BALCONY (OFF WHITE) TEXTURE RENDER TO BALCONY PROJECTIONS (OFF WHITE) TEXTURE RENDER TO FEATURE BLADE WALLS (COLOUR TO MATCH COLORBOND SHALE GREY) FROSTED GLASS SEMI-FRAMELESS BALCONY BALUSTRADE (UP TO LEVEL 5 ONLY) CLEAR GLASS SEMI-FRAMELESS BALCONY BALUSTRADE (LEVEL 5 AND UP) TEXTURE RENDER TO BLOCK-WORK WALLS AT GROUND LEVEL RETAINING AND PLANTER WALLS AND EXPOSED BASEMENT WALLS (COLOUR TO MATCH COLORBOND WALLABY) POWDER-COATED METAL SCREENS (POWDER-COAT TO MATCH COLORBOND SHALE GREY) TEXTURE RENDER TO EXTERNAL WALLS OF STAIR (OFF WHITE) GLASS IN POWDERCOATED METAL FRAME (CLEAR GLASS AND POWDER-COAT TO MATCH COLORBOND SHALE GREY) METAL STRUCTURE TO COMMUNAL OPEN SPACE AT PODIUM (COLOUR TO MATCH COLORBOND WALLABY) METAL STRUCTURE WITH FABRIC/POLYCARBONATE ROOF TO ROOF-TOP TERRACE (COLOUR TO MATCH COLORBOND WALLABY) EXTERNAL TILES TO ENTRY STAIRS TEXTURE RENDER TO EXPOSED CONCRETE COLUMNS (OFF WHITE) POWDERCOATED METAL SAFETY FENCE TO SUBSTATION ENCLOSURE (COLOUR TO MATCH COLORBOND WALLABY) TEXTURE RENDER TO WALLS IN ROOF TERRACE, STAIR (OFF WHITE) POWDER-COATED METAL LOUVRES (COLOUR TO MATCH COLORBOND WALLABY)

RL 22020

3050

DA-14 DA-08

Level 3 3050

RL 18970

DA-19

Level 2 RL 15920

DA-13

3050

DA-02 RL +10.62

Level 1 3050

RL 12870

DA-10

Ground Level RL 9820

DA-04

1

S96/4 East Elevation 1 : 200

Austin 12 Matthew 2006-2014

DA-16

DA-10

DA-21 STAIRWELL PRESSURIZATION AIR INTAKE LOUVRE.

LEGEND Extent of S96 (rev.3) Extent of DA


Matthew Austin

2006-2014

13


MERU WELLNESS CENTRE

We were commissioned by Zencare to design a wellness centre for an aged care site in Ipoh City, Malaysia. Later during the design phase we were also got engaged in reviewing the exisiting master-plan for subject site. For the first part, we proposed a concept which correlates with its internal functions, and external appearance of the building actually describes the internal programs. Also, in our scheme at there is a strong empahsis on the distinction between private, public and smipublic programs which are all connected through genrous and light filled circulation spaces. The building is contained and at the same blurs the boundary between the public areas and the surrounding landscape, where this opportunity arises. The primary access creates an entry statement for the aged care village and operations as well as a clear visual marker for the community. Technical Datails Masterplan/Villa Types Design Review Meru Retirment Village Concept Design for a Community & Wellness Centre with a GFA of 2 103 m2 Responsibilities • Architect Assistant • Concept Developer • Producing area programm for the Wellness Centre • Architectural Documentation - Revit • 3d modelling/rendering and presentation

Austin 14 Matthew 2006-2014


Matthew Austin

2006-2014

15


GROUND LEVEL FLOOR PLAN

UPPER LEVEL FLOOR PLAN Austin 16 Matthew 2006-2014


VIEW FROM MAIN ROAD

AERIAL VEW FROM MAIN ROAD

VIEW FROM PARK

Matthew Austin

2006-2014

17


Lifecare Masterplan

Masterplan project for Aged Care provider Life Care involving 6 major sites across Adelaide.

The project has involved an in depth analysis of the current Life Care network and concepts which can be used as reference for future models of Aged Care across all sites. For this specific project we used different approach, rather than analysing the sites as micro regions we have analysed them in relation to each other and other in-demand facilities that can benefit each and every site as a whole. This means in this analysis technique we might come a cross interesting observation which can change the important of having one particular facility in one of these site rather than others. And also we might conclude that some facilities might not be feasible for a particular sight even though it was asked by client. Responsibilities • Architect Assistant • Co-ordinations with Melbourne Office • Design and Production of analysis • Concept presentation • Production of master plan studies

Austin 18 Matthew 2006-2014


The upper images are the in-depth analysis of three site of 6 sites. The main focus was the locations of medical centres, retails, community centres, age care facilities, recreation facilities and parks, within 1, 5, 10, 15 and 20 km radius of subject sites. This enabled us to have a more accurate understanding of what facilities and programs we have to accommodate in out sites. Also the data that we gathered for our sites, have made us realise that some of the programs can actually contribute and complete the surrounding programs/facilities. After this analysis, we have propose some very basic diagrams, of how each facility should be place on each site. Below are a sample diagrams which we have done for one the sites. The next phase was the actual concept design for each site.

Matthew Austin

2006-2014

19


NORTH

NORTH OPEN SPACE

NORTH

OPEN SPACE

OPEN SPACE

NE 1

Blacket St.

Blacket street project, was residential development located in Downer, ACT. One of our major challenges was designing a building which did not feel like apartment blocks but rather town houses. At the same time the client wanted the maximise the yield yet without compromising the quality of living. Our design consists of two main blocks with mix of 1 bed, 2 bed and 3 bedroom units. The main concept was to have an even width across the site thus giving the advantage of modular construction resulting in reduction of overall cost. Also by providing duplex or two story units giving the residents the advantage of separating the living and sleeping area in elevation, which creates the feeling that the building is bigger than what it seems.

Austin 20 Matthew 2006-2014

3

4

5

6

7

8

OPEN SPACE

15 15

OPEN SPACE SOUTH

2

14

13

12

11

OPEN SPACE

SOUTH

SOUTH

Technical Datails 16 Unit Residential Development Site Area: 1011 m2 GFA: 2134 m2 Responsibilities • Architect Assistant • Concept Developer • Architectural Documentation - AutoCAD • 3d modelling/rendering and presentation

10

PROHIBITED BUILD ING ZO

OPEN SPACE

PROHIBITED BUILD ING ZO

WEST

BUILDING FOOTPRINT

EAST

NE

OPEN SPACE

9


Matthew Austin

2006-2014

21


GROUND LEVEL FLOOR PLAN Austin 22 Matthew 2006-2014


LEVEL-1 FLOOR PLAN Matthew Austin

2006-2014

23


ELEVATIONS Austin 24 Matthew 2006-2014


SECTIONS Matthew Austin

2006-2014

25


EXISTING CIRCULATION DIAGRAM

PROPOSED CIRCULATION DIAGRAM

CANBERRA OUTLET CENTRE RETAIL We were commissioned to review the existing Canberra outlet Centre. The scope was to increase the efficiency, profitability and user experience. The challenge was to meet all of the above requirement and stage the changes in such a way that it would not force the centre to be fully shut-down. After analysing the flow and circulation of the movement we realised that the size and distribution of the tenancies, long corridors without any visual stimulating characteristics were the major factors. One of the changes that we proposed was introducing a new mall breakthrough which would create a relief in circulation and optimise the flow movement of users. We also decreased the northern corridors length and introduced major retails area which by bringing major brands would act as a magnet for the outlet centre.

E 2 PHAS

Responsibilities • Concept Developer • Architectural/Tenancy/Construction Documentation - AutoCAD & Revit • Liasing/Coordinating with the stakeholders • Coordinating/Reviewing the services drawings

PHASE 1

Technical Datails GLA: 45501 m2 (excluding circulation) Site Area: 68791 m2 145 Tenancies

DESIGN/CONSTRUCTION PHASE DIAGRAM

NEW MALL BREAK THROUGH

EXISTING PLAN LAYOUT Austin 26 Matthew 2006-2014

PROPOSED PLAN LAYOUT


STAGE-1 MALL BREAKTHROUGH PLAN Matthew Austin

2006-2014

27


STAGE-1 MALL BREAKTHROUGH SECTIONS Austin 28 Matthew 2006-2014


STAGE-1 MALL BREAKTHROUGH DETAILS Matthew Austin

2006-2014

29


SEPEHRRETAIL CENTRE

Sepehr Retail Centre was one of my favourite projects. Dynamic features which made it very unique. The folds and the actual form was driven by it surrounding. The cut in upper level was made for better view towards the mountains. The raise in form on ground level was made to invite people into the building and also create a semi-open space which has the potential to be a cafe/restaurant. The main reason to this approach was because of adjacent block. The adjacent block was a major retail development with 10 times more gfa than our subject site. Instead of looking at this issue as a threat, we embraced it. Rather than competing with that retail, we would use its users as our potential customers, by making our retail programs more of a service provider rather than a specialty retail. For instance our building is the only block in that area with a permit to built a 5 story public parking in the basement. Also our ground level has a supermarket, bank, and cafe shops. Also our building is the has more circulation space than its neighbour.

Technical Datails A shopping centre with 5 sotry basement with GFA of 11 680 m2, with capacity of 200 parking space.

ALT - 01

ALT - 02 ALT - 03

PERFERED SCHEME

Austin 30 Matthew 2006-2014

Responsibilities • Project Architect - Project Manager • Preparing the Contract and Calculating the preliminary cost and duration of the services provided by Hootanpei. • Supervising the area programming of the project. • Providing the design concept and building system that employed the construction technique for this project. • Coordinating and Reviewing shop drawings.


Matthew Austin

2006-2014

31


Austin 32 Matthew 2006-2014


Matthew Austin

2006-2014

33


Austin 34 Matthew 2006-2014


TABNAK

Tabnak residential building was a very challenging project. The client approached us after having problem with previous architect. The issue was that he didn’t like the previous design concept, he requested on changing the architectural design of the building but not the structural elements. This made the project twice as hard. Eventually after many sketches we came up with a scheme which both us and the client liked. The main concept was to have a maximum yield without affecting the established tree. So the curve in the design reflect the existence of trees on site. Technical Datails The site is located in one the the most expensive regions in Tehran. The high end users of these accommodations are wealthy residents of Tehran. GFA: 32 000 m2 10 story tower

Responsibilities • Architect • 3d modelling and rendering

Matthew Austin

2006-2014

35


BUILDING FOOTPRINT

PERMITTED BUILDING ZONE

PERMITTED BUIDLING ZONE

Austin 36 Matthew 2006-2014

BUILDING FOOTPRINT


Matthew Austin

2006-2014

37


HOTEL DARBAND

This project was commissioned to us by one of the biggest Holding and Investment groups in Iran.

For this project we teamed up with Obermeyer (German base architectural practice) to come up with two designs. One of the important things about the site was its location in Tehran. Darband is situated on the most elevated zone in Tehran with a Panoramic View to the city and also a beautiful view to the mountains. The site was near a heritage zone, which limited the building height at the southern boundary of the site. Also traffic was one of the major factors in our design, Darband is one of the few densely vegetated areas in Tehran, but ironically these vegetations and green zones are mainly located in private properties, also the ratio of public green space to residents in Darband is close to none. So our main scheme and design inspirations came right from the surrounding nature of the context. We wanted to have the lease amount of excavation and also use the topography to our benefit. We also wanted to create a certain circulation which can attract the people to come into the site rather than neglecting them. Technical Datails GFA: 44 000 m2 5-Star Hotel - 350 rooms, restaurants, wellness centre, shopping centre Responsibilities • Project Manager • Monitoring the final area program and research documentation of the project for nay faults and miscalculations. • 3d renders of final results

Austin 38 Matthew 2006-2014


SCHEME 01

In both of our first schemes, we used the existing excavation to our benefit. Our main focus was to have the little or close to none excavation and we wanted to have the rest of the site (apart from where there was already a building, intact). Thus we reduced the impact of our form on site to zero. The concept in both scheme was to design a layered form, with different interconnected programs, these layers are the extend of the existing topography into the built area. By moving this layers horizontally we created interesting points of views toward the city and natural attraction near our site. Also by moving the layers vertically, we have managed to mimic the mountains. In both schemes, we introduced the traditional Bazaar, which will boost the profit for the site’s stakeholders.

Matthew Austin

2006-2014

39


SCHEME 02

Austin 40 Matthew 2006-2014

The second scheme follows the first scheme’s main ideas except it is more fluid in terms of form. The appearance of a mountain form is more predominant in this scheme compare to our first concept.


Matthew Austin

2006-2014

41


Si-o-Seh Pol (The Bridge of 33 Arches) - Isfahan, Iran

SAMAN BUILDING

Saman building was commissioned to Hootanpei by Saman Bank, for their housing development project. The brief was to design a 200 unit apartment building which had to look unique and different from the traditional residential designs and also do not feel dense nor populated. To address the uniqueness we came up with a unique facade which resembled Sio-Seh Pol (The Bridge of 33 Arches). An iconic/historic bridge located in isfahan, which everyone can relate to. In order accommodate 200 units in one building we proposed a cross-shape layout plan. This enabled us to divide the site into four separate private courtyards which made the building feel not that dense.

+

Technical Datails Land Area: 9 000 m2 GFA: 42 000 m2 Responsibilities • Architect • Attending meetings with client as necessary to establish design parameters • Producing Architectural plans, construction documents. • 3d modelling and rendering

=

The form has a dynamic facade, no matter from which location you look at it, you could still see it’s concept, which in essence is “the bridge”. Austin 42 Matthew 2006-2014


Matthew Austin

2006-2014

43


Austin 44 Matthew 2006-2014


SALEHI

OFFICE

This a 250 m2 interior renovation project which was a conversion of residential unit to private office for Mr. Salehi. In this project I was responsible for the design, 3d presentation, and also the construction delivery of the project. Mr. Salehi’s most concern was to make the office looking as luxurious as possible within a certain limitation which was using MDF as our main material. Responsibilities • Interior Designer - Project Supervisor • Producing Architectural plans, construction documents, shop drawings, and 3d renders • Successfully managed to supervise the construction of the project from start to end

Matthew Austin

2006-2014

45


SCHEME 01

SADEGHIEH FACADE Hootanpei was invited to a design competition for a facade of a retail building located in one the busiest commercial district in west of Tehran. For this project we designed two schemes, which our first alternative won the 1st prize, and the second won 3rd.

In both of our schemes we didn’t design according to the brief, we actually modified the plans without altering the structural system of the building. We simplified to circulation and also increased the number of retail units in the building. The client was so happy with our approach that he considered our recommendation. Responsibilities • Concept developer • 3d modelling and rendering

Austin 46 Matthew 2006-2014


Matthew Austin

2006-2014

47


SHIRINOO HOUSING In this project, which we were commissioned by Petro elopment Management of Iran, we Chemical Industries Development ay out a very practical and useful had the opportunity to lay he site and the people who will live plan which would serve the ave took into our consideration the there in the future. We have harsh climate where the site is located, and have designed and architecture which resemble Iranian culture and has a sustainable theme. Technical Datails Are of the property: 300 000 m2 Negine Pars was a residential housing project that consist of 187 residential buildings (10 type of villas, 5 types of apartments and 1 tower), schools, cultural centre, shopping area, and sport facilities. Responsibilities • Architect, 3d Visualiser, Presentation Supervisor • Produced more than 70 renders

Austin 48 Matthew 2006-2014


Matthew Austin

2006-2014

49


Austin 50 Matthew 2006-2014


Matthew Austin

2006-2014

51


SHERVAN HOTEL Razineh was commissioned by ex-minister of Iraq to collaborate with an Kurd builder for development of a 5 star International hotel in Soleimanieh Iraq. Shervan hotel consists of 100 rooms plus other facilities. In this project I was responsible for the design of the restaurant and the VIP main entry.

Technical Datails 5 star hotel in Soleymanieh Iraq for a private client. 100 rooms, restaurant, wellness area Responsibilities • Interior Designer - 3d Visualiser

Austin 52 Matthew 2006-2014


Matthew Austin

2006-2014

53


ALMANSOUR HOTEL As a freelancer I was approached by Mr. Shahvand Yousefzadeh CEO of Archi-Comp (an Architectural firm in Kuwait) to work on a concept for a 27 stories hotel based in Baghdad, Iraq. The brief was to develop a form which is unique and also daring. The following are some of the schemes and contents that we have prepared for this project. Technical Datails High-rise building compelx with hotel, offices and commercial area Height: 27 stories G.F.A: 60 000 m2 Responsibilities • Architect - Concept Developer - 3d Visualiser • Providing different concept ideas • Produced the premilinary layout plans • Produced 3d renderings

Austin 54 Matthew 2006-2014


Matthew Austin

2006-2014

55


Austin 56 Matthew 2006-2014


accepted

scheme

After numerous sketch and many concepts, we finally had something that we felt that it was the right approach. The chosen concept was the peace ribbon, a symbol which is well noticeable from distance. Even from ground. Also, because of having a two leg format, it gives us the opportunity to divide the official zone from the serviced hotels. At the top of this building, where to the two zones meet, there is restaurant which acts as a observatory deck for the building.

Matthew Austin

2006-2014

57


Austin 58 Matthew 2006-2014


Matthew Austin

2006-2014

59


MELLI COMPETITION

I was part of a team that participated in an International Competition, which won the 4th prize. The subject site with an area of about 21,000 m2 was located near a domestic airport. The land use was for commercial, official & residential buildings. Our main goal in this project was to create an spectator theme which makes the landing and departure of planes the event of the site. Also another focus was to create a public domain for that particular area, and create a landmark that does not echo the usual approach to building design.

Technical Datails The site is located near Mehrabad Airport in about 21 000 m2 area for about 90 000 m2 building. The site is in the official & commercial zone and it will act under the title of “Iran Industrial Trade Centre”. Responsibilities • Key player and part of the design team.

Austin 60 Matthew 2006-2014


Matthew Austin

2006-2014

61


Austin 62 Matthew 2006-2014


KOLAHI TOWER

This project was a competition for a residential tower. The site was near a lake. The brief was to provide retail space on ground level, 1 bed units one lower levels, 2 bed units in mid levels and 3 bed units on upper levels. Our approach was a bit different, we though of a tower as a dead-end, also the location of the site was unique because there was no high-rise building in the region, therefore the no one from that region had experience the city from a higher horizon. We proposed a VERTICAL STREET, which has the retail in middle section of our tower, thus enabling the public audience to experience something that they had never had. Also by creating that unique void we also managed to create a loop which addressed the dead-end problem in towers. Technical Details Design residential towers in the given site with gross area approximately 2 200 m2. Responsibilities • Key player and part of the design team.

Matthew Austin

2006-2014

63


Austin 64 Matthew 2006-2014


extruded sample

arrangement of apartments type in two levels

Interior 3d of a south-north apartments

The plan layout of the residential units were arranged in 8 different types with variety of sizes . According to the modulation philosophy. In this concept in addition to easy construction, the nature of there design is that all of the units have both the direct sun- light of south and also the daylight of the north. Another benefit of this approach is the fact that we have eliminated corridors in every other levels, which mean more yield to be sold.

Matthew Austin

2006-2014

65


Austin 66 Matthew 2006-2014


Sample pictures of ARCH-3

ARCH-3 research

This research was done with collaboration of 2 other students. Our research led to creation of “Arch-3” which is a software that was made by us. Our objective was to produce a program which can assist Architects in making proper suggestion for the placement of architectural programs in the site. For putting all my effort and energy on this project, I withdrew myself from that semester, by the approval of the dean of the faculty. One of the main reasons that this project was introduced and started was that there were no researches done on the fact of computation in architecture in our university. It seems that there haven’t been any software developed in the field of architecture which could simulate and suggest the positioning of the architectural objects in the given site by using the intelligent methods which the architect can have almost a full control over the program. Unfortunately it seems that all of the CAD (Computer Aided Design) software aren’t actually aiding the user in design; they are only the drafting aided design software. We decided to publish a research paper which may help in future studies of computational development in architecture in our faculty. Creating a program, which uses fuzzy logic as its core of decision-making, for suggesting an optimal placement of architectural objects in the given site, became our goal.

The subject site

Matthew Austin

2006-2014

67


110

days

lecture

I was invited by Professor Mashayekh Faridani to teach Grasshopper to graduate students of Shahid Beheshti University for one semester. In addition to this class, we held a 3 day workshop called “Design to Fabrication�. Main focus of this class was to teach students the process behind advance computational designes using grasshopper. At the end of the semester each group had to present their final project in addition to some mini-problems which they had to find solution by only using grasshopper. This class was the first class of its kind in our university.

Austin 68 Matthew 2006-2014


Matthew Austin

2006-2014

69


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.