P3WAVE 185 QUEENS QUAY EAST TORONTO, ON M5A1B6 MATTHEW WONG
SITE CONTEXT
CN TOWER LAKE ONTARIO GARDINER EXPRESSWAY
“OLD TORONTO”
EAST BAY FRONT WEST PRECINCT
SITE DESIGN
PHASE 1
ZONING BYLAWS FOR THE SITE WERE ANALYZED TO DETERMINE THE MAXIMUM VOLUME ALLOWED.
TWRC EAST BAYFRONT WEST
BUILDING TYPOLOGY: MID-RISE
MAX HEIGHT: 50M
BASE BUILDING HEIGHT: 12M (MIN)
STREET FRONT SETBACK: 0.15M (MAX)
SETBACK ABOVE 12M HEIGHT: 5 FROM LOT LINE
TWRC | EAST
- East Bayfront revitalization is meant to bridge the connection between the lakefront and Downtown Toronto, which is currently divided by the Gardener Expressway o The development will help improve access to the waterfront edge o Circulation access points Arterial streets running north/south Lower Jarvis Street Sherbourne Parliament o
DOCKSIDE SHERBOURNEPARK
PHASE 2 MASSING SUBTRACTION TO FOLLOW MAIN PEDESTRIAN CIRCULATION FLOW ON SITE.
BAYFRONT WEST
QUEENSQUAYEAST
PHASE 3
FURTHER MASSING SUBTRACTION TO ISOLATE PODIUM LEVEL AND RESIDENTIAL TOWER TOWARDS QUEENS QUAY EAST. TOWER MASSING KEPT AND ANGLED TO FACE LAKE ONTARIO AND SHERBOURNE PARK. PODIUM LEVEL ALSO CONTINUES SIMILAR MASSING LANGUAGE FROM GEORGE BROWN COLLEGE JUST SOUTH OF SITE.
PHASE 4
TOWER MASSING OFFSET 5M FROM FRONT STREET PROPERTY LINE AND WEST PROPERTY LINE TO EMPHASIZE PODIUM LEVEL. THE TOWER ALSO LINES UP TO NEIGHBOURING BULIDING TO THE WEST OF SITE.
PHASE 5
PASSIVE DESIGN INTENTION ALONG TOWER TO CREATE MORE SURFACE AREA FACING THE SOUTH FOR SOLAR ENERGY PURPOSES (I.E. PV PANELS).
PHASE 5
CURVES INTRODUCED AS PART OF DESIGN CONCEPT ALONG EDGES FACING THE INTERIOR PORTION OF THE SITE.
PHASE 6
LEVELS CARVED OUT FOR EACH MASS TO REFLECT PROGRAMMATIC LAYOUT. PODIUM LEVEL INCLUDES COMMERCIAL PUBLIC SPACES, WHILE THE TOWER INCLUDES RESIDENTIAL UNITS, AND THE TOP FLOOR A LABORATORY.
PHASE 7
PODIUM LEVEL OFFSET INSIDE TO EMPHASIZE MAIN BULIDING ENTRANCE.
PHASE 8
TOWER LEVEL FOR RESIDENTIAL UNITS STAGGERED OUTWARDS IN A “WAVE FASHION” TO FURTHER THE DESIGN CONCEPT AS WELL AS INTRODUCE MORE RESIDENTIAL UNITS.
THIS ALSO CREATE A GREATER SURFACE AREA FACING SOUTH FOR PASSIVE/ACTIVE SOLAR ENERGY OPPORTUNITIES.
GARDINER EXPRESSWAY
WAVE BULIDING
SITE
ACTS AS DIVISION BETWEEN “OLD
AND NEW DEVELOPMENT IN EAST
WEST
EAST
ON
CURRENTLY
TORONTO”
BAY FRONT
PRECINCT “LANDMARK” IN
BAYFRONT TO DRAW MORE PEOPLE TO THE WATERFRONT
LAKE ONTARIO
SHERBOURNE PARK
SUGAR BEACH
IMPORTANT GREEN SPACE WIITH INTENSIONS OF OPENING UP VISUAL CONNECTION TO LAKE ONTARIO
PUBLIC WATER EDGE CIRCULATION DEVELOP A CONTINOUS AND ACTIVE PUBLIC WATER EDGE
1/3 MAIN CIRCULATION ACCESS POINTS GARDINER EXPRESSWAY ACTS AS DIVISION BETWEEN OLD TORONTO AND EAST BAYFRONT. LOWER SHERBOURNE STREET IS 1/3 NORTH-SOUTH ACCESS POINTS THAT CIRCULATE DIRECTLY TO THE WATER FRONT
EXTENDED PATH TO WATERFRONT
THE DIVISION IN THE MASSING INTRODUCES MORE NATURAL CIRCULATION TO THE WATERFRONT EDGE
MAIN E-W CIRCULATION SPINE
DESIRED LINE PATH
SINCE SHERBOURNE PARK IS AN IMPORTANT PUBLIC SPACE IN THE EAST BAY FRONT, THE PLANS ACCOUNTED FOR THIS NATURAL CIRCULATION PATH TO BRING PEOPLE TO THE PARK THROUGH THE SITE
STREET FRONT CONTINUITY
THE BUILDING WAS INTENTIONALLY PUSHED TOWARDS THE EDGE OF THE PROPERTY TO NOT ONLY KEEP THE STREET LINE, BUT TO ALSO MAXIMIZE PROGRAM SPACE ON SITE.
ROOF PLANE CONTINUITY
THE CURVES IN THE DESIGN CREATE A SMOOTH / GRADUAL TRANSITION ALONG THE STREET FRONT BETWEEN SHERBOURNE PARK AND THE SURROUNDING CONTEXT. IT ALSO HELPS TO PUT EMPHASIS ON DRAWING PUBLIC CIRCULATION TOWARDS THE SITE AND THROUGH THE BULIDING OR TOWARDS THE WATERFRONT EDGE.
SIGHT LINES
A TALL DESIGN WAS CONSIDERED TO KEEP UNOBSTRUCTED VIEWS TO LAKE ONTARIO AND SHERBOURNE PARK
SUN PATH
THE TALL DESIGN AND CURVED FORM MAXIMIZES SOLAR RADIANCE EXPOSURE ALONG THE BUILDING TO ALLOW FOR SUSTAINABLE OPPORTUNITIES, SUCH AS SOLAR CHIIMNEY’S, RAIN WATER HARVESTING AND PV PANELS.
FLOOR PLANS
LEVEL 1 1. VESTIBULE 2. LOBBY / ATRIUM 3. LIBRARY 4. WASHROOM 5. MECHANICAL ROOM 6. STORAGE/RECEIVING 7. OFFICES 8. RECEPTION 9. STAFF ROOM 10. CONFERENCE ROOM 11. CAFE/DINING 12. KITCHEN 13. PUBLIC SEATING 14. OUTDOOR SEATING 15. OUT DOOR CIRCULATION FLEX SPACE 1. 1. 1. 1. 2. 3. 4. 4. 4. 4. 4. 4. 5. 5. 6. 7. 7. 7. 7. 8. 9. 10. 11. 12. 13. 14. 15. 14. 14. 14.
LEVEL 2 1. ATRIUM 2. FLEX GALLERY SPACE 3. CLASSROOM 4. SEMINAR ROOM 5. MAKER SPACE STUDIO WORKSHOP 6. WASHROOM 7. MECHANICAL ROOM 8. PUBLIC SEATING 9. LEARNING YURT 1. 2. 3. 3. 3. 3. 3. 3. 5. 6. 6. 7. 8. 8. 9. 9. 4. 4.
LEVEL 3 1. ATRIUM 2. WASHROOM 3.. MECHANICAL ROOM 4. PUBLIC SEATING 5. LEARNING YURT 6. OUTDOOR SEATING 7. GREEN ROOF 1. 2. 3. 4. 4. 5. 6. 6. 7. 7. 7. 7. 5. 5. 5. 5. 2.
LEVEL 4 1. OPEN LEARNING FLEX SPACE 2. LEARNING YURTS 3. PRIVATE LEARNING ROOM 4. RESIDENTIAL UNIT 5. MECHANICAL CLOSET 1. 2. 2. 3. 4. 4. 4. 4. 4. 4. 4. 4. 4. 5.
LEVEL 5 1. OPEN LEARNING FLEX SPACE 2. LEARNING YURTS 3. PRIVATE LEARNING ROOM 4. RESIDENTIAL UNIT 5. MECHANICAL CLOSET 1. 2. 3. 5. 4. 4. 4. 4. 4. 4. 4. 2.
LEVEL 6 1. OPEN LEARNING FLEX SPACE 2. LEARNING YURTS 3. PRIVATE LEARNING ROOM 4. RESIDENTIAL UNIT 5. MECHANICAL CLOSET 1. 2. 2. 3. 4. 4. 4. 4. 4. 5.
LEVEL 7 1. OPEN LEARNING FLEX SPACE 2. PRIVATE LEARNING ROOM 3. RESIDENTIAL UNIT 4. MECHANICAL CLOSET 1. 2. 3. 3. 3. 4. 3. 3. 3.
LEVEL 8 1. OPEN LEARNING FLEX SPACE 2. EXPERT RESIDENTIAL UNIT 1. 2. 2. 2.
1. 2.
LEVEL 9 1. LABORATORY 2. TESTING AREA
1.
LEVEL 10
1. MECHANICAL PENTHOUSE
ELEVATIONS
BRICK MASONRY
ALUMINUM PANELS
FIBER CEMENT PANELS
FLY-BY CURTAIN WALL
WHITE TEXTURE TOWARDS STREET FRONT FOR ACCENT ARCH AND BALCONY TO EMPHASIVE CURVE ALONG MAIN STREET QUEEN QUAY EAST.
DARK GREY AT BACK TO MATCH BRICK MASONRY TO FURTHER EMPHASIZE CURVE ON ELEVATION.
DARK GREY BRICK FOR CORE TO FURTHER EMPHASIZE CURVE ON ELEVATION.
LIGHT TEXTURE FOR FLOOR 1 TO 3 WRAP AROUND 2ND FLOOR BELT.
SOLAR ANALYSIS
CURVED CURTAIN WALL SOUTH FACING AND ELEVATED FOR MAXIMUM SOLAR EXPOSURE HOURS 3497.00 < 3404.50 3312.00 3219.50 3127.00 3034.50 2942.00 2849.50 2757.00 2664.50 <2572.00
BASE BULIDING FORM
THERMAL MASS
WALLS IN SOLAR CHIMNEY’S WILL HEAT UP AIR TO CAUSE NATURAL AIR CONVECTION CIRCULATION THROUGHOUT BUILDING.
LEARNING SPACES
SPACES STAGGER AS YOU MOVE UP BULIDING FOR DYNAMIC EXPERIENCE AND VARYING VIEWS FOR USERS.
SURFACES
REFLECTIVE
WILL BE HIGHLY REFLECTIVE FOR BI FACIAL SOLAR
ON FACADE
WALLS
PANELS
TRANSPARENT PV PANELS
AMORPHOUS SILICON PHOTOVOLTAIC GLASS BY ONYX.
THESE PV PANELS WOULD BE UTILIZED FOR ALL AREAS THAT REQUIRE VIEWS (I.E. LEARNING SPACES ON RESIDENTIAL FLOORS, LAB, ETC.)
BI-FACIAL PV PANELS
DOUBLE SIDED ENERGY GENERATING PANELS TO BE UTILIZED IN ALL AREAS WHERE THERE ARE REFLECTIVE SURFACES BEHIND.
SOLID HIGH EFFICIENCY PV PANELS
TO BE UTILIZED ON HIGHEST POINT OF ROOF WHERE VIEWS AREN’T NECESSARY AND MAXIMUM SOLAR EXPOSURE OCCURS.
SYSTEM ANALYSIS
STRUCTURAL SPINE DETAIL
T1 T2 T3 T4 T5 SPECIAL STRUCTURAL CONDITIONS THE DESIGN AIMS TO CELEBRATE STRUCTURE. 5 MAIN STRUCTURAL SPINES CAN BE FOUND ACROSS THE ATRIUM IN A RAIDAL FASHION, SPANNING FROM GRADE TO THE ROOF. 0.60 0.60 REINFORCED CONCRETE COLUMN HORIZONTAL REBAR TIES LONGITUDINAL REBAR REINFORCED FLAT PLATE FLOOR REINFORCED CONCRETE BEAM VERTICAL STIRRUPS LONGITUDINAL REBAR LONGITUDINAL REBAR 0.50 0.20 1 25 Structural Detail 1 1 100 Structural Detail 2 REINFORCED FLAT PLATE SLAB REINFORCED BEAM MAIN LONGITUDINAL REBAR VERTICAL STIRRUPS REBAR CAGE
TYPICAL REBAR REINFORCEMENT STUDIED AND PROPOSED ACCORDINGLY.
RENDERS
THE END
APPENDIX
ENCLOSURE DETAILS
CURTAIN WALL TO ENTRY SOFFIT DETAIL 2 CURTAIN WALL TO GREEN ROOF DETAIL 1 SOFFIT TERMINATION TO WALL DETAIL 3 TYPICAL WALL TO FOUNDATION DETAIL 4 TYPICAL WINDOW TO WALL DETAIL 5
TOP HORIZONTAL MULLION WITH METAL COPING FINISH
FLY BY CURTAIN WALL PARAPET / GAURD RAIL
VERTICAL MULLION WITH INTERNAL STRUCTURAL REINFORCING POST
DEAD LOAD SHIM STACK
METAL COUNTER FLASHING
CONCRETE CURB
CAP SHEET MEMBRANE GRAVEL OR PAVERS
SOPRAFLOR GROWING MEDIUM METAL CURB VEGETATION (GRASS)
BASE SHEET MEMBRANE SOPRADRAIN ECO-5 MICROFAB MEMBRANE
SUPPORT PANEL SHEATHING
A.W.V. BARRIER ROOF MEMBRANE 5" RIGID INSULATION (EPS)
FIRE STOP INSULATION, SMOKE AND COMPARTMENTALIZATION SEAL
CURTAIN WALL MOUNTING ANCHOR
REINFORCED TWO WAY CONCRETE SLAB
SPANDREL PANEL SHADOW BOX WITH SEMI RIGID INSULATION
INTEGRATED MOUNTING JOINT IN VERTICAL MULLION
SUSPENDED WOOD CEILING PANELS
UNITIZED DOUBLE GLAZED CURTAIN WALL ASSEMBLY
HSS FLOOR TO FLOOR TRUSS (TOP) WITH FIRE RATED INTUMESCENT PAINT FINISH
VERTICAL ALUMINUM LOUVRES
0.30 0.50
SCALE DATE BY DRAWING NUMBER PROJECT NO. PROJECT TITLE DRAWING TITLE NO. REVISION DATE DRAWN CHECK NOTES 1 : 10 06.12.22 A202 MW 673-P3 WAVE S.L.C. 185 Queen Quay East, Toronto, ON. M5A 1B6 Curtain Wall to Green Roof Detail 1 7 Melville St. S . Cambridge ON. N1S 2H4 CURTAIN WALL TO GREEN ROOF DETAIL 1
1.10 0.76 0.50
0.30
0.50
VERTICAL MULLION
HSS FLOOR TO FLOOR TRUSS (BOTTOM) WITH FIRE RATED INTUMESCENT PAINT FINISH AND SEATING OPPORTUNITY 0.50
VERTICAL ALUMINUM LOUVRES
UNITIZED DOUBLE GLAZED CURTAIN WALL ASSEMBLY
INTEGRATED MOUNTING JOINT IN VERTICAL MULLION
INTERIOR CERAMIC TILE FLOOR FINISH
REINFORCED TWO WAY CONCRETE SLAB
FIRE STOP INSULATION, SMOKE AND COMPARTMENTALIZATION SEAL
STEEL FORMED L BRACKET
CURTAIN WALL MOUNTING ANCHOR SPANDREL PANEL SHADOW BOX WITH SEMI RIGID INSULATION
REINFORCED CANTINLEVERED CONCRETE BEAM
EIFS SUSPENSION TIES
FULLY ADHERED A.W.V. MEMBRANE
SUSPENDED EIFS PANEL WITH 5" RIGID INSULATION
WOOD LAMINA FINISH
SEALANT ON BACKER ROD
SEMI RIGID INSULATION
FORMED TERMINATION PANEL
SCALE DATE BY DRAWING NUMBER PROJECT NO. PROJECT TITLE DRAWING TITLE
REVISION
NOTES 1 : 10 06.12.22 A203 MW 673-P3 WAVE S.L.C. 185 Queen Quay East, Toronto, ON. M5A 1B6 Curtain Wall to Entry Soffit Detail 2 7 Melville St. S . Cambridge ON. N1S 2H4 CURTAIN WALL TO ENTRY SOFFIT DETIAL 2
0.90
NO.
DATE DRAWN CHECK
INTERIOR CERAMIC TILE FLOOR FINISH
TEMPERED GLASS GUARD RAIL 1.10
REINFORCED TWO WAY CONCRETE SLAB
STEEL STAND OFF CONNECTION BOLTS FOR GUARD RAIL (X4 / PANE)
2"x4" STEEL STUDS BEAM FURRING 5/8" GWB DRYWALL WITH PAINT FINISH
REINFORCED CONCRETE CANTILEVERED BEAM
REINFORCED CONCRETE BEAM
FULLY ADHERED A.W.V. MEMBRANE
STEEL TOP PLATE RUNNER 2"x6" STEEL STUDS OFFSET 4" FROM COLUMN
REINFORCED CONCRETE COLUMN IN DISTANCE ALIGNED TO BEAM ABOVE
SUSPENDED EIFS PANEL WITH 5" RIGID INSULATION + RECESSED EDGE FOR CONCEALED LIGHT FIXTURE
CONCEALED LINEAR LED STOFIX VERTICAL L RAIL STOFIX WALL NON CONDUCTIVE BRACKET
5" RIGID INSULATION (EPS)
CEMENT
WOOD LAMINA FINISH
PROJECT NO.
NOTES
A204 MW
SOFFIT TERMINATION TO WALL DETAIL 3
EQUITONE FIBER
PANEL 0.11 0.22 0.50 0.20 0.73 0.10 SCALE DATE BY DRAWING NUMBER
PROJECT TITLE DRAWING TITLE NO. REVISION DATE DRAWN CHECK
1 : 10 06.12.22
673-P3 WAVE S.L.C. 185 Queen Quay East, Toronto, ON. M5A 1B6 Soffit Termination to Wall Detail 3 7 Melville St. S . Cambridge ON. N1S 2H4
REINFORCED CONCRETE COLUMN IN DISTANCE ALIGNED TO BEAM ABOVE
2"x6" STEEL STUDS OFFSET 4" FROM COLUMN
STOFIX WALL NON CONDUCTIVE BRACKET
STOFIX VERTICAL L RAIL EQUITONE FIBER CEMENT PANEL
FLASHING SYSTEM DRIP EDGE (ABOVE GRADE)
STEEL BOTTOM PLATE RUNNER
5/8" GWB DRYWALL WITH PAINT FINISH
4" REINFORCED CONCRETE SLAB AT GRADE WITH POLISHED FINISH
5" RIGID INSULATION (EPS) A.W.V. MEMBRANE (POLY)
8" GRAVEL
CONCRETE BENCH WITH WOOD SEATING SURFACE
PVC UNDERDRAIN PIPE FOR RAIN WATER HARVESTING
GEOTEXTILE MATERIAL ON SUBGRADE MATERIAL SLOPED TO DRAIN
PERMEABLE BASE AGGREGATE PERMEABLE SUBBASE AGGREGATE
1.5" PERMEABLE SETTING BED AGGREGATE
PERMEABLE JOINT OPENING AGGREGATE
UNILOCK PERMEABLE PAVER
WATERPROOFING MEMBRANE 5" RIGID INSULATION (EPS)
REINFORCED FOUNDATION WALL 4' BELOW GRADE TO FROST LINE DEPTH
DATE
CIP CONCRETE FINISH
REINFORCED CONCRETE STRIP FOOTING (8"-16") WEEPING TILE AND GRANULAR BACKFILL
0.10
SCALE
BY
NUMBER PROJECT NO.
NOTES
A205 MW
WAVE
Typical
CAST IN PLACE CONCRETE SLAB OVER 8" GRAVEL TYPICAL WALL TO FOUNDATION DETAIL 4
DRAWING
PROJECT TITLE DRAWING TITLE NO. REVISION DATE DRAWN CHECK
1 : 10 06.12.22
673-P3
S.L.C. 185 Queen Quay East, Toronto, ON. M5A 1B6
Wall to Foundation Detail 4 7 Melville St. S . Cambridge ON. N1S 2H4
EQUITONE FIBER CEMENT PANEL
5/8" GWB DRYWALL WITH PAINT FINISH
2"x6" STEEL STUDS OFFSET 4" FROM COLUMN
5" RIGID INSULATION (EPS)
STOFIX VERTICAL L RAIL
STOFIX WALL NON CONDUCTIVE BRACKET
A.W.V. MEMBRANE SPLITS (WATER BARRIER OUTSIDE, AIR BARRIER INSIDE)
DRAINAGE PLANE LAPS OVER HEAD FLASHING BACK DAM
DRAINAGE PLANE LAPS OVER HEAD FLASHING BACK DAM
STEEL BOTTOM PLATE RUNNER FOR ROUGH WINDOW OPENING
2 LAYER 1/2" PLYWOOD BACKING
AIR SEAL FOR A.W.V. SPLIT AIR MEMBRANE
TRIPLE GLAZED ALUMICOR RAINBLADE 1900 SERIES WINDOW
AIR SEAL FOR SUB SILL FLASHING TO A.W.V. MEMBRANE
WOOD SILL
2 LAYER 1/2" PLYWOOD BACKING
STEEL TOP PLATE RUNNER FOR ROUGH WINDOW OPENING
A.W.V. MEMBRANE
RAIN SHEDDING FLASHING SILL
5" RIGID INSULATION (EPS)
5/8" GWB DRYWALL WITH PAINT FINISH
2"x6" STEEL STUDS OFFSET 4" FROM COLUMN
STOFIX WALL NON CONDUCTIVE BRACKET
STOFIX VERTICAL L RAIL
EQUITONE FIBER CEMENT PANEL
SCALE DATE BY DRAWING NUMBER PROJECT NO. PROJECT TITLE DRAWING TITLE NO. REVISION DATE DRAWN CHECK NOTES 1 5 06.12.22 A206 MW 673-P3 WAVE S.L.C. 185 Queen Quay East, Toronto, ON. M5A 1B6 Typical Window to Wall Detail 5 7 Melville St. S . Cambridge ON. N1S 2H4 TYPICAL WINDOW TO WALL DETAIL 5
SYSTEMS
PASSIVE STRATEGIES
PASSIVE VENTILATION STRATEGY
TWO ANGLED SOLAR CHIMNEYS ARE LOCATED ON OPPOSITE SIDES OF THE BUILDING THAT CONNECT THE ATRIUM TO THE ROOF. THIS DESIGN ALLOWS FOR MAXIMUM SOLAR GAIN ALONG THE SOUTHERN AND EASTER FACADE THROUGHOUT THE YEAR. AS THE SUN MAKE DIRECT CONTACT WITH THE SOLAR MASSES WITHIN THE CHIMNEY (HIGHLIGHTED IN RED), THE AIR WITHIN BEGINS TO HEAT UP AND CAUSE AN UP DRAFT. THIS STRATEGY IS THEN COMBINED WITH SENSOR CONTROLLED DAMPERS TO ALLOW FOR NATURAL CROSS VENTILATION.
SUMMER & WINTER STRATEGY
6 SENSOR-CONTROLLED DAMPERS ARE LOCATED THROUGH OUT THE BUILDING AND OPEN DEPENDING ON THE TEMPERATURE OUTSIDE. DAMPER A+B ARE LOCATED ON LEVEL 1 TO ALLOW FOR THE EAST/WEST WINDS TO ENTER. DAMPER C+D ARE BETWEEN THE ATRIUM SPACE AND SOLAR CHIMNEYS, AND DAMPER
N E S W NNE NE ENE ESE SE SSE SSW SW WSW WNW NW NNW C D
E F
A B
ACTIVE HEATING/COOLING STRATEGIES | WATER PIPING SCHEMATIC RADIANT FLOOR HEATING VRF CONDENSING UNITS BRANCH CONTROLLER CU BC CU BC FCU FCU FCU FCU FCU FCU FCU FCU ELECTRIC BOILER GROUND HEAT EXCHANGER MAKE UP AIR UNIT 3 WAY HEAT PUMP WAVE | SIMPLIFIED HVAC PIPING SCHEMATIC WATER TO AIR HEAT PUMPS HP HP HP HP HP HP PUMP BELOW GRADE VERTICAL LOOP SYSTEM MAIN LARGE MECHANICAL ROOM ON LEVEL 1 INDIVIDUAL HEAT PUMP UNITS FOR EACH RESIDENTIAL DORM PUBLIC OPEN SPACES + LAB OPEN SPACE ATRIUM COOLING SMALL MECHANICAL CLOSET ON EACH FLOOR LEVEL 1 - 3 + LEVEL 9 LEVEL 1 - 3 ATRIUM SPACE ONLY MECHANICAL PENTHOUSE LEVEL 4 - 9 ROOF TOP PV PANELS DESCRIPTION WATER-LOOP HEAT PUMP SYSTEM + RADIANT FLOOR HEATING WITH GEOTHERMAL GROUND SOURCE HEAT EXCHANGE. SECONDARY SUPPORT SYSTEM BY ELECTRIC BOILER AND MAKE UP AIR UNIT. DISTRIBUTION FROM HEAT PUMPS TO FAN COIL UNITS TO CONDITION PUBLIC SPACES. WATER TO AIR HEAT PUMPS TO BE UNTILIZED FOR EACH RESIDENTIAL UNITS.
DESCRIPTION: MINIMALLY CONDITIONED SPACES WITH LOW OCCUPANCY. (I.E. WASHROOMS, STORAGE, MECHANOCAL ROOM, ETC.)
RELATIVE HUMIDITY: 50% TO 55%
TEMPERATURE: 15oC - 25oC
DESCRIPTION: EVENLY CONDITIONED GATHERING SPACES WITH CONSISTENT MINOR OCCUPANCY. (I.E. OFFICES, CLASSROOMS, ETC.)
RELATIVE HUMIDITY: 20% TO 60%
TEMPERATURE: 20oC - 24oC
DESCRIPTION: EVENLY CONDITIONED GATHERING SPACES WITH PERIODS OF HIGH OCCUPANCY. (I.E. LIBRARY, SEMINAR ROOMS, WORKSHOPS, CAFE, ETC.)
RELATIVE HUMIDITY: 50% TO 55%
TEMPERATURE: 21oC - 22oC
DESCRIPTION: FOCUSED CONDITIONED SPACES WITH CONSTANT HIGH OCCUPANCY. (I.E. ATRIUM, HALLWAYS, ETC.)
RELATIVE HUMIDITY: 50% TO 55%
TEMPERATURE: 18oC - 20oC
DESCRIPTION: EVENLY CONDITIONED SELF CONTAINED SPACES CONTROLLED TO OCCUPANT’S NEEDS. (I.E. RESIDENTIAL DORMS, EXPERT RESIDENT SUITES, ETC.)
RELATIVE HUMIDITY: 40% TO 60%
TEMPERATURE: 18oC - 24oC
ACTIVE HEATING/COOLING STRATEGIES | THERMAL ZONES UP UP UP 0 5 10 m UP UP UP 200 Level 1 1 0 5 10 m UP UP UP 200 Level 1 1 0 5 10 m UP UP UP 1 200 Level 1 1 0 5 10 m UP UP UP 1 200 Level 1 1 0 5 10 m QUEENS QUAY EAST DOCKSIDE DRIVE DN DN DN DN UP QUEENS QUAY EAST DOCKSIDE DRIVE UP 1 : 200 Level 2 1 0 5 UP QUEENS
DOCKSIDE DRIVE LEVEL 3 LEVEL 1 LEVEL 4 LEVEL 2
QUAY EAST
SERVICE SPACES CIRCULATION SPACES PRIVATE SPACES PUBLIC ENCLOSED SPACES PUBLIC OPEN SPACES
UP UP UP GEOTHERMAL GROUND HEAT EXCHANGE VERTICAL LOOP SYSTEM BELOW GRADE HP CU BC FCU FCU FCU FCU FCU FCU HP B CU BC ACTIVE HEATING/COOLING STRATEGIES | PLANS SCHEDULE LEGEND
HP 3 WAY HEAT PUMP B ELECTRIC BOILER CU CONDENSER UNIT BC BRANCH CONTROLLER FCU FAN COIL UNIT WATER SUPPLY WATER RETURN VERTICAL PIPING TO FLOOR ABOVE/BELOW RADIANT FLOOR HEATING ATRIUM HEATED BY RADIANT FLOOR
AND COOLED WITH
UNITS
LEVEL 1
DESCRIPTION
HEATING
FAN COIL
TO LINEAR DIFUSERS ALONG THE WALL. MECHANICAL ROOM HOUSES 2 MAIN 3 WAY HEAT PUMPS - 1 SERVES AS A BACK UP IN CASE THE OTHER BREAKS DOWN. THE ELECTRIC BOILER, CONDENSER UNIT AND BRANCH CONTROLLER ARE ALSO LOCATED IN THE MAIN MECHANICAL ROOM. A SEPARATE MECHANICAL CLOSET IS LOCATED IN THE ACCESSORY BUILDING TO THE RIGHT TO SERVICE THE FAN COIL UNITS FOR THE CAFE AND KITCHEN. BELOW GRADE IS A VERTICAL LOOP CLOSED GEOTHERMAL SYSTEM.
GROUND SOURCE HEAT PUMPED UP TO THIS LEVEL TO SUPPLY THE 2 CONDENSER UNITS. EACH CONDENSER GOES TO THEIR OWN BRANCH CONTROLLER, WHICH SUPPLY NUMEROUS FAN COIL UNITS ON OPPOSITE SIDES OF THE BULIDING. THE ELECTRIC BOILER ALSO IS PUMPED UP TO THIS LEVEL TO SUPPLY THE RADIANT FLOOR HEATING IN THE ATRIUM. ALL THIS EQUIPMENT IS HOUSED IN THE SECONDARY MECHANICAL ROOM, WHICH ALSO DOUBLES AS THE ELECTRICAL ROOM FOR PANEL DISTRIBUTION.
DN DN DN UP QUEENS QUAY EAST UP FCU FCU FCU FCU FCU FCU FCU FCU FCU FCU BC CU BC CU ACTIVE HEATING/COOLING STRATEGIES | PLANS SCHEDULE LEGEND DESCRIPTION CU CONDENSER UNIT BC BRANCH CONTROLLER FCU FAN COIL UNIT WATER SUPPLY WATER RETURN VERTICAL PIPING TO FLOOR ABOVE/BELOW RADIANT FLOOR HEATING
LEVEL 2
HEATING/COOLING STRATEGIES | PLANS QUEENS QUAY EAST DN FCU BC CU SCHEDULE LEGEND DESCRIPTION CU CONDENSER UNIT BC BRANCH CONTROLLER FCU FAN COIL UNIT WATER SUPPLY WATER RETURN VERTICAL PIPING TO FLOOR ABOVE/BELOW RADIANT FLOOR HEATING GROUND SOURCE PUMPED UP TO 3RD LEVEL TO SUPPLY TOT HE CONDENSER UNIT AND FAN COIL UNITS. ELECTRIC BOILER ALSO PUMPED UP TO THIS LEVEL TO SUPPLY THE RADIANT FLOOR HEATING FOR THE ATRIUM. A MECHANICAL CLOSET ON THE FLOOR HOUSES THE CONDENSER UNIT AND BRANCH CONTROLLER. LEVEL 3
ACTIVE
ACTIVE HEATING/COOLING STRATEGIES | PLANS UP QUEENS QUAY EAST FCU HP HP HP HP HP HP HP HP HP HP HP HP HP BC CU SCHEDULE LEGEND DESCRIPTION HP WATER TO AIR HEAT PUMP CU CONDENSER UNIT BC BRANCH CONTROLLER FCU FAN COIL UNIT WATER SUPPLY WATER RETURN VERTICAL PIPING TO FLOOR ABOVE/BELOW RADIANT FLOOR HEATING GROUND SOURCE HEAT PUMPED UP TO 4TH LEVEL AND DISTRIBUTED THROUGH OUT THE FLOOR TO EACH RESIDENTIAL UNIT’S HEAT PUMP. CONDENSER UNIT AND FAN COIL ALSO LOCATED IN MECHANICAL CLOSET TO CONDITION PUBLIC LOUNGE SPACE IN THE CENTER OF THE FLOOR PLAN. LEVEL 4
ACTIVE VENTILATION
STRATEGIES | SCHEMATIC OA EA MOTORIZED DAMPERS MOTORIZED DAMPERS WAVE | SIMPLIFIED VENTILATION SCHEMATIC OA EA ERV ROOF TOP UNIT MOTORIZED DAMPERS LEVEL 9 LEVEL 8 LEVEL 7 LEVEL 6 LEVEL 5 LEVEL 4 LEVEL 3 LEVEL 2 LEVEL 1 CO2 CO2 CO2 CO2 CO2 CO2 CO2 CO2 CO2 DESCRIPTION ERV MAKE-UP-AIR UNIT LOCATED ON ROOF TO SUPPLY FRESH OUTDOOR AIR IN THE BULIDING AND RECYCLE RETURN AIR. MORTORIZED DAMPERS ON EACH FLOOR FOR SUPPLY AND RETURN DUCTS TO CONTROL THE CO2 LEVELS INDOORS. DAMPERS TO BE AUTOMATED WITH SENSORS.
FRESH OUTDOOR AIR WILL BE SUPPLIED FROM THE ROOF TOP ERV, DOWN THE MAIN MECHANICAL SHAFT, BRANCHED OFF TO EACH FAN COIL UNITS AND DISTRIBUTED TO VARIOUS DIFFUSERS THROUGHOUT THE SPACE. ALL ROOMS HAVE SUPPLY AIR EXCEPT THE WASHROOMS. TRANSFER GRILLS WILL BE PLACED ON THE WASHROOM DOORS TO ALLOW FOR INWARD AIR FLOW. AFTER THE SUPPLY AIR HAS CIRCULATED IN THE SPACE, THE STALE AIR TRAVELS THROUGH THE RETURN DUCTS, UP THE MAIN RETURN SHAFT AND BACK TO THE ROOF TOP ERV TO BE RECYCLED THROUGH THE ENTHOLPY WHEEL. A SEPARATE AND SMALLER ERV ROOF TOP UNIT WILL BE LOCATED ON THE ACCESSORY BULIDING.
THE ATRIUM WILL HAVE SPECIAL LINEAR DIFFUSERS ALONG THE WALL TO SUPPLY COOL AIR TO THE SPACE.
ACTIVE VENTILATION STRATEGIES | PLANS UP UP UP FCU FCU FCU FCU FCU FCU
FCU FAN COIL UNIT MAIN SUPPLY DUCT BRANCH SUPPLY DUCT BRANCH SUPPLY DUCT FROM FCU MAIN RETURN DUCT BRANCH RETURN SUPPLY DIFFUSER RETURN GRILL MAIN VERTICAL SUPPLY
ROOF
MAIN VERTICAL RETURN
SCHEDULE LEGEND DESCRIPTION
DUCT TO
ERV
DUCT TO ROOF ERV ERV ABOVE ON ROOF
LEVEL 1
ACTIVE VENTILATION STRATEGIES | PLANS DN DN DN UP QUEENS QUAY EAST UP FCU FCU FCU FCU FCU FCU FCU FCU FCU FCU SCHEDULE LEGEND DESCRIPTION FCU FAN COIL UNIT MAIN SUPPLY DUCT BRANCH SUPPLY DUCT BRANCH SUPPLY DUCT FROM FCU MAIN RETURN DUCT BRANCH RETURN SUPPLY DIFFUSER RETURN GRILL MAIN VERTICAL SUPPLY DUCT TO ROOF ERV MAIN VERTICAL RETURN DUCT TO ROOF ERV ERV ABOVE ON ROOF SAME AS LEVEL 1 LEVEL 2
VENTILATION STRATEGIES | PLANS QUEENS QUAY EAST DN FCU SCHEDULE LEGEND DESCRIPTION FCU FAN COIL UNIT MAIN SUPPLY DUCT BRANCH SUPPLY DUCT BRANCH SUPPLY DUCT FROM FCU MAIN RETURN DUCT BRANCH RETURN SUPPLY DIFFUSER RETURN GRILL MAIN VERTICAL SUPPLY DUCT TO ROOF ERV MAIN VERTICAL RETURN DUCT TO ROOF ERV ERV ABOVE ON ROOF SAME AS LEVEL 1 AND 2. THERE WILL ALSO BE A LARGE MAIN RETURN DUCT TO CAPTURE THE AIR IN THE ATRIUM SPACE LEVEL 3
ACTIVE
VENTILATION STRATEGIES | PLANS UP QUEENS QUAY EAST FCU HP HP HP HP HP HP HP HP HP HP HP HP HP SCHEDULE LEGEND DESCRIPTION FCU FAN COIL UNIT MAIN SUPPLY DUCT BRANCH SUPPLY DUCT BRANCH SUPPLY DUCT FROM FCU MAIN RETURN DUCT BRANCH RETURN SUPPLY DIFFUSER RETURN GRILL MAIN VERTICAL SUPPLY DUCT TO ROOF ERV MAIN VERTICAL RETURN DUCT TO ROOF ERV ERV ABOVE ON ROOF FRESH AIR IS SUPPLIED TO EACH OF THESE UNITS ON THIS LEVEL. AIR IS THEN RETURNED FROM EACH UNIT TO THE ERV UNIT ON THE ROOF. LEVEL 4
ACTIVE
RADIANT FLOOR HEATING
THIS SYSTEM WAS SELECTED FOR THE ATRIUM BECAUSE OF IT’S ENERGY EFFICIENCY IN LARGE VOLUME SPACES. RATHER THAN INTRODUCING A TYPICAL FORCED AIR SYSTEM TO CONDITION THE ENTIRE SPACE, WE ONLY NEED TO FOCUS CONDITIONING THE SPACE CLOSEST TO THE GROUND WHERE OCCUPANCY OCCURS. HOT AIR WILL NATURALLY RISE TO BE CAPTURED IN THE RETURN IN TAKE AT THE TOP OF THE ATRIUM. PASSIVELY, THE SOLAR CHIMINEY STACK EFFECT WILL ASSIST IN THE BULIDING VENTILATION CIRCULATION.
HP HP HP HP HP HP HP HP HP HP HP HP HP HP HP HP HP HP CU BC FCU CU BC BC FCU FCU HP CU FCU FCU FCU BC CU FCU FCU BC CU FCU FCU HEAT PUMP GROUND HEAT EXCHANGER R-A-W HP
- GEOTHERMAL GROUND SOURCE HEAT PUMP + VERTICAL LOOP SYSTEM -
-
ACTIVE / PASSIVE STRATEGIES | SECTION
PASSIVE /ACTIVE SYSTEMS
RADIANT FLOOR HEATING ON 1ST+2ND FLOOR ATRIUM - SOLAR CHIMNEY ON ANGLE SOUTH FACADE
PV PANELS ARRAY ON ANGLE SOUTH FACADE
UP UP UP 1 200 Level 1 1 0
RAIN WATER HARVESTING:
BLACK
ACTIVE WATER STRATEGIES | SCHEMATIC WAVE | SIMPLIFIED WATER PIPING SCHEMATIC MUNICIPAL WATER CONNECTION PERMEABLE PAVERS SYSTEM ROOF SLOPE COLLECTION ROOF TOP PV PANELS MUNICIPAL SEWAGE CONNECTION POTABLE WATER STORAGE TANK GREY WATER STORAGE TANK OVERFLOW TO BLACK WATER LINE IRRIGATION SPRINKLERS SAND FILTER FIRE SPRINKLERS SINKS SHOWER DISH WASHER LAUNDRY ON DEMAND ELECTRIC WATER HEATERS TOILETS / URINALS FRESH WATER SUPPLY LINE RAIN WATER COLLECTION LINE GREY WATER RECYCLING SUPPLY LINE GREY WATER RECYCLING RETURN LINE SOLAR ENERGY POWER SUPPLY LINE BLACK WATER EXIT LINE
DESCRIPTION
FRESH WATER
SUPPLIED
AND STORED
STORAGE
POTABLE WATER:
IS
FROM THE CITY TO THE BUILDING
IN A POTABLE
TANK BEFORE IT’S PUMPED IN AN UP FEED SYSTEM TO DISHWASHERS, SINKS AND SHOWERS. ON DEMAND ELECTRIC WATER HEATERS WILL BE UTILIZED AND POWERED BY THE ROOF TOP PV PANELS.
GREY WATER: WATER WILL RETURN FROM DRAINS, LAUNDRY, DISH WASHERS, SINKS AND SHOWERS AND STORED IN THE GREY WATER STORAGE TANK, WHERE IT WILL THEN BE PUMPED THROUGH A SAND FILTER BEFORE RESUPPLYING IRRIGATION/ FIRE SPINKLERS, LAUNDRY MACHINES AND TOILETS.
RAIN WILL BE COLLECTED BY THE PERMEABLE PAVERS ON SITE AND THE LARGE SLOPE ON THE ROOF. THE RAIN WILL BE COLLECTED AND ADDED TO THE GREY WATER STORAGE TANK.
WATER: TOILETS DRAIN DIRECTED TO THE MUNICIPAL SEWAGE CONNECTION. THE GREY WATER STORAGE TANK WILL HAVE AN OVERFLOW THAT CONNECTS TO THE MUNICIPAL SEWAGE.
WATER STRATEGIES | PLANS UP UP UP GREY WATER STORAGE TANK BELOW GRADE LEGEND DESCRIPTION BLACK WATER RETURN PIPE POTABLE SUPPLY WATER / COLD WATER LINE GREY WATER SUPPLY PIPE FROM TANK HOT WATER LINE GREY WATER RETURN PIPE TO STORAGE POTABLE STORAGE TANK ON DEMAND ELECTRIC WATER HEATER VERTICAL PIPE LINE GREY WATER SUPPLY VERTICAL PIPE LINE GREY WATER RETURN VERTICAL PIPE LINE POTABLE SUPPLY WATER VERTICAL PIPE LINE BLACK WATER GREY WATER FILTRATION POINT ROOF RAIN WATER COLLECTION LINE PIPING DISTRIBUTED ACCORDINGLY TO WATER FIXTURES THROUGHOUT BUILDING. LEVEL 1 UP
ACTIVE
ACTIVE WATER STRATEGIES | PLANS DN DN DN UP QUEENS QUAY EAST UP LEGEND DESCRIPTION BLACK WATER RETURN PIPE POTABLE SUPPLY WATER / COLD WATER LINE GREY WATER SUPPLY PIPE FROM TANK HOT WATER LINE GREY WATER RETURN PIPE TO STORAGE POTABLE STORAGE TANK ON DEMAND ELECTRIC WATER HEATER VERTICAL PIPE LINE GREY WATER SUPPLY VERTICAL PIPE LINE GREY WATER RETURN VERTICAL PIPE LINE POTABLE SUPPLY WATER VERTICAL PIPE LINE BLACK WATER GREY WATER FILTRATION POINT ROOF RAIN WATER COLLECTION LINE PIPING DISTRIBUTED ACCORDINGLY TO WATER FIXTURES THROUGHOUT BUILDING. LEVEL 2 DN
WATER STRATEGIES | PLANSQUEENS QUAY EAST DN LEGEND DESCRIPTION BLACK WATER RETURN PIPE POTABLE SUPPLY WATER / COLD WATER LINE GREY WATER SUPPLY PIPE FROM TANK HOT WATER LINE GREY WATER RETURN PIPE TO STORAGE POTABLE STORAGE TANK ON DEMAND ELECTRIC WATER HEATER VERTICAL PIPE LINE GREY WATER SUPPLY VERTICAL PIPE LINE GREY WATER RETURN VERTICAL PIPE LINE POTABLE SUPPLY WATER VERTICAL PIPE LINE BLACK WATER GREY WATER FILTRATION POINT ROOF RAIN WATER COLLECTION LINE PIPING DISTRIBUTED ACCORDINGLY TO WATER FIXTURES THROUGHOUT BUILDING. LEVEL 3 DN
ACTIVE
WATER STRATEGIES | PLANS UP QUEENS QUAY EAST LEGEND DESCRIPTION BLACK WATER RETURN PIPE POTABLE SUPPLY WATER / COLD WATER LINE GREY WATER SUPPLY PIPE FROM TANK HOT WATER LINE GREY WATER RETURN PIPE TO STORAGE POTABLE STORAGE TANK ON DEMAND ELECTRIC WATER HEATER VERTICAL PIPE LINE GREY WATER SUPPLY VERTICAL PIPE LINE GREY WATER RETURN VERTICAL PIPE LINE POTABLE SUPPLY WATER VERTICAL PIPE LINE BLACK WATER GREY WATER FILTRATION POINT ROOF RAIN WATER COLLECTION LINE PIPING DISTRIBUTED ACCORDINGLY TO WATER FIXTURES THROUGHOUT BUILDING. LEVEL 4 UP
ACTIVE
MUNICIPAL WATER CONNECTION MUNICIPAL SEWAGE CONNECTION RAIN WATER COLLECTION GREY WATER STORAGE TANK TOILETS / URINALS RAIN SOURCE / POTABLE WATER SUPPLY DISH WASHER SHOWER FIRE SPRINKLER ON DEMAND ELECTRIC WATER HEATER IRRIGATION SPRINKLER SINK LAUNDRY MACHINE GREY WATER SUPPLY / RETURN LINE BLACK WATER RETURN LINE WATER SYSTEMS - RAIN WATER HARVESTING + GREY WATER RECYCLING - WATER COLLECTION ALONG SOUTH ANGLE FACADE DOWN COLUMN AND INTO STORAGE TANK BELOW GRADE. - PERMEABLE PAVERS FOR LANDSCAPING. ACTIVE WATER STRATEGIES | SECTION RAIN WATER HARVESTING WATER COLLECTION OPPORTUNITIES ON LARGE SLOPED ROOF, DOWN COLUMNS AND INTO STORAGE TANK BELOW GRADE. PERMEABLE PAVERS ACT AS ANOTHER COLLECTION POINT. GREY WATER STORAGE TANK PUMPS WATER THROUGH FILTER BEFORE BEING RECYCLED THROUGHOUT BUILDING ACCORDINGLY. UP UP UP 200 Level 1 1 5 10 m
CARBON REPORT
METHODOLOGY SUMMARY:
DUE TO THE SIMPLICITY OF THE EXCEL FILE, QUANTIFIABLE INPUTS WERE LIMITED IN THE PROCESS, THEREFORE IT IS IMPORTANT TO UNDERSTAND THAT EXTRACTED VALUES ARE ROUGH ESTIMATES TO GET A BENCH MARK UNDERSTANDING OF THIS BUILDING DESIGN. ONLY THE MAIN MATERIALS THAT WERE EXPECTED TO HAVE THE BIGGEST IMPACT ON THE FINAL RESULTS WERE IMPLEMENTED IN THE REPORT (I.E. INSULATION, SHEATHING, STEEL, CONCRETE, ETC.) SITE LANDSCAPING WAS NOT AS INTEGRAL TO THE DESIGN AS THE STRUCTURE WAS, SO ALL SUPER STRUCTURE ELEMENTS WERE PLACED UNDER THE “GROUND MATERIAL” SECTION. THIS DECISION MAY HAVE SKEWED THE EMBODIED CARBON A LITTLE BIT, BUT THE CARBON FOOTPRINT SHOULD STILL BE ACCURATE.
REGARDING OPERATIONAL CARBON, NOT ONLY IS THE SITE ON AN ANGLE, BUT MY DESIGN INTRODUCED CURVES TO THE BUILDING THAT MADE IT A BIT CHALLENGING TO ACCURATELY ESTABLISH THE PERCENTAGE VALUE OF WALLS FACING EACH DIRECTION - ESTIMATES WERE MADE AS ACCURATELY AS POSSIBLE. ALSO, NOT ONLY ARE THERE A LARGE QUANITITY OF RESIDENTIAL UNITS FACING DIFFERENT DIRECTIONS, THEY STAGGER BACK AS THE LEVELS INCREASE. IN ORDER TO WORK WITHIN THE LIMITED INPUT CONSTRAINTS, ALL UNITS WERE COMPILED IN 3 VOLUMES, WHERE AVERAGES AREAS FOR EACH FLOOR WERE CALCULATED. THIS ALLOWED FOR MORE SPACES IN THE BUILDING TO BE CONSIDERED IN THE CALCULATION.
ANALYSIS SUMMARY
AFTER COMPLETING THE FIRST CARBON REPORT, IT WAS NOTED THAT LOTS OF EMBODIED CABON WAS FOUND IN THE EXTERNAL WALLS AND “GROUND” (STRUCTURE). ALSO, THERE WAS A SUBSTANTIAL AMOUNT OF OPERATIONAL CARBON DEDICATED TO HEATING. UNDERSTANDING THE CAUSES OF THESE ENERGY SPIKES LEAD TO THE FOLLOWING 4 STRATEGIES TO REDUCE THE CARBON FOOT PRINT (AND COST). (1) HEIGHT REDUCTION, (2) AREA REDUCTION, (3) WINDOW OPENING REDUCTION, AND (4) SIMPLIFY STRUCTURAL MEMBERS.
IN THE END, IMPLEMENTING THESE 4 STRATEGIES LEAD TO THE ENERGY USE INTENSITY TO DECREASE FROM 125 KWH/ M2 TO 93 KWH/M2 AND CARBON FOOTPRINT FROM 3646 KGCO2E/M2 TO 3004 KGCO2E/M2
A | STRUCTURE SIMPLIFICATION
THE STEEL TRUSS SYSTEM ON THE PERIMETER OF THE 2ND FLOOR WAS REMOVED. AFTER CONSULTATION WITH STRUCTURAL ENGINEERS, IT WAS ESTABLISHED THAT THE TRUSS SYSTEM WASN’T NECESSARY FOR THE CANTILEVER BUT WAS KEPT IN THE ORIGINAL DESIGN FOR AESTHETIC PURPOSES. THIS STRATEGY WAS IMPLEMENTED TO AVOID THE UNNECESSARY ADDITION OF STEEL IN THE DESIGN WHICH TYPICALLY HAS A LARGE AMOUNT OF EMBODIED CARBON.
B | AREA REDUCTION
THE RESIDENTIAL AREA ON LEVELS 4 TO 8 WERE THE FOCUS OF REDUCTION. AFTER REMOVING THE CENTRAL ROOMS, THERE WERE STILL 27 RESIDENTIAL UNITS THAT FACED NORTH AND WEST. THE ORIGINAL 44 UNITS WERE ADDITIONAL TO THE CLIENT’S REQUEST, THEREFORE THERE WAS REMOVING 17 UNITS WASN’T AN ISSUE. THIS STRATEGY ALSO REDUCES A SUBSTANTIAL AMOUNT OF MATERIALS REQUIRED DURING CONSTRUCTION (ESPECIALLY STRUCTURE), WHICH THEORETICALLY REDUCED THE OVERALL EMBODIED CARBON.
C | HEIGHT REDUCTION
THE FIRST THREE LEVELS WERE REDUCED FROM 7M TO 6M AND THE REST OF THE LEVELS FROM 4M TO 3.5M. THIS RESULTED IN THE TOTAL HEIGHT DECREASING BY 13.3%. PART OF THE DESIGN INTENT WAS TO PROVIDE ADEQUATE HEIGHT FOR THE LABORATORIES AT THE TOP OF THE BUILDING TO HAVE A VISUAL CONNECTION TO LAKE ONTARIO. THIS STRATEGY REDUCES THE AMOUNT OF MATERIALS REQUIRED DURING CONSTRUCTION, WHICH THEORETICALLY REDUCED THE OVERALL EMBODIED CARBON.
D | WINDOW OPENING REDUCTION
THE WINDOW TO WALL RATIO ALONG THE NORTH AND WEST SIDES OF THE RESIDENTIAL UNITS WERE REDUCED BY 50%. THIS STRATEGY HELPS TO REDUCE THE OPERATIONAL CARBON FOR HEATING SINCE DIRECT SUN LIGHT IS EXTREMELY MINIAL ON BOTH THOSE SIDES - LESS WINDOW OPENINGS EQUATE TO LESS HEAT LOSS.
A B C D
CARBON REPORT | CONCLUSION
6m 6m 6m 3.5m 3.5m 3.5m 3.5m 3.5m 3.5m 3.5m 42.5m BASE MODEL 13.3% BUILDING HEIGHT REDUCTION
STRUCTURE
1 2 3 4 A B C D E F H 5 6 7 CA CA CA 9.34 6.62 6.05 8.95 9.03 6.78 4.90 6.11 6.41 6.08 3.10 G 8 9 10 9.47 14.99 3.12 9.31 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3 B3 B3 B3 B3 B3 B3 B3 B3 B5 B5 B5 B5 STRUCTURAL ANALYSIS | PLANS LEGEND SCHEDULE COLUMN BEAM SHEAR WALLS COLUMNS ABOVE FLOOR SLAB ABOVE C1 COLUMNS SHEAR WALLS FLOOR SLABS BEAMS C2 S1 F1 B1 B2 B3 600mm x 600mm x 7000mm (H) 600mm x 600mm x 4000mm (H) 200mm wide 200mm wide 156mm (W) x 311mm (D) 188mm (W) x 563mm (D) 150mm (W) x 299mm (D) LEVEL 1
1 2 3 4 A B C D E F H 5 6 7 CA CA CA CA CA CA CA G 8 9 10 6.62 9.34 6.05 8.95 9.03 9.47 14.84 2.81 5.74 7.04 6.11 4.90 6.78 B1 B1 B1 B2 B2 B2 B2 B2 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B4 B4 B5 B5 B5 B5 B5 B5 B5 B5 STRUCTURAL ANALYSIS | PLANS LEGEND SCHEDULE COLUMN BEAM SHEAR WALLS COLUMNS ABOVE FLOOR SLAB ABOVE C1 COLUMNS SHEAR WALLS FLOOR SLABS BEAMS C2 S1 F1 B1 B2 B3 600mm x 600mm x 7000mm (H) 600mm x 600mm x 4000mm (H) 200mm wide 200mm wide 156mm (W) x 311mm (D) 188mm (W) x 563mm (D) 150mm (W) x 299mm (D) LEVEL 2
UP 1 2 3 4 A B C D E F H 5 6 7 CA CA CA G 8 9 10 5.74 7.04 6.11 4.90 6.78 6.62 9.34 6.05 8.95 9.03 9.47 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3 B3 B3 B3 B3 B3 B3 B3 B5 B5 B5 B5 STRUCTURAL ANALYSIS | PLANS LEGEND SCHEDULE COLUMN BEAM SHEAR WALLS COLUMNS ABOVE FLOOR SLAB ABOVE C1 COLUMNS SHEAR WALLS FLOOR SLABS BEAMS C2 S1 F1 B1 B2 B3 600mm x 600mm x 7000mm (H) 600mm x 600mm x 4000mm (H) 200mm wide 200mm wide 156mm (W) x 311mm (D) 188mm (W) x 563mm (D) 150mm (W) x 299mm (D) LEVEL 3
UP 1 2 3 4 A B C D E F H 5 6 7 CA G 8 9 10 6.62 9.34 6.05 8.95 9.03 7.04 6.11 4.90 6.78 B1 B1 B1 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 STRUCTURAL ANALYSIS | PLANS LEGEND SCHEDULE COLUMN BEAM SHEAR WALLS COLUMNS ABOVE FLOOR SLAB ABOVE C1 COLUMNS SHEAR WALLS FLOOR SLABS BEAMS C2 S1 F1 B1 B2 B3 600mm x 600mm x 7000mm (H) 600mm x 600mm x 4000mm (H) 200mm wide 200mm wide 156mm (W) x 311mm (D) 188mm (W) x 563mm (D) 150mm (W) x 299mm (D) LEVEL 4
DN 1 2 3 4 A B C D E F H 5 6 7 CA CA CA G 8 9 10 6.62 9.34 6.05 8.95 9.03 5.74 7.04 6.11 4.90 6.78 B1 B1 B1 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 STRUCTURAL ANALYSIS | PLANS LEGEND SCHEDULE COLUMN BEAM SHEAR WALLS COLUMNS ABOVE FLOOR SLAB ABOVE C1 COLUMNS SHEAR WALLS FLOOR SLABS BEAMS C2 S1 F1 B1 B2 B3 600mm x 600mm x 7000mm (H) 600mm x 600mm x 4000mm (H) 200mm wide 200mm wide 156mm (W) x 311mm (D) 188mm (W) x 563mm (D) 150mm (W) x 299mm (D) LEVEL 5
1 2 3 4 A B C D E F H 5 6 7 CA CA CA G 8 9 10 6.62 9.34 6.05 8.95 7.04 6.11 4.90 6.78 9.03 B1 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3 B3 B3 B3 B3 B3 B3 B3 B3 B3 STRUCTURAL ANALYSIS | PLANS LEGEND SCHEDULE COLUMN BEAM SHEAR WALLS COLUMNS ABOVE FLOOR SLAB ABOVE C1 COLUMNS SHEAR WALLS FLOOR SLABS BEAMS C2 S1 F1 B1 B2 B3 600mm x 600mm x 7000mm (H) 600mm x 600mm x 4000mm (H) 200mm wide 200mm wide 156mm (W) x 311mm (D) 188mm (W) x 563mm (D) 150mm (W) x 299mm (D) LEVEL 6
1 2 3 4 A B C D E F H 5 6 7 CA CA CA CA G 8 9 10 6.62 9.34 6.05 8.95 6.11 4.90 6.78 B1 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3 B3 B3 B3 B3 B3 B3 B3 B5 B5 B5 B5 STRUCTURAL ANALYSIS | PLANS LEGEND SCHEDULE COLUMN BEAM SHEAR WALLS COLUMNS ABOVE FLOOR SLAB ABOVE C1 COLUMNS SHEAR WALLS FLOOR SLABS BEAMS C2 S1 F1 B1 B2 B3 600mm x 600mm x 7000mm (H) 600mm x 600mm x 4000mm (H) 200mm wide 200mm wide 156mm (W) x 311mm (D) 188mm (W) x 563mm (D) 150mm (W) x 299mm (D) LEVEL 7
1 2 3 4 A B C D E F H 5 6 7 CA CA G 8 9 10 6.62 9.34 6.05 6.11 4.90 6.78 B1 B1 B1 B1 B1 B1 B2 B2 B2 B2 B2 B2 B3 B3 B3 B3 B3 B3 B3 B3 B3 B5 STRUCTURAL ANALYSIS | PLANS LEGEND SCHEDULE COLUMN BEAM SHEAR WALLS COLUMNS ABOVE FLOOR SLAB ABOVE C1 COLUMNS SHEAR WALLS FLOOR SLABS BEAMS C2 S1 F1 B1 B2 B3 600mm x 600mm x 7000mm (H) 600mm x 600mm x 4000mm (H) 200mm wide 200mm wide 156mm (W) x 311mm (D) 188mm (W) x 563mm (D) 150mm (W) x 299mm (D) LEVEL 8
1 2 3 4 A B C D E F H 5 6 7 G 8 9 10 6.62 9.34 4.90 6.78 B1 B1 B1 B1 B1 B1 B1 B2 B2 B3 B3 B3 B3 B3 B3 B5 STRUCTURAL ANALYSIS | PLANS LEGEND SCHEDULE COLUMN BEAM SHEAR WALLS COLUMNS ABOVE FLOOR SLAB ABOVE C1 COLUMNS SHEAR WALLS FLOOR SLABS BEAMS C2 S1 F1 B1 B2 B3 600mm x 600mm x 7000mm (H) 600mm x 600mm x 4000mm (H) 200mm wide 200mm wide 156mm (W) x 311mm (D) 188mm (W) x 563mm (D) 150mm (W) x 299mm (D) LEVEL 9
1 2 3 4 A B C D E F H 5 6 7 G 8 9 10 6.62 9.34 4.90 6.78 B2 B2 B2 B3 B3 B3 B3 B3 B3 B5 STRUCTURAL ANALYSIS | PLANS LEGEND SCHEDULE COLUMN BEAM SHEAR WALLS COLUMNS ABOVE FLOOR SLAB ABOVE C1 COLUMNS SHEAR WALLS FLOOR SLABS BEAMS C2 S1 F1 B1 B2 B3 600mm x 600mm x 7000mm (H) 600mm x 600mm x 4000mm (H) 200mm wide 200mm wide 156mm (W) x 311mm (D) 188mm (W) x 563mm (D) 150mm (W) x 299mm (D) LEVEL 10
LEVEL 1 LEVEL 6
LEVEL 2 LEVEL 7
LEVEL 3 LEVEL 8
LEVEL 4 LEVEL 9
LEVEL 5 LEVEL ROOF
SPECIFICATION
SYSTEM: REINFORCED TWO WAY CONCRETE FLAT SLAB
NOTE: THICKNESS WAS DETERMINED BY L/30. DUE TO VARYING LENGTHS THROUGH OUT THE BUILDING, THE AVERAGE LENGTH WAS CALCULATED TO DETERMINE A 0.2M SLAB THICKENSS. REBAR REINFORCEMENT TO BE LINED UP IN DIRECTION OF BEAMS.
STRUCTURAL ANALYSIS | AXO FLOOR SLAB
SPECIFICATION
ANALYSIS | AXO COLUMN
1 LEVEL 6 LEVEL 2 LEVEL 7 LEVEL 3 LEVEL 8 LEVEL 4 LEVEL 9 LEVEL 5 LEVEL ROOF
STRUCTURAL
LEVEL
PLACE CONCRETE
TYPICAL COLUMN 0.60 0.60 REINFORCED CONCRETE COLUMN HORIZONTAL REBAR TIES LONGITUDINAL REBAR
SYSTEM: REINFORCED CAST IN
COLUMN NOTE: PROFILE DIMENSION VARIES DEPENDING ON BULIDING HEIGHT. FOR THIS SCALE, A 600MM x 600MM COLUMN IS PROPOSED AS A CONSERVATIVE SIZE.
STRUCTURAL ANALYSIS | AXO SHEAR WALLS
LEVEL 1
LEVEL 6
LEVEL 2 LEVEL 7
LEVEL 3 LEVEL 8
LEVEL 4 LEVEL 9
LEVEL 5 LEVEL ROOF
SPECIFICATION
SYSTEM: REINFORCED CONCRETE SHEAR WALL
NOTE: SHEAR WALLS RANGE FROM 200MM TO 300MM WIDE DEPENDING ON WALL LENGTH. SHORTER LENGTH WALLS REQUIRE MORE THICKNESS (300MM) WHILE LONGER WALLS CAN BE AS THIN AS 200MM. THE SHEAR WALLS ON THE 4TH TO 9TH FLOOR ALSO ACT AS THE THERMAL MASS WITHIN THE SOLAR CHIMNEY.
SPECIFICATION
SYSTEM: REINFORCED CONCRETE SIMPLY SUPPORTED AND CANTILEVER
NOTE: BEAMS TREATED AS SIMPLY SUPPORTED HAD THEIR DEPTH CALCULATED BY L/16 WHILE CANTILEVERED BEAMS CALCULATED BY L/8. 5 TYPICAL BEAMS WERE ESTABLISHED BASED OF AVERAGE LENGTHS THROUGHOUT THE BUILDING. BEAM WIDTH WAS CALCULATED BY D/2 FOR SHORT SPANS AND D/3 FOR LONGERS SPANS.
| AXO
STRUCTURAL ANALYSIS
BEAMS
LEVEL 1 LEVEL 6 LEVEL 2 LEVEL 7 LEVEL 3 LEVEL 8 LEVEL 4 LEVEL 9 LEVEL 5 LEVEL ROOF
TYPICAL COLUMN TO BEAM 0.60 0.60 REINFORCED CONCRETE COLUMN HORIZONTAL REBAR TIES LONGITUDINAL REBAR REINFORCED FLAT PLATE FLOOR REINFORCED CONCRETE BEAM VERTICAL STIRRUPS LONGITUDINAL REBAR LONGITUDINAL REBAR 0.50 0.20
STRUCTURAL SPINE DETAIL
T1 T2 T3 T4 T5 STRUCTURAL ANALYSIS | AXO + DETAIL SPECIAL STRUCTURAL CONDITIONS THE DESIGN AIMS TO CELEBRATE STRUCTURE. 5 MAIN STRUCTURAL SPINES CAN BE FOUND ACROSS THE ATRIUM IN A RAIDAL FASHION, SPANNING FROM GRADE TO THE ROOF. 0.60 0.60 REINFORCED CONCRETE COLUMN HORIZONTAL REBAR TIES LONGITUDINAL REBAR REINFORCED FLAT PLATE FLOOR REINFORCED CONCRETE BEAM VERTICAL STIRRUPS LONGITUDINAL REBAR LONGITUDINAL REBAR 0.50 0.20 1 25 Structural Detail 1 1 100 Structural Detail 2 REINFORCED FLAT PLATE SLAB REINFORCED BEAM MAIN LONGITUDINAL REBAR VERTICAL STIRRUPS REBAR CAGE
TYPICAL REBAR REINFORCEMENT STUDIED AND PROPOSED ACCORDINGLY.
LIFE CYCLE
CONSTRUCTION OCCUPANCY DEMOLITION RECYCLE 01 | 1 - 10 YEARS MATERIAL RECYCLING STRATEGY 02 | 10 - 20 YEARS 03 | 20 - 30 YEARS 04 | 40 80 YEARS 05 | 80 - 110 YEARS PODIUM LEVEL INITIALLY BUILT STRUCTURALLY HEAVY FOR FUTURE ADDITION POTENTIAL. LOTS OF SHEAR WALLS IMPLEMENTED FOR LATERAL SUPPORT. RESIDENTIAL MASS ABOVE HAS LIGHTER STRUCTURE (BEAM+COLUMNS) FOR FLEXIBILITY IN THE FUTURE. 2 LARGE CORES FOR STURDY INITIAL FOUNDATION. OPPORTUNITY FOR CORE TO EXTEND UPWARDS FOR FUTURE ADDITION SUPPORT. OPPORTUNITY FOR REPURPOSING TOP MASS AND ADDING LARGE BULIDING ADDITION OVER EXISTING STURDY FOUNDATION/
CONCRETE
WHEN THE BUILDING REACHES THE END OF IT’S LIFE SPAN, THE
CAN BE CRUSHED INTO VARIOUS SIZED AGGREGATE. THIS PROCESS CAN OCCUR ON SITE DURING DEMOLITION WITH A SPECIAL MACHINE TO REDUCE CONSTRUCTION COSTS AND POLLUTION FOR TRANSPORT. APPROXIMATELY 60% OF THE CRUSHED CONCRETE CAN BE REUSED (I.E. BASE MATERIAL FOR STRUCUTRE, SUCH AS ROADS). THE CONCRETE CAN ALSO BE RECYCLED TO REPLACE GRAVEL IN NEW CONCRETE. REBAR WILL BE FILTERED OUT FROM THE CRUSHED CONCRETE TO BE REUSED IN FUTURE PROJECTS THAT REQUIRE STEEL FORMING.
COSTING
Name :Matthew Wong-Chun-Sen
Project Location:Toronto, ON
GFA (m2):5,465 Report Date:2022-11-16
Unit rateSub-TotalTotalSub-Total
Total 1590.83 126.97 350.00
5,465m2 8,693,253 58.0 693,835 4.6 0.152828m2 191.00158,138 28.94 0.0000m2 0.00 0 0.00 0.088478Sum1,120.00535,697 98.03 1,912,589 12.8 0.082447m2 63.8628,535 5.22 0.3031,657m2 1,133.871,878,380 343.74 0.01686m2 65.825,674 1.04 6,086,828 40.6 0.0000m2 0.00 0 0.00 1.89210,340m2 289.942,997,861 548.60 0.00525Lvs4,150.00103,750 18.99 0.4192,292m2 1,302.312,985,218 546.28 0.0000m2 0.00 0 0.00
1113.86
285.00 155.15 59.92
69.93
567.15 360.91
206.24
13 349 941 89.1 5,465m2 143,248 1.0 143,248 1.0 0.164895m2 91.6081,948 15.00 0.0001Sum40,000.0040,000 7.32 0.0001Sum21,300.0021,300 3.90
977
2442.98 26.21 26.21
2469.20 271.61 2740.81 411.12
NET BU LDING COST - EXCLUDING SITE
NET BU LDING COST - INCLUD NG SITE $
TOTAL CONSTRUCT ON ESTIMATE - EXCLUD NG CONT NGENCIES $ 14
439
7.0%
TOTAL CONSTRUCT ON ESTIMATE - INCLUDING CONTINGENCIES $ 17 224 055
13.0%
TOTAL CONSTRUCT ON ESTIMATE $
5,465m2 1,557,439 10.4 847,857 5.7 2.54813,925m2 49.91695,054 127.19 0.018101Lvs1,512.90152,803 27.96 327,432 2.2 0.6023,290m2 45.44149,492 27.36 0.5893,220m2 19.5062,790 11.49 1.5618,530m2 13.50115,150 21.07 382,150 2.6 0.0000m2 0.00 0 0.00 0.174949m2 350.00332,150 60.78 0.0002No25,000.0050,000 9.15 0.0000No 0.00 0 0.00 5,465m2 3,099,249 20.7 1,972,249 13.2 1.0005,465m2 122.17667,612 122.17 1.0005,465m2 26.69145,875 26.69 1.0005,465m2 212.051,158,763 212.05 1.0005,465m2 0.00 0 0.00 1,127,000 7.5 1.0005,465m2 53.07289,985 53.07 1.0005,465m2 88.26482,328 88.26 1.0005,465 m 2 64.91354,687 64.91
$
13 493 189 90.1 1,484,251 9.9 8.0% 1,079,455 197.54 3.0% 404,796 74.08
100.0 2,246,616
1,048,421 191.86 3.5% 524,210 95.93 4.5% 673,985 123.34 Z31 Harmonized Sales Tax (HST)
2,239,127 Z12 Fee Z2 ALLOWANCES Z21 Design & Pricing Allowance Z22 Escalation Allowance Z23 Construction Allowance Z3 HARMON ZED SALES TAX (HST) D1 SITE WORK D11 Site Development D12 Mechanical Site Services D13 Electrical Site Services Z1 GENERAL REQUIREMENTS & FEE Z11 General Requirements C14 Controls C2 ELECTRICAL C22 Lighting, Devices & Heating C23 Systems & Ancillaries D S TE & ANCILLARY WORK C21 Service & Distribution B31 Fittings & Fixtures B34 Escalators C SERV CES C1 MECHANICAL C11 Plumbing & Drainage C12 Fire Protection C13 HVAC B32 Equipment B33 Elevators A12 Basement Excavation A13 Special Conditions A2 STRUCTURE A21 Lowest Floor Construction A22 Upper Floor Construction A23 Roof Construction B22 Ceiling Finishes B23 Wall Finishes B3 F TT NGS & EQUIPMENT B INTERIORS B1 PART TIONS & DOORS B11 Partitions B12 Doors B2 F N SHES B21 Floor Finishes ELEMENTAL COST SUMMARY SCHEMATIC DESIGN ESTIMATE Rate per m 2 % Element A SHELL A1 SUBSTRUCTURE A11 Foundations Ratio to GFA Elemental Cost Quantity Elemental Amount A3 EXTERIOR ENCLOSURE A32 Walls Above Grade A31 Walls Below Grade A33 Entrances A34 Roof Coverings A35 Projections COSTING ANALYSIS | BASE MODEL 7m 7m 7m 4m 4m 49m 4m 4m 4m 4m 4m
2,239,127 409.75
19 463 183 $ 3561 68
3151.93 409.75
Name :Matthew Wong-Chun-Sen
Project Location:Toronto, ON
GFA (m2):4,327 Report Date:2022-11-16
Unit rateSub-TotalTotalSub-Total 4,327m2 7,571,797 59.1 622,300 4.9 0.191828m2 191.00158,138 36.54 0.0000m2 0.00 0 0.00 0.096414Sum1,120.00464,162 107.26 1,658,597 12.9 0.090388m2 63.8624,749 5.72 0.3321,437m2 1,133.871,628,940 376.42 0.01775m2 65.824,908 1.13 5,290,900 41.3 0.0000m2 0.00 0 0.00 2.0728,965m2 289.942,599,259 600.65 0.00625Lvs4,150.00103,750 23.97 0.4591,987m2 1,302.312,587,892 598.02 0.0000m2 0.00 0 0.00
4,327m2 1,378,321 10.8 755,424 5.9 2.79012,073m2 49.91602,621 139.26 0.023101Lvs1,512.90152,803 35.31 284,924 2.2 0.6672,888m2 45.44131,226 30.32 0.6382,762m2 19.5053,859 12.45 1.7097,396m2 13.5099,839 23.07 337,973 2.6 0.0000m2 0.00 0 0.00 0.190823m2 350.00287,973 66.55 0.0002No25,000.0050,000 11.55 0.0000No 0.00 0 0.00 4,327m2 2,454,309 19.1 1,561,833 12.2 1.0004,327m2 122.17528,685 122.17 1.0004,327m2 26.69115,519 26.69 1.0004,327m2 212.05917,629 212.05 1.0004,327m2 0.00 0 0.00 892,476 7.0 1.0004,327m2 53.07229,640 53.07 1.0004,327m2 88.26381,957 88.26 1.0004,327 m 2 64.91280,878 64.91
11 404 427 89.0 4,327m2 143,248 1.1 143,248 1.1 0.207895m2 91.6081,948 18.94 0.0001Sum40,000.0040,000 9.24 0.0001Sum21,300.0021,300 4.92
NET BU LDING COST - EXCLUDING SITE
NET BU LDING COST - INCLUD NG SITE $
TOTAL CONSTRUCT ON ESTIMATE - EXCLUD NG CONT NGENCIES $ 12 817 919 100.0 1,922,688 7.0%
3.5%
TOTAL CONSTRUCT ON ESTIMATE - INCLUDING CONTINGENCIES $ 14 740 607 1,916,279 13.0%
442.82 TOTAL CONSTRUCT ON ESTIMATE $ 16 656 886 $ ELEMENTAL COST SUMMARY SCHEMATIC DESIGN ESTIMATE Rate per m 2 % Element A SHELL A1 SUBSTRUCTURE A11 Foundations Ratio to GFA Elemental Cost Quantity Elemental Amount A3 EXTERIOR ENCLOSURE A32 Walls Above Grade A31 Walls Below Grade A33 Entrances A34 Roof Coverings A35 Projections A12 Basement Excavation A13 Special Conditions A2 STRUCTURE A21 Lowest Floor Construction A22 Upper Floor Construction A23 Roof Construction B22 Ceiling Finishes B23 Wall Finishes B3 F TT NGS & EQUIPMENT B INTERIORS B1 PART TIONS & DOORS B11 Partitions B12 Doors B2 F N SHES B21 Floor Finishes B31 Fittings & Fixtures B34 Escalators C SERV CES C1 MECHANICAL C11 Plumbing & Drainage C12 Fire Protection C13 HVAC B32 Equipment B33 Elevators D12 Mechanical Site Services D13 Electrical Site Services Z1 GENERAL REQUIREMENTS & FEE Z11 General Requirements C14 Controls C2 ELECTRICAL C22 Lighting, Devices & Heating C23 Systems & Ancillaries D S TE & ANCILLARY WORK C21 Service & Distribution 1222.64 Z31 Harmonized Sales Tax (HST) Total 1749.72 143.80 383.27 Z12 Fee Z2 ALLOWANCES Z21 Design & Pricing Allowance Z22 Escalation Allowance Z23 Construction Allowance Z3 HARMON ZED SALES TAX (HST) D1 SITE WORK D11 Site Development 78.10 318.51 174.57 65.84 206.24 567.15 360.91 3849 13 3406.31 442.82 2668.48 293.53 2962.01 444.30 2635.37 33.10 33.10 COSTING ANALYSIS | REDUCED MODEL 6m 6m 6m 3.5m 3.5m 3.5m 3.5m 3.5m 3.5m 3.5m 42.5m BASE MODEL 20.8% FLOOR AREA REDUCTION ALONG RESIDENTIAL LEVEL 4 - 8 STEEL TRUSS REMOVED FOR SIMPLIFIED STRUCTURE 13.3% BUILDING HEIGHT REDUCTION
$
11 547 675 90.1 1,270,244 9.9 8.0% 923,814 213.48 3.0% 346,430 80.05
897,254 207.34
448,627 103.67 4.5% 576,806 133.29
1,916,279
COSTING ANALYSIS | CONCLUSION
LECTURE SUMMARY:
TYPICAL COSTING PHASES:
- CLASS D: END OF CONCEPT DESIGN
- CLASS C: END OF SCHEMATIC DESIGN
- CLASS B: END OF DESIGN DEVELOPMENT
- CLASS A: 75% COMPLETE CONSTRUCTION DOCUMENTS
CONSTRUCTION
BUDGET VS. PROJECT BUDGET
- HARD COST: ALL THE MEASUREABLE/QUANTIFIABLE COSTS REQUIRED TO COMPLETE THE PHYSICAL CONSTRUCTION OF A BULIDING (+HST)
- SOFT COST: FEES ASSOCIATED AROUND THE HARD COSTS (I.E. BUILDING PERMITS, CONSULTATION SERVICES, LEGAL, ETC.)
- ARCHITECTS MAINLY REFER TO HARD COSTS WHEN DISCUSSING “THE BUDGET”
- CLIENTS REFER TO SOFT COSTS + HARD COSTS WHEN DISCUSSING “THE BUDGET”
INITIAL COST REDUCTION STRATEGIES:
- RAW PROGRAMATIC AREA REDUCTION WITH EXPLANATION OF QUALITATIVE CHANGES/ADVANTAGES
- PLAN OUT PROJECT TO BE PHASED (COMPLETED OVER TIME)
- ARCHITECT CAN QUESTION IF CLIENT IS WILLING TO ADD BUDGET TO ACHIEVE GOALS
ANALYSIS SUMMARY
THE FOLLOWING 4 STRATEGIES WERE IMPLEMENTED IN ORDER TO REDUCE BOTH THE BULIDING COST AND CARBON FOOT PRINT. (1) HEIGHT REDUCTION, (2) AREA REDUCTION, (3) WINDOW OPENING REDUCTION, AND (4) SIMPLIFY STRUCTURAL MEMBERS.
HEIGHT REDUCTION: THE FIRST THREE LEVELS WERE REDUCED FROM 7M TO 6M AND THE REST OF THE LEVELS FROM 4M TO 3.5M. THIS RESULTED IN THE TOTAL HEIGHT DECREASING BY 13.3%. PART OF THE DESIGN INTENT WAS TO PROVIDE ADEQUATE HEIGHT FOR THE LABORATORIES AT THE TOP OF THE BUILDING TO HAVE A VISUAL CONNECTION TO LAKE ONTARIO. THIS HEIGHT REDUCTION PROVIDES THE MAXIMUM AMOUNT OF COST REDUCTION WHILE STILL ALLOWING FOR THE ORIGINAL VISUAL CONNECTION.
AREA REDUCTION: THE RESIDENTIAL AREA ON LEVELS 4 TO 8 WERE THE FOCUS OF REDUCTION. AFTER REMOVING THE CENTRAL ROOMS, THERE WERE STILL 27 RESIDENTIAL UNITS THAT FACED NORTH AND WEST. THE ORIGINAL 44 UNITS WERE ADDITIONAL TO THE CLIENT’S REQUEST, THEREFORE THERE WAS REMOVING 17 UNITS WASN’T AN ISSUE.
WINDOW OPENING REDUCTION: THE WINDOW TO WALL RATIO ALONG THE NORTH AND WEST SIDES OF THE RESIDENTIAL UNITS WERE REDUCED BY 50% NOT ONLY TO POSITIVELY REDUCE CARBON OPERATING EMISSIONS, BUT ALSO TO REDUCE COSTS SINCE UNIT RATES FOR CURTAIN WALL GLAZING FALL ON THE HIGHER END.
STRUCTURE SIMPLIFICATION: THE STEEL TRUSS SYSTEM ON THE PERIMETER OF THE 2ND FLOOR WAS REMOVED TO SAVE ON THE ENORMOUS COSTS ON STEEL. AFTER CONSULTATION WITH STRUCTURAL ENGINEERS, IT WAS ESTABLISHED THAT THE TRUSS SYSTEM WASN’T NECESSARY FOR THE CANTILEVER BUT WAS KEPT IN THE ORIGINAL DESIGN FOR AESTHETIC PURPOSES.
UNIT COSTS WERE EXTRACTED FROM THE 2022 YARDSTICKS HANDBOOK WHICH LEAD TO FURTHER IN DEPTH BREAKDOWNS TO QUANTIFY AVERAGE UNIT COSTS BASED OFF MATERIAL PERCENTAGES THROUGHOUT THE BULIDING (REFER TO CHART ON THE RIGHT FOR MORE INFORMATION). INITIALLY, THE BASE BULIDING COSTED $19,463,183.00, BUT AFTER A 20.8% DECREASE IN BULIDING AREA AND 13.3% DECREASE IN OVERALL BULIDING HEIGHT, THE NEW COST BECAME $16,656,886.00. IT’S IMPORTANT TO NOTE THAT THE OVERALL SHELL PERCENTAGE (~60%) IS DOUBLED THE TYPICAL AMOUNT (~30%) DUE TO LARGE SPECIAL STRUCTURAL MEMBERS IN THE DESIGN. THE OVERALL PRICES FOR THE INTERIOR AND SERVICE SECTIONS ARE ON THE LOWER END.
A2 | STRUCTURE
15 A21 LOWEST FLOOR
($/m2) MATERIAL A
SHELL
85.311--
117.23--
Pre-Cast Concrete Column Rectangular Section (multi storey)T3 99.492--
Pre-Cast Concrete Column Rectangular Section (multi storey)T4 89.047--
Pre-Cast Concrete Column Rectangular Section (multi storey)T5 87.226--
CONSTRUCTION Cast-in-Place Concrete Column85.20.076.24656357 7.8 -32.76
15 Cast in place Concrete Wall77.60.4031.11259316 127.96 -179.15
15 Cast in place Concrete Beams (integrated with slab) 50.40.063.089443412 --27.39
15 Cast in place Concrete - Slab on Grade 50.40.4623.40825817 207.53 Concrete Slab thickness = 0.2m
15 A22 UPPER FLOOR
CONSTRUCTION Cast-in-Place Concrete Column85.20.108.553892588 --166.32
15 Cast in place Concrete Wall77.60.1814.00595191 54.994 -299
15 Cast in place Concrete Beams (integrated with slab) 50.40.073.314952825 --108.96
15, 19 Steel Truss (Wide Flange)7740.510.141082.524769 --231.68
15 Cast in place ConcreteSuspended Slabs (flat slabs) 49.60.5125.46902409 --850.65 Concrete Slab thickness = 0.2m
15A23 ROOF CONSTRUCTIONCast-in-Place Concrete Column85.20.1714.23240508 --14.4
15 Cast in place Concrete Wall77.60.3728.33217632 --31.47328
15 Cast in place Concrete Beams (integrated with slab) 50.40.063.274121356 --5.6
15 Cast in place ConcreteSuspended Slabs (flat slabs)49.60.4019.98309113 --34.73
A3 | EXTERIOR ENCLOSURE
1302.306596 |
446.83 63.86 REF. PG D | INTERIORS MATERIAL
A31 WALLS BELOW GRADE - -----Disregarded section due to no basement
25A32 WALLS ABOVE GRADE Thermal Insulation Polystyrene (2") + (2")+ (1") 139.20.2940.16619834 -2983.5378.9 20 Cold Formed Metal Framing Stud Wall (6" studs) 1230.1721.46645647 -1804.527.19 23 Sheathing Supply - Unsanded Fir Ply (1/2") 16.90.172.949472559 -1804.522.92
1120 478.3008 MATERIAL % UNIT COST ($/m2) AVG. UNIT COST ($/m2)
UNIT COST ($/m2) 1120 All (13) columns, shear walls and beams added up on level 1. Percentage of each member determined by volume proportions. % OF ASSEM BLY
1656.61 65.82 86.20328 Concrete Slab thickness = 0.2m 10339.55 EPS Insulation 5" thick (2"+2"+1" from Yardstick summed up) 289.941142 All (70) columns, shear walls and beams added up from level 2 to 9. Steel beam converted from 1 Tonne = $8770 to 1m3 = $7740.51. [1 tonne = 1.133 m3] UNIT COST ($/m2)
5 reinforced concrete spines. Total linear length (m) was calculated for T1, T2, T3, T4 and T5, which includes the vertical, horizontal and arched portions of the special structural members. QUANTITY QUANTITY TOTAL
NOTES
L (m) A (m2)V (m3) A1 | SUBSTRUCTURE 13A11 FOUNDATION Concrete Foundation Wall
Finish)
69A12 BASEMENT EXCAVATION - -----Disregarded section due to no basement
SPECIAL
Concrete Column
(Exposed
191-- 191 -827.95- 827.95
16A13
CONDITIONS Pre-Cast
Rectangular Section (multi storey)T1
Pre-Cast Concrete Column Rectangular Section (multi storey)T2
PROJECTIONS - -----Disregarded section due to no projections L (m) A (m2)V (m3) B1 | PARTITIONS & DOORS 35B11 PARTITIONS Gypsum Board Supply Only Regular 5/8" thick 19.50.6111.94471626 -8529.625 Acoustic Insulation Glass Fibre 4"980.3937.97014392 -5395.2Fibre Insulation 4" thick (2" + 2" from Yardsticks summed up) B12 DOORS - 1512.9 101 Default value taken from excel sheet B2 | FINISHES 38B21 FLOOR FINISHES Resilient Flooring Vinyl Composite Tile (1.5mm thick) 420.7531.68510638 -248239 Carpeting Nylon A Static Light Duty) 560.2513.75319149 -80835B22 CEILING FINISHES Gypsum Board Supply Only Regular 5/8" thick 19.5-- 19.5 -3220- 3220 40B23 WALL FINISHES Painting and Coating Walls coats rolled Drywall 13.5-- 13.5 -8529.6- 8529.6 B3 | FITTINGS & EQUIP B31 FITTINGS & FIXTURES - -----Disregarded B32 EQUIPMENT PV Panel 350-- 350 949 Avg cost/panel fon Google for a 1.7m x 0.993m (a=1.6881m2). Quantity determined by total roof area/1 panel size. B33 ELEVATORS - 25000 2 Default value taken from excel sheet L (m) A (m2)V (m3) D1 | SITE WORK D11 SITE DEVELOPMENT - 91.6 -894.62- 894.622 Default value taken from excel sheet 3290 45.43829787 13924.8 49.91486018 REF. PG B | INTERIORS MATERIAL UNIT COST ($/m2) % OF ASSEM BLY MATERIAL % UNIT COST ($/m2) AVG. UNIT COST ($/m2) 2292.254
QUANTITY QUANTITY TOTAL NOTES
1133.87
COST BREAK DOWN AVG.
REF. PG NOTES QUANTITY TOTAL
26 Roofing/Siding Panels Hidden Fastener (Single Skin Panels 24ga)3320.1756.0924605 -1746.94.37 31 QUANTITY MATERIAL % UNIT COST ($/m2)
Curtain Wall Glazed Assembly Double Glazed (clear anodized 5' modules) 8750.19169.2665542 -2000.2A33 ENTRANCE - 4150 25 Default value taken from excel sheet 25A34 ROOF COVERINGS Thermal Insulation Polystyrene (2") + (2")+ (1") 139.20.3446.72545224 -769.4431 % OF ASSEM BLY
Curtain Wall Glazed Assembly Slope Glazing Assembly (exceeding 45m2 clear anodized)18900.661255.581144 -1522.8A35 UNIT COST