Mattias Lindskog - Portfolio 2019

Page 1

MATTIAS LINDSKOG

PORTFOLIO | 2019 PROFESSIONAL & ACADEMIC CAREER

ARKITEKT SAR/MSA|MAA armlindskog@outlook.com

Lauritz Sørensens vej 8 2000 Frederiksberg +45 60 46 18 00


MOBILIA SHOPPING CENTER

(JAIS ARKITEKTER)

2014-2018 Per Albin Hanssons Väg 40 214 32 Malmö 58,000 m2 | 114 stores | retail | transformation | all phases | project architect | mix-use | ongoing Malmö Stadsbyggnadspris” For making an old worn down shopping center into a living, breathing part of the city. A new neighbourhood of Malmö.

FROM CONCEPT TO AS-BUILT New customer aisles and additions Especially demanding businesses Inside infrastructure Several stores New entrances/facade Public toilets Car wash

SKETCHES AND OTHERS

New main concept for shopping aisles in older parts of the centre Guidelines/designmanual Dentist Offices Food court Teater JaLaDa Kjell & Co Normal Kicks Albrekts Guld Stadium Twilfit Accent GameStop Hemmakväll

Complete makeover of an old shopping center housed in historically valuable buildings in Malmö. Adding housing, schools, healthcare, and offices to make it a self sustainable part of the city. My role in the project: Project architect for retail development on Mobilia Shopping Centre. Sketching, visualisations, all phases, coordination, administration, design manual etc. Have had the possibility follow several small projects thorugh from sketch to as-built.

2

Snapshot of Mobilia


New lounge.

Hairdresser Josefina.

New entrance.

ALAB office.

New access corridor and toilets.

The square between the new & old on opening 3


Example of dentist in early development. Examples of made construction drawings.

Examples of late design development.

4


VISIONS & HOW TO GET THERE

THEMES

FORGOTTEN SPACE

SPACE BETWEEN

CLARIFY EXTERIOR

RE-IMAGE INTERIOR

IN BETWEEN

Selection of visualisations made for different projects. New entrances, children’s theatre, new establishments, new facilities, guiding inspiration, “places” in the centre, etc. 5


Kv VESSLAN 14 / CONTENTUS (JAIS ARKITEKTER)

2017 - 2018 Win in a parallel assignment | 8300 m2 | 120 apartments & retail/restaurant | schematic design | transformation | city regulations/zoning | ongoing Smedjegatan 5 214 21 Malmö A very attractive site in the city centre of Malmö. Connection point between Triangeln and Möllan - two major hubs. Old car park in prime location for development to be replaced by new businesses and dwellings. Enable slowed down street for walking and creating varied places for the residents. My role in the project: Sketching, building design, making of schematic design drawings and diagrams for a discussion of city regulations on plot. Space effective apartments. Created a dynamic yard which supports location of yard house. Approved by City Planning Office.

Site

Old building on site. 6

Vy från Södra Förstadsgatan.


HEMMA

STAD

SĂ–

Second floor plan with the raised inner yard and yard house.

Elevation towards south.

DE

RS

I DA

Early concept sketch! Urbanistic, a strong corner, places where the home side breaks through to soften the building in places, slowing down movement by opening up the first floor.

Section through yard house and existing parts towards west.

7

VESSL CONTE

SKISS SEK


ALAB KONTOR - ATRIUM LJUNGBERG MOBILIA CENTRUMLEDNING / ALAB OFFICE

(JAIS ARKITEKTER)

2016-2017 650 m2 | all phases | transformation | office typology experimentation | office | interior & design | built 2017 Per Albin Hanssons Väg 40 214 32 Malmö Office for the Centre Management of Mobilia in Malmö. A long-going project in which we designed different office types and tested with the actual users. Sketched in many different spaces throughout the centre. Complete design responsibility. In all a very good learning of how to design an office for many different organisational workflows. My role in the project: Sketching and design development on all locations, parts of the construction drawings and interior.

Interior design vision board. 8

Views from finnished office.


Final plan design of office + zoning of places through surfaces, light and materials. 9


ALAB KONTOR - ATRIUM LJUNGBERG MOBILIA CENTRUMLEDNING / ALAB OFFICE

(JAIS ARKITEKTER)

Early activity based office plan in different site.

10


SUN OFF INREDNING & BUTIKSKONCEPT

(JAIS ARKITEKTER)

2016 100+x m2 | all phases | transformation | new overall concept for all stores | interior & design | built 2016 - ongoing Helsingborg A chain of stores through all of Sweden offering different blinds and shutter solutions. We were tasked with tranforming their first branch and developing a new nationwide store concept. My role in the project: Sketching and design development, custom furnature design.

11


AMERIKA NORRA 53 - FOLKETS HUS / THE COMMUNITY HOUSE

(JAIS ARKITEKTER)

2017-2018 6000 m2 | high school/dwellings | protected building | transformation | schematic design | zoning Sรถdergatan 65 252 25 Helsingborg Old protected community house in the centre of Helsingborg. New uses and applying modern demands on an old building. A school, a resturant mixed with cantine, a public yard or by challenging the zoning plan adding beautiful apartments. In a larger perspective, we want to activate the building / yard for a larger part of the day. A half-time restaurant serves as a dining room for the school. During the evening it creates movement in the area.

PROJECT

DWELLINGS 4 FLOORS 2 RoK = 12 st 4 RoK = 4 st

CREATIVE CLUSTER / SEE-BE SEEN / STIMULATING / PRIVATE DINING / CAFร / EXHIBITIONS My role in the project: Sketching and making schematic design drawings for transformation of all space, restoration of various lost parts of the building, and to challenge some city regulated uses of the plot/building allowing for dwellings to be incorporated. Presentation material.

BOA 1300 m2 Relocated elevator and restored old grand stairwells. Storage for tenants in space between stairs.

Normal plan proposition dwelling. Scale 1:200

Facade today. 12

Ball room / theatre

Explaining the off center gate in ground level.


FASTIGHETSGRÄNS

1. KLASSRUM (30P)

FLEX-YTA 60 m² TYST RUM

MATSAL (80p) 119 m²

KÖK 123 m² SERVERING

BUTIK

ÖPPET UPP SITTRAPPA

WC TRAPPA OCH MATHISS TILL PLAN 2

WC

BUTIK

RECEPTION 35 m²

WC

SKYLIGHT INLAST

RESTAURANG (96p) 143 m²

ENTRÈ SKOLA BUTIK

TAKFÖNSTER BUTIK

UTESERVERING 24p

AV BÄRANDE SKA VERIFIERAS First floorNOTERA: plan withAVVÄXLING main semipublic facilites VÄGGAR for the school, activated AV KONSTRUKTÖR yard with school in the day and dining in the evening. Scale 1:400

Elevation towards east.

SKISS PLAN 1 SKALA 1:200 SKOLA;TEST-FIT AM ERI K A NO RRA 5 3 2 / 6

13


MASTHUSEN, MALMÖ

(JAIS ARKITEKTER)

2017 10 200 m2 | 126 apartments | dwellings | schematic design | zoning Masthusen Västra Hamnen, Malmö Old protected community house in the centre of Helsingborg. New uses and applying modern demands on an old

PROGRAMHANDLING

My role in the project: Sketching and making schematic design drawings according to customers wishes.

PROGRAMHANDLING

14


AKTERN 3, MALMÖ

(JAIS ARKITEKTER)

2016 10 200 m2 | dwellings & commercial | competition Västra Hamnen, Malmö Lost competition... Lot in prime location just next to Turning Torso. My role in the project: Sketching and working out main strokes in the project.

15



MATTIAS LINDSKOG

PORTFOLIO | 2019 ACADEMIC WORK ARKITEKT SAR/MSA|MAA armlindskog@outlook.com

Lauritz Sørensens vej 8 2000 Frederiksberg +45 60 46 18 00


COLUMN: A DESIGN ENQUIRY INTO A PERFORMATIVE ORDER FOR A CEREMONIAL SPACE. (KADK, CITA) Thesis Project, 2014 Fabrication | secular ceremonial space | computational design Teachers: Martin Tamke, Mette Ramsgaard Thomsen, Phil Ayres and Paul Nicolai VELUX DAGSLYSLEGAT (2014) “The project illustrates an inspiring and insightful process where architecture and lighting design formally unite and create new potentials.” DURAVITPRISEN (2014) “His well-researched and referenced project shows finally an astonishing width and depth: a depth in the detailed investigation and a width, that engages with architectural questions on atmospheric, technological, social and cultural level.

In the old temples of Greece and Rome, the column was not only used as a highly structural element, it also allowed a freer planning of space and allowed light to enter spaces in a new way. In many examples, the column helps create something intangible, an atmosphere in the space. The aim of this project was to develop a range of a contemporary order of columns that may perform according to light and space making functions. As a setting for further development of the project, I investigated how the column might be deployed in a secular ceremonial space. A ceremonial space devoid of religious doctrine - with only social, cultural, constitutional and matterof-course properties embedded in its design.

[...] This synthesis allows Mattias most importantly to create a convincing and innovative proposal with intriguing spaces and atmosphere. Starting in research the project creates finally a very personal manifestation in a truly ceremonial space.”

http://www.karch.dk/dk/Menu/Om+skolen/Nyheder/Nyuddannede+arkitekter+h%C3%A6dret+med+legater 18


+ 3.5

0

- 5 (m)

0

30 (m)

1:100

19


LIGHT SLITZ

WATER CHANNEL

LIGHT CHANNEL

Column in dark and light surroundings.

Close-up on performative aspects.

Robot Arm with Hot Wire Cutter / Digitally Controlled Hot Wire Cutter Machine / 3D Printing / special purpose cut HWC / A cut piece 20


Section lines of one type of column.

A column broken down in pieces. CNC-milled or cast in molds cut from foam. 21


THE SOUND - STRATEGIES FOR A FUTURE MONUMENT ON SALTHOLM (KADK, CITA) Individual Project 2013 Teacher: Martin Tamke, Mette Ramsgaard Thomsen, Paul Nicholas, Phil Ayres Exhibited and published for the Beijing Architectural Biennale 2013. The project is a speculation on how emerging technologies in robotics and material science can establish ecologies to handle the challenges of climate change. Here a monument is proposed for Copenhagen’s flat neighbour island Saltholm. This is expected to disappear under the raising water levels over the next 50 years. Its limestone filled ground, collected rainwater and the energy from the continuously blowing wind are the

foundation for a society of robots. These interact in order to refine the raw matter into 3d printed structures, shaped in a constant computational loop to engage with the everlasting wind. The created acoustic effects will be a reminder of the island, when this since long have been immersed under sea-level, while the new monument provides a sanctuary for humans.

0

210.2 cm2 68 cm 2.31 m3

61 freq 40.7 cm2 18 cm 1.697 m3 B1

210.2 cm2 72 cm 2.758 m3

55 freq 40.7 cm2 20 cm 1.988 m3 A1

210.2 cm2 88 cm 2.855 m3

49 freq 36.3 cm2 25 cm 1.767 m3 G1

210.2 cm2 94 cm 3.479 m3

44 freq 36.3 cm2 26 cm 2.065 m3 F1

42 freq 210.2 cm 2 36.3 cm2 96 cm 27 cm 3.706 m3 2.226 m3 E1

Helmholtz resonator / Bottle sound coding the tunes.

153.9 cm2 78 cm 4.316 m3

36 freq 36.3 cm2 29 cm 2.758 m3 D1

1,43 (m)

153.9 cm2 60 cm 7.059 m3

32 freq 36.3 cm2 25 cm 4.189 m3 C1

Mind map of relations between parts.

Wavelength of different sounds produced by the instruments during different times of the year.

MACHINES DEBARK ON SALTHOLM

PROTOCOL: THE BUILDER

BUILDING COMMENCES

284.1 cm2 60 cm 0.905 m3

FIRST REAL229.7 cm2 cm PRINT 1.04752 m3

123 freq 45.4 cm2 17 cm 0.524 m3 B2

111 freq 43.0 cm2 17 cm 0.589 m3 A2

99 freq THE FIRST SONG 232.9 cm2 43.0 cm2 56 cm 1.26 m3

18 cm 0.697 m3 G2

87 freq 304.2 cm2 40.7 cm2 63 cm 16 cm 1.839 m3 0.998 m3 F2

82 freq 300.5 cm2 40.7 cm2 65 cm 16 cm 1.988 m3 1.098 m3 E2

PROTOCOL: 307.3 cm2 69 cm THE KEEPER 2.395 m3

73 freq 40.7 cm2 17 cm 1.317 m3 D2

65 freq MOST OF 314.2 SALTHOLM cm2 40.7 cm2 74 cm 18 cm IS SUBMERGED 2.953 m3 1.563 m3 C2

FIRST BARRIERS OPEN TO FILL WATERPATHS

ENERGY SOURCE

WATER SUPPLY

SETTING UP PRINTING METHOD BARRIERS AROUND MINING SITES TESTING

OPEN-PIT HARVESTING MINING MATERIALS

MATERIAL PROCESSING GROUNDWORK

UNCERTAIN FUTURE WATER LEVEL

PROJECTED WATER LEVEL IN A CENTURY

51.0 cm2 12 cm 0.195 m3

RAISING LEVELS

248 freq 31.4 cm2 14 cm 0.102 m3 B3

ANNUAL VARIATIONS

CURRENT WATER LEVEL

Timeline 22

0

PREPPING SOIL

144.4 cm2 28 cm 0.31 m3

220 freq 32.2 cm2 16 cm 0.125 m3 A3

194 freq 151.7 cm2 32.2 cm2 30 cm 16 cm 0.382 m3 0.151 m3 G3

173 freq 156.6 cm2 36.3 cm2 32 cm 18 cm 0.463 m3 0.195 m3 F3

VISITORS ARE WELCOME

164 freq 151.7 cm2 36.3 cm2 33 cm 18 cm 0.493 m3 0.212 m3 E3

151.7 cm2 35 cm 0.589 m3

148 freq 36.3 cm2 20 cm 0.248 m3 D3

149.1 cm2 37 cm 0.697 m3

130 freq 34.2 cm2 20 cm 0.289 m3 C3

2100

0,56 (m)

II.


Visualisation of the future monument

Working robots

Robots/drones that carry out the work.

Sound propagation map

III.11

Section of a part of the monument.

23


WAVE? WAVE! WAVE^%::&++! (FINNISH: AALTO? AALTO! AALTO^%::&++!) (BOX IN A LANDSCAPE) * 2 (AALTO, PUBLIC BUILDINGS) PROJECT SPACE READING AREAS

Individual Project, 2011 MUSIC CONTROLLER

RESTAURANT

PROJECT SPACE

20,000 m2 | schematic design | main hub building on campus | process | academic | technical feasibility CLUB SPACE

ROOF GARDEN

READING AREAS

READING AREAS

MUSIC CONTROLLER

RESTAURANT

MAIN EXHIBITION

TERIAL COLLECTION

Teachers: Saija Holmén, Teemu Kurkela, Vesa Oiva (AOA and Juha Grönlund (ALA)

MAIN EXHIBITION

Exhibited in WeeGee Art Center, Helsinki, as a part of World Design Capital. LEARNING

MAIN AUDITORIUM

Otaniemi, Espoo, Greater Helsinki

MATERIAL COLLECTION

OFFICES

LOANING & INFO

PACKAGING & HANDLING

OFFICES

20,000 square meters of various programmatic functions was the requirement and to be placed right next to Alvar Aalto’s now obsolete Auditorium and a new Metro station. IT OFFICES

POST

OPEN LEARNING

SOCIAL SPACES

MAGAZINE READING

CLUB SPACE

ROOF GARDEN

My main concept for placing the building on site and planning the space inside was “(Box in Landscape) * 2”. The final result: the tallest building on the campus (a cube); undulating floor for relaxed mix-use space and boxes inside for specific functions.

OFFICES

LOANING & INFO

24H SEMINAR ROOMS

IT OFFICES

PACKAGING & HANDLING

OFFICES POST

SEMINAR ROOMS

FLEX STUDIO

FABLAB

SOCIAL SPACES

2nd AUDITORIUM

MAGAZINE READING

FLEX STUDIO PHOTO

GAMES

MUSIC & VIDEO

STUD. KITCHEN

NG, COMPUTERS, GROUP, OPEN LEARNING

LIVING ROOM CLOAKROOM & LOCKERS

(3)

3

8

2

4

7

FABLAB

LIVING ROOM

BOUTIQUES

FLEX STUDIO

FLEX STUDIO

PLAZA

PUBLIC TOILETS

PHOTO

GAMES

SHOP WINDOWS

MUSIC & VIDEO CAFÉ

-1 Plans 24

1

5

6

AALTO INFO, SHOP OFFICE

MEETING, COMPUTERS, GROUP, OPEN LEARNING

STUD. KITCHEN


Elevator shafts

Stairs

Pillars r=300 CC=8000 Service elevator

Pillars r=200 CC=8000 Elevator shafts

SCALE 1:500

Stairs

Pillars r=300 CC=8000

Sectional dissection of the building

Service elevator

Slabs 300 mm Pillars r=200 CC=8000

Slabs 300 mm

Pillars make out primary support in the bu shafts containing elevators and stairs. Thes building on the sides. Slabs are flat slabs c

MATTIAS LINDSKOG 300360 PUBLIC BUILDING STUDIO Visualisation of the project on site

MATTIAS LINDSKOG 300360 PUBLIC BUILDING STUDIO

Pillars make out primary support in the building but is helped by strong shafts containing elevators and stairs. These shafts also help stabilize the building on the sides. Slabs are flat slabs cast in situ.

Axionometri and load requirements for a technical assignment 25


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.