Matthew Evans Portfolio of Work Spring 2011

Page 1

PORTFOLIO OF WORK Spring 2011

Matthew N. Evans, ASLA

MLA Candidate 2012 NC State University Dept. of Landscape Architecture


In


Des INTRODUCTION ign P Grap roce s h s i c s Mod el B uildi Con stru ng ction nter ests Doc um This portfolio of work has been assembled to showcase design work completed during the first half of my academic tenure in the Master’s of Landscape Architecture program at North Carolina State University. First and foremost, this portfolio demonstrates my design process in abstract and as applied in a studio project. Secondly, it showcases specific technical abilities such as graphics & photography, model building, and construction documentation. Beyond these topics, this portfolio includes information about my background, skills that I am currently developing, and academic interests that I plan on developing.

e



CON ENTS

1 Proc ess 6 Grap hics 12 Mod els 14 Con truc tion Doc ume 18 nts Inte r Sket

chbo

Exa

ok to

mpl

Stud

es of

y mo

Dem

dels

oliti

on t

Rese ests arch , Wr

work

and

o De

,

truc

tion

usin

g

lase

tails

iting

cons

r cu

t


AL

ES

polo g y Dia g ram

ES

FEA TUR

TION

ING

MO DEL

IDEA

AND

TUA L

The his ing 10 toric/ sin ways ’-20’ usua gle-story facing lly. Th home Auto mobil the stree e fronts of s have a typ es ar t e park with pede the home ical setb Most ack s ha ed on str the sid ian acce ve wind from th face of the bu e ro ss ow park e or ing. Th sinesses behin directly to s, porche ads, with d the s, e pede in the th The build e sidew and door strian area ar hig ing. alk sy e lar acce of pu h-rise bu ge stem. ss 1blic ou is avail story ild able, tdoo ings offer bu r spac but se ildings hig hsu e. Pa cond rking density liv ary to rrounded is us ing by th at fo large en ually f the unde vironme auto surrgroun nt, mobil d, an but not e. d pe ve destr ry much ian ac cess in the wa is pr imar y y.

ING

TCH

ric /

Busi ness

Highrise

d Ty

ADE

NM

MA

Sing le St ory Hou Surr se ound ed by Park / Hig ing h-de Surf nsity ace Hou Park si ng ing SITE 2

Histo

2

Neig hbo rho o

SITE

This is a summary of my design process for my construction studio project during the Fall of 2010. Each ‘layer’ of the graph shows benchmarks in my process.

SKE

0

t 201

23 A ugus

s 21 &

IS; site visit

nty G

Sour ce: W ake C ou

LYSI S

CON CEP

Su rface flow • • St Piped flow orm drain p curb Juncti inlet on bo x

• • • • p

• Si te 2 fa (Neu lls with in se stream river tri the Pigeo butary n Br s or • W ater fl mapped ) and in anch dra cl in flood ows nort from plai udes no age basin hw pere Neare est; NO high po n. nnial N along st storm E is inte ints locate drain rcep Boyl d with • W te ater p an Avenu inlets are d by sto in 500 fe e and rm a ools a sout John bout 300 drains. et t he son St feet along ast corn the east e s re er ou dg th Bran Johnson and flow e of the et. St ch w ithou reet. St s overla site, exi ts v nd or t any treatm mwater r to a stor ia the each m ent. es Pig drain eon

ROL OGY

HYD

FEA TUR

ANA

2 NAT UR

PROCESS


ER

A-5

C-3

1

FOOT

7.5%

C-5

SWAL E

B-1

INE

OUTL

A-7

C-4

DECK

10

C/S-

OTER

A-19

G FO

A-6

OTER

G FO

PILIN

18

A/S-

BW-1

LE

A-9

BACK DRAI OF WAL N OU L TLET A-8

D-2

B-2 C-6

G FO OTER

PILIN

ODUC T

L PR

IONA

A-10

17

A/S-

SK ED UCAT

BW-2

TAIL

E DE

RENC

REFE

C-7

16

A/S-

TODE

AN AU

PILIN

TW-2

. GR ADIN GT AB

TW-1

.C.S

R.E

C-8

A-11

D-3

A/S15

DESK

AUTO

C-9

A/S14 A/S13

D-4

G

1.

AL

D

GRA

EQ.

EQ.

. 6"

10

APPR OX

EQ.

EX SHAL POSED BO L BE CAP LT PED H SEE EIGHT GRAD VAR IES ING PLAN

"=10 '

5

Ø4"

4" MI

N

10

N

3" MI

2%

12"

TYP

0

8" TY P

20

LK

EWA

SID

D

8 FO O 20 U T DOU BL NITS TOTA E L

3

PER F.

PI

IED

ECIF

AS SP

FOR PE OUTL AS SP ET SE ECIF IED E LCOM 3.0 PAC WIT TED H A

BLY

ASSE M

0

L-3.

.)

ENT

N

ISIO COMM

P HE

RE

DATE 9-28-1 10-04 0 -10 11-16 -10

SEE

2

MATT HEW LAR N. EV 50 FOX, 3 STUD ANS IO DELC FALL AMBR 2010 E

PRO

16 FO 4 UN OT TRIP ITS TOTA LE MAY L FRO BE COM M BINED COM SHOR TE PON ENTS R

OX.

APPR

HEIG H GRAD T VAR IES ING

6"

2%

16'

EQ.

EQ.

DO COM N MODU PO LAR 8', 12 NENT ', OR 16'

BASE

R.E .C.S LE 1 . WAL /2"= L 8', 1'-0" 12', SCA

EQ.

12 FO 12 U OT DO UBL NITS TOTA E L

EQ.

EQ.

4" 6"

3 9.0

K FRAM E

AL PR

#4 REB

NY ™ DEC 4"X6 " STEE KING L JOIS T AR IN FOO TER

KEBO

L DEC

TION

4"X6 " STEE

UCA

DEC T FOU K SUP NDA PORTED TION SYST BY CRU EM SHE D BRIC K UND AGGREG ER DEC ATE K TYP. DEN

PEN

K ED

INDE

DES

AUTO

6"

6"

MET H ARE ODS FO THE RC N

CH

NT

2'MA

1'

X

ELEV ATI O

ALL

DW

FRO

OUN

E AR

SWAL

1"=1'0"

R.E .C.S . BEN E SCAL

2% M INIM UM

3

1'

8"

N

1'-6"

FINIS

L ATTA

K , OR

KING

DEC

K

GRA

DE

OX.

6" APPR

IVAL

EQU

ENT

KS

ENT

T

WOO

S CA

BEN

OR

T

EQU IVAL CH SUP POR

D BEN CH, STEE L FIN STEE

E TEN E TEN

COR

KEBO NY™

COR

3 8"

3 8 "

2

ENT

24"

WITH

EQU IV. DEC E K

KEBO STEE L DEA NY™ CK FRAM OR

10'

RAIN MAX GARDEN 2:1 SLOP SOIL E AWA MIXTURE Y FRO AS M FOO SPECIFIED TER

UCED

1 6.0

PROD

R.E.C EDG .S. CUT E OFF EDG SITE ES TO STAI . BE GRO NLES FOR UND SEC S STEE TO SMO L URE FIT. WASHER STEE OTH FILL S AS IN GAP CON L BRACKE REQ CRE S WITH UIRE T TO TE BLOC SEC GRO D CON KS TO URE UT. CRE FOR TE FOO FOO RECYCLE BRA TER D TER CKE T ATTA WITH SHE CHE J-BOLTS R RUN MEN INSE T AGG RTED REG ATE PAC 90% TED COM FILL PAC SOIL TION COM

CRU

L PLAT 7.0 E INSE 18" STAI RT TO BE NLES CUT S STEE AND L FILE BOLT TO D AFTE REC BIND YCLE R INST BLOC D CON KS ALLA CRE TION OF CON TE BLOC CRE TE K FRO M SIDE WAL K

R.E .C.S L E 1 . WA LL 1 /2"= 1'-0" 0'

, OR

CKE

IVAL BRA

EQU CHM ENT

SEA T BAC STEE

L JOIS T FOR NY™ DEC

STEE

HED

E TEN

NY™

KEBO

COR

1 4"

512 "

6"

16"

HEIG H GRAD T VAR IES ING PLAN

8"

1'-8 1

8"

COR E FRO TEN STEE M REC YCLE L FINE D CON EXTR CRE UDED TE BLOC

3 4"

KEBO

3

6"

112 "

STEE REC L BRACKE YCLE D BLOCT FOR K TO MOUNTIN FOO TER G

1"

1 4"

1 34 "

18"

SEE

2"

T

4"

ODU C

REC YCLE HEIG VAR HT VA IOU D CONC S SI RIES ZES. RETE BL OCK 8" TY TOP P WAL SOIL1 R.E.C.S LS .B ASSC ALE SP 1"=1'- ENCH EC 0" SEC IFIE BOLT D TIO ASSE N MBL Y AS SP COM ECIF PAC IED 90% TE COM D AGG PAC R TION EGATE WIT H FI NES

Y AN

ED B

TS DUC

UME N HEIG H GRAD T VAR IES ING NOT PLAN MOR HMa E EIG9-2 4-201 THAN 2 HT tthew 0 OF Evan s WAL 3 L

AM E ST

SEE

PLAC

DATE DRAW: CHEC N BY: KED BY:

REV REV.

.C.S

(R.E

16'

12'

C& C/S

DOC

THE

EA GRAD CH R.E. C. E SH ALL S. COMP BE DE ONEN TE AT TH RMINEDT IS PO INT

REC YCLE D CO 2% M NCR ETE INIM BLO UM #57 CK SWAL W BAC ASHED E AR KFIL L FO AGGREG OUND W R DR ALL AT TOP AINAG E SOIL E AS SP ECIF IED BOLT

40

TE

AT

2

OVE

Y 32 AB

TEL

D ALK

H SE

WIT

2

SIDEW

2

RETE

10 FO 2 UN OT SIN G ITS TOTA LE L

CRE

GR1 ADNRIOE-USED N T TG EXIS O SC PAL T LEA SCA N ING CON LE 1

6"

LOG

ING Eros ion co NOT any ntrol10' ES gr to be Botto ading pr epar impleme m ation nted finish of wall and/ and prior ed gr ele or gr to Any ade ad plan eleva vations dis refer ing. with tio the La crepanc n. to actio ies nd sc to n is taken ape Arch be discu . ss itect befor ed e an y

B

1

LOG FINISHSECTION ED GR REST APPR ADE. OXIMA

AFTE R SEAL GLUIN EDG G AND ES W BOLT 1. ITH ALL CLE ING PA EDG NEL AR W IN O ES TO ATER S TOG 2. R ET PRO ALL DER TO BE CU OF C HER H AULK DRIL OLES FOACHIEVET WITH 3. LED R AS A SM STONE ALL O FF SE SAW 4. W MBL OOTH IF M ALLS TOSITE. Y TO EDG ORE ES. BE BE CON C TRAC ONCRET ASSEM SOU BL TOR E IS ED O R SH NEE RE-U CE OF DED FF SITE CO ALL FI SED . CON MPARAB ND AN , CRET LE G OTHER E SL AB. RADE O F

3.

2.

1

.C.S . ISTING LE GEN CONC

1 A/S AN MOUN D C/S DE TED ABOVNOTE R.E E .C.S

D

C

B

A

R.E

RE-US ED EX

1-4

L-6.0

LEG BW END BOTT TW OM TOP OF W TC OF W ALL TOP BC AL OF CU L BOTT LP RB OM LOW OF CU HP POIN RB RIM T GH AHI& POIN TOP A /ST OF DR 323 AIN PROP (323 ) PROP OSED SP 8' OT EL EXIS OSED CO EVAT TI ION PROP NG CO NTOUR NT PROP OSED CO OUR EDGE OSED SL NTOUR OP BIO- OF PROP E RETE NTIO OSED DE N OV CK ERFL OW GEN DRAI N ER

GRA DIN

BW-2

ION GRAD E ME EX. SIDE ETS WAL K

BW-1

ODUC T

IONA L PR

TAB LE

EDUC AT

TW-2

UCT

1

L-6.0

BY AN

.C.S . GR ADIN TW-1 G

R.E

PROD UCED

T

ONEN

COMP

GRA PHIC S

G

DIN

DEL S&

MO R.E. C.S.

A-12

PROD UCED BY

-20

ENT

CON STR

MPON

S. CO

R.E. C.

DIG ITAL

CT

GRA

PEA

615

TIC

S

CE

W. P EA

H NC

EMA

K LEIG

SCH

ED B

PAR

TRE ET

, RA

EET

UCT

DUC

T

CE S TR

PROD

PRO

ODU L PR ONA CATI EDU ESK TOD Y AN AU

ODUC AL PR

NAL

ATION

ATIO

EDUC

EDUC DESK

DESK

AUTO

AUTO

BY AN

BY AN

UCED

UCED

PROD

PROD

1 34 "

1"

518 "

1'

1 4"

6"

1 34 " 1 4"

5 34 "

3"

ATION

COR

EDUC

AL PR

ODUC

EQ.

1'

EQ.

1'-6"

3/8"

5 78 "

8"

418 "

3"

8" TY

SCAL TEN FI E1 1/2"=1 '-0"

DESK

2

AUTO

618 "

BY AN


PROCESS

TS MEN ION D OCU UCT STR CON

DIG IT

AL M ODE

LS &

ING RAD IC G EMA T SCH

AND ING TCH SKE

GRA P

LING MO DE

TION IDEA UAL CON CEP T

S LYSI ANA

strictly linear fashion. This allowed for a stronger integration of each phase of the design. It also allowed me to address the complexities of the site while maintaining a strong design concept.

HICS

This graphic abstracts my overall process for my construction studio project. While there were distinct phases of developing the design for the studio, I did not continue through each phase in a

Diagram: This diagram is an abstraction of my process used during my studio project Fall 2010 4


TODESK EDUCATIONAL PRODUCT

Mock-up: Testing materials and design through fabrication. Kebony® , Steel, & Concrete. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

KEBONY™ WOOD BENCH, OR EQUIVALENT 3 8"

3 8

CORE TEN STEEL FIN BENCH SUPPORT

2 7.0

" CORE TEN STEEL PLATE INSERT

18" STAINLESS STEEL BOLT TO BIND BLOCKS OF CONCRETE TO BE CUT AND FILED AFTER INSTALLATION

16" 6"

RECYCLED CONCRETE BLOCK FROM SIDEWALK

In developing a detail for my construction studio project. I revisited some of my early conceptual ideas as well as central themes of the final design. Using digital modeling and sketching, and AutoCAD, I developed a design for a bench. To take the design one step further and to test the strength and comfort of the bench, I made a full scale mock-up of a key COR TEN FIN BENCH SUPP 2 SCALEpoint. connection 1 1/2"=1'-0" 112°

4"X6" STEEL DECK FRAME KEBONY ™ DECKING

18"

4"X6" STEEL JOIST

R.E.C.S. CUT EDGES TO BE GROUND TO SMOOTH EDGE OFF SITE.

8" 6" APPROX.

#4 REBAR IN FOOTER

STAINLESS STEEL WASHERS AS REQUIRED FOR SECURE FIT. FILL IN GAPS WITH GROUT.

2"

3 9.0

STEEL BRACKET TO SECURE RECYCLED CONCRETE BLOCKS TO FOOTER

DECK SUPPORTED BY INDEPENDENT FOUNDATION SYSTEM

CONCRETE FOOTER WITH J-BOLTS INSERTED FOR BRACKET ATTACHEMENT

CRUSHED BRICK AGGREGATE UNDER DECK TYP.

6"

CRUSHER RUN AGGREGATE 90% COMPACTION

6"

COMPACTED FILL SOIL RAIN GARDEN SOIL MIXTURE AS SPECIFIED MAX 2:1 SLOPE AWAY FROM FOOTER

512" 4"

1'-818"

24"

1 6.0

1'-57 8"

1'-31 4"

84°

118° 2" 151°

105°

1'-112"

90°

R.E.C.S. BENCH SECTION SCALE 1"=1'-0"

158°

1'-101 4"

90°

1

81

100°

5

3'-4


GRAPHICS The following graphics are examples of from a variety of projects utilizing various techniques. Some show the mechanics of a design, while others are meant to convey an emotional character of the space. Not all graphical elements shown were used in presentations, many of my drawings or models help me understand a site, a problem, or convey a possible solution to teammates in a group project.

O-RETENTION AND PUBLIC SPACE

1

Perspective: SketchUp Model and Photoshop 2

3

2

1

PERSPECTIVE

REFERENCE PLAN

2

LOGS INOCULATED WITH MYCELIUM AND FUNGI

SECTION

RE-USED CONCRETE RETAINING STRUCTURES

Perspective: SketchUp Model and Photoshop BIO RETENTION GARDEN

GRADE DROPS BELOW DECK

6 SHELTER STRUCTURE


3

Perspective: SketchUp Model and Photoshop

Section: SketchUp Model and Photoshop 7


GRAPHICS

Plan Graphics: AutoCad, SketchUp, Photoshop, & Hand Rendering 8


Perspective: AutoCad, SketchUp, Photoshop, & Hand Rendering 9


10 Pencil Sketch: Umstead Park

Pencil Sketch: Lake Johnson

Pencil Sketch: Player’s Retreat

Pencil Sketch: Ilex opaca

GRAPHICS


This highly conceptual piece was produced for the inaugural edition of “SHIFT� an academic journal produced by the NCSU student ASLA. This graphic is composed on two facing pages and one page of vellum in between as an overlay. When the center page is turned, the image and its message is modified.

Adobe PhotoShop: Conceptual art for SHIFT: journal 11


MODELS Modeling, along with sketching and diagramming, is an important part of my design process. Both physical and digital modeling allow me to explore design alternatives in three dimension, generating new alternatives, and refining concepts.

Study Models: Used from conceptual to technical design.

12


Using AutoCAD to create a complete draft of the design, laser-cut models can be made quickly and with a high degree of precision. The model to the left is from a second semester project.

Laser-cut Model: Final Design

13


CONSTRUCTION DOCUMENTATION Demolition to Detail: After completing a conceptual design, I generated a set of construction drawings for the project. This set can be made available upon request. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

R.E.C.S. GRADING TABLE R.E.C.S. COMPONENT

TW-1

TW-2

R.E.C.S. LEGEND

R.E.C.S. GRADING TABLE

BW-1

R.E.C.S. COMPONENT

BW-2

TW-1

TW-2

BW-1

BW-2

RE-USED EXISTING CONCRETE SIDEWALK

1-4

L-6.0

A

1

B

1

EACH R.E.C.S. COMPONENT GRADE SHALL BE DETERMINED AT THIS POINT

2 2

MATTHEW N. EVANS LAR 503 STUDIO FOX, DELCAMBRE FALL 2010

C D

1

2

A/S AND C/S DENOTE R.E.C.S WITH SEAT MOUNTED ABOVE

LOG

1

L-6.0

8.3% MAX SLOPE A-19 A/S-17 A/S-15

C/S-10

A/S-14 A/S-13

A/S-18

PILING FOOTER

A/S-20

BW TW TC BC LP HP RIM

BOTTOM OF WALL TOP OF WALL TOP OF CURB BOTTOM OF CURB LOW POINT HIGH POINT TOP OF DRAIN

323 (323)

PROPOSED SPOT ELEVATION PROPOSED CONTOUR EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SLOPE EDGE OF PROPOSED DECK BIO-RETENTION OVERFLOW DRAIN

A/S-16

PILING FOOTER

PILING FOOTER

PILING FOOTER

GENERAL GRADING NOTES

C/S-11

1.

A-12

DECK OUTLINE

2. D-4 A-11

C/S-1

3.

Erosion control to be implemented prior to any grading preparation and/ or grading. Bottom of wall and elevations refer to finished grade elevation. Any plan discrepancies to be discussed with the Landscape Architect before any action is taken.

E

ER

P

DATE: DRAWN BY: CHECKED BY:

C-8 D-1

BACK OF WALL DRAIN OUTLET

A-3

A-1

B-1 C-4

C-3 A-4

REV.

A-10 D-3 B-2

C-7

COMMENT

DATE 9-28-10 10-04-10 11-16-10

C-6

C-2 A-5

GRADE MEETS EX. SIDEWALK

9-24-2010 Matthew Evans

REVISION

A-8 A-6

ST

P

C-9

A-2

H

AM

E

C LA

C-5

A-7

A-9 D-2

7.5% SWALE

GRADING PLAN SCALE 1"=10' PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

14

10 5

0

10

20

40

L-3.0

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

GRADING LEGEND GRADE MEETS EX. SIDEWALK

615 W. PEACE STREET, RALEIGH NC

REFERENCE DETAIL

PEACE STREET PARK

LOG SECTION REST APPROXIMATELY 32 ABOVE THE FINISHED GRADE.


Documents Generated: Existing Conditions, Demolition Plan, Materials Plan, Grading Plan, Planting Plan, Layout Plan, Planting Details, 6 Details (3-6 drawings each). PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PLANT SCHEDULE

SHRUB AREAS

COMMON NAME / BOTANICAL NAME

CONT

CAL

5

Downy Serviceberry / Amelanchier arborea Multi Trunk

15 gal

5

Cryptomeria / Cryptomeria fortunei

B&B

2.5"Cal

2

Swamp White Oak / Quercus bicolor

B&B

2.5"Cal

5

Autumn Gold Bald Cypress / Taxodium distichum `Autumn Gold`

B&B

3"Cal

QTY

COMMON NAME / BOTANICAL NAME

CONT

2,693

Cast Iron Plant / Aspidistra elatior

FLAT @ 3" OC

5,864

Giant Spiral Rush / Juncus effusus `Unicorn`

FLAT @ 4" OC

SHRUBS

QTY

COMMON NAME / BOTANICAL NAME

CONT

6

Cleopatra Camellia / Camellia sasanqua `Cleopatra`

2 GAL

3

Buttonbush / Cephalanthus occidentalis

5 GAL

6

Dwarf Red Twig Dogwood / Cornus sericea `Alleman`s Compact`

5 GAL

79

Inkberry Holly / Ilex glabra `Shamrock`

3 GAL

14

Winterberry Holly / Ilex verticillata `Sparkleberry`

3 GAL

52

Red Switch Grass / Panicum virgatum `Praire Fire`

1 GAL

GROUND COVERS

QTY

COMMON NAME / BOTANICAL NAME

CONT

3,462 sf

Watersaving Blend of Tall Fescue / Festuca arundinacea `Watersaver Blend`

seed

902

Cream Iris / Iris cristata

flat @ 12" oc

3,495

Poverty Rush / Juncus tenuis

flat @ 6" oc

4,659

Mondo Grass / Ophiopogon japonicus `Silver Mist`

4"pot@ 6" oc

1,134

Royal Fern / Osmunda regalis

flat @ 12" oc

163 sf

Tree Oyster Mushroom / Pleurotus ostreatus INSERT PLUGS INTO LOGS ACCORDING TO SPEC.

Plug

MATTHEW N. EVANS LAR 503 STUDIO FOX, DELCAMBRE FALL 2010

PEACE STREET GENERAL NOTES

Camellia sasanqua `Cleopatra` TYP

1.

UE

Ophiopogon japonicus `Silver Mist` TYP

3.

N BOYLAN AVEN

4. Ilex glabra `Shamrock` TYP Juncus effusus `Unicorn` TYP

3 L-5.1

Juncus tenuis TYP Iris cristata TYP

Osmunda regalis TYP

Aspidistra elatior TYP

Pleurotus ostreatus TYP

Festuca arundinacea TYP

Cornus sericea `Alleman`s Compact` TYP

Quercus bicolor TYP

Taxodium distichum `Autumn Gold` (4)

PROPERTY LINE

LIMIT OF WORK

Ilex verticillata `Sparkleberry` TYP

Panicum virgatum `Praire Fire` TYP

4 L-5.1

All planting to conform to the standards set forth by the American Association of Nurserymen and written specifications. Plant qualifications, locations and size to be approved in the field, prior to installation. Areas not delineated by plant symbol and/or label shall be mulched with 4" of hard-wood mulch according to specifications. All plants shall be watered after planting according to specifications

1 L-5.1

E

ER

P

H

AM

2 L-5.1

E

C LA

ST

P

DATE: DRAWN BY: CHECKED BY:

10-01-10 Matthew Evans

Cryptomeria fortunei (5)

REVISION REV.

COMMENT

DATE 10-04-10 11-15-10

PLANTING PLAN SCALE 1"=10'

10 5

0

10

20

40

L-5.0

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

2.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amelanchier arborea TYP

615 W. PEACE STREET, RALEIGH NC

QTY

PEACE STREET PARK

TREES

15


CONSTRUCTION DOCUMENTATION PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

GENERAL DECK DESIGN NOTES

3. 4. 5. 6.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

MATTHEW N. EVANS LAR 503 STUDIO FOX, DELCAMBRE FALL 2010

DECK LAYOUT PLAN SCALE 1"=1'-0"

3

PIN FOUNDATION SECTION SCALE 1"=1'-0"

E

ER

P

H

AM

CE

ST

A

PL

DATE: DRAWN BY: CHECKED BY:

4

11-09-10 Matthew Evans

PIN FOUNDATION PLAN SCALE 1"=1'-0"

REVISION REV.

COMMENT

DATE

11-16-10

2

DECK LAYOUT ENLARGEMENT SCALE 1/4"=1'-0"

5 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

16

PIN FOUNDATION CONNECTION ENLARGMENTS SCALE 3"=1'-0"

L-9.0

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1

All specifications of decking shall be approved by Structural Engineer and by Landscape Architect Installation of Kebony™ or equivalent product shall be according to manufacturers specifications. Alternate material shall be approved by Landscape Architect prior to purchase of material by contractor. Contractor must provide material sample and specifications to any alternate decking product. All fasteners shall be stainless steel. All decking shall be perpendicular to steel beams.

615 W. PEACE STREET, RALEIGH NC

2.

PEACE STREET PARK

1.


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A & A/S

C & C/S 8 FOOT DOUBLE 20 UNITS TOTAL

8'

MATTHEW N. EVANS LAR 503 STUDIO FOX, DELCAMBRE FALL 2010

12 FOOT DOUBLE 12 UNITS TOTAL 12'

16 FOOT TRIPLE 4 UNITS TOTAL MAY BE COMBINED FROM SHORTER COMPONENTS

10' 16'

BASED ON MODULAR COMPONENT 8', 12', OR 16' HEIGHT VARIES SEE GRADING PLAN NOT MORE THAN 32 HEIGHT OF WALL

6"

EQ.

HEIGHT VARIES 8" TYP

2.

1

EQ.

ALL EDGES TO BE CUT WITH STONE SAW IN ORDER TO ACHIEVE A SMOOTH EDGES. ALL HOLES FOR ASSEMBLY TO BE DRILLED OFF SITE. ALL WALLS TO BE ASSEMBLED OFF SITE. IF MORE CONCRETE IS NEEDED, CONTRACTOR SHALL FIND ANOTHER SOURCE OF COMPARABLE GRADE OF RE-USED CONCRETE SLAB.

EQ.

RE-USED EXISTING CONCRETE SIDEWALK (R.E.C.S.) NOT TO SCALE

2

TOP SOIL AS SPECIFIED

HEIGHT VARIES SEE GRADING PLAN

TOP SOIL AS SPECIFIED 8" TYP

BOLT ASSEMBLY AS SPECIFIED

EQ.

COMPACTED AGGREGATE WITH FINES 90% COMPACTION

COMPACTED AGGREGATE WITH FINES 90% COMPACTION

EQ.

R.E.C.S. WALL 8', 12', 16'

3

SCALE 1/2"=1'-0"

R.E.C.S. WALL 10' SCALE 1/2"=1'-0"

2% MINIMUM SWALE AROUND WALL

2% MINIMUM SWALE AROUND WALL

METHODS FOR CONSTRUCTION ARE THE SAME AS IN DETAIL 1. NO BINDING BOLTS TO BE APPLIED FOR 10' SECTIONS ONLY. SEE REFERENCE DIAGRAMS.

METHODS FOR CONSTRUCTION ARE THE SAME AS IN DETAIL 1. 16 FOOT SECTION SHALL BE 3 SECTION OF CONCRETE THICK. SEE REFERENCE DIAGRAMS.

RECYCLED CONCRETE BLOCK 2% MINIMUM SWALE AROUND WALL #57 WASHED AGGREGATE BACKFILL FOR DRAINAGE

APPROX. 6"

APPROX. 6"

3" MIN

TOP SOIL AS SPECIFIED

2%

EXPOSED BOLT SHALL BE CAPPED

4" MIN

2%

12"

Ø4" TYP EQ.

PERF. PIPE AS SPECIFIED FOR OUTLET SEE L-3.0

EQ.

E

ER

P

8" TYP

H

AM

CE

ST

A

12"

PL

COMPACTED AGGREGATE WITH FINES 90% COMPACTION

Ø4" TYP

Ø4" TYP EQ.

REVISION REV.

DATE 9-28-10 10-04-10

6"

R.E.C.S. WALL SECTION : 10' SCALE 1"=1'-0"

6

R.E.C.S. WALL SECTION : 16" SCALE 1"=1'-0"

L-6.0 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

5

COMMENT

6"

6"

6"

11-09-10 Matthew Evans

8" TYP

6"

R.E.C.S. WALL SECTION : 8', 12'

DATE: DRAWN BY: CHECKED BY:

EQ.

8" TYP

6"

SCALE 1"=1'-0"

2%

HEIGHT VARIES SEE GRADING PLAN

BOLT ASSEMBLY AS SPECIFIED

EQ.

4

12"

HEIGHT VARIES SEE GRADING PLAN

EQ.

HEIGHT VARIES SEE GRADING PLAN

APPROX. 6"

8" TYP

8" TYP

17

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

3. 4.

HEIGHT VARIES NOT MORE THAN 32 HEIGHT OF WALL

4"

AFTER GLUING AND BOLTING PANELS TOGETHER SEAL EDGES WITH CLEAR WATERPROOF CAULK 1.

RECYCLED CONCRETE BLOCK WALLS VARIOUS SIZES.

10'

RECYCLED CONCRETE BLOCK WALLS VARIOUS SIZES.

PEACE STREET PARK

D

615 W. PEACE STREET, RALEIGH NC

B

10 FOOT SINGLE 2 UNITS TOTAL


INTERESTS WORK EXPERIENCE Design Build: 2 years working in design and installation of fine residential gardens

Entrepreneurship & Graphic Design: DaSilva coffee, part-owner and brand designer.

18


PROJECT LEADERSHIP Design Build: Materials and Logistics, Syme Hall Raingarden Design-Build Studio, North Carolina State University, Summer 2010 FINAL DESIGN LID STUDIO SUMMER 2010 Estimates of Probable Cost

TAX ID# 400021

8/13/10 1 of 2

Wed

Thu

Fri

07

08

09

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Thu

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

1 day ?

A.

LID Construction Clearing/Grubbing

Rough Staking

HARDSCAPES

DESCRIPTION QUANTITY UNIT Conveyance channels 71 LF x 1.5'W x 2" Crushed Agg.- ABC thick compacted approx 1.7 CY per ton 1 CY Total for project Glass Agg. 4 ton = .5 CY Concrete pavers 150 LF

PRICE per UNIT

TOTAL ESTIMATE

1d

L.T.

Delivery of Rubble (Arboretum)

SUPPLIER

PURCHASED BY

TOTAL PAID

Dry-Stack Wall Prep Rubble

$30.00 $200.00 $0.00

Triangle Landscape $30.00 Supply delivery? 5 yd min. may include all the $800.00 Strategic Materials channels $0.00 NCSU $0.00

3.62 days

Robert / Dingo

1.14 months ?

Rough Grading

1.3 weeks

Stack / backfill wall

1.15 weeks ?

Lay / compact base

1.2d?

Rent gravel Compactor

2.12 days

Delivery of Edging pavers

for concrete separators Manhole cover

80# bag of concrete

Formwork

0 1 80# bag

$5.00

$0.00 Lowes

T.F.M.R.

Delivery of Gravel

1 day

Fine Staking

R.B. 2.5 days

D.T.

3 days

L.T.

Delivery of Stalite

Concrete 300psi Fly Ash 20% Concrete Delivery Bender Board Wood- Form

Tie wire stakes

1.3 CY 1 5 boards fee

1 roll = 300' 100 EA

$125.00 $100.00 $60.00 $0.00

$3.80

Thomas Concrete: 5yd + free delivery $162.50 ($100 for less) 1 day $100.00 $300.00 $0.00

$3.80 Guaranteed Supply

Fine Grading/Amendment

Matt E. 7-22, full order

$415.50

14-Jul Nate

$185.40

$137.75

$0.35

$35.00 Guaranteed Supply

Andy hardware run

4 EA = 20' 1 CY 1

$3.95 $12.50

$15.80 Guaranteed Supply $12.50 Wake Stone $4.00 Lowes

Matt 7-20

Nails

1 5 lb box

$10.00

$10.00 Guaranteed Supply

Screws Caulk - Silicone outdoor Glass Agg.

1 box

$10.00

$10.00 Guaranteed Supply

A.; P.T.

Concrete Pour/Drying

NATE Guarantered 19-Jul Supply Run

#3 rebar ABC Crushed Agg. 2x4's

1 week 1 day

D.T.; A.

Cistern Base pour / 5000 psi

6h

Finish Hardscaping

4 days

Lay base

2 days ?

edging

$54.00

D.T.; A.

Conveyance Channels

1.5d?

glass cullet place Place Cistern

1 day

Install Raingarden Media

50 SF X 4" BASE

1 day ?

Plantings Till compost

2 days

Plant/ mulch

31 SF x 4" Retaining Wall 90 LF x 2' T

Concrete Rubble

90 LF x 2.5' w x 6" Crushed Ag. -Base d compacted ABC- 1.7 CY p ton 65 LF x 2' Filter Fabric commercial landscape fabric Stone Fines

2 tubes 0 ton 425 LF

$7.00 $200.00 $0.00

$14.00 Lowes $0.00

2.3 weeks

Deliver Mulch Water plants Install new gutter

3.4 weeks 4h

Brick repair of walkway

.4 CY

2 weeks Target Finish Install gravel

$0.00 City of Raleigh $0.00

Deliver gravel Robert dig trench for light

2.75 CY

$12.50

65 SY

$0.65

1 YD

$30.00

$34.38 Wake Stone Atlantic soil & $42.25 mulch Atlantic soil & $30.00 mulch

delivery?

Punch List

1 week Install Light

Matt 7-20

$42.50

Matt 7-20

$30.00

R.B.

ACTUAL FINISH Ribbon Cutting

Project Budget

As part of a design-build studio taught by Andrew Fox, I was given the opportunity to manage the budget and logistics for implementing a student-designed project on

Project Time Line

NCSU’s campus. I worked with a team of 4 people over a 5 week construction schedule. The project was finished on time and under budget.

Winner of a Tri-State ASLA award (GA, SC, NC)

19


INTERESTS AREAS OF INTEREST Design that supports energy-use reduction & environmental stewardship Design & development strategies that make a project more environmentally and economically efficient through the creative application of technology, re-use of materials (up-cycling). Design that focuses on environmental remediation and restoration and also human interaction with the environment to support education, natural learning and human as well as environmental health. Storm management strategies that reduce runoff and reduce pollutants entering our drinking water resources, streams, and estuaries.

Defensible design using applied research. Using qualitative and quantitative research methods to make design decisions. This includes behavior mapping, surveys, questionnaires, interviewing, community design charrettes. Using GIS for mapping and relating data to geographic space to produce a more complete understanding of a site’s issues and potential.

Context sensitive design.

In addition to site analysis, creative exploration using modeling, sketching, and abstractions to create a design that is both intrinsic to its environment and shows artful expression from the designer. Through an understanding of a site (its ecology, geography, history, sociology, & physiography) to turn it into a place highlighting its beauty and value to its users.

20


ACADEMIC INITIATIVE SHIFT: journal 2010 & 2011: Student-produced, peer-reviewed academic journal. SHIFT is an effort by the students of the NCSU chapter of the ASLA to produce a peer-reviewed journal featuring the best student research, writing, and design by students from around. An ambitious goal, the first edition of SHIFT was published in the Fall of 2010.

shift: infrastructure

TEAMWORK COLLABORATION MANAGEMENT RESEARCH WRITING THEORY

The second edition is underway, for which I am serving as the editor. This project has taught me about project management, successfully working with others, and pulling together a quality product with limited time and budget.

Winner of a Tri-State ASLA award 2011 for Communication

2010

SHIFT: infrastructure

CURRENT WORK AND INTERESTS FOR FUTURE STUDY

Current Work

Interests for Future Study

• Working toward a certification in GIS applied in landscape architecture. • Independent research looking at potential new business models for landscape architecture • Applied research: Robin Moore’s methodologies in studying human use of the urban landscape.

• • • • •

Urban / re-urban design including suburban retrofits Ecological design: storm water, ecological restoration Environments for human health Public space: parks, greenways, green infrastructure Participatory design

21


INTERESTS AWARDS WINNER NCSU ASLA 2011 Bench Design Competition Project to the Right

WINNER Tri-State ASLA Award for Communication

1

SYME HALL SEATING SYSTEM TEAM: DAVID PEARSON, MATTHEW EVANS Design Values As we developed our schematic designs for a seating system, we outlined values important to the design.

Schematic Development

We developed three schematically different alternatives for seating spaces.

1.

1. The seating should reflect the values of the Syme Hall Rain Garden: • Low Impact Design: through material choices. • Support education about storm water in the environment 2. The seating should enhance the outdoor environment for students. 3. The seating should accommodate persons with mobility challenges, such as persons in a wheel-chair. 4. The seating should support a variety of social seating alternatives, • A person sitting by themselves • A small group of 2-3 people together • A large group of people

2.

Schematic Sketch

3.

Page 21

SYME HALL SEATING SYSTEM TEAM: DAVID PEARSON, MATTHEW EVANS

WINNER Tri-State ASLA Syme Hall Rain Garden Page 19

Conceptual Sketch

Anthropometric measurements were obtained from databases. Popliteal and lower back heights were calculated using a “Design for Mean” approach - the mean of the 50th percentile of male and female popliteal heights determined seat height. This approach made certain the design met ergonomic standards.

22

2


3

SYME HALL SEATING SYSTEM TEAM: DAVID PEARSON, MATTHEW EVANS 3 Person Bench: Located in front of garden feature.

2 Person Bench and 1 Person Stool

3 Person Bench: View of the back of the sunshade

This competition was open to all students at the NC State School of Design and was adjudicated by professors and university representatives. This bench will be built and installed behind Syme Hall at NC State University, Summer 2011

23


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.