PORTFOLIO OF WORK Spring 2011
Matthew N. Evans, ASLA
MLA Candidate 2012 NC State University Dept. of Landscape Architecture
In
Des INTRODUCTION ign P Grap roce s h s i c s Mod el B uildi Con stru ng ction nter ests Doc um This portfolio of work has been assembled to showcase design work completed during the first half of my academic tenure in the Master’s of Landscape Architecture program at North Carolina State University. First and foremost, this portfolio demonstrates my design process in abstract and as applied in a studio project. Secondly, it showcases specific technical abilities such as graphics & photography, model building, and construction documentation. Beyond these topics, this portfolio includes information about my background, skills that I am currently developing, and academic interests that I plan on developing.
e
CON ENTS
1 Proc ess 6 Grap hics 12 Mod els 14 Con truc tion Doc ume 18 nts Inte r Sket
chbo
Exa
ok to
mpl
Stud
es of
y mo
Dem
dels
oliti
on t
Rese ests arch , Wr
work
and
o De
,
truc
tion
usin
g
lase
tails
iting
cons
r cu
t
AL
•
•
•
ES
polo g y Dia g ram
ES
FEA TUR
TION
ING
MO DEL
IDEA
AND
TUA L
The his ing 10 toric/ sin ways ’-20’ usua gle-story facing lly. Th home Auto mobil the stree e fronts of s have a typ es ar t e park with pede the home ical setb Most ack s ha ed on str the sid ian acce ve wind from th face of the bu e ro ss ow park e or ing. Th sinesses behin directly to s, porche ads, with d the s, e pede in the th The build e sidew and door strian area ar hig ing. alk sy e lar acce of pu h-rise bu ge stem. ss 1blic ou is avail story ild able, tdoo ings offer bu r spac but se ildings hig hsu e. Pa cond rking density liv ary to rrounded is us ing by th at fo large en ually f the unde vironme auto surrgroun nt, mobil d, an but not e. d pe ve destr ry much ian ac cess in the wa is pr imar y y.
ING
TCH
ric /
Busi ness
Highrise
d Ty
ADE
NM
MA
Sing le St ory Hou Surr se ound ed by Park / Hig ing h-de Surf nsity ace Hou Park si ng ing SITE 2
Histo
2
Neig hbo rho o
SITE
This is a summary of my design process for my construction studio project during the Fall of 2010. Each ‘layer’ of the graph shows benchmarks in my process.
SKE
0
t 201
23 A ugus
s 21 &
IS; site visit
nty G
Sour ce: W ake C ou
LYSI S
CON CEP
Su rface flow • • St Piped flow orm drain p curb Juncti inlet on bo x
• • • • p
• Si te 2 fa (Neu lls with in se stream river tri the Pigeo butary n Br s or • W ater fl mapped ) and in anch dra cl in flood ows nort from plai udes no age basin hw pere Neare est; NO high po n. nnial N along st storm E is inte ints locate drain rcep Boyl d with • W te ater p an Avenu inlets are d by sto in 500 fe e and rm a ools a sout John bout 300 drains. et t he son St feet along ast corn the east e s re er ou dg th Bran Johnson and flow e of the et. St ch w ithou reet. St s overla site, exi ts v nd or t any treatm mwater r to a stor ia the each m ent. es Pig drain eon
ROL OGY
HYD
FEA TUR
ANA
2 NAT UR
PROCESS
ER
A-5
C-3
1
FOOT
7.5%
C-5
SWAL E
B-1
INE
OUTL
A-7
C-4
DECK
10
C/S-
OTER
A-19
G FO
A-6
OTER
G FO
PILIN
18
A/S-
BW-1
LE
A-9
BACK DRAI OF WAL N OU L TLET A-8
D-2
B-2 C-6
G FO OTER
PILIN
ODUC T
L PR
IONA
A-10
17
A/S-
SK ED UCAT
BW-2
TAIL
E DE
RENC
REFE
C-7
16
A/S-
TODE
AN AU
PILIN
TW-2
. GR ADIN GT AB
TW-1
.C.S
R.E
C-8
A-11
D-3
A/S15
DESK
AUTO
C-9
A/S14 A/S13
D-4
G
1.
AL
D
GRA
EQ.
EQ.
. 6"
10
APPR OX
EQ.
EX SHAL POSED BO L BE CAP LT PED H SEE EIGHT GRAD VAR IES ING PLAN
"=10 '
5
Ø4"
4" MI
N
10
N
3" MI
2%
12"
TYP
0
8" TY P
20
LK
EWA
SID
D
8 FO O 20 U T DOU BL NITS TOTA E L
3
PER F.
PI
IED
ECIF
AS SP
FOR PE OUTL AS SP ET SE ECIF IED E LCOM 3.0 PAC WIT TED H A
BLY
ASSE M
0
L-3.
.)
ENT
N
ISIO COMM
P HE
RE
DATE 9-28-1 10-04 0 -10 11-16 -10
SEE
2
MATT HEW LAR N. EV 50 FOX, 3 STUD ANS IO DELC FALL AMBR 2010 E
PRO
16 FO 4 UN OT TRIP ITS TOTA LE MAY L FRO BE COM M BINED COM SHOR TE PON ENTS R
OX.
APPR
HEIG H GRAD T VAR IES ING
6"
2%
16'
EQ.
EQ.
DO COM N MODU PO LAR 8', 12 NENT ', OR 16'
BASE
R.E .C.S LE 1 . WAL /2"= L 8', 1'-0" 12', SCA
EQ.
12 FO 12 U OT DO UBL NITS TOTA E L
EQ.
EQ.
4" 6"
3 9.0
K FRAM E
AL PR
#4 REB
NY ™ DEC 4"X6 " STEE KING L JOIS T AR IN FOO TER
KEBO
L DEC
TION
4"X6 " STEE
UCA
DEC T FOU K SUP NDA PORTED TION SYST BY CRU EM SHE D BRIC K UND AGGREG ER DEC ATE K TYP. DEN
PEN
K ED
INDE
DES
AUTO
6"
6"
MET H ARE ODS FO THE RC N
CH
NT
2'MA
1'
X
ELEV ATI O
ALL
DW
FRO
OUN
E AR
SWAL
1"=1'0"
R.E .C.S . BEN E SCAL
2% M INIM UM
3
1'
8"
N
1'-6"
FINIS
L ATTA
K , OR
KING
DEC
K
GRA
DE
OX.
6" APPR
IVAL
EQU
ENT
KS
ENT
T
WOO
S CA
BEN
OR
T
EQU IVAL CH SUP POR
D BEN CH, STEE L FIN STEE
E TEN E TEN
COR
KEBO NY™
COR
3 8"
3 8 "
2
ENT
24"
WITH
EQU IV. DEC E K
KEBO STEE L DEA NY™ CK FRAM OR
10'
RAIN MAX GARDEN 2:1 SLOP SOIL E AWA MIXTURE Y FRO AS M FOO SPECIFIED TER
UCED
1 6.0
PROD
R.E.C EDG .S. CUT E OFF EDG SITE ES TO STAI . BE GRO NLES FOR UND SEC S STEE TO SMO L URE FIT. WASHER STEE OTH FILL S AS IN GAP CON L BRACKE REQ CRE S WITH UIRE T TO TE BLOC SEC GRO D CON KS TO URE UT. CRE FOR TE FOO FOO RECYCLE BRA TER D TER CKE T ATTA WITH SHE CHE J-BOLTS R RUN MEN INSE T AGG RTED REG ATE PAC 90% TED COM FILL PAC SOIL TION COM
CRU
L PLAT 7.0 E INSE 18" STAI RT TO BE NLES CUT S STEE AND L FILE BOLT TO D AFTE REC BIND YCLE R INST BLOC D CON KS ALLA CRE TION OF CON TE BLOC CRE TE K FRO M SIDE WAL K
R.E .C.S L E 1 . WA LL 1 /2"= 1'-0" 0'
, OR
CKE
IVAL BRA
EQU CHM ENT
SEA T BAC STEE
L JOIS T FOR NY™ DEC
STEE
HED
E TEN
NY™
KEBO
COR
1 4"
512 "
6"
16"
HEIG H GRAD T VAR IES ING PLAN
8"
1'-8 1
8"
COR E FRO TEN STEE M REC YCLE L FINE D CON EXTR CRE UDED TE BLOC
3 4"
KEBO
3
6"
112 "
STEE REC L BRACKE YCLE D BLOCT FOR K TO MOUNTIN FOO TER G
1"
1 4"
1 34 "
18"
SEE
2"
T
4"
ODU C
REC YCLE HEIG VAR HT VA IOU D CONC S SI RIES ZES. RETE BL OCK 8" TY TOP P WAL SOIL1 R.E.C.S LS .B ASSC ALE SP 1"=1'- ENCH EC 0" SEC IFIE BOLT D TIO ASSE N MBL Y AS SP COM ECIF PAC IED 90% TE COM D AGG PAC R TION EGATE WIT H FI NES
Y AN
ED B
TS DUC
UME N HEIG H GRAD T VAR IES ING NOT PLAN MOR HMa E EIG9-2 4-201 THAN 2 HT tthew 0 OF Evan s WAL 3 L
AM E ST
SEE
PLAC
DATE DRAW: CHEC N BY: KED BY:
REV REV.
.C.S
(R.E
16'
12'
C& C/S
DOC
THE
EA GRAD CH R.E. C. E SH ALL S. COMP BE DE ONEN TE AT TH RMINEDT IS PO INT
REC YCLE D CO 2% M NCR ETE INIM BLO UM #57 CK SWAL W BAC ASHED E AR KFIL L FO AGGREG OUND W R DR ALL AT TOP AINAG E SOIL E AS SP ECIF IED BOLT
40
TE
AT
2
OVE
Y 32 AB
TEL
D ALK
H SE
WIT
2
SIDEW
2
RETE
10 FO 2 UN OT SIN G ITS TOTA LE L
CRE
GR1 ADNRIOE-USED N T TG EXIS O SC PAL T LEA SCA N ING CON LE 1
6"
LOG
ING Eros ion co NOT any ntrol10' ES gr to be Botto ading pr epar impleme m ation nted finish of wall and/ and prior ed gr ele or gr to Any ade ad plan eleva vations dis refer ing. with tio the La crepanc n. to actio ies nd sc to n is taken ape Arch be discu . ss itect befor ed e an y
B
1
LOG FINISHSECTION ED GR REST APPR ADE. OXIMA
AFTE R SEAL GLUIN EDG G AND ES W BOLT 1. ITH ALL CLE ING PA EDG NEL AR W IN O ES TO ATER S TOG 2. R ET PRO ALL DER TO BE CU OF C HER H AULK DRIL OLES FOACHIEVET WITH 3. LED R AS A SM STONE ALL O FF SE SAW 4. W MBL OOTH IF M ALLS TOSITE. Y TO EDG ORE ES. BE BE CON C TRAC ONCRET ASSEM SOU BL TOR E IS ED O R SH NEE RE-U CE OF DED FF SITE CO ALL FI SED . CON MPARAB ND AN , CRET LE G OTHER E SL AB. RADE O F
3.
2.
1
.C.S . ISTING LE GEN CONC
1 A/S AN MOUN D C/S DE TED ABOVNOTE R.E E .C.S
D
C
B
A
R.E
RE-US ED EX
1-4
L-6.0
LEG BW END BOTT TW OM TOP OF W TC OF W ALL TOP BC AL OF CU L BOTT LP RB OM LOW OF CU HP POIN RB RIM T GH AHI& POIN TOP A /ST OF DR 323 AIN PROP (323 ) PROP OSED SP 8' OT EL EXIS OSED CO EVAT TI ION PROP NG CO NTOUR NT PROP OSED CO OUR EDGE OSED SL NTOUR OP BIO- OF PROP E RETE NTIO OSED DE N OV CK ERFL OW GEN DRAI N ER
GRA DIN
BW-2
ION GRAD E ME EX. SIDE ETS WAL K
BW-1
ODUC T
IONA L PR
TAB LE
EDUC AT
TW-2
UCT
1
L-6.0
BY AN
.C.S . GR ADIN TW-1 G
R.E
PROD UCED
T
ONEN
COMP
GRA PHIC S
G
DIN
DEL S&
MO R.E. C.S.
A-12
PROD UCED BY
-20
ENT
CON STR
MPON
S. CO
R.E. C.
DIG ITAL
CT
GRA
PEA
615
TIC
S
CE
W. P EA
H NC
EMA
K LEIG
SCH
ED B
PAR
TRE ET
, RA
EET
UCT
DUC
T
CE S TR
PROD
PRO
ODU L PR ONA CATI EDU ESK TOD Y AN AU
ODUC AL PR
NAL
ATION
ATIO
EDUC
EDUC DESK
DESK
AUTO
AUTO
BY AN
BY AN
UCED
UCED
PROD
PROD
1 34 "
1"
518 "
1'
1 4"
6"
1 34 " 1 4"
5 34 "
3"
ATION
COR
EDUC
AL PR
ODUC
EQ.
1'
EQ.
1'-6"
3/8"
5 78 "
8"
418 "
3"
8" TY
SCAL TEN FI E1 1/2"=1 '-0"
DESK
2
AUTO
618 "
BY AN
PROCESS
TS MEN ION D OCU UCT STR CON
DIG IT
AL M ODE
LS &
ING RAD IC G EMA T SCH
AND ING TCH SKE
GRA P
LING MO DE
TION IDEA UAL CON CEP T
S LYSI ANA
strictly linear fashion. This allowed for a stronger integration of each phase of the design. It also allowed me to address the complexities of the site while maintaining a strong design concept.
HICS
This graphic abstracts my overall process for my construction studio project. While there were distinct phases of developing the design for the studio, I did not continue through each phase in a
Diagram: This diagram is an abstraction of my process used during my studio project Fall 2010 4
TODESK EDUCATIONAL PRODUCT
Mock-up: Testing materials and design through fabrication. Kebony® , Steel, & Concrete. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
KEBONY™ WOOD BENCH, OR EQUIVALENT 3 8"
3 8
CORE TEN STEEL FIN BENCH SUPPORT
2 7.0
" CORE TEN STEEL PLATE INSERT
18" STAINLESS STEEL BOLT TO BIND BLOCKS OF CONCRETE TO BE CUT AND FILED AFTER INSTALLATION
16" 6"
RECYCLED CONCRETE BLOCK FROM SIDEWALK
In developing a detail for my construction studio project. I revisited some of my early conceptual ideas as well as central themes of the final design. Using digital modeling and sketching, and AutoCAD, I developed a design for a bench. To take the design one step further and to test the strength and comfort of the bench, I made a full scale mock-up of a key COR TEN FIN BENCH SUPP 2 SCALEpoint. connection 1 1/2"=1'-0" 112°
4"X6" STEEL DECK FRAME KEBONY ™ DECKING
18"
4"X6" STEEL JOIST
R.E.C.S. CUT EDGES TO BE GROUND TO SMOOTH EDGE OFF SITE.
8" 6" APPROX.
#4 REBAR IN FOOTER
STAINLESS STEEL WASHERS AS REQUIRED FOR SECURE FIT. FILL IN GAPS WITH GROUT.
2"
3 9.0
STEEL BRACKET TO SECURE RECYCLED CONCRETE BLOCKS TO FOOTER
DECK SUPPORTED BY INDEPENDENT FOUNDATION SYSTEM
CONCRETE FOOTER WITH J-BOLTS INSERTED FOR BRACKET ATTACHEMENT
CRUSHED BRICK AGGREGATE UNDER DECK TYP.
6"
CRUSHER RUN AGGREGATE 90% COMPACTION
6"
COMPACTED FILL SOIL RAIN GARDEN SOIL MIXTURE AS SPECIFIED MAX 2:1 SLOPE AWAY FROM FOOTER
512" 4"
1'-818"
24"
1 6.0
1'-57 8"
1'-31 4"
84°
118° 2" 151°
105°
1'-112"
90°
R.E.C.S. BENCH SECTION SCALE 1"=1'-0"
158°
1'-101 4"
90°
1
81
100°
5
3'-4
GRAPHICS The following graphics are examples of from a variety of projects utilizing various techniques. Some show the mechanics of a design, while others are meant to convey an emotional character of the space. Not all graphical elements shown were used in presentations, many of my drawings or models help me understand a site, a problem, or convey a possible solution to teammates in a group project.
O-RETENTION AND PUBLIC SPACE
1
Perspective: SketchUp Model and Photoshop 2
3
2
1
PERSPECTIVE
REFERENCE PLAN
2
LOGS INOCULATED WITH MYCELIUM AND FUNGI
SECTION
RE-USED CONCRETE RETAINING STRUCTURES
Perspective: SketchUp Model and Photoshop BIO RETENTION GARDEN
GRADE DROPS BELOW DECK
6 SHELTER STRUCTURE
3
Perspective: SketchUp Model and Photoshop
Section: SketchUp Model and Photoshop 7
GRAPHICS
Plan Graphics: AutoCad, SketchUp, Photoshop, & Hand Rendering 8
Perspective: AutoCad, SketchUp, Photoshop, & Hand Rendering 9
10 Pencil Sketch: Umstead Park
Pencil Sketch: Lake Johnson
Pencil Sketch: Player’s Retreat
Pencil Sketch: Ilex opaca
GRAPHICS
This highly conceptual piece was produced for the inaugural edition of “SHIFT� an academic journal produced by the NCSU student ASLA. This graphic is composed on two facing pages and one page of vellum in between as an overlay. When the center page is turned, the image and its message is modified.
Adobe PhotoShop: Conceptual art for SHIFT: journal 11
MODELS Modeling, along with sketching and diagramming, is an important part of my design process. Both physical and digital modeling allow me to explore design alternatives in three dimension, generating new alternatives, and refining concepts.
Study Models: Used from conceptual to technical design.
12
Using AutoCAD to create a complete draft of the design, laser-cut models can be made quickly and with a high degree of precision. The model to the left is from a second semester project.
Laser-cut Model: Final Design
13
CONSTRUCTION DOCUMENTATION Demolition to Detail: After completing a conceptual design, I generated a set of construction drawings for the project. This set can be made available upon request. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
R.E.C.S. GRADING TABLE R.E.C.S. COMPONENT
TW-1
TW-2
R.E.C.S. LEGEND
R.E.C.S. GRADING TABLE
BW-1
R.E.C.S. COMPONENT
BW-2
TW-1
TW-2
BW-1
BW-2
RE-USED EXISTING CONCRETE SIDEWALK
1-4
L-6.0
A
1
B
1
EACH R.E.C.S. COMPONENT GRADE SHALL BE DETERMINED AT THIS POINT
2 2
MATTHEW N. EVANS LAR 503 STUDIO FOX, DELCAMBRE FALL 2010
C D
1
2
A/S AND C/S DENOTE R.E.C.S WITH SEAT MOUNTED ABOVE
LOG
1
L-6.0
8.3% MAX SLOPE A-19 A/S-17 A/S-15
C/S-10
A/S-14 A/S-13
A/S-18
PILING FOOTER
A/S-20
BW TW TC BC LP HP RIM
BOTTOM OF WALL TOP OF WALL TOP OF CURB BOTTOM OF CURB LOW POINT HIGH POINT TOP OF DRAIN
323 (323)
PROPOSED SPOT ELEVATION PROPOSED CONTOUR EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SLOPE EDGE OF PROPOSED DECK BIO-RETENTION OVERFLOW DRAIN
A/S-16
PILING FOOTER
PILING FOOTER
PILING FOOTER
GENERAL GRADING NOTES
C/S-11
1.
A-12
DECK OUTLINE
2. D-4 A-11
C/S-1
3.
Erosion control to be implemented prior to any grading preparation and/ or grading. Bottom of wall and elevations refer to finished grade elevation. Any plan discrepancies to be discussed with the Landscape Architect before any action is taken.
E
ER
P
DATE: DRAWN BY: CHECKED BY:
C-8 D-1
BACK OF WALL DRAIN OUTLET
A-3
A-1
B-1 C-4
C-3 A-4
REV.
A-10 D-3 B-2
C-7
COMMENT
DATE 9-28-10 10-04-10 11-16-10
C-6
C-2 A-5
GRADE MEETS EX. SIDEWALK
9-24-2010 Matthew Evans
REVISION
A-8 A-6
ST
P
C-9
A-2
H
AM
E
C LA
C-5
A-7
A-9 D-2
7.5% SWALE
GRADING PLAN SCALE 1"=10' PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
14
10 5
0
10
20
40
L-3.0
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
GRADING LEGEND GRADE MEETS EX. SIDEWALK
615 W. PEACE STREET, RALEIGH NC
REFERENCE DETAIL
PEACE STREET PARK
LOG SECTION REST APPROXIMATELY 32 ABOVE THE FINISHED GRADE.
Documents Generated: Existing Conditions, Demolition Plan, Materials Plan, Grading Plan, Planting Plan, Layout Plan, Planting Details, 6 Details (3-6 drawings each). PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PLANT SCHEDULE
SHRUB AREAS
COMMON NAME / BOTANICAL NAME
CONT
CAL
5
Downy Serviceberry / Amelanchier arborea Multi Trunk
15 gal
5
Cryptomeria / Cryptomeria fortunei
B&B
2.5"Cal
2
Swamp White Oak / Quercus bicolor
B&B
2.5"Cal
5
Autumn Gold Bald Cypress / Taxodium distichum `Autumn Gold`
B&B
3"Cal
QTY
COMMON NAME / BOTANICAL NAME
CONT
2,693
Cast Iron Plant / Aspidistra elatior
FLAT @ 3" OC
5,864
Giant Spiral Rush / Juncus effusus `Unicorn`
FLAT @ 4" OC
SHRUBS
QTY
COMMON NAME / BOTANICAL NAME
CONT
6
Cleopatra Camellia / Camellia sasanqua `Cleopatra`
2 GAL
3
Buttonbush / Cephalanthus occidentalis
5 GAL
6
Dwarf Red Twig Dogwood / Cornus sericea `Alleman`s Compact`
5 GAL
79
Inkberry Holly / Ilex glabra `Shamrock`
3 GAL
14
Winterberry Holly / Ilex verticillata `Sparkleberry`
3 GAL
52
Red Switch Grass / Panicum virgatum `Praire Fire`
1 GAL
GROUND COVERS
QTY
COMMON NAME / BOTANICAL NAME
CONT
3,462 sf
Watersaving Blend of Tall Fescue / Festuca arundinacea `Watersaver Blend`
seed
902
Cream Iris / Iris cristata
flat @ 12" oc
3,495
Poverty Rush / Juncus tenuis
flat @ 6" oc
4,659
Mondo Grass / Ophiopogon japonicus `Silver Mist`
4"pot@ 6" oc
1,134
Royal Fern / Osmunda regalis
flat @ 12" oc
163 sf
Tree Oyster Mushroom / Pleurotus ostreatus INSERT PLUGS INTO LOGS ACCORDING TO SPEC.
Plug
MATTHEW N. EVANS LAR 503 STUDIO FOX, DELCAMBRE FALL 2010
PEACE STREET GENERAL NOTES
Camellia sasanqua `Cleopatra` TYP
1.
UE
Ophiopogon japonicus `Silver Mist` TYP
3.
N BOYLAN AVEN
4. Ilex glabra `Shamrock` TYP Juncus effusus `Unicorn` TYP
3 L-5.1
Juncus tenuis TYP Iris cristata TYP
Osmunda regalis TYP
Aspidistra elatior TYP
Pleurotus ostreatus TYP
Festuca arundinacea TYP
Cornus sericea `Alleman`s Compact` TYP
Quercus bicolor TYP
Taxodium distichum `Autumn Gold` (4)
PROPERTY LINE
LIMIT OF WORK
Ilex verticillata `Sparkleberry` TYP
Panicum virgatum `Praire Fire` TYP
4 L-5.1
All planting to conform to the standards set forth by the American Association of Nurserymen and written specifications. Plant qualifications, locations and size to be approved in the field, prior to installation. Areas not delineated by plant symbol and/or label shall be mulched with 4" of hard-wood mulch according to specifications. All plants shall be watered after planting according to specifications
1 L-5.1
E
ER
P
H
AM
2 L-5.1
E
C LA
ST
P
DATE: DRAWN BY: CHECKED BY:
10-01-10 Matthew Evans
Cryptomeria fortunei (5)
REVISION REV.
COMMENT
DATE 10-04-10 11-15-10
PLANTING PLAN SCALE 1"=10'
10 5
0
10
20
40
L-5.0
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
2.
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Amelanchier arborea TYP
615 W. PEACE STREET, RALEIGH NC
QTY
PEACE STREET PARK
TREES
15
CONSTRUCTION DOCUMENTATION PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
GENERAL DECK DESIGN NOTES
3. 4. 5. 6.
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
MATTHEW N. EVANS LAR 503 STUDIO FOX, DELCAMBRE FALL 2010
DECK LAYOUT PLAN SCALE 1"=1'-0"
3
PIN FOUNDATION SECTION SCALE 1"=1'-0"
E
ER
P
H
AM
CE
ST
A
PL
DATE: DRAWN BY: CHECKED BY:
4
11-09-10 Matthew Evans
PIN FOUNDATION PLAN SCALE 1"=1'-0"
REVISION REV.
COMMENT
DATE
11-16-10
2
DECK LAYOUT ENLARGEMENT SCALE 1/4"=1'-0"
5 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
16
PIN FOUNDATION CONNECTION ENLARGMENTS SCALE 3"=1'-0"
L-9.0
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
1
All specifications of decking shall be approved by Structural Engineer and by Landscape Architect Installation of Kebony™ or equivalent product shall be according to manufacturers specifications. Alternate material shall be approved by Landscape Architect prior to purchase of material by contractor. Contractor must provide material sample and specifications to any alternate decking product. All fasteners shall be stainless steel. All decking shall be perpendicular to steel beams.
615 W. PEACE STREET, RALEIGH NC
2.
PEACE STREET PARK
1.
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
A & A/S
C & C/S 8 FOOT DOUBLE 20 UNITS TOTAL
8'
MATTHEW N. EVANS LAR 503 STUDIO FOX, DELCAMBRE FALL 2010
12 FOOT DOUBLE 12 UNITS TOTAL 12'
16 FOOT TRIPLE 4 UNITS TOTAL MAY BE COMBINED FROM SHORTER COMPONENTS
10' 16'
BASED ON MODULAR COMPONENT 8', 12', OR 16' HEIGHT VARIES SEE GRADING PLAN NOT MORE THAN 32 HEIGHT OF WALL
6"
EQ.
HEIGHT VARIES 8" TYP
2.
1
EQ.
ALL EDGES TO BE CUT WITH STONE SAW IN ORDER TO ACHIEVE A SMOOTH EDGES. ALL HOLES FOR ASSEMBLY TO BE DRILLED OFF SITE. ALL WALLS TO BE ASSEMBLED OFF SITE. IF MORE CONCRETE IS NEEDED, CONTRACTOR SHALL FIND ANOTHER SOURCE OF COMPARABLE GRADE OF RE-USED CONCRETE SLAB.
EQ.
RE-USED EXISTING CONCRETE SIDEWALK (R.E.C.S.) NOT TO SCALE
2
TOP SOIL AS SPECIFIED
HEIGHT VARIES SEE GRADING PLAN
TOP SOIL AS SPECIFIED 8" TYP
BOLT ASSEMBLY AS SPECIFIED
EQ.
COMPACTED AGGREGATE WITH FINES 90% COMPACTION
COMPACTED AGGREGATE WITH FINES 90% COMPACTION
EQ.
R.E.C.S. WALL 8', 12', 16'
3
SCALE 1/2"=1'-0"
R.E.C.S. WALL 10' SCALE 1/2"=1'-0"
2% MINIMUM SWALE AROUND WALL
2% MINIMUM SWALE AROUND WALL
METHODS FOR CONSTRUCTION ARE THE SAME AS IN DETAIL 1. NO BINDING BOLTS TO BE APPLIED FOR 10' SECTIONS ONLY. SEE REFERENCE DIAGRAMS.
METHODS FOR CONSTRUCTION ARE THE SAME AS IN DETAIL 1. 16 FOOT SECTION SHALL BE 3 SECTION OF CONCRETE THICK. SEE REFERENCE DIAGRAMS.
RECYCLED CONCRETE BLOCK 2% MINIMUM SWALE AROUND WALL #57 WASHED AGGREGATE BACKFILL FOR DRAINAGE
APPROX. 6"
APPROX. 6"
3" MIN
TOP SOIL AS SPECIFIED
2%
EXPOSED BOLT SHALL BE CAPPED
4" MIN
2%
12"
Ø4" TYP EQ.
PERF. PIPE AS SPECIFIED FOR OUTLET SEE L-3.0
EQ.
E
ER
P
8" TYP
H
AM
CE
ST
A
12"
PL
COMPACTED AGGREGATE WITH FINES 90% COMPACTION
Ø4" TYP
Ø4" TYP EQ.
REVISION REV.
DATE 9-28-10 10-04-10
6"
R.E.C.S. WALL SECTION : 10' SCALE 1"=1'-0"
6
R.E.C.S. WALL SECTION : 16" SCALE 1"=1'-0"
L-6.0 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
5
COMMENT
6"
6"
6"
11-09-10 Matthew Evans
8" TYP
6"
R.E.C.S. WALL SECTION : 8', 12'
DATE: DRAWN BY: CHECKED BY:
EQ.
8" TYP
6"
SCALE 1"=1'-0"
2%
HEIGHT VARIES SEE GRADING PLAN
BOLT ASSEMBLY AS SPECIFIED
EQ.
4
12"
HEIGHT VARIES SEE GRADING PLAN
EQ.
HEIGHT VARIES SEE GRADING PLAN
APPROX. 6"
8" TYP
8" TYP
17
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
3. 4.
HEIGHT VARIES NOT MORE THAN 32 HEIGHT OF WALL
4"
AFTER GLUING AND BOLTING PANELS TOGETHER SEAL EDGES WITH CLEAR WATERPROOF CAULK 1.
RECYCLED CONCRETE BLOCK WALLS VARIOUS SIZES.
10'
RECYCLED CONCRETE BLOCK WALLS VARIOUS SIZES.
PEACE STREET PARK
D
615 W. PEACE STREET, RALEIGH NC
B
10 FOOT SINGLE 2 UNITS TOTAL
INTERESTS WORK EXPERIENCE Design Build: 2 years working in design and installation of fine residential gardens
Entrepreneurship & Graphic Design: DaSilva coffee, part-owner and brand designer.
18
PROJECT LEADERSHIP Design Build: Materials and Logistics, Syme Hall Raingarden Design-Build Studio, North Carolina State University, Summer 2010 FINAL DESIGN LID STUDIO SUMMER 2010 Estimates of Probable Cost
TAX ID# 400021
8/13/10 1 of 2
Wed
Thu
Fri
07
08
09
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
1 day ?
A.
LID Construction Clearing/Grubbing
Rough Staking
HARDSCAPES
DESCRIPTION QUANTITY UNIT Conveyance channels 71 LF x 1.5'W x 2" Crushed Agg.- ABC thick compacted approx 1.7 CY per ton 1 CY Total for project Glass Agg. 4 ton = .5 CY Concrete pavers 150 LF
PRICE per UNIT
TOTAL ESTIMATE
1d
L.T.
Delivery of Rubble (Arboretum)
SUPPLIER
PURCHASED BY
TOTAL PAID
Dry-Stack Wall Prep Rubble
$30.00 $200.00 $0.00
Triangle Landscape $30.00 Supply delivery? 5 yd min. may include all the $800.00 Strategic Materials channels $0.00 NCSU $0.00
3.62 days
Robert / Dingo
1.14 months ?
Rough Grading
1.3 weeks
Stack / backfill wall
1.15 weeks ?
Lay / compact base
1.2d?
Rent gravel Compactor
2.12 days
Delivery of Edging pavers
for concrete separators Manhole cover
80# bag of concrete
Formwork
0 1 80# bag
$5.00
$0.00 Lowes
T.F.M.R.
Delivery of Gravel
1 day
Fine Staking
R.B. 2.5 days
D.T.
3 days
L.T.
Delivery of Stalite
Concrete 300psi Fly Ash 20% Concrete Delivery Bender Board Wood- Form
Tie wire stakes
1.3 CY 1 5 boards fee
1 roll = 300' 100 EA
$125.00 $100.00 $60.00 $0.00
$3.80
Thomas Concrete: 5yd + free delivery $162.50 ($100 for less) 1 day $100.00 $300.00 $0.00
$3.80 Guaranteed Supply
Fine Grading/Amendment
Matt E. 7-22, full order
$415.50
14-Jul Nate
$185.40
$137.75
$0.35
$35.00 Guaranteed Supply
Andy hardware run
4 EA = 20' 1 CY 1
$3.95 $12.50
$15.80 Guaranteed Supply $12.50 Wake Stone $4.00 Lowes
Matt 7-20
Nails
1 5 lb box
$10.00
$10.00 Guaranteed Supply
Screws Caulk - Silicone outdoor Glass Agg.
1 box
$10.00
$10.00 Guaranteed Supply
A.; P.T.
Concrete Pour/Drying
NATE Guarantered 19-Jul Supply Run
#3 rebar ABC Crushed Agg. 2x4's
1 week 1 day
D.T.; A.
Cistern Base pour / 5000 psi
6h
Finish Hardscaping
4 days
Lay base
2 days ?
edging
$54.00
D.T.; A.
Conveyance Channels
1.5d?
glass cullet place Place Cistern
1 day
Install Raingarden Media
50 SF X 4" BASE
1 day ?
Plantings Till compost
2 days
Plant/ mulch
31 SF x 4" Retaining Wall 90 LF x 2' T
Concrete Rubble
90 LF x 2.5' w x 6" Crushed Ag. -Base d compacted ABC- 1.7 CY p ton 65 LF x 2' Filter Fabric commercial landscape fabric Stone Fines
2 tubes 0 ton 425 LF
$7.00 $200.00 $0.00
$14.00 Lowes $0.00
2.3 weeks
Deliver Mulch Water plants Install new gutter
3.4 weeks 4h
Brick repair of walkway
.4 CY
2 weeks Target Finish Install gravel
$0.00 City of Raleigh $0.00
Deliver gravel Robert dig trench for light
2.75 CY
$12.50
65 SY
$0.65
1 YD
$30.00
$34.38 Wake Stone Atlantic soil & $42.25 mulch Atlantic soil & $30.00 mulch
delivery?
Punch List
1 week Install Light
Matt 7-20
$42.50
Matt 7-20
$30.00
R.B.
ACTUAL FINISH Ribbon Cutting
Project Budget
As part of a design-build studio taught by Andrew Fox, I was given the opportunity to manage the budget and logistics for implementing a student-designed project on
Project Time Line
NCSU’s campus. I worked with a team of 4 people over a 5 week construction schedule. The project was finished on time and under budget.
Winner of a Tri-State ASLA award (GA, SC, NC)
19
INTERESTS AREAS OF INTEREST Design that supports energy-use reduction & environmental stewardship Design & development strategies that make a project more environmentally and economically efficient through the creative application of technology, re-use of materials (up-cycling). Design that focuses on environmental remediation and restoration and also human interaction with the environment to support education, natural learning and human as well as environmental health. Storm management strategies that reduce runoff and reduce pollutants entering our drinking water resources, streams, and estuaries.
Defensible design using applied research. Using qualitative and quantitative research methods to make design decisions. This includes behavior mapping, surveys, questionnaires, interviewing, community design charrettes. Using GIS for mapping and relating data to geographic space to produce a more complete understanding of a site’s issues and potential.
Context sensitive design.
In addition to site analysis, creative exploration using modeling, sketching, and abstractions to create a design that is both intrinsic to its environment and shows artful expression from the designer. Through an understanding of a site (its ecology, geography, history, sociology, & physiography) to turn it into a place highlighting its beauty and value to its users.
20
ACADEMIC INITIATIVE SHIFT: journal 2010 & 2011: Student-produced, peer-reviewed academic journal. SHIFT is an effort by the students of the NCSU chapter of the ASLA to produce a peer-reviewed journal featuring the best student research, writing, and design by students from around. An ambitious goal, the first edition of SHIFT was published in the Fall of 2010.
shift: infrastructure
TEAMWORK COLLABORATION MANAGEMENT RESEARCH WRITING THEORY
The second edition is underway, for which I am serving as the editor. This project has taught me about project management, successfully working with others, and pulling together a quality product with limited time and budget.
Winner of a Tri-State ASLA award 2011 for Communication
2010
SHIFT: infrastructure
CURRENT WORK AND INTERESTS FOR FUTURE STUDY
Current Work
Interests for Future Study
• Working toward a certification in GIS applied in landscape architecture. • Independent research looking at potential new business models for landscape architecture • Applied research: Robin Moore’s methodologies in studying human use of the urban landscape.
• • • • •
Urban / re-urban design including suburban retrofits Ecological design: storm water, ecological restoration Environments for human health Public space: parks, greenways, green infrastructure Participatory design
21
INTERESTS AWARDS WINNER NCSU ASLA 2011 Bench Design Competition Project to the Right
WINNER Tri-State ASLA Award for Communication
1
SYME HALL SEATING SYSTEM TEAM: DAVID PEARSON, MATTHEW EVANS Design Values As we developed our schematic designs for a seating system, we outlined values important to the design.
Schematic Development
We developed three schematically different alternatives for seating spaces.
1.
1. The seating should reflect the values of the Syme Hall Rain Garden: • Low Impact Design: through material choices. • Support education about storm water in the environment 2. The seating should enhance the outdoor environment for students. 3. The seating should accommodate persons with mobility challenges, such as persons in a wheel-chair. 4. The seating should support a variety of social seating alternatives, • A person sitting by themselves • A small group of 2-3 people together • A large group of people
2.
Schematic Sketch
3.
Page 21
SYME HALL SEATING SYSTEM TEAM: DAVID PEARSON, MATTHEW EVANS
WINNER Tri-State ASLA Syme Hall Rain Garden Page 19
Conceptual Sketch
Anthropometric measurements were obtained from databases. Popliteal and lower back heights were calculated using a “Design for Mean” approach - the mean of the 50th percentile of male and female popliteal heights determined seat height. This approach made certain the design met ergonomic standards.
22
2
3
SYME HALL SEATING SYSTEM TEAM: DAVID PEARSON, MATTHEW EVANS 3 Person Bench: Located in front of garden feature.
2 Person Bench and 1 Person Stool
3 Person Bench: View of the back of the sunshade
This competition was open to all students at the NC State School of Design and was adjudicated by professors and university representatives. This bench will be built and installed behind Syme Hall at NC State University, Summer 2011
23