MJ Lee 2019 Selected Works

Page 1

L E E 李 M AW 茂 J I A 嘉 selected works 2010 - 2019



李茂嘉 MAW JIA LEE + EMAIL mawjialee@gmail.com + TEL +44 (0) 7 493 123 503 + WEB www.mawjia.com

Board of Architects Malaysia (LAM) Pt I + Pr II Royal Institute of British Architects (RIBA) Pt II

WORK EXPERIENCE JUN 2018 - MAR 2019 (10 mos) PT TWO ARCHITECTURAL DESIGNER •

BOYES REES ARCHITECTS

Involved mainly in RIBA Stages 1, 2 and 3, across sectors which include commercial and residential developments in the UK

JUL 2017 - SEP 2017 (3 mos) PT TWO ARCHITECTURAL ASSISTANT •

JOHN BULCOCK DESIGN UNIT

• •

ARCHICENTRE

KUALA LUMPUR, MY

Completed 7 mixed-used masterplanning proposals and various high-end residential developments; assisting directors by assembling materials (diagrams, drawings, models, feasibility study, etc) for client-facing presentations. Involved and managed a luxurious clubhouse development in Hanoi, Vietnam from inception until near-completion. Involved in two high-end low-rise residential parcels in Puteri Harbour, Malaysia from inception until advanced tender stages before projects were kept-in-view.

JAN 2013 - APR 2013 (4 mos) ARCHITECTURAL INTERN •

KUALA LUMPUR, MY

Short-term contract to assist in tender and construction drawings for a large-scale factory project in Penang, Malaysia

MAR 2014 - JUN 2015 (15 mos) PT ONE ARCHITECTURAL ASSISTANT •

LONDON, UK

ZLG DESIGN

KUALA LUMPUR, MY

Assisted in developing construction drawings, physical models and computer-generated models

EDUCATION 2017 - 2018 • Master of Architecture (Conversion)

GLASGOW SCHOOL OF ART

GLASGOW, UK

2015 - 2017 • Post-Graduate Diploma in Architecture

GLASGOW SCHOOL OF ART

GLASGOW, UK

2010 - 2013 • Bachelor of Science in Architecture • Cumulative GPA, 3.22/4.0 • Bauhaus Summer Programme • ARCASIA Conference Presenter

TAYLOR’S UNIVERSITY

KUALA LUMPUR, MY

ACHIEVEMENTS 2017

SHEPPARD ROBSON SUSTAINABILITY AWARD

2016

KUALA LUMPUR CITY HALL DESIGN COMPETITION

2013

MALAYSIAN INSTITUTE OF ARCHITECTS DESIGN COMPETITION

SKILLS COMPUTER SKILLS • ADVANCED AutoCAD, SketchUp, Photoshop, InDesign, Microsoft Office, Lightroom, Flow Design • INTERMEDIATE Rhino, Illustrator, Premiere, After Effects, Vasari, Artlantis • ENTRY Revit, 3DsMax, Lumion LANGUAGES • FULL WORKING PROFICIENCY English, Chinese (Mandarin), Malay • INTERMEDIATE PROFICIENCY Chinese (Cantonese)

WINNER COMMENDATION THIRD


GLASGOW The Glasgow School of Art Dip Arch 2015 - 2017 M Arch 2017 - 2018

LONDON Boyes Rees Architects Part-II Architectural Designer 2018-2019

Byfleet

Sutton Coldfield

Kingston

Birmingham Rd Apartments Stage 1-2

Lidl Retail Store Stage 2-3

Wo r c e s t e r

Lidl Retail Store Stage 1

The Butts Student Housing Stage 1

London

Leominster

Rye Lane Apartments Stage 2-3

Lidl Retail Store Stage 1

Newport Lidl Retail Store Stage 1

Swansea

Lidl Mottingham Store Stage 3-4 Restaurant Story Stage 1-2

Jockey St Student Housing Stage 2-3

Blackheath Homes Stage 0-1

Cardiff

William Road Tower Stage 0-1

Guildford Crescent Tower Stage 0-1

Street

Brighton

Cranhill Road Homes Stage 1-2

Royal Mail Delivery Office Stage 1-2

Camberley

Portsmouth

Council Site Masterplan Stage 1

London Rd Apartments Stage 2

PRACTICAL EXPERIENCE Commercial Mixed-Use Residential Student Housing Masterplanning Office


K l a n g Va l l e y ParkCity Clove Masterplan Feasibility and Concept Phase Santuario Masterplan Feasibility and Concept Phase Puchong Festival City Masterplan Feasibility and Concept Phase Eco Majestic Masterplan Feasibility and Concept Phase Phun Private Residence Concept - Technical Design Phase UEM Serene Heights Terraces Concept Phase “Cocoon” the Homeless Shelter Ideas Design Competition

KUALA LUMPUR Taylor’s University B(Sc) Arch 2010 - 2014 ZLG Design Architectural Intern 2013 Archicentre Part-I Architectural Assistant 2014 - 2015 Design Unit Part-II Architectural Assistant 2017

Hanoi

Lenggong

ParkCity Clubhouse Concept - Construction Phase

Visitor Centre Ideas Design Competition

Phnom Penh

Penang Hotayi Electronics Factory Construction Phase

Nusajaya Estuari Gardens 2B + 2C Masterplan Feasibility - Technical Design Phase UEM Southern Corridor Office Tower Feasibility and Concept Phase

Kota Kinabalu SP Setia Aeropod Concept - Design Development Phase

PRACTICAL EXPERIENCE Masterplanning Residential Mixed-Use Civic Recreational Industrial Commercial Office

NagaWorld FBO Terminal Design Development Phase

Ho Chi Minh SP Setia District 7 Masterplan Feasibility and Concept Phase



PA R T O N E PA R T T WO

01 02 03 04 05 06

P U C H O N G F E S T I VA L C I T Y M i x e d - U s e M a s t e r p l a n P r o p o s a l i n K u a l a L u m p u r, M a l a y s i a Archicentre, Kuala Lumpur

H A N O I PA R K C I T Y C L U B H O U S E U p s c a l e R e c r e at i o n a l Fa c i l i t y i n H a n o i , Vi e t n a m Archicentre, Kuala Lumpur

SANTUARIO Naturopathy Centre and Markethall in Madrid, Spain Mackintosh School of Architecture, Glasgow

B I R M I N G H A M R O A D A PA R T M E N T S Residential Development in Sutton Coldfield, UK B oye s R e e s A r c h i t e c t s , Lo n d o n

L O N D O N R O A D A PA R T M E N T S Mixed-Use Extension + Conversion in Portsmouth, UK B oye s R e e s A r c h i t e c t s , Lo n d o n

R E S TA U R A N T S TO R Y M i c h e l i n - s t a r R e s t a u r a n t E x t e n s i o n i n C e n t r a l Lo n d o n , U K B oye s R e e s A r c h i t e c t s , Lo n d o n


-

the

formative

years

PA R T O N E KUALA

LUMPUR

201 0- 201 5

-


-

the

mentors

-

Taken from ‘The Prestige’ magazine, January 2015 issue, where I was photographed together with two influential men who have helped lay out the building blocks of my architectural career. Mr Tony Liew (centre) is the dean of the School of Architecture, Building and Design at Taylor’s University. He was the man responsible for nurturing my world-view on architecture and design with his tutelage, and even selected me on behalf of Taylor’s University to be part of the Bauhaus Summer Programme in Dessau, Germany for a month-long workshop, which consequently opened my eyes to Western architecture and modern history. Dr Tan Loke Mun (right) is the director of Archicentre and DTLM Architects; a respectable man who has served the architectural industry in Malaysia with tremendous integrity. I was fortunate enough to be taken under his wing, to serve as an apprentice for about a year and a half, working closely on a wide-variety of projects. Beyond architecture and design, he taught me to honour my profession, always display modesty and be courageous, which helped me develop into not just a better designer, but also a better man.


01 P U C H O N G F E S T I VA L C I T Y M i x e d - U s e M a s t e r p l a n P r o p o s a l i n K u a l a L u m p u r, M a l a y s i a Archicentre, Kuala Lumpur

Project Information Client // Mah Sing Group (Malaysia) Gross Development Value // USD 950mil Total Land Size // 88 Acres Nett Floor Area // 12.3mil ft2

Key Responsibilities • • • • • • •

Produced Graphics, Diagrams and Presentation Drawings Produced Computer 3D Model Coordinated CGIs with Rayspace (China) Coordinated 1:2000 Model with Technibuilt (Malaysia) Tabulated Development Composition Compiled Design Document Attended Presentation to Mah Sing’s Board of Directors



T H E

D E S I G N

P R O C E SS

01 The Principle

02 The Districts

Establishing that an iconic tower will act as a pivot and a central park to provide for communal amenities and vista opportunities.

The edges are defined by roads which create a demarcation of districts. The client’s brief begins to feed into the planning process.

03 The Objects

04 The Networks

The proposed tower blocks which consider the views, daylighting and orientation arrayed radially around the central park.

Connectivity between public and private spaces, and the hierarchy of linkages begin to take shape with emphasis on the park.

05 The Massing

06 The Integration

With all the urban elements considered, the architecture begins to define itself more clearly by floor area and setback constraints.

The final draft illustrating a fully-integrated township with extensive landscaping.


The Masterplan

Key Section


PARC E L F RETAI L & OF F IC E PARC E L E H OT E L & S E RV IC E D APART ME NTS PARCEL G RETAIL & OFFICE

PARC E L J

PARC E L D

RE TAI L & S E RV IC E D APART ME NTS

RE TAI L & OF F IC E

PARCEL H PARC E L C

RETAIL & OFFICE

PARC E L L PARC E L K RETAI L & S E RV IC E D APART ME NTS

RE TAI L & OF F IC E

RE TAIL & S E RV IC E D APART ME NTS

PARCEL L HOTEL & CONVENTION CENTRE

PARC E L A

PARC E L B

MAL L & S OVO

MAL L & S OVO

Parcel

Land Size (acres)

Plinth Size (sqft)

Total NFA (sqft)

Total GFA (sqft)

Car Parking Required

Motorcycle Parking

A

12.16

246,000

1,072,800

1,578,000

3,156

1,151

B

6.31

72,000

1,391,400

1,898,400

3,797

912

C

4.42

66,000

1,051,200

1,512,000

3,024

1,671

D

4.48

75,000

1,555,200

2,169,000

4,338

2,397

E

4.42

72,000

1,755,600

2,466,769

2,958

682

F

9.16

115,000

2,856,600

3,657,000

7,314

4,041

G

4.26

72,000

878,400

1,152,000

2,304

1,273

H

4.16

69,000

873,000

1,143,000

2,286

1,263

I

5.23

102,000

507,000

720,615

1,318

479

J

3.07

56,000

347,200

483,897

874

293

K

3.59

63,000

359,800

504,897

934

316

L

6.19

104,167

635,000

910,258

1,067

460

Total

67.45

1,112,167

12,283,200

18,195,837

33,368

14,939

Central Park

4.80

-

-

-

-

-

Total Land Size: 88.71 acres (3,864,208 sqft) Total GFA: 18,195,837 sqft Total Green Area: 10.34 acres (11,66% of land area) Overall Plot Ratio: 4.71


Outsourcing Render Expertise Given the tight time-constraint, visual production was outsourced to Chinese company, Rayspace to generate high quality renders and post-renders. Iterations and amendments to the SketchUp model had to be communicated to Rayspace as the proposal developed. Materiality, ambiance, landscaping, contextual details were also added by Rayspace to bring the visuals to a professional standard, which were then used for client-facing presentations.


Outsourcing Modeling Expertise To communicate the proposal effectively, Technibuilt was asked to create a 1:2000 scale physical model. Acrylic blocks with integrated LED lighting helped inform the massing of the scheme. Coordination was key in this process as time and cost of generating the model had to be carefully considered. The model was then delivered to the client’s office, and was used as a key design communication tool to inform our approach and intentions for the scheme.



02 H A N O I PA R KC I T Y C L U B H O U S E U p s c a l e R e c r e at i o n a l Fa c i l i t y i n H a n o i , Vi e t n a m Archicentre, Kuala Lumpur

Project Information Client // Perdana ParkCity Group (Malaysia) Gross Development Value // USD 40mil Total Land Size // 4.5 Acres Gross Internal Floor Area // 74,131 ft2

Key Responsibilities Schematic Design Phase • Formulated Concept and Preliminary Sketch Design • Produced Graphics, Diagrams and Presentation Drawings • Attended Regular Client-Consultant Meetings Design Development • Co-ordinate Design with Structural and M&E Engineers, Interior Designers and Landscape Architects • Attended Technical Meetings and Client Presentations Pre-Construction • Worked Together with Vietnamese Draftsmen and Technical Assistants to Produce Tender Drawing Packages Construction • Traveled to Hanoi, Vietnam to Document Work Progress



T H E

D E S I G N

June 2014 One of the earliest drafts which was set-out to achieve a ‘village-look’ to approach the scheme with pavilions with prism-like roofs as a reference to vernacular Vietnamese architecture.

July 2014 The prism roofs are toned down after engineer’s input on the practicality and cost. Therefore, a more tropical approach was taken, and landscaping has been placed as an emphasis to resolve the open spaces.

August 2014 A landscape consultant was engaged by the client, and provided extensive input on the open spaces. The main discussion of the architectural design revolved around the main pavilion and its climatic response to precipitation.

September 2014 The scheme matures as it becomes resolute after having regular technical meetings between all consultants. The client approves the design and the project enters the tender stage.

E VO LU T I O N


Indoor Pool

Outdoor Pool Kid’s Pool

Gym Main Pavilion Cafe

Car Park with Tennis Courts on Roof

Changing Room

Kid’s Room

Multipurpose Hall

The Masterplan

An Aerial Impression


Outdoor Pool The main outdoor feature of the scheme with provisions for 2 50m lanes accompanied by extensive landscaping, surrounded by decking area and barbecue pits.

Gym Building A large complex which adjoins to the Olympicsized indoor lap pool with ample open space at the front for large outdoor group activities such as linedancing and tai-chi.

Multipurpose Hall A double-volume building which features a running-track on the mezzanine and four badminton courts on the ground floor.


T H E

Ta s k

CO N ST R U C T I O N

Q4 2014

Q1 2015

P H AS E

Q2 2015

Q3 2015

Q4 2015

Substructure Construction Superstructure Construction (Including Infrastructure Works) Interior Works Landscaping

Site Visit Although most of the site supervision is done by the project architect in Vietnam, we still had to monitor the progress of the works and provide assistance where necessary. The entire duration of construction was 274 days, and the photographs above were taken during Q2 of 2015, where we recorded and documented the progress of the works. I left Archicentre shortly after the site visit to pursue my Part-II education.


T H E

CO M P L E T E D

P R OJ E C T

The ParkCity Club The new members-only clubhouse opened its door at the start of 2016 and have enjoyed considerable press coverage in Vietnam. The above images show the end product provided by Perdana ParkCity Group.



-

the

resilient

years

-

PA R T T WO ( S C H O O L ) GLASGOW 201 5- 201 8


-

# bringbac k Mac k

-

Throughout my time at the Glasgow School of Art (2015-2018), The Art School community has been constantly marred by the tragic fire that broke out in 2014. It was only from the devastation in 2014 had I only realised the amount of adulation and global influence The Art School had on the art community. The overwhelming support shown by people from all over the world, coupled with the tremendous resilience and the positive attitude shown by The Art School towards the ravage had helped instill a little Glaswegian patriotism in me, and I am very proud to call myself an alumni of the Glasgow School of Art despite these testing times. Unfortunately, it happened again in the summer of 2018 when the restoration of the Mackintosh Building was still ongoing, and I firmly believe that a personal experience within the historic walls of the Mackintosh building was not meant to be for me. Things were not looking great when I arrived, as I had to quickly adapt to the brutal Glaswegian climate which coincided when the Malaysian to British currency exchange rate was at its worst. Thankfully the experience as a student very much made up for it. The architecture studio was a creative and exciting space where plenty of creative influences and interesting exchanges have helped broaden my horizons. The studio has encouraged me to hone my craft and have an appreciation towards design theory, which helped significantly in improving my architectural representation and illustration techniques. Beyond the studio, I like to occupy my time attending workshops, Friday lectures given by guest speakers, symposiums, forums and exhibitions organised by The Art School, which kept me inspired and motivated to produce good works.


03 SANTUARIO Naturopathy Centre and Markethall in Madrid, Spain Mackintosh School of Architecture, Glasgow

Project Information Tutors // G. Massie & C. Sutherland Location // Plaza de la Cebada, Madrid Program // Civic (Health + Market) Total Land Size // 2.5 Acres Gross Internal Floor Area // 315,335 ft2

Awa r d 1.

Sheppard Robson Sustainability Award 2017

Publication 1. 2.

MacMag 42 Designing for Wellness


infirmary

cloisters

naturopathists

social spaces

stringer beams

plaza

mercado


1617

1875

1958

1

2017

2

3

1

4 3

2

4

Chronology |

Site was an open plaza turned open-air market and then later an enclosed market with a formerly adjoined indoor swimming pool.

Existing Fabric |

Many historical buildings remain, while the proposed site is dominated by a controversial six-domed indoor markethall.

nun rooms cloister

nun communal cloister

medicinal herb garden

hospital

Hospital La Latina |

Between 1499 and 1904, there was a hospital attached to a convent which had a large garden to grow medicinal herbs.

The City’s Sanctuary |

La Latina was an important place to seek refuge and medicine during the medieval period.


Macro Response

Defence Mechanism

The idea was to provide a platform for the various religious institutions nearby, such as colleges and churches to give support to the patients spiritually and mentally.

The two main streets are fended off by the two main walls to create a quiet and safe environment for patients, which can help in the healing process.

infirmary

+

plaza

m .0

32

market

+ 0m 6.

01

Returning the plaza back to the urban fabric and to rehouse the markethall to be more urbanresponsive.

02

Determining the maximum building height and slope to obtain adequate daylighting and not overshadowing neighbours.

03

04

05

06

Setting-up a grid system that allows for a logical approach to spatial planning.

The grid helps develop a serrated form, with modular patient cells that feature garden terraces to grow medicinal herbs.

Designing cloisters on each floor so that the patients, support staff and healers can access each other within reasonable distances.

The two main walls act as defence mechanisms from pollution and noise, while housing the healers, staff and social spaces.


Level 00 - Markethall

1. Algae Bioreactor Tubes to capture pollutants from SouthWest prevailing wind.

5. Fuel is used in the markethall for cooking and heating.

4. Water and biomass stored to be used as fertiliser in the herbal terraces. 2. Reverse turbines act as scrubbers to collect carbon residue.

3. The clarifier separates byproducts via density, which are fuel, water and biomass.

Carbon Capture in Europe’s Most Polluted City


Level 01 - Healing Spaces

Inpatient Environment


New Plaza de la Cebada

New Mercado de la Cebada

M e d i c i n a l Te r r a c e s

Cloisters



-

t he

living

lab

-

PA R T T WO ( WO R K ) LONDON 201 8- 201 9


-

s u rviving

the

c risis

-

- A Nation Divided - Economic Uncertainty - The Failure of Western Democracy - and synonymous headlines have populated the media after the historic 24 June 2016 referendum. It was not easy entering the job market during this period, because the political and economic uncertainty kept-on piling as the leave date drew closer. All this Brexit shenanigans, on top of the stringent migrant employment policies did damper my aspirations to work in the United Kingdom a little. However, after several interviews over the span of numerous months, I received an offer to join Boyes Rees Architects. Enticed by the prospect of exciting projects on offer and working in Central London, I started on 18 June 2018 as a Part-II Architectural Assistant. My experience with Boyes Rees Architects has been very fruitful for the most part, and I have worked on projects across different sectors, mostly in the Southern region of the United Kingdom. This has given me insight into the architecture and construction industry in the UK, particularly with regards to the planning process, building construction and building regulations. On top of that, London was a living lab; a global metropolis full of bustling life and industry. I took this opportunity to explore the city’s culture and heritage by regularly attending festivals and exhibitions, fully immersing myself into the social fabric of London. However, after nearly a year of living and working in London, I have decided to move onto a fresh new challenge.


04 B I R M I N G H A M R OA D A PA R T M E N T S Residential Development in Sutton Coldfield, UK B oye s R e e s A r c h i t e c t s , Lo n d o n

Project Information Client // Evolve Estates Ltd (UK) Gross Internal Floor Area// 10,237 ft2 Nett Floor Area // 8,087 ft2

Key Responsibilities • • • • •

Produced Graphics, Diagrams and Presentation Drawings Produced Computer 3D Model, CGIs and Post Renders Prepared Unit Layout and Accommodation Schedule Compiled Design Document Assisted in Producing Sketch Designs for Discussions with the Client



P R E -A P P

1

:

D E C E M B E R

A

B

A

B

Ty p i c a l F l o o r P l a n

2 01 8


133.57

v

Lobby

2 BR Apartment

Staircore

Lobby

2 BR Apartment

13711

124.90

Proposed Amenity Space

v

SAJ CM 24/5/89

1 BR Apartment

2575

2 BR Apartment

Staircore

Lobby

1 BR Apartment (Conv.of Existing) 1 BR Apartment (Conv.of Existing)

Studio

120.76

6430

v

Lobby

Bin Store

117.83

v

117.00 DATUM

v

134.01

v

Riser

Lobby

2 BR Apartment

Riser

1 BR 1 BR Apartment Apartment

2575

v

19542

23448

1 BR 1 BR Apartment Apartment

Lobby

2575

1 BR 1 BR Apartment Apartment

2575

2 BR 1 BR Apartment Apartment

25905

2 BR Apartment

2 BR Apartment 2575

1 BR Apartment

2575

3 BR Apartment

130.54

2 BR Apartment

13669

SECTION BB 3960

1 BR Apartment Undercroft Car Park

6430

Undercroft Car Park

118.21

v

3950

Car Park

1 BR Apartment

2575

2 BR Apartment

Access Road

Car Park

Riser

6022

Proposed Amenity Space

Lobby

1 BR 1 BR Apartment Apartment

2575

2 BR 1 BR Apartment Apartment

Access Road

124.91

118.21

v

v

124.91

v

Existing Commercial Unit

Existing Commercial Unit

133.57

v

2550 2750

v

2 BR Apartment

2596 2550

131.44

1 BR Apartment (Conv.of Existing)

2596

BoundaryBoundary Line Line

S e c t i o n A A’

1 BR Apartment (Conv.of Existing) 120.97

Line BoundaryBoundary Line

Staircore

v

Birmingham Rd SAJ CM

4350

Car Park

Undercroft Car Park

24/5/89

Access Road

2750

Staircore

2550

1 BR Apartment

v

2 BR Apartment

2596

2 BR Apartment

2575

1 BR Apartment

Lobby

2575

2 BR Apartment

2 BR Apartment

Staircore

2575

1 BR Apartment

19565

Boundary Line

Boundary Line

134.01

120.97

v v

117.00 DATUM

SAJ CM 24/5/89

117.00 DATUM

v

Section BB’ 0

4

2

8

6

12

10

16

14

20

18

20m Scale Bar

SECTION AA SECTION AA 0

4

8

6

12

10

16

14

20

18

14

2

20m Scale Bar

The client owns both the existing block, and the existing car park site; the client has advised the design team to put forward a proposal by utilising all usable space in the land in order to maximise the potential of the site. Hence, the design team developed a set of principles to adhere to during the design process. WHIL

8342

D E ROA

El Sub Sta

12a

20669

To ensure that the views of existing neighbours are not obstructed. This is done by making sure that there is at least an 18.0m setback from the window positions of neighbouring buildings. 2. To preserve the local foliage. There will be a minimum 8.0m setback from the annotation tree positions on the survey drawings. 3. To have an acceptable access for vehicles and services into the site. The existing car park site was re-planned to ensure that there are provisions for a minimum 6.0m carriageway, and strategy for loading. 4. To satisfy the number of car parking required for residents. By lifting the volume of the proposal off the ground to provide for a minimum of 3.5m clearance undercroft car park. 5. 67 To enhance the commercial value of the existing block. Adding another floor of flats, and using the large flat roof as a potential shared amenity space for both the existing and proposed blocks. 117.00 DATUM 2

10 8

DUKE STREET

(PH)

The Duke

Design Principle

8548

29918

20867

8165

6

Block B Developable Area

8312

2 to 4

134.01

9004

9004

1 BR 1 BR Apartment Apartment

1 BR 1 BR Apartment Apartment

43

1 BR Apartment Undercroft Car Park

1 BR Apartment

Undercroft Car Park

8084

Ceiling slope

Up Up

Access Road 6390

Access Road 6390

59

Shelter

Ceiling slope

1 BR BR 1 Apartment Apartment

Line BoundaryBoundary Line

2575

1521

2575 2575

Proposed 1.4m Dwarf Wall

2575 2575

1521

2575 2575

Up

37

Proposed 1.4m

BR 11 BR Apartment Apartment

2575

31

v

BR 11 BR Apartment Apartment

8879

1 BR BR 1 Apartment Apartment

Corridor Corridor Corridor Corridor Corridor Corridor

BoundaryBoundary Line Line

v

Block B 134.01 Developable 1 BR Area Floors Apartment Above

1 BR Apartment

1.

v

117.00 DATUM

HA

BIRMING

Shelter

v

26

to 20


P R E -A P P

2

:

F E B R UA RY

A

B

A

B

Ty p i c a l F l o o r P l a n

2 01 9


2575 2575

2 BR Apartment

2575

2 BR Apartment

v

24989

124.90

v

10756

120.76

v

117.83

v

117.00 DATUM

v

130.54

Access Road 6022

1 BR Apartment

3960

Access Road

Car Park

1 BR Apartment Undercroft Car Park

1 BR Apartment

6022

118.21

v

Undercroft Car Park

3960

Car Park

23448

118.21

v

v

124.91

v

Existing Commercial Unit Existing Commercial Unit

120.97

v

Birmingham Rd SAJ CM

1 BR 1 BR Apartment Apartment

124.91

24/5/89

1 BR 1 BR Apartment Apartment

SECTION BB 1 BR 1 BR Apartment Apartment

v

23448 25905

120.97

v v

117.00 DATUM

Birmingham Rd SAJ CM

1 BR Apartment

2550

2575 2575

2 BR 1 BR Apartment Apartment

v

130.54

2596 2550

2575

v

2575 2575

3 BR 1 BR Apartment Apartment

2 BR Apartment

2575

3 BR Apartment

25905

2596

BoundaryBoundary Line Line

131.44

BoundaryBoundary Line Line

v

S e c t i o n A A’

131.44

Birmingham Road

24/5/89

4350

Lobby

Car Park

Lift Core

Lobby Lobby

2 BR Apartment

2 BR Apartment

130.54

23495

Lobby

2 BR Apartment

Bin Store

Access Road 6022

3 BR Apartment

Lobby

v

Boundary Line

Boundary Line

131.44

117.00 DATUM

v

Section BB’ 0

2

4

6

8

10

12

14

16

18

20

2

4

6

8

10

12

14

16

18

20

20m Scale Bar

0

SECTION AA SECTION AA 20m Scale Bar

T8 -B1

T7 -C1

D

E ROA

100mm

T9 -C1

83

2.

T10 -C1

70

WHIL

4261

1.

y Off site Holl

T6 -C1

El Sub Sta

amore Off site Syc

After a session of design-led discussions with the client’s team, the key comments were as follows.

RL 125.91

3565

12a

3295 51

Developable Area

RL 124.70

43

Proposed 1.4m

1521

1 BR Apartment Undercroft Car Park

1 BR Apartment

Proposed 1.4m

1521

Undercroft Car Park

BoundaryBoundary Line Line

2575 2575 2575 2575 2575 2575 2575

1 BR 1 BR Apartment Apartment

2575

RL 123.01 RL 123.48

1 BR 1 BR Apartment Apartment

RL 126.68

37

1 BR 1 BR Apartment Apartment

Existing

Access Road 6390

The client’s feedback gave the design a stronger direction. Although the tree survey helped increase the develop-able area, but the number of units will decrease due to the fact that the client has advised against altering or adding to the volume of the existing block. However, the circulation, westeast orientation and undercroft car parking strategies were the strengths of the previous design exercise, and the client was happy to have these design features carried forward. Hence, the proposal was updated accordingly, by 1.

59 Shelter

T3 -C1

T2 -C1 T1 -C1

BoundaryBoundary Line Line

1 BR 1 BR Apartment Apartment

9004

v

1 BR Staircase to be 1 BR demolished Apartment Apartment

4806

1 BR 1 BR Apartment Apartment

134.01

1 BR Apartment

T12 -C1

v

94 52

2 to 4

134.01

4598

Corridor Corridor Corridor Corridor Corridor Corridor

RL 125.63

6

T4 -C1

Design Iteration

3008

1 BR Apartment

9004

Access Road 6390

117.00 DATUM

v

2.

v

121.19 121.15

121.13

Shelter 120.95

120.86

120.53

D

26

HAM ROA

120.62

117.00 DATUM

BIRMING

The trees were updated on the survey drawings, with better precision of the root and tree crown radii. The integration of the amenity space and addition of flats atop the existing building is structurally complicated and could be very costly.

19092

3105

31

2

29

RL 128.

4193

T13 -C1

27773

T11 -B1

RL 125.89

H5 -C2

RL 126.

10 8

DUKE STREET

RL 124.65

(PH)

The Duke

Feedback

67

Having at least 3.0m clearance from the crowns of the existing trees and clear from all roots. This widens the build-able area, allowing for a deeper unit layout. Separating the proposed block from the existing building, which decreases the amount of units per floor.

to 20


Residents’ Entrance

View from the Rear



05 LO N D O N R OA D A PA R T M E N T S Mixed-Use Extension + Conversion in Portsmouth, UK B oye s R e e s A r c h i t e c t s , Lo n d o n

Project Information Client // Evolve Estates Ltd (UK) Gross Internal Floor Area// 43,486 ft2 Nett Floor Area // 32,560 ft2

Key Responsibilities • • • •

Produced Graphics, Diagrams and Presentation Drawings Produced Computer 3D Model, CGIs and Post Renders Compiled Design Document Assisted in Producing Sketch Designs for Discussions with the Client



D E S I G N

D E V E LO P M E N T

Pre-App 1 : June 2018

Enhanced Design Principle

There were several concerns with the previous scheme, and the client highlighted that the access, aspect, balcony clearance and permeability needed to be addressed in order to proceed with the design development.

The principle was to firstly address the access into the site to service both the proposed and existing building, which creates a void that adds permeability and daylighting into the scheme. Also, a shared amenity space was provided.

Agreed Design Principle After several sketch designs and client’s feedback, a design resolution was derived. The total amount of development and unit numbers were agreed between the client and design team, and the scheme has successfully addressed all the previous client’s concerns.


P R E -A P P

2

:

JA N UA RY

Ty p i c a l F l o o r P l a n

2 01 9


Existing Block GIA 33,417 ft2

B - GIA 16,580 ft2

Level 00 - Commercial Space GIA 20,020 ft2 Level 01 - Consented Flats GIA 8,500 ft2 Level 02 - Consented Flats GIA 4,897 ft2

Level 01 - Studio, 1 & 2 Bedroom Units GIA 6,190 ft2 Level 02 - Studio, 1 & 2 Bedroom Units GIA 6,190 ft2 Level 03 - 1 & 2 Bedroom Units GIA 4,200 ft2

A - GIA 21,903 ft2

C - GIA 690 ft2

Level Level Level Level

Level 01 - 2 Bedroom Unit GIA 690 ft2

00 - Commercial Space GIA 5,866 ft2 01 - 1 & 2 Bedroom Units GIA 5866 ft2 02 - 1 & 2 Bedroom Units GIA 5866 ft2 03 - 1 & 2 Bedroom Units GIA 4,305 ft2

D - GIA 4,313 ft2 Level 03 - 1 & 2 Bedroom Unit GIA 4,313 ft2

B

A

D

C

Development At A Glance


View from Main Street

Regeneration of The Mall


Residents’ Entrance and Car Park

View from the Rear Car Park



06 R E S TA U R A N T S T O R Y M i c h e l i n - S t a r R e s t a u r a n t E x t e n s i o n i n C e n t r a l Lo n d o n , U K B oye s R e e s A r c h i t e c t s , Lo n d o n

Project Information Client // Chef Tom Sellers (UK) Extension Gross Internal Floor Area// 690 ft2 Existing Gross Internal Floor Area// 2,465 ft2

Key Responsibilities • • • • •

Produced Graphics, Diagrams and Presentation Drawings Produced Computer 3D Model, CGIs and Post Renders Assisted in Producing Sketch Designs for Discussions with the Client Compiled Design Document Assisted in Design and Access Statement (DAS) Document and Planning Package



T H E

D E S I G N

N A R R AT I V E

01 Existing Conditions

02 Client’s Brief

The existing restaurant is a single-storey building which falls under the Southwark Council’s Tower Bridge Conservation Area.

The client, owner and head chef Tom Sellers wanted to add another storey atop the existing restaurant to expand its seating capacity.

03 Facade Continuation

04 Pergola-Inspired

The existing timber cladding is a prominent feature, which was then accentuated by extrusion on both sides to act as a wall.

The idea was to join the cladding across the building, to create a series of pergola-like timber structures which function as both wall and roof.

0 5 Te r r a c e A r e a

06 Circulation

The setback volume of the extension created some external space which can function as a terrace which can add to the dining experience.

By incorporating a lift and staircase which can act as an aesthetic feature, circulation is made possible between the two floors.


D E S I G N

D E V E LO P M E N T

November 2018 One of the earlier drafts for the restaurant extension. There was a meeting with the client to discuss his concerns and to receive feedback, which were: 1.

The general principle of having a setback volume atop the existing building was agreed.

2.

The scale, massing and materiality was generally well-received.

3.

The team will work together with an interior designer to finalise the internal layout.

4.

The client requested that the design team explored an option where the timber cladding stops at balustrade level on the first floor.

We s t E l eva t i o n

February 2019 After several meetings with the interior designer and client’s review, a proposal was finalised to submit for planning. In terms of the design, the most significant changes were to the roof, which is more costeffective and less intrusive to the surrounding urban environment as compared to the timber pergola concept. The advantages of this design are that:

We s t E l eva t i o n

1.

Views are uninterrupted

2.

Cost-efficient

3.

Scale and mass less imposing to surrounding

4.

More facade articulation


X

X

First Floor Plan

7830

790

2165

2015

1200

3000

850

1100

3000

2126

Section XX’

2165


0

2

4

6

W e8 s t E l 10 evation

10m Scale Bar

0 10m Scale Bar

2

4

6

8

South Elevation

10


N i g h t V i e w f r o m To o l e y S t r e e t

View from The Square



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.