Selected work 2007-2011 Maxim Borshchevskiy
About I believe that an Architect must understand the relationship between space, form and function of the building. My initial goal is to obtain enough experience through professional practice to become a good architect. I want to use my knowledge of architecture to create well planed spaces and hopefully, aesthetically pleasing structures. I am currently studying at Taliesin, The Frank Lloyd Wright School of Architecture and I am in my second and final year pursuing my master of architecture.
Education Taliesin, The Frank Lloyd Wright School of Architecture Final Year M.Arch
Kazan State University of Architecture and Engineering Specialist Degree in Architecture. Specialization: Urban Planing
Table of contents Borshchevskie Residence 2010-2011 Olympic Museum in Athens 2010 Taliesin West New Studio 2009 The Kazan Water Port Renovation 2008
Professional Practice 2007-2011 Hand Rendering/ Sketches
Contact information
go back
Borshchevskie Residence 2010-2011
go back
Russia
Russia
Borshchevskie Residence 2010-2011 LocationTypeTotal site areaFloor area totalLiving areaBuilt up area-
Kazan, Russia Single Family Residence 2080 (0,51 acre) m2 427.5 m2 (4602 sq.ft.) 152.3 m2 (1639 sq.ft.) 235.6 m2 (2535 sq.ft.)
Software used: Graphisoft Archicad, Google SketchUp, Artlantis Studio, Adobe Creative Suite Gavrilkovo Settlement
1-STUDIO A: 29.9 m2
2-BATHROOM A: 2.8 m2
3-LOBBY A: 19.0 m2
4-HALLWAY A: 5.5 m2
5-BEDROOM A: 16.1 m2
9-BATHROOM
go back
A: 5.5 m2
10-BATHROOM A: 3.7 m2
11-BALCONY
Project details:
A: 8.7 m2
12-BALCONY A: 20.6 m2
- Connection with landscape through a series of outside terraces
13-GARAGE3 A: 8.7 m2
A: 3.8 m2
7-GALLERY A: 22.3 m2
8-MASTER BEDROOM A: 13.5 m2
14-GARAGE2 A: 44.9 m2
- Best views from the floor-to-ceiling windows
15-GARAGE1 A: 20.6 m2
16-DIESEL GENERATOR
- Passive solar gain through 2storied sun space
A: 4.6 m2
- South-north orientation provides natural ventilation - Use of unit system/ structural bays determine rhythm in composition - Dynamic rhythm of solid horizontal railings and vertical walls - Maximum transparency and privacy at the same time - Roof angles determined by prevailing winds - Protection from snow melt-effective drainage system - Visual connections between interior and exterior spaces
N
6-CLOAKROOM
Borshchevskie Residence 2010-2011
UPPER LEVEL FLOOR PLAN
1-GUEST ROOM
go back
A: 12.6 m2
2-GUEST ROOM A: 10.0 m2
3-BATHROOM A: 4.6 m2
4-CORRIDOR A: 4.8 m2
5-WINTER GARDEN-HALL A: 36.3 m2
6-KITCHEN-DINING ROOM A: 41.2 m2
7-LIVING ROOM A: 42.4 m2
8-TERRACE A: 141.4 m2
LOWER LEVEL FLOOR PLAN
1-MECHANICAL ROOM A: 9.9 m2
2-CORRIDOR A: 24.6 m2
3-SKIGEAR STORAGE A: 11.1 m2
4-LOCKER ROOM A: 5.3 m2
5-STORAGE/ LAUNDRY A: 8.1 m2
6-SHOWERS A: 6.1 m2
7-SAUNA A: 8.6 m2
8-TOILET A: 2.8 m2
9-MECHANICAL RM A: 2.8 m2
10-CHILLOUT
N
A: 15.3 m2
11-SWIMMING POOL A: 59.4 m2
BASEMENT FLOOR PLAN
Borshchevskie Residence 2010-2011
go back
Borshchevskie Residence 2010-2011
go back
Olympic Museum in Athens 2010 /In collaboration with Pranav Naik/
go back
Olympic Museum in Athens 2010
go back
Olympic Museum in Athens 2010 LocationType-
Athens, Greece Public, International competition for new Olympic museum Built up area 2803 sq.m Public Square 4226 sq.m Total program area 17097 sq.m Total built up area 12871 sq.m Site area 15000 sq.m
Acropolis
Acropolis Museum
Temple of Zappeion Zeus
Site
Parliament /Syntagma square
Panathinaiko Stadium
site photos - archmedium
Software used: Autodesk Revit, Autodesk Autocad, Artlantis Studio, Google SketchUp, Adobe Creative Suite
go back Ancient Olympics gallery - 1653 sq.m Kitchen 307 sq.m Toilets, AHU + maint. 82 sq.m Atrium
Mechanical Ancient Olympics gallery
408 sq.m
Shop - 100 + (96) = Modern gallery 2 Winter gallery Service core+toilets -
Kitchen
196 sq.m 1321 sq.m 1687 sq.m 140 sq.m
Floor area = 5698 sq.m
Mechanical
Olympic Museum in Athens 2010 Project details: -Building geometry juxtaposes the axial alignments with surrounding monuments, and bends and undulates to frame important landmarks and views. -The design of the building is leaner, stronger, and more "athletic," it pushes the limits of building construction. -The resultant "Exoskeleton" framework provides the structure of the building, thereby freeing up interior large open spaces.
Shop
Modern Olympics gallery 2
Winter Olympics Gallery
Level one plan
-Terraces on the second level open up the gallery space that provide visual connections to the square below and, more dramatically, framed views of the Acropolis, Zappeion, and Temple of Zeus.
Atrium Terrace Restaurant Temporary exhibit Audiovisual
-In the museum, visitors walk through the six galleries in chronological order, beginning with the Ancient gallery and proceeding on to the Modern wing and exiting through the shop.
Ancient Olympics Interactive area
-The building collects rainwater, which is reused in the pools, and has solar collectors on all south faces to provide shade and produce electricity to run the building.
Double height
Auditorium
Lobby
Double height
Restaurant Temporary exhibit Audiovisual Ancient interactive Toilets, AHU + maint. Lobby+Auditorium Modern gallery 1 Modern interactive Service core + toilets -
350 sq.m 420 sq.m 149 sq.m 830 sq.m 82 sq.m 624 sq.m 380 sq.m 1395 sq.m 140 sq.m
Built up area = 4370 sq.m
CafĂŠ
Terrace Modern Olympics gallery 1
Modern Olympics interactive area
Terrace
Level Two plan
-The exoskeleton structure is a series of rigid frames leaning into one another and tied together. -Seismic factors are mitigated by the use of two expansion joints. -The Athens Olympic Museum emulates the Agora and Stoa, recognizes the established neighboring monuments, and becomes a definitive Icon to the Olympic spirit, Greece, and the World.
go back
c
Lobby Hall Cloak room Shop Toilets Mechanical Auditorium Lobby Outdoor Café Shop - 96 + (100) = Administration Storage Restoration Building management -
+4.0
Leo
foro
s Va
cloakroom
s. O
lgas
+2.0
1136 sq.m 100 sq.m 40 sq.m 42 sq.m 60 sq.m 223 sq.m 194 sq.m
Olympic Museum in Athens 2010
96 sq.m 133 sq.m 474 sq.m 352 sq.m 35 sq.m
Hall Lobby shop mechanical Restaurant service area
+4.3
+1.4
+1.4
Public square +2.0
Auditorium lobby Outdoor Café
Primary structure Secondary structure Tertiary structure
Storage
Museum service area
Restoration
Restoration
ing Build ent agem
man
+1.4
Light steel roof
tou
Ardit
Admin +3.0
Structure+Floors
A’ Data Rigid Reinforced concrete frames + Precast beam + cavity floor slab system
Elec Water HVAC
structural concept
Plaza Level plan
Section bb’
Structural system
Expansion joints
go back
Olympic Museum in Athens 2010
go back
Taliesin West New Studio and Education Facilities 2009
go back
Situation N
Taliesin West New Studio and Education Facilities 2009 LocationTypeBuilt up area Public Square Total program area Total built up area Site area -
D C B A
Arizona, Scottsdale
Scottsdale, Arizona Educational Facility 2803 sq.m (30171 sq.ft.) 4226 sq.m (45488 sq.ft.) 17097 sq.m (184030 sq.ft.) 2871 sq.m (138540 sq.ft.) 15000 sq.m (161458 sq.ft.)
Software used: Google SketchUp, Graphisoft Archicad, Artlantis Studio, Corel Draw, Adobe Creative Suite
go back Taliesin West New Studio and Education Facilities 2009 Project details: - Composition based on three axes , based on existing Taliesin 16'x16' grid. - The orientation of buildings shading for interior spaces. All the openings are oriented to north- north-east and major mountain views: McDowell Peaks ,Thompson Peak and Sawik Mountains. - Three buildings composition. All three buildings are connected by the courtyard. The main path between two buildings is oriented to Sawik Mountains and ends with fountain. - Load bearing structure: glue-lam girders covered with metal/ concrete base/ metal plate connectors/ roof system- SIP panels for insulation, waterproof membrane, gravel roof / tinted glass skylights/self-sustaining walls/ masonry on the south- south west sides/ glass and SIP panels on north- north-east facing elevations
go back Taliesin West New Studio and Education Facilities N
Design Floor plan
50 '0 .0 "
A SECTION
24
Specification
12
23
A2 SECTION
5,754 sq ft 635 sq ft 1,347 sq ft 912 sq ft
A2 SECTION
0'
0.
0"
21
22
2
24
247 sq ft 921 sq ft 681 sq ft 457 sq ft 1,073 sq ft 517 sq ft 382 sq ft 473 sq ft
1 3
21
12
24
24
A1 SECTION
23
12
13 6'0. 0"
5
23
6
4
9
26 23
26
80'-0.0"
1 Main Studio space 2 Chill space 3 Lecture 81p. 4 Collaboration space 5 Chill space 2 6 Faculty Offices 7 Kitchen 8 Toilets 9 Classes 10 Admin. Office 11 Dean Office 12 Technical and storage 13 Exhibition area 14 Sun Cottage 15 Shop
26
12
26
29
7
F
A SECTION 26
25
8
24
27
27
14
13
DW
26
15
27
27
40'-9.6"
28
84°
27
26
19'-10.6"
11
10 55'-3.2" A1 SECTION
P P
0 10’ 20’
40’
0
50’
100’
go back
The Kazan Water Port Renovation / diploma project 2008
go back The Kazan Water Port Renovation / diploma project 2008 LocationType-
Russia
Russia
River Port
Kazan, Russia Multi-use/ commercial/ public center/ passanger terminal
Site areaBuild- up area totalHotel total floor areaHotel build-up area Hotel building volume-
10.8 he (26.6 acres) 15 600 m2 (167916 sq.ft.) 30 390m2 (327115 sq.ft.) 5 870 m2 (63184 sq.ft.) 109 760m3 (3876137 ft3)
Software used: Google SketchUp, Graphisoft Archicad, Artlantis Studio, Corel Draw, Adobe Creative Suite.
go back The Kazan Water Port Renovation / diploma project 2008 Project details: - design development project included addition of new functions to the existing River Port functionality, creating community spaces, new 4 star conference hotel and business center. - project included development of new transportation center, new parking structure and a multi-functional center which included new bus terminal, restaurants and cafĂŠ - project introduced new sustainability features and significantly increases vegetation and recreation facilities in the area - project focused on more detailed design for the hotel and conference center, spatial planing and composition of buildings in relationship to the surroundings
go back The Kazan Water Port Renovation / diploma project
Master plan legend 1- 4 stars Conference hotel 330 occupants/ 194 rooms 2- Conference hall 504 occupants 3-Existing River Port Main Terminal building and 87 rm hotel 4- 1330 occupants Business Center 5- River Port Administrative Building 9 12
6- Storage Building 13
7- Utility Building 10
8- Cleaning Facilities
21 14
17
9- 240 cars parking 11
10- 200 cars parking 11- Departure Pavillion, entertainment center, restaurant, 2 cafes 12- Passenger Terminal, fitness center
2 5
13- tram stop 14- bus stop 15- control building
6
16
20
16
16- outdoor terrace, recreation zones, cafes
7
3
17- shopping center
15
4
1 8
18- outdoor pool 19- central terminal zone
18
20- local routes terminal 19
21- cargo port zone порта
- buildings main entrances
go back
Professional Practice Borshchevskiy Mikhail Architectural Studio 2007-2011
Build projects. Commercial/ interior. 2007-2009
go back
7 000
кабинет директора
Г
кабинет зам.директоратепловой узел
5,9 м2
тех.пом
19,6 м2
2,0 м22,0 м2
10,2 м2
В
16,9 м2
7,5 м2
14,9 м2
ком. менеджеров
тепловой узел 2,5 м2
21 000 7 000
15,1 м2
1,9 м2 электрощит 2,3 м2
торговый зал 253,2 м2 11,3 м2
7 000
300 на 2 019
Б
17,7 м2
А
3,0 м2
151.034
151.015
151.015
7 000
151.060
151.015
151.015
151.015
7 000 21 000
7 000
151.048
1
2
3
4
Ground level floor plan
-Project: Borshchevskie apartment 2006-2008 -Location: Kazan, Russia -Project role: design, 3D rendering, BIM modeling, construction documents preparation, project meetings, on-site architect, materials selection, presentation materials preparation. -Software used: Graphisoft Archicad, Artlantis Studio, Google Sketchup
-Project: Retail and furniture exhibition center “Solo” 2006-2009 -Location: Kazan, Russia -Project role: 3D rendering, BIM modeling, presentation materials preparation. -Software used: Graphisoft Archicad, Artlantis Studio
Build projects. Residential. 2007-2011
1
1
go back 2
4 4*
5
11000 5000
2700
3000
Ж 3000
Ж 3300
Е 1500
Е ок-1 ок-4
Д
5500
дн-2 дв-2
дв-2 ок-4
2200
4000
ком отдыха 7,1 м2 3,0 м2
ГОСТИНАЯ 2 25,4 м
Г
ок-3
Г
ок-4
Х
16000 4500
дв-2
дв-1
ок-3
2
дв-1
В
ок-2 3000
дн-1 3000
В
ок-3
3,6 м2
13,1 м2
2
19000
КУХНЯ2 22,9 м
4500 16000
19000
дв-2
сауна2 3,4 м
дб-1
4,3 м2
СПАЛЬНЯ 10,4 м2
Б
Б 3000
3000
ок-1
А
А 1000
1000
1
5500
5500
1 300
11000
2
3
3
6 250
4
5
25 200 3 000
4 000
5* 5
6
3 000
4 000
7
3
1
1*
1
1
8
2 000
2 950
в-4
ок-3
ок-3
Л К
1 700
ок-1
1 600
К
1 300
1 400
Л
дн-3
И ок-1
дв-2 2 700
11,4 м2
52,1 м2
Е 17 000
барбекю
17 000 1 250
Д Г
5
ванная СПАЛЬНЯ 19,5 м2 дв-2 гардеробная 5,6 м2
ТЕРРАСА
4 000
дв-1
5
Ж
ок-1 ГОСТИНАЯ 43,8 м2
2
дв-1 дв-2
Х
В
Х
КУХНЯ 2 26,7 м
2
дв-1 0,9 м2 дв-1
13,8 м2
2 000
5 750
дв-1
ок-1
гараж 35,5 м2
ок-3
6 000
2 300
И
вг-2
2,3 м2 2,2 м2 ок-1
2 000
Б 2 000
Б ок-4 12,0 м2
А
А колодец для водяной скважины
3 000 25 200
3 000
1
4 000
6 000
колодец для канализации
2 950
4
6 250
2
1
3
2
3 2 000
4 2500
5
7
5
20600
6 15000 2 000
3500
8
7
8
2 000
9
2500
2500
18
3600
дн-2
4
Б
1
2700 ТЕРРАСА
16
Ж
ок-7
Е
18 29,9 м2
15,2 м2
дн-2
ок-7
39,2 м2
1200х2100 ГОСТИННАЯ
4
5
4800 6
1130 3170 2900 1130 54070 7
8
9
10
11
4930
4680
1260 2920
4150
ГАП
4930
Борщевский М.А
План 1 этажа
12
13
14
15
16
17
М 1-100
ПроектировалБорщевский М.А
Стадия ЭП
Лист
Листов
Д
архитектор Борщевский М.
2009
Г
1400х2100
Б
дн-2
С/У
дв-1
18,8 м2
ХОЛЛ
дв-1 ГАРДЕРОБ дв-1 2
дв-2
12,2 м2
3,9 м
2,1 м2
ДУШЕВАЯ дв-2
СПАЛЬНЯ дв-2
ок-4
8,8 м2
4,4 м2
дв-1
3,7 м2
С/У
В
9,3 м2
ок-4
2,3 м2
САУНА
2
4,6 м
2,7 м2
дв-2
ок-4
ок-4
дн-1
ок-4
2200
-Projects: Multi-storied apartments and single family residences / 2006-2010 -Project role: 3D rendering, BIM modeling, presentation materials and construction drawings preparation. -Software used: Graphisoft Archicad, Artlantis Studio, Autodesk Autocad
А
Х
8,7 м2
А 2300
2000
2000
Б
3
4810
2800
2
2900 1260
ок-4
КУХНЯ-СТОЛОВАЯ
ок-1
1000
1
4170
1200х2100
14000 10500 1200
4930
СОЛЯРИЙ
16,3 м2
28,1 м2 Жилой дом по ул.Касаткина
1400
16
39,8 м2
5500
29,9 м2
ок-7
1500
З
1300
17
1500
17
3600
2 000
2500
3500
2 000 15000
2 000
2500
2500
20600
1
2
3
4
5
6
7
8
9
go back
-Project: High-technology research facility in Naberezhnie Chelny design proposal / 2011 -Location: Naberezhnie Chelny, Russia -Project role: design, materials selection, 3D rendering, BIM modeling, presentation materials preparation. -Software used: Graphisoft Archicad, Artlantis Studio, Photoshop
Competition entries. 2007-2011
-Project: High density apartment complex design proposal / 2008 -Location: Kazan, Russia -Project role: design, spacial planning, building codes analysis, schematic design drawings, 3D rendering, BIM modeling, presentation materials preparation. -Software used: Graphisoft Archicad, Artlantis Studio, Corel Draw, Photoshop
go back
-Project: New apartment complex competition proposal / 2007 -Location: Kazan, Russia -Project role: design, space planing, 3D rendering, BIM modeling, presentation materials preparation. -Software used: Graphisoft Archicad, Artlantis Studio, Corel Draw
Competition entries 2007-2011
-Project: Tatarstan National Library Design proposal / 2007 -Location: Kazan, Russia -Project role: design, space planing, 3D rendering, BIM modeling, presentation materials preparation. -Software used: Graphisoft Archicad, Artlantis Studio, Corel Draw
go back
Hand Rendering / Sketches
go back
Contact Information e-mail: maxborshev@yahoo.com web: http://www.wix.com/maxborshev/home http://www.taliesin.edu/students/borshchevskiy mobile: 1-480-284-2084 U.S. 8-927-402-7557 Russia address: 12621 N. Frank Lloyd Wright Blvd. Scottsdale, AZ 85259 5481 County Highway C, Spring Green, WI 53588 20-31 Kasatkin Street, Kazan, Russia
MAXIMBORSHCHEVSKIY design
C
all rights reserved