Corporate profile V3

Page 1

Your Vision. Delivered.

CO M PANY P R O F IL E 2016


Landmark Holdings Ltd Company Profile

TABLE OF CONTENTS

1

02

Intro d u c t i o n

11

O rganizatio n S tructure

03

Co m p a ny

13

Ge neral E xperie nce

04

A bo u t u s

17

Fe atured Pro jects

05

W h at We D o

35

Plant & Equipm ent

07

CEO ’s S tate m ent

37

C lients

10

B oa rd o f D i rec tors

38

Refe re nces


Introduction The only way to do great work is to love what you do.

We are Building & Civil Engineering Contractors registered with the Ministry of Lands Housing and Urban Development, Kenya, as Class “A� Contractors and also Road Works Contractors registered with the Ministry of Roads, Kenya, and now with the National Construction Authority Building & Road works Class NCA 1.


Landmark Holdings Ltd Company Profile

Company

3

OUR VISION Our vision is to create long-term shareholder value via unmatched service delivery to our customers by providing quality, efficient and reliable services.

OUR MISION Our mission is to become a trusted leading provider of high quality,safe, rapid and affordable construction and engineering services in Sub Saharan Africa.

EXPANDING GOAL To further develop our corporate strengths we are committed to reinvestment in construction technology, human resource, information technology and equipment.


Landmark Holdings Ltd Company Profile

ABOUT US ABOUT US

KEY DATA

Who We Are

• Founded in 1999 • 100% Kenyan owned • Registered NCA 1 Building & Roads Contractor • One of the top 10 Construction companies in Region • Headquartered in Nairobi, Kenya • A diverse culture built around teamwork, respect and long-term relationships • Over 60% of work from repeat clients • Awarded the Construction Excellence

Founded in 1999 and awarded the Construction Excellence Award in 2014, Landmark Holdings Ltd has leveraged its management’s extensive experience to develop a unique set of competitive advantages that allow it to successfully operate in the construction industry in sub Saharan Africa. To date Landmark Holdings Ltd has completed several building, infrastructure and civil engineering projects throughout East Africa for the private and public sector.

Award in 2014 • Awarded Overall Building Contractor of the Year 2014 • Highly trained and competent personell, machinery and equipment

4


Landmark Holdings Ltd Company Profile

What We Do Building Construction We have undertaken a number of complex building projects including highrise commercial, multi level basements, housing, highrise housing, shopping centres, healthcare institutions, educational facilities and public sector facilities. We are fully equipped to execute several projects at the same time. Major landmarks can be viewed in and around Nairobi.

Civil Engineering We are fully equipped with heavy earth moving equiment, road construction machines, pipe laying tools and sophisticated survey equipment which allow us to undertake design and construction of major roads, bridges irrigation and pipeline projects

Joinery & Carpentry

5

At our Head Office, we have a 50,000 Square foot fully fitted woodworking workshop capable of manufacturing doors, door frames, kitchens, wardrobes, specialized form works and furniture.

Alternative Building Solutions We are able to offer our clients alternative methods of construction such as precast construction, pre-stress concrete construction solutions, and expanded polystyrene (EPS) building solutions that result in increase in delivery speed and quality.

Aluminium Works At our Head Office, we have an Aluminium Workshop covering 20,000 Square foot capable of manufacturing and assembling Aluminium Windows , Doors and Curtain Wall systems. It is fully equipped with the required cutting and welding machines.


Landmark Holdings Ltd Company Profile

Stone Cladding We are equipped with Stone Cutting machines allowing us to cut natural stones for cladding purpose such as Mazeras and blue stone.

Steel Fabrication At our Head Office, we have a Steel Fabrication workshop covering 20,000 Square foot capable of manufacturing casement windows, casement doors and heavy steel structural elements

Precast Concrete

We manufacture various Precast Concrete items using mechanized methods. Products include; 60 mm and 80 mm paving blocks,invert block drains, paving slabs. side slabs, road channels, road kerbs,culvert, concrete blocks, hollow pots and window sills. 6


Landmark Holdings Ltd Company Profile

CEO’s Statement Harveer Singh Sethi Chief Executive Officer

What we do impacts the lives of people and the environment around us! Every day the landmark family wakes up with this thought in their minds. Our construction services and projects impact the lives of individuals, young families and citizens as a whole. Our buildings and infrastructure impact the environment, wildlife and general surroundings. We acknowledge we have a responsibility to our community to ensure we maintain the highest standard in quality and safety while bearing in mind the consequences of our structures.

7

As Kenya leads the region through a new era of investment and development, Landmark is determined to partner with the private sector and governments to be at the forefront of this development with delivery of several Vision 2030 projects including the Forensic Laboratory and the New Ministry of Energy Headquarters. Over the coming years, I foresee the construction industry to remain resilient and competitive throughout the region. We can continue to expect a greater influx of foreign competition especially from the Asian countries. As a leading Kenyan contractor it will be prudent for us to continue to invest in key machinery, alternative building solutions and human capital and to continue to strengthen our global supply chain to manage foreign competition. In closing, I would like to invite you to come and partner with us and be a part of our growth and success story and let us deliver your Vision.

Our client’s undertake major development projects and the trust they place in us to handle projects of such magnitude is something we are immensely proud of. We have a tradition of striving for excellence in all our projects and the results, we believe, bear witness to this tradition.


Landmark Holdings Ltd Company Profile

8


Landmark Holdings Ltd Company Profile

Board of Directors PROFESSIONAL & EXPERIENCED. L a ndmar k H oldings has over 200 Profes s i on a l a n d ex p er i neced e mployees who s er ve in all reg i on s of t h e cou nt r y a nd the East Af rican region with attent i on to q u a l i t y, a n d or ientatio n to the f uture. With ac tive l ocat i on s a cros s Ken ya, we deliver construction, Inf rastru ct u re, C i v i l E n g i n eeri ng ser v ices for the National Governm ent , C ou nt y G over n m e ntsand the Private Sector. Under the Leaders hip of our Board of D i rectors , we a re a ble to plan and com petently overs ee p roject s i n a l l sta g es, bo th in Kenya and the greater Ea st Afr i ca n reg i on

9 Manjit Singh Sethi Chairman Founder, Shareholder & Director • Chairman of East African Ramgarhia Board (Community service)

Perminder Singh Sethi Technical Director Founder, Shareholder & Director


Landmark Holdings Ltd Company Profile

BOARD OF DIRECTORS Our Board of Directors is a mix of Professionals bringing on board more than 30 years of experience in the construction industry.Led by Chairman Majit Singh Sethi, the board leads a team of dedicated construction professionals embodying our tradition of excellence.

Harveer Singh Sethi Chief Executive Officer Director • Master of Business Administration (M.B.A), Georgetown University • Bachelor of Science, Computer Science, University of Maryland at Baltimore

Sahib Singh Sethi Finance Director Director • BSc (Joint Hons) Mathematics & Management, University of Manchester, Manchester Business School

Satveer Singh Sethi Logistics, Plant & Equipment Manager Director • Bsc Business Management, Middlesex University

10


Landmark Holdings Ltd Company Profile

Organizational Structure Landmark Holdings Ltd Company Organization Structure

B.O.D B.O.D CEO Finance Director

Supply Chain Manager

11

Procurement Dept.

Stores Department

Procurement Manager.

Central Stores Manager.

Finance, Admin & HR Department

Fleet Dept.

Estimatin Tendering/ QS

Quantity Surv Contract Ma

Fleet Manager

Project Q Assistant

Site Store Keepers

CFO

Assistant

HR Manager

Financial Accountant

Subordinate Staff

Management Accountant


Landmark Holdings Ltd Company Profile

Construction Director

Security Technical Director

ng/ S Dept.

Project Dept.

veyor/ anager

Project/Construction Manager

QSS

t Engineers

Site Engineers

Surveyor

12

Production Dept.

Joinery Dept. Head Fabrication Dept. Head

Foreman

E-Pave Dept. Head

Maintenance Manager


Landmark Holdings Ltd Company Profile

General Experience Current & Past Projects

Project: Proposed Mixed Use Development for Safaricom Staff Pension Fund Client: Safaricom Staff Pension Fund Completion Date: 2017 Built up Area: 60,000 sqm Contract Sum: Kshs 3,380,000,000 ($ 34.8 Million) Project: Proposed Mix Use Development – The Riverine Client: Alexander Forbes Retirement Fund Completion Date: 2017 Built up Area: 55,000 sqm Contract Sum: Kshs 2,523,649,230 ($ 26 Million)

13

Project: Proposed Mixed Use Development for County Pension Fund Client: County Pension Fund Completion Date: 2016 Built up Area: 55,000 sqm Contract Sum: Kshs 2,958,131,520.00 ( $ 30.5 Million) Project: Proposed Police Forensic Laboratory at CID Client: Ministry of Interior & Coordination of National Government Completion Date: 2016 Contract sum: Kshs 1,690,576,976 ($ 17.4 Million) Project: Proposed JKUAT SRBS Tower Client: JKUAT Staff Retirement Benefits Scheme Completion Date: 2016 Contract Sum: Kshs. 1,579,241,396 ($ 16.3 MillIon) Project: Proposed International Sports Academy Phase 1 Client: Sports Stadia Completion Date: 2016 Contract sum: Kshs 859,814,770 ($ 9 Million) Project: Proposed Residential Properties for I.C.D.C Client: Industrial and Commercial Development Corporation (I.C.D.C) Completion Date: 2016 Contract sum: Kshs 275,866,888 ($ 2.9 Million)

B.O.D


Landmark Holdings Ltd Company Profile

Project: Proposed KCAA Headquarters at JKIA Client: Kenya Civil Aviation Authority Completion Date: 2015 Contract sum: Kshs 832,723,216 ($ 8.90 MillIon) Project: Proposed Completion of Kibish Police Lines, GSU Base Camp, and AP Lines Client: Ministry of Works Completion Date: 2015 Contract Sum: Kshs 2,111,024,033 ($ 25.7 Million) Project: Proposed Residential Properties for I.C.D.C Client: Industrial and Commercial Development Corporation (I.C.D.C) Completion Date: 2015 Contract Sum: Kshs 275,866,888 ($ 2.9 Million) Project: Construction of Town Houses at Rosslyn Gardens on L.R.No. 21/1/23 Client: Kengen Staff Retirement Benefit Scheme Completion Date: 2015 Contract Sum: Kshs 576,000,000 ($ 6.7 Million) Project: The Ministry of Energy Headquarters (H.O/D30/9759A) Client: The Ministry of Energy Completion Date: 2014 Built up Area: 46,000 sqm Project: Erection and Completion of Lecture Theatre at Narok University College Client: : Masaai Mara University (Formally Narok University College) Completion Date: 2013 Contract Sum: Kshs. 108,638,930 ($ 1.1 Million) Project: Construction of Lecture Theatre at Laikipia University College Client: Laikipia University College Completion Date: 2013 Contract Sum: Kshs. 117,625,076 ($ 1.2 Million) Project: Construction of Hostel, Kitchen, and Dining Hall for Kenya School of Government Client: Kenya School of Government Completion Date: 2013 Built up Area: 80 Bedroom Hostel Contract Sum: Kshs 547,062,085 ($ 6 Million) Project: Proposed Security Enhancements to the Vice Presidents Residences at Karen, Yatta, and Tsaikuru Client: Ministry of Home Affairs Completion Date: 201 Contract sum: Kshs 102,731,310

14


Landmark Holdings Ltd Company Profile

General Experience Current & Past Projects

Project: Completion of Kitui Teachers Training College Client: Completion of Kitui Teachers Training College Completion Date: 2011 Contract Sum: Kshs 500,000,000 Project: Construction and Completion of office block off Karbanett Lane, Nairobi Client: Nursing Council of Kenya Completion Date: 2009 Contract Sum: Kshs 38,626,855 Project: World Vision Kenya Tsaikuru Developemnt Program (ADP) Client: World Vision Kenya Completion Date: 2009 Contract Sum: Kshs 8,397,530

15

With over 25 major Project awards in the last 13 Year, LHL has performed and completed 80% of these projects concurrently further demostrating our ability to provide value within set project timelines.

Project: Construction of Prefabricated Block at NEMA Headquarters Client: NEMA Completion Date: 2008 Contract Sum: Kshs 8,397,530 Project: 371 No Maisonettes for Jopa Villas Residential Housing Developmen,Mavoko Client: Jopa Villas LLC Completion Date: 2007 Contract Sum: Kshs 720,000,000 Project: 411 No. Hoises Valley View Park Housing Scheme Mlolongo, Athi River Client: Harp developers Completion Date: 2007 Contract Sum: Kshs 650,000,000 ($9.5 Million) Project: 20 No. Apartments Forest Road Nairobi, and 20 No. Apartments, Hill Flats Kileleshwa, Nairobi Client: Harbans Singh Associates Completion Date: 2005 Contract Sum: Kshs. 109,972,480 Project: Renobation of Block of 17 Flats Client: Kenapco Ltd Completion Date: 2003 Contract Sum: Kshs 19,000,000


Landmark Holdings Ltd Company Profile

BUSINESS STATISTICS

AWARDS & RECOGNITION

CONSTRUCTION EXELLENCE AWARDS 2014 I. AWARDED OVERALL CONTRACTOR OF THE YEAR II. AWARDED CONTRACTOR OF THE YEAR FOR BUILDINGS AND MIXED USE BUILDING

16


Landmark Holdings Ltd Company Profile

Featured Project The Proposed KCAA Head Office (ICB KCAA/45/2012-2013) Award date April 2014 Completion date

December 2015

Role in Contract

Kenya Civil Aviation Authority

Employer’s Name:

Harp Developers Ltd

Physical Size: Construction of a 10,000 sqm office block with a one level basement Contract Sum: Kshs 832,723,216 ($ 8.90 Million)

OVERVIEW The construction consists of a single level basement of approximately 3500 sqm a with a single suspended stab on which 2 4 storey commercial blocks are constructed on.

17

The building includes construction of an auditorium including state of the art audio visual facilities. External works included construction of sewer line of approximately 1.2 Km, paved parking area of 5500 sqm, fuel station with underground tanks, gate house and generator room. The building is finished with Pilkington curtain walling, external cladding with aluminium composite panel, and Hunter Douglas Sun Shading. All subcontractors were domestic and managed by Landmark Holdings Ltd


18


Landmark Holdings Ltd Company Profile

Featured Project Proposed Mix Use Development – The Riverine Award date Oct 2014 Completion date 2017 Role in Contract Prime Contractor Employer’s Name: Alexander Forbes Physical Size: 55,000 Sqm built up area Contract Sum: Kshs 2,523,649,230 ($26 Million)

OVERVIEW Construction of 151 town houses, 60 apartments, Commercial Center, Community center and a Nursery school including all civil and road works and associated services.

19


OTHER CHARASTERISTICS I.Earthworks: Excavated approximately 60,000 cubic meters for the basement, underground water tanks of which 16,000 cubic meters was hard rock which was competed with 90 days. II.Concrete Works: Concrete works amounted to approximated 12,500 cubic meters

20 III.Steel Works: Approximately 3,500,000 Kg of steel IV.Water proofing: Basement floors, retaining walls, water tanks, sumps amounting to a total of 15,500 sqm V.Aluminium Composite Panels (ACP): 6000sqm of ACP installed VI.Curtain Walling: 8000 Sqm of curtain walling installed


Landmark Holdings Ltd Company Profile

Featured Project Proposed Mixed Use Development for County Pension Fund Award date Dec 2011 Completion date

March 2017

Role in Contract Prime Contractor Employer’s Name:

County Pension Fund

Physical Size: 55,000 Sqm built up area Contract Sum: Kshs 2,958,131,520.00 ( $ 28 Million)

OVERVIEW Construction of 9 blocks off apartments consisting og 253 units, a commercial center and management offices including all road works and associated

21

services.


22


Landmark Holdings Ltd Company Profile

Featured Project

Proposed Completion of Kibish Police Lines, G.S.U Base Camp and A.P Lines (7411B & 7412B)

Award date

January 2010

Completion date

August 2015

Role in Contract Prime Contractor Employer’s Name:

Ministry of Public Works

Physical Size: Over 13,000sqm spread over a 200 acre site in Kibish Northern Kenya Contract Sum: Kshs 2,111,024,033 ($ 25.7 Million)

OVERVIEW Construction of 3 bases for A.P Lines, Police Lines and G.S.U spread over 200 acres. Location of site is 480 kms north of Lodwar.

23 Works consisted of construction of 160 housing units, offices, police station, petrol station, workshops, barracks, kitchens, mess areas, generator rooms, pit latrines, pump houses, road works, and airstrip with all associated mechanical, fire fighting, electrical, plumbing, civil works, earth works power generation and water supply and harvesting. All subcontractors are domestic.


Landmark Holdings Ltd Company Profile

Kibish Site

OTHER CHARASTERISTICS Water Supply: Drilling and development of 2 boreholes complete with solar pumps to support borehole yields of 2 cm3/hr and 20 cm3/hr Water Storage: 3 High level galvanized steel water tanks of 6400 gallons each on 15m high galvanized steel towers. 3 low level R.C tanks Power Generation: Solar and Diesel hybrid power solution. 3 10 Kw solar farms and 6 diesel generators ranging from 50 Kva to 150 Kva. Also solar water heating for 15 units Airstrip: 1500m x 50m airstrip complete with radial drains for storm water drainage and fencing to Kenya Civil Aviation Authority specification Logistics and Site Setup: Satellite office setup in Lodwar to manage supplies and logistics. Stone Quarry with crusher set up on site. VSAT communication facility on site as well as Head office allowing VOIP and video conferencing capabilities. 3 generators of over 100 Kva. Site workshops for joinery and metal works. Kitchen Equipment: Supply and fixing of all kitchen equipment required to serve the whole facility Fuel Station: 4 10,000 liter storage tanks fixed heavy duty dispensing pump complete with all necessary piping

24


Landmark Holdings Ltd Company Profile

Featured Project Proposed Town Houses at Rosslyn Gardens on L.R.No 21/1/23, Nairobi Kenya Award date

May 2012

Completion date

April 2015

Role in Contract Prime Contractor Employer’s Name:

Kengen Staff Retirement Benefit Scheme

Physical Size: Construction of 17 High End Villas and a Club House total built up area 10,000 sqm Contract Sum: Kshs 576,000,000 ($ 6.7 Million)

OVERVIEW Construction and completion of 17 town houses, comprising of 3 types, a club house, security and gate house together with all associated external works.

25

The construction generally comprises of reinforced concrete foundations and frame super structure, masonry stone walls, solid suspended slabs, steel trusses, concrete louvers and steel casement windows. External wall finishes consists of horizontal recessing, cladding of columns with mazeras, plaster and paint. Floor finishes are high end granito and wood block tiles. Internal wall finishes are generally ceramic wall tiles, plaster and paint. Services comprise of electrical installations, telephone pre-wiring. Stand by generator and plumbing, drainage and fire fighting installation. External works include, concrete paved internal roads, stone cladded boundary walls, associated storm water drainage and foul water drainage. Other services include construction of swimming pool


26


Landmark Holdings Ltd Company Profile

Featured Project Proposed Residential Properties for Industrial and Commercial Development Corporation, Nyali, Mombasa Award date September 2013 Completion date

April 2015

Role in Contract Prime Contractor Employer’s Name:

Industrial and Commercial Development Corporation

Physical Size: Construction of a 7 storey apartment block in Nyali Mombasa Contract Sum: Kshs 275,866,888 ($ 2.9 Million)

OVERVIEW The project included the construction of 28 high end apartments in a 7 sto-

27

rey apartment block. The works included fully fitted high end kitchens and wardrobes. The project included nominated subcontractors who were fully managed by Landmark Holdings Ltd. Finishes included high end Granito Tiles, Granite Table Counters, and Mazeras External Cladding.


28


Landmark Holdings Ltd Company Profile

Featured Project Erection and completion of the Ministry of Energy Headquarters (H.O/D30/9759A)

Award date

May 2011

Completion date

June 2014

Role in Contract Prime Contractor Employer’s Name:

Ministry of Energy

Physical Size: 46,000 Sqm built up area Contract Sum: Kshs 1,862,978,270 ($ 21.9 Million)

OVERVIEW Construction of the Ministry of Energy Headquarters, a 46,000sqm multistoried building including all external works and access road. Site is a 6 acre site. Main building built over a 7,000 sqm basement with one suspended slab, includes 5 independent circular structures all interconnected to the central core using suspended walk ways.

29

A Laboratory wing of 10,000 sqm floor area including a separate basement. A total of 9 lift shafts housing panoramic lifts and 12 stair wells. Underground water storage tanks below basement floor bed of a total capacity of 350,000 liters. Above ground but in basement sprinkler tank of 100,000 liters. Basement floors finish in power trowel. Offices and common areas finished in polished granito tiles. Total of 4,000 sqm glass curtain walling on separate steel structure forming a double skin in parts of the building. All roof structures constructed using light weight steel roofing systems by ultraspan and covered with Decra roofing tiles to fit curved nature of the towers. Auxiliary buildings and services include a biodigester, transformer room, generator room and gate house. All subcontractors were nominated however under our supervision and in contract with us.


OTHER CHARASTERISTICS I.Earthworks: Excavated approximately 60,000 cubic meters for the basement, underground water tanks of which 16,000 cubic meters was hard rock which was competed with 90 days. II.Concrete Works: Concrete works amounted to approximated 12,500 cubic meters

30 III.Steel Works: Approximately 3,500,000 Kg of steel IV.Water proofing: Basement floors, retaining walls, water tanks, sumps amounting to a total of 15,500 sqm V.Aluminium Composite Panels (ACP): 6000sqm of ACP installed VI.Curtain Walling: 8000 Sqm of curtain walling installed


Landmark Holdings Ltd Company Profile

Featured Project Construction of Hostel, Kitchen, and Dining (0274DT) Award date

May 2011

Completion date November 2012 Role in Contract Prime Contractor Employer’s Name:

Kenya School of Government

Physical Size: 6200 Sqm Building located in Lower Kabete, Nairobi, Kenya Contract Sum: Kshs 547,062,085 ($ 6 Million)

OVERVIEW Construction of a 6200 sqm hostel block comprising a basement and ground plus five floors.

31

Building consists of 80 high ends, en-suite rooms and a fully equipped kitchen with LPG storage and dining area. Finishes include stainless steel balustrades (manufactured in house), granito tiles, granite top vanities in public bathrooms, MDF wardrobes and dressing tables (manufactured in house) panoramic lift, goods lift, powder coated aluminum windows, light steel structure roof with poly carbonate and Decra roof covering. External works included all landscaping, excavation of basement, storm water drainage, preparation of sub base to receive paving in 60mm blocks for parking area and construction of gabions. All subcontractors were nominated however under our supervision and in contract with us.


OTHER CHARASTERISTICS Subcontractors: Plumbing and Fire Fighting – Antopi Mechanical Services Electrical – Muga Electrical Structured Cabling – Viaonet Global LTD LPG Storage and Kitchen Equipment – Stainless Steel Masters Coldroom storage – Solakold LTD

32


Landmark Holdings Ltd Company Profile

Featured Project Valley View Park Housing Scheme Award date

May 2005

Completion date April 2007 Role in Contract Prime Contractor Employer’s Name:

Harp Developers Ltd

Address: Purshottam House, P.O.Box, 38272 – 00623, Nairobi, Kenya Telephone/fax number

+254 203664502

E-mail: info@harp-group.com Physical Size: 411 Housing units, total built up area 41,000 sqm Contract Sum: Kshs 650,000,000 ($9.5 Million)

OVERVIEW 33

Construction and completion of 411 housing units including all Mechanical Electrical, Plumbing and Civil Works. The 20 acres site was an ex quarry thus contained extensive earth works. Internal finishes were in ceramic tiles, vista ceiling and laminated MDF kitchens and wardrobes manufactured in-house.


OTHER CHARASTERISTICS I.Plumbing Earth Works: Cut, fill and compacted over 40,000 cubic meters of Hardcore material. II.Concrete Works: Approximately 11,000 cubic meters III.Road Works: Preparation of sub base, 22,000 sqm of 60mm paving blocks and road furniture. Concrete storm water drains and paving block footpaths along road side

34


Landmark Holdings Ltd Company Profile

Plant & Equipment

PLANT & EQUIPMENT SNAPSHOT

OVER 45 Vehicle Transport Equipment. All owned & working

OVER 16 Vertical Transport Equipment. All owned & working

To guarantee 100% client satisfaction, we have invested in modern equipment. These include: Earthworks – All heavy machinery involved in excavation, drilling, carting away, back filling, leveling and compaction.

35

Concrete – Concrete batching, concrete handling – pumps/ dumpers, trans-mixers. Asphalt – Crushing plant, asphalt processing plant.

OVER 48 Earth Movers/ Compacters. All owned & working

OVER 8 Steel Cutters / Bending machines. All owned & working

OVER 8 Surveywork Equipment. All owned & working

Construction Support Tools – Transportation, cranes, Generators, Compressors, scaffolding, pumps, tanks and general maintenance equipment. Our storage and garage yard store our main equipment, support workshop, fleet management system, concrete block making plant, concrete batching plant, as well as the parking yard for our heavy equipment and project materials.

OVER 75 Powertools & Equipment. All owned & working


Landmark Holdings Ltd Company Profile

36


Landmark Holdings Ltd Company Profile

CLIENTS

37


Landmark Holdings Ltd Company Profile

CLIENTS

38


CONTACT US

Landmark Holdings Ltd Falcon Road, Off Enterprises Road Industrial Area, Nairobi, Kenyae + 254 (0) 20 231 7881