BLAST-FURNACE EQUIPMENT
"DNEPROTECHSERVICE" SCIENTIFIC PRODUCTION GROUP is a network of machinery and heavy equipment manufacturers based in Ukraine. We specialize in the development, manufacturing, sale, and service of this heavy equipment and machinery. Our products serve the space, mining, metallurgical, coking, chemical, oil and gas refining, mass transit, rail, and power production industries as well as marine ports.
GROUP STRUCTURE
Dneprotyazhmash PJSC Heavy engineering equipment for metallurgical and mining industries
Dneprotyazhmash PJSC
Hot Rolling Plant
by-product coke equipment
Cast Iron Roll Forming
Svetofor PJSC
RDE NIKE
Electrical products for rail industry
Cellular constructions for Space industry
Metallurgical Equipment Designing and Technical institute
Metallurgavtomatika PJSC
Trade House Dneprotechservice JSC Russia, Moscow
Comprehensive supplier of equipment and material
Ukrainian Research Institute of Manufacturing Engineering PJSC
Transenergoservice PJSC
Sinelnikovo Spring Plant PJSC Springs for auto and tractor vehicles
United engineering company PJSC
is the marketing, engineering, and production branch of the “Dneprotechservice” SPG heavy equipment and machinery engineering companies “Dneprotyazhmash” PJSC and “Slavtyazhmash” PJSC. Dneprotechservice SPG has four divisions: HEAVY EQUIPMENT AND MACHINERY ENGINEERING: Design and fabrication of machinery, processing equipment, and rigging for the mining, metallurgy, coking, and coal industries as well as for power plants and ports. UNDERGROUND INFRASTRUCTURE: Development and implementation of projects for the subway and mining industry. SPACE: Manufacturing of rocket launcher components. Development and manufacturing of main and auxiliary equipment for space launcher complexes. INNOVATION: Complete service from pre-production models, technology development, and manufacturing new equipment and machinery to serve customers’ needs. “Dneprotyazhmash” and “Slavtyazhmash” are the foundation of these four divisions. Our complete facilities for heavy engineering include a steel mill, iron foundry, metal fabricators, and mechanical assembly plants. “DTS-Tyazhmash” contains the Design Engineering Institute of Technology (PKTI), which can provide both basic engineering services as well as detailed design work for a wide range of equipment. The PKTI specialists can also build on their experience to modernize existing equipment. Regardless of the need, our team has the knowledge and experience to serve our customers’ needs.
Our staff is dedicated to customer satisfaction. This commitment includes: Rapid response to our customers’ changing needs. High quality products delivered on schedule.
Dneprotechservice’s success comes from our ability to meet our customers’ needs. We continue to thrive by offering services that give our customers an advantage in their industry. We are looking for long term projects and joint ventures that will lead to mutually beneficial business relationships We look forward to working with you.
Sincerely,
"DNEPROTYAZHMASH" PJSC is one of the leading heavy equipment companies in Ukraine, relying on its extensive experience in the industry and tradition of quality. “DNEPROTYAZHMASH” PJSC has the resources to complete the entire production cycle: from metal smelting, to turnkey delivery. Design Engineering Institute of Technology’s involvement means a single piece of equipment can be designed, manufactured, and delivered, according to a customer’s unique needs and exact specifications. We are a leading supplier of processing equipment for the mining, smelting, coking, power production, transportation, space, cast-iron tubing, and underground railway industries. Our complete line of production services includes raw metal processing, welding, and mechanical assembly. “DNEPROTYAZHMASH” PJSC is ISO 9001:2008 certified under certificate TIC 15 100 96570 d/d 11.12.2009 issued by the agency TÜVTHÜRINGEN. Smelting: Steel is produced in electric arc furnaces. Electric arc furnaces have a 24 ton capacity. Cast iron is smelted in BBC induction furnaces with a capacity of 20 tons and in cupola furnaces with a capacity of 12 t/hr. Mould and core making: German 20000f, German 1000f, German 60000f, mod. 232; 24473 sand-casting machine, blended sand pouring machines, LN 240 molding line. Fettling equipment: "Firefly-18" electrohydraulic fetching unit, shot blasting chambers, tumbling barrels, and hydrochamber. Heat Treating: Furnace with 160 sq.ft. and 515 sq.ft. hearth; quenching tank; high frequency induction quench units; wheel sorbitizing and parts carburizing. Mechanical assembly: Facilities to fabricate, weld, and assemble large sized carbon and alloyed steel structures. This allows for the manufacture of unique, custom equipment. State-of-the-art technology and precision equipment allow us to produce us the right parts from a few grams to fifty tons. Screw-cutting lathes and CNC mills can machine parts up to 2,5 m in diameter and 12,5 m long, weighing up to 50 tons. Vertical turning lathes can process parts up to 8 m in diameter and 5 m high. Gear-cutting equipment can product all types of gears with module pitch from 4 to 5 mm and diameters up to 8 m. Horizontal CNC mill SKODA HCW2-200 can machine large parts up to 20 m long and 4,5 m high with a boring depth of 2,5 m. Quality control of metallurgical products is carried out using proximate analysis, mechanical testing, microstructure determination, leakage testing, hydraulic pressure testing, ultrasonic inspection and other standardized testing methods.
METALLURGICAL PRODUCTS
Weight / Size
Grade
Standard castings STEEL CASTINGS
Slag car pots and ladles 3 800 - 22 500 kg 25L, 30L, GOST 977-88
Slag car pots with capacity of 11, 13, 16 and 16,5m3 Ladles with capacity of 1,6 to 5m3
Shaped castings of carbon steels 50 - 15 000 kg 15L, 25L, 30L, 35L, 45L GOST 977-88
Support rings for slag cars with capacity of 11, 16, 16.5 m3 Furnace-charging gear components: funnel Ø3600 Furnace-charging gear funnels and pans Ø4200, Ø4800, Ø5000, Ø5400 in cast and welded design Binding rings, geared rims, gear-wheels Pallet cars Reduction gear covers and housings Slag pans Drop pile hammers Hot-metal transfercar bases End wall bodies Car dumper rim sections, etc.
Shaped castings of low-alloyed steels 50 - 10 000 kg 15HML, 20HML, 35GL, 35HML, 40HL, GOST977-88 Shaped castings of high-alloyed steels 50 - 10 000 kg 35H23N7SL, 40H24N2SL, 20X25N19S2L, 12X18N9L Shaped castings of steel 110G13L 50 - 5 000 kg 110G13L
Shaped alloy castings 100 - 5 000 kg 210X33N3SL, 230X28G3SL as per the TU U 3.05-00168076035-99
Pilger rolls, car dumper rim sections Pallet cars bodies, gear-wheels, wheels, chain links, rollers, etc. Furnace equipment components (subject to heat packaging) Components of crushing machines KKD-1500/180, KRD700/100, KSDT-2200, KMDT-2200, KSD-2200T, KKD-1500/180, KKD-500, KKD-900; components of mills Sh-50, Sh-50A; components of jaw crushers ShD 600X900; bucket teeth for excavators EKG-4,6, EKG-8, EKG-12,5 and other castings Components of pumps NP-800, 28GR-8T, NP-500, 12GRT-8, 8GRT-8 and other castings
IRON CASTINGS Shaped castings of grey cast iron 50 - 16 000 kg SCh10 to SCh30 GOST1412-85 Shaped castings of ductile cast iron rough weight up VCh400-15 to VCh700-2 to 15 000kg DSTU 3925-99
Blast-furnace cast cooling plates Subway tunnels and mine shafts lining plates Reduction gear covers and housings, etc.
Blast-furnace cast cooling plates Mine tubbing Molds, etc. Castings of bearing cast iron AChS1 and heat-resistant cast iron 20 - 400 kg AChS1 GOST1585-85 Hollow bars and blanks up to 5 000 kg ChX1, ChX2, ChX3 Gas burner components GOST 7769-82 Components of blast-furnace stove checker understructure
MANUFACTURING CAPABILITIES OF THE "DNEPROTYAZHMASH" PJSC
Work types turning
Maximum diameter (width) capacity, mm 2500
Maximum workpiece length, mm
Weight, kg
12500
100000
vertical turning
8000
5000
125000
boring
4500
20000
95000
milling
3060
8000
70000
planing
2200
11000
20000
deep drilling pull-broaching (pulling capacity of 40 tons) cylindrical grinding
250
10000
25000
32x20
650
25000
800
7600
10000
surface grinding
400
2000
2000
1200 Maximum tooth width, mm 2000
6000 Module pitch
external spur
1250 Diameter capacity, mm 8000
internal spur
1000
400
up to 50
straight-bevel
1600
300
6-30
spiral-bevel
800
125
4-16
300รท1000
200
20
slotting Gear cutting
crown-shaved
up to 50
"SLAVTYAZHMASH" PJSC is the primary machine manufacturing company who offers complete engineering and production services. The company was founded in 1931, and is a leading producer of coke machinery and equipment in Ukraine and among CIS countries. “SLAVTYAZHMASH” PJSC produces equipment for new and reconstructed coke batteries. They also manufacture and supply complex machinery and equipment for the domestic by-product coking industry as well as for companies in more than 30 other countries. Machines and equipment are delivered as completely assembled as possible. “SLAVTYAZHMASH” PJSC specialists carry out final installation and inspection of equipment at the customer’s facility. “SLAVTYAZHMASH” PJSC adheres to strict quality control standards and is ISO9001:2008 certified under certificate TIC 15 100 117383 d/d 18.03.2011 issued by the agency TÜVTHÜRINGEN in Germany.
MANUFACTURING CAPABILITIES OF THE "SLAVTYAZHMASH" PJSC
Work types Turning
Drilling Boring Grinding Milling
Planning Slotting Gear cutting
Turret lathe Vertical turning Radial drilling Vertical drilling. Jig boring Horizontal boring Cylindrical grinding Surface grinding Universal milling Vertical milling Horizontal milling. Planomilling Planing Horizontal shaping Turret lathe Vertical turning Gear-milling Straight teeth Worm-type Gear-shaping
Gear-planing
Diameter (width) Workpiece dimensions, capacity, mm mm 650 L 8000 200 L 1400 40 L 110 3150 L 2000 100 3150x1550 35 700 F250 110x630x750 F550/L=2000 10000x4000x3000 F400 L 2400 2000x630x505 350x1100 350x1100 350x1000 8500x2500x2000 8000x3150x2240 1000x500 1050x400 Diameter capaGear wheel width, mm city, min/max 40/200 500 40/200 500 Diameter Gear wheel width, mm capacity, max 800 170 Diameter capacity, max
Pitch cone radius, min/ max, mm
500
0/250
Weight, kg
8000
20000 300 20000 1000 2000 300 300 300 65000 20000 150 2000 Inclination Pitch min/ angle, deg max ±180 1/16 ±180 2/16 Gear-shaping Pitch cutter stroke 1/12 Pitch cone angle, min/ Pitch, max max, ° 4/90 10
In 2008, the company modernized the iron foundry and installed the new mixer TA20VS. Made by the Ashland Company, the new mixer allows the changeover to the HTS (no-bake) casting process. This process results in a much cleaner casting surface and helps to eliminate blowholes and other defects. In 2012, the capability to create permanent mold iron casting up to 220 kg was added. Casting accuracy is much higher than traditional methods. All parts are 3D modeled in SolidWorks and further analyzed using LVMFlow software to simulate the thermal and hydrodynamic process that occur during casting. FOUNDRY PRODUCTION Equipment: Cupola furnace with capacity of 10 t/hour - 2 pcs. refractory lining: acid; purpose: cast-iron production; heat size at the continuous operation up to 70 t per shift. Induction furnaces: IST -0,5 – 1 pcs., ITP-0,5/1 – 2 pcs. purpose: Cast-iron production; refractory lining: basic, acid, rammed crucible; Up to 500kg by liquid weight; When dual heat process is used, capacity rises to 1000kg of liquid steel.
NOMENCLATURE OF THE PRODUCED STEEL AND CAST-IRON GRADES
Grey cast iron Ductile cast iron Bearing cast iron Heat-resistant cast iron Carbon Alloyed
MATERIAL IDENTIFICATION
PRODUCED CASTING WEIGHT, KG
CASTINGS NOMENCLATURE
CAST-IRON CASTING Frame, casing, door bodies, T-unions, pallets, SCh 15 – SCh 30 5 - 7500 moulds, tubbing, fittings, etc. Hydraulic cylinder bodies, pulleys, reduction VCh 30 – VCh 50 5 - 500 gear covers and housings AChС-1, AChС-2 5 - 500 Liners, bush sleeves Cooling plates, checker understructure, pockets, ChX-1, ChX-2 5 - 7500 heat-treatment furnace framework STEEL CASTING 15L – 55L Chain links, bearing and reduction gear 5 - 500 35GL, 25GСL, housings, couplings, pump parts, etc. 30GСL, 35XML etc. Foundry production capacity – 20 000 tons per year.
PRESS FORGING PRODUCTION Forged pieces are made by hammer forging at the hammers M1340, MA417, M415A: shafts, axes (Ø120-140 mm and up to 1000 mm long); bosses, gear-wheels, bush sleeves (Ø120-300 mm, 80-120 mm high).
Forged pieces production capacity – 5500 kg per month. Stamped pieces are made in the subpress dies at the hammers (flanges, bosses, covers): dimensions: Ø up to 140 mm, height up to 40 mm, weight up to 6 kg; stamped pieces surface parameters – 50 mkm; stamped pieces material – carbon and structural-grade steels (steel 3, 20, 35, 40, 45, 40X, 40XN). Spring winding of Ø 8 - 40 mm and height in unloaded state of up to 420 mm. HEAT TREATMENT PRODUCTION
Volume heat treatment (quenching, tempering, normalization, annealing, case hardening) – production capacity 40000 kg per month;
High frequency induction heating – production capacity – 4500 kg per month. Heat treatment can be applied to carbon and low-alloyed steel parts including long, cylindrical parts, and gear-wheels or sprockets made of carbon and alloyed steels.
BLAST-FURNACE EQUIPMENT
BLAST-FURNACE EQUIPMENT
SLAG LADLES The slag ladle is designed to hold molten slag discharged from furnaces, steelmaking, and ferroalloy units. The ladles are made to hold slag at temperatures up to 1600 °C and with a max density of 3,7 t/m3. On the upper part of the ladle, there are four castings designed to attach to the ring gear on the ladle slag car. Martin ladles have four more castings that allow for transport with a lifting beam and circular stiffening hoop. The four lower castings are T-shaped gauges designed to lock the ladle into the ring support in order to prevent the ladle from falling during slag car movement.
SPECIFICATIONS
Ladle designation
VALUE
Capacity, m
Diameter, mm
Height, mm
Weight, kg
For furnace slag
11
3350
2870
13680
For steelmaking slag
11
3350
2870
15200
For furnace slag
16
3570
3300
20200
For steelmaking slag
16
3570
3300
21110
For steelmaking slag (heavy-duty)
16
3640
3300
22900
16,5
4270x3350
2860
21600
For steelmaking slag
11
3310
2950
18490
For steelmaking slag
16
3570
3430
33450
3
Railway slag cars:
For furnace slag (oval ladle) Ladles for automatic slag cars:
Manufacturing period – 30 days 2 M3 AND 5 M3 LADLES The ladles are designed for collection and transportation of molten slag with temperature of up to 1500°C. SPECIFICATIONS
Overall dimensions Capacity, m3
Height, mm
Width in spouts, mm
Weight, kg
2
1600
2550
5480
5
2240
3160
11800
Manufacturing period – 30 days LADLE OPERATING PARAMETERS
The ladle is designed to remove the slag from the furnace. SPECIFICATIONS
VALUE
Operating pressure in furnace, MPa 0,30 Cooling water pressure, MPa 0,65 Manufacturing period – 120 days
BLAST-FURNACE EQUIPMENT HOT METAL LADLE CAR Standard series: G-1-50, G-100,G-1-140. The hot metal ladle car is designed for transportation of hot metal from the furnace to casting machines, mixers, and steelmaking units. Ladle cars are produced with a capacity of 50, 100 and 140 m3 . The ladle car moves along railways with the help of traction railway equipment. The ladle is tilted with a tilting winch or cane. The hot metal ladle car consists of: bearing frame; railway carriages; ladle; automatic coupler. The hot metal ladle car does not include the ladle brickwork.
SPECIFICATIONS
Type
VALUE
G-1-50
G-100
G-1-140
Track gauge, mm Number of loaded hot metal ladle cars moving in a formation Carriage base, mm Overall dimensions, mm : - length (along the automatic coupler axes)
1520
1520
1520
5
5
6
1850
1300
1500
8200
8200
9000
- width
3140
3600
3750
4210
4300
- height (from the rail head to the upper ladle edge)
3500
Weight of empty hot metal ladle car without brickwork, kg
21090
36410 45000 Manufacturing period – 120 days
NON-SELF-PROPELLED RAILWAY SLAG CAR Standard series: ShTD-11, ShTD-16, ShTD-16,5, ShTС-11, ShTС-16. The non-self-propelled railway slag car with planetary ladle tilting gear is designed for transportation of molten or hard slag from the steelmaking units to granulating units or the dumping area. The car moves along railways with traction railway vehicles. The ladles for the slag car may be filled with slag directly on the car or filled with slag and then moved to the car. The frame and automatic coupler are high-strength and allow for transport of up to 15 slag cars in formation. The slag cars with capacities of 11 and 16 m3 are equipped with a round ladle that has a circular cross-section and spherical bottom. Slag cars with a capacity of 16.5m3 – have an oval cross-section. Traction slag cars with ladles for blast furnace slag (ShTD) and ladles for steelmaking (ShTС) are available. The slag car consists of: bearing frame; railway carriages (two biaxial railway carriages); ring support ladle; ladle tilting mechanism; automatic coupler. Advantages: Enforced axle bearing. The slag car comes with the electric motor (control equipment not included).
BLAST-FURNACE EQUIPMENT
SPECIFICATIONS
Carriage capacity, t Maximum ladle tilting angle, degree Number of loaded hot metal ladle cars moving in a formation Track gauge, mm
VALUE
ShTD-11 80
ShTС-11 80
ShTD-16 80
ShTС-16 80
ShTD-16,5 80
118
118
118
118
114
70
70
70
70
70
1520, 1435, 1676
Electric motor, type :
MTKR 312-8
- power, kW
7,5
7,5
7,5
7,5
7,5
- rotation rate, rpm
695
695
695
695
695
Reducer, type:
Worm-cylinder
- length (along the couplers axes), mm
8100
8100
8100
8100
8100
- width, mm
3480
3480
3610
3610
3360
- height (from the rail head to the upper ladle edge), mm
3615
3615
3945
3945
3855
Weight, max, kg:
55000
58000
65000 66000 65000 Manufacturing period – 90 days
SLAG CAR WITH SCREW LADLE TILTING GEAR TStandard series: ShВ-11D, ShВ-11С, ShВ-16D, ShВ-16С, ShВ-16,5D. Slag cars with a screw ladle tilting gear designed for in-plant transportation of molten slag at temperatures up to 1600 °C with ladle capacities of 11, 16 or 16,5 m3 are available. The slag cars with capacity of 11 and 16 m3 are equipped with a round ladle that has a circular cross-section and spherical bottom. Slag cars with a capacity of 16,5 m3 – have an oval cross-section. Slag cars come with options for both blast furnace slag ladles (ShT…D ) or for steelmaking ladles (ShT…C ). The slag car consists of: bearing frame; railway carriages; ring support ladle; ladle tilting mechanism; automatic coupler. Advantages: heavy-duty thrust bearings; increased frame rigidity; rack bar is made with windows between the racks for spillage of slag and waste; h eavy-duty screws.
SPECIFICATIONS
VALUE
ShВ-11D
ShВ-11С
ShВ-16D
ShВ-16С
ShВ-16,5D
Carriage capacity, t
80
80
80
80
80
Maximum ladle tilting angle, degree Number of loaded hot metal ladle cars moving in a formation
118
118
118
118
118
120
120
120
120
120
Track gauge, mm
1520
1520
1520
1520
1520
Overall dimensions, mm: - length (along the couplers axes) - width - height (from the rail head to the upper ladle edge)
7850 3480 3615
7850 3480 3615
7850 3580 3945
7850 3580 3945
7850 3580 3650
Weight, max, kg:
62000
66000
68000 72000 70000 Manufacturing period – 120 days
BLAST-FURNACE EQUIPMENT SKIP The skip is designed for transportation of raw materials from the skip pit to the reception hopper and blast furnace throat. The skip consists of the body, front and rear wheel set, and traction equipment. To increase capacity and facilitate loading and unloading, the front edge of the body is widened. The bottom and walls are protected from wearing due to the furnace charge by alloy steel plates. The upper body contains a hole for charging the waste and spills formed in the skip pit. Skips are produced with hinged front and rear wheel sets. Advantages: increased capacity.
SPECIFICATIONS
VALUE
Skip struck capacity, m3 Skip blending capacity, m3 Skip net loading capacity, ton-forceс Main track, mm Base, mm Diameter of running wheels, mm Weight, kg
6,5 5,5 12 1454 1800 500 8920
BATCH DISTRIBUTOR The batch distributor is included in the furnace charging gear and is designed to distribute batch materials around the large cone of the charging gear. It is also used to pressurize the furnace body. SPECIFICATIONS
VALUE
Useful capacity of revolving hopper, m3 10 Diameter of the small cone, mm 2000 Steady rotation rate of revolving hopper, 3,27 (19,62) rpm (degrees/sec) Centralized grease CYATIM 203 Manufacturing period – 120 days
8 6,5 15 1454 2400 500 10000
10 20 9 17 23 35 1660 2420 2400 3100 500 700 9260 21900 Manufacturing period – 100 days
BLAST-FURNACE EQUIPMENT CHARGING MACHINE Standard series: TM-16, TM-20, TML-16, TML-20. The charging machine is designed to distribute the hot metal and slag ladle formations around the furnace and performs maneuvering operations at the working railway section. The charging machine consists of: bearing frame; driven running wheels; cab; electric drive; remote control system; automatic coupler. Main advantages: no need to use additional gears and the end of the formation during the casting process; high serviceability; the charging machine is supplied with a tension winch for the rope bearing the electric cables (TML model) or without a winch (TM model).
SPECIFICATIONS
Type Thrust at breakaway (pushing power), ton-force Adhesion weight of charging machine, minimum, t Travel speed, m/s Control Track gauge, mm Electric motor, type : - power, kW - rotation rate, rpm Reducer, type : Overall dimensions, mm : - length (along the automatic coupler axes) - width - height ((without post) Weight, kg: - winch excluded - winch included
VALUE
TM-16 16 72
TM-20 20 80
0,25
0,4
0,25 Remote 1520, 1435, 1676
MTKN-411-6U2
MTKN-412-6U2
22 935
0,4
MTKN-411-6U2
MTKN-412-6U2
30 22 940 935 Two-stage right-angle
30 940
9390 2640 3030
9390 2640 3030
72000 74000
80000 82000 Manufacturing period – 120 days
FURNACE COOLING PLATES Furnace cooling plates are designed to protect the furnace mantle from the impact of high temperatures and preserve the efficient brickwork profile. They can increase the life of the furnace by 8 to 10 years. The cooling plates have a capacity ranging from 1033 to 5400 m3. The design of the plates allows for pressurization of the furnace mantle. The cooling plates operate by evaporation, water cooling, and mixed cooling. A unique feature of the plates is the four cooling pipes each have a separate water supply. That way, if one of the pipes fails, the plate remains operational. Nodular iron is used for the cooling plate. The carbon content is reduced in the casted pipes to create a seamless product, increasing longevity and giving the material optimal plasticity. The cooling plates can be designed and fabricated according to a customer’s specific needs.
BLAST-FURNACE EQUIPMENT FURNACE CHARGING GEAR (CUP-AND-CONE) The cup and cone distribute materials evenly around the throat of the furnace and seal in gases at the furnace mouth. The cup and cone feature carbide and chrome welding to provide increased wear resistance on the contact belts. Precision designed geometry and machining ensure a tight gas seal. To prevent any warping in the dimensions, the cup and cone are put through a special heat treating process. Advantages: geometrical dimensions stability.
SPECIFICATIONS
VALUE
Specified diameter of cup and cone, mm Furnace capacity, m3 Cone weight, kg Cup weight, k
5400 2000 27100 16200
BLAST-FURNACE CONE The blast furnace cone is designed to ensure a tight pressure seal. It sets the base for installing the charging gear, discharge tubes, and other processing equipment. The cone is made of sheet metal with the gas discharge tubes are installed on it. The inner surface of the cone and discharge tubes is lined with plates made of 35L steel. SPECIFICATIONS
VALUE
Diameter, mm 7380 Height, mm 6000 Tubes diameter, mm 1700 Weight, kg 133000 Manufacturing period – 180 days NOSTRIL GEAR The nostril gear is an integral part of the blast furnace heater. It is designed to act as a heat exchanger, heating the air entering the blast furnace. It operates in the final gas area at a constant temperature of up to 400 °C. The nostril gear is made up of grids, columns, and plates. All of the components of the nostril gear are casted of ChX1 cast-iron. When assembled, the grids of the nostril gear are fixed onto the columns and the plates are attached to the grid with pins. After assembly, the entire construction is lined. SPECIFICATIONS
VALUE
Operation temperature, ºС 400 Diameter, mm 3643 Height, mm 2630 Weight, kg 74280 Manufacturing period – 120 days
5000 1719 23200 15600
4800 4200 1386 1033 20000 16300 22100 10200 Manufacturing period
3600 700 8100 13700 – 120 days
BLAST-FURNACE EQUIPMENT SCREW DUST UNLOADER The screw dust unloader humidifies and removes the dust from the dust collector of the blast furnaces and suppresses the fine dust. The dust unloader is a screw mixer with added gears for dust suppression and shutdown valves. The easily worn parts are protected with welded sheets. To eliminate the impact of abrasive dust, all bearings are equipped with packing seals. The gear for dust suppression is made of two cyclones installed on the screw mixer and vibrators installed externally on the sides that prevent the dust from sticking to the walls of the cyclones.
SPECIFICATIONS
VALUE
Capacity, m /h Water arte for humidifying, maximum, m3/h Additional dust reclaiming, t/day Shutoff valve diameter, mm Shutoff valve opening force, kilogauss Electric motor power, kW Overall dimensions, mm : - length - width - height with cone tube - height without cone tube Number of cyclones, pcs Weight, kg
up to 100 25 5 350 2000 11
3
4880 1600 2266 2556 2 9885 Manufacturing period – 80 days ROPE SHEAVE Rope sheaves direct the ropes of the blast furnace skip hoist. SPECIFICATIONS
Sheave diameter, mm Internal radius of the groove form, mm Axis diameter, mm Weight, kg
VALUE
2000
2000 (enhanced)
28
28
200 220 2827 2885 Manufacturing period – 90 days
BLAST-FURNACE EQUIPMENT TILTING RUNNER The tilting runner is designed to change the direction of the molten iron stream or slag to the desired ladle cars. The tilting runner consists of: the runner itself, cradle, crank gear and electric drive. The surface of the runner is lined and the runner is fixed on the travelling cradle. The drive of the runner consists of: the welded frame, electric drive, brake, worm reducer, cylinder reducer, and controller. There is a hand drive to rotate the runner from the wheel with the electric drive start blocking. Hot iron and slag arrive at the tilting runner from the nose of the stationary channel. SPECIFICATIONS
VALUE
Rotation angle of the tilting runner from horizontal position to every side of the draining 10 (working position), degrees Rotation angle of the tilting runner from horizontal position to the position of full draining, 40 degrees Rotation time of the tilting runner between the working positions, s 9 Drive: - electric motor power, kW 4,5 - electric drive shaft rotation rate, rpm 900 - electric drive gear ratio 787,5 Overall dimensions, mm: 4000-5400 - tilting runner length - distance between the supports 3100-3300 Weight, max, kg 8800 Manufacturing period – 90 days GAS SAMPLING MACHINE The gas sampling machine is designed to select the gas samples under the furnace mouth with the test pipe through the special cooler. Advantages: enhanced drive capacity; enhanced probe feed thrust (up to 15 t); increased probe rigidity. SPECIFICATIONS
VALUE
Maximum path of the test pipe, 4900 5500 6000 mm Test pipe travel speed, m/s 0,194 0,194 0,194 Number of test points, pcs. 8 8 8 Stay time of the pipe in the furnace shaft during a gas 2,45 2,75 3 extraction period, maximum, min Outer diameter of the test pipe, 76 76 76 mm Overall dimensions, mm : 13055 1980 1560 - length 13055 1980 1560 - width 13055 1980 1560 - height Weight, kg 7420 7420 7420 Manufacturing period – 90 days
BLAST-FURNACE EQUIPMENT WATER FILTER The water filter provides mechanical purification of the water (sieve size 6,3 mm) that is supplied to the blast furnace cooling system. Filters may be supplied with either a manual or electric drive. SPECIFICATIONS
VALUE
Nominal diameter, mm
400
500
600
Working water pressure, mPa
0,65
0,65
0,65
Capacity, m3/h: - at water velocity of 1,5 m/s - at water velocity of 2,5 m/s Sieve size, mm Weight, kg
690 1040 1040 1180 1800 1800 6,3 6,3 6,3
3300 5470 6835 Manufacturing period – 160 days
BLAST-FURNACE MAIN EQUIPMENT BYPASS VALVE The bypass valve reduces the pressure in the furnace stove when it changes from “standby” to “blasting,” before opening the cold blast shutoff valve. The DN500 valve comes with an electric drive, controller, and end switch.
Manufacturing period – 150 days SPECIFICATIONS
Type Nominal diameter, mm Working pressure, MPa Gas temperature, K (°C) Opening (closing) time, s Valve travel, mm Drive, type Electric motor, type : - power, kW - rotation rate - current type - voltage, V Reducer, type : Gear ratio: - when operated from electric drive - when operated from hand drive Controller, type Overall dimensions, mm: - length - width - height Valve weight, max, kg
VALUE
DN350 350 0,5 523 (250) 5,4 (3,6) 100 hydraulic - - - - -
DN500 500 0,5 673 (400) 15 (15) 130 electric ARF53-8U-3 2,2 640 alternating 380 Renveloping worm-gear with bevel drive
-
320,3 640,6 KA 4658-1 U2
1890 640 780 1130
1815 1770 1125 2200
BLAST-FURNACE EQUIPMENT EQUALIZING VALVE The equalizing valve operates as the gas shutoff valve for the blast furnace charging gear. The valve is installed on vertical sections of the filling gas mains and supply gas to the interbell space of the blast furnace charging gear in order to equalize pressure in the furnace mount as well as discharge gas to the atmosphere to equalize the pressure in the interbell space with atmospheric pressure. The valve comes with an electric drive, controller, position, and end switches. Control equipment is not included.
VALUE
SPECIFICATIONS
DN300 300 0,37 3 reverse 723 (450) 2AIMС160L8 7,5 750 KA 4658-1U2 ВP 15Е21A231-54U2,8 KU-701 AU2
Nominal diameter, mm Working pressure, MPa Opening (closing) time, s Valve operation Temperature, max, K (°C) Electric motor, type : - power, kW - revolutions per minute Controller, type End switch, type End switch, type Overall dimensions, mm: - length - width - height Weight, kg
1820 1695 1265 2570
SLIME VALVE The slime valve prevents slime from settling in the gas-cleaning plants of metallurgical plants. SPECIFICATIONS
VALUE
Nominal diameter, mm 300/250 Working pressure, MPa 0,3 Overall dimensions, mm: 1353 - length 618 - width 760 - height Weight, kg 220 Manufacturing period – 120 days
DN450 450 0,37 3 reverse 723(450) 4AM200M8 18,5 750 KA 4658-1U2 ВP15Е KU-701 AU2
2200 2130 1775 4451 Manufacturing period – 90 days
BLAST-FURNACE EQUIPMENT GOGGLE VALVE Goggle valves DC350 and DN500 are designed to shut off the equalizing valves during maintenance operations. Goggle valves DC1100 and DN1300 are designed to completely shut off the stoves from the gas mains and air mains coming from the central ventilation station when maintenance procedures are required on the air mains or stoves. The valves are installed on vertical sections of gas and air mains.
SPECIFICATIONS
Nominal diameter, mm Working pressure, MPa Working temperature, max, K (°C) Valve rotation angle, degree Overall dimensions, mm: - length - width - height Weight, kg
VALUE
DN350 350
DN400 400
DN500 500
DN1100 1100
DN1300 1300
0,25
0,37
0,37
0,012
0,012
373 (100)
373 (100)
373 (100)
373 (100)
373 (100)
90
90
90
105
105
1045 885 397
1300 1093 424
2740 1670 700
3170 1850 700
351
579
1060 910 366 338
1467 1960 Manufacturing period – 60 days
SECTORAL VALVE Sectoral valves DN2400 and DN2000 are designed to shut off the clear and semi-clear furnace gas mains. The valves are installed on horizontal sections of the mains. An expansion pipe must be installed on the gas main directly above the valve. The sectoral valve consists of the following main units: welded shell consisting of the left and right sides; wlide gate installed between the shell parts; .fixed axle installed in the supports on which the slide gate fits freely; .slide gate swiveling gears and two (upper and lower) slide gate clamps. SPECIFICATIONS
VALUE
Nominal diameter, mm
DN2000 2000
DN2400 2400
Working pressure, MPa
0,03
0,03
Total gear ratio of the slide gate swiveling gear
7933
9066
84
96
AIMM100S4U2.5
AIMM100S4U2.5
Slide gate rotation time during the electric drive operation, s Electric motor, type Weight, kg
4400 4910 Manufacturing period – 150 days
BLAST-FURNACE EQUIPMENT GAS DAMPER The gas damper shuts the interbell space off from the atmosphere to prevent gas from discharging from the furnace when the large cone is opened The gas damper is a welded cylindrical cone shell consisting of two bolted connections and welded plates. The upper flange of the gas damper has oval holes and grooves for sealing cord. The batch distributor in installed on the assembly.
SPECIFICATIONS
Nominal diameter of the cylinder part, mm Nominal diameter of the cone part, mm Height, mm Overall dimensions, mm: - length - width - height Weight, kg
VALUE
5550 2960 3180…3500 1050 3145 7020 17800…18500
THERMAL GAS SHUTOFF The thermal gas shutoff DN2000/1700 is designed to shut off separate gas cleaning units and main sections from the general gas network. It is installed on the horizontal section of the gas main. The gas shutoff may be switched on manually when the current or electric drive fails. The gas shutoff includes the electric drive, controller, microswitch, electric contact thermometer, gate valves and return valves installed on the mains to supply steam and remove cooling water. Controlling equipment and welded chain for the sprocket on the hand drive are not included.
SPECIFICATIONS
Nominal diameter of the gas main, mm Nominal diameter of the shutoff, mm Gas main pressure, MPa Steam temperature, K (°C) Steam pressure, MPa Time of the shutoff changing with the drive, s Overall dimensions, mm: - length - width - height Weight, kg
VALUE
2000 1700 0,025 423…473 (150…200) 0,6…1 75 4072 3752 4800 10500
BLAST-FURNACE EQUIPMENT BLEEDER STACK DN250 The bleeder stack DN250 is designed to blow through and ventilate separate gas main sections and the hot-blast stove gas burner housing. The bleeder stack is installed on the vertical section of the gas main. The bleeder stack consists of the following main units: housing; valve seat installed in the housing; shutoff plate; driven shaft; crank gear; electric and mechanic drive. SPECIFICATIONS
VALUE
Nominal diameter, mm 250 Gas working pressure, MPa 0,15 Plate opening angle, degree 75 Opening time, s 3 Electric drive: - type AIM 71В6 - power, kW 0,55 - rotation rate, min 900 Controller KA 4658 Overall dimensions, mm: - length 1580 - width 1025 - height 1173 Weight, kg 1329 Manufacturing period – 60 days BLEEDER STACK DN250 The DN250 and DN400 bleeder stacks discharge gas from the dust collector into the atmosphere. The bleeder stacks are installed on the vertical sections of the gas bleeders. The DN800 bleeder stack discharges gas from the dust collector to the atmosphere. The furnaces are usually shipped with two of these bleeder valves installed in the upper parts of the gas bleeders. The bleeder stack consists of the following main units: housing, seat, shutoff plate, driven shaft, and regulator. The stacks are opened with a separate electric winch. The shutoff plate is pressed to the seat of the stack with the counterbalance.
SPECIFICATIONS
Nominal diameter, mm Working environment Working pressure, MPa Gas temperature, K (°C)) Overall dimensions, mm : - length - width - height Counterbalance weight, kg Bleeder stack weight, max, kg
VALUE
DN250 250 gas 0,37 623…723 (350…450)
DN400 400 gas 0,37 593 (320)
2816 410 912 400 723
1860 680 2020 2000 799
DN800 800 gas 0,25 723 (450) 3320 1560 2620 3300 2630 Manufacturing period – 80 days
BLAST-FURNACE EQUIPMENT COLD-BLAST VALVE The cold-blast valve is designed to completely shut off the stove from the cold blast air duct. The gate type valve has no cooled elements. The valve is installed on the vertical section of the air main, near the stove. The cold-blast valve consists of the following main units: housing with a cover; choke with a relief valve; drive. The cold-blast drive may operate in the automatically driven system. The valve is supplied with electric drive, brake, controller and position switch. Controlling equipment is not included.
SPECIFICATIONS
Nominal diameter, mm Air pressure, MPa Air temperature, maximum, K (°C) Opening time upon the pressure equalization, s Permissible pressure difference, max, MPa Electric motor power, kW Overall dimensions, mm: - length - width - height Weight, kg
VALUE
DN1200 1200 0,42 473 (200) 12 0,03 2,5 5964 2515 1356 7647
DN1400 1400 0,42 473 (200) 12 0,03 2,5 6819 2715 1466 8702
HOT-BLAST VALVE The hot-blast valve shuts the furnace stove off from the hot blast air duct when the stove is operating in “heating” mode or is completely shut off from the furnace. The valve is installed on the horizontal section of the air main near the stove. The valve may be used as a shutoff valve. The hot-blast valve is produced in two models: «В» - with water cooling; «I» - with evaporation cooling.
BLAST-FURNACE EQUIPMENT Main advantages of the hot-blast valve: middle part of the housing, welded rings, and plate housing are made as a solid piece of low-alloyed steel that allows for a 2-3 times increase in thermal stability; lower part of the plate has a high-temperature protective coating, 5-1 mm thick; hydraulic or electric drive options. Main design features of the hot-blast valve: welded joints are protected with refractory lining; increased rigidity of housing and cover; increased thickness of the rings lining; interchangeability of the main units; high-temperature fusion of carbon threads increase the service life over 12 months without affecting the sealing ability. VALUE
SPECIFICATIONS
Nominal effective section diameter, mm Hot-blast temperature, max, K (°C) Hot-blast pressure, max, MPa Time of the valve closing (opening), max, s Pressure in the cooling system, maximum, MPa Overall dimensions, mm: - length - width - height Weight, max, kg
DN1100 1165
DN1300 1300
DN2000 2000
1873 (1600)
1773 (1500)
1873 (1600)
0,5
0,55
0,5
10 0,55
12 0,6
11 0,6
700 3152 6740
1050 3145 9470
500 2684 5590 6600…6800
11585…11800 20910…21310 Manufacturing period – 120 days
FUME VALVE The fume valve shuts the stove off from the intake of the fume pipe during air heating and withdraws the combustion products from under the stove to the chimney. The fume valve consists of: the housing, cover, plate, and cooled seat. The plate is connected with the regulator through the joint. The driven sector is located on a single axle with the regulator and is connected with the winch through the rope. The valves can be manufactured either right or left according to the drive position.
SPECIFICATIONS
VALUE
DN1100 1100 0,3
DN1300 1300 0,52
Nominal diameter, mm Working pressure on the stove side, MPa Temperature of the gas passing, max, 673 (400) 673(400) K (°С) Time of the valve opening with drive, s 7,5 10 Time of the valve opening with air, s 35 40 Overall dimensions, mm : 2150 - length 2000 2150 - width 2000 2570 - height 2200 Weight, kg 5640 7500 Manufacturing period – 150 days
BLAST-FURNACE EQUIPMENT GAS SHUTOFF The gas shutoff shuts off the gas main and regulates the gas flow in the mains and branch pipelines of sinter plants, furnaces, and other metallurgical plant facilities. The following models and options are available: DN2000, DN2000PN2,5, DN2400
SPECIFICATIONS
Nominal diameter, mm Working drive Time of valve closing (opening), max, s Emergency drive Gain on the wheel of the hand drive, max, H Electric motor power, kW Excessive gas pressure in the gas main, MPa Gas temperature, K (°C) Overall dimensions, mm: - length - width - height Weight with counterflanges, kg
VALUE
DN2000 2000 electric 110 hand 200 7,5 0,015 433(160)
DN2000PN2,5 2000 electric 331 hand 400 7,5 0,25 473 (200)
DN2400 2400 electric 130 hand 200 7,5 0,015 433 (160)
2525 850 9600 8345
2548 1250 9220 12852
2945 920 11245 11752
TUYERE CONNECTIONS Tuyere connections supply hot air blasts and natural gas through the air tuyere to the furnace well. The tuyere connections consist of the three main units: stationary section fixed on the housing of the furnace well; blast connection (tuyere) stock connecting the stationary section to the hot-blast circulating duct; springing attachment (buckle).
BLAST-FURNACE EQUIPMENT The tuyere connections are installed directly near the furnace connecting it to the hot-blast circulating duct. The connections are supplied without the refractory lining. SPECIFICATIONS
VALUE
Hot-blast temperature, K (°C) Hot-blast pressure, MPa Natural gas pressure, MPa Pressure of the cooling medium, MPa Overall dimensions, mm: - length - width - height Weight, kg
1473 (1200) 0,4 0,5 0,5 2700 1100 3200 3430 Manufacturing period – 120 days
THROTTLE GAS VALVE The throttling gas valve regulates the amount of gas supplied to the gas burner of the furnace stove and shuts the burner off from the gas main during normal operation or when the current fails. The valve is installed on the vertical section of the gas main. The throttle gas valve consists of the following main units: housing; two-stage worm reducer; flange electric drive; magnet support with electric magnetic coil; drive; switch.
SPECIFICATIONS
Nominal diameter, mm Excessive gas pressure, kPa (mm.w.column) Gas temperature, K (°C) Two-stage worm reducer: - gear ratio Electric drive: - type - power, kW - rotation rate, rpm - model Brake coil, type : - voltage, V Position switch Selsyn sensor: - voltage, V Overall dimensions, mm: - length - width - height
VALUE
DN1100 1100 7,85 (800) 343 (70)
DN1300 1300 7,85 (800) 343(70)
DN1500 1500 14,7 (1500) 343 (70)
1120
1120
1120
ARM43-10.U3 0,63 530 1M3002 TKP400U2 110
ARM52-10.U3 1,3 530 1M3002 TKP500U2 110
ARM53-10.U3 2 530 1M3002 TKP500U2 110
ВP16PG23B231-55.U23 ВP16PG23B231-55.U23 ВP16PG23B231-55.U23 BD 501AU3 110
BD 501AU3 110
BD 501AU3 110
2590 1540 1143
2820 1875 1143
2946 1875 1266
Manufacturing period – 90 days
BLAST-FURNACE EQUIPMENT THROTTLE UNIT The tightened throttle unit maintains excessive pressure under the blast furnace mouth by throttling the air stream with the DN425 and DN1000 valves. The operating motors are used as valve drives. The throttle unit consists of: valves of DN425 and DN1000 types installed on the bearing pipe and closed with the irrigation diffuser, as well as other valves according to the customer’s base data.
SPECIFICATIONS
Gas pressure, kg/cm (MPa) Gas temperature, K (°С) Gas content at the output, mg/mm Water flow for spraying, m/h Throttle rotation angle, degree DN425 throttle rotation time for 90°, s DN1000 throttle rotation time for 90°, s Overall dimensions, width*height, mm Weight, kg DX2000 VALVE The DX2000 valve regulates flow of the gas-air medium up to 200°C and is installed in the air and gas networks of blast furnaces. The DX2000 valve consists of: housing in which the valve gate is installed on the shaft with bearings. Single-turn actuator is used as a drive. SPECIFICATIONS
VALUE
2,5(0,25) 303…325 (30…50) 100 50…70 0…90 25 63 3750*4250 20423 Manufacturing period – 150 days
VALUE
Nominal diameter, mm 2000 Maximum medium pressure, MPa, 0,1 max Overall dimensions, mm: 2666 - length 750 - width 2200 - height Weight, kg 1706 Manufacturing period – 90 days UNIFIED UMT DAMPERS FOR METALLURGIC MAINS Multiple leaf dampers regulate the gas-air mixture and are installed on the mains of the ventilation system to remove the dust and combustion products from the gas in the heating and baking furnaces for metallurgical and other production facilities. The UMT dampers operate at the pressure of the medium in the main, not exceeding .005 MPa, and medium temperatures not exceeding 425°C. The dampers are classified as low-volume products and final assembly is completed at the customer’s site. There are two types of valves available: square and rectangular, which also differ in the position of the drive shaft.
BLAST-FURNACE EQUIPMENT SEPARATING FLAPPER The separating flapper is designed to quickly shut off the flow from the cross-section of the mixing cold blast pipe in case the blast supply to the furnace is stopped. This prevents the penetration of hot gases from the furnace to the cold-blast pipe. The flapper may operate in the automatic control system. The flapper has a vertical flap and is installed on the horizontal section of the blast pipe. Left-handed and right-handed flappers, depending on the drive location, are available, and include the electric drive, brake, controller, and position switches.
SPECIFICATIONS
VALUE
Nominal diameter, mm Air temperature, max, K (°C) Air pressure, MPa Flapper opening time, s Electric motor: - type - power, kW Brake, type Reducer, type Overall dimensions, mm: - length - width - height Weight, kg
1200 673 (400) 0,52 14 ARM 53-8U3 2,5 TKP 200 worm-differential 1583 2591 5753 8585 Manufacturing period – 120 days
GAS SHUTOFF VALVE The gas shutoff valve is designed to be installed on the coneless charging gear. The disk gas shutoff valve with a spherical contact surface separates the charge tract from the atmosphere and blast furnace body. The main advantage of this design is the opportunity to use this shutoff valve as a replacement to make operation easier.
SPECIFICATIONS
VALUE
Nominal diameter, mm 800 Gas temperature, K (°С) 623 (350) Gas pressure, , MPa 0,25 Gas pressure in the cooling system, 0,25 MPa Pressure in blow system, MPa 0,4 Valve opening (closing) time, s 4 Valve opening degree, degree 85 Overall dimensions, mm: - length 2870 - width 2867 - height 960 Weight, kg 7700 Manufacturing period – 90 days
REFERENCE LIST HOT METAL LADLE CARS NAME
COUNTRY
Russia Hot Metal Ladle Car G-100 Ukraine
Russia Hot Metal Ladle Car G-1-140 Ukraine Russia Hot Metal Ladle Car G-140 (without Ladle) Ukraine
CUSTOMER
EVRAZ KGOK Severstal Alchevsk Iron and Steel Works Zaporizhstal NLMK Achinsk cement NLMK Chelyabinsk Metallurgical Plant West-Siberian Metallurgical Plant ArcelorMittal Kryvyi Rih Azovstal Iron and Steel Works Transteshservice Energy NLMK Ilyich Iron and Steel Works Dniprovagonmash Azovstal Iron and Steel Works
QTY, UNITS
2 8 5 12 2 4 14 2 1 10 2 2 4 1 3 1 2
PERIOD
2005 2005-2006 2007 2006-2008 2002 2006 2005-2011 2008 2010 1999-2002 2005-2006 2004 2004-2005 2005 2002-2003 2003 2005-2006
RAILWAY SLAG CARS NAME
COUNTRY
Kazakhstan
Russia Railway Slag Car 11 m3 United States Ukraine Georgia Kazakhstan
Russia Railway Slag Car 16 m3
Ukraine
CUSTOMER
Aktobe Ferroalloy Plant Kuznetsk Iron and Steel Works Motovolokhinskiye Zavody Rusmash Mashprom Izhstal SUMPZ FELMAN Dneprospetsstal Donetsk Metallurgical Plant Alchevsk Iron and Steel Works Interpipe NTRP Georgian Manganezi Aksuskii Ferroalloy ArcelorMittal Temirtau Yermakovsky Ferroalloy Plant EVRAZ NTMK West-Siberian Metallurgical Plant NLMK Severstal Metallurgical Plant "Krasny Oktyabr" Azovstal Iron and Steel Works Alchevsk Iron and Steel Works Dzershinsky Iron and Steel Works Dneprometallurgmash Donetsk metallurgical plant Yenakiieve Iron and Steel Works Zaporizhstal Ilyich Iron and Steel Works Stakhaniv Ferroalloy
QTY, UNITS
9 3 1 1 1 4 1 4 5 2 1 2 4 13 4 1 3 6 27 4 1 4 30 10 3 6 8 14 7 5
PERIOD
2009-2010 1995 2001 2004 2004 2005 2010 2006 1994 1994 1994 2000 2008 2009-2011 2005-2011 1995 2007 2006-2011 2005-2011 2007-2008 1994 2005-2006 1994-2007 1994-2006 2005 2004-2009 1994-2008 2000-2006 1998-2007 2004-2006
REFERENCE LIST NAME
Railway Slag Car 16 m3
COUNTRY
Ukraine
Kazakhstan
Russia
Railway Slag Car 16,5 m3
Ukraine
Railway Slag Car 16,5 m3 (with Screw Ladle Tilting Gear)
Ukraine
CUSTOMER
QTY, UNITS
PERIOD
Combine plant Kramatorsk Iron and Steel Works Nikopol Ferroalloy ArcelorMittal Kryvyi Rih Makeevka metallurgical plant Balhash Power Plant EVRAZ KGOK Kumernomed Magnitogorsk Iron and Steel Works Severstal Tulachermet Azovstal Iron and Steel Works ArcelorMittal Kryvyi Rih Alchevsk Iron and Steel Works Dzershinsky Iron and Steel Works Yenakiieve Iron and Steel Works Makeevka Metallurgical Plant Ilyich Iron and Steel Works
2 2 5 12 2 4 15 1 7 10 8 6 29 13 3 17 3 15
1997 1994 2001 1999-2004 2004 2008 2004 2008 2006 2005-2006 2011 2007-2011 1994-2002 1994-2007 2005-2006 1994-2011 2007 1995-2007
Ilyich Iron and Steel Works
13
1998-2003
SLAG LADLES NAME
Slag Ladle 5 m3 Slag Ladle 13 m3
COUNTRY
Ukraine Belarus Belarus Kazakhstan Latvia
Russia
Slag Ladle 11 m3
Slovakia United States
Ukraine
CUSTOMER
Stakhaniv Ferroalloy Byelorussian Steel Works Byelorussian Steel Works Aktobe Ferroalloy Plant Liepajas metalurgs Bezhitski steel plant Vyksa Iron and Steel Works Nizhniy Tagil Iron and Steel Works NLMK New technologies Petrostal Taganrog Metallurgical Plant Taganrog Metallurgical Plant Himmashexport Chelyabinsk Metallurgical Plant IMET-TEC Redwood Enterprises, LLC Azovstal Iron and Steel Works Alchevsk Iron and Steel Works EVRAZ DMZ Petrovskogo Dzershinsky Iron and Steel Works Dneprospetsstal Donetsk metallurgical plant Donetsk Electrometallurgical Plant Zaporizhya Ferroalloy Interpipe NTRP Istil-DMZ Konstantinovka Metallurgical Plant Kramatorsk Iron and Steel Works ArcelorMittal Kryvyi Rih Interpipe NTRP Energoinvest
QTY, UNITS
7 21 45 8 8 4 27 3 4 20 3 33 27 5 6 20 8 20 2 103 12 46 13 2 36 109 29 2 13 4 116 3
PERIOD
2005 2008-2010 2005-2010 2009-2010 1994-1996 1994 2010-2011 2004 2002 1998-1999 2005 2002 2005-2011 2000-2004 2010 2007-2011 1997 1997-2010 1994 1999-2011 1998-1999 2005-2011 1994-1995 2011 1998-2011 2005-2011 2001-2008 1998 1994-1998 1994 1998-2004 1999
REFERENCE LIST NAME
Slag Ladle 11 m
3
COUNTRY
Finland Georgia Kazakhstan
Russia
Slovakia Turkey Slag Ladle 16 m3
Ukraine
Sweden Bulgaria Kazakhstan
Russia Slag ladle 16,5 m3
Slovakia Ukraine
CUSTOMER
Rautaruukki Georgian Manganezi ArcelorMittal Temirtau Aksuskii Ferroalloy Kazhrom EVRAZ KGOK Metallurgical Plant "Svobodniy Sokol" NLMK New technologies Achinsk cement EVRAZ NTMK West-Siberian Metallurgical Plant Magnitogorsk Iron and Steel Works Severstal Uralsteel Chelyabinsk Metallurgical Plant Energoinvest IMET-TEC Iscanderun Metal Works Azovstal Iron and Steel Works Alchevsk Iron and Steel Works ArcelorMittal Kryvyi Rih EVRAZ DMZ Petrovskogo Dzershinsky Iron and Steel Works Dniprovagonmash Dzershinsky Iron and Steel Works Dneprometallurgmash Dneprostrojtyazhmash Donetsk metallurgical plant Yenakiieve Iron and Steel Works Istil-DMZ Kramatorsk Iron and Steel Works ArcelorMittal Kryvyi Rih Makeevka metallurgical plant Ilyich Iron and Steel Works Metallurgical Academy Nikopol Ferroalloy Ordzhonikidze GOK SSAB EMEA AB ATKĐž Trade Balhash Power Plant New technologies Achinsk cement Severstal Tulachermet Uralsteel Chelyabinsk Metallurgical Plant NLMK IMET-TEC Azovstal Iron and Steel Works Alchevsk Iron and Steel Works EVRAZ DMZ Petrovskogo
QTY, UNITS
PERIOD
12 4 58 40 4 10
1996-1997 2011 2003-2010 2009-2010 2008 2004
2
1994
67 4 30 45 51 32 84 34 10 2 26 15 32 112 6 23 78 14 12 8 1 229 34 4 18 87 30 155 16 73 4 19 8 8 6 52 20 14 10 6 108 17 130 36 113
1999-2002 1999 2005-2006 2007-2010 2009-2010 2006-2008 2008-2011 2009-2010 2009-2011 1999 2006-2011 2007 1997-2008 1994-2008 2007 1999-2011 1994-2003 2003-2004 2000 2005 1995 1994-2011 1994-2011 2001 1994-1996 1994-2004 1994-2000 1994-2003 1997 1998-2011 1995 1995-2011 2007-2011 2008 1999 2005-2006 2009-2010 2009-2011 2009 2009 1999-2001 2007-2008 1997-2010 1994-2000 1998-2011
REFERENCE LIST NAME
COUNTRY
CUSTOMER
Dzershinsky Iron and Steel Works
Slag Ladle 16,5 m3
Ukraine
Slag Ladle 8,5 m3
Sweden
Dniprovagonmash Dzershinsky Iron and Steel Works Yenakiieve Iron and Steel Works Zaporizhya Ferroalloy ArcelorMittal Kryvyi Rih Makeevka metallurgical plant Ilyich Iron and Steel Works Ilyich Iron and Steel Works Dniepropetrovsk Metallurgic Ac. Ordzhonikidze GOK Pobugsky ferronickel plant Energoinvest SSAB EMEA AB
QTY, UNITS
PERIOD
69 58 2 162 4 211 18 170 94 26 5 59 8 5
1996-2002 2003-2004 2000 1994-2011 1999-2007 1994-2004 1994-1999 1994-2002 2005-2009 1997 1995 1994-2011 1999 1998
BATCH DISTRIBUTORS NAME
Batch Distributor
COUNTRY
Ukraine
CUSTOMER
Ilyich Iron and Steel Works Dzershinsky Iron and Steel Works
QTY, UNITS
PERIOD
9 1
1994-2009 1998
SKIPS NAME
Skip 0,7 m Skip 1,0 m3
COUNTRY
Russia Russia Russia
3
Skip 10 m3
Ukraine
Skip 8 m3
Ukraine
CUSTOMER
Severstal Severstal Chelyabinsk Metallurgical Plant Dzershinsky Iron and Steel Works Zaporizhstal Dzershinsky Iron and Steel Works Makeevka Metallurgical Plant Magnitogorsk Iron and Steel Works Yenakiieve Iron and Steel Works Donetsk metallurgical plant
QTY, UNITS
PERIOD
4 2007 2 2007 6 2006-2007 2 2005 1 1995 4 1998-1999 6 1994-2007 2 2006 2 2001 2 2005
CHARGING MACHINES NAME
COUNTRY
Iran Kazakhstan
TM-20 Charging Machine
Russia
Ukraine Belarus Russia TM-16 Charging machine Ukraine
CUSTOMER
Esfahan Steel ArcelorMittal Temirtau Nevaelektromash EVRAZ Kachkanar Ore Enrichment Plant Saratovkomplektstroj West-Siberian Metallurgical Plant NLMK Tulachermet ArcelorMittal Kryvyi Rih Makeevka Metallurgical Plant Beltrubotehservis Chelyabinsk Metallurgical Plant Ammofos Severstal Uralsteel Azovstal Iron and Steel Works Azot Ilyich Iron and Steel Works
QTY, UNITS
PERIOD
2 1 2
2005 2007 2003
3
2004
2 2004 2 2007 12 2010-2011 2 2009 2 2007 1 2007 1 1996 2 1994 3 2009-2010 1 2010 1 2009 5 1999-2008 1 2006 1 1997
REFERENCE LIST NAME
COUNTRY
TM-16 Charging Machine
Ukraine
TM-10 Charging Machine
Ukraine
CUSTOMER
QTY, UNITS
Zaporizhstal Alchevsk Iron and Steel Works Istil-DMZ Dniprovagonmash Donetsk Metallurgical Plant Yenakiieve Iron and Steel Works Dneprospetsstal
PERIOD
1 2000 3 1994-2005 2 2001 1 2003 2 2004 2 2006 3 1994-2006
FURNACE COOLING PLATES NAME
COUNTRY
Russia Turkey Cooling Plate Ukraine
Cooling Plate
Ukraine
CUSTOMER
EVRAZ NTMK Severstal Satka Iron-Smelting Works Tulachermet Iskanderun Metallurgical Plant Azovstal Iron and Steel Works Alchevsk Iron and Steel Works Dzershinsky Iron and Steel Works ArcelorMittal Kryvyi Rih Makeevka Metallurgical Plant Donetsk metallurgical plant EVRAZ DMZ Petrovskogo Yenakiieve Iron and Steel Works Zaporizhstal MMC Trading Stroi
QTY, UNITS
248 295 184 577 978 285 556 666 76 6 169 546 482 609 249
PERIOD
2005 2005-2009 2008 2007-2011 2007 2007-2008 2003-2007 1994-2008 2001 2000 2004-2008 1998-2007 2004-2009 1997-2011 2006
FURNACE CHARGING GEAR, SMALL CONES NAME
COUNTRY
Furnace Charging Gear Ø3600
Ukraine
Furnace Charging Gear Ø4200
Ukraine
Small Cone with Barbell Ø4200
Iran Kazakhstan
CUSTOMER
EVRAZ DMZ Petrovskogo EVRAZ DMZ Petrovskogo Yenakiieve Iron and Steel Works Esfahan Steel Соrp. ArcelorMittal Temirtau
QTY, UNITS
1 9 1 1 2
PERIOD
2011 1998-2010 2001 2010 2006-2011
NOSTRIL GEAR NAME
COUNTRY
Russia Ukraine
Nostril Gear
CUSTOMER
Tulachermet Alchevsk Iron and Steel Works
QTY, UNITS
1 1
PERIOD
2010 2012
DUST UNLOADERS NAME
COUNTRY
Kazakhstan
Screw Dust Unloader
Russia
Ukraine
CUSTOMER
ArcelorMittal Temirtau NLMK EVRAZ NTMK West-Siberian Metallurgical Plant Kosogorsk Metallurgical Plant Kuznetsk Iron and Steel Works Severstal Nevaelektromash Chusovoy Metallurgical Works EVRAZ KGOK Alchevsk Iron and Steel Works Dzershinsky Iron and Steel Works
QTY, UNITS
3 11 2 2 1 1 6 2 1 4 2 2
PERIOD
2000-2004 1994-2009 2005 2007 2008 2006 2003-2006 2003 1994 2004 2005 2006
REFERENCE LIST NAME
Screw Dust Unloader
COUNTRY
Ukraine
CUSTOMER
Zaporizhstal Yenakiieve Iron and Steel Works ArcelorMittal Kryvyi Rih Ukrremputčermet
QTY, UNITS
2 1 1 1
PERIOD
1999, 2006 2011 2002 1997
ROPE SHEAVES NAME
COUNTRY
Russia
Rope Sheave Ø2000 Ukraine
Sheave Brake
Ukraine
CUSTOMER
Tulachermet Sarkomplektstroj Energy Azovstal Iron and Steel Works Donetsk metallurgical plant Zaporizhstal Dzershinsky Iron and Steel Works Promarmatura ArcelorMittal Kryvyi Rih EVRAZ DMZ Petrovskogo Dneprometallurgmash Burshtynska Power Plant Volnogorsky Mining and Metallurgical Plant Ukrtechnosyntez Kryvy Rih Power Plant Sinelnikovo Springs Plant Central GOK
QTY, UNITS
PERIOD
2 2 4 26 8 3 12 4 12 6 1 2
2006 2004 2004 2002-2008 1994-2005 2005 1994-1999 2001 2001-2003 2004 2005 1996
5
1998
4 8 22 1
1999 2000-2001 2010 2007
TILTING RUNNERS NAME
Tilting Runner
COUNTRY
Ukraine
CUSTOMER
Donetsk metal-rolling plant Ferrit Podilsky cement
QTY, UNITS
2 40 1
PERIOD
1994 2000 2006
GAS SAMPLING MACHINE NAME
COUNTRY
Ukraine Gas Sampling Machine
Russia
CUSTOMER
EVRAZ DMZ Petrovskogo Yenakiieve Iron and Steel Works Zaporizhstal ArcelorMittal Kryvyi Rih Ilyich Iron and Steel Works Istil-DMZ Sarkomplektstroj West-Siberian Metallurgical Plant
QTY, UNITS
2 4 3 7 4 2 2 2
PERIOD
2004-2006 2006-2009 1999-2007 2003-2007 1995-2000 2001 2004 2007
WATER FILTER NAME
COUNTRY
DU-600 Water Filter
Ukraine
DU-500 Water Filter
Ukraine
CUSTOMER
EVRAZ DMZ Petrovskogo Azovstal Iron and Steel Works Alchevsk Iron and Steel Works
QTY, UNITS
2 3 1
PERIOD
2004-2006 2003 2003
REFERENCE LIST
BLAST-FURNACE MAIN EQUIPMENT BYPASS VALVE NAME
COUNTRY
Bypass Valve DN350
Ukraine
Bypass Valve DN500
Ukraine
CUSTOMER
ArcelorMittal Kryvyi Rih ArcelorMittal Kryvyi Rih Alchevsk Iron and Steel Works Donetsk metallurgical plant Yenakiieve Iron and Steel Works
QTY, UNITS
4 4 2 1 1
PERIOD
2005 2003 2004-2006 2007 2007
EQUALIZING VALVES NAME
COUNTRY
Kazakhstan Russia
Equalizing Valve Ukraine
CUSTOMER
ArcelorMittal Temirtau Chelyabinsk Metallurgical Plant Donetsk metallurgical plant Ilyich Iron and Steel Works Energy Gala-Capital EVRAZ DMZ Petrovskogo Donbasstehnologiya Dzershinsky Iron and Steel Works Azovstal Iron and Steel Works Yenakiieve Iron and Steel Works Makeevka metallurgical plant ArcelorMittal Kryvyi Rih
QTY, UNITS
2 4 2 4 2 2 4 4 2 29 13 8 6
PERIOD
2009 2011 1996 1996 2003 2001 2004 2004 2005 2002-2008 2005-2006 2007 2010
GOGGLE VALVES NAME
COUNTRY
Goggle Valve Ø1100
Kazakhstan Russia Ukraine
Goggle Valve Ø350
Ukraine Russia
Goggle Valve Ø400
Goggle Valve Ø500
Ukraine Ukraine
CUSTOMER
ArcelorMittal Temirtau Tulachermet Azovstal Iron and Steel Works Donetsk metallurgical plant Yenakiieve Iron and Steel Works Severstal Azovstal Iron and Steel Works Donetsk metallurgical plant Yenakiieve Iron and Steel Works Donetsk metallurgical plant ArcelorMittal Kryvyi Rih
QTY, UNITS
2 4 1 1 1 3 27 12 3 1 2
PERIOD
2011 2011 2005 2005 2011 2006 2004-2008 2005 2007 2010 2000
SECTORAL VALVES NAME
Sectoral Valve DN-2400
COUNTRY
Russia Ukraine
CUSTOMER
West-Siberian Metallurgical Plant ArcelorMittal Kryvyi Rih
QTY, UNITS
1 1
PERIOD
2007 2007
GAS DAMPER NAME
Gas Damper
COUNTRY
Ukraine
CUSTOMER
Dzershinsky Iron and Steel Works EVRAZ DMZ Petrovskogo
QTY, UNITS
5 1
PERIOD
2005-2007 2004
REFERENCE LIST GAS SHUTOFF NAME
COUNTRY
Russia
Gas Shutoff Ø2000
Ukraine
Russia Gas Shutoff Ø2400 Ukraine
CUSTOMER
Ammofos EVRAZ NTMK West-Siberian Metallurgical Plant Severstal NLMK Spectehkomplekt Alekseevskij Building Materials Plant EVRAZ KGOK Souzenergo Tulachermet Azovstal Iron and Steel Works Dzershinsky Iron and Steel Works EVRAZ DMZ Petrovskogo Yenakiieve Iron and Steel Works Ilyich Iron and Steel Works Zaporizhstal Achinsk cement Magnitogorsk Iron and Steel Works Nikopol Ferroalloy ArcelorMittal Kryvyi Rih
QTY, UNITS
6 5 2 11 2 1 3 4 1 3 2 1 1 1 5 3 2 2 1 2
PERIOD
2006-2011 2005-2009 2007 1997-2006 1999 2001 2004 2004 2007 2005-2010 2005-2006 2011 2005 2005 2007-2011 1998 2006 2007 2000 2007-2008
BLEEDER STACK NAME
COUNTRY
Bleeder Stack Ø250
Ukraine Czech Republic
Bleeder Stack Ø800
Ukraine
Bleeder Stack DN250, PN 3,7
Russia
CUSTOMER
QTY, UNITS
PERIOD
Azovstal Iron and Steel Works
8
2005
ARMATURY Group
2
2006
Dzershinsky Iron and Steel Works Donetsk metallurgical plant Tulachermet
2 2 2
2005 2006 2011
COLD-BLAST VALVE NAME
DU-1200 Cold-blast Valve DU-1400 Cold-blast Valve
COUNTRY
CUSTOMER
QTY, UNITS
PERIOD
Ukraine
Zaporizhstal Makeevka Metallurgical Plant
2 1
2004 2005
Kazakhstan
ArcelorMittal Temirtau
4
2004-2005
HOT-BLAST VALVE NAME
COUNTRY
Ukraine GDU-1300 Hot-blast Valve
GDU-1100-ВE Hot-blast Valve
Kazakhstan Slovakia Ukraine Russia Russia
GDU-1100 Hot-blast Valve
Russia Kazakhstan Ukraine
CUSTOMER
ArcelorMittal Kryvyi Rih Zaporizhstal ArcelorMittal Temirtau IMET a.s. Dzershinsky Iron and Steel Works Donetsk metallurgical plant Alchevsk Iron and Steel Works Uralsteel Lipetsk Iron Works "Svobodny Sokol" Mechel Uralsteel ArcelorMittal Temirtau Dzershinsky Iron and Steel Works
QTY, UNITS
PERIOD
5 2 9 2 7 8 4
1994-1997 1995 2002-2004 2003 1994 1994-1996 2005
19
2008-2010
1 4 4 4 6
2006 2006 2008 2010-2011 1994
REFERENCE LIST NAME
COUNTRY
GDU-1100 Hot-blast Valve
Ukraine
GDU-1100 I-E Hot-blast Valve
Ukraine
GDU-1100-I Hot-blast Valve
Russia
CUSTOMER
Azovstal Iron and Steel Works Alchevsk Iron and Steel Works Yenakiieve Iron and Steel Works ArcelorMittal Kryvyi Rih Zaporizhstal Kramatorsk Iron and Steel Works Dzershinsky Iron and Steel Works Makeevka metallurgical plant Uralsteel
QTY, UNITS
1 4 1 5 1 1 8 8 5
PERIOD
1995 1995 2001 1994 2010 2009 1994 1994-1996 2009-2010
FUME VALVE NAME
DU-1100 Fume Valve
COUNTRY
Ukraine
CUSTOMER
Zaporizhstal
QTY, UNITS
2
PERIOD
2005
THROTTLE VALVE NAME
COUNTRY
DU-1000 Throttle Valve
Ukraine Ukraine
DU-1100 Throttle Valve
Russia
DU-1400 Throttle Valve DU-1500 Throttle Valve DU-3000 Throttle Valve DX-2000 Throttle Valve
Kazakhstan Ukraine Russia Ukraine Ukraine
CUSTOMER
Dzershinsky Iron and Steel Works Yenakiieve Iron and Steel Works Serov Metallurgical Plant Ural Steel Satka Iron-Smelting Works Chelyabinsk Metallurgical Plant ArcelorMittal Temirtau Northen GOK Severstal Northen GOK Northen GOK
QTY, UNITS
2 3 3 6 1 4 6 1 1 1 1
PERIOD
2006 2006-2007 2006 2008-2011 2008 2011 2010-2011 2011 2009 2011 2011
THE THROTTLE UNIT NAME
COUNTRY
Ukraine Kazakhstan
Throttle Unit
CUSTOMER
Alchevsk Iron and Steel Works ArcelorMittal Temirtau
QTY, UNITS
1 1
PERIOD
2005 2004
SEPARATING VALVE NAME
DU-1200 Separating Valve
COUNTRY
Ukraine Kazakhstan
CUSTOMER
Azovstal Iron and Steel Works Makeevka Metallurgical Plant ArcelorMittal Temirtau
QTY, UNITS
7 1 1
PERIOD
2005 2006 2011
GAS SHUTOFF VALVE NAME
Gas Shutoff Valve
COUNTRY
Kazakhstan
CUSTOMER
ArcelorMittal Temirtau
QTY, UNITS
6
PERIOD
2005-2009
MULTIPLE LEAF DAMPERS NAME
COUNTRY
Kazakhstan Latvia UMT Multiple Leaf Dampers Russia
CUSTOMER
Aksuskii Ferroalloy Liepajas metalurgs EVRAZ NTMK Oskol Electric and Metal Works Severstal NLMK Sinarsky Pipe Works
QTY, UNITS
8 8 3 12 5 19 17
PERIOD
2001 2003 2006 1995-2000 2001 2000-2004 1994
REFERENCE LIST NAME
UMT Multiple Leaf Dampers
COUNTRY
Ukraine
CUSTOMER
Alchevsk Iron and Steel Works Yenakiieve Iron and Steel Works Azovstal Iron and Steel Works Nikopol Ferroalloy Zaporizhstal Istil-DMZ Dzershinsky Iron and Steel Works Northen GOK
QTY, UNITS
15 28 41 4 12 10 6 4
PERIOD
2006 2005-2010 1996-2005 2007 2000 2001 1999 1994
STEELMAKING EQUIPMENT STEEL CASTING LADLES NAME
COUNTRY
Kazakhstan Ladle 2 m3
Ukraine Ukraine
Ladle 3 m3
Ladle 5 m3 Ladle 8 m3 Ladle 10 m3 Ladle 20 tonnes Ladle 100 tonnes
Kazakhstan Estonia Ukraine Georgia Ukraine Mongolia Ukraine Russia Ukraine
CUSTOMER
Aksuskii Ferroalloy Zaporizhya Ferroalloy Ferrotrading Dneprometallurgmash Alchevsk Iron and Steel Works Stakhaniv Ferroalloy Aksuskii Ferroalloy FELMAN Zaporizhya Ferroalloy Georgian Manganezi Nikopol Ferroalloy Advances Technology ArcelorMittal Kryvyi Rih Tulachermet Donetsk metallurgical plant
QTY, UNITS
26 205 12 5 1 2 10 16 59 16 4 2 13 1 2
PERIOD
2009-2011 2000-2011 2005 2010 2004 2003 2011 2006-2010 1998-2011 2010-2011 2003 2008 2002-2004 2007 2008
METALLURGICAL PLATFORM NAME
COUNTRY
Russia PM-180 Metallurgical Platform Ukraine Russia
PM-250 Metallurgical Platform
Ukraine
CUSTOMER
Serov Metallurgical plant NLMK Ashinsky Metallurgical Plant Dzershinsky Iron and Steel Works Ordzhonikidze GOK Alchevsk Iron and Steel Works Makeevka metallurgical plant Uralsteel Dneprospetsstal Istil-DMZ Yenakiieve Iron and Steel Works ArcelorMittal Kryvyi Rih Interpipe NTRP Zaporizhstal
QTY, UNITS
6 6 2 21 1 59 6 5 1 11 3 4 5 15
PERIOD
2006-2007 1994-2004 2003 1994-2008 1995 1994-2004 1994 2008 1994 2005-2008 1994 2004 2000 2000
CASTING FORMS NAME
COUNTRY
Casting Form Casting Form V=1,8 m3
Ukraine Georgia
Casting Form
Ukraine
CUSTOMER
Zaporizhya Ferroalloy Georgian Manganezi Dneprospeczsplav Speczsplav
QTY, UNITS
75 28 4 18
PERIOD
2004-2009 2007-2008 2000 2002-2003
REFERENCE LIST STANDS NAME
Stands
COUNTRY
Ukraine
CUSTOMER
Istil-DMZ
QTY, UNITS
44
PERIOD
2004-2008
BOGIES NAME
COUNTRY
Mold Transporting Bogie
Ukraine
Transfer Bogie Motor Bogie
Russia Ukraine
Motor Stub Bogie
Ukraine
Stub Bogie
Ukraine
CUSTOMER
Dzershinsky Iron and Steel Works Ilyich Iron and Steel Works Alchevsk Iron and Steel Works Severstal ArcelorMittal Kryvyi Rih Azovimpeks Ilyich Iron and Steel Works Interpipe NTRP Starokramatorsk MBP MG Star Inc. Alchevsk Iron and Steel Works ArcelorMittal Kryvyi Rih Zaporizhstal Makeevka Metallurgical Plant
QTY, UNITS
2 24 14 1 5 107 60 30 6 8 3 1 2 2
PERIOD
1994 1994-1996 1994 2006 2005 2007-2011 1994-1997 1998-2001 2005-2006 2004 2001-2005 2003 2005 2008
WHEEL PAIRS NAME
COUNTRY
Bulgaria Wheel Pairs
Russia
Ukraine
Bulgaria Iran Wheel Pairs with Disc Headwork
Russia Ukraine Russia
Wheel Pairs for Railway Slag Car
Ukraine
CUSTOMER
ATKO Trade Magnitogorsk Iron and Steel Works Severstal Donetsk metallurgical plant Makeevka metallurgical plant Alchevsk Iron and Steel Works Dneprometallurgmash Ilyich Iron and Steel Works Dzershinsky Iron and Steel Works EVRAZ DMZ Petrovskogo ArcelorMittal Kryvyi Rih ArcelorMittal Kryvyi Rih Zaporizhstal ATKO TRADE Esfahan Steel 小芯. Electro Interservice Chelyabinsk Metallurgical Plant Magnitogorsk Iron and Steel Works Motovolokhinskiye Zavody Azovimpeks NLMK Konstantinovka Metallurgical Plant Ilyich Iron and Steel Works Alchevsk Iron and Steel Works EVRAZ DMZ Petrovskogo Dzershinsky Iron and Steel Works Zaporizhya Ferroalloy Istil-DMZ Donetsk metallurgical plant ArcelorMittal Kryvyi Rih
QTY, UNITS
8 20 160 20 10 28 30 40 32 20 107 161 60 4 120 30 14 20 2 4 58 4 529 288 50 16 8 6 12 1033
PERIOD
2005 2005 2005 2005 2005 2005-2006 2005 2005 2005 2005 2005-2006 2006-2007 2005-2006 2011 2007 2011 2011 2007 2003 2011 2001-2002 2000 1995-2002 1999-2004 1998 2002 1998 2001 2002 1994-2004
2 Zavodskaya street Slavyansk, Ukraine, 84102 Phone: +38-0626-66-8100, Fax: +38-0626-66-8130, e-mail: n.panarin@dneprotechservice.com www.sztm-ua.com
3 Sukhoy Ostrov street Dnepropetrovsk, Ukraine, 49600 Phone: +38-056-371-4919, Fax: +38-056-371-4908 e-mail: n.panarin@dneprotechservice.com www.dtm.dp.ua
201 Wilshire blvd., Suite A14 Santa Monica, CA, 90401, USA Phone: +1-310-883-7943, Fax: +1-310-883-7944 e-mail: m.dyakonyuk@dneprotechservice.dp.ua www.dts.dp.ua