Mazen's Portfolio

Page 1

Mazen Abdelham i d P o r t f o l i o


Contents

88 v st sw, apt 506 Wa s h i n g t o n DC 2 0 0 2 4 U n i t e d S tat e s mazen066@gmail.com )7 0 3 (3 8 8 - 8 3 6 3

1

Sketchin g

4

2

Resid entia l

8

3

Commercia l

30

4

Urban Pla n n i n g

38

5

In terior

42

6

In d ustrial

46

7

Ed ucationa l Pr ojec t

50

Architecture is the will of an epoch translated into space Ludwig Mies Van Der Rohe


Sketching

Mazen Abdelhamid


Project Descrptions Residential Complex Under Construction Content: 158 residential units , 7 showrooms, 165 parking, Gym, Multi purpose hall, cafeteria, swimming pool& drivers room Owner: Al-Soliman Real Eatate Company Cost: 53 million dollars

Position TypicalFloor Plan

Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

Location Al-Khobar, Saudi Arabia

Date

08/2010

Mazen Abdelhamid


Project Descrptions Residential Complex Under Construction Content: 182 residential units ,185 parking, Gym, Multi purpose hall, cafeteria, swimming pool& drivers room Owner: Al-Soliman Real Eatate Company Cost: 55 million dollars

Position Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

Location

Al-Madinah Al-Monawara, Saudi Arabia

TypicalFloor Plan

Date

10/2011

Mazen Abdelhamid


MDL

Project Description 10 story mixed-use development 76-unit luxury affordable apartments 3,500 sq. ft. commercial space Owner: TM Associates DCHD project

Position Project Manager, PGN Architects

Location Buzzard Point, Washington, DC 20024 Date 06/2017

First Floor Plan

Mazen Abdelhamid


PLANTER

LO T : 4 9

1530 FIRST STREET SW

LOT : 8 24 174' - 4"

BENCH

PLANTER

19.76 ft

172' - 1" 15' - 6"

1 A-45

RETAIL 7052.61 SF

PKG. 74.70 SF

16.00% 94' - 5"

RAMP TO GARAGE

REST ROOM 68.88 SF

76' - 1"

8.33%

15' - 8"

21' - 6"

LOT : 8 24

10 story mixed-use development 101-unit luxury affordable apartments commercial retail space 13,032 square-feet Owner: TM Associates DCHD project

23.20 ft

EGRESS PATH 8.00% 8' - 10"

4' - 2"

4' - 8"

DN

LOADING BERTH

5.00% 12' - 0"

GARAGE ENTRY

18' - 0"

UP

BENCH

5.82% SERVICE CORRIDOR

ELEVATOR LOBBY

16' - 4"

LOBBY 1057.58 SF

19.80 ft

UP

16' - 4"

19.80 ft

RESIDENTIAL ENTRY

LEASING 168.96 SF

EGRESS PATH

STAIR #2

STAIR #1 LEASING 175.49 SF

ELEV.

5' - 3" 4' - 0"

76' - 1"

FIRST STREET SW

ELEV.

LOT : 8 23

23' UHAUL TRUCK

25' - 4" TRASH ROOM 436.37 SF

MAIL

100 SF LOADING PLATFORM

8' - 6"

56' - 9"

23.81 ft

12' - 10"

42' - 8"

UP

RETAIL ENTRY

SHORT TERM BIKE RACK

Project Description

23' - 11"

FIRE COMMAND 98.90 SF

26.35 ft

PUBLIC ALLEY

Position Project Manager, PGN Architects

PUBLIC ALLEY

PLANTER

1550 FIRST STREET SW

Location

First Floor Plan

AN

ELEVATOR

LEASING

PKG.

RETAIL

TRASH

FIRE COMMAND

LOBBY

REST ROOM

SERVICE CORRIDOR

UTILITY

GROSS FLOOR AREA = 11,831 SF LOT OCCUPANCY= 11,831 / 13,206 = 89.59 % FAR 7.8

ROOM Plan First Floor

0

15'

30'

60'

Buzzard Point, Washington, DC 20024 Date 10/2019

Mazen Abdelhamid


Project Description 6-story + penthouse , 67-units Mullti-family development 50,000 square feet

Position Project Manager, PGN Architects

First Floor Plan First Floor Plan

Location NoMA Washington, DC Date 07/2019

Mazen Abdelhamid


EUROPA

Project Description 5-story + penthouse , 49-units 44 parking spaces Mullti-family development 50,400 square feet

Position Project Manager, PGN Architects

First Floor Plan First Floor Plan

Location 818 Potomac Ave SE Washington, DC Date 10/2017

Mazen Abdelhamid


1

2

3

4

5

6

1

2

3

4

5

6

2

F

1

F

MECHANICAL EXHAUST OUTLET, TYP

05 - PENTHOUSE FLOOR

6

2

2

1

1

E

Sim

2 A202

04 - FOURTH FLOOR 185.25'

EHLERT BRYAN

4910 Massachusetts Avenue, NW

8609 Westwood Center Drive, Suite 800

3

3

1

1

Washington, DC 20016

Tysons, VA 22182

202.244.414

703-827-9552

2)0 $5&+,7(&76 1

2

2

1

1

1

1

2

1

2

1

1

2

1

1

2365 Rhode Island Ave NE

Square No: 4249

1

2

1

2

50' - 0"

BHMP

2

Lot No: 0017-0801 Zone: MU-4

SOUTH ELEVATION CALLOUT1

A202

1/8" = 1'-0"

2365 Rhode Island Ave NE 2365 RHODE ISLAND AVE NE WASHIGNTON DC 20018

4

Square No: 4249

FCP-1

NORTH ELEVATION

GRAY REGION ISSUE NO: ANGLED FACADES

1/8" = 1'-0"

5

4

3

1

2

A321

ST

2

1

3

A321

DESCRIPTION

06/23/2021 07/16/2021

90% CONSTRUCTION DOCUMENT PERMIT SET

GRAY REGION ANGLED FACADES

GRAY REGION ANGLED FACADES

ST

MECHANICAL EXHAUST OUTLET, TYP

2

163.92'

-01 - CELLAR FLOOR 141.92'

1/8" = 1'-0"

E L E V A TI O N

DESCRIPTION

SOUTH

2

W AL L ( S F )

1,352

2,786

991

NORTH

5,854

1,738

EAST

1,085

0$18)$&785( :,/621$57 $921'$/( $6+ 288

98

BAY 2 (SIDES)

288

98

15,215

4,669

TOTAL

'1

WINDOW / WALL RATIO = 30.68%

3

4

3 4 5 6 7 8 9 10 11 12 13 14 15

6))

: '

5()(5 722 $

A201

,= 81,7

K E Y P L AN

5

6 1

6)) 5()(5 722 $

'1

5'

6)) 3$175<

5()(5 722 $

83

6))

7<3( % 81 1, 7

+%

3( 6/2

6/23( (

5' 2'

3( 6/2

3( 6/2

2' 5'

6/23(

3( 6/2

6/23(

IW

3( 6/2

+%

2'

6/23(

5' 2'

5'

6))

3( 6/2

7<3( % 81 1, 7

10' - 8" 11' - 0"

6

0$18)$&785( 7$5.(77 0LOOZRUN :DOO )LQLVK LQJ 6\VWHP 58%%(5 %$6( &RORU :+,7(

5-story + penthouse , 41-units 7 parking spaces Mullti-family development 50,000 square feet

6&21&(

5()(5 722 $

First Floor Plan

6)) 5()(5 722 $

: '

5

Project Description

7<3( $ 81 1 ,7

$

DATE

SOUTH ELEVATION

&21&5(7( 67$,5 :,7+ :22' ),1,6+

: '

98

DESCRIPTION

COPYRIGHT © 2021PGN ARCHITECTS, PLLC

98

4,669

0$18)$&785( %(1-$0,1 0225( &RORU 6XSHU :KLWH 2&

5()(5 722 $

REVISION NO:

WINDOW / WALL RATIO = 30.68%

67$,5

$

288 288

15,215

4

: '

IW

BAY 1 (SIDES) BAY 2 (SIDES)

83

$

6/23(

: ' $

67$,5 673

1 ,7 7<3( $ 81

)/225 67 )/225 0$18)$&785( '$/7,/( &HQWHU &LW\ 1$785$/ 6721( &2/25 '(/$1&(< *5(< 0

)(&

2'

392

673

IW

6/23(

1,738

1,085

1, 7 7<3( % 81

IW

5,854

EAST

07/16/2021

A202

: '

NORTH

DATE 06/23/2021

10/01/2021

K E Y P LA N

'1

5'

991

6/23(

(/(9

)/225 /2%%<

1,352

2,786

TOTAL

SOUTH ELEVATION CALLOUT 2 1/8" = 1'-0"

W IN D O W ( S F )

4,914

WEST

3

&/5

6/23(

6))

5()(5 722 $

90% CONSTRUCTION DOCUMENT PERMIT SET

: '

$

$

2'

CAST-IN-PLACE CONCRETE EXTERIOR INSULATION FINISHIN SYSTEM NICHIHA FIBER CEMENT PANEL - MEDIUM GREY NICHIHA FIBER CEMENT PANEL - ORANGE NICHIHA FIBER CEMENT PANEL - LIGHT GREY NICHIHA FIBER CEMENT PANEL - DARK GREY NICHIHA FIBER CEMENT PANEL - DARK ORANGE METAL SLAT - FINISH TBD ARRISCRAFT BLACKCOMB STONE

$

CONCRETE MASONRY UNITS

W AL L ( S F )

SOUTH

': 5()

6/23(

CMU CON EFIS FCP-1 FCP-2 FCP-3 FCP-4 FCP-5 MTL-1 ST

ST

IW

0$,/%2;(6 %/$&. ),1,6+

42" METAL RAILING ROLL-UP GARAGE DOOR GARAGE EGRESS MAIN ENTRANCE ENTRANCE CANOPY METAL COPING SLIDING BALCONY DOOR BIFOLD AMENITY BALCONY DOOR OUTDOOR DOOR 42" CMU WALL ARRISCRAFT CAST STONE CORNICE LADDER MAIN ENTRY SIGNAGE 72" LOUVERED METAL MECHANICAL SCREEN MECHANICAL EQUIPMENT

2

&/5

E L E V AT IO N

DESCRIPTION

7<3( % 81 1, 7

DESCRIPTION

100% DESIGN DEVELOPMENT

60% CONSTRUCTION DOCUMENT

3

152.92'

7

138.75'

3

MARK

Note Text

1 2

163.92'

-02 - LOWER CELLAR FLOOR

MATERIAL LEGEND

ELEVATION KEYNOTE

CHECKED BY: Checker

02 - SECOND FLOOR

2

1/8" = 1'-0"

7<3( $ 81 1,7Note Number NORTH ELEVATION 1 2

ISSUE NO:

BHMP 147.90'

SOUTH ELEVATION CALLOUT 3

392

BAY 1 (SIDES)

174.59'

152.92'

22

COPYRIGHT © 2021PGN ARCHITECTS, PLLC

4

E L E V AT IO N N O TE S : 1. REFER TO SHEET A801 FOR EXTERIOR FINISH SCHEDULE. 2. REFER TO SHEET A705 & A710 FOR DOOR AND WINDOW SCHEDULE. 3. EXTERIOR VENTS TO MATCH COLOR W/ EXTERIOR FINISH MATERIAL.

'1

83

A202

W I N D O W (S F )

4,914

WEST

2

03 - THIRD FLOOR

01 - FIRST FLOOR

23

A

CONCRETE MASONRY UNITS CAST-IN-PLACE CONCRETE EXTERIOR INSULATION FINISHIN SYSTEM NICHIHA FIBER CEMENT PANEL - MEDIUM GREY NICHIHA FIBER CEMENT PANEL - ORANGE NICHIHA FIBER CEMENT PANEL - LIGHT GREY NICHIHA FIBER CEMENT PANEL - DARK GREY NICHIHA FIBER CEMENT PANEL - DARK ORANGE METAL SLAT - FINISH TBD ARRISCRAFT BLACKCOMB STONE

CMU CON EFIS FCP-1 FCP-2 FCP-3 FCP-4 FCP-5 MTL-1 ST

6/23(

1

MARK

Note Text 42" METAL RAILING ROLL-UP GARAGE DOOR GARAGE EGRESS MAIN ENTRANCE ENTRANCE CANOPY METAL COPING SLIDING BALCONY DOOR BIFOLD AMENITY BALCONY DOOR OUTDOOR DOOR 42" CMU WALL ARRISCRAFT CAST STONE CORNICE LADDER MAIN ENTRY SIGNAGE 72" LOUVERED METAL MECHANICAL SCREEN MECHANICAL EQUIPMENT

6/23(

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

2

01 - FIRST FLOOR

MATERIAL LEGEND

ELEVATION KEYNOTE Note Number

ST

IW

6/23(

E L E V AT I O N N O T E S : 1. REFER TO SHEET A801 FOR EXTERIOR FINISH SCHEDULE. 2. REFER TO SHEET A705 & A710 FOR DOOR AND WINDOW SCHEDULE. 3. EXTERIOR VENTS TO MATCH COLOR W/ EXTERIOR FINISH MATERIAL.

7

7

DATE

DESCRIPTION

NORTH ELEVATION - CELLAR

)'&

REVISION NO:

BHMP 147.90'

3

2

4

00 - GRADE 148.42'

IW

1 12

3( 6/2

1

9/30/2021 6:09:07 PM

1

23

6/23(

22

SCALE: As indicated DRAWN BY: Author PROJ NO: 20-0019

:$//6 &(,/,1* 3$,17

02 - SECOND FLOOR

10/01/2021

3( 6/2

3( 6/2

2

/5

S3

22

1

B

1

4' - 6"

6' - 4"

B

S3 1 12

NE

185.25'

DATE

100% DESIGN DEVELOPMENT 60% CONSTRUCTION DOCUMENT

I AM RESPONSIBLE FOR DETERMINING THAT THE ARCHITECTURAL DESIGN INCLUDED IN THIS APPLICATION ARE IN COMPLIANCE WITH ALL LAWS AND REGULATIONS OF THE DISTRICT OF COLUMBIA. I HAVE PERSONALLY PREPARED, OR DIRECTLY SUPERVISED THE DEVELOPMENT OF, THE ARCHITECTURAL DESIGN INCLUDING APPLICATIONS.

7

1

01 - FIRST FLOOR 152.92'

195.92'

04 - FOURTH FLOOR

7

12' - 0"

11' - 4"

CHECKED BY: Checker

S3

PENTHOUSE FRAMING

FCP-1 2

23

S5

10' - 8"

196.59' 7

2 FDC

PENTHOUSE HEIGHT

05 - PENTHOUSE FLOOR

FCP-4

2 3

MTL-1

A321

FCP-4

2

SCALE: As indicated DRAWN BY: Author PROJ NO: 20-0019

ISLAND AVE,

Zone: MU-4

207.25'

10' - 8"

C

C

3

BHMP 147.90'

CON

45' - 0"

4

14

ST

Lot No: 0017-0801

RIA PARTNERS, LLC 06 - ROOF

152.92'

CON

703-827-9552

Washington DC 20006

163.92'

ST

Tysons, VA 22182

202.244.414

BUILDING HEIGHT

BHMP 147.90'

8609 Westwood Center Drive, Suite 800

Washington, DC 20016

2020 K Street NW, #650

147.90'

02 - SECOND FLOOR

I AM RESPONSIBLE FOR DETERMINING THAT THE ARCHITECTURAL DESIGN INCLUDED IN THIS APPLICATION ARE IN COMPLIANCE WITH ALL LAWS 1 REGULATIONS SOUTH ELEVATION 1 AND OF THE DISTRICT 1/8" OF =COLUMBIA. I HAVE A202 1'-0" PERSONALLY PREPARED, OR DIRECTLY SUPERVISED THE DEVELOPMENT OF, THE ARCHITECTURAL DESIGN INCLUDING APPLICATIONS.

ROHDE

EHLERT BRYAN

4910 Massachusetts Avenue, NW

Metropolitan Engineering

152.92'

01 - FIRST FLOOR

4' - 6"

6' - 4"

S5

13

2

10' - 8"

10' - 8" 0' - 8"

12' - 0"

1

2

CMU

5

1

A201

VIKA Capitol, LLC

01 - FIRST FLOOR

202-296-2580

RIA PARTNERS, LLC

01 - FIRST FLOOR 152.92' 00 - GRADE 148.42'

1

1

174.59'

2365 RHODE ISLAND AVE NE WASHIGNTON DC 20018

02 - SECOND FLOOR 163.92'

1

03 - THIRD FLOOR

2

CON

A201

2 CON

Sim

4

2

1

1

2

CONSULTANTS

ST 14

2

2365

PGN ARCHITECTS, PLLC 210 7th Street SE - Suite 201 Washington, DC 20003 202.822.5995 (P); 202.822.0908 (F)

163.92'

202-296-2580

A202

2

174.59'

02 - SECOND FLOOR

185.25'

1

2

1

Washington DC 20006

11' - 0"

2

2

03 - THIRD FLOOR

04 - FOURTH FLOOR

2020 K Street NW, #650

03 - THIRD FLOOR 174.59'

MTL-1

ST

MECHANICAL EXHAUST OUTLET, TYP

1

2

50' - 0"

1

10' - 8"

1

50' - 0"

1

BUILDING HEIGHT

1

3

D

D

1

3

10' - 8"

FCP-4

1

195.92' 2

Metropolitan Engineering 1

FCP-4

PENTHOUSE HEIGHT

PENTHOUSE FRAMING 1

2

1

CONSULTANTS

VIKA Capitol, LLC

2

196.59'

10/1/2021 4:28:06 PM

1

185.25'

2

05 - PENTHOUSE FLOOR

10' - 8"

1

1

10' - 8"

1

1

2

BUILDING HEIGHT

1

2 FCP-1

11' - 0"

2

10' - 8"

2

PENTHOUSE FRAMING 195.92'

0' - 8"

FCP-4

FCP-1

NICHIHA PANEL, 6' X 1'-6" TYP.

FCP-4 1

PGN ARCHITECTS, PLLC 210 7th Street SE - Suite 201 Washington, DC 20003 202.822.5995 (P); 202.822.0908 (F)

207.25'

10' - 8"

12' - 0"

MECHANICAL EXHAUST OUTLET, TYP

10' - 8"

BAC K SET 1:1

E

GRAY REGION ANGLED FACADES

CK T BA

FCP-5

SE

K AC TB

2

S3

195.92'

04 - FOURTH FLOOR

06 - ROOF

1:1

SE

1

23

2

S3

2

FCP-4

06 - ROOF 207.25'

05 - PENTHOUSE FLOOR 196.59'

1

2

FCP-1

1:1

24

1

196.59'

A202

15

PENTHOUSE FRAMING

FCP-1

FCP-3

FCP-2

1

15

1

Sim

BUILDING HEIGHT

2

7

FCP-1 8

3

10' - 8"

3

GRAY REGION ANGLED FACADES

11' - 4"

GRAY REGION ANGLED FACADES

4

6

3 A321

PENTHOUSE HEIGHT

5

2 A321

11' - 0"

1 A321

0$18)$&785( 2&/ $UPHW 6 6$ ,1'225 $'$ &203/,$17 6&21&( 6,=(

Position Project Manager, PGN Architects

$

Location

First Floor Plan

/2%%< &55,'256 67 )/225 3/$1

:$//3$3(5 ,0$18)$&785( 9(56$ :$//&29(5,1* %DOOLDQR 7H[WXUH R]

2365 RHODE ISLAND AVE NE, Washington, DC Date 06/2021

Mazen Abdelhamid


1 7 3 1 Kaloramal Condominium Project Descrptions Residential condominium Content: 25 residential units Cost: 5 million dollars

Position Architect in Rich Markus Architects, 2601 P ST NW Washington DC 20007 United States

Location

1731Kalorama RD, NW Washington DC 20009 United States TypicalFloor Plan

Date

07/2016

Mazen Abdelhamid


3300-3316 11thst,NW Mexed Use Project Descrptions Mexed Use Content: 10 residential units, 7,000 SF Retail, 9 Parking spots Cost: 5 million dollars SecondFloor Plan

Position Architect in Rich Markus Architects, 2601 P ST NW Washington DC 20007 United States

Location

1731Kalorama RD, NW Washington DC 20009 United States

Date

02/2016 ThirdFloor Plan

Mazen Abdelhamid


2 2 0 7 FoxHall S i n g l e H o u s e Project Descrptions Single Family House Cost: 2 million dollars

Position Architect in Rich Markus Architects, 2601 P ST NW Washington DC 20007 United States

Location

2207-FoxHall RD, NW Washington DC 20007 United States

Date GroundFloor Plan

04/2016

Mazen Abdelhamid


2 2 0 7 FoxHall S i n g l e H o u s e Project Descrptions PRIVATE RESORT Cost: 3 million dollars

Position Architect in Al-Soliamn Real Estate, Riyadh, Saudi Arabia

Location

Telal Al-Amaria, Riyadh, Saudi Arabia

Date Site Plan

02/2014

Mazen Abdelhamid


Shiekh Jassim Nasser Al-Thani Palace Project Descrptions Basement Floor Plan

Ground Floor Plan

Private Palace Finished Construction Owner: Shiekh Jassim Bin Nasser Al-Thani Cost: 4.1 million dollars

Position Architect in UDC Consultant & Engineers, Doha, Qatar

Location

Doha, Qatar

Date 05/2009 First Floor Plan

Penthouse Floor Plan

Mazen Abdelhamid


Project Descrptions Residential Village Finished Construction Owner: Barwa Real Estate Companym Doha , Qatar Cost: 106 million dollars

Position Architect in UDC Consultant & Engineers, Doha, Qatar

Location

Doha, Qatar

Date 02/2009

Mazen Abdelhamid


Typical Floor Plan

Saad AlDawoud Office Building Project Descrptions Commercial & Office Building Finished Construction Content: 3 showroom & 24 office Owner: MR. Fahad Saad AlDawood Cost: 14.4 million dollars

Ground Floor Plan

Position Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia

Location

Riyadh, Saudi Arabia

Date Basement Floor Plan

11/2012

Mazen Abdelhamid


Basement Floor Plan

Ground Floor Plan

Project Descrptions Commercial & Office Building Under Construction Content: 1 showroom & 8 office Owner: Al-Soliman Real Estate company Cost: 1.35 million dollars

Position Section A-A

First Floor Plan

Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia

Location

Riyadh, Saudi Arabia

Date 01/2014 Front Elevation

Side Elevation

Mazen Abdelhamid


Riyadh city is one of the oldest, historical and biggest cities in Saudi Arabia. Since 17 century Riyadh has significant cultural and architectural environment, Riyadh is considered a model of growth in the global architecture field, the architecture developments plans and designs depends on developments tools and importance historical and cultural of the city, since the fast growth of population, architecture deigns development has consider the natural geographic, historical and cultural of the city, all these elements will create successful and productive community

Al-Morabaa Palace - Riyadh City

Al-Direya - Riyadh City

The eastern entrance for capital palace

the project main concept project principle one beacuse of the huge lenght of the land , the spaces divied to unties which leads to the internal spaces to creat modern environment suitable with the location Circumstances , avoid the boring in design

1

project principle two As one of the Riyadh Architectural heritage, deign will consider using the architecture system which parallelogram with the land shape to create green planted areas, as well as using curved lines to create a great combination between modernisms and historical heritage

2

project principle three Traffic flows and cars movement has moved to the surrounding streets and separated from the main buildings and green planted areas

Project Descrptions Residential Compound Under Construction Content: 260 Units Owner: Al-Soliman Real Eatate Company Cost: 66.7 million dollars

3

Position

4

Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

project principle four the main area is depends on natural elements which is creating a simulation of palm valley and building services which is located in low level from the complex

Location

Riyadh, Saudi Arabia

Date 06/2013

Mazen Abdelhamid


Interior Design Project Descrptions Residential Complex Owner: Al-Ezdihar Real Eatate Company

Position Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia

Location

Al-Madinah Al-Monawara, Saudi Arabia

Date

10/2013

Mazen Abdelhamid


Project Descrptions Precast Factory Finished Construction Owner: Barwa Real Estate Companym Doha , Qatar Cost: 580 million dollars

Position Project cordonator in Barwa Building Material Company, Doha, Qatar

Location

Mesaed, Qatar

Date 02/2008

Mazen Abdelhamid



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.