Mazen Abdelhamid portfolio

Page 1

Mazen Abdelham i d P o r t f o l i o


Contents

A l - A q i e q , 1 5 0 5 K i n g Fa h a d R o a d , PO.Box 911 R i ya d h 1 1 3 2 2 Saudi Arabia mazen066@gmail.com +966-544244603

1

Sketchin g

4

2

Resid entia l

8

3

Commercia l

30

4

Urban Pla n n i n g

38

5

In terior

42

6

In d ustrial

46

7

Ed ucationa l Pr ojec t

50

Architecture is the will of an epoch translated into space Ludwig Mies Van Der Rohe


Sketching

Mazen Abdelhamid


Sketching

Mazen Abdelhamid


Project Descrptions Residential Complex Under Construction Content: 158 residential units , 7 showrooms, 165 parking, Gym, Multi purpose hall, cafeteria, swimming pool& drivers room Owner: Al-Soliman Real Eatate Company Cost: 53 million dollars

Position TypicalFloor Plan

Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

Location Al-Khobar, Saudi Arabia

Date

08/2010

Mazen Abdelhamid


Project Descrptions Residential Complex Under Construction Content: 182 residential units ,185 parking, Gym, Multi purpose hall, cafeteria, swimming pool& drivers room Owner: Al-Soliman Real Eatate Company Cost: 55 million dollars

Position Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

Location

Al-Madinah Al-Monawara, Saudi Arabia TypicalFloor Plan

Date

10/2011

Mazen Abdelhamid


Q u rt o b a Residential Compound Project Descrptions

First Floor Plan

Ground Floor Plan

Residential Complex Finished Construction Content: 12 villa Owner: Al-Soliman Real Eatate Company Cost: 3.2 million dollars

Position Front Elevation

Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

Location

Riyadh, Saudi Arabia

Date 09/2010

Mazen Abdelhamid


Shiekh Jassim Nasser Al-Thani Palace Project Descrptions Basement Floor Plan

Ground Floor Plan

Private Palace Finished Construction Owner: Shiekh Jassim Bin Nasser Al-Thani Cost: 4.1 million dollars

Position Architect in UDC Consultant & Engineers, Doha, Qatar

Location

Doha, Qatar

Date 05/2009 First Floor Plan

Penthouse Floor Plan

Mazen Abdelhamid


Mr. Mohamed Abdullah Al-Atiya Villa First Floor Plan

Project Descrptions Private Villa Finished Construction Owner: Mr. Mohamed Abdullah Al-Atiya Cost: 2.8 million dollars

Position Architect in UDC Consultant & Engineers, Doha, Qatar

Location

Doha, Qatar

Date 07/2009 Ground Floor Plan

Mazen Abdelhamid


Front Elevation

Project Descrptions First Floor Plan Right elevation

Twin Filla Finished Construction Owner: Al-Soliman Real Eatate Company Cost: 0.6 million dollars

Position Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

Back elevation

Location

Riyadh, Saudi Arabia

Date 01/2011 Lift elevation

Ground Floor Plan

Mazen Abdelhamid


Private Villa

Project Descrptions Private Villa Finished Construction Owner: Al-Soliman Real Eatate Company Cost: 0.3 million dollars

Position Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

Ground Floor Plan

First Floor Plan

Location

Al-Magmaa, Saudi Arabia

Date 06/2012

Mazen Abdelhamid


Project Descrptions Residential Compound Finished Construction Content: 8 villa Owner: Al-Soliman Real Eatate Company Cost: 2.1 million dollars

Position Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

Ground Floor Plan

First Floor Plan

Location

Riyadh, Saudi Arabia

Date 12/2009

Mazen Abdelhamid


Al-Nafl Residential Compound Project Descrptions Residential Compound Finished Construction Content: 12 villa Owner: Al-Soliman Real Eatate Company Cost: 3.5 million dollars

Position Ground Floor Plan

First Floor Plan

Roof Floor Plan

Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

Location

Riyadh, Saudi Arabia

Date 05/2012 Front Elevations

Mazen Abdelhamid


Project Descrptions Residential Village Finished Construction Owner: Barwa Real Estate Companym Doha , Qatar Cost: 106 million dollars

Position Architect in UDC Consultant & Engineers, Doha, Qatar

Location

Doha, Qatar

Date 02/2009

Mazen Abdelhamid


Anthony Freeman Villa Project Descrptions Private Villa Finished Construction Owner: Mr. Anthony Freeman Cost: 1.2 million dollars

Position Draftsman in UC engoneering, San Francisco, CA, USA

Location

Ridge Dr Gilory , CA, USA

Date 09/2007

Mazen Abdelhamid


Typical Floor Plan

Saad AlDawoud Office Building Project Descrptions Commercial & Office Building Finished Construction Content: 3 showroom & 24 office Owner: MR. Fahad Saad AlDawood Cost: 14.4 million dollars

Ground Floor Plan

Position Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia

Location

Riyadh, Saudi Arabia

Date Basement Floor Plan

11/2012

Mazen Abdelhamid


Basement Floor Plan

Ground Floor Plan

Project Descrptions Commercial & Office Building Under Construction Content: 1 showroom & 8 office Owner: Al-Soliman Real Estate company Cost: 1.35 million dollars

Position Section A-A

First Floor Plan

Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia

Location

Riyadh, Saudi Arabia

Date 01/2014 Front Elevation

Side Elevation

Mazen Abdelhamid


3

2

6

5

4

9

8

7

1

18

17

16

15

14

13

12

11

10

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

52

53

54

55

56

57

58

36

5.87 %

59 %

11 .74 %

5.87

60

BASMENT FLOOR OF ADMINSTRATION A: 1,581.42 m2

Basement Floor Plan A: 147.58 m2

A: 147.58 m2

A: 160.05 m2 4.00

A: 160.05 m2

6

5

9

8

7

11

10

12

16

15

14

13

19

18

17

22

21

1.90

4 3 2

2.10

1.40

1.90

1.90

1.90

20

5

9

8

7

6

11

10

12

15

14

13

19

18

17

16

22

21

20

5

8

7

6

9

11

10

12

15

14

13

19

18

17

1.90

1.90

1.90

16

22

21

20

5

8

7

6

9

11

10

15

14

13

12

18

17

16

21

20

22

0.90 23

23

24

24

25

25

1.90

25

25

0.90

24

24

3

23

23

2

25

25

1

24

24

6

23

23

5

25

4

24

9

1.40

23

2 1

25

4 3

2 1

24

8

1.40 4 3

23

7

22

21

20

19

18

17

16

1.40

15

14

13

12

11

10

9

8

2 1

7

4 3

2 1

6

1.40 4 3

5

22

21

20

19

18

17

16

1.40

15

14

13

12

11

10

9

8

2 1

7

4 3

2 1

6

1.40 4 3

5

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

1.40

1.20

1.20

1

5

22

18

17

16

15

14

13

12

11

10

2

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

1.40 4 3

19

6.50

86.75

1

1.90

SECURITY ROOM A: 19.81 m2

Al-Safwa Office Building

1.80

SHOW ROOM A: 78.07 m2

STORE A: 10.01 m2

SHOW ROOM A: 86.79 m2

6.50

SHOW ROOM A: 110.96 m2

8% 8.4

SHOW ROOM A: 93.21 m2 0.20

12.33

0.20

6.00

0.20

6.00

SHOW ROOM A: 97.41 m2 0.20

6.00

SHOW ROOM A: 99.42 m2 0.20

6.00

SHOW ROOM A: 99.26 m2

0.20

6.00

SHOW ROOM A: 97.09 m2

0.20

6.00

6.00

CONTROL ROOM A: 18.53 m2 0.20

0.20

4.55

1.20

0.20

PANTRY A: 7.11 m2 3.43

0.20

20.70

8.48 %

OFFICE A: 385.26 m2

12.92 %

3 2

6.50

1

25.84 %

3 2

5.75

1

MAIN ENTRANCE A: 64.01 m2

3 2

7.63

1

3 2 1

3

3

2 1

3

3

2

2

1

1

2 1

7.40

12.00

5.50

2.60

RESIDINTIAL BUILDING AREA 4571.9 SQ.M = 47.5%

30째

ADMINISTRAION BUILDING AREA 1341.9 SQ.M = 13.9 %

STREET 100 M - 11 PARKING

8

7

6

5

9

11

10

14

13

12

18

17

16

15

21

20

19

22

7

6

5

9

8

11

10

14

13

12

17

16

15

21

20

19

18

22

7

6

5

9

8

11

10

14

13

12

17

16

15

20

19

18

21

7

6

5

9

8

10

11

13

12

17

16

15

14

20

19

18

22

22 25

25

23

23

24

24

25

25

2

24

24

1

23

23

5

25

25

4

24

24

3

23

23

8

25

25

7

24

24

6

23

23

9

22

1

21

3 2

1

20

4

3 2

19

18

17

16

15

14

13

12

11

10

9

8

7

4

6

1

11.00

5

3 2

1

22

4

3 2

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

4

6

5

1

22

3 2

1

21

4

3 2

20

19

18

17

16

15

14

13

12

11

10

9

8

7

4

6

5

22

21

20

19

18

17

16

15

14

18

17

16

15

14

13

12

11

10

1

13

12

11

10

9

8

7

6

5

4 3 2

21

ALL BUILDING AREA = 5913.8 SQ.M = 61.5 % Ground Floor Plan

Project Descrptions Commercial & Office Building Under Construction Content: 8 showroom & 32 office Owner: Al-Soliman Real Estate company Cost: 9.3 million dollars

4 3 2 1

SHOW ROOM A: 45.35 m2 SHOW ROOM A: 47.20 m2

SHOW ROOM A: 56.27 m2

SHOW ROOM A: 62.93 m2

SHOW ROOM A: 67.32 m2

SHOW ROOM A: 69.26 m2

SHOW ROOM A: 69.43 m2

SHOW ROOM A: 66.94 m2

OFFICE A: 410.06 m2

Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia

0.90

1.20

1.20

1.70

1.00

1.70

0.90

2.00

1.70

2.00

1.20

1.00

1.20

2.00

2.00

1.00 0.90

1.70

1.00

2

18

17

16

15

14

13

12

11

10

CORRIDOR A: 157.74 m2

1

5

4

3

8

7

6

Mezzanine Floor Plan 9

Position

0.90

Location OFFICE A: 1,098.30 m2

Al-Khobar, Saudi Arabia

Date 04/2010

Typical Floor Plan

Mazen Abdelhamid


Al-Kaabi Office Building Project Descrptions Commercial & Office Building Finished Construction Owner: Mr. Mohamed Al-Kabbi Cost: 5.3 million dollars Ground Floor Plan

Position Basement Floor Plan

Architect in UDC Consultant & Engineers, Doha, Qatar

Location

Doha, Qatar

Date Typical Floor Plan

07/2009

Mazen Abdelhamid


Riyadh city is one of the oldest, historical and biggest cities in Saudi Arabia. Since 17 century Riyadh has significant cultural and architectural environment, Riyadh is considered a model of growth in the global architecture field, the architecture developments plans and designs depends on developments tools and importance historical and cultural of the city, since the fast growth of population, architecture deigns development has consider the natural geographic, historical and cultural of the city, all these elements will create successful and productive community

Al-Morabaa Palace - Riyadh City

Al-Direya - Riyadh City

The eastern entrance for capital palace

the project main concept project principle one beacuse of the huge lenght of the land , the spaces divied to unties which leads to the internal spaces to creat modern environment suitable with the location Circumstances , avoid the boring in design

1

project principle two As one of the Riyadh Architectural heritage, deign will consider using the architecture system which parallelogram with the land shape to create green planted areas, as well as using curved lines to create a great combination between modernisms and historical heritage

2

project principle three Traffic flows and cars movement has moved to the surrounding streets and separated from the main buildings and green planted areas

Project Descrptions Residential Compound Under Construction Content: 260 Units Owner: Al-Soliman Real Eatate Company Cost: 66.7 million dollars

3

Position

4

Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia - Owner & Developer

project principle four the main area is depends on natural elements which is creating a simulation of palm valley and building services which is located in low level from the complex

Location

Riyadh, Saudi Arabia

Date 06/2013

Mazen Abdelhamid


Design Concept For Type A

Chalet Bulding Garden Sitting Plaza Sitting Swimming Pool Services Building BBQ Entrance

Private Resort

Single Unit Landscape Chalet Bulding BBQ Swimming Pool Services Building Garden Sitting Plaza

Project Descrptions Under Construction Content: 16 Units Owner: Al-Ezdihar Real Eatate Company Cost: 3.8 million dollars

Sitting Services Building Entrance

Position Design concept for the Tent Zone Cafeteria Secondary entrance

Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia

Space for tent Tent 300 sq.m Front space tent

Location

Riyadh, Saudi Arabia

Date The main entrance

08/2012

Mazen Abdelhamid


Interior Design Project Descrptions Residential Complex Owner: Al-Ezdihar Real Eatate Company

Position Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia

Location

Al-Madinah Al-Monawara, Saudi Arabia

Date

10/2013

Mazen Abdelhamid


Interior Design Project Descrptions Residential Complex Owner: Al-Ezdihar Real Eatate Company

Position Architect in Alsoliman Real estate compmay, Riyadh, Saudi Arabia

Location

Al-Madinah Al-Monawara, Saudi Arabia

Date

10/2013

Mazen Abdelhamid


Project Descrptions Precast Factory Finished Construction Owner: Barwa Real Estate Companym Doha , Qatar Cost: 580 million dollars

Position Project cordonator in Barwa Building Material Company, Doha, Qatar

Location

Mesaed, Qatar

Date 02/2008

Mazen Abdelhamid


57.179

18.568

0.875

0.250

1.125

0.875

0.001

0.250 0.001

1.125

wet area 28-3 A: 30.366 m2 <floor type> P: 27.92 m H: 2.70 m

4.450 2.173

wc 30 A: 82.047 m2 <floor type> P: 37.41 m H: 2.70 m

1.104 0.104

sprue grinding 28-2 A: 64.114 m2 <floor type> P: 33.21 m H: 2.70 m

finishing 28-1 A: 88.645 m2 <floor type> P: 45.03 m H: 2.70 m

main treasury 29 A: 14.996 m2 <floor type> P: 15.75 m H: 2.70 m

polishing 28-3 A: 97.419 m2 <floor type> P: 40.16 m H: 2.70 m

finishing 28-4 A: 62.804 m2 <floor type> P: 34.70 m H: 2.70 m

9.002

5.424

0.060

5.217

5.424

1.263

39.694

22.000

0.000 0.000

0.875

0.060

22.000

0.000 0.000

0.250 0.000 0.000

1.125

1.125

4.370

3.396

wet area 28-1 A: 20.269 m2 <floor type> P: 18.14 m H: 2.70 m

4.370

4.370

2.342

0.060

2.762

2.342

2.342

14.723

0.473 1.576

1.576

1.125

33.770

1.125

0.001

1.125

1.125

1.125

wet area 28-4 A: 15.201 m2 <floor type> P: 16.39 m H: 2.70 m

corridor

1.576

1.576

1.104 0.473

2.262

2.262

2.262

0.104

A: 140.824 m2 <floor type> P: 111.21 m H: 2.70 m

sprue grinding 27-2 A: 56.769 m2 <floor type> P: 30.73 m H: 2.70 m

finishing 27-4 A: 86.730 m2 <floor type> P: 36.86 m H: 2.70 m

1.925

polishing 27-3 A: 109.647 m2 <floor type> P: 49.34 m H: 2.70 m

0.250 0.001 0.845

0.179 0.179 0.250

0.179

1.047

44.722

0.875

1.125

0.875

57.178

3.270

2.763

0.250

1.125

57.179

1.125

57.179

11.453

1.125

4.450

9.694

57.178

1.047

1.142

0.875

3.270

32.697

3.622

0.104

0.250

1.125

0.875

1.125

1.478

0.129

wet area 22-7 A: 12.139 m2 <floor type> P: 15.51 m H: 2.70 m

4.450

1.142

2.425

1.142 0.400

0.400

1.120

1.120

1.120

0.682

0.682

0.468 0.424 0.518

0.468 0.424 0.518

0.468 0.424 0.518 0.548

0.548

roduim section 22-7 A: 20.918 m2 <floor type> P: 18.87 m H: 2.70 m sand plasting 22-8 A: 45.333 m2 <floor type> P: 26.77 m H: 2.70 m silver model 22-6 A: 37.784 m2 <floor type> P: 27.59 m H: 2.70 m

0.540

0.548

0.682

0.400

1.142

0.082

1.688

2.762

1.047

1.142

0.892

0.250

0.024

0.024

1.096

1.096

0.250

1.688

0.250 0.001

1.125 0.079

0.079

0.250

0.001

0.001 0.079

0.250

1.125

4.321

4.321 0.030

0.030

0.177 0.030

0.177

0.177 1.047

0.797

wet area 27-4 A: 23.645 m2 <floor type> P: 19.11 m H: 2.70 m

wet area 27-3 A: 32.817 m2 <floor type> P: 26.19 m H: 2.70 m

wet area 27-1 A: 16.354 m2 <floor type> P: 16.79 m H: 2.70 m

0.250

1.047

4.321

finishing 27-1 A: 96.644 m2 <floor type> P: 42.54 m H: 2.70 m

treasury

design free hand 23-2 A: 52.658 m2 <floor type> P: 30.50 m H: 2.70 m

technical

A: 14.996 m2 <floor type> P: 15.75 m H: 2.70 m

A: 8.046 m2 <floor type> P: 11.80 m H: 2.70 m

22.000

22.000

8.750

8.080

8.080

7.000

technical A: 6.075 m2 <floor type> P: 9.86 m H: 2.70 m

corridor

Project Descrptions

1.925 0.250

0.179 0.179 0.250

0.179

1.142

53.453

3.622

0.892

0.104

0.875

57.179

0.250

0.250

3.270

2.730

3.270

1.125

0.120

2.730

31.975

4.568

4.315

1.580

2.685

3.270

8.697

3.347

0.379

1.125

1.125

Women lockers 17 A: 94.284 m2 <floor type> P: 62.33 m H: 2.70 m

1.481

1.688

1.651

0.250

4.450 2.175

1.142

1.142

1.142

0.400

0.400 1.120

1.120

1.120 0.682

0.682

0.682

0.468 0.424 0.518

0.468 0.424 0.518

0.468 0.424 0.518

0.548

Recovery zone 19 A: 138.960 m2 <floor type> P: 55.66 m H: 2.70 m

0.130

0.548

Men lockers 16 A: 140.655 m2 <floor type> P: 52.79 m H: 2.70 m

0.548

0.400

0.104

1.688

3.200

0.875

0.250

11.507

5.210

0.025

0.2250.025 0.870

1.120

0.120

0.104

1.095

0.179

57.200

19.775

0.250

1.125

1.120

0.870

1.095

0.025

0.250

0.179 0.179 0.250

0.875

1.125

57.179

1.142

1.125

4.450 0.001

1.125

1.096

0.250

0.250

0.250 0.001

1.478

treasury 40-2 A: 13.319 m2 <floor type> P: 16.00 m H: 2.70 m

0.001

1.710

1.710

0.024 0.000

treasury 22-4 A: 16.931 m2 <floor type> P: 16.87 m H: 2.70 m

wet area 23-1 A: 17.839 m2 <floor type> P: 17.44 m H: 2.70 m

1.125

0.548

0.548

Lazurde Gold Factory Owner: Lazurde Company

0.875

0.468 0.425 0.518

0.468 0.425 0.518

0.468 0.425 0.518 0.682

0.682

laser section 22-5 A: 65.929 m2 <floor type> P: 33.89 m H: 2.70 m

bar code 40-1 A: 41.506 m2 <floor type> P: 25.88 m H: 2.70 m

0.129 1.096

0.001 0.250 0.000 0.845

0.024 0.000

cafteria 36 A: 133.468 m2 <floor type> P: 45.27 m H: 2.70 m

0.682

0.400

0.400

0.400

1.120

1.120

1.120

stone assorting 22-3 A: 35.546 m2 <floor type> P: 23.90 m H: 2.70 m

pica gold section 23-1 A: 37.271 m2 <floor type> P: 24.44 m H: 2.70 m

0.104

1.120

1.120

laser spot 22-4 A: 68.124 m2 <floor type> P: 34.03 m H: 2.70 m

1.120

0.548

0.540

A: 157.976 m2 <floor type> P: 126.52 m H: 2.70 m

Cleaners & checkers 14-4 A: 157.161 m2 <floor type> P: 59.09 m H: 2.70 m

Administration 14-1 A: 18.293 m2 <floor type> P: 17.48 m H: 2.70 m

0.130 0.548

22.000

22.000

9.000 1.925

Furnace zone 8-14 A: 56.089 m2 <floor type> P: 34.22 m H: 2.70 m

Electricity

4.450

Cleaning & washing zone 14-7 A: 30.985 m2 <floor type> P: 23.83 m H: 2.70 m

A: 31.994 m2 <floor type> P: 32.93 m H: 2.70 m

1.125

0.250

0.875

0.548

0.548 0.468 0.425 0.518

0.468 0.425 0.518

0.468 0.425 0.518 0.682

0.682

0.682 1.120

Position

1.120

1.120

0.400

0.400

0.400

1.120

1.120

1.120

0.104 1.478

1.710

Gypsum zone 14-6 A: 29.650 m2 <floor type> P: 23.26 m H: 2.70 m

Tree making 14-5 A: 31.913 m2 <floor type> P: 22.32 m H: 2.70 m

0.129

1.710

A: 12.066 m2 <floor type> P: 13.91 m H: 2.70 m

1.119

0.869

Gold cutter

Wax injecting zone 14-3 A: 53.466 m2 <floor type> P: 29.84 m H: 2.70 m

0.250

1.119

clipping one 14-9 A: 36.489 m2 <floor type> P: 27.00 m H: 2.70 m

rubber section 14-2 A: 21.022 m2 <floor type> P: 21.11 m H: 2.70 m

0.250

0.250

0.250

0.179 0.179 0.250

0.179

1.119

11.429

3.270

2.792

3.270

2.730

3.270

2.730

0.869

3.270

2.730

3.270

2.730

3.270

2.730

3.270

2.714

3.347

0.379

57.201

1.119

Architect in Bit Design Con-

1.125

0.875

57.201

1.125

8.080

Corridor A: 157.283 m2 <floor type> P: 136.58 m H: 2.70 m Rubber storage 14-2 A: 8.004 m2 <floor type> P: 14.49 m H: 2.70 m

7.820

8.080

Storage 15 A: 14.996 m2 <floor type> P: 15.75 m H: 2.70 m

sultant office , Cairo , Egypt

0.250

1.125

59.445

1.120

0.870

1.380

1.046

3.599

1.000

6.401

1.000

8.900

1.380

1.046

3.599

1.000

6.401

1.000

9.600

4.750

0.250

3.632

0.250

0.718

0.955

7.444

9.600

1.046

0.309

1.046

3.600

0.955

7.444

9.600

1.046

0.309

1.046

3.600

1.400

1.150

0.250

0.250

1.400

1.150

0.870

1.120

0.250

0.250

8.900

modeling 1-1 A: 48.752 m2 <floor type> P: 28.90 m H: 2.70 m Mentinance 7 A: 55.087 m2 <floor type> P: 33.59 m H: 2.70 m

Wave 8 A: 46.629 m2 <floor type> P: 30.16 m H: 2.70 m

hollow 9 A: 93.674 m2 <floor type> P: 43.63 m H: 2.70 m

stone on wax 1-1 A: 71.636 m2 <floor type> P: 35.04 m H: 2.70 m

Location

corridor

polishing 1-1 A: 35.978 m2 <floor type> P: 24.90 m H: 2.70 m

storage 6 A: 27.690 m2 <floor type> P: 21.52 m H: 2.70 m

A: 24.206 m2 <floor type> P: 33.29 m H: 2.70 m stone setting 1-1 A: 35.238 m2 <floor type> P: 24.40 m H: 2.70 m

finishing 1-1 A: 26.048 m2 <floor type> P: 23.55 m H: 2.70 m

primary casting 1-1 A: 21.025 m2 <floor type> P: 19.28 m H: 2.70 m

wet area 1-1 A: 16.440 m2 <floor type> P: 17.30 m H: 2.70 m

Lab 4 A: 19.932 m2 <floor type> P: 20.49 m H: 2.70 m

0.250

0.870

0.250

0.870

1.120

8.900

1.070

0.311

1.045

9.599

1.045

0.312

1.045

8.900

1.070

0.311

1.045

9.599

1.045

0.312

1.045

59.445

21.450

08/2007 1.150

wet area 1-1 A: 16.999 m2 <floor type> P: 17.29 m H: 2.70 m

furnaces 5-2 A: 67.334 m2 <floor type> P: 39.94 m H: 2.70 m

0.225 0.025

1.095

wet area 1-1 A: 16.203 m2 <floor type> P: 16.78 m H: 2.70 m

21.450

Date

chian machines 5-1 A: 43.145 m2 <floor type> P: 29.12 m H: 2.70 m

treasury 2 A: 21.505 m2 <floor type> P: 18.98 m H: 2.70 m

sprue grinding 1-1 A: 26.140 m2 <floor type> P: 23.52 m H: 2.70 m

Cairo, Egypt

press machines 5-4 A: 35.141 m2 <floor type> P: 23.84 m H: 2.70 m

shear machines 5-3 A: 32.255 m2 <floor type> P: 22.73 m H: 2.70 m

15.600

1.045

0.311

1.045

9.600

1.045

0.311

1.045

3.600

15.600

1.045

0.311

1.045

9.600

1.045

0.311

1.045

3.600

1.150

0.250

1.400

1.400

diamond cutting 1-1 A: 29.257 m2 <floor type> P: 24.15 m H: 2.70 m

24.250

Storage 10 A: 26.317 m2 <floor type> P: 21.76 m H: 2.70 m

corridor

0.025

24.275

A: 157.741 m2 <floor type> P: 169.28 m H: 2.70 m

22.060

22.060

Maun treasury 11 A: 14.996 m2 <floor type> P: 15.75 m H: 2.70 m

Mazen Abdelhamid


Educational Projects Project Descrptions Graduation Project

Location

New Cairo, Egypt

Date 06/2007

Mazen Abdelhamid


Educational Projects Project Descrptions Air port Design Project

Location

Port said, Egypt

Date 05/2006

Mazen Abdelhamid


Educational Research

Date 04/2007

Mazen Abdelhamid


Educational Research

Date 04/2007

Mazen Abdelhamid



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.