ARCHITECTURAL PORTFOLIO PRIYANKA GHODKE SELECTED WORKS ( 2017-2020)
ABOUT ME urrently pursuing Bachelors in Architecture at M.K.S.S.S. Dr.Bhanuben Nanavati college of Architecture, Pune, Maharashtra. The curiosity & eagerness to experience new ideas was engrained early in my life. My interest in architecture extends beyond simple asthetics & delves deep into the fine details that creates a bond between the user & space. I am always willing to go the extra mile to achieve the same.
PRIYANKA GHODKE ARCHITECTURE STUDENT 4TH YEAR DOB : 13/11/1999 priyankaghodke.bnca@gmail.com +91 7767963344
EDUCATION 2017- Present
MKSSS Dr.BhanubenNanavati College of Architecture, Pune
2015 - 2017
Sardar Dastur Hormazdiar Junior College, Pune
2004 - 2015
Hutching High School, Pune
AWARDS & EXPERIENCE 2020
63/2B, Flat no. 18, Indraprastha society, Satara Road, Pune- 411009, Next to Vijay sales.
English
Marathi
Hindi
German
2020
Top 10 entry in Hatke lift car Interior design competition by Schindler.
SOFTWARE SKILL AutoCad
MS Office
Lumion
Vray
Revit
InDesign
Rhinocerous
Illustrator
SketchUp
Photoshop
INTERESTS Sketching and Painting Photography
Participated in Kaarwan design competition.Design of a Quarantine ward,During the Covid -19 Pandemic
Travelling
2020
Graphic Designer at Kafila org. Free lancing - Interior projects.
Baking and Cooking Co-owner of The Baking Studio
2019
Graphic Design intern at Social Sushi, Delhi.
Trekking and Hiking
2017 - 2018
Consequtive Classroom Representative for 2 Years (1st & 2nd Year).
17 Sahyadri moutain treks Participation in Himalayan Bhrigu lake Trek. -13000 ft Co-leading Himalayan trek to Brahmatal - 12300 ft
COVER SHEET
50 THK PUFF PANEL
NORTH ELEVATION
50 THK PUFF PANEL FLASHING STIFFNER PLATE
+8480MM ROOF LVL.
TOP CHORD OF GIRDER VERTICAL POST OF GIRDER
ISMC RUNNER FOR PUFF PANEL
+5700MM FIRST FLOOR LINTEL LVL.
+4500MM FIRST FLOOR SILL LVL. +3600MM FIRST FLOOR SLAB LVL.
GLASS RUNNER
SHS COLUMN 250 X 250, 5 THK
+2550MM LINTEL LVL. +2900 GROUND LEVEL
CLEAT PLATE
GLASS 6MM
+1350MM SILL LVL.
Academic Projects
+450MM PLINTH LVL.
02
06 04 DETAIL AT COLUMN C17Working Drawing - II
±0 GROUND
EAST ELEVATION
Community center
AND SIMILAR COLUMNS
Green Housing
COVER SHEET 50 THK PUFF PANEL Z SECTION
50 THK PUFF PANEL
50 THK PUFF PANEL RUNNER FOR PUFF PANEL FLASHING
01
03
Bungalow
Tiny Library
05
Advanced Building Technology & CLEAT ANGLE SPACER Materials SHS 250 COLUMN ISMC PURLIN
DETAIL AT COLUMN P15
GLASS RUNNER TOP CHORD OF GIRDER VERTICAL POST OF GIRDER GLASS 6MM
AND SIMILAR COLUMNS
300 X 300 X 5 MM THK. TATA SHS COLUMN
08
Interior of an apartment Pune, Sinhagad road.
SPACER HOT ROLLED L-SECTION TO AVOID SAGING
09 SIDE Art RUNNER works, photography DETAIL& Extra cirricular
07
Schindler Lift car Competition Top 10 entry
01
Bungalow Design for an Artist Site - 475 sqm, Located in Pondicherry. Tropical climate. Monsoon season from October - December. November has the Highest rainfall of around 135 cm. We were to design a Bungalow for a client, keeping in mind his identity, hobbies and personality. This project is focused on designing a residence for an Artist and his family using RCC construction. The site is narrow surrounded by existing buildings on both sides. Climatic approach was also taken into consideration while designing. Sloping roof constructed for rainy seasons, as well as to place skylights for maximum natural light intake from the South.
BUNGALOW DESIGN | 03
Bedroom 1
Bedroom 2
Porch Master Bathroom Dining room Common Bathroom
Master Bathroom Dining room below
Store Indoor Garden
Work Space
Kitchen Services
Living room
GROUND FLOOR PLAN
Living room below
FIRST FLOOR PLAN
V I E W S
BUNGALOW DESIGN | 04
05
Community Center in Raghurajpur Raghurajpur, a small village located in the state of Odisha, is a heritage crafts village out of Puri district, India, known for its master Pattachitra painters. A cultural center was to be designed for the village to promote the culture and art creations by the fellow villagers for their daily income. The site was situated alongside an existing pond surrounded by numerous evergreen trees . Local materials are used in the construction of the cultural and art. The main goal of this Project is to build a modern gathering point for people from all over the world, to help preserve the culture and art created in the village of Raghurajpur, that can be adaptable to different contexts and where there will be an innovative atmosphere, where new technologies will play a very important role and that will try to inspire people to live in a more knowledgable way and aware of unique Indian heritage. Site Area : 4750 SQM
COMMUNITY CENTER | 07
C
1
8 A
C’ A’
9 2
B
4
6 Water body
9
5 7
Section AA’
B’
3 1. Parcel 2. Medical center 3. Administration 4. Sarpanch office 5. Workshops 6. Shops 7. Dormitories 8. Community hall 9. Amphitheater
Section CC’
COMMUNITY CENTER | 08
Section BB’
09
Tiny Library Site loacted in Rural area. (Sangrun).Small village loacted on the outskirts of the city Pune, Maharashtra. Despite its importance, education is still inaccessible to many communities in remote locations around the world. Self-learning,especially through reading, is crucial for the society’s development. It is necessary to have places promoting education - and self-learning toeducate the local population within the closest proximity. It will make them accessible to gainful employment opportunities in theirhometowns and will thereby avoid the need for migration elsewhere. One storey Library building with a pond in the front yard and open activity/ reading space in the back yard.
TINY LIBRARY | 11
User Analysis
Target Group :
Closed or semi-closed working places are rather popular in libraries. Most of users would like to work in more isolated areas. Wide usage of computer technology does not change much of the planning of user space, with exception on the size of readers' tables, which are planned much larger than in traditional libraries.
User Activities :
Special users
Open Space
Senior Citizen Students & Children
Academic users
Group Discussion Common Reading Space
Activity Space
+450 MM
Materials Plinth Steps: Broken Cobblestone piedes layed on mortar. Porch: Mahogany wood finshed floor. Columns: R.C.C. columns with Grey Plaster on the exterior. Walls : Stone cladding on the exterior & Turqouise Blue paint finshed. Storefront Curtain wall: Transparent 8mm glass panels, Supported by PVC mullions & transoms. Windows: Fiberglass framed windows with 2mm thick float glass. Entrance door: Fiberglass framed doors with 2mm thick float glass. Sliding door: 18mm thk. wood cherry paneled door with Veneer coverd framing. Flushed door (toilets): Plywood paneled flushed doors with Veneer covered Framing. Roofing : Contrete tile roofing shingles on the pichted roof & Grey Asphalt Cladding underneath.
Wood finished Porch
UP
+450 MM
±0 MM
UP
Summer from the
Site Plan
TINY LIBRARY | 12 B
V I E W S
DN
3 +450 MM
Winter Winds from the East
M DN
1. Reading Area 2. Toilets 3. Group discussion 4. Multi purpose room
1 2
A
4 Winds west
B’
Floor Plan
A’
13
Housing for a Urban Educational Symbiosis Institute campus Sustainable housing needs to be designed to maximize occupant’s well-being and minimize the environmental load. The pursuit of combining these two different aspects toward sustainability is a goaloriented task. Green affordable housing is reasonably priced housing that incorporates sustainable features. The intent of this project is to design and develop building systems providing comfort for the users as well as it being environment friendly for taking into consideration that it is a student housing project on symbiosis campus in viman nagar, pune. Through code research, the new residence hall was to be developed starting with a building design strategy for an environment structure based on sustainability, resiliency and green housing. In addition to architectural design, other aspects like structural and mechanical design strategies, legal constraints, LEED s trategies and cost analysis are to be developed. Site is situated in viman nagar, in the Existing plot of an educational Institution namely symbiosis college. Area of the entire educational campus is :34.8 acre | 11150 SQM 14.1 hectare The alloted area for housing is 35917.5 sqm |3.6 hectare | 8.9 acres
GREEN HOUSING | 15 Design Parameters The following parameters explain the main concerns of the project design, which were considered on every step, following the hierrachy as listed below:
BUILDING LAYOUT AROUND PROPOSED SITE. The site is surrounded by residential areas on the north and east and institutional area to the east. There is open space towards the south and west.
India
E Low the Energy consumption
GREEN TREE COVER The lowest part of site is surrounded by green cover which is followed all the way towards south west. These tree help diverting the harsh winds coming from the west.
Maharashtra
Symbiosis Institute, Viman Nagar
ROAD LAYOUT AROUND PROPOSED SITE
Altitude Area Climate Latitude Longitude Rainfall Population Relief Average temp. in Summer Maximum temp. Average temp. in winter Minimum Temp. Distance from Mumbai.
Create a healthy indoor climate
Make a flexible design, with the possibility of expansion
Use the sun heat
Create an accessible house to all users
Optimize the Daylight
Create a house where the users will feel safe.
Viman nagar has a very well connected route to highways and local streets which provides easy vehicular access. Entry to the site is connected from the main airport road.
Pune city
560 metres 15.642 sq.km hot semi-arid 18° 32" north 73° 51" east 211 mm 7.4 million Plateau region 32°C 38°C 19°C 13°C 150 km
Use the rain water
70% Wind flow from West direction
SITE ANALYSIS Sun orientation to be considered when designing to maximize solar heat gain. Summer wind need to be used for ventilation and winter wind needs to be reduced. Using local wind patterns to maintain the temperature with the premises. Cross ventilation and green Balconies to be provided in every room to reduces heat island effect.
Over head water tank
Director’s and Principle’s Bungalow
20% Wind flow from West direction
Faculty housing, open space
Student housing, open space
Student housing
GREEN HOUSING | 16
SECTION CC’
SECTION BB’
SECTION AA’
Student housing, ancillary
Student housing, open space
Site entrance
Medical and warden
Faculty Club House
GREEN HOUSING | 17 Living accomodations on ground floor for physically challenged /universal accessibility.
Topography to understand natural terrain and identify the surface run- off to manage services in site development. Rain water harvesting plant
Rain water harvesting plant
Provision of contemplative landscaping and tree plantation to maintain biodiversity.
Access to amenities & Transport.
Green parking facility
Retaining maximum of existing natural vegetation & soil erosion control.
Over head water tank
A
Green parking facility
Building orientation
A
Electrical and transformer area
SUSTAINABLE SITE CONSIDERATION
WATER CONSERVATIO & OTHER SERVICES
GREEN HOUSING | 18
Over head water tank
3 BHK
2 BHK
1 BHK
Inspection Chamber
B'
B'
B'
B'
B'
B'
A
A'
A'
A
A'
A
A'
A
B'
B
B B'
B'
A'
A
A'
A
A'
B
B
ON B
A'
B
B
B
B
A
A'
ADVANCED BUILDING TECHNOLOGY & MATERIALS | 19 59550
600 mm WIDE CHAJJA 890
4010
6000
650
2110
840
960
1830
800
6000
6000
845
1950
780
2060
780
780
820
1660
1675
1520
775
515
GALVANIZED PRECOATED ROOFING SHEET
C18
ROLLING SHUTTER
W1
W1
C19
W1
C20
W1
P16 450 X 700
D4
C21
C22
ROLLING SHUTTER
P18 450 X 700
W1
C23
W1
W1
C24
W1
P20 450 X 700
W1
C25
W1
W1
C26
W1
P22 450 X 700
ROOF LVL.
5151
P14 450 X 700
1900
D2
MEZZANINE FLOOR LINTEL LVL.
3510
1450
D2
UP
W1 900
UP
RAIN WATER GUTTER
FRAME LVL
D2
Ground Floor Plan W1
MEZZANINE FLOOR SILL LVL.
D2
W1
W1
W1
W1
W1
W1
W1
W1
W1
RAINWATER DOWN TAKE PIPE
MEZZANINE FLOOR LVL. LINTEL LEVEL
300
1750
2380
650
3620
2640
D4
C17
W1
UP
3000
C16
375
B UP
W1
W1
W1
W1
W1
D1
W1
W1
W1
W1
D1
BRICK WALL MASONARY DUCT WALL TO COVER SANITARY PIPES
W1
SILL LVL.
1700
900
3620
I-C 1 230 X 400
C15
I-C 2 230 X 400
I-C 3 230 X 400
I-C 4 230 X 400
I-C 5 230 X 400
I-C6 230 X 400
I-C7 230 X 400
I-C 8 230 X 400
PLINTH LVL.
900
1670
1500
3830
W1
500 TH CORRU ROOFIN SHEET
GROUND LVL.
North elevation
SHUTTER DOOR
UP
D2
P12 250 X 425
W1 2705
D2
MECHANICAL DOOR
3620
D2
375
2000
C14
3620
1082
UP
3740
C13
3510
34000
C12
CLADDING SHEET
D2
FRAME LVL
1900
D2 W1
STAFF AND VISITOR'S TOILET
C1
W1
C2
W1
W1
4010
890
450 X 700
C3
W1 6000
C4
D1
650
4275
W1
960
C5
W1
1012
1830
450 X 700 W1 C6
W1
800
2050
4275
W1
845
D3
D3
D3
D3
650
D3
C8
W1 1950
C9
V
V
V
V
C10 V
V
V
V
C11
V
MECHANICAL DOOR SILL LVL.
PLINTH LVL.
GROUND LVL.
5904,88
780
LINTEL LEVEL
1750
D3
P9 450 X 700
450 X 700
C7
D1
750
D3
900
450 X 700
D3
MEZZANINE FLOOR SILL LVL. MEZZANINE FLOOR LVL.
900
P1
P7
A'
W1
2675
D3
P5
900
1920
D3 A
P3
11825
MEZZANINE FLOOR LINTEL LVL.
1450
D2
1532
D2
UP
3000
3600
ROOF LVL.
D1
B'
East elevation
12450
Ground Floor Plan
CANOPY ABOVE
PU 59550
600 mm WIDE CHAJJA 890
4010
W1
650
C17
P14 450 X 700
C18
2110
W1
840
W1
1830
960
C19
W1
B 800
W1
6000
C20
P16 450 X 700
1730
C16
6000
6000
845
C21
C22
P18 450 X 700
1950
W1
780
W1
2060
780
C23
780
W1
820
W1 C24
P20 450 X 700
W1
1660
W1
1675
775
C25
W1
1520
W1
515
C26
P22 450 X 700
3220
3300
5151
375
PUFF PANEL
D1
R.W.GUTTER
WATER STORAGE AND GENERATOR ROOM
DOWN
C12
2480
900
200 THK TREKMIX FLOOR
100 THK PCC BED
GROUND LVL.
DRY RUBBLE HARD MURUM PACKING
Section AA’
2705 3600
1082
6275
W1
SHEETING LINE 375
D2
W1
890
W1
W1 4010
W1
W1 6000
C3 650
C4 2110
840
960
W1
W1 1830
C5 800
W1
W1
C6
C7
6000
6000
W1
845
C8
W1 1950
780
780
C9
C10
B'
3000 MECHANICAL DOOR
PEB CANOPY BELOW
I SECTION COLUMN SUPPORTING MEZZANINE FLOOR SILL LVL.
GANTRY BAY
6275
PEB CANOPY
MEZZANINE FLOOR LVL. LINTEL LEVEL
780
2060
1900 MEZZANINE FLOOR SILL LVL.
MEZZANINE FLOOR
C11
1450
P5 450 X 700
450 X 700
11825
P4
450 X 700
MEZZANINE FLOOR LINTEL LVL.
900
C2
P3
450 X 700
FRAME LVL
LIFT SHAFT
230 THK BRICK WALL WITH EXTERNAL SANDFACE PLASTER AND INTERNAL NEERU PLASTER
PLINTH LVL.
900
C1
P2
450 X 700
2500
P1
A'
650
W1
11210
1750
A
ROOF LVL.
900
WATER STORAGE GENERATOR ROOM 10980 X 7250
Mezzanine Floor Plan
SILL LVL.
PLINTH LVL.
W1
GANTRY BAY BELOW
GENTS TOILET
1750
1500 900
2500
3300
STAFF AND VISITOR'S TOILET
GANTRY BAY
C14
C13
2500
LADIES TOILET ROOM
ALUMINIUM POWDER COATED WINDOW IN ELEVATION
900
W1
LIFT SHAFT
1650
1670 1020
1730
PEB CANOPY BELOW
11825
900
MEZZANINE FLOOR SILL LVL.
MEZZANINE FLOOR LVL. LINTEL LEVEL
OFFICE 10980 X 26090 34000
MEZZANINE FLOOR
650
1500
W1
900
1100
3300 1700
1450
MEZZANINE FLOOR LINTEL LVL.
2380
MEZZANINE FLOOR
1900
ROOF LEVEL
W1
1600
900
1600
1500
1600
1500
1600
1500
DOWN
200 THK TREKMIX FLOOR
100 THK PCC BED
DRY RUBBLE HARD MURUM PACKING
GROUND LVL.
Section BB’
GROUND LVL.
ADVANCED BUILDING TECHNOLOGY & MATERIAL | 20 COVER SHEET
COLUMN SHS 250 THK
50 THK PUFF PANEL Z SECTION
50 THK PUFF PANEL FLASHING
50 THK PUFF PANEL RUNNER FORPUFF PANEL
HK UGATED NG
FLASHING
VERTICAL POST OF GIRDER
TOP CHORD OF NORTH LIGHT CLEAT ANGLE TRUSS
GLASS 6MM SPACER SHS 250 COLUMN
ISMC PURLIN
PUFF PANEL
PURLIN CHANNEL SECTION
URLIN / CLEAT
CLEAT PLATE BOTTOM CHORD OF NORTH LIGHT TRUSS SHS 61
PUFF PANEL 50 THK
STIFFENER PLATE
BOTTOM CHORD OF GIRDER RHS ( 122 X 61 )
16MM THK PLATE ONE WELDED TO TOP CHORD OF NLT BOTH BOLTED TOGETHER
STIFFENER PLATE
Z SECTION
FLASHING
16MM PLATES BOLTED TO EACH OTHER
FIXING OF N.L.T. AND GIRDER TO COLUMN AT BOTTOM CHORD
AND SIMILAR DETAIL AT COLUMN P15 COLUMNS
PUFF PANEL
CORRUGATED SHEET
STRUT OF N GIRDER SHS 91 X 91
GLASS RUNNER TOP CHORD OF GIRDER
COVER PANEL FLASHING
PUFF PANEL 50 THK
POST OF N GIRDER SHS 91 X 91
16MM PLATES BOLTED TO EACH OTHER AND WELDED TO MEMBERS
BASE PLATE 250 SHS COLUMN FLASHING, CLADDING RAIL
250 THK BRICK WALL WITH PLASTER 16MM PLATES ONE WELDED TO SPACER ONE WELDED TO TOP CHORD OF GIRDER AND BOLTED TOGETHER
DETAIL AT COLUMN TOP-NORTH LIGHT TRUSS IN SECTION
C20
CLEAT ANGLE
NORTH LIGHT TRUSS
STIFFENER PLATE
COVER SHEET 50 THK PUFF PANEL
CORRUGATED SHEET TOP CHORD OF GIRDER
TOP CHORD OF NLT
TOP CHORD NLT
PUFF PANEL 50 THK
FIXING OF N.L.T. AND GIRDER TO COLUMN AT TOP CHORD
TRUSS
ISOMETRIC VIEW OF END TRUSS PUFF PANEL PURLIN/CLEAT TRUSS RAFTER
ANGLE SECTION RUNNER SPACER SECTION BOLTED PLATES TOP CHORD FOR GIRDER 50 THK PUFF CLADDING
FLASHING GLASS RUNNER
50 THK PUFF PANEL FLASHING STIFFNER PLATE TOP CHORD OF GIRDER
ISMC RUNNER FOR PUFF PANEL ANGLE RUNNER
3MM THK. PLATE OF 100 WIDTH @600 c/c ADDITIONAL SUPPORT
VERTICAL MEMBER OF GIRDER
COVER SHEET
50 THK PUFF PANEL
NORTH LIGHT GLASS
GUTTER SUPPORTS BETWEEN PURLIN & GLASS RUNNER
ISMC 250 TO SUPPORT PUFF PANEL CLADDING RAIL
RUBBER SEAL PURLIN CLEAT
CROSS SECTION THROUGH GUTTER
ISMC RUNNER FOR PUFF PANEL
SPACER SECTION SHS COLUMN 250 X 250, 5 THK
VERTICAL POST OF GIRDER
GLASS RUNNER CLEAT PLATE
STIFFENER PLATE STIFFENER ISMC 20 PURLIN 250 THK SHS COLUMN FLASHING SECTION/CLADDIND RAIL
250 THK BRICKWALL WITH PLASTER
GLASS 6MM AND SIMILAR DETAIL AT COLUMN C17 COLUMNS
DETAIL AT COLUMN TOP-GIRDER IN SECTION
WORKING DRAWING | 21 9
B
3224
A B
C1 450X230
C2 450X230
C4 450X230
C5 450X230
3115
C3
B
3224
7018
C D
7127
C6 450X230
C7 450X230
764
DAYCARE 6840 X 3780
C D
7127
890
C D
D1
TOILET 4160 X 2610
10
8
C11 450X230
E F
12885
C12 450X230
C13 450X230
12885
21688
W1
17
4298
18
3
19
2
+1350MM SILL LVL.
+450 LVL.
20 UP
RISER -150 TREAD -300 STEPS -20
+450MM PLINTH LVL.
D1
PCC BED
919 E F
D1 3250
898
898
SUNK : 200M
±0 GROUND LVL.
W1
1
WORKSHOP 1 4540 X 10750
PASSAGE
E F
SUNK : 200M
+2550MM LINTEL LVL.
16
5
5418
+3600MM FIRST FLOOR SLAB LVL.
800
15
6
W1
12775
+4500MM FIRST FLOOR SILL LVL.
C D
14
7
12775
DORMITORY 5860 X 9540
13
695
E F
+5700MM FIRST FLOOR LINTEL LVL.
C'
12
9
W1
C13
W1
2972
4
C11,C12 C14
A B
4815
11
W1
908
E F
89
1285
714
C D
C13
+8480MM ROOF LVL.
W1 7018
D2
C11,C12 C14
21578
7
DUCT
A B
8 9
16313
11923
7153
11813
56
732
C10 450X230
C9 450X230
C8 450X230
A
W1
222
C
C D
7263
3225
34
W1
W1 A B
C5 C10 C14
7
D3
A
C7, C8 C9,C10 C6
C4 C9 C13
5 6
D3
89
C1, C2 C4, C5
C6
C7, C8 C9,C10
C8 C3 C16 C12 C18
3 4
12
21688
21578
7
C3 450X230
C2 C15 C7 C17 C11
D3
C3
8 9
7
56
2
D3
A
3115
5 6
C1
1
C5 C10 C14
16313
7153
3115
3225
34
12
C1, C2 C4, C5
C4 C9 C13
11923
3 4
1 2
C8 C3 C16 C12 C18 11813
C2 C15 C7 C17 C11
C1
7263
C6 START POINT
C6
3115
START POINT
7
2000
C14 450X230
E F
W1
W1 927
W1
W1
1002
UP 6770 W1
W1 +4000 LVL.
G
C15, C16
18114
667
G
TOILET 4540 x 3930
D1 C15, C16
G
C16 450X230
C15 450X230
G
18114
+0 LVL.
666
G
G
D1
B
D3
D3
D1
D3
B'
D3
+2450 LVL. C17, C18
H
22274
H
C17, C18
H
H
22274
C18 450X230
C17 450X230
1
+4000 GROUND LVL.
H
V1
V1
V1
V1
UP
H
SUNK : 200MM
34
12
56
7
+2000 LVL.
89
UP
4590
4038
+
+ PCC BED
5 6
34
C5 C10 C14
8 9
7
3115
56
7
C3
B
3224
A B
89
C6
C8 450X230
C7, C8 C9,C10
DORMITORY 5860 X 9540
D2
C D
7018
7127
A B
W1
D2
C10 450X230
C9 450X230
TOILET 4160 X 2610
D2
V1 DUCT V1
D2
A
D2
C1, C2 C4, C5
V1
C6 450X230
C4 C9 C13
C5 450X230
C3 450X230
C7 450X230
A
C8 C3 C16 C12 C18
3 4
6
21688
3115
C4 450X230
C2 C15 C7 C17 C11
21578
2
16313
C1
1
12
C2 450X230 C1 450X230
89
3
11923
C6
11813
START POINT
START POINT
7
A'
7153
1000 2000
56
7263
CENTERLINE PLAN
34
12
GROUND FLOOR PLAN
3225
ENTRY TO SITE
W1
C D
C D 10 11
9
12
8
13
7
14
6
15
5
16
4
17
3
18 19 20
RETAINING WALL
W1 +3450 LVL.
2
RISER -150 TREAD -300 STEPS -20
DOWN
1
W1 C11 450X230
C13 450X230
+450 LVL.
C14 450X230 C13
C12 450X230
C11,C12 C14
E F
12775
12885
E F
+3450 LVL.
D1 E F
W1
W1
W1
NORTH ELEVATION
PLINTH BEAM +4000 LVL.
+2000 LVL.
+0 LVL.
+8480MM ROOF LVL.
±0 MM
C15 450X230
+4000 MM
C15, C16
C16 450X230
G
18114
G
G
RETAINING WALL
+5700MM FIRST FLOOR LINTEL LVL. C17 450X230 C17, C18
C18 450X230
H
22274
H
H
+4500MM FIRST FLOOR SILL LVL. +3600MM FIRST FLOOR SLAB LVL. +2550MM LINTEL LVL. +2900 GROUND LEVEL
+2000 MM
+1350MM SILL LVL.
ENTRY TO SITE
FOUNDATION PLAN
FIRST FLOOR PLAN
12
34
56
A'
+450MM PLINTH LVL. 7
89
±0 G
EAST ELEVATION
WORKING DRAWING | 22 6
1
FLOOR FINISH LEVEL
25
START TILE
PLINTH BEAM
MM
+8480MM ROOF LVL.
+5700MM FIRST FLOOR LINTEL LVL.
1580 1280
380
SHOWER ARM CASTED 190MM LONG FLAT FLAT SHAPEFOR WALL MOUNTED SHOWERS WITH FLANGE
230
+4500MM FIRST FLOOR SILL LVL. +3600MM FIRST FLOOR SLAB LVL.
SOAP DISH HOLDER
OVERHEAD SHOWER 200X200MM SQUARE SHAPE SINGLE FLOW (ABS BODY CHROME PLATED WITH GRAY FACE PLATE) WITH RUBIT CLEANING SYSTEM
450 600
+450MM PLINTH LVL. ±0 GROUND LVL.
SECTION BB'
7
4505
D2
A'
D2 730
B
30
230 THK BRICK WALL
980
410
6
175
90
PLAN 2 (DIMENSIONS)
1130X1230MM REFLECTIVE START TILE GLASS(MIRROR)
165
7
START TILE SHOWER ARM CASTED 190MM LONG FLAT FLAT SHAPEFOR WALL MOUNTED SHOWERS WITH FLANGE
1800
PLAN
700
871
+4550MM LINTEL LVL.
+4500MM FIRST FLOOR SILL LVL. +4450 GROUND LEVEL
900
1200
+5700MM FIRST FLOOR LINTEL LVL.
1330
2190
2300
2840
+8480MM ROOF LVL.
+2550MM LINTEL LVL. +2900 GROUND LEVEL
25
400.4479
200
400.4479
+2450MM PLINTH LVL.
SUNK
+2000 GROUND LEVEL
+1350MM SILL LVL.
FLOOR STANDING BASIN WITH FIXING ACCESSORIES, SIZE:510X445X840MM
+450MM PLINTH LVL. ±0 GROUND LVL.
±0 GROUND LEVEL
SOUTH ELEVATION
OVERHEAD SHOWER 200X200MM SQUARE SHAPE SINGLE FLOW (ABS BODY CHROME PLATED WITH GRAY FACE PLATE) WITH RUBIT CLEANING SYSTEM AQUAMAX EXPOSED PART KIT OF THERMOSTATIC SHOWER WITH THREE WAY DIVERTER D-SHAPE SPOUT WITH BUTTON ATTACHMENT FOR HAND SHOWER WITH WALL FLANGE
+3350MM SILL LVL.
+3600MM FIRST FLOOR SLAB LVL.
SECTION BB' START TILE
18MM THK PLYWOOD PARTITION
2840 160
25
200
+3350MM SILL LVL.
400
+4550MM LINTEL LVL.
390
690
+8480MM ROOF LVL.
10MM SCREED 300X 400MM WALL TILE 380x725x690mm RIMLESS SINGLE PIECE WC WITH UF SOFT CLOSE SLIM SEAT COVER
3000
230MM THK BRICK WORK
+2450MM PLINTH LVL. +2000 GROUND LEVEL
WEST ELEVATION
B'
D2
700
1500
+8480MM ROOF LVL.
GROUND LVL.
A B
595
D2
750
+1350MM SILL LVL.
16313
450
A
FLOOR STANDING BASIN WITH FIXING ACCESSORIES, SIZE:510X445X840MM
PLAN 1 (TILES AND NAMING)
+2550MM LINTEL LVL.
207
400MM X 300MM RUVIDO ANTI-SKID TILES D2
6
A B
D2
7
2610
75
WALL QUTLET WITH SHOWER HOOK IN SQUARE SHAPE TOWEL RACK 600MM LONG WITH LOWER HANGERS
10 MM PLASTER
D2
C4,C9 C13
3070
75
HAND SHOWER (HEALTH FAUCET) WITH 8MM DIA., 1.2M LONG FLEXIBLE TUBE
C3 C12
6
4735
595
SECTION
A
11923
3115
SECTION CC'
MM
D2
B 3224
PAPER HOLDER WITH FLAP RECESSED TYPE (STAINLESS STEEL)
C1,C2 C4,C5
320
AS PER DESIGN
C3
1216
380x725x690mm RIMLESS SINGLE PIECE WC WITH UF SOFT CLOSE SLIM SEAT COVER
80
80 MM THICK CONCRETE MADE OF40 MM DOWN SIZE AGGREGATE
595
100 MM PCC BED
311
25 MM POLISHED STONE FLOORING OVER 100 MM CC BED
SECTION AA'
SCHINDLER LIFT COMPETITION | 23
Celing Design
Right side Elevation
CONTACTLESS SOLUTIONS USED VOICE ASSISTANCE: The system would work much like a smart speaker or another voice enabled device, combining a wake work and command. Users wouldn’t need to try and press a button with their hands full, or strain to reach a high up button if they are in a wheelchair, there’s no concern about touching a surface that may have germs on it.
Front side elevation
Floor view
SMART MIRROR ( AUGMENTED REALITY )
Engages people in Ensures optimum The LED display Mirror helps acquainting the security as system keeps the user person in wheelsmall space can catch culprits updated with daily chair, helps reduce news and data anxiety, creates illusion
Left side elevation
Railing
USE OF COPPER ON HANDRAILS & MAIN DOOR Living Bacteria
Dead Bacteria
Copper, through cuporous oxide, kills teh germs with kill mechanisms available at any time it comes into contact with the living cells. It stands as the best material to prevent the user from getting in contact with the harmful bacteria that may have ben set on the surface of the copper railings or the copper main door.
MOTION SENSOR: The motion sensor is also called as an infrared sensor. it is an electronic device, which emits in order to sense some aspects which are happening in the surroundings. An IR sensor will not only measure the heat of an object, but will also detect the motion. Therefore the user may be able to minimize the risk form spreading contact disease.
VENTILATION INLET THROUGH THE PANELS
SCAN & REACH: The QR ( Ouick Response) code based identification allows the user to simply Sacn QR Code on your Mobile for gaining access reduces cost and installation time. Highly convinient for tech savvy users as they can meet great tech - solutions in just one scan.
Ventilation is the most vital aspect in the elevator design . AC systems for air in elevator cars are important to the comfort of occupants that use building elevators. In this design, the air inlet smoothly merges into the side panels. The hot air rises up and its taken out by air exhaust outlets from the ceiling.
Ceiling Design
Flooring Design
Handrail Design
False Ceiling has a basic rhombus pattern with fibre board ( 8mm), PU coating(polyurethane), mirrors in alternative pattern, which enhances the car even more. LEDs are an ideal light source because their rugged design can with stand the vibrations and motions of the car. LEDs running along the panels. Lux inside the car is 200lux.
The natural durability of stone makes it ideal for highly trafficked areas like an elevator. A strong and rugged material. In case of contact with water can be cleaned easily. Cost effective, Workability, Easy maintainace.
Handrail on either sides of the car. Solid copper with polish finish. Mainly used as copper has microbail agent which is 900 mm above flooring level. Polyamide panels provide a realistic implementation of the complex detail design for its character of high precision, firmness and surface smoothness. Extremely strong and lightweight.
Beyond the aesthetics, this elevator design offers functionality in terms of convinience, utility and security.
INTERIOR PROJECT | 24
Interior Design of an apartment in Pune, Sinhagad Road The client wanted simple and subtle designs in the living room. One of the bedroom’s to have a soft padding on the head board of the bed in master bedroom. The other bedroom to have a pull out storage as well as surface for extra bedding. Both the bedrooms have sliding door cupboards. The kitchen has Soft- close cabinets.
EXTRA CIRRICULAR | 25
Art boards
Photography
EXTRA CIRRICULAR | 26
THANK YOU priyankaghodke.bnca@gmail.com +91 7767963344