Exurban Studio . The Future of Sprawl . Construction Document Set

Page 1

the future of sprawl 84th & Pine Lake RD, Lincoln, NE 68526 USA Landon Beard & Megan Peterson

Landon Beard Megan Peterson

T. Title T. 101 Cover Sheet G. General G. 101 Project Information G. 102 General Requirements G. 103 Project Understanding A. Architectural A. 101 Macro Site Plan A. 201 Mega Structure Function A. 202 Mega Structure Transportation A. 203 Mega Structure Transportation (cont)

ARCH 411 Spring 2018 Marc Maxey

A. 301 Micro Site Plan A. 302 Floor Plans A. 303 Floor Plans (cont) A. 304 Roof Plan A. 401 Elevations A. 402 Elevations (cont) A. 403 Elevations (cont) A. 404 Elevations (cont)

A. 601 Wall / Floor Sections A. 701 Details A. 702 Details (cont) A. 703 Details (cont) A. 704 Details (cont) A. 801 HVAC A. 901 Lighting S. Stuctural S. 101 Structural Plan C. Concept C. 101 Mega Structure Perspective C. 102 Platform Perspective C. 103 Interior Dwelling Perspective C. 104 Megastructure Aerial Perspective

SHEET INDEX

SCALE NA

2

CONCEPT

SCALE NA

1

T.101

the future of sprawl cover

A. 501 Building Sections A. 502 Building Sections (cont)


Existing Zoning Requirements

Zone Heigh Setba Zone Heigh Setba

Zone B-5 Height Restriction : 40’ Setbacks : 15’ / Side 5’ / Rear 20’

Zone Heigh Setba

Zone R-3 Height Restriction : 35’ Setbacks : Front 20’ / Side 0’

Zone Heigh Setba

Project Location EXTERIOR ELEVATION

84th & Pine Lake, Lincoln, NE 68526 USA Site Area : 450 acres

ELEVATION NO.

2 A201

SHEET NO.

SECTION

ELEVATION NO.

1 A301

SHEET NO.

PROJECT INFORMATION BUILDING GRID LINES A

1

BUILDING GRID LINES LEVEL NUMBER LEVEL 01

60’

ELEVATION

ROOM LABEL ROOM NAME

LIVING ROOM 240

SQUARE FOOTAGE

DETAIL

1 A401

DETAIL NUMBER SHEET NUMBER AREA REFERENCE

ANNOTATION KEY

SCALE NA

3

VICINITY PLAN


Emergency and life safety services access site via micro helicopter and specified helicopter landing zones.

SCALE NA

Landon Beard Megan Peterson

Occupancy Classifications: R-3, B-5 Construction Type: Type III Fire Rating: 1 Hour ( Does not contain Sprinkler System) Egress Components: 1 in-House Stair, 4 Megastructure Stair Cores, Magnetically driven autonomous transportation system

1

SCALE NA

2

G.101

O-3 ht Restriction : 35’ acks : Front 30’ / Side 10’

International Building Code 2009 (IBC 2009) International Fire Code 2006 (IFC 2006) American National Standard Institute 2009 (ANSI 2009)

ARCH 411 Spring 2018 Marc Maxey

H-4 ht Restriction : 55’ acks : Front 20’ / Side 20’ / Rear 20’

Building Code Requirements

the future of sprawl project information

B-2 ht Restriction : 40’ acks : Front 20’ / Side 20’ R-5 ht Restriction : 35’ acks : Front 20’ / Side 5’ / Rear 30’


Zoning: R-3* This district is intended to provide developing areas of residential use with a gross density of three to five dwelling units per acre, with strong encouragement for the general use of community unit plans to foster improved and innovative design, a mix of housing types and socio-economic groups, and improved energy resource conservation. Source: lincoln.ne.gov Zoning: B-5* This is a district established to permit the development of regional retail shopping facilities and related activites which will provide for planned and controlled consumer survices for all segments of the population, promote healthful economic growth, create a desirable enviroenment, best complement the general land use pattern of the community, and assist in implementing the established goals and policies of the community. Source: lincoln.ne.gov *Requires a zoning amendment in order to surpass required height restrictions.

Due t of Zo Code

All pro jurisd indus Linco zonin in eac as se two ty of ch of lan involv and is proce appro noted Plann a cha requir chang coord with P for a

ZONING REQUIREMENTS Pervious / Non Pervious Areas

Zoning: Setbacks

Floor A

Each platform is constructed similar to that of a green roof. Water drains fast the vegetation and is collected and transferred vis the mega structure to an underground water treatment facility.

Applicable to residentail units < 7,500 - 9,999 SF Side : 8’- 0” Front : 15’ - 0” Rear : 15’ - 0” *

Floor A

Habitat / Erosion Concerns

Source: International Building Code

The majority of the site is left largely untouched by this design intervention. Therefore, habitat protection and erosion is not applicable.

*Due to nature of residential units, the rear setback is accounted for on the operable extended deck attached to each individual unit.

*Based alternat

PLUMBING REQUIREMENTS

SCALE NA

5

ZONING REQUIREMENTS

Dwellin Lot : 3,


R-3 One and two family dwellings and lodging houses with fiver or fewer guest rooms

NA

3

Area Ratio

Water Closets: 1 per dwelling unit

Bathtubs or Showers: 1 per dwelling unit Drinking Fountains: NA Other: 1 kitchen sink per dwelling unit; 1 automatic clothes washer connection per dwelling unit.d Source: International Building Code (IBC)

PLUMBING REQUIREMENTS

SCALE NA

1

Parking

Area Ratio : .4775 *

Due to projective nature of the project, situated in 2100, there is no requirement for parking as the transportation system functions in an autonomous fashion via magnetic tracks. This vertical and horizontal system is currently being tested in Germany by Thyssen Krupp.

ng Unit : 1,720 SF ,600 SF

d upon illustrated 2 - 4 person dwelling unit; te floor area ratios will exist on site

SCALE NA

Public parking will be available on the ground level near commercial ammenities.

4

Landon Beard Megan Peterson

Lavatories: 1 per 10

PARKING REQUIREMENTS

SCALE NA

2

G.102

SCALE

Mimimum number of required plumbing facilities:

ARCH 411 Spring 2018 Marc Maxey

operty within the City and its three-mile extraterritorial diction is zoned, and can range from agricultural to strial zoning. The City’s Zoning Ordinance, part of oln Municipal Code (LMC), describes the various ng districts and includes the range of uses allowed ch district along with the applicable regulators such etbacks and other minimum standards. There are ypes of zone changes. The first involves the process hanging the zoning designation on a specific parcel nd from one designation to another. The second ves an amendment to the Zoning Ordinance itself, s typically referred to as text amendment. Both are essed in the same manner and require City Council oval, but have very different effects. It should be d that a useful development tool known as the ned Unit Development, or simply the PUD, is also ange of zone application as well. The application rements are much greater compared to other ge of zone applications and involve more review and dination, so it is recommended you please consult Planning staff prior to submitting a change of zone PUD. Source: lincoln.ne.gov

the future of sprawl general requirements

to current zoning restrictions, a “Change one” in compliance with Lincoln’s Municipal e is required.


Concept This project is designed at three different scales : the mega structure, the platform and the dwelling unit. The axon on the right highlights each individual component. The following sheets will give a diagramatic sense of how the overall system functions, but will focus largely on the dwelling unit construction and its relationship to the larger whole.

CONCEPT INFORMATION

SCALE NA

2

AXON - THREE SEPARATE DESIGN SCALES


SCALE

NA

G.103

1

the future of sprawl project understanding

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson


AA

BB

11

S 84TH ST.

22

HW

Y2

33

44

MACRO SITE PLAN


Y2 1 A102

SCALE 1” = 650’-0”

1

A.101

1 A102

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson

S 98TH ST.

HW

the future of sprawl macro site plan

CC DD


150’

80’

cell / wifi tower

structural support

underside transportation system

upcycling center material storage

energy generation + storage

centrifugal separation

gray filtration

ground water filtration

ground water collection

MEGA STRUCTURE INNER WORKINGS DIAGRAM


Landon Beard Megan Peterson

600’

450’

maximum height platform (375’)

300’

magnetic vertical transportation net work

ARCH 411 Spring 2018 Marc Maxey

150’

automated waste dropoff point 0’ waste collection

waste storage

-150’

methane fermentation container -300’

waste incineration chamber

-450’

algae carbon dioxide absorber

-600’

waste heat container

-750’ geothermal well

paleozoic oil shaft -5000’

SCALE 1” = 100’-0”

1

A.201

the future of sprawl mega structure function

waste water treatment facilit y


1 A401

1 A401

0

20’-0”

50’-0”

MACRO TRANSPORTATION SYSTEM


SCALE 1/2” = 50’-0”

A.202

1

the future of sprawl mega structure transportation

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson


0

5’-0”

20’-0”

TRANSPORTATION + WASTE MANAGEMENT THRESHOLD


A.203

SCALE 1” = 10’-0”

the future of sprawl mega structure transportation

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson


5’

MICRO SITE PLAN


SCALE 1” = 10’-0”

1

A.301

the future of sprawl micro site plan

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson

Platform Below

Buildable Area

Rear Setback Side Setback


4 A201

A

30’-0”

1

18’-0”

OPTIONAL DECK 460

2

LIVING ROOM 240

2 A302

30’-0”

UP

3 A201

3’-0”

KITCHEN - DINING 360

4

8’-0”

3

4

2 A201

FLOOR PLAN - LEVEL 01


1 A301

Landon Beard Megan Peterson

B

OPERABLE DECK

ARCH 411 Spring 2018 Marc Maxey

HINGE

M EXIT PATH

1 A201

4’0” 4 A501

BATH 48 SF AUTOMATIC CLOTHES WASHER CONNECTION OPERABLE BACK PLATFORM

1 A301

SCALE 1/8” = 1’-0”

1

A.302

the future of sprawl floor plans

2 A302


4 A201

A

2

12’-0”

TERRACE 74

2 A302

DN 3’-0” 4’0”

18’-0”

3 A201

BATH 60

BEDROOM 106

3

2 A201

FLOOR PLAN - LEVEL 02


Landon Beard Megan Peterson 1 A301

ARCH 411 Spring 2018 Marc Maxey

B

RAILING 2 A302

1 A201

BEDROOM 106

MEGASTRUCTURE PLATFORM

EXIT PATH

1 A301

SCALE 1/8” = 1’-0”

1

A.303

the future of sprawl floor plans

3’-0”


A

4 A201

2

2 A302

3 A201

3

2 A201

ROOF PLAN


SKYLIGHTS

1 A301

SCALE 1/8” = 1’-0”

1

A.304

1 A201

the future of sprawl roof plan

ARCH 411 Spring 2018 Marc Maxey

1 A301

B

2 A302

Landon Beard Megan Peterson


3’-0”

4’-6”

60’-0”

17’-0”

BUILDING ELEVATION 01 - EAST


48’

30’-0” INPUT AIR VENT

SCALE 1/8” = 1’-0”

1

A.401

60’

ARCH 411 Spring 2018 Marc Maxey

30’-6” LEVEL 01

the future of sprawl elevations

LEVEL 02

Landon Beard Megan Peterson


14’-0”

13’-0”

30’-0”

BUILDING ELEVATION 02 - SOUTH


48’

SCALE 1/8” = 1’-0”

1

A.402

LEVEL 01

the future of sprawl elevations

LEVEL 02

60’

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson


BUILDING ELEVATION 03 - WEST


48’

INPUT AIR VENT

SCALE 1/8” = 1’-0”

1

A.403

11’-6” LEVEL 01

the future of sprawl elevations

LEVEL 02 60’

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson


12’-0”

8’-6”

30’-0”

BUILDING ELEVATION 04 - NORTH


48’

SCALE 1/8” = 1’-0”

1

A.404

LEVEL 01

the future of sprawl elevations

LEVEL 02

60’

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson


3 A501 2 A501 1 A501

1 A401

STAINLESS STEEL SUSPENSION CABLE

PLUMBING & ELECTRICITY CAVITY AUTONOMOUS POD TRANSPORT SYSTEM STEEL SUPPORT

STEEL PLATE STEEL BRACKET

BUILDING SECTION 01

2 A401


LEVEL 01

48’

11”

1”

SCALE 1/8” = 1’-0”

1

A.501

7”

the future of sprawl building sections

ARCH 411 Spring 2018 Marc Maxey

2 A502

LEVEL 02 60’

Landon Beard Megan Peterson


12’-0”

10”

30’-0”

BUILDING SECTION 02

6 A501

5 A501


48’

SCALE 1/8” = 1’-0”

1

A.502

LEVEL 01

the future of sprawl building sections

LEVEL 02

60’

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson


EMERGENCY SPRINKLER SYSTEM OPTIONAL GREENING EROSION CONTROL ENGINEERED SOIL

STAINLESS STEEL RAILING GLASS INFILL ADJUSTABLE HEIGHT CONCRETE PAVER SUPPORT PEDESTAL

RIGID INSULATION DRAINAGE LAYER TAPERED CONCRETE PRE-CAST CONCRETE SECTION RAILING FASTENER

PRECAST CONCRETE SECTION STEEL BRACKET

PLATFORM FLOOR SYSYTEMS SECTION

4’-6”

STEEL WALL


Landon Beard Megan Peterson FIBER REINFORCED PLASTIC SHELL INSULATION FIBERRIGID REINFORCED PLASTIC SHELL DECKING

ARCH 411 Spring 2018 Marc Maxey

STEEL RIGID INSULATION FIBER REINFORCED DECKING PLASTIC SHELL STEEL FIBER REINFORCED TRUSS SUPPORT CONNECTION PLASTIC SHELL RUBBER INSULATED COVER TRUSS SUPPORT CONNECTION BOLTED CONNECTION POINT RUBBER INSULATED COVER BOLTED CONNECTION POINT

PLUMPING INPUT

1 A502

1 A502

SCALE 1-1/2” = 1’-0”

1

A.601

the future of sprawl wall / floor secitons

PLUMPING INPUT


SKYL

IN

SKYL

SKYL


INSULATED TEMPERED GLASS EXTRUDED ALUMINUM RETAINER CAP FRAME VINYL GLAZING TAPE

NEOPRENE SETTING BLOCK BACK ADHERED RUBBER DRAFT DEAL

Landon Beard Megan Peterson

FASTENER FLASHING RUBBER MEMBRANE

LIGHT WINDOW HEAD

SCALE 1-1/2” = 1’-0”

1

SCALE 1-1/2” = 1’-0”

2

RUBBER MEMBRANE FLASHING FASTENER

ARCH 411 Spring 2018 Marc Maxey

NEOPRENE SETTING BLOCK BACK ADHERED VINYL GLAZING TAPE EXTRUDED ALUMINUM RETAINER CAP FRAME RUBBER DRAFT SEAL

VINYL GLAZING TAPE EXTRUDED ALUMINUM RETAINER CAP FRAME INSULATED TEMPERED GLASS

LIGHT WINDOW JAMB

NEOPRENE SETTING BLOCK BACK ADHERED FASTENER FLASHING RUBBER MEMBRANE

ALUMINUM CAP

SCALE 1-1/2” = 1’-0”

3

A.701

LIGHT WINDOW SILL

the future of sprawl details

NSULATED TEMPERED GLASS


STRUCTURAL STEEL FRAME

DOUBLE PANELED WINDOW

DRAINED & VENTILATED ZINC CLADDING

WINDOW FRAME

ALUMINUM PANEL

SEALANT & BACKER ROD

SIP WALL PANEL STANDARD WIRE CHASE

WATER BARRIER

GYPSUM BOARD

FLASHING & DRIP

SEALANT & BACKER ROD

STANDARD WIRE CHASE GYPSUM BOARD

FLASHING & DRIP

SIP WALL PANEL ALUMINUM PANEL

WINDOW FRAME

DRAINED & VENTILATED ZINC CLADDING STRUCTURAL STEEL FRAME

DOUBLE PANELED WINDOW

WINDOW SILL DETAIL

SCALE 1-1/2” = 1’-0”

3

WINDOW HEAD DETAIL


Landon Beard Megan Peterson ARCH 411 Spring 2018 Marc Maxey WINDOW FRAME SEALANT & BACKER ROD

WATER BARRIER FLASHING & DRIP

GYPSUM BOARD SIP WALL PANEL ALUMINUM PANEL DRAINED & VENTILATED ZINC CLADDING STRUCTURAL STEEL FRAME

SCALE 1-1/2” = 1’-0”

2

WINDOW JAMB DETAIL

SCALE 1-1/2” = 1’-0”

1

A.702

the future of sprawl details

DOUBLE PANELED WINDOW


TRUSS SUPPORT CONNECTION RUBBER INSULATED COVER BOLTED CONNECTION POINT

EROSION CONTROL

ENGINEERED SOIL RIGID INSULATION

DRAINAGE LAYER PRE-CAST CONCRETE SECTION STEEL BRACKET

WALL TO MEGASTRUCTURE PLATFORM CONNECTION DETAIL


Landon Beard Megan Peterson ARCH 411 Spring 2018 Marc Maxey

WATER BARRIER RUBBER SEAL & TRIM ADJUSTABLE SUPPORT PEDESTAL ADJUSTABLE HEIGHT CONCRETE PAVER SUPPORT PEDESTAL

INSULATION

SCALE 1-1/2” = 1’-0”

1

A.703

the future of sprawl details

STEEL BRACKET


DOUBLE LAYERED TEMPER GLASS

STAINLESS STEEL DECK RAILING

SWIVEL FASTENER BOLTED CONNECTION

SWIVEL GEAR RAILING HEAD LOCKING MECHANISM

SECOND LEVEL TERRACE RAILING DOUBLE LAYERED TEMPER GLASS

OPERABLE DECK LOCKING MECHANISM


Landon Beard Megan Peterson STAINLESS STEEL SUSPENSION CABLE

ARCH 411 Spring 2018 Marc Maxey

STAINLESS STEEL ATTACHMENT

SCALE 1-1/2” = 1’-0”

2

A.704

the future of sprawl details

COLLAPSED SIDE RAILINGS


SUPPLY AIR FAN

HEATING COIL

DX COOLING COIL

OUTSIDE AIR RELIEF AIR

THERMOSTAT

ZONE AIR INLET NODE

ZONE AIR EXHAUST NODE

NATURA

ZONE BOUNDARY

NATURA

HVAC PROCESS DIAGRAM

SCALE NA

2

NATURA

HVAC HOIZONTAL / VERTICAL DISTRIBUTION

SCALE 1/8” = 1’- 0”

3

HVAC


Landon Beard Megan Peterson

AL VENTILATION

DAYLIGHT GLASS

AL VENTILATION

NATURAL VENTILATION

ARCH 411 Spring 2018 Marc Maxey

VIEW GLASS

AL VENTILATION

C LOCATION & AIR INPUT / OUTPUT

SCALE 1/8” = 1’-0”

1

A.801

VI

EW

/D

AY L

IG H

T

G

LA S

S

TH

RE

SH

O

LD

the future of sprawl HVAC

VENT


LED FLOOR STRIP LIGHT

SQUARE WALL LIGHT

E.Q.

LIGHTING PLAN - LEVEL 01

E.Q.

E.Q.

SCALE 1/8” = 1’-0”

2

LIGH


E.Q.

E.Q. E.Q. E.Q.

SCALE 1/8” = 1’-0”

1

A.901

the future of sprawl lighting

ARCH 411 Spring 2018 Marc Maxey

E.Q. E.Q.

HTING PLAN - LEVEL 02 SQUARE WALL LIGHT

E.Q.

E.Q. E.Q.

Landon Beard Megan Peterson


CONNECTION OF DWELLING TO MEGA STRUCTURE / FOUNDATION


Landon Beard Megan Peterson

PLATFORM STRUCTURE

LE

VE

ARCH 411 Spring 2018 Marc Maxey

L 02 60 ’

UPPER SHELL

LE

VE

L 01 48 ’

EXTERIOR WALL

LOWER SHELL

UNIVERSAL DECK

EXTERIOR WALL

SCALE 1” = 25’-0”

1

S.101

the future of sprawl structural plan

UNIVERSAL STRUCTURE SYSTEM



C.101

the future of sprawl mega structure perspective

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson



C.102

the future of sprawl platform perspective

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson



C.103

the future of sprawl interior dwelling perspective

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson


C.104

the future of sprawl mega structure perspective

ARCH 411 Spring 2018 Marc Maxey

Landon Beard Megan Peterson


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.