2 13 10 6 12
11 4 3
5
15
1
9
14 8
7
1:200 @ A2 Short Section Key: 1 - CO-OPERATIVE MEMBER 2 - Tram line using existing infrastructure 3 - Landscaped area and public gardens 4 - Warehouses 5 - Housing 6 - Train Tracks 7 - Germination tower 1 8 - Germination tower 2 9 - Entrance 1 10 - Water tank 11 - Germination trays 12 - Continuous ramp 13 - Louvres 14 - Primary steel structure 15 - Secondary timber structure
Drawn at A1
17 10 16 8 11
5 12
1
14
9
15
3
4
13
7 2
6
Key: 1 - Tram line using existing infrastructure 2 - Landscaped area and public gardens 3 - Train Tracks 4 - Germination tower 1 5 - Germination tower 2 6 - Entrance 1 7 - Water tank 8 - Germination trays 9 - Continuous ramp 10 - Louvres 11 - Primary steel structure 12 - Secondary timber structure 13 - Market Space 14 - Tram exchange 15 -Bioluminescent light 16 - Louvred roof 17 - Water harvester
1:400 @ A2 Long Section Drawn at A0
3
4
14
1
2
5
11 10 12
7
8 9 Key: 1 - Market space 2 - Market stalls 3 - Train Tracks 4 - Germination tower 1 5 - Germination tower 2 6 - Entrance 1 7 - Water tank 8 - Germination trays 9 - Continuous ramp 10 - Entrances 11 - Primary steel structure 12 - Secondary timber structure 13 - Community landscaping 14 - Bioluminescent lights
13 6
1:400 @ A2 Pan section 1 Drawn at A0
3
14
4
1
5
11 10 12
7
8 2
9
Key: 1 - Fan canopy 2 - Market level 3 - Train Tracks 4 - Germination tower 1 5 - Germination tower 2 6 - Entrance 1 7 - Water tank 8 - Germination trays 9 - Continuous ramp 10 - Entrances 11 - Primary steel structure 12 - Secondary timber structure 13 - Community landscaping 14 - Water harvesters
13 6
1:400 @ A2 Pan section 2 Drawn at A0
1:750 @ A2 Overall Site Plan