m s
e i
selected
h d works
a h
k u 2021
m e h a k s i d h u architecture student
604 780 5004 mehakksidhu@gmail.com 6661 121A Street Surrey, BC V3W 0H8
As an architecture student I am still evolving and am eager to learn the different aspects of the architecture industry especially the relationship between architecture and socio culture. My interest mainly centers around how architecture can f ight against social injustice and can be the catalyst in making the world a more inclusive and diverse environment.
EXPERIENCE
EDUCATION
GRADUATE RESERACH ASSISTANT
MASTER’S DEGREE
University of Calgary | Oct 20 - May 21
University of Calgary | Sep 19 - May 21
Part of the Center For Civilization team
Graduated with a Masters of
and responsible for creating a social me-
Architec ture degree with 3. 85 GPA .
dia strategy and promoting via Instagram.
Wo r ke d a s a g r a d u a te re s ea rc h assistant during the f inal year.
JUNIOR TECHNOLOGIST
BACHELOR’S DEGREE
Ciccozzi Architecture Inc. | June 18 - July 19
BC Institute of Technology | Sep 16 - May 18
Assisted with design development of
Graduated with Distinction f rom the
residential projects through development/
Bachelors of Architectural Science
building permit drawings .
degree
Coordinated with various consultants to meet specif ic building permit
JUNIOR DRAFTSPERSON
DIPLOMA
Paragon Design Group | June 18 - Dec 18
BC Institute of Technology | Sep 14 - May 16
Responsible for preparing working
Graduated with Distinction f rom the
drawings for custom houses in accordance
A rc h i te c t u r a l a n d B u i l d i n g Te c h n o l o g y
to BCBC part 9.
diploma program with the architectural elective.
VOLUNTEER
ACHIEVEMENTS
Architectural Connections Event Manager
GEC Award of Excellence Design
B C I n s t i t u te o f Te c h n o l o g y
Nominated. University of Calgary
W.H.E.E.L Humanitarian Group Volunteer Ho Chi Minh, Vietnam
Riddle Kurczaba Sustainability Design Award Nominated. University of Calgary
SKILLS Rhino
Adobe Photoshop
Ve c to rWo r ks
Microsoft Excel
Revit
Adobe Indesign
Sketchup
M i c ro s o f t Wo rd
AutoCAD
Adobe Illustrator
Grasshopper
TABLE OF CONTENTS ACAD E M IC
01
Pu nja bi Futurism
07
T h e Rhizom e
13
VAHA Urba n O a sis
19
I n g l ewood In Between
23
T h e Fa lse Creek Fla ts
25
U rba n Seed
29
S t Petri Ca se study
PR OF ESSIO NAL
37
L ati m er H eights
41
E lec tronic Avenue
45
No r th Roa d A pa r tm ents
ACADEMIC
PUNJABI FUTURISM l o c a t io n: Un ive rs ity of Calgar y pro fe s s o r : Su m e r S in gh du ra t io n : 3 we e ks
Punjabi Futurism M2 project 2021
Futusistic Punjabi Warrior
01
Anthropogenic effec t such as colonialism, environm ental an d econ omic exploitation have an d continue to oppress many cul tures an d societies aroun d th e world. Through years of econ omic an d in dustrial exploitation humans are continuously tied up in a large web of insatiability with evolvin g greed an d capitalistic min dsets that grew out of colonialism an d have led to subjugation of many cul tures.
This research aims to view th e Anthropocen e as a political an d socio econ omic symptom of global injustices in Punjab through th e lens of a futuristic narrative an d provide a n ew h ope an d raisin g a voice a gainst th e oppression curated by th e fascist governm ental regim es an d global capitalism. Punjabi Futurism that creates oppor tunities to challen ge th e present by pic turin g what com es n ext . th ey are a pathway to liberation an d empowerm ent .
Th e ima ges created aim to answer h ow can a different narrative transform th e culture of Punjab through th e lens of th e futuristic ideologies? How will th e cultures m odes of kn owin g, h ealin g, sensin g, an d becomin g be used to decolonize n eoliberal discourses an d th eir politics? How will techn ological a dvan cem ents becom e the voice of the oppressed?
02
Punjabi Futurism M2 project 2021
03
Punjabi Futurism M2 project 2021
04
Punjabi Futurism M2 project 2021
05
Punjabi Futurism M2 project 2021
Punjabi Futurism M2 project 2021
Fab ric a t io n
06
THE RHIZOME SOLARPUNK l o c a t io n: Un ive rs ity of Calgar y pro fe s s o r : A lb e r to d e S alvate rria du ra t io n : 1 3 we e ks
Nor th South Sec tion
The Rhizome M2 project 2020
View of Wetlan d Area
07
Th e studio was based on th e reima gin g a sec tion of th e ity of Calgar y with th e prin ciples of th e solarpunk m ovem ent . Solarpunk is a growin g m ovem ent that envisions a society 1) buil t with ren ewable en ergies such as solar an d win d power, 2) integrated with urban farmin g an d natural ecologies, 3) embra cin g pref igurative politics an d th e twin values of pluralism an d diversity, while 4) prom otin g self-suff icien cy an d decentralization of urban an d governan ce systems.
Potato, Solanum tuberosum, is a root vegetable that establish es a cer tain level of conn ec tivity with its anatomy an d struc ture. Th e entire plant struc ture is lin ear star tin g above groun d with its th e roun ded leaves an d makin g its way un dergroun d to th e edible par t of th e plant via a stern set of stems. Th e main f ruit of th e plant grows subm erged in th e groun d kn own as th e tuber, a ccompanied by a dense system of roots.
Th e f inal grid for th e city was created by usin g th e river as a point attra c tor an d distor tin g th e existin g city grid to expan d an d offer flexibility to th e city. Th e local grid was created by highlightin g th e historic buildin gs aroun d th e site an d creatin g a var yin g pattern. Th e resultin g lan dforms provide th e city with a diverse point of interests that can fa cilitate a gra dient of a c tiv ities an d operations.
F R
A R
I B
M A
L A N
R
V
E
R
The Rhizome M2 project 2020
U
N
D
08
The Rhizome M2 project 2020
View of th e Walkway
09
View of Wa ter Bank
nd
-fo
rm
Bu
Ge
ild
ne
ing
alo
Ty
gy
po
Gr
log
id
The Rhizome M2 project 2020
La
yG rid
10
The Rhizome M2 project 2020
Nor th South Sec tion
11
The Rhizome M2 project 2020
Edge Con ditions
Context Axom om Axon etric omView etric
12
VAHA URBAN OASIS l o c a t io n: Un ive rs ity of Calgar y pro fe s s o r : Ph ilip Van d e rm ey pa r t n e rs : Ya gmu r Yu r tb u lmu s du ra t io n : 1 3 we e ks
VAHA Urban Oasis M1 project 2019
VIEW OF EXTERIOR ENTRANCE COURTYARD
13
Th e studio was based on th e museum of truth con cept . Th e studio began with th e premise that a museum focused on secular m orality an d ethical imperatives might ser ve as a forum for th e explora tion of tim ely issues an d inspire debate. Our interpretation star ted with studyin g th e m eanin g of truth an d h ow ea ch in dividual experien ce truth in a different way, an d is m ostly reliant on th e truth of our sense.
VAHA is an urban san c tuar y with a cultural spa ce overlaid in a sense urban environm ent m eans to perceive or awaken the truth that inh erits on es life. Th e architec ture will provide a pla ce for psych ological cleansin g allowin g spa ces for contemplation that would reveal th e nature of th e true self. It is an oasis centered in middle of dense urban environm ent .
Light is an oth er fa c tor that was given a lot of preceden ce through out th e design process. Small skylights are pla ced above th e pool spa ces to create a unique an d contemplated experien ce. Th e lan dscape aroun d th e buildin g an d in th e plaza allows various trees to create a forest like feelin g with th e light f ilterin g through th e can opies.
4
6
54
5
5
5
7
6
3
2
1
3
2
1
1 2 3 4 5 6 71 2 3 4 5 6 7
7
Cold Pool Salt Thera Hot Pool Entrance Hallway Parking Mechanic Cold Pool Salt Thera Hot Pool Entrance Hallway Parking Mechanic
P R OWest P O S E DSec E A tion ST WEST SECT East
PROPOSED EAST WEST SECT
7
6
3
2
8
1 4
9
1 2 3 4 5 6 7 8 9
Change Room Admin/Staff Entrance Hallway Yoga Room Class 1 Meditation Storage Parking
Nor th South Sec tion
VAHA Urban Oasis M1 project 2019
5
PROPOSED NORTH SOUTH SECTION 14
View of Hot Pools
VAHA Urban Oasis M1 project 2019
VIEW OF HOT POOLS
15
View of Tree Cour tyard V I E W O F E X T E R I O R T R E E C O U RT Y A R D
Axom om etric View
16
VAHA Urban Oasis M1 project 2019
BELO
W GR OUND
GROU
ND L EVEL
ROOF
LEVE
L
3 4
3
2
2
1
1 Rainwater falls on the raised grasslands
1
1
2 Filtering shrubs and grasses planted 3 Water filtered through the plant and used for building water system
1 Grey water overflow from plaza 2 Mixed grey water pumped into raised gravel bed 3 Filtered water gravity flow to hydrobotnic ponds 4 Fully filtered water flow to testing room in basement 5 Clean pool water pumped to supply nozzle of pool spaces
PLAZA SUSTAINABILITY DESIGN
VAHA Urban Oasis M1 project 2019
Plaza Sustainability Dia gram
17
View of Plaza VIEW OF EXTERIOR PLAZA
PROPOSED WEST
P R O P OWest S E D WElevation EST ELEVATION
Nor th Elevation
PROPOSED NORTH
PROPOSED NORTH ELEVATION
VAHA Urban Oasis M1 project 2019
MO DEL EXPLORATIONS
18
INGLEWOOD IN BETWEEN
Inglewood In Between M1 project 2019
l o c a t io n: Un ive rs ity of Calgar y pro fe s s o r : Yve s Poitras du ra t io n : 1 3 we e ks
19
Th e objec tive of this projec t was to rethink th e idea of inf ill especially in a historic n eighborh ood like In glewood. Typically an inf ill site is h orizontal an ds ta ckin g up. This projec t aims challen ge that n otion an d focus on th e unique side fa ca des as bein g th e primar y site an d design driver. Thus inf illin g while still maintain th e existin g street chara c teristic of In glewood.
This projec t is shiftin g our thinkin g f rom a lin ear econ omy to a m ore circular econ omy. It en coura ges con sum ers to stop feelin g th e n eed to buy ever y thin g n ew an d to donate items that th ey n o lon ger n eed - suppor tin g what’s kn own as th e circular econ omy. More specif ically it takes in h ouseh old waste an d is a prototype on h ow we can re - con ceptualize what waste is.
Th e waste is th en available for th e ar tist a s well as th e public to buy. Th e ar t studios an d recyclin g center togeth er ta ckle risin g consumption on a local level. Takin g th e residual pla ce between 9 th avenue an d conver tin g th em into usable an d fun c tionin g spa ces fur th er solidif yin g th e idea of circular econ omy.
Axon om etric Floor Plan
20
Inglewood In Between M1 project 2019
Inglewood In Between M1 project 2019
Entran ce Galler y View
21
Market Mall View
Nor th-South Sec tion
East-West Sec tion
FACADE STUDY MODELS WITH PVC PIPES
Inglewood In Between M1 project 2019
SCALED MODEL
22
THE FALSE CREEK FLATS
The False Creek Flats fourth year project 2018
l o c a t io n: B ritis h Co lu mb ia I n stitute of Techn ology pa r t n e r : C las s of 201 8 pro fe s s o r : Ron Kato & J o d y Patterson du ra t io n : 8 we e ks
23
Th e False Creek Flats h olds high econ omic an d historic value within th e City of Van couver. Th e Flats are h om e to roughly 8 ,000 employees an d over 600 busin esses in diverse an d thrivin g sec tors of th e local econ omy. th e area consists of primarily in dustrial lan ds an d la cks th e care, linka ges an d public pla ces that so often def in e th e rest of Van couver.
Th e master plan design was based on a stron g con n ec tion to nature. Th e design in cluded an estuar y. On e a dvanta ge of th e estuar y was to brin g ba ck th e native inhabitants an d put an emphasis on nature an d re -wildin g. Th e estuar y features a ecological park with pedestrian an d bike trails to educate th e public .
Th e precin c t was design ed as a pedestrian f rien dly an d th e streets were widen ed to in corporate bike rotes. Unique buildin g lots an d interestin g geom etr y were embra ced in order to maintain an d highlight view corridors.
Ex te n d of p re c i n c t
Es t u a r y an d e col ogi cal park Stratcona park v i ew of m ountai ns
vi ew of d own town
Termi nal street
Roa d traff ic
Bike paths
Pedestrian
Natural Systems
The False Creek Flats fourth year project 2018
PROPO SED
EXISTIN G
False Creek Flats Master plan Strategies
24
THE URBAN SEED l oc a t io n : B ritis h Co lu mb ia I n stitute of Techn ology pro fe s s o r : Ron Kato & J o d y Patterson du ra t io n : 1 5 we e ks Ma i n S t re e t Fa rm e rs Ma rke t
Urba n Fa re
Mt P l ea s a n t Fa rm e rs Market Uni on M arket
FARM
farm ers m arkets aroun d th e fl ats
TRAVEL
Va n W h ol e Prod u ce
Fresh Poi nt Van couver
MISSING! The Flats is missing this direct link between where the produce comes from.
Can-A m Prod uce D i s cove r y O rga n i c s
Fresh Di rec t Prod uce Prod uce Term i nal DISTRIB UTO R
p rod uce p rod uc ti on aroun d th e fl ats
S UPERMARKET
The Urban Seed fourth year project 2018
U rba n Fa rm
25
YO U
p rop osed l ocati on for urban farm
Present! The Flats is one of the Largest and most diverse produce wholesale & distribution cluster in Metro Vancouver.
26
The Urban Seed fourth year project 2018
Th e sunless greenh ouse spa ces that implem ent th e use of hydroponics farmin g. This techniques uses nutrient base instea d of tra ditional soil. Th e plantin g systems are sta cks to maximize yield
The Urban Seed fourth year project 2018
Th e tra ditional f ramin g is pla ced alon g th e west side to take a dvanta ge of th e sun. It uses a carousal system. It rotates to ensure equal sun distribution for all plants.
27
87 times more families fed
Traditional farming
Vertical farming
Urban Seed is an inn ovative market illustratin g h ow sustainable farmin g pra c tices can take pla ce in an urban settin g. Th e groun d floor features a produce market an d cafe that sells produce grown direc tly above with sustainable farmin g pra c tices. Th e plants grown above conn ec t th e consum ers to th e locally grown food.
Th e growin g areas in clude tra ditional an d sunless greenh ouse spa ces that implem ent th e use of hydroponics. Urban seed reconn ec ts people with food produc tion an d ser ves as a m odel for th e future of food. As th e world is experien cin g a population in crease an urban farm can provide food security into urban n eighbourh oods.
M A R KE T
East-We st Se c ti o n
RESEARCH
No r th-So uth Se c ti o n
E ATI N G
The Urban Seed fourth year project 2018
G R OWI N G
28
ST PETRI CHURCH CASE STUDY l o c a t io n: B ritis h Co lu mb ia I n stitute of Techn ology pa r t n e rs : J os h Hall, David Ram os, Steph Friba n ce, Ila ria M a n etta pro fe s s o r : M atth ew Wood ru ff & M ich el L a brie du ra t io n : 8 we e ks
n en g
gae yvyav b b d d e Ve V
Stasparken Stasparken Park
park
K Kllo
osste trevra vgaen ge
n
St Petri Church third year project 2017
Si te an d Co ntex t Pla n
29
SITE Scale – 1 : 2000 Th e objec tive for this case study is to develop critical thinkin g through pra c tice of studyin g projec ts by oth er architec ts an d design ers an d prepare an analy tical case study of a specif ied projec t , workin g on cross disciplinar y, mul ticul tural team.
Th e projec t at study is th e St Petri Church design ed by architec t Siguard Lewerentz . Th e church architec ture can be identif ies as untidy, asymm etrical, contextual an d contin gent , but th ese irregularities are relish ed rath er than repressed.
intimate experience
It was a dmired for its h on est an d direc t use of materials,but also for its complex, irregular an d ar ticulated forms. It speaks of God’s imm ensity an d th e safety un der his protec tion. Th e design is a communicative m ovem ent between site, architec ture an d sculpture.
E
I in
cooper copperroof roof
out
vaulted vaultedbrick brick
principle frame principlesteel steel frame
clusiveness
steel steelvalley valleysupports supports ROOF TYPOLOGY
S te e l va l l ey su p p o r t s
Ste e l f ram e
Bri ck vaul te d
G e o mt r y A n a l ysi s
L i g hti n g A nal ysi s
Move m e nt A nalys is
St Petri Church third year project 2018
Ro o f an d Mate ri a l An a lys is
30
STRATHCONA ARTS CENTER
Strathcona Art Center third year project 2017
l o c a t io n: B ritis h Co lu mb ia I n stitute of Techn ology pro fe s s o r : M atth ew Wood ru ff & M ich el L a brie du ra t io n : 1 0 we e ks
31
This projec t was don e in th e mann er of Siguard Lewerentz followin g th e case study don e on th e Church of St Petri. Th e sam e way th e St Petri Churchs main con cept is on e relationship with god, this design is based on on e relationship with ar t .
The building is a community ar t center that features several workshop and classrooms. The ar t center features individual studio spaces that can be rented and hopes to tackle the rising young ar tist population in the neighborhood.
The building provides an interior cour tyard to allow for lighting to come though as well as an exterior cour tyard to allow for an space to exhibit the work .
extruded down for low ceilings
exit tunnel with perforated wall to emphasis contemplating
extended out to house the art studios &
internal courtyard introduced
art rooms feature low ceiling and coffered ceiling that feature different lighting features
exit and entry emphasized
entry room allows dor inspiring ideas where ideas can come together and is also used as an exhibition space in times of events for to community
Strathcona Art Center third year project 2017
6m x 6m grid
32
> > 1. looking at the entry 2. window peaking
Strathcona Art Center third year project 2017
into the entrance room
33
3. turn around dark
corner into entrance room
Similar to th e church in st petri. va ried forms of lightin g h elp guide th e view through th e hidden entr y sequen ce. Th e entr y features a low roof for a m ore intimate experien ce an d terminates at th e cour tyard with ample light .
4. dark hallway towards lobby
>
5
2
3
>
4
> 1
5. first glimse of the courtyard from the lobby
34
Strathcona Art Center third year project 2017
PROFESSIONAL
THE RISE LATIMER PHASE 2
The Rise work experience 2019
l o c a t io n: C i ccozzi Arch ite c tu re In c . tea m : S a n dro Man c in n i, Rob Ciccozzi du ra t io n : 1 2 we e ks cl ie nt : M itch e ll Gro u p
37
Th e Rise is a collec tion of m odern ar tisan townh om es inspired by its histor y as a ch erish ed family h om estea d. Set on f ive a cres in th e desirable n eighbourh ood of L an gley West , Foun dr y is steps f rom a scenic creekside trail an d minutes f rom great sch ools, sh oppin g an d recreation.
Auth ors contribution was completin g a developm ent pa cka ge f rom th e initial yield study for th e projec t to th e design of th e units, buildin gs plans an d elevations.
Th e process involved collaboratin g an d coordinatin g with civil an d struc tural en gin eers to create a reso lved site an d buildin g design for th e developm ent .
Buildin g Elevations
38
The Rise work experience 2019
39
Unit Plans
The Rise work experience 2019
Overall Site Plan
40
The Rise work experience 2019
50 ELECTRONIC AVENUE
50 Electronic Avenue work experience 2018
l o c a t io n: C i ccozzi Arch ite c tu re In c . tea m : C ra ig R o g e rs , Rob C iccozzi a n d Ela in e Ch en du ra t io n : 5 we e ks cl ie nt : Pa natch Grou p
41
50 Elec tronic Avenue has a distin c t sense of pla ce. A collec tion of 358 con dominium residen ces, featurin g spa cious 1, 2 , 3 an d 4 bedroom floor plans. Located a cross f rom Rocky Point Park an d just steps away f rom Brewers Row, 50 Elec tron ic Avenue will offer unique urban livin g.
Auth ors contribution to th e projec t in cluded a daptin g tot h e design chan ges outlin ed by th e client an d coordinatin g th e design of th e units with th e struc tural en gin eers. Th e auth or assisted with th e submission of th e a complete develpom ent pa cka ge to th e city.
Th e auth or was responsible for th e design of th e am enity win g of th e buildin g. Th e 2 storey struc ture in cluded various recreational a c tivities such as a gym, yoga/ dan ce studio an d a day care fa cility.
Unit Plans
42
50 Electronic Avenue work experience 2018
43
50 Electronic Avenue work experience 2018
44
50 Electronic Avenue work experience 2018
NORTH ROAD DEVELOPMENT
North Road work experience 2019
l o c a t io n: C i ccozzi Arch ite c tu re In c . tea m : S a n dro Man c in i, Rob C i ccozzi a n d Coa la n D evin e du ra t io n : 4 we e ks cl ie nt : O nn i Grou p
45
Th e developm ent on Nor th Roa d in Burquitlam will consist of two towers: a 46 -storey market con do tower an d a 20 -storey rental tower. Th ere will be a total of 4 82 units; 34 8 market con dos, 134 purpose -buil t rentals an d 21 n on-market units. Eight of th e market con dominium units will be townh ouses f rontin g onto Nor th Roa d.
Th e auth ors contribution to th e projec t in cluded updatin g unit plans as per client mark ups for th e developm ent permit submission pa cka ge. Coordinatin g with th e projec t team, client an d struc tural & m echanical en gin eers.
Th e auth or developm ent pa cka ge submission pa cka ge in cluded arran gin g th e unit plans into buildin g floor plans, sec tions, sha dow study, as well as 3d m odel views.
46
North Road work experience 2019
47
North Road work experience 2019
48
North Road work experience 2019
THANK YOU FOR VIEWING