MELANIE JACQUELINE VIGER
(647) 528-8436
melanie.jacqueline.viger@gmail.com
issuu.com/melanieviger
ABOUT
I have been set designing for film productions in the Toronto, Calgary and Vancouver area since 2018. I've had the pleasure of working some huge productions where I honed my 3d skills and worked with large teams of set designers, which always breeds a little healthy competition. Though I've learned a lot from set design, I love to branch out of the art department and learn how the magic comes together. Future goals include art direction and production design. Prior to joining the film union I went to architecture school where I focused on urban design, landscape architecure and earth art.
MASTER OF ARCHITECTURE, 2018
Daniels Faculty of Architecture, Landscape and Design University of Toronto
HON. B.A. IN ARCHITECTURAL DESIGN & ENVIRONMENTAL STUDIES, 2016
Daniels Faculty of Architecture, Landscape and Design University of Toronto
PROGRAM Rhino SKILLS
Set concepting, rendering, drafting, 3D modelling, developing creative standards, coordinating between departments, corporate bonding and problem solving
TOP BOOKS
Sapiens by Yuval Noah Harari
The Economy of Cities by Jane Jacobs
Invisible Women: Data Bias in a World Designed for Men by Caroline Criado Perez
EXPERIENCE
THE DEAD BOY DETECTIVES S1
Assistant Art Director
Production Designer: Tony Wohlgemuth
Art Directors: Nancy Ford, Kate Whyte
THE SPIDERWICK CHRONICLES S1
Set Designer
Production Designer: Elena Albanese
Art Directors: Andrew Li, Michael Corrado, Sandra Nieuwenhuijsen
SCHMIGADOON S2
Set Designer
Production Designer: Jamie Walker McCall
Art Director: Gregory Clarke
THE LAST OF US S1
Set Designer
Production Designer: Jon Paino
Art Directors: Callum Webster, Andrew Li
STAR TREK: STRANGE NEW WORLDS S1
Set Designer
Production Designer: Jonathon Lee
Supervising Art Director: Jody Clement
Art Director: Hayley Isaacs
SUPERGIRL SEASONS 4 & 5
Set Designer
Production Designer: Tyler Harron
2022
2022
2022
2022
2021
2019-2020
Art Directors: Douglas Scott, Brendan Harron
THE 100 SEASON 6
Set Designer
Production Designer: James Phillpot
Art Director: Nancy Ford
2018
COMMERCIAL STREET SIDE ALLEY PARKING LOT 10'X10' ROLL TOP DOOR 26'-7 1 2 " 15'-0" 30'-0" 10'-0" 3'-4 1 4 5'-4" 6 1 2 " 26'-1" 71'-7 1 2 " 40'-0" 4'-0" SEE DWGS 222_BLDG 16_PRS 20.4 PLAN DETAIL // CORNER P-1.2 SCALE: 1" = 1'-0" ELEVATION // BACK 20.4 E-1 SCALE: 1/4" = 1'-0" 20.4 20.4 E-2 E-1 PLAN // BUILDINGS 16, 17, 18 SCALE: 1/8" = 1'-0" 20.4 P-1 P-1.2 20.4 FINISH 2" FOAM BRICK AS CONCRETE CURB MATCH STONE CONDITION SIDE AND AS CONRETE PLANT ON P-1.2 // NTS PERSPECTIVE // CORNER 3D MODEL VIEW INCLUDING VFX // BACK PARKING LOT 3D MODEL VIEW INCLUDING VFX // SIDE ALLEY N 6 1 2 " 1'-0" 1" 2" 15'-11" 2'-9 1 2 " 2'-4" 2'-6 1 2 " 2'-4" 3'-0" 2'-4" 2'-10" 4'-10" 10'-3 1 2 " 4'-6" 2'-0" 1'-8" 1'-10" 2'-0" 1'-2" 5'-2 1 2 " 4'-4" 4'-2" 1'-6" 7" 23'-0" 5" 1'-0"
10'X10' ROLL TOP DOOR June 24, 2021 ISSUED 20.5 June 24, 2021 20.5 20.5 NOTES S-3 - 10'X10' ROLL TOP DOOR AS PER SET DEC - FIRE ESCAPE AS PER SET DEC - TYP WINDOW "J" X1 - BLDG 17 - TYP WINDOW "K" X6 - BLDG 18 - BRICK FINISH AS PER P.D. - USE 2" FOAM BRICK, TO BE SCULPTED 20.4 20.5 BACK OF BUILDINGS 16-18 MJV As Noted 222 101 Bldgs 16,17,18 Back and Side Alley S-3 E-2 20.4 S-1 20.5 ELEVATION // SIDE ALLEY S-2 S-2 Boston QZ Backlot SHOOTING Plan and Elevations SCALE: 1/4" = 1'-0" FINISH AS LOWER QUALITY 2" FOAM BRICK 3'X7' MAN DOOR AS PER CONST. FIRE ESCAPE AS PER SET DEC FIRE ESCAPE AS PER SET DEC TYP WINDOW "K" X6 AND BACK OF BUILDING 18 FINISH AS CONCRETE CL CL 26'-1" BLDG 16 15'-0" BLDG 17 30'-0" BLDG 18 10'-0" 2'-6" 2'-6" 10'-2" 9'-5" 1'-4 1 2 " 5'-0" 4'-3" 1'-0" 6'-3 1 2 " 7'-2" 10'-1" 10" 1'-2" 6'-2" 2'-8" 6'-2" 10'-2" 19'-10" 5'-6" 3'-0" 5'-0" 3'-0" 5'-0" 3'-0" 5'-6" 6'-4 1 2 " 10'-0" 3'-0" 1'-8" 6'-0" 1'-11" 5" 5" 3'-0" 3'-4" 3'-4" 3" 8" 12'-11 1 2 " 5'-2 5 8 " 4'-9 3 4 " 8" 23'-0" 2'-11 1 2 " 3'-6 3 4 " 2'-4" 3" 1'-4" 1'-6" 12'-4" 1'-11" 8'-9" 3'-9" 5'-2 5 8 " 3'-4 3 8 " 1'-1" 5'-2 5 8 " 2'-5 3 8 " 5'-0" 3'-0" 6'-0" 3'-0" 6'-0" 3'-0" 6'-0" 3'-0" 5'-0" 40'-0" 8" TYP 3" TYP 3'-4" TYP 8" TYP 3" TYP 23'-0" ±12'-4"
FOR FULL ELEVATION DETAILS SEE DWG 222_15.1
TYP. 24' STEEL STRUCTURE 15.3 S-2 15.3 15.3 S-2 TYP. SECTION THRU WINDOW
SCALE: 1/4" = 1'-0" SCALE: 1" = 1'-0" E-1 15.3 ELEVATION
BUILDING
S-2 F&D
12'-0" 1'-0" 9'-0" 22'-0" 7'-10" 8'-4" 7'-10" 24'-0" 2'-3" 1" 2'-3 1 2 " 2" 6'-10 1 2 " 4" 1'-0" 1'-2" 3" 6'-0" TYP. WINDOW "G" 6" 1'-1" 22'-0" 1 1 2 " 6'-7 1 2 " 1 1 2 " 1'-7 7 8 " OC 1'-7 7 8 " OC 1'-7 7 8 " OC 1'-7 7 8 " OC 6'-0" 1" 6'-0" 1 1 2 " 4'-10" PANEL 1'-3 1 2 " PANEL
//
11
BRICK PATTERN #02
EXISTING BUILDING June 15, 2021 101 June 15, 2021 Building 11 Window Detail 15.3 15.3 SECTION DETAIL SCALE: 3" = 1'-0" Boston QZ Backlot 222 MJV As Shown Commercial Street (West) S-2.2 ISSUED MUNTINS AS PER CONST. FINISH AS WOOD FINISH AS CONCRETE CLASSIC PANEL MOULDING A5 13/16"X2" FINISH AS WOOD STAIN AS PER P.D. FINISH AS WOOD F&D BIRCK PATTERN #02 AS PAINTED CONCRETE COLOUR AS PER P.D. 3D MODEL VIEW // BUILDINGS 08-11, INCLUDING VFX PORTION // NTS 1" 2'-3 1 2 " 2" 1 1 2 " 1 2 " 1'-6 7 8 " 1" 1'-7 7 8 " TYP. OC 6" 1'-3 1 2 " PANEL 6" 1 2 3 4 3 4 " 7" 2 3 8 " 1" 1 1 2 " 6" 2 3 8 " 1'-0" 4" 1 1 2 " 1 2 " 1 2 " 1 1 2 " 2"
SCALE: 1" = 1'-0" 15.2 S-1 SECTION 15.2 P-2 15.1 S-1 FOR FULL PLAN SEE DWG 222_15.1 PLAN // ENTRANCE P-2 15.2 SCALE: 1" = 1'-0" ELEVATION // DOUBLE DOORS E-2 SCALE: 1" = 1'-0" 15.2 E-2 15.2 SCALE: 3" = 1'-0" 15.2 P-2.2 PLAN DETAIL // ENTRANCE
COLOUR AS PER P.D. FINISH AS WOOD STAIN AS PER P.D.
BRASS KICKPLATE AS PER CONST. CLASSIC PANEL MOULDING A7 27/32"X1 3/8" 1/4" BASEBOARD CLASSIC PANEL MOULIDNG A7 CLASSIC PANEL MOULDING A7 27/32"X1 3/8" 3'-0" 8'-4" 6'-6" 11" 11" 8" 8" 3" 3'-0" 3'-0" 3" 6'-0" ROUGH OPENING 6'-6" 6" 2'-0" 6" 6" 2'-0" 6" 1'-2" 7'-0 1 2 " ROUGH OPENING 3" 1" 2'-6 1 2 " 1 1 2 " 2'-0 1 2 " 1 1 2 " 3" 7'-0" DOOR LEAF 8" 10 1 2 " PANEL 7" 1'-7 1 2 " PANEL 7" 1'-8 7 16 " GLASS 6" 1 3 8 " 1 1 2 " 5'-9" 1 1 2 " 3" 6'-0" 3" 6'-6" 5'-9 1 2 " GLASS 3'-0" 2'-10" KICKPLATE TYP. 3'-0" 2'-0" TYP. PANEL 6" 6" 7" BASEBOARD 6'-0" ROUGH OPENING 3" 3" 9'-11" 11'-1" 2'-1" GLASS 3" 3" 7" 7" 9'-11" 3" 7" 7" 10 1 2 " 7" 1'-7 1 2 " 7" 10 1 2 " 7" 1'-7 1 2 " 7" 10 1 2 " 6 1 2 " 1'-0" 8" 1'-0" 13'-0" 1" 4 1 2 " 1'-7 1 3 8 " 1 2 " 1 3 4 " 1" 6" 3" 1 4 " 1'-1 9 16 " 4 1 2 " 1'-7 1 2 " TYP. PANEL 4 1 2 " 4 1 2 " 1'-0" 2'-0"
PAINT
8"X34"
1/2" MATERIAL AS PER CONST. 5'-9" 2'-0 1 2 " 1 2 " TYP. 24' STEEL STRUCTURE EXISTING BUILDING June 15, 2021 ISSUED 101 As Shown MJV 15.2 June 15, 2021 Building 11 Entrance Detail NOTES 222 Boston QZ Backlot 15.2 S-1.2 - EASE ALL EDGES - DOUBLE DOORS ARE NOT PRACTICAL - DOOR HARDWARE AS PER SET DEC - FINISH STEPS AS CONCRETE. CNC TRANSOM MUNTIN 15.2 SCALE: 1/4" = 1'-0" SCALE: 3" = 1'-0" S-1.3 15.2 Commercial Street (West) SECTION DETAIL // DOOR CLASSIC PANEL MOULDING A7 27/32"X1 3/8" 3D MODEL VIEW // BUILDING 11 // NTS 3D MODEL VIEW // S-1 THRU BUILDING 11 // NTS 2'-0" 3" 7'-0 1 2 " ROUGH OPENING 3" 1" 2'-3 1 2 " 3" 2'-7 1 2 1 2 " TYP 4 1 2 " 3" 3" 6" 1" 1'-6 7 16 " 3" 4 1 2 " TYP 3'-1 1 2 " 10 1 2 " 1'-1 9 16 " 1 2 " GAP 8" BRASS KICKPLATE 1" 4 9 16 " 1" 7" 3 4 " 1'-8 7 16 " GLASS 1" 3 1 2 " 3" 1 3 4 " 1 3 4 "
23'-0" 02 02 01 01 SCALE: 01 SCALE: 1/4" = 1'-0" E-1 01 P-2 ELEVATION 01 SCALE: 1/2" = 1'-0" E-3 S-2 PLAN // STORAGE ROOM P-1 ELEVATION ELECTRICAL GAK AS PER SET DEC FINISH FLOOR METAL PANEL SHOOT OFF FLAT 8' WIDE FOR DETAIL SEE DWG 549_01_INT KC APARTMENT ATTIC HIDEOUT ATTIC HATCH WITH LADDER AS PER REGIONAL AVAILABILITY S-1 S-2 S-1 // SECTION PERSPECTIVE S-2 // SECTION PERSPECTIVE FILE CABINETS RE-USE DECK, STAIR AND HALLWAY FROM 821_BOSTON APARTMENT TOP FLOOR 15'-8" 4" 20'-0" 2'-0" 4" 15'-0" 4" 7'-8" 4" 4'-0" 59'-2" 01 01 01 01 E-2 E-1 E-3 E-4 9'-0" UNDERSIDE WOOD BEAM 8'-0" UNDERSIDE I BEAM 7 1 2 " JOIST 1'-0" 10'-0" 20'-0" 5" HSS COLUMN 2'-8" ±2'-0" 7'-0" 1'-6" 1'-6" 1'-3" 12'-0" CLERESTORY 4'-0" TYP 1'-0" BEAM
02 02 Feb 07, 2022 ISSUED Feb 07, 2022 SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" S-2 01 ELEVATION E-2 SCALE: 1/2" = 1'-0" 01 ELEVATION E-4 548 Stage Plan and Elevations 01 As Noted MJV S-1 105 Int KC Apartment Storage Room ELEVATION FILE CABINETS ATTIC DETAIL SEE DWG 549_01_ATTIC HIDEOUT ATTIC HATCH AS PER REGIONAL AVAILABILITY SEE LOWES.CA TONGUE AND GROOVE CEILING HATCH TO BE CONCEALED SEE DETAIL TO FOLLOW PLUMBING, ELECTRICAL GAK AS PER SET DEC TYP SERVICE DOOR SEE DWG 548_02 FILE CABINETS FLOOR AS CONCRETE 15'-0" 15'-0" 10'-0" 7'-0" 1'-6" 1'-6" 5" HSS COLUMN 5" HSS COLUMN 20'-0" 6'-8" 6'-8" 6'-8" 7'-0" TYP SERVICE DOOR 1 2 " GAP 9'-0" UNDERSIDE WOOD BEAM 1'-0" 8'-0" UNDERSIDE BEAM 1'-0" 7 1 2 " JOIST 10'-0" 2" 8'-4" 12'-0" 1'-6" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 1'-6" 1'-6" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 1'-6" 18'-6" 4'-5 1 2 " OPENING 2'-0 1 2 " 4" TYP WOOD BEAM 1 1 2 9" I BEAM 9" I BEAM 7 1 2 " 1'-0" 1'-0" 8'-0" 10'-0"
03 01 04 01 03 01 03 03 04 01 WILD HINGED WILD WILD S-3 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" P-1 S-2 S-4 SCALE: SECTION S-2 S-3 S-1 S-1 P-2 S-1 S-2 01 01 01 S-4 P-1 SECTION ELEVATION PLAN // HIDEOUT 8'X12' ROLLING DECK WOOD PLANK FLOORING SAM AND HENRY'S HIDEOUT RED LINE INDICATES WILD SECTIONS EXT BRICK TO MATCH LOCATION REF AS PER P.D. WHITEWASHED BRICK STUD SPACING IS IRREGULAR USE 2X4 AND 2X6 FOR VARIETY HATCH WITH LADDER AS PER REGIONAL AVAILABILITY SEE LOWES.CA SPFX TO RIG TO OPEN AND CLOSE FROM ATTIC LEVEL ABOVE THIS AS CINDERBLOCK WHITEWASHED 1X8 BOARDS ANGLED 45° SECTION PERSPECTIVE S-4 SECTION PERSPECTIVE S-3 8" 22'-0" 8" 23'-4" 12'-0" 8'-0" 6'-0" 8'-0" 5 1 2 " 5'-0" ±1'-10" 3'-7" 4'-5 1 2 3'-11 1 2 6'-0" DECK 5'-6" 5 1 2 8'-4" 4'-0" 555° 6'-0" 8'-4" 5 1 2 1'-11" 5 1 2 5'-6" 8" 8" 8'-0" 6'-0" 8'-0" 8" 5 1 2 " 1'-11" 1'-6" 1'-7" 2'-3" 5 1 2 " 14'-4" 10" 3'-9" 3 1 2 " 3'-7" 2'-1 1 2 " 1'-8" 1'-3" 6" 5 1 2 " 10" 1'-6" 2'-6" 1'-8" 10" 5 1 2 " 23'-4" VARIES 6'-0" 5 1 2 " 5'-0" ±1'-10" 721" 5 1 2 " 10" 1'-8"
MATERIALS.
PERSPECTIVE // HIDEOUT WITH HINGED WALLS OPEN
PERSPECTIVE // HIDEOUT WITH WILD WALLS REMOVED
03 03 WILD WILD HINGED WILD Feb 07, 2022 ISSUED 549 LOWES.CA LADDER $483 AS OF FEB 04 2022 MODIFY LENGTH TO SUIT 6' DECK HEIGHT SECTION ELEVATION SCALE: 1/2" = 1'-0" SEE DWG 549_02_TRUSS DETAIL SCALE: 1/4" = 1'-0" SECTION ELEVATION TEXTURE REFERENCE NOTES S-2 Int KC Apartment Attic Hideout Feb 07, 2022 105 Stage SECTION ELEVATION As Noted MJV S-2 - ATTIC HATCH WITH LADDER AS PER REGIONAL AVAILABILITY. SEE LOWES.CA - GABLE WALLS AS WHITEWASHED BRICK. EXT WINDOW SILL BRICK TO MATCH LOCATION REFERENCE AS PER P.D. VERTICAL SIDE WALL AS CINDERBLOCK. ANGLED SIDE WALLS AS WHITEWASHED 1X8 BOARDS. ALL WOOD STRUCTURE AND STUDS TO BE WHITEWASHED. FLOORING AS 1/2" WOOD PLANK. SEE AGING AND TEXTURE REFERENCE. 01 SCALE: 1/2" = 1'-0" Plan and Elevations 01 S-1 S-1 01 INDICATES SECTIONS SET DEC TO COVER ALL WINDOWS WITH PAPER, CARDBOARD AND OTHER IMPOROVISED
THIS WALL CINDERBLOCK
12'-0" 12'-0" 5 1 2 " 7'-1" 5 1 2 " 72.5° 3'-0" SAFETY RAIL 6'-0" 5'-6" 5 1 2 " 1'-11" 5 3 8 " 8'-4" 3'-0" HEADER 2'-8" 8" 2'-8" ±4'-5 1 2 3'-11 1 2 2'-0" 2'-6" 3 1 2 5 1 2 2'-5" 2'-6" 2'-10" 16" 8" 8'-0" 6'-0" 8'-0" 8" 22'-0" 2'-6" 1'-6" 10" 5 1 2 " 1'-3" 1'-8" 2'-1 1 2 " 6" 5 1 2 " 2'-4" 1'-6 1 2 " 1'-2" 2'-3" 5 1 2 "
30'-0" 9 1 2 18'-11 1 2 49'-9" 5'-7" 3'-1" RO 8'-3" 3'-1" RO 5'-7" 1'-4" 3'-1" RO 9'-6" 30'-0" 9 1 2 18'-11 1 2 4" 9'-10" 4 1 2 29'-7 1 2 " 4 1 2 " 5 3 4 4 1 2 " 1 1 4 " 5'-10 5 8 5'-11 1 2 " OC 5'-11 1 2 " OC 5'-11 1 2 " OC 5'-10 5 8 2'-10" 2'-10" 2'-10" 2'-10" 2'-10" 2'-10" 2'-10" 1 3 4 1 3 4 1 3 4 1 3 4 1 3 4 1 3 4 1 3 4 2'-10" 1" 4 1 2 " 50'-0" 5 3 4 " 4 1 2 32'-0" 9'-8" 30'-8" 9'-8" 2'-7 1 2 " 1 3 4 3'-0 3 8 " 4 1 2 " 3'-1 3 8 " 5 3 4 4 1 2 " 18'-2 1 2 " 5'-10 5 8 5'-11 1 2 " OC 6'-4 3 8 " 2'-10" 1 3 4 " 2'-10" 1 3 4 " 1 3 4 " 1 3 4 " 2'-10" 2'-10" 1 3 4 " 3'-0 3 8 " 5'-0" 5 3 4 " 5 3 4 " 50'-8 1 2 17'-8" 3'-3" 3'-5" 2'-0" 4" 21'-10" 2'-0" 01 01 01 01 01 01 08 01 SCALE: 1/4" = 1'-0" 01 S-2 S-3 E-1 S-1 P-1.2 01 SCALE: 3" = 1'-0" 01 S-1 S-1.2 SECTION DETAIL // TYP STOREFRONT, PARAPET SCALE: 1/4" = 1'-0" PLAN // PRE CRASH FOR POST CRASH VERSION SEE DWG 530_04_LAUNDRY MACHINE SCHEDULE S-3 EXTERIOR ELEVATION E-2 P-1 FRONT ELEVATION 01 E-1 SCALE: 1/4" = 1'-0" E-2 BREAKAWAY STOREFRONT SHED ROOF ABOVE OFF CAMERA UNFINISHED DRYWALL OPEN STUD WALL BREAKAWAY GLASS SPANDREL GLASS DESK BLOCKS DOOR 1/2" CHAMFER AS CONCRETE LOOTED SAFE NO COLUMNS REINFORCE WALL PER STUNTS/SPFX FOR TRUCK CRASH STUNT D1 D3 D3 D1.2 D4 30'-0" 9 1 2 " 18'-11 1 2 " ±1'-0" 1 2 " FOAM BRICK 10 1 2 " 1" 7 1 2 " JOIST 1" 1'-6" 4 1 2 " 5" DECK 1 3 4 " 1'-0" 1 3 4 " 3 1 2 " 3 4 " 3 4 " 13'-2" 5" 13'-7" 5" 8'-6" 1'-0" 1" 5 3 4 5 3 4 " 5 3 4 " 50'-8 1 2 " 1'-8" 1 1 4 4 1 2 5 3 4 " 1 3 4 " 1'-0" 1 3 4 " 6'-5" 1 3 4 " 1'-9 1 4 " 4 1 2 " 4 1 2 5'-9 3 4 5'-9 3 4 1 3 4 5'-9 3 4 1 3 4 5'-9 3 4 1 3 4 5'-9 3 4 1 3 4 4 1 2 4 1 2 6'-3 1 2 1 3 4 5'-9 3 4 1 3 4 5'-9 3 4 4 1 2 D1 D1 D2 5'-0" 3'-8" 4'-0" 5'-6" 3'-1" HOLE IN DOUBLE STUD WALL CONFIRM WITH STUNTS 10'-6"
0.00 05 REV02 Feb 24, 2022 Feb 22, 2022 REV01 Feb 14, 2022 ISSUED 105 STAGE 530 01 SCALE: 1/4" = 1'-0" MJV SECTION ELEVATION S-2 Feb 24, 2022 PARAPET S-1 XX 01 SCALE: 1/4" = 1'-0" 01.1 S-1 SECTION ELEVATION Plan and Laundromat Elevations Laundromat + Money Mart 01 SCALE: 1/4" = 1'-0" SECTION ELEVATION S-3 As Noted REINFORCE THIS WALL AS NEEDED PER STUNTS/SPFX FOR TURCK CRASH STUNT 1/4" SKIN FINISH AS PER P.D. STRUCTURE AS PER CONST. CONCRETE WALL STARTS CLEAN SPFX TO SQUIB AS NEEDED ON THE DAY. COPING AS PER CONST BUILDING PAPER + BITUMEN SHEETS AS PER CONST 3/4" DONNACONNA BOARD 3/4" PLY 2X8 JOISTS CEILING PANELS TILE FLOORING AGE AND GRAFFITI AS PER P.D. 3D MODEL VIEW // POST CRASH 3D MODEL VIEW // PRE CRASH D1D1 5" 10'-0" 1'-6" 1'-8" 13'-2" 3" 1'-0" 30'-0" 1'-6" ±2'-10" 1'-0" BETWEEN STUDS 5" 10'-0" 1'-6" 4" 5 3 4 5 3 4 13'-2" 5'-7" 3'-1" 8'-3" 3'-1" 1'-4" 5'-7" 4" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 5 3 4 8" TYP HEADER 5 3 4 50'-0" 50'-0" 5" 8'-6" 1'-0" 30'-8" 5" 10'-0" 1'-6" 13'-7" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 5 3 4 " 5 3 4 " 1'-8" 9 1 2 " 4" 9'-8" 9'-8" 5" 6'-7" 3'-5" 1'-6" 11'-6" 5" 1'-3 1 2 " 6'-5" 1 3 4 " 1'-9 1 4 " 4 1 2 " 3'-9" 1'-6" 1 2 " WOOD PANEL 3 1 2 " WOOD PANEL 21'-0" D2 5'-0" 4" 8" 1 3 4 " 5'-6 3 4 " 4 1 2 " 5" 1 3 4 " 1'-0" 1 3 4 " 6'-5" 1 3 4 " 1'-9 1 4 4 1 2 " 10'-0" 3'-2" 13'-7" 3'-0" 4'-0" 2'-8" 51'-2" 4'-8 1 2 4'-0" CLERESTORY
R5 1 2 2'-7 3 4 2 1 2 2'-11 1 2 2'-3 3 4 " 3'-3 3 4 " 2'-8 1 2 " 1'-3" 1'-5" 15'-7 1 2 R5 1 2 R6 1 2 1" 3'-3" 15'-7 1 2 5 3 8 " 2" 6'-4 1 2 3'-0 1 8 MAKE X5 ROUNDED CORNER MAKE AS PER CONST. 3/4" PLY COUNTER SUPPORT MAKE X5 1" PLY COUNTER "B" MAKE X2 COUNTER "A" MAKE X2 1/2" ULTRA LITE MDF PLEXI AS PER CONST. 02 S-1 SCALE: 1/8" = 1'-0" PLAN S-3.3 02 SCALE: 3" = 1'-0" COUNTER DETAIL SCALE: 1/2" = 1'-0" 02 S-3.2 SECTION // CASH COUNTER S-2 CASH COUNTER PLAN // CASH COUNTER 02 P-2 SCALE: 1/2" = 1'-0" SCALE: 1/4" = 1'-0" 02 CNC SECTION ELEVATION 02 02 SECTION ELEVATION SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" P-2 02 P-1 6" RUBBER BASEBOARD AS PAINTED DRYWALL LOOTED SAFE PLASTIC LAMINATE COUNTERTOP AS PER P.D. LAPPED 1/4" 1" COUNTER SPACERS 1X3 ROUNDED CORNER CNC D1 D1 D1 D1 D4 D4 D3 S-4 S-4 02 02 S-3 S-3 02 02 30'-0" 18'-11 1 2 49'-9" D2 50'-0" 32'-0" 5'-9" S-1 02 S-2 02 9'-10" 4 1 2 " 21'-10" 18'-11 1 2 " 1 3 4 " 1 3 4 " 1 3 4 " 2'-11 5 8 1 3 4 " 2'-11 5 8 1 3 4 " 2'-11 5 8 1 3 4 " 3'-1" 1 3 4 2'-11 5 8 2'-11 5 8 10'-0" 1'-6" 7'-0 1 2 " 1 3 4 " 2'-8" 1 3 4 " 3'-6" 6'-4 1 4 1 3 4 1 3 4 2'-11 5 8 1 3 4 2'-11 5 8 1 3 4 2'-11 5 8 1 3 4 2'-11 5 8 1 3 4 2'-11 5 8 1 3 4 3'-1" 1 3 4 3'-0 1 8 " TYP CNC PLEXI 1 4 1 4 15'-7 1 2 R6 1 2 3'-0 3 4 DOOR LEAF 4 1 2 " 1'-5 1 8 " 1'-11" 1'-5" COUNTER "B" 1 4 " 1 4 3'-3" COUNTER 4 1 2 8" TYP HEADER 1 3 4 " 5 1 4 " 2'-5 3 4 " 1'-0" 6'-4 1 4 " 1 3 4 " 1'-6" 3 4 " 1 1 4 " 3'-3 3 4 2" D3 9 1 2 " DOUBLE STUD WALL 9 1 2 " DOUBLE STUD WALL 5" 10'-0" 1'-6" 18'-11 1 2 4" 4" 5'-6" 3'-1" RO 7'-0" DOOR LEAF 3'-1" RO 3'-0 3 4 " DOOR LEAF 3'-0" DOOR LEAF 7'-0" DOOR LEAF 17'-8" 4" 2'-0" MATCH LOCATION DOOR 50'-0" 5'-6" 3'-1" 9 1 2 2'-0" 10'-6" 10'-6"
INSULATION
05 02 02 02 01 105 Feb 14, 2022 ISSUED Feb 24, 2022 REV 01 SCALE: 3" = 1'-0" S-4.2 02 SECTION DETAIL MJV As Noted 02 SECTION ELEVATION S-3 P-2 Laundromat + Money Mart 02 SCALE: 1/4" = 1'-0" STAGE 530 S-4 S-3.2 S-4.2 SCALE: 1/4" = 1'-0" 02 Feb 24, 2022 SECTION ELEVATION S-1.2 Money Mart Elevations D3 OFFICE FURNITURE AS PER SET DEC MANAGER'S DESK BLOCKS DOOR ROUNDED CORNER BRACE CNC LAPPED PLY SURFACE IS CONTINUOUS SNUG TO STOREFRONT EXTRUSION (DOOR JAMB) VCT FLOORING AS PER P.D. SHEET LINO AS PER P.D. LOOTED SAFE LAPPED 1/2" SNAKE PLY SNAKE PLY COUNTER SUPPORT THIS DOOR SAME AS D1, BUT 3'- 0 3/4" WIDTH PAINT FINISH AS PER P.D. DOOR JAMB EXTRUSION AS PER CONST. SPACERS AS PER CONST. 1X3 COUNTER SUPPORT CNC FURTHER BRACING AS PER CONST. 1/2" GYPSUM PLASTER FINISH WITH WALL DAMAGE
CABLES CASH COUNTER DOUBLE STUD
AS UNFINISHED DRYWALL OPEN STUD WALL PAINTED DRYWALL 30'-0" 9'-10" 4 1 2 " 19'-10" 10'-0" 4" 8" TYP 5" 7'-8 1 2 " 1 3 4 " 1'-9 1 4 " 4 1 2 3'-2" 13'-2" 1'-8" 1'-9" 1'-6" 2'-9" 7'-7 1 2 " DOOR LEAF 6'-1 3 4 " DOOR GLASS 32'-0" 21'-8" 8" 9'-4" 4" 5" 1'-8" 13'-2" 3'-3" COUNTER "A" 5" DECK 1 4 " FLOORING 2" 3" R1" 2" 10" 2" 1 2 " QUARTER ROUND 6 3 4 5" 10'-0" 3'-2" 1 3 4 " 1'-0" 1 3 4 " 6'-5" 1 3 4 " 1'-9 1 4 " 4 1 2 " LEAF 7'-0 1 2 " RO 7'-0" DOOR LEAF 1 3 4 " 1 3 4 " 4 1 2 1 3 4 8" 4 1 2 " 1 3 4 " 19'-8" 4" 5" 11'-6" 13'-2" 17'-8" 2'-0" 4" 10'-0" TYP 10'-0" TYP 15'-8"
WALL WITH HOLE
NICHE WILD NICHE WILD ENTIRE WALL WILD WILD TOP AREA (ABOVE BANQUET) WILD DISPLAY WILD SET DRAWING TITLE Ready Room FOR FULL FLOOR PLAN SEE DWG S02_1.02 SCALE: 3" = 1'-0" S-2.2 NOT TO SCALE AXO-1 4.01A ARCH + HEADER DIAGRAM TYP SECTION THRU ARCH AT 4.01A SCALE: 1/2" = 1'-0" ELEVATION // ARCH A S-1 S-1 4.01A KEY PLAN // PLAN AT 6'-0" P-1 E-1 SCALE: 3/32" = 1'-0" 4.01A THIS SHEET: ARCH A FOR ARCH A CNC LAYOUT, SEE DWG S02_6.01A Arch "A" Detail 4.01A SCALE: 1/2" = 1'-0" P-2 PLAN AT 6' DETAIL // ARCH A WALL MEETS ARCH FACE STRAIGHT HEADERS COPE AROUND CURVED EDGE OF RISER A PIPE TO SUSPEND FROM TRUSS AS PER CONST. D E C B1 A COPE TO WALL AS PER CONST. A B2 A C GUSSET AS REQ'D PER CONST. A B2 A A E C C D A A B1 A 3" 3" 3" 9" R 1'-5 1 2 " 8'-8" 1'-1" 1" 1'-1" 84.00° 87.40° R4" 3'-1 1 4 17'-11" 84.00°TYP 84.00°TYP 1 4 " 1'-10 3 4 " R60'-11"
Matheson Studios - Stage 5 DRAWN BY DATE SET NO. Dec 15, 2020 As Noted Amort S02 MV SCALE 4.01A Dec 15, 2020 4.01A S-2.2 SCALE: 3" = 1'-0" S-1 4.01A S-1 SCALE: 1/2" = 1'-0" AT CEILING 4.01A TYP SECTION THRU ARCH AT LOWER WALL S-2 SECTION ELEVATION // ARCH A ARCH A MAKE X4 ISS EPISODE SHEET S-2 LOCATION PLEXI ENDS 3/4" PLY 3/4" PLEXI 3/8" 2447 PLEXI HEADER D SEE DWG S02_4.01D SEE DWG S02_4.05 FOR CEILING DETAILS 3/4" PLY 1/2" ULTRALITE MDF PLANT-ON 1/2" ULTRALITE MDF PLANT-ON 3/4" PLY 3/4" PLY LED STRIP PAINTED WHITE LOWER WALLS DETAIL TBD 3/8" 2447 PLEXI GUSSET AS REQ'D PER CONST. GUSSET AS REQ'D PER CONST. GUSSET AS REQ'D PER CONST. GUSSET AS REQ'D PER CONST. 2'-9 1 4 " 1'-4 3 4 " 3" 1" 84.00° 5 1 2 " 1" 1'-10 3 4 " 1'-10 3 4 3" 3" 9 3 4 9 3 4 " 3" 3" 3" 3" 414 " 414 " R 1 8 " R 1 8 " 1'-8 1 4 " 1'-5 1 2 " 8'-8" 1'-1" 1'-10 3 4 " 6" 17'-11" 3'-0" 5 1 2 " 2'-9 1 4 " R8'-0" 8'-6" 1'-0 1 2 " Ø2 1 4 "
B3 A2 C1 B2 MAKE X6 A1 ARCH A // PLEXI FIN ARCH B // PLEXI FIN A1 MAKE X24 HEADER C // PLEXI FIN 3/4" PLEXI 8'-7 1 2 " R7" R3" 90° 4'-8 5 8 " 5'-0" 5'-2 1 4 " 5'-6" 4'-2 5 8 " Arch A, Arch B, Header C CNC Layout SET Ready Room 6.01A SCALE: 1/2" = 1'-0" CNC SCHEDULE 01 DRAWING TITLE THIS FACE IS SNUG TO SIDE WALL 3/8" 2447 PLEXI MILLED MDF CORNER THIS FACE COPES TO HEADER D CNC COMPONENTS A4- A6 1/4" MDF AS PER CONST. PLEXI FINS X6 PER ARCH SEE DWG S02_4.01C MILLED MDF CORNER THIS FACE COPES TO HEADER D MILLED MDF CORNER SURFACE FOR LEDs HEADER C // 3D MODEL VIEW WITH HEADER E (BLUE) AND HEADER D (GREEN) ARCH A // 3D MODEL VIEW + SECTION VIEW DETAIL ARCH B1 // 3D MODEL VIEW + FLIP SIDE AXO // ARCH SKELETON
ULTRALIGHT MDF
MILLED MDF AS PER CONST.
X4 ARCH A = MAKE X4 + X4 MIRROR ARCH A + B // PLANT-ON B2 A2 A2 MAKE X48 B1 MAKE X6 PER ARCH B= 12 TOTAL X2 ARCH B = MAKE X1 + X1 MIRROR X4 ARCH A = MAKE X4 + X4 MIRROR A3 A3 MAKE X36 C1 MAKE X36 C1 C1 X6 PER ARCH A= 24 TOTAL A6 MAKE X5 + X5 MIRRORED A5 MAKE X9 + X9 MIRRORED A4 MAKE X5 + X5 MIRRORED HEADER C: X4 20' STRAIGHT B3 MAKE X12 ARCH A + B // MILLED MDF CORNER B1 MAKE X6 X2 ARCH B = MAKE X1 + X1 MIRROR A3 MAKE X6 PER HEADER C= 12 TOTAL 1/4" CHAMFER A6 A5 A5 A4
1/2"
3D MODEL PROVIDED 14'-11 3 8 " 4" R7'-11" 17'-11" 2'-9 3 4 " 9'-9" 9" 2'-5 1 4 " 5'-0" 5'-0" 5'-0" 5'-6 1 4 " 4'-10 1 8 " 9" 6'-2 1 2 " 9" R8'-3" R8'-3" 5'-0" 5'-0" 5'-4 1 8 " 120° 6'-3 1 2 " 5'-6 3 4 " 4'-3 1 4 " R8'-0" R4" 120° 4'-81 2 " 9 7 8 " 5'-2 1 4 " 5'-4 1 8 " 16'-6" 5'-6" 5'-6" 5'-6" 30° 5'-4 1 8 " 4" 3'-7 5 8 " [B1 ] 4'-2 5 8 " [B2] 3'-7 5 8 " Matheson Studios - Stage 5 Dec 15, 2020 SHEET SET NO. DRAWN BY SCALE LOCATION MV S02 EPISODE As Noted ISS S-1 TYP. SECTION S-1 6.01A SEE DWGS S02_4.01A-C FOR ARCH AND HEADER C DETAILS SCALE: 3" = 1'-0" Dec 15, 2020 Amort DATE 6.01A 3D MODEL VIEW // SMALL CORNER, BIGGER CORNER, AND STRAIGHT SECTION 3" 3" 441"
HEADER C A
HEADER E IS HIGHLIGHTED IN BLUE
WITH HEADER C "S-2" CONDITION B1
C "S-1" CONDITION E D B2
2447 PLEXI LOUVERS STRAIGHT HEADERS COPE AROUND CURVED HEADER
// GUSSET AS PER CONST.
NICHE WILD ENTIRE WALLWILD NICHE WILD WILD TOP AREA (ABOVE BANQUET) WILD D8.04 D8.03 D8.03 CNCD14 CNC D5 - 1" CNC D5 CNC D4 CNCD15 CNC D3 CNC D11 CNC D10 CNC D9 CNC D8 Header "D" Detail DRAWING TITLE SET Ready Room 4.01D SCALE: 3/32" = 1'-0" SCALE: 3" = 1'-0" 4.01D P-1 RCP// HEADER D DETAIL SCALE: 1/2" = 1'-0" 4.01D FOR FULL REFLECTED CEILING PLAN INCLUDING CEILING PANELS SEE DWG S02_1.03 TYP SECTION THRU HEADER D P-2 4.01D FOR
4.01D 4.01D
HEADERS D AND E CNC LAYOUT, SEE DWG S02_6.01B
S-1 V-1 V-2 KEY PLAN // REFLECTED CEILING PLAN AT 6'-0" FOR FULL REFLECTED CEILING PLAN INCLUDING CEILING PANELS SEE DWG S02_1.03 HEADER E
INTERSECTION
SCALE: HEADER E // INTERSECTION WITH
E-1 3/8"
P2 HEADER
THIS SHEET: HEADER D, E AS PER CONST.
REMOVABLE FRAME AS PER CONST. (LEDs MUST BE ACCESSIBLE)
COPING
R 1 2 " 1 2 1'-4 1 2 6 1 4 3" R 1 2 " 2'-5" 135° 3" 3" 1 4 " 1'-0" R60'-11" 3'-10" 2" 3'-0" 2 3 4 " 8" 135° 2" 1 4 " 1" 9" TYP 7" 5'-3" VOID FOR X62 LOUVERS 3'-3 1 4 " 1'-2 1 2 " 1 4 "
X582 LOUVERS FOR HEADER D 62 + (2x101) + (3x106) = 582 1/8" THICK X 8" TALL X 1" DEEP SPACED 1" ON CENTRE LEDs BEHIND MUST BE ACCESIBLE.
CNC E3 CNC E2 CNC E1 CNC E5 CNC E4 CNCD12 CNCD13 CNC D1 CNC D2 CNC D7 CNC D6 Dec 15, 2020 SHEET SET NO. DATE SCALE LOCATION MV S02 EPISODE As Noted Matheson Studios - Stage 5 Dec 15, 2020 WIP E-1 S-1.2 TYP SECTION THRU HEADER E HEADER D MAKE X1 HEADER E MAKE X1 SCALE: 3" = 1'-0" 4.01E S-1 S-1 Amort DRAWN BY SCALE: 1/2" = 1'-0" 4.01D
HEADER D LOUVER DETAIL CEILING PANEL DETAIL TO FOLLOW GUSSET AS PER CONST. 1 2 6 1 4 3" R57'-11" 3" 1 4 " 3" 8'-11" TYP. VOID FOR X106 LOUVERS 10'-10 3 16" TYP. 3 3 16 " 4" 2 5 16 " 10" 11" 1 1 2 " 5 1 2 " 4" 120° 120° 4" R51'-3" R49'-7 1/2" 6'-8 3 8 " 8'-7 15 16 3'-10" 1'-7 1 2 1'-7 1 2 " R49'-7 1 2 " R51'-3" ±50'-10" HEADER D FULL LENGTH 44'-9 3 4 " HEADER D INSIDE SET R57'-11" R60'-11" 3'-0" 8" 1'-2 3 4 " 6 1 4 " 6" 2" 135° 9" 8'-5 7 8 8'-5 7 8 " VOID FOR X101 LOUVERS 8'-5 78" VOID FOR X101 LOUVERS 8" 1" CC 1 1 2 " 512" 612"
FOR STANDARD REPLICATOR SEE DWG S00_4.01 FOR CNC LAYOUT SEE DWG
CNC 02 CNC03 CNC 05 CNC02 CNC 03 CNC04 Bar - Niche with Sink Ready Room SET DRAWING TITLE S-1 SCALE: 3" = 1'-0" S-1 SECTION THRU
SCALE: 1" = 1'-0" PLAN // THRU UPPER NICHES 4.07E P-1 NOTES TYP. PLAN DETAIL // LEFT NICHE WITH SINK 4.07E P-2 SCALE: 3" = 1'-0" "UNROLLED" ELEVATION // JUST NICHE WALL E-1 4.07E S-1 4.07E SCALE: 1" = 1'-0" FOR VERTICAL SLAT DETAIL
S02_2.03B 1X2 FRAMING BAR LIGHT SEE DWG S02_4.19 #2447 P95 LIT FROM BEHIND WITH SET RED LINE INDICATES WILD SINK AND HARDWARE AS PER SET DEC SINK BACKSPLASH CNC COMPONENT 01.1 BAR TOP SEE DWG S02_4.07D LIGHT ABOVE SINK REPLICATOR NICHE CENTRE NICHE CNC RIB COMPONENT A RED LINE INDICATES WILD LEFT NICHE WITH SINK SINK COUNTER TOP CNC COMPONENT 01.2 3'-4" 2'-7" 2'-3 1 2 " 6 3 8 " 2'-1" 8 1 8 " 6" 1" 2'-5" 2'-1" R4'-6 3 4 " R4'-0 3 4 " 1'-0" 2'-1" 1 4 " R4'-7 1 4 " R4'-6 3 4 " R4'-0 3 4 " R4'-1 1 4 " R1" 2'-1 1 2 " 2'-4 1 2 " 11 15 16 " 1'-1 11 16 "
S02_6.04
SEE DWG
CNC04 SHEET EPISODE Amort As Noted 4.07E Matheson Studios DRAWN BY LOCATION Matheson Studios - Stage 5 DATE ISS Jan 25, 2021 4.07E THRU NICHE WITH SINK WALL SET NO. S02 SCALE Jan 25, 2021 SECTION DETAIL S-1.2 MV SCALE: 3" = 1'-0" FACIA ARCH SEE DWG S02_4.07G P95 SHELF LIGHTING RED LINE INDICATES WILD STANDARD REPLICATOR SEE DWG S00_4.01 SINK BACKSPLASH CNC 1.01 3/8" #2447 P95 DOTTED LINE INDICATES DECORATIVE FACIA ARCH SEE DWG S02_4.07F 1/4" X 1/4" ROUTER SINK COUNTER TOP CNC 01.2 1X2 FRAMING BAR TOP DETAIL SEE DWG S02_4.07D SECTION PERSPECTIVE // THRU LEFT NICHE WITH SINK SINK AND HARDWARE AS PER SET DEC SINK IS PRACTICAL 8'-6 1 8 " 1'-8 5 16 " 2'-3 1 2 " 3 5 8 " 1'-11 1 2 " 7 15 16 " 3 1 2 " R4" 10'-4" 3'-2 1 2 " COUNTER HEIGHT 9" SINK DEPTH TBD 9" TBD 11" TBD 1 2 " 2'-11 1 8 " 1'-0 7 8 " 2" 4" R4 1 4 " R3 1 2 " 2" 2" 1'-0 5 8 " 10 7 8 " 1 4 " 3 4 " 1"
Bar - Lower False Cabinet Detail DRAWING TITLE SET Ready Room 4.07C E-1 4.07C 4.07C P-1 SCALE: 1/2" = 1'-0" PLAN // THRU LOWER FALSE CABINETS P-1.2 SCALE: 3/32" = 1'-0" TYP. PLAN DETAIL // THRU LOWER FALSE CABINETS TYP. ELEVATION // FALSE CABINET SCALE: 3" = 1'-0" 4.07C KEY PLAN // PLAN AT 6'-0" FOR FULL FLOOR PLAN SEE DWG S02_1.02 P-0 END WEDGE 02 1/4" SNAKE PLY SIDE PANEL 1/4" MDF END WEDGE 02 END WEDGE 01 P-1 RED LINE INDICATES HINGE BREAK HINGE MECHANISM AS PER CONST. GUSSET AS PER CONST. P-1.2 TYP. FOAM WEDGE 3/4" PLY CNC RIB 01 END WEDGE 01 EXPLODED SECTION PERSPECTIVE FOR FULL BAR SEE DWG S02_4.18 BAR // LOWER FALSE CABINET S-1 S-1 P-1 P-1 2'-5" 1'-0" 1 1 2 " 9" 1 1 2 " 10'-8" 1'-1" 15° 3 4 " 1'-0 1 4 " 1'-0" 1 1 2 " 1 2 " 8" 1 2 " 1 1 2 " 3 7 16 " 8" 1'-4"
NOTES
MAKE X10 FALSE CABINET UNITS MAKE X9 WEDGES + X1 EACH END WEDGE
SEE DWG S02_6.04 FOR CNC LAYOUT
REVISION: MILLED MAPLE OMITTED. REPLACED WITH 1/4" SKIN
Jan 25, 2021 SHEET SET NO. DATE DRAWN BY LOCATION EPISODE Matheson Studios - Stage 5 SCALE As Noted MV 4.07C ISS Jan 27, 2021 REV01 4.07C D-1 S-1.2 SCALE: 3" = 1'-0" SECTION DETAIL // FALSE CABINET 4.07C WEDGES S-1 SCALE: 1/2" = 1'-0" 4.07C Jan 25, 2021 Amort TYP. SECTION Matheson Studios S02
SCALE: 1" = 1'-0"
1/4" SNAKE PLY GUSSET 01 SEE DWG S02_4-07D FOR LIGHT CHANNEL DETAIL MILLED MAPLE 3/4" PLY CNC RIB 01 R3'-10 3/4" R3'-10 3/4" MILLED MAPLE GUSSET 01 PERSPECTIVE TYPICAL WEDGE SECTION END WEDGE 01 MAKE X1 END WEDGE 02 MAKE X1 TYPICAL WEDGE MAKE X9 MATERIAL: FOAM AS PER CONST. 2'-5" 9" 3'-3" 6" 3'-5" 10'-4" 1'-1" 3" 1 3 16 " 1 2 " 1'-3" R2" R10" 43" 2'-5" 1'-1" 126.00° 1" 2 13 16 " 2'-5" 4 1 8 " 2 3 16 " 3 7 16 " 3 16 " 1'-0 1 4 1'-0 1 4 " 15° R9" R1" 4 1 2 " 1'-0 5 16 " 1'-0" 6 3 4 " 2 5 16 " 4 1 16 " 3 7 16 " 2'-5" 2'-5" 2'-5" 1 11 16 " 1'-11" 4 5 16 " R2" 2 5 8 " 3 16 " 2 3 16 " 4 1 8 "
28
Concept renders by North Front Studio, Toronto ON
30
Concept renders by North Front Studio, Toronto ON
MELANIE.JACQUELINE.VIGER@GMAIL.COM