1 minute read
MASSIVE THREE-DAM PLANT STARTS OPERATING
One of Europe’s largest industrial projects – and certainly Portugal’s largest – is set to be completed next year, with two out of three major dams and substations already operating
Click here to read article on Maritime Journal online
- PHT combines Diesel and Electric power sources in one driveline
- Heavy duty design
- Very strong PTO/PTI rated for up to +/-1500Nm/350kW
- Ratios - 1.27, 1.47, 1.70
- Increase of E-motor torque by ratio
- Versions for rigid and freestanding installations
- Vertical, horizontal, and angled installation possibilities
Propulsion Modes: Diesel, Electric & Automatic Operation Modes: Generator, Back-up, Cross-feed