Gregory Andrej Graduate Architecture Portfolio

Page 1

GREGORY ANDREJ GRADUATE ARCHITECTURE PORTFOLIO 2015 - 2021 Royal Melbourne Institute of Technology, RMIT Internship: Arkhefield Brisbane Queensland University of Technology, QUT Long Version Portfolio_09/2021


GREGORY ANDREJ CURRICULUM VITAE

EDUCATION 2019 - 2021 RMIT, Melbourne Masters of Architecture with Distinction Grade Point Average: 3.9 / 4.0 2012 - 2016 Queensland University of Technology, Brisbane Bachelor of Design (Architecture)(Honours) Grade Point Average: 6.75 / 7.00 Second Class Honours (Division A) 2010 Charleville State High School Queensland Certificate of Education (QCE) 2008 Vásárhelyi Pál High School of applied technology Location: Bekescsaba, Hungary

WORK EXPERIENCE Feb 2019 Ferencz Baranyay Architects 1 mth Architecture Student, Casual Melbourne, Victoria

PROFILE I am a motivated, experienced and committed architectural graduate, passionate in strengthening urban common and celebrating public life through architecture. I am seeking a professional environment with critical attitude towards development of the public realm through community, educational and civic projects. Trained in Revit, Rhinoceros, Adobe suite and hand sketching, I am a fast learner, always work with enthusiasm and prepared to engage both independently and in a team. I am able to work in highly multifunctional and demanding environments with efficiency and particular eye for details.

Nationality: Australian - Hungarian dual citizen Place of birth: Bekescsaba, Hungary Languages: English (proficient), Hungarian (native) Residence: Melbourne, Australia Web: Email: merovingo20@hotmail.com Phone: +61403028722

02

Feb 2017 - July 2018 Arkhefield 1 yr 6 mth Architecture Intern, Full time Brisbane, Queensland In this role I was responsible for the student assistance of a wide range of projects phases ranging from schematic, design to construction documentation of medium-rise residential, high-rise student housing and medium scale commercial projects. Construction Documentation • Setting up CD drawings from Revit models, using view templates, toggling visibility settings, printing for markups. • Modelling elements in Revit from instructions of supervisor, using markups, sketches and meetings. • Setting up and completing detail callouts from instructions. • Setting up transmittals and sharing documents with contractors through Aconex. Marketing Drawings: • Setting up and developing marketing drawing graphics from Revit models, through controlling view template/visibility settings of Revit. • Simultaneous updates of interior and joinery from supervisor and client for both marketing and CD phases. • Creating rendered site plans of project through Photoshop. Design Application Package: • Working closely with supervising architect in creating DA packages using Revit, SketchUp, Photoshop, InDesign. • Exercising effective time management through scheduling tasks, reporting on progress and timeframes with supervisor. Office Admin duties: • Phone reception duties at regular (daily) scheduled times. • Preparing physical documents through printing and binding. • Organizing/receiving deliveries. • Door reception duties.


COMPETITIONS AND EXHIBITIONS Nov 2020 ArchDaily - Architectural Visualisation award Conceptual category, Group Award Drawing Architecture Studio by Li Han and Hu Yan RMIT, Melbourne June 2019 DRIA - Architectural Design Excellence award ‘Between Sky and Water’ project, Group award Designing Resilience in Asia Studio by Mauro Baracco and Imogen Fry RMIT, Taipei Jan 2018 Architecture Australia Vol 107 Issue 1 - Commonwealth Games Village parklands drawings published Arkhefield + ARM + Archipelago Brisbane

01

THIRD -AND ONLY- PLACE Masters thesis project Ringwood, VIC - 2021

03

BETWEEN SKY AND WATER RMIT masters studio project (DRIA) Chennai, India - 2021

05

WHITES HILL VILLAGE Commercial project, Arkhefield Brisbane, QLD - 2017

06

THE GRANGE Multiresidential project, Arkhefield Brisbane, QLD - 2017

08

GOWANUS FIELD STATION QUT studio project Brooklyn, USA - 2015

09

NUDGEE BEACH SCHOOL QUT landscape architecture project Nudgee Beach, QLD - 2016

10

BAMBOSQUE PAVILION QUT Design competition winner project 2015

02

WORKPLACE AS URBAN COMMON RMIT masters studio project Melbourne, VIC - 2020

04

DRAWING ARCHITECTURE RMIT graphics elective Melbourne, VIC - 2019

07

CAREY GROUP Office+commercial,Arkhefield Townsville, QLD - 2018

VOLUNTEER PROJECTS July 2015 ‘Bambosque’ Pavilion The Dub Student Club Design competition, documentation, material sourcing (bamboo), construction and exhibition. QUT Gardens Point campus gardens, Brisbane Aug 2015 ‘Near Kin Kin’ bamboo installation Cave Urban Circular Quay, Sydney 2012 - 2015 Cultural representative, dancer, artist International House Soiree international cultural festival Brisbane

SKILLS AND TECHNIQUES 3D + Rendering BIM Adobe OS Microsoft Physical

Rhinoceros, SketchUp, Vray, SketchUpPodium Revit, basic AutoCAD Illustrator, Photoshop, InDesign, AfterEffects, PremierePro Microsoft Windows Word, Excel, Powerpoint Lasercutting (with AutoCAD), hand sketching

PERSONAL INTERESTS Accordion music, Hungarian folk dance, photography, hand drawing, geography / cartography, walking, travelling, cooking

REFEREES Mr Shy Tay Practice Director Arkhefield Ph: (07) 3831 8150

Mr Anthony Ip Project Architect A Ph:

Claudette Cutts HR manager Arkhefield Ph: (07) 3831 8150

03


2021 - Masters Thesis Project - Third -and only- place

01

THIRD -AND ONLY- PLACE MASTER THESIS PROJECT Supervisor :

Vicky Lam

S i t e : Ringwood, Melbourne VIC, Australia Y e a r : Feb - June 2021 RMIT Masters Thesis Project cumulative work.

04


2021 - Masters Thesis Project - Third -and only- Place 1st

1st

2nd

HOME

WORK

2nd

3rd

1st

1st

2nd

2nd

Past site conditions (1995 - 2015)

Current site conditions (2015 - )

Proposed site conditions

05


2021 - Masters Thesis Project - Third -and only- place

06


2021 - Masters Thesis Project - Third -and only- Place

07


2021 - Masters Thesis Project - Third -and only- place

08


2021 - Masters Thesis Project - Third -and only- Place Existing Retail Eastland Shopping Mall Entry

Existing Carpark

c.

c. d. b. f.

Existing Ringwood Library

e. Existing Retail

g.

m.

Ringwood Street

l.

o.

Existing Retail

i.

h.

a.

j. Existing Retail

l.

k. dah

oon Mar

way

High

n.

d

woo

Ring

Ground Site Plan a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p.

Civic Retail Lane Foodcourt square (civic interface) Mall carpark Entry Civic Place (existing street) Civic Square Train Station Bridge entry Council Reception Council Waiting Area Plant Nursery / Council Forecourt End-of-Trip facilities Temporary Bike Storage Undercroft Space Elevator Train Station Access Bridge Library Entry Court Public Workspace

09

try

n En

tatio

S Train


2019 - RMIT Studio Project - Between Sky and Water

03

BETWEEN SKY AND WATER RMIT STUDIO PROJECT 2019 Supervisors :

Mauro Baracco Imogen Dry

S i t e : Y e a r :

Chennai, India Feb - June 2019

Project won ‘Architectural Design Excellence’ award at Designing Resilience in Asia (DRIA) competition. (Group award) The aim of the competition was to thorougly map and propose a program as a response to transform the borough of Brookyln’s Gowanus - one of the most polluted site of North America. The mapping exercise required a series pf purposeful overlays of existing information to explore

010

undiscovered and unharnessed qualities of the neighborhood. The proposed program and architectural language must respond to these qualities, adhere to the theme of ‘residual architecture’ and display adaptability to future changes of rising sea levels.


Between Sky and Water - RMIT Studio Project - 2019

The vision is to change the perception of the value of the natural environment, which hasalways been seen as an endlessly exploitable space. Rather than covering up the landfill and building

walls to stop encroachment, the incorporation of natural regeneration in an economical strategy offers resilient future for both the marshland and the city.

Energy generation through landfill gas extraction

Outdoor classroom (boardwalk) for natural regeneration of marshland

Sequence of micro wetlands to filter leaching of landfill and buildup of sediments for plant regenration

011


2019 - RMIT Studio Project - Between Sky and Water

The vision is to change the perception of the value of the natural environment, which hasalways been seen as an endlessly exploitable space. Rather than covering up the landfill and building walls to stop encroachment, the incorporation of natural regeneration in an economical strategy offers resilient future for both the marshland and the city.

12


Between Sky and Water - RMIT Studio Project - 2019

13


2019 - RMIT Graphics Elective - Lost in Melbourne

04

LOST IN MELBOURNE RMIT GRAPHICS ELECTIVE 2019 L e d b y

:

Supervisors : Y e a r :

Li Han Hu Yan Vicky Lam Quan Tran Sept - Nov 2019

Project won ‘Architectural Visualisation’ award in conceptual category, in 2020 Architectural Visualisation competition, launched by ArchDaily. (Group award)

14


Lost in Melbourne - RMIT Graphics Elective - 2019

The essence of DA studio’s drawing technique is the usage of controlled axonometric projections.

15


2017 - Work Experience Project - Whites Hill Village

05

WHITES HILL VILLAGE WORK EXPERIENCE - 2017 C o m p a n y : S i t e :

Arkhefield, Brisbane 37-39 Thomas st Camp Hill, Brisbane, QLD

Project leader : T i m e l i n e :

Mr. Shy Tay 2015 - 2017

Time engaged : R o l e :

Feb - May 2017 Assist construction process CD Detailing

Two-stage small scale commercial mall project, completed in 2017

16


Whites Hill Village - Work Experience Project - 2017

Min. 200 mm cover to so

TIL04 Fall

Fall

EUSSI AB

Fall

WPM01 continuous under wall

Podium slab. Refer to structural engineer's drawings

Sim

100

B2-660-03

2180

Screed layer on slip sheet

Typical Retaining Wall Detail 1:5

45

B2-200-L0

004

400 45

255

ot refeR .liospoT noitacificeps epacsdnal 70LIT thgilpirts DEL

LED Striplight TIL03/04

40/30LIT 10KLB

EPB

BPE

50

RL39.25

1:5

TIL03/04 BLK01

TIL 03/04

15

Project Stages 3

B0-190-01

TIL03/04

Podium slab. Refer structural engineer’s drawing.

Pavement joining to

.reyal noitartlif dna eganiard muidoP Compacted sub.base eganiard dna cirbafoeg revo dellatsnI structural engineer’s noitacificeps epacsdnal refeR .llec

Typical column view

teehs pils no reyal deercS

Mulch and landscaping. Refer landscape drawings for detail and specification.

WPM01 cont wall.

WPM01 continuous under slab

Base plate connection to structural engineer’s detail.

details and specification

2

Typical column cladding detail section

10 mmsubgrade compressed 1:5 Existing B2-200-L0

filler

liated egde retnalp lacipyT 5:1

420

Typical edge seat Detail

Podium slab structural drawings. Screed Ty 3 laye

2

B2-660-03

1

0L-002-2B

Construction Details

1:5

APPROVED

REV. A B

ST

DATE DESCRIPTION 05.04.2017 Costing Issue 09.05.2017 Water proof membrane update

DRW. JF JF

CHK. WS WS

APRV. ST ST

PROJECT

CLIENT

DRAWING NAME

Whites Hill Village-Stage 2

HaMELL

Landscape Details

37-39 Thomas Street Camp Hill Brisbane

Do not scale from drawings. Dimensions are to be ch ecked on site prior to commencement of work. Discrepancies to be brough t to the attention of the author. Electronic drawings are uncontrolled do cuments and are issued for information only. Any dimensions not nom inated must be referred to the Architect for confirmation. The con cepts and information contained in this document are the copyright of Ark hefield. Use or copying of the document in whole or in part without the written permission of Arkhefield constitutes an infringement of copyri ght.

SC

SF

5

JS

Fall

3 -

Typical PFC

1470

CHECKED

llaF

Fall

llaF

Screed layer on slip sheet over trafficable membrane/structural TIL04 slab. Fall towards drainage outlet.

llaw rednu suounitnoc 10MPW

1

A

Mass concrete infill

Sealant Existing footpath

ot refeR .bals muidoP sgniward s'reenigne larutcurts

TIL07 LED Striplig TIL03/04 BLK01

TIL07 LED strip light

TIL07 LED Striplight

40LIT

Topsoil. Refer landscape drawings for detail and specification.

Podium dra filtration l over geofa cell. Refer specificatio EPB

75.93LR

BLK01 TIL03 15mm setdown for tile finish

RL39.25

Recessed hex head fixing. Steel cleats welded to SC. SC

03

RL39.67

05

Typical planter edge detail

224

B2-200-L0

2

20

1

Subframe to support TIM02 @ 600mm centres

U2 TIM02

5

5

3 degree s of wall 200 series structural and spec. Smooth con to all expo

5

1:50 nominal fall in slab

AL01

hsinif e

B relli

MSH01

larutcurts noitacificeps d

Sim

Ceiling 46135

Roof 47825

CL02 SCR01 P03 GLZ01

Level 1 43135

2 B2-620-05

THOMAS

P03

Tenancy 19

CL02 GLZ01 TIL02

CON01

STREET

P02

P03

Tenancy 14

DB FDP CON02

B2-620-02

1

CC CC

CC CC

CC CC

Stage 2 Basement Carpark

CON02 CON02

Sim

CC CC

B

C

D

E

F

Sim

B2-620-01

1

E

F

Sim

Column Cladding Elevation 3 1 : 20

5

39135

Sim

4

MSH01 MSH01

P03

B CL02

CL03 SC

DRW. CHK. APRV. JF WS ST .ON GWD JFESAHP WS .CSID ST

10-066-2B Tenancy 19

DC

CL02

DRAWING NAME

EMADetails N GNIWARD Landscape sliateD epacsdnaL

CL02 CL02 CL03 CL03

CL02 CL02 GLZ01 GLZ01

L1. W12

0143 .OCC N TCEJO RP 2 Basement Carpark Stage P03 5 : 1 ELACS

CC

Tenancy 14

GLZ01

CC

“Green Heart” P03 P03

2 -

“Green Heart”

TIL07 TIL07 TIL04 TIL04 South-East Axo

43135 Tank SF Stormwater BLK01 BLK01

3 B2-620-06

CL02 CL02

P02 P02

P03 P03

Roof Line

structural engineer's d

BAL02

Lift

INTERNAL ROAD

1

MSH01

VAP

TIL01

SF

Ground Level 39135

Stage BLK01 2 Section G 1 : 100

BLK01 BLK01

Stage 2 Basement Carpark CC CC

CC CC

Stage 2 Basement Carpark

CC CC

CON03 CON03

CON02 CON02

CC CC

BLK01 BLK01

CON02 CON02 DRAWN

B2-620-01

JF

GIT

1

2

CHECKED

JS

APPROVED

ST

Do not scale from drawings. Dimensions are to be ch ecked on site prior to commencement of work. Discrepancies to be brough t to the attention of the author. Electronic drawings are uncontrolled do cuments and are issued for information only. Any dimensions not nom inated must be referred to the Architect for confirmation. The con cepts and information contained in this document are the copyright of Ark hefield. Use or copying of the document in whole or in part without the written permission of Arkhefield constitutes an infringement of copyri ght.

3

REV. A

DATE DESCRIPTION 05.04.2017 Costing Issue

DRW. JF

CHK. WS

3 B2-620-02

Basement

1

APRV. PROJECT ST 35770

B2-620-01

37-39 Thomas Street Camp Hill

4

5

Sim Sim

Sim

8

PFC Junctio

1

Whites Hill Village-Stage 2

CLIENT

HaMELL

Brisbane WPM03

17 47825

2e

B2-500-01

MSH02 SCR01 MSH02

BG01

BLK01

Tenancy 16

L0 W.14

1

TNEILC

LL4EMaH

Level 1

CC CON01 CON01

Co

SF

Ceiling

P02 P02

PFC Junctio

6

46135 SCR01 SCR01

CON01 CON01

1A

MA 55:04:01 7102/50/9

TIM01 DB FDPTIM01

37-39 Thomas Street SCR01 SCR01 Camp Hill Brisbane

A

47825

CLIENT

HaMELL

TIL02

Stage 1 Basement Carpark

TIM02 TIM02

MSH01 MSH01

Whites Hill Village-Stage 2 SF

GLZ01

CON02

P02

PROJECT

Roof Line

Sim

B2-620-02 AG pipe and backfill to 1 Sim structural engineer's detail B2-200-B1

Basement 35770

XXX06

CON02

1

GIT

A

TIL04

B2-620-02

3

BLK01 BLK01

CON02 CON02

B2-620-01

TIL07

2

Ground Level 39135 BLK01

ST

I N T E R N A L R OP03A D

TIL01

5

2

REV. DATE DESCRIPTION SC A 05.04.2017 Costing Issue .VEproof R B 09.05.2017 Water membrane update TIM02

Basement T H O M 35770 AS STREET

“Green Heart”

GLZ01

CL02

APPROVED

JS CL02

D

SC

Ground Level

Typical column View

Sim

1 CHECKED

B2-620-05

SF

221

46135Do not scale from drawings. Dimensions are to be ch ecked on site prior to commencement of work. Discrepancies SCR01 to be brough t to the attention of the author. Electronic drawings are uncontrolled do cuments and are SCR01 SCR01 Level issued forGround information only. Any dimensions P03 not nom inated must be referred to the Architect for confirmation. The con cepts and information contained39135 in this document are the copyright of Ark hefield. Use or BG01 GLZ01 copying of the document in whole or in part without the written permission of Arkhefield constitutes an 3 infringement of copyri ght. Level 1 B2-620-06 SF 2 43135 CL02 CL02 B2-620-05 CON01

CL02 CL02

P03

AG pipe and backfill to structural engineer's detail Basement 35770

CL03 CON02

2

Ground Level 39135

DRAWN

Ceiling GA

3000

1 B2-620-05

Level 1 MSH01 Line 43135MSH01

C

TIM02

LOT BOUNDARY

LOT BOUNDARY

Roof Line 47825

4

B

North-West Axo

MSH01

3000

LOT BOUNDARY

Ceiling 46135

Extent of works

A

Roof Line 47825

1 -

EXTENT OF WORKS

Planter configuration of “Green Heart”

710

BG01

2

St


2017 - Work Experience Project - The Grange

06

THE GRANGE RESIDENCES WORK EXPERIENCE - 2017 C o m p a n y : S i t e :

Arkhefield, Brisbane 41 Agincourt st The Grange, Brisbane, QLD

Project leader : T i m e l i n e :

Mr. Juergen Weigl 2016 - 2018

Time engaged : R o l e :

April - Aug 2017 Assist interior design Interior documentation Marketing Issue

Two-stage small scale commercial mall project, completed in 2017

18


The Grange - Work Experience Project - 2017

Pantry Types 4 and 5

Kitchen Type 5

Kitchen Type 4

Marketing Plan of a typical townhouse (Upper level)

Kitchen Type 3

Kitchen Type 2

Kitchen Type 1

Kitchen Joinery Range axonometric sketches

Marketing Plan of a typical townhouse (Ground level)

19


2018 - Work Experience Project - Carey Group

07

CAREY GROUP WORK EXPERIENCE - 2018 C o m p a n y : S i t e :

Arkhefield, Brisbane 41 Agincourt st The Grange, Brisbane, QLD

Project leader : T i m e l i n e :

Mr. Juergen Weigl 2016 - 2018

Time engaged : R o l e :

April - Aug 2017 Assist interior design Interior documentation Marketing Issue

Small scale office project, completed in 2018.

20


Carey Group - Work Experience Project - 2018

Continuous steel angle top plate. Cable end fittings fixed to welded cleats within angle. Black finish.

Top fitting. Black finish. Details TBC by Ronstan.

Kitchen/C

D8 mm 1x19 SS cables. 15kN per cable. Blackened finish. Steel outrigger support welded to steel columns.

3600 from botton of screen

3

Cables pass through round bar, fixed around intermediate anodised aluminium support angle fixed to outrigger. Rod to be fixed with black satin finish Locker Atmosphere Panel clamps.

530-01

600

Hub 4

Folded anodised aluminium sections fixed with black satin finish. Locker Atmoshpere Panel clamps. Glazing. Refer to glazing schedule for details.

530-01

Planter mulch to conceal base fixing angle.

SCR04

50

ACSI - Compact Adjuster bottom fixing. Black finish.

200

Separate dissimilar metals.

Steel baseplate fixed to concrete wall with Sleeved expansion anchors. Cable end fittings fixed to welded cleats within angle. Protective finish tbc by Ronstan. Planter soil layer.

A

B 240

C 240

D 240

F

E 240

240

G 240

H 240

I 240

A

2000

SCR06

9

150

3

6mm brass plate stiffening bar @ various heights length to suit number of rods passing through, refer to elevation

Sim

150

510-03

10

150

150 150

STB01

TV01

1275 1000

150

Handrail to comply with AS1428 and be fixed to wall

150

Level 1 CON01

14050

New bondek slab

150

CON-E existing concrete slab

90 10

150

CON02

150

17 330

3

150

910

15 16

20

STB01

510-03

150

13

STB01 STB01

150

11 12

18 19

6

150

7

STB01

150

5mm tension cables shown dashed

8

150

9 10

3

150

21

510-02

150

150

23 24

1060

150

22

TV01

TV01 - timber veneer bulkhead to wrap to underside of existing concrete floor

150

26

TV01

150

25

31 32

150 150 150

TIM

300

30

300

29

TV0

new RB01 over existing stair

300

28

Vertical wire

300

27

33

5

150

7 8

14

4

10mm tension cables shown thick dashed

150

6

E

150

150 150 150 150

5

D

STB01

150

300

2 3

150

1

2 4

C

80 Typical

150

1 510-02

20

2 510-40

1

3

B

Screen

10

80 Typical

112

proprietary planter understair. Refer sheet 510-02 for details.

Gorund 10170 2710

21


2015 - Bachelors Studio Project

08

GOWANUS FIELD STATION QUT STUDIO PROJECT - 2015 Supervisor :

Liz Brogden

S i t e : Y e a r :

Brooklyn, NY, USA 2015

International Design Competition Project: “Axis Civitas” Sponsor: Gowanus by Design The aim of the competition was to thorougly map and propose a program as a response to transform the borough of Brookyln’s Gowanus - one of the most polluted site of North America. The mapping exercise required a series pf purposeful overlays of existing information to explore

undiscovered and unharnessed qualities of the neighborhood. The proposed program and architectural language must respond to these qualities, adhere to the theme of ‘residual architecture’ and display adaptability to future changes of rising sea levels.

Facade porosity analysis

Gowanus canal site context map

Facade porosity map (Brooklyn)

22

Cul-de-sac View


Gowanus Field Station - Bachelor Studio Project - 2015

Typical plan

Longitudinal section

Massing/building form models

Street cross section

Project Site Plan

23


2016 - Bachelors Studio (Landscape Design) Project

09 NUDGEE BEACH ENVIRONMENTAL EDUCATION CENTRE QUT STUDIO PROJECT - 2016 Discipline :

Landscape architecture

S i t e : Y e a r :

Nudgee Beach, QLD 2016

Presented at landscape architecture firm ‘Mode’ (Brisbane) as part of best end-of-semester projects selection (QUT), June 2016. The idea is to redesign the environmental school grounds currently under-used outdoor space to adhere to these strategies: its future outdoor classrooms to resonate with the unique site context, to drive design strategy directly by target

24

user-group of schoolaged children, to establish a connection between site configuration and existing teaching schedule and to consider a minimum 50 year span of the environment’s changing context.

Conceptual visualisation


Nudgee Beach Env. Edu. Centre - Bachelor Studio Project - 2016

Playground axis

Outdoor classroom axis

Schoolgrounds Site Plan

Treescape scheme

25


2016 - Bachelors Studio Project - Nudgee Beach Env. Edu. Centre

Playground axis

Outdoor classroom axis

26

Detail Landscape Plan


Bambosque Pavilion - QUT Volunteer Project - 2015

10

BAMBOSQUE PAVILION VOLUNTEER PROJECT - 2015 C a t e g o r y

:

Design competition

S i t e :

QUT Gardens point gardens, Brisbane July 2015

Y e a r :

First Prize winner project, QUT Project Week, organised by ‘The Dub’ student club, July 2015 The aim of the competition was to thorougly map and propose a program as a response to transform the borough of Brookyln’s Gowanus - one of the most polluted site of North America. The mapping exercise required a series pf purposeful overlays of existing information to explore

undiscovered and unharnessed qualities of the neighborhood. The proposed program and architectural language must respond to these qualities, adhere to the theme of ‘residual architecture’ and display adaptability to future changes of rising sea levels.

27


2015 - QUT Volunteer Project - Bambosque Pavilion

Collage of physical model

28


Bambosque Pavilion - QUT Volunteer Project - 2015

Pavilion Elevation View

Pavilion Section View

2.

3.

1.

1. Full thickness, cured bamboo beam 2. Half thickness, cured bamboo stick 3. Soft bamboo shavings

Pavilion Plan View

29


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.