STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com tel.347.517.8237
SIMONE GIOSTRA AND PARTNERS Jingya Linyi Spa and Restaurant Center, China August 2008 - March 2009
Jingya Linyi is a spa and restaraunt complex in Linyi, China. The driving concept behind this design was the creation of a green facade in order to camouflage the building enclosure. Creeping plants will grow along an array of cable net fins which vary in their amplitude in reaction to interior lighting requirements. The architectural effect rendered is organic yet deliberate; a building systems response to programmed spaces. For this project, I developed a parametric system
using the Rhino 3d plugin, Grashopper in order to quickly, efficiently, and accurately design the complex geometry of the outer facade. Using a parametric model allowed our team to quickly analyze various options and later facilitated in the transition from concept to DD, and shortly thereafter from DD to CD. The parametric model grew throughout this process to ultimately include structural member typologies and sizing.
Phases: Concept Design, Schematic Design, Design Development Software: Rhino 3D, VRay, Grasshopper, AutoCad, Ecotect, Adobe Creative Suite, Cinema4D Role: Project Leader, Parametric 3D Model, Concept Design, Presentation Material, Drawings Set
STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com tel.347.517.8237
SIMONE GIOSTRA AND PARTNERS Jingya Linyi Spa and Restaurant Center, China August 2008 - March 2009
STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com tel.347.517.8237
EVANS AND PAUL UNLIMITED Work Station Pod for Dupont Corian Showroom - New York City Morris Sato Studio March 2010
The Work Station Pod is composed of a spherical corian shell, a work surface, and a cabinet. The Pod was built in order to showcase Corian as a product while simultaneously exploring some of it’s material properties. The main challenge was to rationalize the surface in a way that would produce maximum curvature - yet
require minimal number of molds for thermoforming. The project was particularly interesting because it is a result of a fusion of many processes and components.
Phases: Fabrication, Installation Software: Rhino 3D, RhinoCAM, AutoCad, Role: Project Management, 3D Model, Shop Drawings, CNC Fabrication, coordination of Installation
STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com tel.347.517.8237
EVANS AND PAUL UNLIMITED. Reception Desk for Law Office Resolution4Architecture May 2010
Fabrication of a custom reception desk for a New York based law firm. The primary challenge here was to develop a pliable 3d parametric model in order to
rationalize the framework of the desk based on the material constraints of creating a continuous Corian surface.
Phases: Fabrication, Installation Software: Rhino 3D, RhinoCAM, Grasshopper, AutoCad Role: Project Management, Shop Drawings, 3D Model, CNC Fabrication Package, Coordination of Installation
4" MAX
8" MAX 3" TYPICAL
EVANS AND PAUL UNLIMITED. Backlit Wall Panels for Traxon Technologies February 2010
Traxon Technologies is an architectural LED lighting manufacturer who asked us to develop a backlit wall panel system to showcase in their show-room . I created a parametric model that deploys a pattern logic onto a surface based on the surface’s curvature. This pattern was then back-gauged at different
depths to create variation in light intensity as experienced from the front of the surface.
Phases: Concept Design, Fabrication, Installation Software: Rhino 3D, RhinoCAM, Grasshopper, AutoCad Role: Concept Design, Project Management, Shop Drawings, 3D Model, CNC Fabrication Package, Coordination of Installation
STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com tel.347.517.8237
EVANS AND PAUL UNLIMITED. Corian Tub Bernsohn & Fetner July 2010
Phases: Fabrication, Installation Software: Rhino 3D, RhinoCAM, AutoCad Role: Project Management, Shop Drawings, 3D Model, CNC Fabrication Package, Coordination of Installation Fabrication of a 8 foot in diameter 100% Corian construction tub. The challenges of the project included developing multiple molds and structural frames. The tub was fabricated in 3 sections and required on-site seaming.
EVANS AND PAUL UNLIMITED. Reception Desk Herman Miller January 2010
Phases: Fabrication, Installation Software: ArtCAM, AutoCad Role: Project Management, Shop Drawings, CNC Fabrication Package, Coordination of Installation At Evans and Paul I was the lead designer of the Herman Miller for Healthcare product line. Herman MIller is a producer of a standardized steel framing system. We were approached to develop a systematic way for outfitting the prefabricated steel frame structure - with multiple skinning options(Corian, Wood, Laminate).
STANISLAV VINOKUR
email. stanislav.vinokur@gmail.com tel.347.517.8237
SIMONE GIOSTRA AND PARTNERS SolPix - Solar Powered Media Louver System (Built) Cooper Hewitt - 2010 Design Triennial August 2008 - March 2009
We were asked to design a site specific installation for the 2010 Cooper Hewitt Design Triennial. The project was based on a previous project by sgpa - greenpix. Greenpix is based in Beijing and is the world’s largest zero-energy media facade. The the installation showcases the design of a selfsustainable media facade. Solpix installation is based
in the conservatory of the Cooper Hewitt museum, Cooper Hewitt Museum. The louvers sit to the exterior of the building enclosure, collecting energy via embedded photovoltaic cells used to power an array of LED’s. These LED’s project an interactive pattern onto the frosted glazing enclosure.
Phases: Concept Design, Schematic Design, Software: Rhino 3D, VRay, Grasshopper, AutoCad, Ecotect, Adobe Creative Suite, Animation Role: Concept Design, Presentation Material, Site Survey, Client Meetings.