1 minute read
ODOT announces projects for tri-county area
The Ohio Department of Transportation is announcing the following road-construction updates in Mahoning, Trumbull and Columbiana counties for December and beyond.
ODOT will not issue weekly construction updates during winter months. When the construction season begins in spring 2022, updates will resume.
Mahoning County
Ongoing: State Route 7 resurfacing, Beaver Township. State Route 7, between the Columbiana County line and state Route 164, has various lane restrictions. Estimated completion is early December 2021.
Trumbull County
New: State Route 7 retaining wall, Kinsman Township. State Route 7, between state Route 87 and the Ashtabula County line, is now open.
New: Warner Road bridge replacement, Fowler and Hartford townships. Warner Road, between Cadwallader Sonk Road and state Route 305, is closed through mid-December for a bridge replacement. The detour is King Graves Road, to Sodom Hutchings Road, to Wilson Sharpsville Road. Estimated completion is early December 2021.
Columbiana County
Ongoing: U.S. 30/state Route 7 interchange ramp closure. The state Route 7 south/state Route 39 west ramp, from U.S. Route 30 east, is closed for 45 days. The detour is east on U.S. 30 to Jackson Street, Jackson Street to U.S. 30 west, and U.S. 30 west to the state Route 7 south/state Route 39 west ramp. The completion date is Oct. 31, 2022.
Ongoing: U.S. 30/state Route 39 westbound utility bridge rehabilitation. The bridge rehabilitation is located at the Ohio/West Virginia state line. Two, 12-foot lanes of traffic are maintained. The scheduled completion date is Nov. 30, 2021.
Ongoing: Elizabeth Street bridge replacement in East Liverpool. The completion date is July 31, 2022.
© 2021 Metro Monthly. All rights reserved.