ROMAIN MEUNIER
PROFESSIONAL EXPERIENCE
PART-II ARCHITECTURAL ASSISTANT
07/2018 - 10/2018 3 months Lyon, France
10/2017 - 06/2018 9 months Lyon, France
115, Bennerley Road SW11 6DT LONDON +44 7767 209913 meunier.rmn@gmail.com
PERSONAL PROFIL
09/2016 - 11/2016
Graduated with honours at the Faculty of Architecture of ULB, in Brussels, in 2017. With previous experiences at Chabanne & Partenaires Architectes, I have been through the different stages of a project, met deadlines, and worked efficiently individually and as part of a team from a concept to the construction details. Hard working and self motivated, always keen to learn more, I also follow the conviction that architecture as to be humanist at first, and each situation deserves a singular approach both on the analysis of a program and the characteristics of the site.
EDUCATION 2017 - 2018 Lyon
2016 - 2017 Brussels
Part III (HMONP)
| In progress for the thesis
ENSAL - Ecole Nationale Supérieure d’Architecture de Lyon
Master degree of Architecture
| Graduated with honours
Faculty of Architecture La Cambre Horta - ULB University Master thesis : Postmodern legacy and influences on urban dynamics in Tel Aviv and Jaffa.
| Exchange program
Master’s year abroad
2015 - 2016
Bachelor degree of Architecture
2010 - 2011
MANAA
2009 - 2010
French Baccalaureate
Brussels
Nice
Cannes
06/2012 - 07/2012 2 months Mougins, France
| Part II Assistant Architect
- Full design of the technical stage for a disabled high school. - Liaised with the structural engineering office and building control surveyor.
Chabanne & Partenaires Architectes
| Part II Assistant Architect
- Design of the technical stage for the Caneton Aquatic Center (Roman), and Event & Function Hall of Muret. - Strategic definition to Concept design for Valmorel Hotel & Resort. - Participated in the competition of The Municipal Baths of Strasbourg. - Created 2D materials & 3D visualisations for final renders on various competitions.
Chabanne & Partenaires Architectes
| Part I Assistant Architect
- Won a competition for an aquatic center (Rillieux-La-Pape, Le Loup Pendu) - Developed and designed from strategic definition to developed design for the SBM Headquarter. Liaised with the client. - Created 2D/3D materials for final renders on various projects.
ABRI Architecture | Part I, Freelance - Worked as a drawing assistant, learnt the basics of planning application. - Assisted faesibilities and concept design, architectural surveys.
ADDITIONAL
2012 - 2015 Jerusalem
2 months Lyon, France
Alain Lelièvre Architecte
Bezalel Academy of Arts & Design
| Graduated with honours
Faculty of Architecture La Cambre Horta - ULB University
| Upgrading program in Applied Arts
Ecole de Condé
Lycée Carnot
| Major : Sciences
2016 - 2017 Brussels, Belgium
09 / 2014 1 month Bali, Indonesia
English/French translation of a book
Volunteering
| Green Lion Association
Volunteer in a humanitarian Association Rehabilitation & construction of an orphanage and school (involved in roofing, tilling, wooden construction, reused material)
KEY SKILLS AUTOCAD REVIT SKETCHUP ARTLANTIS VRAY RHINO PHOTOSHOP ILLUSTRATOR INDESIGN MS. OFFICE
| Architecture field
White City, Black City, Architecture and War in Tel Aviv and Jaffa, Sharon Rotbard, Babel Publishing, Tel Aviv, 2017
CAPABILITIES / STRENGHTS Hand draughting / sketching Technical drawing / detailing 3D Modelling & Rendering Graphic Design Active team member
Creative
Languages :
Interests / Hobbies
FRENCH ENGLISH
Guitare (played in band groups & compositions) Tennis (played as regional competitor)
very
spirit curious
Enterprising Determinated
● ●
●
Enthusiastic
●
Conscientious Attention
Passionate
to ●
and ●
details
Ambitious
ACADEMIC WORKS
1 2 3
LEARNING AND INNOVATION CENTER Brussels, Belgium, 2017
MIZRAHI CULTURAL CENTER Tel Aviv, Israël, 2016
IN BETWEEN LIMITS Jaffa, Israël, 2015
PROFESSIONAL WORKS
4 5 6
SBM HEADQUARTER Ecully, Lyon, France, 2018
AQUATIC CENTER CANETON Romans-sur-Isère, France, 2018 EVENT & FUNCTION HALL Muret, France, 2018
SELECTED WORKS 2015-2018
ACADEMIC WORKS
LEARNING & INNOVATION CENTER Campus ULB-VUB, Brussels, 2017
A place of transitions The Learning Center is characterized by the alliance between research and training. It is not totally out of sync with the library typology but is part of one of the current transitions mostly related to the expansion of the digital area. Books are not forgotten and shelves are not systematically replaced by virtual storage servers, but technology remains at the heart of its operation. The modes of learning and production evolve accordingly: we talk about distance learning, research through digital libraries, or ÂŤ crowd sourcing Âť. An integral part of a campus or even its central point, the Learning Center is also the place of connection, intermediate to other academic entities, providing additional functions participating in the dynamics of a campus. All this generates a different reflection in the architectural logic of the place and its operation. We then find flexible spaces linked to a constant transition and meeting a need for versatility, many meeting places and some interaction between the main areas.
Implementation plan
View from the park
Centrality, connection and landmark The central location of the Learning Center in the ULB / VUB site allows for easy connection between the surrounding buildings and a landmark building potential. It serves as a transition between the two campuses, linking two public spaces today in complete rupture.
serves as a meeting place but also a link between the functions of one building to another. Finally, the difference in level between the levels of this urban sheet allows an indirect light (north) to enter an atmosphere conducive to the study space it overlooks.
Some axes of neighboring buildings are taken over and a bridge in several stages concretizes this link. At the project level this bridge is materialized by a public space on several levels around which the two volumes of the project are grafted. This public space punctuated with micro-situations and spontaneous events
With regard to buildings, the accent is put on a strong interaction between two false twin volumes and the third volume, empty, that they come to make exist. The visual complementarity is paradoxically created by the dynamics of the two opposing volumes, the aesthetic objective being a landmark building with clean forms.
VUB Admin.center VUB Park
ULB
• Existing situation : two campuses in total -- rupture (road, altitude difference, built front). • Two neighboring public spaces to link.
• Connection point at the ULB / VUB site center. • The Learning Center as a transition point and • « landmark building ».
Section AA'
Ground Floor Plan
Section BB'
VUB
d
Roa
ULB
• A flaw through the project creates the urban transition between the two campuses.
• Some existing routes influence the misalignment of the building. • The resulting corridor takes on the character of an «urban layer» on several levels, serving specific functions.
• Hierarchy : a minor volume, a major volume, a third one : the void. • Dynamics created by the complementarity of two contrary volumes.
The urban corridor
5th Floor
Administration & staff
Direction department
Meeting room
Multimedia & recording studios
2nd Floor
Locker room (sport activities upstairs) Collective work
Lounge area
Individual work
West elevation
1st Floor
Gallery
Connection with the Dutch Campus (VUB)
Collective work
Cafeteria Auditorium
Ground Floor Foyer Green patio
Exploded axonometry (upper building part)
Gallery
North elevation
Connection with the Dutch Campus (VUB)
Fab lab Workshop
Connection with the French Campus (ULB)
Reading room
Auditorium
Lower Ground Floor -1 Green patio Archives Lounge area
Reading room
Noise zone
Lower Ground Floor -2
Archives
Exploded axonometry (Lower building part)
Inside the library
MIZRAHI CULTURES CENTER,
Neve Sha’anan, Tel Aviv, 2016
The project is taking place on the former disused site of Tel Aviv’s Central Bus Station, on the border between the northern and southern parts of the city. The neighborhood remains in great questions of identity and the gentrification phenomenon pushes a disadvantaged population to leave the places under the big private investments. This is a counter-project defending the interests of the Mizrahi culture (from local populations), establishing a place of life and activities composed largely of a theater, auditoriums, galleries , library, social center, restaurant, in the form of a cultural center. Everyday activities are separated from the event part of the project according different schedules, as well as light needs. The building’ scale also follows and a special attention is given to the junction between these two parts of the city. On the other hand, the memory of the site is taken into account concerning the old bus platforms, reinterpreted in the new building, each hosting a specific part of the program.
Axonometric view
Ground Floor Plan
Conceptual sketches
LOWER GROUNG FLOOR -1
2ND FLOOR
3RD FLOOR
4TH FLOOR
Section aa'
Rehearsal studios
Dressing & Locker room Workshops studios & Co-working spaces
Auditoriums
4th Floor
Fly system (Lighting & Decoration installation
1st Floor
Administration & Direction Theater Cafeteria
Ground Floor 2 Floor nd
Parking entrance
Entrance Hall & Ticket Office
Library
Locker & Dressing room Restaurant Black box (exhibition or entertainment events)
Art Gallery
Lower Ground Floor -1
Exploded axonometric view
Between the platforms
The lobby entrance
View of the theater facade
IN BETWEEN LIMITS
Jaffa, Israël, 2015
« A place for hosting and meeting for locals and tourists. The visitors will experience traditional Arab flavors and meet the chefs – Arab women from Jaffa, who will share their personal stories and the story of Jaffa from their point of view. » A first observation on informal architecture in Jaffa had arisen on an analysis of the limits management. These limits may be visual or physical, and more or less free. It allows to separate the public spaces from the private spaces, or sometimes only to protect themselves from the sun. The project began by the exploring the explicit and implicit limits, several examples were listed, both in their shape, different materials, their architectural meaning.
Axonoletric view
Inside the "in between space"
One of the examples of limit found in Jaffa is reused and reinterpreted in the project. There was a openwork fence made of concrete blocks, alternating empty/ full. Generalized to the whole project with a gradation of transparency in terms of space, it can manage the different limits : visual, physical, solar. This notion of boundaries traduced by an openwork becomes the main concept of the project. It appears as a first openwork facade from the street, and create a corridor with the second front, this time frank limit with inside the building. It acts as a corridor between two, creating a neutral space between the public and the private, used here for the weekend market / everyday coffee place or else for an indirect entry into the building.
GROUND FLOOR
FIRST FLOOR
Section aa'
Workshop & meeting around the arabic cutlture & food Bedrooms for hosting visitors
Project First Floor
Kitchen Access to the outdoor dining area
Storage
Lobby entrance Dining area
Project Ground Floor
Office Coffee & Market place
Existing Ground Floor
The structural axes are reused, as is the organization and symmetry of the plan around a central space. The existing building is enlarged in its peripheries with a homogeneous envelope inspired by the site.
Exploded axonometric view
The peripheral corridor
PROFESSIONAL WORKS
SBM HEADQUARTER
Ecully, Lyon, 2017
The head office of SBM, which sells care and crop protection products, is located in the former premises of Euronews in Ecully. The purpose of the venue is to communicate to the client about the company’s new eco-responsible spirit, while providing its employees with spaces adapted to new forms of work, highlighting collaborative energy and a certain fluidity. These intentions are manifested by the setting up of open-spaces accompanied by informal work areas, as well as the integration of a plant component in the interior design.
Informations and drawings under on-disclosure agreement
Building entrance 8
33 34
7
Built up area : 4 585 sq.m 40
plac
A
A'
5
36
4
3
38
3
2
+17.35 (+283.40NGF)
1
79
EP
+14.13
EP
+280.18 NGF
78
+13.23
+279.28 NGF
948
1008
+13.23
+279.28 NGF
77
21
60°
22
76
40
24 73
26
AA
130
138
110
300
270
300
270
313
270
335
270
300
130 270
270 118
133
110 335 135
300
130 270
300
DGT.
ARCHIVE INNOVATION
DGT.
TGBT TRANSFO
RESERVE
1
2
3
4
5
6
+20.30 (+286.35NGF)
+17.35 (+283.40NGF)
+16.00 (+282.05NGF)
+14.13(+280.18NGF)
LT. ANTENNE
TERRASSE TECHNIQUE
CTA
Espace déjeuner / lounge
+14.13 (+280.18NGF)
+14.13 (+280.18NGF)
+13.53 (279.58NGF)
+13.23 (+279.28NGF)
72
72
2
±00.00
74
25
AA
+266.05 NGF
75
D
100
23
1
Terrasse
LOCAL SYNDICAL
230
3114
1144
400
80
Espace déjeuner / Lounge 206.2m² sol plancher bois
EP
C
BB
BB
Espace déjeuner / Lounge
LOCAL VDI
195
503
EP
DEGAGEMENT
35
40
EP
MEETING ROOM
413
100
19
ME 25
skydome Esc . Est
+17.20
+283.25 NGF
20
CHEMIN DES MOUILLES
+283.25 NGF
SAS
138
838
+17.20
ME 25
skydome Esc . Ouest
HALL D'ACCUIEL
130
2986
EP
+13.23
+279.28 NGF
passerelle IS
DEGAGEMENT
±0.00 (+266.05NGF)
138
156
81
940
BB
Personal contribution : ▷ Preliminary sketches ▷ Facade design ▷ Program renegotiation ▷ Part of interior design ▷ Liaise with client
285
957
B
82
40
BB
SHOWROOM
35
+14.13
+280.18 NGF
EP
138
158
rampe 5%
EP
ESPACE C&S
205
40 928
+13.73
+279.78 NGF
+279.78 NGF EP
DEGAGEMENT
+4.45 (270.50NGF)
220
5584
A
153
87
200
83
800
18
220
84
17
+13.23
+279.28 NGF
+13.73
+14.13
+280.18 NGF
BUREAU FERMÉ
+8.90 (274.95NGF)
85
16
1
+13.23
+279.28 NGF
60°
+14.13
195
92
88
ME 24
Terrasse technique 114m²NGF +280.18 sol caillebotis métal
Stages : Strategic definition ▷ Developed design
86
15
2
785
Terrasse technique
+13.53 (+279.58NGF)
+13.23 (279.28 NGF)
93
A'
94
89
14
e
+14.13 (+280.18NGF) +13.23 (279.28 NGF)
90
11
e
13
iqu
iqu
TERRASSE TECHNIQUE
TRAITEMENT D'AIR
91
10
e
+16.00 (+282.05NGF)
9 12
iqu
3
140
8
1
urs
4
4
ctr
e
5
ctr
Éle
iqu
6
3
N
5114
urs
7
ctr
Éle
CC
Local Orange
cour
ctr
2
5
Entrée principale
1
Éle Éle
urs
ite
ite
urs
6
Local archive
ite
Vis Vis
2
4
5
urs
urs
3
3
4
+4.45
2
CC
4
3
1
3 2
Vis
81
1
ite
ite
ite
AA 1
rs
205
2
2
ite Parking u
Vis Vis Vis
+270.50 NGF
1289
B
+20.30 (+286.35NGF)
Role : Architectural assistant (with senior architect)
1 Vis
AA
CHEMIN DES MOUILLES
C
es
37
Parking
D
6
35
13545
MEETING ROOM
DGT
MEETING ROOM
BUREAU FERMÉ J HOPKINS
DGT
190
DGT
388
SAN. H
STOCKAGE IT
270
MEETING ROOM
270
DGT
270
388
270
190
71
3
BUREAU FERMÉ EQUIPE LEGAL
230
35 138
138
130
4
103
138
27
35
230
+8.90 (274.95NGF)
28 DEGAGEMENT
MEETING ROOM
DGT
270
SAN. F
MEETING ROOM
270
DGT
270
270
BOX
240
MEETING ROOM
BOX
DG FRANCE
35 108
130
DGT
SAS
CUISINE COMMUNE
290
DGT
300
SAN. H
260
MEETING ROOM 270
300
65
8168
OPEN SPACE BUISNESS INCUBATOR
270
388
66
33
Parking
388
55
32
67
135
138
35
230
+4.45 (270.50NGF)
68
31
36
BUREAU FERMÉ JP VIOT
270
335
69
30
35
388
70
29
5
34
1,96
5,97
±0.00 (+266.05NGF)
64
41
61
47
62
38 39
20
63
37
40
Implementation plan
Section AA' / BB'
60
44
42
59
43
1
4
North elevation
South elevation Ground floor
Second floor
Auditorium
Meeting area
Cafeteria
Open space
AQUATIC CENTER CANETON
Romans-sur-Isère, France, 2018
The project consists of the rehabilitation and extension of the Pool Caneton built in 1970. The objective of the operation is to expand the activity with a new 25 meters pool allowing the establishment to become the reference of the region for national competitions. The intervention also includes the restoration of hygiene standards and the development of outdoor spaces following the evolution of the practice in an aquatic center. The constructive details are mainly based on the connections between different construction techniques (concrete / metal), particularly focused on the hygrometry and acoustics issues related to this typology. Finally, we have prepared the building site phasing of the for the next stage.
Informations and drawings under on-disclosure agreement
Coupe NS 3
Coupe NS 1
A
B
C
456
D
490
E
490
F
490
G
490
H
490
I
242
J
214
K
596
L
292
M
1120
N
305
O
387
P
177
685
0_118
PP90+50 E30 ht: 213
1
1
EP EP
11
60
24
151
152
326
150
Pente 2%
90
Sol:S05 Mur:M06
152
366
EP
10
827
150 Pente 2%
80
?
EP
90 520
1.1.1.1 Parvis couvert 81,08 m²
MR01
606
6
7
80
3,3%
150
10
256
10
10
165
0_06 15
PP93 E30 ht: 204
150
10
175
30
183
682
1.4.0.1 Salle de réunion et de convivialité 31,61 m²
8
1.1.1.2 Box chien 2,10 m² Sol:S05 Mur:M07
80
1.1.1.3 Box chien 2,10 m²
2,0%
PP93 E30 ht: 204
0_08
1.5.1.9 Dgt gradins 1 6,86 m²
1.6.0.5 VDI 5,50 m²
Sol:S11 Mur:M03
0_05
PP93 E30 ht: 204
Sol:S04 Mur:M03 Plaf:FP07
ME_03 all. : 100 cm ht : 260 cm
SOLS
0_03
PP103+50 E30 ht: 204
0_04
PP103+50 E30 ht: 204
0_07
260
PP103+50 E30 ht: 204
Caniveau
10
1.5.1.4 Buanderie 6,62 m²
0_21
1.5.1.5 Office détente 14,73 m²
PP93 E30 ht: 204
114 20
Sol:S11 Mur:M03 Plaf:FP05
EP
0_29
PP93 Ei30 ht: 204
1.5.1.7 local repro 2,49 m²
577
130
Sol:S05 Mur:M03 0_28
PP93 E30 ht: 204
2 4
5
6
30
8
1.5.1.8 dgt Pers. 31,12 m²
Chape gros-oeuvre Dalle béton min. 2%
Coupe EO 2
140
50
7
372
20
3
20
20
270
169
10
Caniveau
10
Sol:S01
2
MURS
Revêtement carrelage
PP93 E30 ht: 204
151
1.3.2.3 Gradins bas 53,11 m² 1 1
50
ME_07 all. : 120 cm ht : 120 cm
PP93 E30 ht: 204
0_30
PP93 E30 ht: 204
2500
2500
Coupe EO 2
3245
1.3.1.2 Bassin de nage neuf 500,00 m²
PV120+120_MR E30 ht: 253
Sol:S11 Mur:M03 Plaf:FP05
0_22
330
0_31
B
ME_05 all. : 120 cm ht : 120 cm
ME_06 all. : 120 cm ht : 120 cm
1.5.1.1 Bureau 14,73 m²
EP
480
Sol:S05 Mur:M01 Plaf:FP04
1.5.1.10 Dgt gradins 2 37,74 m²
Main courante de l'échelle
ME_04 all. : 120 cm ht : 120 cm
250
1.5.1.3 Vestiaires du personnel 15,56 m²
PROFONDEUR 3,4m
S 01 : Carrelage SEL effet bois PN18 S 02 : Carrelage SEL Gris 30x60 PN18 S 03 : Résine antidérapante S 04 : Carrelage Gris 30x60 S 05 : Carrelage 30x30 S 06 : Peinture de sol S 07 : Sol sportif S 08 : Béton lissé S 09 : Tapis brosse S 10 : Peinture époxy
70
Sol:S05 Mur:M01
0_124
LEGENDE DES FINITONS
Sol:S06 Mur:M07
PP93 E30 ht: 204
Sol:S05 Mur:M07
3,8%
1.5.1.2 Coffre 4,95 m²
0_09
100
Sol:S05 Mur:M03 Plaf:FP05
10
169
159
20
662
1.6.0.7 Chaufferie 73,94 m²
0_32
0_33
PP93 E30 ht: 204
330
480
Sol:S05 Mur:M01 Plaf:FP04
Sol:S06 Mur:M08
0_27
PP93 E30 ht: 204
265
10
1027
LIMITE FOND MOBILE PROF 1m80 (BRUT 2,30m)
945 Acro Bass. neuf
330
60 72
180
Sol:S06
+8,40
PRO CHA 00 TT DE 02
30.5 25
20
1.6.0.11 Atelier 13,40 m²
Echelle inox intégré dans bac inox
Sol:S10
7
340
60 40
20
Sol:S06 Mur:M07 261
20
Sol:S06
261
20
100
PP103+50 Ei30 ht: 204
PP103+50 Ei30 ht: 204
0_122
P. Sec. ht 320 E30 ht: 320
494
494
prof: 3m40
Sol:S05 Mur:M03
1.6.0.2 Local compresseur 18,38 m²
412
15
1.6.0.4 Local poubelles 11,70 m²
Sol:S06 Mur:M07
372
40
5
7
324
Etanchéité Paroi béton
-496 R-1 LT CTA
Trémie / courette anglaise
8 9 20
Coupe NS 3
717
11
717
15
14
PP90+50 Ei30 ht: 213
717
16
Coupe NS 3
17
PP120 Ei30 ht: 204
734
M
18
N
P
O
Ground floor 945 Acro Bass. neuf
+9,45
Plan de repérage
Enduit Blanc +7,90
Résille métal doré Rive, cf: PRO CHA 00 TT DE 05
28
Sas, cf: PRO CHA 00 TT DE 04
1.5.1.6 Local MNS
254
1.2.0.8 Douches 2
260
1.2.1.2 Circ. 2
320
1.4.0.2 Musculation
260
320
1.1.0.6 Sanitaire F
260
340
+0,00
0
19 bis avenue Jean Bertin 26000 Valence
P / 06 74 45 64 64 tolle@alpes-controles.fr
68 Chemin du Moulin Carron 69570 Dardilly
Exploitation Maintenance Engie Axima Simon AULAGNIER
3 allées des Gingkos 69500 Bron
P / 07 50 69 60 75 simon.aulagnier@engie.com
Architecte Chabanne et Partenaires Jérôme BOU / Guillaume CLEMENT
38 quai Pierre Scize 69009 Lyon
T / 04.72.10.95.95 contact@chabanne-architecte.fr T / 04 37 26 27 60 bbautheney@keo-ingenierie.fr
T / 04 78 66 35 00 P / 06 07 42 60 68 florent.pichon@spiebatignolles.fr
BE-Fluides Kéo Benoit Bautheney
1 Montée de la Butte 69001 Lyon
BE-Structure Kéo Alsény CONDE / Olivier BONNEL
1 Montée de la Butte 69001 Lyon
T / 04 37 26 27 60 aconde@keo-ingenierie.fr
Économistes Kéo Arnaud AYMARD
1 Montée de la Butte 69001 Lyon
T / 04 37 26 27 60 aaymard@keo-ingenierie.fr
1 Montée de la Butte 69001 Lyon
T / 04 37 26 27 60 ccoutal@keo-ingenierie.fr
HQE Kéo in Cécile MASCARELL
1 Montée de la Butte 69001 Lyon
T / 04 37 26 27 60 cmascarell@keo-ingenierie.fr
Acousticien Echologos Bastien FRANCONY
24 Bd de la Chantourne 38700 La Tronche
T / 04 76 89 36 63 grenoble@echologos.com
1.3.1.1 Bassin de nage existant
0 R.D.C
208
96
-0,02
IND
cloison cf PRO CHA 00 NB DE 506
1.1.0.2 Hall de distribution
260
1.1.1.1 Parvis couvert
NUMERO
97
157
420
157
97
+4,57
+4,20
TYPE
Entreprise SPIE Batignolles Sud-Est Florent PICHON
Paysagiste Kéo Claire COUTAL
+6,20
Sas, cf: PRO CHA 00 TT DE 07
NIV
MAITRISE D'OEUVRE
0_35 0_38 733
EMETTEUR LOT
PRO CHA 00 NB PL 01
Plateau de Lautagne, 42 avenue des Langories P / 06 88 05 35 72 26000 Valence eric.boyer@fr.bureauveritas.com
SPS Alpes Contrôle Thierry OLLE
493
PHASE
Doc:
MAITRISE D'OUVRAGE T / 04 75 75 41 61 Département cohésion Sociale et Communautaire, P / 06 73 71 86 57 Direction Enfance, Jeunesse et Sport BP 10388 - 26958 Valence Cedex 9 Imen.poulet@valenceromansagglo.fr
Bureau de Contrôle Bureau Veritas Eric BOYER
palan 1T
6
-4,96 49
Date: 04/04/2018
MOA Communauté d'agglomération Valence Romans Agglo
Garde corps cf: PRO CHA 10 NB DE 07
4
1.6.2.5 BT Réserve
340
Ech:
B
2 3
Sol:S08 Mur:M07
Coupe NS 1
Sol:S08 Mur:M07
1
-2,70 1.5.2.1 Dépôt matériel 20,38 m²
Echelle inox intégré dans bac inox
Echelle inox encastrée dans bac inox
RDC réduction 1/100°
A
0 R.D.C
1205 0_36
PP120 Ei30 ht: 204
membrane PVC
Ancrage ligne de séparation
1.6.0.1 Cour logistique 59,10 m²
0_39
fond mobile (1m80) revêtement inox
30
PP200 Ei30 ht: 210
453
1.5.2.1 Dépôt matériel
470
250
230
PG110+110 E30 ht: 220
+0,00
70 0_121
0_34
PP103+50 E30 ht: 204
A
0_41
PV120+120_MR E30 ht: 253
Rue Alfred de Musset, 26100 Romans sur Isère
406 20
3,2% -0,04
+0,00
-3,84
159
385 Local1.6.0.9 électrique R+01 2,30 m²
1.6.0.3 Local PH 6,00 m²
0_24
PP103+50 E30 ht: 204
0_42
MR03
MR04
54
Sol:S05 Mur:M03
0_40
Caniveau
3,2%
Caniveau
1.5.2.3 Entretien 6,00 m²
40
+0,30 +0,00
garde corps, cf: PRO CHA 10 NB DE 02
Caniveau
PP93 E30 ht: 204
387
marche carrelée
50
30
JD 250
320
417
417 260
320
260
1.4.0.2 Musculation
0_23
110
Caniveau
échelle encastrée
marche carrelée
1.2.0.4 Vestiaires 4
Sol:S06
garde corps, cf: 0_37 PP90+90 330 Ei30 ht: 20402 PRO CHA 10 NB DE
546
Caniveau
157
157
échelle encastrée
1.2.0.5 Vestiaires 3
1.6.0.8 330 Chlore 1,98 m²
80 161
MR05
1.2.0.3 Vestiaires 2
EP
2 80
1.2.0.2 Vestiaires 1
PP200 Ei60 ht: 210
PP103+50 Ei30 ht: 204
330
27 27 27 27 27 27 27
1
garde corps, cf: PRO CHA 10 NB DE 01
0_120
0_25
Panneaux acoustiques, cf: PRO CHA 12 NB DE 01
8
230
6
Fil d'eau
RENOVATION ET EXTENSION DE LA PISCINE CANETON
JD
20
5
230
4
±0.00
6
3
340
2
344
163
+4,57
1
Détail pédiluve, cf: PRO CHA 00 NB DE 504
20
Panneaux acoustiques, cf: PRO CHA 12 NB DE 01
Vestiaires, cf: PRO CHA 00 NB DE 401
Panneaux acoustiques, cf: PRO CHA 122NB DE 01 1
Panneaux acoustiques, cf: PRO CHA 12 NB DE 01
Fil d'eau
Goulotte
30
1.6.0.10 TGBT 5,94 m²
+6,20
30
FP 01 : Plaques de plâtre FP 02 : 120x60 minéral hygiène FP 03 : 120X60 Organic FP 04 : 60X60 minéral hygiène FP 05 : 60X60 minéral FP 06 : Métal déployé / étiré laqué FP 07 : Tasseaux et feutre noir (intérieur) FP 08 : Tasseaux et bac noir (extérieur)
10%
1187
PV120+120_MR ? ht: 253
1977
PP93 E30 ht: 204
1.5.1.3 Vestiaires du personnel 15,56 m²
225
0_43
FAUX PLAFONDS
24
151
80
23
2 80
Muret ht.30cm Finition carrelage anthracite
40
1
22.5 16.5
MR06
1544
27 27 27 27 27 27 27 27
M 01 : Grès Cérame Blanc Mat 60x30 M 02 : Grès Cérame Gris 60x30 M 03 : Peinture M 04 : Stratifié compact M 05 : Béton lasuré M 06 : Grès Cérame 20x20 M 07 : Peinture antipoussière
30
5
+0,90
12 18.5
4
2
30
3
+0,45
PV90+50 MR E30 ht: 215
MR02
30
2
27 27 27 27 27 27 27 27
1
0_119
197
JD
503
+0,45 1
CH_06 all. : 0 cm ht : 420 cm
330
347
linteau ht: 210
110
250
Sol:S05 Mur:M07
Sol:S01 Mur:M03 Plaf:FP01
224
250
PV120+120_MR E30 ht: 253
Banque PMR ht:75
1.1.0.3 Borne d'accueil 9,46 m²
PP93 E30 ht: 204
417
250
436 544
Tablette ht:120
1.1.0.8 Poussettes 3,69 m²
0_44
PV90+90 MR E30 ht: 214
Banque accueil cf: PRO CHA 00 NB DE 302
0_10
Sol:S01 Mur:M05 310
0_01
240
2,4% Caniveau
2000
Sol:S09 Plaf:FP07
PV90+90 MR E30 ht: 214
CH_07 all. : 0 cm ht : 220 cm
Garde corps cf: PRO CHA 10 NB DE 01
1.4.0.3 Plateforme chrono 7,84 m²
Détail portail, cf: PRO CHA 10 NB DE 03
1.1.0.1 Sas d'accès 8,61 m² 0_02
PV100+100 E30 ht: 214
Sol:S01 Mur:M05
échelle amovible
250
CH_04 all. : 0 cm ht : 420 cm
JD
CH_05 all. : 0 cm ht : 420 cm
741
0_11
2,0%
1.1.0.5 Déambulatoire spectateurs 63,49 m²
+0,00 53
L
2,0%
Caniveau
+0,30
marche carrelée
3
CH_08 all. : 0 cm ht : 220 cm
-0,04
1.3.2.2 Plages du bassin de nage neuf 310,76 m²
EP
4
K
196
2,0% 2,0%
Caniveau
Sol:S01 Mur:M03 Plaf:FP01 + FP07
0_49
10
810 linteau ht: 210
J
250
Coupe EO 4
1.1.0.2 Hall de distribution 69,95 m²
Sol:S04 Mur:M02 Plaf:FP04
7
20
échelle amovible
3,8%
22
198
0_55
PP93 Ei30 ht: 204
PP93 E30 ht: 204
1.1.0.6 Sanitaire F 14,92 m²
0_50
TV60x60 E30 ht: 56
MR07
250
0_12
446
GT01
1.4.1.5 Dépôt matériel 4,75 m²
HSFP: 3,20 m
275
30
250
joue placo PP93 E30 ht: 204
10
469
Sol:S05 Mur:M03
CH_10 all. : 0 cm ht : 220 cm
Caniveau
250
12 séchoirs à cheveux 181
CH_03 all. : 80 cm ht : 120 cm
0_13
0_51
PP93 E30 ht: 214
Sol:S07 Mur:M03 Plaf:FP02
251
linteau ht: 210
EP
PP93 Ei30 ht: 204
Personal contribution : ▷ Material researches ▷ All technical drawings ▷ Final rendering ▷ Liaise with structural engineers
espace beauté
0_52
0_54
401
151 20
Pente 2%
1.5.2.2 Entretien 6,89 m²
Sol:S01 Mur:M05
241
PV90 E30 ht: 100
Sol:S04 Mur:M02 Plaf:FP04
0_53
PP103+50 E30 ht: 204
CH_09 all. : 50 cm ht : 160 cm
marche carrelée
Pente 2%
84 333
linteau ht: 210
0_57
1.4.0.2 Musculation 35,73 m²
Chape plages
Caniveau
0_14
EP
Pente 2%
1.1.0.7 Sanitaire H 13,02 m²
Détail façade, cf: PRO CHA 00 NB DE 402
PP93 E30 ht: 214
PP163 E30 ht: 234
0_45
Sol:S02 Mur:M02 Plaf:FP02 343
Pente 2%
919
0_56
296 576 PV93 E30 ht: 234
I
570
1842
203
0_63
Pente 2%
91.5
486
0_62
Détail vestiaire, cf: PRO CHA 00 NB DE 401
0_46
PV120+120_MR E30 ht: 253
111
0_61
22 Pente 2%
Pente 2%
1.2.1.5 Pédiluve 4 9,35 m²
111
0_60
PP103+50 E30 ht: 204
0_104
Détail pédiluve, cf: PRO CHA 00 NB DE 504
0_48
CH_11 all. : 0 cm ht : 240 cm
353
Détail sèche cheveux, cf: PRO CHA 00 NB DE 303
Détail pédiluve, cf: PRO CHA 00 NB DE 504
1.2.1.3 Pédiluve 1 5,44 m²
2,4%
PV120+120_MR E30 ht: 253
111
1.2.0.4 Vestiaires 4 44,05 m²
caniveau
196
MR08
PV93 E30 ht: 234
EP
0_106
CH_02 all. : 120 cm ht : 120 cm
158
PP93 E30 ht: 204
Sol:S02 Mur:M05 0_47
CH_13 all. : 0 cm ht : 240 cm
EP
linteau ht: 210
392
EP
Pente 2%
linteau ht: 210
0_58
608
280 162
EP
CH_01 all. : 120 cm ht : 120 cm
494
20
Pente 2% Pente 2%
167
20 406
EP
4
0_103
1.5.1.6 Local MNS 11,53 m²
1.3.2.1 Plages du bassin de nage existant 227,70 m²
3
Stage : Technical design
4,53 m sous poutre
Détail bancs, cf: PRO CHA 00 NB DE 301
PP93 E30 ht: 204
Sol:S01 Mur:M01 Plaf:FP01 + FP02
278 Pente 2%
0_59
hsd: 4,17 m
linteau ht: 210
hsfp: 3,20 m hsd: 4,17 m 30
111
hsfp: 2,60 m
Jouée Plâtre hsfp: 3,20 m
Pente 2%
576
CH_12 all. : 0 cm ht : 240 cm
Pente 2%
45 268
Pente 2%
PP103+50 E30 ht: 204
1.2.0.8 Douches 2 36,23 m²
Pente 2%
0_105
caniveau
Pente 2%
Détail bancs, cf: PRO CHA 00 NB DE 301
0_15
167
0_102
267 Pente 2%
266
0_64
301
Sol:S01 Mur:M02 Plaf:FP01 + FP03
hsfp: 3,40 m 4,27 m sous poutre
EP
0_99
EP
266
Sol:S02 Mur:M02 Plaf:FP02
24 10
Sol:S01 Mur:M03 Plaf:FP04
linteau ht: 210
Chaînette
160
160
104
cloison cf PRO CHA 00 NB DE 506
PV93 E30 ht: 234
4,07 m sous poutre
198
488 10 95
Détail vestiaire, cf: PRO CHA 00 NB DE 401
Sol:S01 Mur:M01 Plaf:P01
Coupe EO 4
Pente 2%
1.1.0.4 Espace Déchaussage / beauté 135,20 m²
Pente 2%
Pente 2%
1.2.1.1 Circ. 1 28,14 m²
Chaînette
291
PP103+50 Ei30 ht: 204
0_71
PP103+50 E30 ht: 204
linteau ht: 210
10
10
0_114
0_70
915
284 10 Plan de travail cf PRO CHA 00 NB DE 501
caniveau
caniveau
0_65
266
Sol:S02 Mur:M03
0_68
Sol:S01 Mur:M01 Plaf:FP01 + FP02
499
205 154
linteau ht: 240
1535
1535
0_98
Espace à langer ht:90
242
1.4.0.5 Dépôts 7,74 m²
Pente 2%
Pente 2%
0_67
1.2.0.5 Vestiaires 3 43,78 m²
PP103+50 E30 ht: 204
0_97
206
0_100
10
60
24
0_66
hsd: 4,17 m
20
Role : Architectural assistant (with senior architect)
1.2.0.1 Stock. faut. 5,55 m² 0_20
113
544 Pente 2%
2195 0_96
329
linteau ht: 210
linteau ht: 210
1.3.1.1 Bassin de nage existant 250,00 m² ?
157
PV90 E30 ht: 100
180
Chaînette
650
22 10
224
180
Sol:S02 Mur:M01 Plaf:FP04
10
linteau ht: 210
Sol:S05 Mur:M03 338
EP
915
hsfp: 2,60 m
224
1.2.0.10 Sanitaires 2 39,05 m²
linteau ht: 210
0_72
0_19
0_16
PP103+50 E30 ht: 204
265
Jouée Plâtre hsfp: 3,20 m 10
0_18
EP
PP103+50 E30 ht: 204
154
Sol:S02 Mur:M02 Plaf:FP02 343
1.5.2.4 Local d'entretien 5,37 m²
0_86
150
2044
164
Pente 2%
Chaînette
1.2.0.3 Vestiaires 2 44,13 m²
227
1.2.1.4 Pédiluve 2 5,44 m²
linteau ht: 210
Sol:S01 Mur:M01 Plaf:FP01 + FP02
PP103+50 E30 ht: 204
0_88 11
Détail pédiluve, cf: PRO CHA 00 NB DE 504
Pente 2%
Détail vestiaire, cf: PRO CHA 00 NB DE 401
Pente 2%
Pente 2%
caniveau
0_89
165
PV90+50 MR E30 ht: 215
200
0_78
PP93 Ei30 ht: 204
0_73
266
0_101
0_77
47
Pente 2%
PP93 E30 ht: 204
91
111
0_76
45
Pente 2%
111
0_75
Pente 2%
276
0_17
152
111
caniveau
Chaînette
572
140
Pente 2%
146
15
30
3053
linteau ht: 210
0_74
hsd: 4,17 m
150
Pente 2%
114
hsfp: 2,60 m
159
Pente 2%
265
Détail pédiluve, cf: PRO CHA 00 NB DE 504
915 267
Jouée Plâtre hsfp: 3,20 m
487
178
Pente 2%
EP
linteau ht: 210
Sol:S01 Mur:M01 Plaf:FP02 + FP06
10
PP123 E30 ht: 204
ME_02 all. : 0 cm ht : 222 cm
Chaînette
PP103+50 E30 ht: 204
1.2.0.6 Douches 1 38,31 m²
Sol:S02 Mur:M02 Plaf:FP02
Pente 2%
266
PP123 E30 ht: 204
0_107
PV93+50 E30 ht: 234
25
31 345
PPGT80 E30 ht: 205
PP103+50 E30 ht: 204
201
Pente 2%
PG110+110 E30 ht: 220
GT02
249
0_113
111
Pente 2%
0_111
10
111
915
Pente 2%
387
0_112
PP93 E30 ht: 204
111
0_80
Pente 2%
10 0_116
0_81
Pente 2%
PG110+110 E30 ht: 220
200
Built up area : 2 432 sq.m
0_79
0_82
24
0_110
PG110+110 E30 ht: 220
275
115
0_83
622
15
265
0_87
cloison cf PRO CHA 00 NB DE 506
280
475
156
195
140
150 15
0_109
PG110+110 E30 ht: 220
15
720
caniveau
254
5
0_108
linteau ht: 210
152
576
691
Sol:S02 Mur:M02 Plaf:FP02
Pente 2%
1.2.1.3 Pédiluve 3 10,37 m²
0_84
hsfp: 2,60 m
0_90
359
Sol:S05 Mur:M06 Plaf:FP04
Jouée Plâtre hsfp: 3,20 m
1.2.1.2 Circ. 2 59,46 m²
174
Plan de travail cf PRO CHA 00 NB DE 501
Attente
1.4.0.4 Infirmerie / antidopage 31,31 m²
345
Sol:S05 Mur:M06
12
246
H
PP123 E30 ht: 204
140
1.4.1.4 Dépôt matériel 4 9,50 m²
Sol:S05 Mur:M06
10
1.4.1.3 Dépôt matériel 3 16,41 m²
195
Sol:S05 Mur:M06
345
345
Sol:S05 Mur:M06
hsd: 4,17 m
99
Détail vestiaire, cf: PRO CHA 00 NB DE 401
Pente 2%
caniveau Pente 2%
linteau ht: 210
linteau ht: 210
0_115
1.4.1.2 Dépôt matériel 2 24,88 m²
1.4.1.1 Dépôt matériel 1 23,32 m²
Pente 2%
487
0_94
1095
Sol:S01 Mur:M01 Plaf:FP01 + FP02
PP103+50 E30 ht: 204
220
787
0_95
231 PP120 E30 ht: 204
1.2.0.2 Vestiaires 1 50,01 m²
275 170
21
Espace à langer ht:80
hsfp: 2,60 m hsd: 0,00 m
0_117
2
157
170
185
Sol:S02 Mur:M01 Plaf:FP04
10
0_85
1.2.0.7 Sanitaires 1 33,59 m²
linteau ht: 210
0_91
159
Pente 2%
10
290
179
10
90
495
linteau ht: 210
10
149
369 10
95
0_93 0_92 90
Section EO1 CHABANNE et PARTENAIRES
Coupe EO 4
38 , QUAI PIERRE SCIZE 69009 LYON TEL. : 07 72 10 95 95 FAX. : 04 72 10 00 80
Coupe AA
Swimming pool ladder
VALENCE ROMANS AGGLO
RENOVATION ET EXTENSION DE
Halle bassin - Détail échelle FORMAT
Coupe BB
PH
Doc: Ech.:
P
Voile-dôme aluminium micro-perforé
A
50
EP
Lanterneau 120x120cm
Membrane étanchéité Isolation thermique en FoamGlass
20
15
Dalle béton
30
150
Costière
Cabine de change
Pare-vapeur
132
Faux plafond tasseaux 40x80mm et feutre noir
67
Plaque de plâtre hydrofugée
185
235
2%
Faux-plafond organic 120x60mm
Carrelage blanc mat 20x20cm
2%
B
2%
120
Peinture teinte choix archi.
54
Assise stratifié compact teinte choix archi.
420
Cabine de change PMR
Carrelage mural 60x30cm teinte choix archi.
Patères adultes ht. 1.80m
155
25
Faux-plafond minéral hygiène
105
40
Carrelage blanc 30x60cm
Sèche-cheveux sur rails verticaux Ht. max: 2.15m
10
Coupe AA
45
45
45
Siphon de sol
EP CHABANNE et PARTENAIRES
Hall - Espace beauté 38 , QUAI PIERRE SCIZE
RENOVATION ET EXTENSION DE LA PISCINE CANETON
69009 LYON TEL. : 07 72 10 95 95 FAX. : 04 72 10 00 80 www.chabanne-architecte.fr
FORMAT
A3
Plancher chauffant
±0.00
Coupe BB
VALENCE ROMANS AGGLO
SEL
Patère ht. 1.35m
Carrelage antidérapant 30x60mm couleur choix archi.
225
Siège rabattable
Renfort tube inox Pieds carrelé aspect bois
Socle maçonné Carrelage aspect bois
SEL
Plancher chauffant
Caniveau à fente
±0.00
45
80
78
B
Assise stratifié compact teinte choix archi.
Carrelage 20x20cm
Tablette stratifiée aspect bois
All. Ht. 80cm
±0.00
Barre de maintien
225
Console stratifiée dito tablette
Patère
45
48
2%
80
Console stratifiée dito tablette
28
Stratifié compact teinte choix archi. sur 2 carreaux Ht. 60cm
235
125
25
20
31
30
Casiers doubles
Patères enfants ht. 1.35m
Pieds carrelé
104
Miroir
155
155
295
55
Tablette stratifié aspect bois
Miroir
45
25
2%
Patère
38 , QUAI PIERRE SCIZE 69009 LYON TEL. : 07 72 10 95 95 FAX. : 04 72 10 00 80 www.chabanne-architecte.fr
Joue en plaque de plâtre hydrofugée
Caniveau à fente Miroir dans épaisseur carrelage Sèche-cheveux sur rails verticaux
A
CHABANNE et PARTENAIRES
114 Faux-plafond minéral hygiène
40
25
A
106
Faux-plafond organic 120x60mm
Casiers doubles
A
Beauty area Plan de repérage
Lockers Coupe AA
VALENCE ROMANS AGGLO Doc: PRO CHA 00 NB DE 303 0 PHASE
EMETTEUR LOT
RENOVATION ET EXTENSION DE Ech.: 1/20 Date : LA PISCINE CANETON
NIV
TYPE
NUMERO
IND
FORMAT 04.04.2018
Vestiaires - Détail bancs, cabine change
A3
Faux-plafond type minéral hygiène 60x60mm
PHASE
Doc: Ech.:
EMETTEUR LOT
NIV
TYPE
NUMERO
IND
PRO CHA 00 NB DE 401 0 1/25 Date : 04.04.2018
260
Carrelage 30x60mm couleur choix archi.
295
Siphon de sol avec tube trop plein
0
316
148 20
120 Caniveau grille inox
Fil d'eau
Tube inox trop plein ±0.00
pente 5%
-0.08
SEL
pente 5%
Plancher chauffant
30
4
25
Carrelage
93
20
Tube thermo laqué Ø40
85
Lisse thermo laquée
120
5%
A
Ø 15
-0.08
130
Ø 15
0
5%
150
Caniveau grille inox
210
A
Siphon de sol
Footbath plan
Footbath section Coupe AA
Coupe NS 1
Coupe NS 3
ITE RME
6986 2286
A
B
C
D
E
F
G
H
I
J
Pare-vapeur
1552
K
1
L
M
N
O
P
EP
EP
Profil d'arrêt isolant 2
Joint coloré dito RAL tôle
EP +5,56 +171,66 NGF
3339
Tôle pleine laquée RAL choix archi pente 3%
+6,54 +172,64 NGF
EP
toiture étancheité blanc mat
toiture étancheité blanc mat
1906
1976
5,0%
2468
EP
toiture étancheité blanc mat
EP
130
+4,57 +170,67 NGF
EP 3,0% 2791
EP
Coupe EO 4
Isolant
2837
moquette solaire
Coupe EO 4
EP
+5,76 +171,86 NGF
3 4
EP
EP
EP
Support PRS + tube
+4,63 +170,73 NGF
EP
EP
EP
EP
EP
+2,84
+168,94 NGF
945 Acro Bass. neuf
130
+9,37
+175,47 NGF
+8,40
+6,20
163
Panneaux acoustiques, cf: PRO CHA 12 NB DE 01
6374
Panneaux acoustiques, cf: PRO CHA 12 NB DE 01
Vestiaires, cf: PRO CHA 00 NB DE 401 +4,57
+6,10
1.2.0.5 Vestiaires 3
1.2.0.4 Vestiaires 4
garde corps, cf: PRO CHA 10 NB DE 02
1621
3,1%
157
320
157 417
417 260
320
260
1.2.0.3 Vestiaires 2
JD
1.4.0.2 Musculation
130
1.2.0.2 Vestiaires 1
+7,70
garde corps, cf: PRO CHA 10 NB DE 02
+173,80 NGF
970
+0,00
1.5.2.1 Dépôt matériel
0 R.D.C
toiture étancheité blanc mat 230
766
766
340
membrane PVC
824
fond mobile (1m80) -2,70
+6,50
+172,60 NGF
3243
7,1%
prof: 3m40
-3,84
panneaux solaires réutilisés
+8,38
+174,00 NGF
EP
revêtement inox
Tôle perforée découpe laser motif +RAL choix archi.
+7,90
toiture étancheité blanc mat
+174,50 NGF
Tableau
385 R+01
+172,20 NGF
garde corps, cf: PRO CHA 10 NB DE 01
Mur rideau
PRO CHA 00 TT DE 02
Panneaux acoustiques, cf: PRO CHA 12 NB DE 01
Panneaux acoustiques, cf: PRO CHA 12 NB DE 01
1.6.2.5 BT Réserve
Coupe EO 2
-496 R-1 LT CTA
-4,96
311
Coupe EO 2
Coupe NS 3
RENOVATION ET EXTENSION DE LA PISCINE CANETON Rue Alfred de Musset, 26100 Romans sur Isère
+9,45
130
945 Acro Bass. neuf
+5,15 +171,25 NGF
Enduit Blanc
+3,85
+7,90
+169,95 NGF
1621
Résille métal doré
A
+6,20
toiture étancheité blanc mat
Sas, cf: PRO CHA 00 TT DE 04 28
Sas, cf: PRO CHA 00 TT DE 07
moquette solaire
+4,57
-0,02
97
1.5.1.6 Local MNS
1.3.1.1 Bassin de nage existant
254
1.2.0.8 Douches 2
1.2.1.2 Circ. 2
260
260
1.4.0.2 Musculation
320
320
1.1.0.6 Sanitaire F
157
97
3,1% 157 260
260
1.1.0.2 Hall de distribution +0,00
Toiture / Couverture et étanchéité
cloison cf PRO CHA 00 NB DE 506
340
420
1.1.1.1 Parvis couvert
2144
EP +4,20
2165
Rive, cf: PRO CHA 00 TT DE 05
+9,37
EP
EP
EP
1170
+170,24 NGF
49
+169,95 NGF
841
EP
SPS Alpes Contrôle Thierry OLLE
474
+3,85
+169,95 NGF
+5,06
14
2422
17
16
371
130
130
Panneaux acoustiques, cf: PRO CHA 12 NB DE 01
échelle encastrée
230
Tôle perforée découpe laser motif + RAL choix archi. 180
Renfort tube métallique
lg = 2000
Plateau de Lautagne, 42 avenue des Langories 26000 Valence 19 bis avenue Jean Bertin 26000 Valence
50
BT Existant
334
349
349 471
BT Neuf
cf: PRO CHA 00 NB DE 01
Tôle pleine laquée RAL choix archi pente 3%
38 quai Pierre Scize 69009 Lyon
T / 04.72.10.95.95 contact@chabanne-architecte.fr
1 Montée de la Butte 69001 Lyon
T / 04 37 26 27 60 bbautheney@keo-ingenierie.fr
BE-Structure Kéo Alsény CONDE / Olivier BONNEL
1 Montée de la Butte 69001 Lyon
T / 04 37 26 27 60 aconde@keo-ingenierie.fr
Économistes Kéo Arnaud AYMARD
1 Montée de la Butte 69001 Lyon
T / 04 37 26 27 60 aaymard@keo-ingenierie.fr
Bavette
134
Paysagiste Kéo Claire COUTAL
1 Montée de la Butte 69001 Lyon
T / 04 37 26 27 60 ccoutal@keo-ingenierie.fr
HQE Kéo in Cécile MASCARELL
1 Montée de la Butte 69001 Lyon
T / 04 37 26 27 60 cmascarell@keo-ingenierie.fr
Acousticien Echologos Bastien FRANCONY
24 Bd de la Chantourne 38700 La Tronche
T / 04 76 89 36 63 grenoble@echologos.com
110
0 R.D.C
Gousset
cf: PRO CHA 00 NB DE 203
-2,70
Section EO2
Metal facade mesh 945 Acro Bass. neuf
105
P / 06 74 45 64 64 tolle@alpescontroles.fr
BE-Fluides Kéo Benoit Bautheney
-4,96
acrotère cf PRO CHA 00 TT DE 02
P / 06 88 05 35 72 eric.boyer@fr.bureauveritas.com
Architecte Chabanne et Partenaires Jérôme BOU / Guillaume CLEMENT
-3,84
Coupe EO 2
IND
T / 04 78 66 35 00 P / 06 07 42 60 68 florent.pichon@spiebatignolles.fr P / 07 50 69 60 75 simon.aulagnier@engie.com
fond mobile (1m80)
CTA Bassins
Profilé de finition 0 métal laqué RAL dito mur rideau
+0.80
Porte d'accés entretien
échelle encastrée
A
NUMERO
385 R+01
525
395
80 260
25
Chaufferie
500
120 240
Habillage Tableau tôle laquée RAL dito MR Structure support
Panneaux acoustiques, cf: PRO CHA 12 NB DE 01
45
945 Acro Bass. neuf
ITE
LT CTA
340
130
0690 R.D.C
906
RME
Coupe NS 3
+6,70
45
110
Edicule toiture, cf: PRO CHA 00 TT DE 06
184
1240
Roof plan
Coupe NS 1
385 R+01
Plan de repérage - Ech. 1/50e
15
TYPE
68 Chemin du Moulin Carron 69570 Dardilly 3 allées des Gingkos 69500 Bron
Exploitation Maintenance Engie Axima Simon AULAGNIER
+1,39
+167,49 NGF
NIV
0 R.D.C
265
945 Acro Bass. neuf
130
+1,85
+167,95 NGF
10 11
EMETTEUR LOT
PRO CHA 00 TT PL 01
MAITRISE D'OEUVRE Entreprise SPIE Batignolles Sud-Est Florent PICHON
+171,16 NGF
Coupe EO 4
Doc:
MAITRISE D'OUVRAGE
Département cohésion Sociale et Communautaire, T / 04 75 75 41 61 Direction Enfance, Jeunesse et Sport P / 06 73 71 86 57 BP 10388 - 26958 Valence Cedex 9 Imen.poulet@valenceromansagglo.fr
Bureau de Contrôle Bureau Veritas Eric BOYER
+3,85
EP échelle à crinoline
toiture étancheité blanc mat
110
Date: 04/04/2018
96
50
208
130
9 +4,14
PHASE
Ech: 1 : 100
MOA Communauté d'agglomération Valence Romans Agglo
+175,47 NGF
Coupe AA - Ech. 1/20e
Sous face tôle pleine laquée RAL choix archi Structure métal galvanisé Pare-vapeur
RENOVATION ET EXTENSION DE LA PISCINE CANETON
18
Rue Alfred de Musset, 26100 Romans sur Isère
Coupes
Couvertine laquée RAL choix archi
Acrotère echelle métal.
bardage métallique laqué blanc
>100
Complexe Façade ventilée finition RME Lame d'air Support isolant
Solin Costière
ITE + pare pluie
15
étanchéité Isolation thermique
Bac métallique noir pente 3%
Structure métallique
UPN 500
Faux plafond extérieur tasseaux
Profilé métal laqué arrêt RME RAL choix archi
Pare-pluie noir mat anti-insectes/ volatiles
New 25 meters pool
Courtyard Roof
Isolation thermique
15
Etanchéité
ht<40
50
Couvertine renforcée tôle larmée sur passage
S AGGLO
SION DE
Ecarteurs métalliques
Toiture - Coupe rive auvent entrée FORMAT
PHASE
Doc: Ech.:
A3
Structure métallique Faux plafond tasseaux + feutre acoustique noir ITE Tôle de finition
EMETTEUR LOT
NIV
TYPE
NUMERO
IND
PRO CHA 00 TT DE 05 0 1/20 Date : 04.04.2018
Bac métallique JD 4cm Pare pluie noir mat anti insectes / volatiles Faux plafond tasseaux bois Roof junction
Lobby entrance
EVENT & FUNCTION HALL
Muret, France, 2018
Modularity : The small town of Muret needed a complex event adaptable to different situations (hall, forums, banquets, exhibitions, concerts, sports competitions on soft ground). To respond to the different configurations, the project consists of a simple volume and an annex part, gathering reception services and technical rooms. The important points of this stage were mainly focused on the acoustics of the room (result of concessions between design offices and interior design), and on the other hand, in the reconsideration of materials and constructive choices (passage of a parametric facade made of metal strips to prefabricated concrete modules.
Informations and drawings under on-disclosure agreement
0
1
2 PP200
ht: 310
ht: 310
C1
?
PP200
C2
0_111
0_110
0_109
ht: 310
ht: 310
C3
C4
C5
C6
C7
C8
?
PP300
PP200
ht: 310
PP300
0_112
ht: 310
PP200 ht: 310
PC
PC
PC
PC
PC
PC
CA
A
ht: 310
ht: 310
C9
C10
C11
C12
C13
C14
C15
C16
C17
C18
0_107
PP300
PP200
PP200
0_108
0_106
0_105
0_104
RIA
RIA
RIA
RIA
CB CC
0_119
2.4.3.1.1. Pied de façade salle et scène
ht: 204
PP180 mur mobile E30
0_120
PP180 mur mobile E30
ht: 204
Placard Elec
CD
HSFP1042
B.1.2 Espace scénique (30 m x 12 m) 345,31 m²
B.1.1 Espace spectateurs 2239,29 m² HSFP850
CE
0_118 ht: 450
PP300*450
ht: 450
PP300*450
CF
RIA
B C
JD1
CG
PC
VH
0_97 ht: 215
0_96 58 Local RIA 9,46 m²
ht: 215
0_95
0_94
ht: 215
ht: 215
PP70 Ext EI30
PP180 EI60
F.9 LT FT 1,29 m²
PP90 Ext EI30
F.4 Transfo 14,53 m²
ht: 215
ht: 204
PP93+FP EI60
0_93
F.10 LT AEP 1,39 m²
ht: 204
ht: 204
PP93+FP EI30
0_62
ht: 204
PP140 EI30
ht: 204
PP93+FP E30
0_83
ht: 204
PP93+FP E30
ht: 204
PP93+FP EI30
130 X 80
PP93+FP E30
0_64
0_63
130 X 80
130 X 80
Sas stockage 8,75 m²
0_100
F.3 TGBT 6,42 m²
F.1 Source centrale 0,85 m²
PP90 Ext EI30
D
PP180 EI60
0_98 ht: 215
VB
VB
VB
VH
PP90 Ext EI30 ht: 215
VH PP70 Ext EI30
ht: 240
C.5.1 Sanitaires artistes 3,86 m² HSFP270
C.5.2 Sanitaires artistes 3,85 m² HSFP270
ht: 204
PP93+FP E30
0_66
ht: 204
PP93+FP E30
ht: 204
0_67
130 X 80
130 X 80
ht: 204
PP93+FP E30
0_82
ht: 204
PP93+FP E30
0_65 130 X 80
0_80
130 X 80
0_77
C.4.2 Douches Artistes F 9,77 m² HSFP270
C.4.1 Douches Artistes H 9,66 m² HSFP270
0_81
130 X 80
0_78
130 X 80
HSFP327
PP200
0_58
ht: 310
HSD345
A.5 Local serveur 3,77 m² HSFP270
E.2 Local entretien + stockage produits entretien 4,75 m²
A.6.2 Sanitaires F personnel 2,78 m² HSFP270
A.6.1 Sanitaires H personnel 2,75 m² HSFP270
E.1.1 Local agents d'entretien H 3,10 m² HSFP270
E.1.2 Local agents d'entretien F 3,19 m² HSFP270
S.1.4 Circulation personnel et artistes 73,80 m²
0_71
ht: 204
PP140 EI30
HSFP270
E
PP93+FP E30
0_79
0_76
ht: 204
HSFP425
0_07
ht: 215
0_03
PP93+FP E30
ht: 204
0_89
ht: 204
ht: 240
0_86
0_84
ht: 204
ht: 204
ht: 204
PP93+FP EI30
PP93+FP EI30
PP93+FP EI30
ht: 204
PP93 Grillagée
C.6.3 Stockage sécurisé 12,43 m²
Cloison grillagée
C.6.1 Stockage chaises, tables et matériel 113,87 m² HSD236
0_92
ht: 204
C.6.4 Atelier 8,83 m²
C.7 Bureau régisseur 9,41 m² HSFP270
C.1.1 Loge HSFP270 individuelle 8,91 m²
HSFP270
C.2 Loge VIP 10,71 m²
C.1.2 Loge individuelle 8,91 m²
0_91
PP93 Grillagée
VB
ENS 05_5 all. : 20 cm ht : 290 cm
ht: 215
ENS 05_4 all. : 20 cm ht : 290 cm
ht: 215
ENS 05_3 all. : 20 cm ht : 290 cm
ht: 215
PP90+imp vitrée EI30
ENS 05_2 all. : 20 cm ht : 290 cm
0_74
PP140+imp vitrée E30
ENS 06 all. : 20 cm ht : 290 cm
0_75
ENS 05_1 all. : 20 cm ht : 290 cm
ENS 01_2 all. : 20 cm ht : 290 cm
ENS 01_1 all. : 20 cm ht : 290 cm
PV180+ imp vitrée E30
G
linteau ht: 210
0_53
linteau ht: 425
PP120 VV E30
ht: 204
MR01
MR02
S.1.7 Circulation traiteur 11,02 m² HSD485
RIA
ht: 204
Sectionnelle EI30
0_87
HSFP270
EI30
ht: 204
C.3 Loge collective 23,76 m² HSFP270
PP93+FP EI30
PP93+FP E30
PP93+FP EI30
ht: 204
0_72
ht: 204
D.2.1 Local traiteur 22,11 m² HSD345
130 X 80
0_52
0_88
PP93+FP EI30
F
PP93+FP EI30
D.2.2 D.3 Rangement Local traiteur poubelles (int.) 2,41 m² 0_73 5,83 m² PP93+FP
0_51
0_50
0_49
0_47
HSD485
0_48
0_47
0_46
HSFP425
0_05
ht: 215
0_01
ht: 215
PV180 MR E30
PV180 MR
A.7.1 Sanitaires publics Hommes 48,02 m² HSFP260
0_90
HSD484
0_69
Placard Elec
ht: 204
HSFP270
ht: 204
PP140 EI30
0_68
ht: 204
PP140 EI30
PP120 VV EI30
S.1.6 Espace convivialité 40,17 m²
ht: 204
PP93+FP E30
HSFP405
0_06
PV180 MR E30
ht: 215
PV180 MR
0_02
ht: 215
A.1.2 Sas d'entrée hall 23,83 m²
A.1 Hall d'accueil / convivialité 240,19 m²
0_45
PV180 MR E30
0_28
PV180 MR
0_08
PV180 MR E30 CH1 ht: 215 all. : 95 cm ht : 115 cm
0_04
PV180 MR
D.1 Espace catering (salle à manger) 45,83 m²
0_36
0_37
0_37
0_39
0_41
0_42
0_43
0_44
0_99 0_59
Sectionnelle EI30
0_60
0_70
0_54
0_114
HSD270
0_35
0_34
0_33
0_32
0_29
0_31
0_30
ht: 204
linteau ht: 210
linteau ht: 210
linteau ht: 210
CH1 all. : 95 cm ht : 115 cm
ht: 215
hsfp: 5,88 m
ht: 215
A.7.2 Sanitaires publics Femmes 58,07 m² HSFP260
PP180 E30
ht: 204
0_57
Sectionnelle E30 ht: 240
ht: 204
0_23
Détail bar buvette cf carnet mobilier 2.3.3
F.2 Gradateur 6,96 m²
F.8 LT Son et lumière 3,53 m²
PC
ht: 204
PP140 E30
ht: 204
0_55
linteau
PP93+FP E30
ht: 210 Sol:S06 Mur:M07 Plaf:-
0_27
HSD265
S.1.8 Dégagement personnel et artistes 18,82 m²
ht: 204
0_22
PP180 E30
PP180 E30
PP140 E30
HSFP250
ht: 204
A.2 Coin bar / buvette 22,69 m²
PP93+FP E30
0_14
ht: 204
0_19
ht: 204
0_26
0_21
ht: 204
PP180 E30
linteau ht: 210
ht: 204
PP93+FP E30 ht: 204
0_15
A.3 Stockage bar 6,36 m²
ht: 204
PP93+FP EI30
PP93+FP EI30
0_12
ht: 204
0_13
PP180 E30
ht: 204
ht: 204
S.1.3 Sas acoustique 18,38 m² HSFP250
HSFP250
S.1.2 Sas acoustique 13,68 m²
0_16
ht: 204
PP93+FP EI30
F.7 LT CFA Scéno 6,55 m²
HSD265
F.5 V.D.I RG 12,08 m²
0_10
ht: 204
PP93+FP E30
0_09
PP180 E30
0_20
PP93+FP E30
VB
VB
PP140 EI30
0_56
PP180 E30
ht: 204
ht: 204
linteau ht: 210
ht: 204
0_25
PC
ht: 204
PP180 E30
0_24
PP180 E30
PP180 E30
HSFP250
0_18
PP180 E30
Placard Electrique
0_17
S.1.1 Sas acoustique 6,86 m² HSFP250
ht: 215
0_11
linteau ht: 210
SSI Report
PP200*215
HSFP250
ht: 215
PP200*215
A.4 Billetterie 9,29 m²
ht: 215
PP200*215
0_101
linteau ht: 210
PC
PC
PC
0_102
RIA
linteau ht: 215
RIA
RIA 0_103
0_113
caniveau technique
0_117
ht: 204
PP180 mur mobile E30
0_115
ht: 204
0_61
ht: 204
PP180 mur mobile E30
0_116
PP93+FP EI30
JD2
JD3
Ground floor PLAN DU REZ-DE-CHAUSSEE
Implementation plan
0
1
N
10m
CITE SCOLAIRE ELIE VIGNAL
Alain LELIEVRE 250, Rue Garibaldi - 69003 LYON TEL. : 04 78 60 01 33 / FAX : 04 78 60 00 32 alain-lelievre@wanadoo.fr
1.2
Extension des locaux existants
PRO
Plan général RDC - Niv : 0.00 (242.75NGF)
Ech: 1 : 250
Juillet 2018
Built up area : 3 930 sq.m East elevation
Role : Architectural assistant (with senior architect) C1
Stage : Technical design
0
JD2
C2
C3
Complexe de Toiture - Couverture Bardage Type SYSCO 280 - Charpente métallique - Faux-Plafonds pose Horizontale (Suivant Article CCTP)
1
Hauteur Max +12,00 m +12,00 Ngf
C4
C5
C6 JD3
C7
Détails Enveloppe 1.1 Acrotère espace Scénique
Toit - Scène +10,80 m +10,80 Ngf
C8
C9
C10
C11
C12
C13
C14
C15
C16
C17
C18 2
+12,00 m Complexe de Toiture - Couverture Bardage Type SYSCO 280 - Charpente métallique - Faux-Plafonds pose Horizontale (Suivant Article CCTP)
+11,75 m +11,30 m
+10,75 m
+11,19 m
Complexe de Toiture - Couverture Bardage Type SYSCO 360 - Charpente métallique
Détails Enveloppe 1.5 Acrotère Jonction Toiture
+11,72 m
+10,26 m
Détails Enveloppe Paroi verticale - Mur béton préfabriqué matricé Ep Murs.27cm Matrice - Suivant Elévations - Support charpente métallique - Laine minérale Ep.14cm - Complexe Acoustique Panneau laine de bois 60x120 - Pose en Damier relief (Cf détails Architecte)
Toit - Hall +8,52 m +8,52 Ngf
Personal contribution : ▷ Material & technical researches ▷ All technical drawings ▷ Final rendering
+6,35 m Finition de Façade: Cassette Aluminium Trame Verticale Largeur - Suivant Elévations RAL à définir par l'Architecte
Toit - Hall & Stock +5,55 m +5,55 Ngf
Paroi verticale - Mur béton préfabriqué matricé Ep Murs.27cm Matrice - Suivant Elévations - Support charpente métallique - Doublage Placo LM140+1BA13
0_94
0_95
0_96
0_97
ht: 215
ht: 215
ht: 215
ht: 215
PP180 EI60
RDC +0,00 m +0,00 Ngf
PP70 Ext PP90 Ext EI30 EI30
PP180 EI60
Détails Enveloppe 1.1 Acrotère espace Scénique
Espace scénique (30 m x 12 m)
Paroi verticale - Mur béton préfabriqué matricé Ep Murs.27cm Matrice - Suivant Elévations - Support charpente métallique - Laine minérale Ep.14cm - Complexe Acoustique Panneau laine de bois 60x120 - Pose en Damier relief (Cf détails Architecte)
Ecran noir masquant gaine
Espace spectateurs
Finition de Parois: Traitement panneaux Acoustique Pose en damier + Relief de profondeur
Finition de Parois: Traitement panneaux Acoustique Pose en damier + Relief de profondeur
Finition de Parois: Traitement panneaux Acoustique Pose en damier + Relief de profondeur
0_57
0_115
ht: 240
ht: 204
Sectionnelle E30
PP140 EI30
0_116
0_56
ht: 204
ht: 204
PP93+FP EI30
0_25
PP180 E30
PP180 E30 ht: 204
RDC +0,00 m +0,00 Ngf
0_24
0_20
0_18
0_17
ht: 204
ht: 204
ht: 204
ht: 204
PP180 E30
PP93+FP E30
PP180 E30
PP180 E30
0_11
0_101
PP180 E30 ht: 204
PP200*215
PP200*215
0_102
0_103
ht: 215
ht: 215
ht: 215
PP200*215
Paroi verticale - Mur béton préfabriqué matricé Ep Murs.27cm Matrice - Suivant Elévations - Support charpente métallique - Doublage Placo LM140+1BA13
RDC +0,00 m +0,00 Ngf
Section AA'
Ind : 0
SALLE
Couvertine Membrane d'étanchéité 1%
Isolation laine de roche min 150 cm
+8.33
Descente EP
+8.22
Isolation laine de roche 140mm
5
55 10 10 10
27 Façade en béton préfabriqué
2 BA 25 jusqu'à 3.10m
35
Dalle béton
+7.95
15
Bourrage isolation
Poteau métallique encoffré
Solin Membrane étanchéité + delta MS Enrobé
25
Dalle béton ±0.00
Couche de forme
-0.05
20
20
+7.70 +7.50
126.5
80
Crochet d'ancrage sur potelet sécurité / maintenance
Gaine CVC
West facade - Lower part
MURET - SALLE ÉVÈNEMENTIELLE- DCE - Détails Pare-pluie
Porte d'accès au local
3.1.2. Pied de façade halle évenement.+ EP Ech. : 1/10e Isolation laine de roche
Bardage aluminium en cassette
Voile béton
385
Fixation en "U"
Peinture sur béton choix archi
Patte de fixation sur béton
215
Lame d'air Solin
LOGES COLL.
Soubassement béton ht. 40
Lisse métallique ép. 6mm
+0.16
+0.14
Dalle béton Couche de forme ±0.00
19
40
15
-0.05
14
18.5 Peinture sur béton choix archi. Voile béton
Scellement mortier Membrane étanchéité + delta MS Isolation polystyrène expansé
14
25
25
Isolation laine de roche
8
+3.65
14.5
24
+3.90
Enrobé
80
100
+4.08
25
Platine d'ancrage Patte de fixation sur béton Fixation en "U" d'air 7.5 cm Access to theLametechnical room Bardage aluminium en cassette
e
Coupe - Ech. 1/20
Pare-pluie
East facade - lower part e
Coupe - Ech. 1/10
0
1
2
Toiture type SYSCO 280
C1
C2
C3
1496
Couvertine
+11,41 m
1269
A
CA
+11,29 m
10,86 m
9,27 m
+12,00 m
+10,25 m
+11,18 m
+10,80 m
EP
+10,25 m
EP
EP
EP
EP
+9,17 m
EP
EP
+11,68 m
Local écran
18
1834
C4
C5
C6
703
C7
9054
C8
1003
C9
C10
C11
C12
C13
C14
C15
C16
C17
C18
+11,68 m
2750
3725
1265
CB
+12,00 m
Lanterneaux
Lanterneaux
Lanterneaux
Lanterneaux
Lanterneaux
Lanterneaux
Lanterneaux
Lanterneaux
1466
+12,00 m
CC
1988
3,00%
3,00%
3,00%
3,00%
3,00%
Toiture type SYSCO 280 3018
CD
11,30 m
+11,50 m 3,00%
3,00%
3,00%
9,70 m
3,00%
+9,61 m
3,00%
+9,61 m +10,73 m
CE
2 BA 25
15
435
1356
7
+6,56 m
+6,56 m
65
Bac acier
BC
JD1
CG
6,29 m
+11,75 m
435
Isolant laine de roche 130mm
Membrane d'insonorisation + plateau métallique
10,86 m
81
Membrane étanchéité Membrane d'insonorisation
PRS métallique SF 1/2H Flocage
CF
+11,52 m
2223
1,00%
8,05 m
3320
4598
1466
+11,86 m
+12,00 m
9,27 m
1,00%
1,00% EP
EP
EP
EP
EP
D
15
6,29 m
6,35 m
+11,72 m
45
Lanterneaux
Lanterneaux
+10,75 m
+11,19 m
+10,60 m
EP
EP
EP
EP
EP
EP
EP
EP
+10,26 m
9,18 m 471
Lanterneaux
Lanterneaux
Lanterneaux
Lanterneaux
Lanterneaux
Lanterneaux
1030
65
Isolation laine de roche 100mm
2140
82
5
5,44 m
1488
82
1,00%
3320
+8,25 m
45
4,00 m
+6,49 m
1513
1580
536
+6,56 m
1,00%
Panneau isolant 150mm
1791
E 1145
1015
1,00%
F
Lanterneaux
Lanterneaux
1,00%
Lanterneaux
EP
EP
EP
1,00%
Isolant 50mm Membrane d'insonorisation + plateau métallique Profil de support bac
EP
EP
4,00 m
5,55 m
Panne métallique G +6,56 m
1854
JD2
JD3
8061
+6,56 m
2309
+8,33 m
+8,33 m
3362
+6,56 m
+6,56 m
536
Roof plan PLAN DU REZ-DE-CHAUSSEE 10m
Juillet 2018
PRO
Acrotère béton intégrant forme de pente mini 1%
+11.75
Ind : 0
MURET - SALLE ÉVÈNEMENTIELLE- DCE- Détails Solin
Bande Etanchéité à l'air
+11.26
Membrane étanchéité Membrane d'insonorisation Isolant laine de roche 130mm Bac acier Panneau isolant 150mm
type SY 1.3. DétailToiture acrotèr 1 15
Ech: 1 : 250
Plan général RDC - Niv : 0.00 (242.75NGF)
15
Extension des locaux existants
1.2
15
CITE SCOLAIRE ELIE VIGNAL
7
Alain LELIEVRE 250, Rue Garibaldi - 69003 LYON TEL. : 04 78 60 01 33 / FAX : 04 78 60 00 32 alain-lelievre@wanadoo.fr
15
1
N
5
0
Stage roof
Crochet d'ancrage sur potelet sécurité / maintenance Isolant 50mm 27
10
30
Membrane d'insonorisation + plateau métallique Faux-plafond 120x60 noir Panne partie courante Traverse métallique Poteau métallique BA 13 Isolation laine de roche 140mm Façade en béton préfabriqué
Scenic area
MURET - SALLE ÉVÈNEMENTIELLE- DCE - Détails
SALLE Facade west 1.1. Détail acrotère espace scénique
+8.33
1%
+8.25
Couvertine Bardage aluminium en cassettes
Trappe occultante Trappe ouvrant en chute
Patte de fixation dans béton
Membrane étanchéité Costière + solin
15
7
15
15
5 8
Membrane d'insonorisation Isolant laine de roche 130mm Bac acier
5
Joue en plaque de plâtre
Solin
Panneau isolant 150mm Isolant 50mm Membrane d'insonorisation + plateau métallique
182
Panne métallique
Isolation acoustique laine de roche 100 mm Bac perforé
Costière 30/10 Cornière métallique
Cornière métallique
10
Solin
Faux-plafond 120x60 noir
25
14
28 Pare-pluie
Membrane d'étanchéité
Isolation laine de roche
Isolation laine de roche
Skydome / smoke extraction
TOITURE type MONOPANEL Sysco 360α
Isolation jonction de toiture
Couvertine
Costière 10
Isolant laine de roche 130mm Bac acier
19
Costière
Membrane étanchéité 2 couches Isolant laine de roche 120mm
Isolant 50mm Membrane d'insonorisation + panneau métallique
33
Bac acier
Panneau isolant 150 mm
+3.65
Panneau isolant 120mm Isolant 90mm + pare-vapeur spécial isolation acoustique +plateau métallique
20 44
Membrane étanchéité 4 couches Membrane d'insonorisation
+3.90
25
TOITURE type MONOPANEL Sysco 280
Dalle béton
1.4. Skydôme toiture type sysco 280 DCE Ech. : 1/10e Juin 2018
20
MURET - SALLE ÉVÈNEMENTIELLE- DCE - Détails
Voile béton
Panne métallique 270mm
Retour tableau bardage aluminium Faux-plafond
East facade - upper part
Faux-plafond acoustique 60*120 noir
PRS métal SF 1/2H Flocage
Panneau acoustique laine de bois 100mm aw>0.9
2 BA 13 Isolation laine de roche 60mm
Rail cloison mobile soudé sur PRS
MURET - SALLE ÉVÈNEMENTIELLE- DCE - Détails Roof junction
MURET - SALLE ÉVÈNEMENTIELLE- DCE - Détails
1.5. Acrotère jonction toitures Ech. : 1/10e
DCE Juin 2018
2.4. Acrotère toiture béton - P Ech. : 1/20e