Romain Meunier Architect Portfolio

Page 1


ROMAIN MEUNIER

PROFESSIONAL EXPERIENCE

PART-II ARCHITECTURAL ASSISTANT

07/2018 - 10/2018 3 months Lyon, France

10/2017 - 06/2018 9 months Lyon, France

115, Bennerley Road SW11 6DT LONDON +44 7767 209913 meunier.rmn@gmail.com

PERSONAL PROFIL

09/2016 - 11/2016

Graduated with honours at the Faculty of Architecture of ULB, in Brussels, in 2017. With previous experiences at Chabanne & Partenaires Architectes, I have been through the different stages of a project, met deadlines, and worked efficiently individually and as part of a team from a concept to the construction details. Hard working and self motivated, always keen to learn more, I also follow the conviction that architecture as to be humanist at first, and each situation deserves a singular approach both on the analysis of a program and the characteristics of the site.

EDUCATION 2017 - 2018 Lyon

2016 - 2017 Brussels

Part III (HMONP)

| In progress for the thesis

ENSAL - Ecole Nationale Supérieure d’Architecture de Lyon

Master degree of Architecture

| Graduated with honours

Faculty of Architecture La Cambre Horta - ULB University Master thesis : Postmodern legacy and influences on urban dynamics in Tel Aviv and Jaffa.

| Exchange program

Master’s year abroad

2015 - 2016

Bachelor degree of Architecture

2010 - 2011

MANAA

2009 - 2010

French Baccalaureate

Brussels

Nice

Cannes

06/2012 - 07/2012 2 months Mougins, France

| Part II Assistant Architect

- Full design of the technical stage for a disabled high school. - Liaised with the structural engineering office and building control surveyor.

Chabanne & Partenaires Architectes

| Part II Assistant Architect

- Design of the technical stage for the Caneton Aquatic Center (Roman), and Event & Function Hall of Muret. - Strategic definition to Concept design for Valmorel Hotel & Resort. - Participated in the competition of The Municipal Baths of Strasbourg. - Created 2D materials & 3D visualisations for final renders on various competitions.

Chabanne & Partenaires Architectes

| Part I Assistant Architect

- Won a competition for an aquatic center (Rillieux-La-Pape, Le Loup Pendu) - Developed and designed from strategic definition to developed design for the SBM Headquarter. Liaised with the client. - Created 2D/3D materials for final renders on various projects.

ABRI Architecture | Part I, Freelance - Worked as a drawing assistant, learnt the basics of planning application. - Assisted faesibilities and concept design, architectural surveys.

ADDITIONAL

2012 - 2015 Jerusalem

2 months Lyon, France

Alain Lelièvre Architecte

Bezalel Academy of Arts & Design

| Graduated with honours

Faculty of Architecture La Cambre Horta - ULB University

| Upgrading program in Applied Arts

Ecole de Condé

Lycée Carnot

| Major : Sciences

2016 - 2017 Brussels, Belgium

09 / 2014 1 month Bali, Indonesia

English/French translation of a book

Volunteering

| Green Lion Association

Volunteer in a humanitarian Association Rehabilitation & construction of an orphanage and school (involved in roofing, tilling, wooden construction, reused material)

KEY SKILLS AUTOCAD REVIT SKETCHUP ARTLANTIS VRAY RHINO PHOTOSHOP ILLUSTRATOR INDESIGN MS. OFFICE

| Architecture field

White City, Black City, Architecture and War in Tel Aviv and Jaffa, Sharon Rotbard, Babel Publishing, Tel Aviv, 2017

CAPABILITIES / STRENGHTS Hand draughting / sketching Technical drawing / detailing 3D Modelling & Rendering Graphic Design Active team member

Creative

Languages :

Interests / Hobbies

FRENCH ENGLISH

Guitare (played in band groups & compositions) Tennis (played as regional competitor)

very

spirit curious

Enterprising Determinated

● ●

Enthusiastic

Conscientious Attention

Passionate

to ●

and ●

details

Ambitious


ACADEMIC WORKS

1 2 3

LEARNING AND INNOVATION CENTER Brussels, Belgium, 2017

MIZRAHI CULTURAL CENTER Tel Aviv, Israël, 2016

IN BETWEEN LIMITS Jaffa, Israël, 2015

PROFESSIONAL WORKS

4 5 6

SBM HEADQUARTER Ecully, Lyon, France, 2018

AQUATIC CENTER CANETON Romans-sur-Isère, France, 2018 EVENT & FUNCTION HALL Muret, France, 2018

SELECTED WORKS 2015-2018


ACADEMIC WORKS

LEARNING & INNOVATION CENTER Campus ULB-VUB, Brussels, 2017

A place of transitions The Learning Center is characterized by the alliance between research and training. It is not totally out of sync with the library typology but is part of one of the current transitions mostly related to the expansion of the digital area. Books are not forgotten and shelves are not systematically replaced by virtual storage servers, but technology remains at the heart of its operation. The modes of learning and production evolve accordingly: we talk about distance learning, research through digital libraries, or ÂŤ crowd sourcing Âť. An integral part of a campus or even its central point, the Learning Center is also the place of connection, intermediate to other academic entities, providing additional functions participating in the dynamics of a campus. All this generates a different reflection in the architectural logic of the place and its operation. We then find flexible spaces linked to a constant transition and meeting a need for versatility, many meeting places and some interaction between the main areas.


Implementation plan


View from the park


Centrality, connection and landmark The central location of the Learning Center in the ULB / VUB site allows for easy connection between the surrounding buildings and a landmark building potential. It serves as a transition between the two campuses, linking two public spaces today in complete rupture.

serves as a meeting place but also a link between the functions of one building to another. Finally, the difference in level between the levels of this urban sheet allows an indirect light (north) to enter an atmosphere conducive to the study space it overlooks.

Some axes of neighboring buildings are taken over and a bridge in several stages concretizes this link. At the project level this bridge is materialized by a public space on several levels around which the two volumes of the project are grafted. This public space punctuated with micro-situations and spontaneous events

With regard to buildings, the accent is put on a strong interaction between two false twin volumes and the third volume, empty, that they come to make exist. The visual complementarity is paradoxically created by the dynamics of the two opposing volumes, the aesthetic objective being a landmark building with clean forms.

VUB Admin.center VUB Park

ULB

• Existing situation : two campuses in total -- rupture (road, altitude difference, built front). • Two neighboring public spaces to link.

• Connection point at the ULB / VUB site center. • The Learning Center as a transition point and • « landmark building ».


Section AA'

Ground Floor Plan

Section BB'


VUB

d

Roa

ULB

• A flaw through the project creates the urban transition between the two campuses.

• Some existing routes influence the misalignment of the building. • The resulting corridor takes on the character of an «urban layer» on several levels, serving specific functions.

• Hierarchy : a minor volume, a major volume, a third one : the void. • Dynamics created by the complementarity of two contrary volumes.


The urban corridor


5th Floor

Administration & staff

Direction department

Meeting room

Multimedia & recording studios

2nd Floor

Locker room (sport activities upstairs) Collective work

Lounge area

Individual work

West elevation

1st Floor

Gallery

Connection with the Dutch Campus (VUB)

Collective work

Cafeteria Auditorium

Ground Floor Foyer Green patio

Exploded axonometry (upper building part)

Gallery

North elevation


Connection with the Dutch Campus (VUB)

Fab lab Workshop

Connection with the French Campus (ULB)

Reading room

Auditorium

Lower Ground Floor -1 Green patio Archives Lounge area

Reading room

Noise zone

Lower Ground Floor -2

Archives

Exploded axonometry (Lower building part)


Inside the library


MIZRAHI CULTURES CENTER,

Neve Sha’anan, Tel Aviv, 2016

The project is taking place on the former disused site of Tel Aviv’s Central Bus Station, on the border between the northern and southern parts of the city. The neighborhood remains in great questions of identity and the gentrification phenomenon pushes a disadvantaged population to leave the places under the big private investments. This is a counter-project defending the interests of the Mizrahi culture (from local populations), establishing a place of life and activities composed largely of a theater, auditoriums, galleries , library, social center, restaurant, in the form of a cultural center. Everyday activities are separated from the event part of the project according different schedules, as well as light needs. The building’ scale also follows and a special attention is given to the junction between these two parts of the city. On the other hand, the memory of the site is taken into account concerning the old bus platforms, reinterpreted in the new building, each hosting a specific part of the program.


Axonometric view


Ground Floor Plan

Conceptual sketches


LOWER GROUNG FLOOR -1

2ND FLOOR

3RD FLOOR

4TH FLOOR

Section aa'


Rehearsal studios

Dressing & Locker room Workshops studios & Co-working spaces

Auditoriums

4th Floor

Fly system (Lighting & Decoration installation

1st Floor

Administration & Direction Theater Cafeteria

Ground Floor 2 Floor nd

Parking entrance

Entrance Hall & Ticket Office

Library

Locker & Dressing room Restaurant Black box (exhibition or entertainment events)

Art Gallery

Lower Ground Floor -1

Exploded axonometric view


Between the platforms


The lobby entrance


View of the theater facade


IN BETWEEN LIMITS

Jaffa, Israël, 2015

« A place for hosting and meeting for locals and tourists. The visitors will experience traditional Arab flavors and meet the chefs – Arab women from Jaffa, who will share their personal stories and the story of Jaffa from their point of view. » A first observation on informal architecture in Jaffa had arisen on an analysis of the limits management. These limits may be visual or physical, and more or less free. It allows to separate the public spaces from the private spaces, or sometimes only to protect themselves from the sun. The project began by the exploring the explicit and implicit limits, several examples were listed, both in their shape, different materials, their architectural meaning.


Axonoletric view


Inside the "in between space"

One of the examples of limit found in Jaffa is reused and reinterpreted in the project. There was a openwork fence made of concrete blocks, alternating empty/ full. Generalized to the whole project with a gradation of transparency in terms of space, it can manage the different limits : visual, physical, solar. This notion of boundaries traduced by an openwork becomes the main concept of the project. It appears as a first openwork facade from the street, and create a corridor with the second front, this time frank limit with inside the building. It acts as a corridor between two, creating a neutral space between the public and the private, used here for the weekend market / everyday coffee place or else for an indirect entry into the building.


GROUND FLOOR

FIRST FLOOR

Section aa'



Workshop & meeting around the arabic cutlture & food Bedrooms for hosting visitors

Project First Floor

Kitchen Access to the outdoor dining area

Storage

Lobby entrance Dining area

Project Ground Floor

Office Coffee & Market place

Existing Ground Floor

The structural axes are reused, as is the organization and symmetry of the plan around a central space. The existing building is enlarged in its peripheries with a homogeneous envelope inspired by the site.

Exploded axonometric view

The peripheral corridor


PROFESSIONAL WORKS

SBM HEADQUARTER

Ecully, Lyon, 2017

The head office of SBM, which sells care and crop protection products, is located in the former premises of Euronews in Ecully. The purpose of the venue is to communicate to the client about the company’s new eco-responsible spirit, while providing its employees with spaces adapted to new forms of work, highlighting collaborative energy and a certain fluidity. These intentions are manifested by the setting up of open-spaces accompanied by informal work areas, as well as the integration of a plant component in the interior design.

Informations and drawings under on-disclosure agreement



Building entrance 8

33 34

7

Built up area : 4 585 sq.m 40

plac

A

A'

5

36

4

3

38

3

2

+17.35 (+283.40NGF)

1

79

EP

+14.13

EP

+280.18 NGF

78

+13.23

+279.28 NGF

948

1008

+13.23

+279.28 NGF

77

21

60°

22

76

40

24 73

26

AA

130

138

110

300

270

300

270

313

270

335

270

300

130 270

270 118

133

110 335 135

300

130 270

300

DGT.

ARCHIVE INNOVATION

DGT.

TGBT TRANSFO

RESERVE

1

2

3

4

5

6

+20.30 (+286.35NGF)

+17.35 (+283.40NGF)

+16.00 (+282.05NGF)

+14.13(+280.18NGF)

LT. ANTENNE

TERRASSE TECHNIQUE

CTA

Espace déjeuner / lounge

+14.13 (+280.18NGF)

+14.13 (+280.18NGF)

+13.53 (279.58NGF)

+13.23 (+279.28NGF)

72

72

2

±00.00

74

25

AA

+266.05 NGF

75

D

100

23

1

Terrasse

LOCAL SYNDICAL

230

3114

1144

400

80

Espace déjeuner / Lounge 206.2m² sol plancher bois

EP

C

BB

BB

Espace déjeuner / Lounge

LOCAL VDI

195

503

EP

DEGAGEMENT

35

40

EP

MEETING ROOM

413

100

19

ME 25

skydome Esc . Est

+17.20

+283.25 NGF

20

CHEMIN DES MOUILLES

+283.25 NGF

SAS

138

838

+17.20

ME 25

skydome Esc . Ouest

HALL D'ACCUIEL

130

2986

EP

+13.23

+279.28 NGF

passerelle IS

DEGAGEMENT

±0.00 (+266.05NGF)

138

156

81

940

BB

Personal contribution : ▷ Preliminary sketches ▷ Facade design ▷ Program renegotiation ▷ Part of interior design ▷ Liaise with client

285

957

B

82

40

BB

SHOWROOM

35

+14.13

+280.18 NGF

EP

138

158

rampe 5%

EP

ESPACE C&S

205

40 928

+13.73

+279.78 NGF

+279.78 NGF EP

DEGAGEMENT

+4.45 (270.50NGF)

220

5584

A

153

87

200

83

800

18

220

84

17

+13.23

+279.28 NGF

+13.73

+14.13

+280.18 NGF

BUREAU FERMÉ

+8.90 (274.95NGF)

85

16

1

+13.23

+279.28 NGF

60°

+14.13

195

92

88

ME 24

Terrasse technique 114m²NGF +280.18 sol caillebotis métal

Stages : Strategic definition ▷ Developed design

86

15

2

785

Terrasse technique

+13.53 (+279.58NGF)

+13.23 (279.28 NGF)

93

A'

94

89

14

e

+14.13 (+280.18NGF) +13.23 (279.28 NGF)

90

11

e

13

iqu

iqu

TERRASSE TECHNIQUE

TRAITEMENT D'AIR

91

10

e

+16.00 (+282.05NGF)

9 12

iqu

3

140

8

1

urs

4

4

ctr

e

5

ctr

Éle

iqu

6

3

N

5114

urs

7

ctr

Éle

CC

Local Orange

cour

ctr

2

5

Entrée principale

1

Éle Éle

urs

ite

ite

urs

6

Local archive

ite

Vis Vis

2

4

5

urs

urs

3

3

4

+4.45

2

CC

4

3

1

3 2

Vis

81

1

ite

ite

ite

AA 1

rs

205

2

2

ite Parking u

Vis Vis Vis

+270.50 NGF

1289

B

+20.30 (+286.35NGF)

Role : Architectural assistant (with senior architect)

1 Vis

AA

CHEMIN DES MOUILLES

C

es

37

Parking

D

6

35

13545

MEETING ROOM

DGT

MEETING ROOM

BUREAU FERMÉ J HOPKINS

DGT

190

DGT

388

SAN. H

STOCKAGE IT

270

MEETING ROOM

270

DGT

270

388

270

190

71

3

BUREAU FERMÉ EQUIPE LEGAL

230

35 138

138

130

4

103

138

27

35

230

+8.90 (274.95NGF)

28 DEGAGEMENT

MEETING ROOM

DGT

270

SAN. F

MEETING ROOM

270

DGT

270

270

BOX

240

MEETING ROOM

BOX

DG FRANCE

35 108

130

DGT

SAS

CUISINE COMMUNE

290

DGT

300

SAN. H

260

MEETING ROOM 270

300

65

8168

OPEN SPACE BUISNESS INCUBATOR

270

388

66

33

Parking

388

55

32

67

135

138

35

230

+4.45 (270.50NGF)

68

31

36

BUREAU FERMÉ JP VIOT

270

335

69

30

35

388

70

29

5

34

1,96

5,97

±0.00 (+266.05NGF)

64

41

61

47

62

38 39

20

63

37

40

Implementation plan

Section AA' / BB'

60

44

42

59

43

1

4


North elevation

South elevation Ground floor

Second floor

Auditorium


Meeting area


Cafeteria

Open space


AQUATIC CENTER CANETON

Romans-sur-Isère, France, 2018

The project consists of the rehabilitation and extension of the Pool Caneton built in 1970. The objective of the operation is to expand the activity with a new 25 meters pool allowing the establishment to become the reference of the region for national competitions. The intervention also includes the restoration of hygiene standards and the development of outdoor spaces following the evolution of the practice in an aquatic center. The constructive details are mainly based on the connections between different construction techniques (concrete / metal), particularly focused on the hygrometry and acoustics issues related to this typology. Finally, we have prepared the building site phasing of the for the next stage.

Informations and drawings under on-disclosure agreement



Coupe NS 3

Coupe NS 1

A

B

C

456

D

490

E

490

F

490

G

490

H

490

I

242

J

214

K

596

L

292

M

1120

N

305

O

387

P

177

685

0_118

PP90+50 E30 ht: 213

1

1

EP EP

11

60

24

151

152

326

150

Pente 2%

90

Sol:S05 Mur:M06

152

366

EP

10

827

150 Pente 2%

80

?

EP

90 520

1.1.1.1 Parvis couvert 81,08 m²

MR01

606

6

7

80

3,3%

150

10

256

10

10

165

0_06 15

PP93 E30 ht: 204

150

10

175

30

183

682

1.4.0.1 Salle de réunion et de convivialité 31,61 m²

8

1.1.1.2 Box chien 2,10 m² Sol:S05 Mur:M07

80

1.1.1.3 Box chien 2,10 m²

2,0%

PP93 E30 ht: 204

0_08

1.5.1.9 Dgt gradins 1 6,86 m²

1.6.0.5 VDI 5,50 m²

Sol:S11 Mur:M03

0_05

PP93 E30 ht: 204

Sol:S04 Mur:M03 Plaf:FP07

ME_03 all. : 100 cm ht : 260 cm

SOLS

0_03

PP103+50 E30 ht: 204

0_04

PP103+50 E30 ht: 204

0_07

260

PP103+50 E30 ht: 204

Caniveau

10

1.5.1.4 Buanderie 6,62 m²

0_21

1.5.1.5 Office détente 14,73 m²

PP93 E30 ht: 204

114 20

Sol:S11 Mur:M03 Plaf:FP05

EP

0_29

PP93 Ei30 ht: 204

1.5.1.7 local repro 2,49 m²

577

130

Sol:S05 Mur:M03 0_28

PP93 E30 ht: 204

2 4

5

6

30

8

1.5.1.8 dgt Pers. 31,12 m²

Chape gros-oeuvre Dalle béton min. 2%

Coupe EO 2

140

50

7

372

20

3

20

20

270

169

10

Caniveau

10

Sol:S01

2

MURS

Revêtement carrelage

PP93 E30 ht: 204

151

1.3.2.3 Gradins bas 53,11 m² 1 1

50

ME_07 all. : 120 cm ht : 120 cm

PP93 E30 ht: 204

0_30

PP93 E30 ht: 204

2500

2500

Coupe EO 2

3245

1.3.1.2 Bassin de nage neuf 500,00 m²

PV120+120_MR E30 ht: 253

Sol:S11 Mur:M03 Plaf:FP05

0_22

330

0_31

B

ME_05 all. : 120 cm ht : 120 cm

ME_06 all. : 120 cm ht : 120 cm

1.5.1.1 Bureau 14,73 m²

EP

480

Sol:S05 Mur:M01 Plaf:FP04

1.5.1.10 Dgt gradins 2 37,74 m²

Main courante de l'échelle

ME_04 all. : 120 cm ht : 120 cm

250

1.5.1.3 Vestiaires du personnel 15,56 m²

PROFONDEUR 3,4m

S 01 : Carrelage SEL effet bois PN18 S 02 : Carrelage SEL Gris 30x60 PN18 S 03 : Résine antidérapante S 04 : Carrelage Gris 30x60 S 05 : Carrelage 30x30 S 06 : Peinture de sol S 07 : Sol sportif S 08 : Béton lissé S 09 : Tapis brosse S 10 : Peinture époxy

70

Sol:S05 Mur:M01

0_124

LEGENDE DES FINITONS

Sol:S06 Mur:M07

PP93 E30 ht: 204

Sol:S05 Mur:M07

3,8%

1.5.1.2 Coffre 4,95 m²

0_09

100

Sol:S05 Mur:M03 Plaf:FP05

10

169

159

20

662

1.6.0.7 Chaufferie 73,94 m²

0_32

0_33

PP93 E30 ht: 204

330

480

Sol:S05 Mur:M01 Plaf:FP04

Sol:S06 Mur:M08

0_27

PP93 E30 ht: 204

265

10

1027

LIMITE FOND MOBILE PROF 1m80 (BRUT 2,30m)

945 Acro Bass. neuf

330

60 72

180

Sol:S06

+8,40

PRO CHA 00 TT DE 02

30.5 25

20

1.6.0.11 Atelier 13,40 m²

Echelle inox intégré dans bac inox

Sol:S10

7

340

60 40

20

Sol:S06 Mur:M07 261

20

Sol:S06

261

20

100

PP103+50 Ei30 ht: 204

PP103+50 Ei30 ht: 204

0_122

P. Sec. ht 320 E30 ht: 320

494

494

prof: 3m40

Sol:S05 Mur:M03

1.6.0.2 Local compresseur 18,38 m²

412

15

1.6.0.4 Local poubelles 11,70 m²

Sol:S06 Mur:M07

372

40

5

7

324

Etanchéité Paroi béton

-496 R-1 LT CTA

Trémie / courette anglaise

8 9 20

Coupe NS 3

717

11

717

15

14

PP90+50 Ei30 ht: 213

717

16

Coupe NS 3

17

PP120 Ei30 ht: 204

734

M

18

N

P

O

Ground floor 945 Acro Bass. neuf

+9,45

Plan de repérage

Enduit Blanc +7,90

Résille métal doré Rive, cf: PRO CHA 00 TT DE 05

28

Sas, cf: PRO CHA 00 TT DE 04

1.5.1.6 Local MNS

254

1.2.0.8 Douches 2

260

1.2.1.2 Circ. 2

320

1.4.0.2 Musculation

260

320

1.1.0.6 Sanitaire F

260

340

+0,00

0

19 bis avenue Jean Bertin 26000 Valence

P / 06 74 45 64 64 tolle@alpes-controles.fr

68 Chemin du Moulin Carron 69570 Dardilly

Exploitation Maintenance Engie Axima Simon AULAGNIER

3 allées des Gingkos 69500 Bron

P / 07 50 69 60 75 simon.aulagnier@engie.com

Architecte Chabanne et Partenaires Jérôme BOU / Guillaume CLEMENT

38 quai Pierre Scize 69009 Lyon

T / 04.72.10.95.95 contact@chabanne-architecte.fr T / 04 37 26 27 60 bbautheney@keo-ingenierie.fr

T / 04 78 66 35 00 P / 06 07 42 60 68 florent.pichon@spiebatignolles.fr

BE-Fluides Kéo Benoit Bautheney

1 Montée de la Butte 69001 Lyon

BE-Structure Kéo Alsény CONDE / Olivier BONNEL

1 Montée de la Butte 69001 Lyon

T / 04 37 26 27 60 aconde@keo-ingenierie.fr

Économistes Kéo Arnaud AYMARD

1 Montée de la Butte 69001 Lyon

T / 04 37 26 27 60 aaymard@keo-ingenierie.fr

1 Montée de la Butte 69001 Lyon

T / 04 37 26 27 60 ccoutal@keo-ingenierie.fr

HQE Kéo in Cécile MASCARELL

1 Montée de la Butte 69001 Lyon

T / 04 37 26 27 60 cmascarell@keo-ingenierie.fr

Acousticien Echologos Bastien FRANCONY

24 Bd de la Chantourne 38700 La Tronche

T / 04 76 89 36 63 grenoble@echologos.com

1.3.1.1 Bassin de nage existant

0 R.D.C

208

96

-0,02

IND

cloison cf PRO CHA 00 NB DE 506

1.1.0.2 Hall de distribution

260

1.1.1.1 Parvis couvert

NUMERO

97

157

420

157

97

+4,57

+4,20

TYPE

Entreprise SPIE Batignolles Sud-Est Florent PICHON

Paysagiste Kéo Claire COUTAL

+6,20

Sas, cf: PRO CHA 00 TT DE 07

NIV

MAITRISE D'OEUVRE

0_35 0_38 733

EMETTEUR LOT

PRO CHA 00 NB PL 01

Plateau de Lautagne, 42 avenue des Langories P / 06 88 05 35 72 26000 Valence eric.boyer@fr.bureauveritas.com

SPS Alpes Contrôle Thierry OLLE

493

PHASE

Doc:

MAITRISE D'OUVRAGE T / 04 75 75 41 61 Département cohésion Sociale et Communautaire, P / 06 73 71 86 57 Direction Enfance, Jeunesse et Sport BP 10388 - 26958 Valence Cedex 9 Imen.poulet@valenceromansagglo.fr

Bureau de Contrôle Bureau Veritas Eric BOYER

palan 1T

6

-4,96 49

Date: 04/04/2018

MOA Communauté d'agglomération Valence Romans Agglo

Garde corps cf: PRO CHA 10 NB DE 07

4

1.6.2.5 BT Réserve

340

Ech:

B

2 3

Sol:S08 Mur:M07

Coupe NS 1

Sol:S08 Mur:M07

1

-2,70 1.5.2.1 Dépôt matériel 20,38 m²

Echelle inox intégré dans bac inox

Echelle inox encastrée dans bac inox

RDC réduction 1/100°

A

0 R.D.C

1205 0_36

PP120 Ei30 ht: 204

membrane PVC

Ancrage ligne de séparation

1.6.0.1 Cour logistique 59,10 m²

0_39

fond mobile (1m80) revêtement inox

30

PP200 Ei30 ht: 210

453

1.5.2.1 Dépôt matériel

470

250

230

PG110+110 E30 ht: 220

+0,00

70 0_121

0_34

PP103+50 E30 ht: 204

A

0_41

PV120+120_MR E30 ht: 253

Rue Alfred de Musset, 26100 Romans sur Isère

406 20

3,2% -0,04

+0,00

-3,84

159

385 Local1.6.0.9 électrique R+01 2,30 m²

1.6.0.3 Local PH 6,00 m²

0_24

PP103+50 E30 ht: 204

0_42

MR03

MR04

54

Sol:S05 Mur:M03

0_40

Caniveau

3,2%

Caniveau

1.5.2.3 Entretien 6,00 m²

40

+0,30 +0,00

garde corps, cf: PRO CHA 10 NB DE 02

Caniveau

PP93 E30 ht: 204

387

marche carrelée

50

30

JD 250

320

417

417 260

320

260

1.4.0.2 Musculation

0_23

110

Caniveau

échelle encastrée

marche carrelée

1.2.0.4 Vestiaires 4

Sol:S06

garde corps, cf: 0_37 PP90+90 330 Ei30 ht: 20402 PRO CHA 10 NB DE

546

Caniveau

157

157

échelle encastrée

1.2.0.5 Vestiaires 3

1.6.0.8 330 Chlore 1,98 m²

80 161

MR05

1.2.0.3 Vestiaires 2

EP

2 80

1.2.0.2 Vestiaires 1

PP200 Ei60 ht: 210

PP103+50 Ei30 ht: 204

330

27 27 27 27 27 27 27

1

garde corps, cf: PRO CHA 10 NB DE 01

0_120

0_25

Panneaux acoustiques, cf: PRO CHA 12 NB DE 01

8

230

6

Fil d'eau

RENOVATION ET EXTENSION DE LA PISCINE CANETON

JD

20

5

230

4

±0.00

6

3

340

2

344

163

+4,57

1

Détail pédiluve, cf: PRO CHA 00 NB DE 504

20

Panneaux acoustiques, cf: PRO CHA 12 NB DE 01

Vestiaires, cf: PRO CHA 00 NB DE 401

Panneaux acoustiques, cf: PRO CHA 122NB DE 01 1

Panneaux acoustiques, cf: PRO CHA 12 NB DE 01

Fil d'eau

Goulotte

30

1.6.0.10 TGBT 5,94 m²

+6,20

30

FP 01 : Plaques de plâtre FP 02 : 120x60 minéral hygiène FP 03 : 120X60 Organic FP 04 : 60X60 minéral hygiène FP 05 : 60X60 minéral FP 06 : Métal déployé / étiré laqué FP 07 : Tasseaux et feutre noir (intérieur) FP 08 : Tasseaux et bac noir (extérieur)

10%

1187

PV120+120_MR ? ht: 253

1977

PP93 E30 ht: 204

1.5.1.3 Vestiaires du personnel 15,56 m²

225

0_43

FAUX PLAFONDS

24

151

80

23

2 80

Muret ht.30cm Finition carrelage anthracite

40

1

22.5 16.5

MR06

1544

27 27 27 27 27 27 27 27

M 01 : Grès Cérame Blanc Mat 60x30 M 02 : Grès Cérame Gris 60x30 M 03 : Peinture M 04 : Stratifié compact M 05 : Béton lasuré M 06 : Grès Cérame 20x20 M 07 : Peinture antipoussière

30

5

+0,90

12 18.5

4

2

30

3

+0,45

PV90+50 MR E30 ht: 215

MR02

30

2

27 27 27 27 27 27 27 27

1

0_119

197

JD

503

+0,45 1

CH_06 all. : 0 cm ht : 420 cm

330

347

linteau ht: 210

110

250

Sol:S05 Mur:M07

Sol:S01 Mur:M03 Plaf:FP01

224

250

PV120+120_MR E30 ht: 253

Banque PMR ht:75

1.1.0.3 Borne d'accueil 9,46 m²

PP93 E30 ht: 204

417

250

436 544

Tablette ht:120

1.1.0.8 Poussettes 3,69 m²

0_44

PV90+90 MR E30 ht: 214

Banque accueil cf: PRO CHA 00 NB DE 302

0_10

Sol:S01 Mur:M05 310

0_01

240

2,4% Caniveau

2000

Sol:S09 Plaf:FP07

PV90+90 MR E30 ht: 214

CH_07 all. : 0 cm ht : 220 cm

Garde corps cf: PRO CHA 10 NB DE 01

1.4.0.3 Plateforme chrono 7,84 m²

Détail portail, cf: PRO CHA 10 NB DE 03

1.1.0.1 Sas d'accès 8,61 m² 0_02

PV100+100 E30 ht: 214

Sol:S01 Mur:M05

échelle amovible

250

CH_04 all. : 0 cm ht : 420 cm

JD

CH_05 all. : 0 cm ht : 420 cm

741

0_11

2,0%

1.1.0.5 Déambulatoire spectateurs 63,49 m²

+0,00 53

L

2,0%

Caniveau

+0,30

marche carrelée

3

CH_08 all. : 0 cm ht : 220 cm

-0,04

1.3.2.2 Plages du bassin de nage neuf 310,76 m²

EP

4

K

196

2,0% 2,0%

Caniveau

Sol:S01 Mur:M03 Plaf:FP01 + FP07

0_49

10

810 linteau ht: 210

J

250

Coupe EO 4

1.1.0.2 Hall de distribution 69,95 m²

Sol:S04 Mur:M02 Plaf:FP04

7

20

échelle amovible

3,8%

22

198

0_55

PP93 Ei30 ht: 204

PP93 E30 ht: 204

1.1.0.6 Sanitaire F 14,92 m²

0_50

TV60x60 E30 ht: 56

MR07

250

0_12

446

GT01

1.4.1.5 Dépôt matériel 4,75 m²

HSFP: 3,20 m

275

30

250

joue placo PP93 E30 ht: 204

10

469

Sol:S05 Mur:M03

CH_10 all. : 0 cm ht : 220 cm

Caniveau

250

12 séchoirs à cheveux 181

CH_03 all. : 80 cm ht : 120 cm

0_13

0_51

PP93 E30 ht: 214

Sol:S07 Mur:M03 Plaf:FP02

251

linteau ht: 210

EP

PP93 Ei30 ht: 204

Personal contribution : ▷ Material researches ▷ All technical drawings ▷ Final rendering ▷ Liaise with structural engineers

espace beauté

0_52

0_54

401

151 20

Pente 2%

1.5.2.2 Entretien 6,89 m²

Sol:S01 Mur:M05

241

PV90 E30 ht: 100

Sol:S04 Mur:M02 Plaf:FP04

0_53

PP103+50 E30 ht: 204

CH_09 all. : 50 cm ht : 160 cm

marche carrelée

Pente 2%

84 333

linteau ht: 210

0_57

1.4.0.2 Musculation 35,73 m²

Chape plages

Caniveau

0_14

EP

Pente 2%

1.1.0.7 Sanitaire H 13,02 m²

Détail façade, cf: PRO CHA 00 NB DE 402

PP93 E30 ht: 214

PP163 E30 ht: 234

0_45

Sol:S02 Mur:M02 Plaf:FP02 343

Pente 2%

919

0_56

296 576 PV93 E30 ht: 234

I

570

1842

203

0_63

Pente 2%

91.5

486

0_62

Détail vestiaire, cf: PRO CHA 00 NB DE 401

0_46

PV120+120_MR E30 ht: 253

111

0_61

22 Pente 2%

Pente 2%

1.2.1.5 Pédiluve 4 9,35 m²

111

0_60

PP103+50 E30 ht: 204

0_104

Détail pédiluve, cf: PRO CHA 00 NB DE 504

0_48

CH_11 all. : 0 cm ht : 240 cm

353

Détail sèche cheveux, cf: PRO CHA 00 NB DE 303

Détail pédiluve, cf: PRO CHA 00 NB DE 504

1.2.1.3 Pédiluve 1 5,44 m²

2,4%

PV120+120_MR E30 ht: 253

111

1.2.0.4 Vestiaires 4 44,05 m²

caniveau

196

MR08

PV93 E30 ht: 234

EP

0_106

CH_02 all. : 120 cm ht : 120 cm

158

PP93 E30 ht: 204

Sol:S02 Mur:M05 0_47

CH_13 all. : 0 cm ht : 240 cm

EP

linteau ht: 210

392

EP

Pente 2%

linteau ht: 210

0_58

608

280 162

EP

CH_01 all. : 120 cm ht : 120 cm

494

20

Pente 2% Pente 2%

167

20 406

EP

4

0_103

1.5.1.6 Local MNS 11,53 m²

1.3.2.1 Plages du bassin de nage existant 227,70 m²

3

Stage : Technical design

4,53 m sous poutre

Détail bancs, cf: PRO CHA 00 NB DE 301

PP93 E30 ht: 204

Sol:S01 Mur:M01 Plaf:FP01 + FP02

278 Pente 2%

0_59

hsd: 4,17 m

linteau ht: 210

hsfp: 3,20 m hsd: 4,17 m 30

111

hsfp: 2,60 m

Jouée Plâtre hsfp: 3,20 m

Pente 2%

576

CH_12 all. : 0 cm ht : 240 cm

Pente 2%

45 268

Pente 2%

PP103+50 E30 ht: 204

1.2.0.8 Douches 2 36,23 m²

Pente 2%

0_105

caniveau

Pente 2%

Détail bancs, cf: PRO CHA 00 NB DE 301

0_15

167

0_102

267 Pente 2%

266

0_64

301

Sol:S01 Mur:M02 Plaf:FP01 + FP03

hsfp: 3,40 m 4,27 m sous poutre

EP

0_99

EP

266

Sol:S02 Mur:M02 Plaf:FP02

24 10

Sol:S01 Mur:M03 Plaf:FP04

linteau ht: 210

Chaînette

160

160

104

cloison cf PRO CHA 00 NB DE 506

PV93 E30 ht: 234

4,07 m sous poutre

198

488 10 95

Détail vestiaire, cf: PRO CHA 00 NB DE 401

Sol:S01 Mur:M01 Plaf:P01

Coupe EO 4

Pente 2%

1.1.0.4 Espace Déchaussage / beauté 135,20 m²

Pente 2%

Pente 2%

1.2.1.1 Circ. 1 28,14 m²

Chaînette

291

PP103+50 Ei30 ht: 204

0_71

PP103+50 E30 ht: 204

linteau ht: 210

10

10

0_114

0_70

915

284 10 Plan de travail cf PRO CHA 00 NB DE 501

caniveau

caniveau

0_65

266

Sol:S02 Mur:M03

0_68

Sol:S01 Mur:M01 Plaf:FP01 + FP02

499

205 154

linteau ht: 240

1535

1535

0_98

Espace à langer ht:90

242

1.4.0.5 Dépôts 7,74 m²

Pente 2%

Pente 2%

0_67

1.2.0.5 Vestiaires 3 43,78 m²

PP103+50 E30 ht: 204

0_97

206

0_100

10

60

24

0_66

hsd: 4,17 m

20

Role : Architectural assistant (with senior architect)

1.2.0.1 Stock. faut. 5,55 m² 0_20

113

544 Pente 2%

2195 0_96

329

linteau ht: 210

linteau ht: 210

1.3.1.1 Bassin de nage existant 250,00 m² ?

157

PV90 E30 ht: 100

180

Chaînette

650

22 10

224

180

Sol:S02 Mur:M01 Plaf:FP04

10

linteau ht: 210

Sol:S05 Mur:M03 338

EP

915

hsfp: 2,60 m

224

1.2.0.10 Sanitaires 2 39,05 m²

linteau ht: 210

0_72

0_19

0_16

PP103+50 E30 ht: 204

265

Jouée Plâtre hsfp: 3,20 m 10

0_18

EP

PP103+50 E30 ht: 204

154

Sol:S02 Mur:M02 Plaf:FP02 343

1.5.2.4 Local d'entretien 5,37 m²

0_86

150

2044

164

Pente 2%

Chaînette

1.2.0.3 Vestiaires 2 44,13 m²

227

1.2.1.4 Pédiluve 2 5,44 m²

linteau ht: 210

Sol:S01 Mur:M01 Plaf:FP01 + FP02

PP103+50 E30 ht: 204

0_88 11

Détail pédiluve, cf: PRO CHA 00 NB DE 504

Pente 2%

Détail vestiaire, cf: PRO CHA 00 NB DE 401

Pente 2%

Pente 2%

caniveau

0_89

165

PV90+50 MR E30 ht: 215

200

0_78

PP93 Ei30 ht: 204

0_73

266

0_101

0_77

47

Pente 2%

PP93 E30 ht: 204

91

111

0_76

45

Pente 2%

111

0_75

Pente 2%

276

0_17

152

111

caniveau

Chaînette

572

140

Pente 2%

146

15

30

3053

linteau ht: 210

0_74

hsd: 4,17 m

150

Pente 2%

114

hsfp: 2,60 m

159

Pente 2%

265

Détail pédiluve, cf: PRO CHA 00 NB DE 504

915 267

Jouée Plâtre hsfp: 3,20 m

487

178

Pente 2%

EP

linteau ht: 210

Sol:S01 Mur:M01 Plaf:FP02 + FP06

10

PP123 E30 ht: 204

ME_02 all. : 0 cm ht : 222 cm

Chaînette

PP103+50 E30 ht: 204

1.2.0.6 Douches 1 38,31 m²

Sol:S02 Mur:M02 Plaf:FP02

Pente 2%

266

PP123 E30 ht: 204

0_107

PV93+50 E30 ht: 234

25

31 345

PPGT80 E30 ht: 205

PP103+50 E30 ht: 204

201

Pente 2%

PG110+110 E30 ht: 220

GT02

249

0_113

111

Pente 2%

0_111

10

111

915

Pente 2%

387

0_112

PP93 E30 ht: 204

111

0_80

Pente 2%

10 0_116

0_81

Pente 2%

PG110+110 E30 ht: 220

200

Built up area : 2 432 sq.m

0_79

0_82

24

0_110

PG110+110 E30 ht: 220

275

115

0_83

622

15

265

0_87

cloison cf PRO CHA 00 NB DE 506

280

475

156

195

140

150 15

0_109

PG110+110 E30 ht: 220

15

720

caniveau

254

5

0_108

linteau ht: 210

152

576

691

Sol:S02 Mur:M02 Plaf:FP02

Pente 2%

1.2.1.3 Pédiluve 3 10,37 m²

0_84

hsfp: 2,60 m

0_90

359

Sol:S05 Mur:M06 Plaf:FP04

Jouée Plâtre hsfp: 3,20 m

1.2.1.2 Circ. 2 59,46 m²

174

Plan de travail cf PRO CHA 00 NB DE 501

Attente

1.4.0.4 Infirmerie / antidopage 31,31 m²

345

Sol:S05 Mur:M06

12

246

H

PP123 E30 ht: 204

140

1.4.1.4 Dépôt matériel 4 9,50 m²

Sol:S05 Mur:M06

10

1.4.1.3 Dépôt matériel 3 16,41 m²

195

Sol:S05 Mur:M06

345

345

Sol:S05 Mur:M06

hsd: 4,17 m

99

Détail vestiaire, cf: PRO CHA 00 NB DE 401

Pente 2%

caniveau Pente 2%

linteau ht: 210

linteau ht: 210

0_115

1.4.1.2 Dépôt matériel 2 24,88 m²

1.4.1.1 Dépôt matériel 1 23,32 m²

Pente 2%

487

0_94

1095

Sol:S01 Mur:M01 Plaf:FP01 + FP02

PP103+50 E30 ht: 204

220

787

0_95

231 PP120 E30 ht: 204

1.2.0.2 Vestiaires 1 50,01 m²

275 170

21

Espace à langer ht:80

hsfp: 2,60 m hsd: 0,00 m

0_117

2

157

170

185

Sol:S02 Mur:M01 Plaf:FP04

10

0_85

1.2.0.7 Sanitaires 1 33,59 m²

linteau ht: 210

0_91

159

Pente 2%

10

290

179

10

90

495

linteau ht: 210

10

149

369 10

95

0_93 0_92 90

Section EO1 CHABANNE et PARTENAIRES

Coupe EO 4

38 , QUAI PIERRE SCIZE 69009 LYON TEL. : 07 72 10 95 95 FAX. : 04 72 10 00 80

Coupe AA

Swimming pool ladder

VALENCE ROMANS AGGLO

RENOVATION ET EXTENSION DE

Halle bassin - Détail échelle FORMAT

Coupe BB

PH

Doc: Ech.:

P


Voile-dôme aluminium micro-perforé

A

50

EP

Lanterneau 120x120cm

Membrane étanchéité Isolation thermique en FoamGlass

20

15

Dalle béton

30

150

Costière

Cabine de change

Pare-vapeur

132

Faux plafond tasseaux 40x80mm et feutre noir

67

Plaque de plâtre hydrofugée

185

235

2%

Faux-plafond organic 120x60mm

Carrelage blanc mat 20x20cm

2%

B

2%

120

Peinture teinte choix archi.

54

Assise stratifié compact teinte choix archi.

420

Cabine de change PMR

Carrelage mural 60x30cm teinte choix archi.

Patères adultes ht. 1.80m

155

25

Faux-plafond minéral hygiène

105

40

Carrelage blanc 30x60cm

Sèche-cheveux sur rails verticaux Ht. max: 2.15m

10

Coupe AA

45

45

45

Siphon de sol

EP CHABANNE et PARTENAIRES

Hall - Espace beauté 38 , QUAI PIERRE SCIZE

RENOVATION ET EXTENSION DE LA PISCINE CANETON

69009 LYON TEL. : 07 72 10 95 95 FAX. : 04 72 10 00 80 www.chabanne-architecte.fr

FORMAT

A3

Plancher chauffant

±0.00

Coupe BB

VALENCE ROMANS AGGLO

SEL

Patère ht. 1.35m

Carrelage antidérapant 30x60mm couleur choix archi.

225

Siège rabattable

Renfort tube inox Pieds carrelé aspect bois

Socle maçonné Carrelage aspect bois

SEL

Plancher chauffant

Caniveau à fente

±0.00

45

80

78

B

Assise stratifié compact teinte choix archi.

Carrelage 20x20cm

Tablette stratifiée aspect bois

All. Ht. 80cm

±0.00

Barre de maintien

225

Console stratifiée dito tablette

Patère

45

48

2%

80

Console stratifiée dito tablette

28

Stratifié compact teinte choix archi. sur 2 carreaux Ht. 60cm

235

125

25

20

31

30

Casiers doubles

Patères enfants ht. 1.35m

Pieds carrelé

104

Miroir

155

155

295

55

Tablette stratifié aspect bois

Miroir

45

25

2%

Patère

38 , QUAI PIERRE SCIZE 69009 LYON TEL. : 07 72 10 95 95 FAX. : 04 72 10 00 80 www.chabanne-architecte.fr

Joue en plaque de plâtre hydrofugée

Caniveau à fente Miroir dans épaisseur carrelage Sèche-cheveux sur rails verticaux

A

CHABANNE et PARTENAIRES

114 Faux-plafond minéral hygiène

40

25

A

106

Faux-plafond organic 120x60mm

Casiers doubles

A

Beauty area Plan de repérage

Lockers Coupe AA

VALENCE ROMANS AGGLO Doc: PRO CHA 00 NB DE 303 0 PHASE

EMETTEUR LOT

RENOVATION ET EXTENSION DE Ech.: 1/20 Date : LA PISCINE CANETON

NIV

TYPE

NUMERO

IND

FORMAT 04.04.2018

Vestiaires - Détail bancs, cabine change

A3

Faux-plafond type minéral hygiène 60x60mm

PHASE

Doc: Ech.:

EMETTEUR LOT

NIV

TYPE

NUMERO

IND

PRO CHA 00 NB DE 401 0 1/25 Date : 04.04.2018

260

Carrelage 30x60mm couleur choix archi.

295

Siphon de sol avec tube trop plein

0

316

148 20

120 Caniveau grille inox

Fil d'eau

Tube inox trop plein ±0.00

pente 5%

-0.08

SEL

pente 5%

Plancher chauffant

30

4

25

Carrelage

93

20

Tube thermo laqué Ø40

85

Lisse thermo laquée

120

5%

A

Ø 15

-0.08

130

Ø 15

0

5%

150

Caniveau grille inox

210

A

Siphon de sol

Footbath plan

Footbath section Coupe AA


Coupe NS 1

Coupe NS 3

ITE RME

6986 2286

A

B

C

D

E

F

G

H

I

J

Pare-vapeur

1552

K

1

L

M

N

O

P

EP

EP

Profil d'arrêt isolant 2

Joint coloré dito RAL tôle

EP +5,56 +171,66 NGF

3339

Tôle pleine laquée RAL choix archi pente 3%

+6,54 +172,64 NGF

EP

toiture étancheité blanc mat

toiture étancheité blanc mat

1906

1976

5,0%

2468

EP

toiture étancheité blanc mat

EP

130

+4,57 +170,67 NGF

EP 3,0% 2791

EP

Coupe EO 4

Isolant

2837

moquette solaire

Coupe EO 4

EP

+5,76 +171,86 NGF

3 4

EP

EP

EP

Support PRS + tube

+4,63 +170,73 NGF

EP

EP

EP

EP

EP

+2,84

+168,94 NGF

945 Acro Bass. neuf

130

+9,37

+175,47 NGF

+8,40

+6,20

163

Panneaux acoustiques, cf: PRO CHA 12 NB DE 01

6374

Panneaux acoustiques, cf: PRO CHA 12 NB DE 01

Vestiaires, cf: PRO CHA 00 NB DE 401 +4,57

+6,10

1.2.0.5 Vestiaires 3

1.2.0.4 Vestiaires 4

garde corps, cf: PRO CHA 10 NB DE 02

1621

3,1%

157

320

157 417

417 260

320

260

1.2.0.3 Vestiaires 2

JD

1.4.0.2 Musculation

130

1.2.0.2 Vestiaires 1

+7,70

garde corps, cf: PRO CHA 10 NB DE 02

+173,80 NGF

970

+0,00

1.5.2.1 Dépôt matériel

0 R.D.C

toiture étancheité blanc mat 230

766

766

340

membrane PVC

824

fond mobile (1m80) -2,70

+6,50

+172,60 NGF

3243

7,1%

prof: 3m40

-3,84

panneaux solaires réutilisés

+8,38

+174,00 NGF

EP

revêtement inox

Tôle perforée découpe laser motif +RAL choix archi.

+7,90

toiture étancheité blanc mat

+174,50 NGF

Tableau

385 R+01

+172,20 NGF

garde corps, cf: PRO CHA 10 NB DE 01

Mur rideau

PRO CHA 00 TT DE 02

Panneaux acoustiques, cf: PRO CHA 12 NB DE 01

Panneaux acoustiques, cf: PRO CHA 12 NB DE 01

1.6.2.5 BT Réserve

Coupe EO 2

-496 R-1 LT CTA

-4,96

311

Coupe EO 2

Coupe NS 3

RENOVATION ET EXTENSION DE LA PISCINE CANETON Rue Alfred de Musset, 26100 Romans sur Isère

+9,45

130

945 Acro Bass. neuf

+5,15 +171,25 NGF

Enduit Blanc

+3,85

+7,90

+169,95 NGF

1621

Résille métal doré

A

+6,20

toiture étancheité blanc mat

Sas, cf: PRO CHA 00 TT DE 04 28

Sas, cf: PRO CHA 00 TT DE 07

moquette solaire

+4,57

-0,02

97

1.5.1.6 Local MNS

1.3.1.1 Bassin de nage existant

254

1.2.0.8 Douches 2

1.2.1.2 Circ. 2

260

260

1.4.0.2 Musculation

320

320

1.1.0.6 Sanitaire F

157

97

3,1% 157 260

260

1.1.0.2 Hall de distribution +0,00

Toiture / Couverture et étanchéité

cloison cf PRO CHA 00 NB DE 506

340

420

1.1.1.1 Parvis couvert

2144

EP +4,20

2165

Rive, cf: PRO CHA 00 TT DE 05

+9,37

EP

EP

EP

1170

+170,24 NGF

49

+169,95 NGF

841

EP

SPS Alpes Contrôle Thierry OLLE

474

+3,85

+169,95 NGF

+5,06

14

2422

17

16

371

130

130

Panneaux acoustiques, cf: PRO CHA 12 NB DE 01

échelle encastrée

230

Tôle perforée découpe laser motif + RAL choix archi. 180

Renfort tube métallique

lg = 2000

Plateau de Lautagne, 42 avenue des Langories 26000 Valence 19 bis avenue Jean Bertin 26000 Valence

50

BT Existant

334

349

349 471

BT Neuf

cf: PRO CHA 00 NB DE 01

Tôle pleine laquée RAL choix archi pente 3%

38 quai Pierre Scize 69009 Lyon

T / 04.72.10.95.95 contact@chabanne-architecte.fr

1 Montée de la Butte 69001 Lyon

T / 04 37 26 27 60 bbautheney@keo-ingenierie.fr

BE-Structure Kéo Alsény CONDE / Olivier BONNEL

1 Montée de la Butte 69001 Lyon

T / 04 37 26 27 60 aconde@keo-ingenierie.fr

Économistes Kéo Arnaud AYMARD

1 Montée de la Butte 69001 Lyon

T / 04 37 26 27 60 aaymard@keo-ingenierie.fr

Bavette

134

Paysagiste Kéo Claire COUTAL

1 Montée de la Butte 69001 Lyon

T / 04 37 26 27 60 ccoutal@keo-ingenierie.fr

HQE Kéo in Cécile MASCARELL

1 Montée de la Butte 69001 Lyon

T / 04 37 26 27 60 cmascarell@keo-ingenierie.fr

Acousticien Echologos Bastien FRANCONY

24 Bd de la Chantourne 38700 La Tronche

T / 04 76 89 36 63 grenoble@echologos.com

110

0 R.D.C

Gousset

cf: PRO CHA 00 NB DE 203

-2,70

Section EO2

Metal facade mesh 945 Acro Bass. neuf

105

P / 06 74 45 64 64 tolle@alpescontroles.fr

BE-Fluides Kéo Benoit Bautheney

-4,96

acrotère cf PRO CHA 00 TT DE 02

P / 06 88 05 35 72 eric.boyer@fr.bureauveritas.com

Architecte Chabanne et Partenaires Jérôme BOU / Guillaume CLEMENT

-3,84

Coupe EO 2

IND

T / 04 78 66 35 00 P / 06 07 42 60 68 florent.pichon@spiebatignolles.fr P / 07 50 69 60 75 simon.aulagnier@engie.com

fond mobile (1m80)

CTA Bassins

Profilé de finition 0 métal laqué RAL dito mur rideau

+0.80

Porte d'accés entretien

échelle encastrée

A

NUMERO

385 R+01

525

395

80 260

25

Chaufferie

500

120 240

Habillage Tableau tôle laquée RAL dito MR Structure support

Panneaux acoustiques, cf: PRO CHA 12 NB DE 01

45

945 Acro Bass. neuf

ITE

LT CTA

340

130

0690 R.D.C

906

RME

Coupe NS 3

+6,70

45

110

Edicule toiture, cf: PRO CHA 00 TT DE 06

184

1240

Roof plan

Coupe NS 1

385 R+01

Plan de repérage - Ech. 1/50e

15

TYPE

68 Chemin du Moulin Carron 69570 Dardilly 3 allées des Gingkos 69500 Bron

Exploitation Maintenance Engie Axima Simon AULAGNIER

+1,39

+167,49 NGF

NIV

0 R.D.C

265

945 Acro Bass. neuf

130

+1,85

+167,95 NGF

10 11

EMETTEUR LOT

PRO CHA 00 TT PL 01

MAITRISE D'OEUVRE Entreprise SPIE Batignolles Sud-Est Florent PICHON

+171,16 NGF

Coupe EO 4

Doc:

MAITRISE D'OUVRAGE

Département cohésion Sociale et Communautaire, T / 04 75 75 41 61 Direction Enfance, Jeunesse et Sport P / 06 73 71 86 57 BP 10388 - 26958 Valence Cedex 9 Imen.poulet@valenceromansagglo.fr

Bureau de Contrôle Bureau Veritas Eric BOYER

+3,85

EP échelle à crinoline

toiture étancheité blanc mat

110

Date: 04/04/2018

96

50

208

130

9 +4,14

PHASE

Ech: 1 : 100

MOA Communauté d'agglomération Valence Romans Agglo

+175,47 NGF

Coupe AA - Ech. 1/20e

Sous face tôle pleine laquée RAL choix archi Structure métal galvanisé Pare-vapeur

RENOVATION ET EXTENSION DE LA PISCINE CANETON

18

Rue Alfred de Musset, 26100 Romans sur Isère

Coupes


Couvertine laquée RAL choix archi

Acrotère echelle métal.

bardage métallique laqué blanc

>100

Complexe Façade ventilée finition RME Lame d'air Support isolant

Solin Costière

ITE + pare pluie

15

étanchéité Isolation thermique

Bac métallique noir pente 3%

Structure métallique

UPN 500

Faux plafond extérieur tasseaux

Profilé métal laqué arrêt RME RAL choix archi

Pare-pluie noir mat anti-insectes/ volatiles

New 25 meters pool

Courtyard Roof

Isolation thermique

15

Etanchéité

ht<40

50

Couvertine renforcée tôle larmée sur passage

S AGGLO

SION DE

Ecarteurs métalliques

Toiture - Coupe rive auvent entrée FORMAT

PHASE

Doc: Ech.:

A3

Structure métallique Faux plafond tasseaux + feutre acoustique noir ITE Tôle de finition

EMETTEUR LOT

NIV

TYPE

NUMERO

IND

PRO CHA 00 TT DE 05 0 1/20 Date : 04.04.2018

Bac métallique JD 4cm Pare pluie noir mat anti insectes / volatiles Faux plafond tasseaux bois Roof junction

Lobby entrance


EVENT & FUNCTION HALL

Muret, France, 2018

Modularity : The small town of Muret needed a complex event adaptable to different situations (hall, forums, banquets, exhibitions, concerts, sports competitions on soft ground). To respond to the different configurations, the project consists of a simple volume and an annex part, gathering reception services and technical rooms. The important points of this stage were mainly focused on the acoustics of the room (result of concessions between design offices and interior design), and on the other hand, in the reconsideration of materials and constructive choices (passage of a parametric facade made of metal strips to prefabricated concrete modules.

Informations and drawings under on-disclosure agreement



0

1

2 PP200

ht: 310

ht: 310

C1

?

PP200

C2

0_111

0_110

0_109

ht: 310

ht: 310

C3

C4

C5

C6

C7

C8

?

PP300

PP200

ht: 310

PP300

0_112

ht: 310

PP200 ht: 310

PC

PC

PC

PC

PC

PC

CA

A

ht: 310

ht: 310

C9

C10

C11

C12

C13

C14

C15

C16

C17

C18

0_107

PP300

PP200

PP200

0_108

0_106

0_105

0_104

RIA

RIA

RIA

RIA

CB CC

0_119

2.4.3.1.1. Pied de façade salle et scène

ht: 204

PP180 mur mobile E30

0_120

PP180 mur mobile E30

ht: 204

Placard Elec

CD

HSFP1042

B.1.2 Espace scénique (30 m x 12 m) 345,31 m²

B.1.1 Espace spectateurs 2239,29 m² HSFP850

CE

0_118 ht: 450

PP300*450

ht: 450

PP300*450

CF

RIA

B C

JD1

CG

PC

VH

0_97 ht: 215

0_96 58 Local RIA 9,46 m²

ht: 215

0_95

0_94

ht: 215

ht: 215

PP70 Ext EI30

PP180 EI60

F.9 LT FT 1,29 m²

PP90 Ext EI30

F.4 Transfo 14,53 m²

ht: 215

ht: 204

PP93+FP EI60

0_93

F.10 LT AEP 1,39 m²

ht: 204

ht: 204

PP93+FP EI30

0_62

ht: 204

PP140 EI30

ht: 204

PP93+FP E30

0_83

ht: 204

PP93+FP E30

ht: 204

PP93+FP EI30

130 X 80

PP93+FP E30

0_64

0_63

130 X 80

130 X 80

Sas stockage 8,75 m²

0_100

F.3 TGBT 6,42 m²

F.1 Source centrale 0,85 m²

PP90 Ext EI30

D

PP180 EI60

0_98 ht: 215

VB

VB

VB

VH

PP90 Ext EI30 ht: 215

VH PP70 Ext EI30

ht: 240

C.5.1 Sanitaires artistes 3,86 m² HSFP270

C.5.2 Sanitaires artistes 3,85 m² HSFP270

ht: 204

PP93+FP E30

0_66

ht: 204

PP93+FP E30

ht: 204

0_67

130 X 80

130 X 80

ht: 204

PP93+FP E30

0_82

ht: 204

PP93+FP E30

0_65 130 X 80

0_80

130 X 80

0_77

C.4.2 Douches Artistes F 9,77 m² HSFP270

C.4.1 Douches Artistes H 9,66 m² HSFP270

0_81

130 X 80

0_78

130 X 80

HSFP327

PP200

0_58

ht: 310

HSD345

A.5 Local serveur 3,77 m² HSFP270

E.2 Local entretien + stockage produits entretien 4,75 m²

A.6.2 Sanitaires F personnel 2,78 m² HSFP270

A.6.1 Sanitaires H personnel 2,75 m² HSFP270

E.1.1 Local agents d'entretien H 3,10 m² HSFP270

E.1.2 Local agents d'entretien F 3,19 m² HSFP270

S.1.4 Circulation personnel et artistes 73,80 m²

0_71

ht: 204

PP140 EI30

HSFP270

E

PP93+FP E30

0_79

0_76

ht: 204

HSFP425

0_07

ht: 215

0_03

PP93+FP E30

ht: 204

0_89

ht: 204

ht: 240

0_86

0_84

ht: 204

ht: 204

ht: 204

PP93+FP EI30

PP93+FP EI30

PP93+FP EI30

ht: 204

PP93 Grillagée

C.6.3 Stockage sécurisé 12,43 m²

Cloison grillagée

C.6.1 Stockage chaises, tables et matériel 113,87 m² HSD236

0_92

ht: 204

C.6.4 Atelier 8,83 m²

C.7 Bureau régisseur 9,41 m² HSFP270

C.1.1 Loge HSFP270 individuelle 8,91 m²

HSFP270

C.2 Loge VIP 10,71 m²

C.1.2 Loge individuelle 8,91 m²

0_91

PP93 Grillagée

VB

ENS 05_5 all. : 20 cm ht : 290 cm

ht: 215

ENS 05_4 all. : 20 cm ht : 290 cm

ht: 215

ENS 05_3 all. : 20 cm ht : 290 cm

ht: 215

PP90+imp vitrée EI30

ENS 05_2 all. : 20 cm ht : 290 cm

0_74

PP140+imp vitrée E30

ENS 06 all. : 20 cm ht : 290 cm

0_75

ENS 05_1 all. : 20 cm ht : 290 cm

ENS 01_2 all. : 20 cm ht : 290 cm

ENS 01_1 all. : 20 cm ht : 290 cm

PV180+ imp vitrée E30

G

linteau ht: 210

0_53

linteau ht: 425

PP120 VV E30

ht: 204

MR01

MR02

S.1.7 Circulation traiteur 11,02 m² HSD485

RIA

ht: 204

Sectionnelle EI30

0_87

HSFP270

EI30

ht: 204

C.3 Loge collective 23,76 m² HSFP270

PP93+FP EI30

PP93+FP E30

PP93+FP EI30

ht: 204

0_72

ht: 204

D.2.1 Local traiteur 22,11 m² HSD345

130 X 80

0_52

0_88

PP93+FP EI30

F

PP93+FP EI30

D.2.2 D.3 Rangement Local traiteur poubelles (int.) 2,41 m² 0_73 5,83 m² PP93+FP

0_51

0_50

0_49

0_47

HSD485

0_48

0_47

0_46

HSFP425

0_05

ht: 215

0_01

ht: 215

PV180 MR E30

PV180 MR

A.7.1 Sanitaires publics Hommes 48,02 m² HSFP260

0_90

HSD484

0_69

Placard Elec

ht: 204

HSFP270

ht: 204

PP140 EI30

0_68

ht: 204

PP140 EI30

PP120 VV EI30

S.1.6 Espace convivialité 40,17 m²

ht: 204

PP93+FP E30

HSFP405

0_06

PV180 MR E30

ht: 215

PV180 MR

0_02

ht: 215

A.1.2 Sas d'entrée hall 23,83 m²

A.1 Hall d'accueil / convivialité 240,19 m²

0_45

PV180 MR E30

0_28

PV180 MR

0_08

PV180 MR E30 CH1 ht: 215 all. : 95 cm ht : 115 cm

0_04

PV180 MR

D.1 Espace catering (salle à manger) 45,83 m²

0_36

0_37

0_37

0_39

0_41

0_42

0_43

0_44

0_99 0_59

Sectionnelle EI30

0_60

0_70

0_54

0_114

HSD270

0_35

0_34

0_33

0_32

0_29

0_31

0_30

ht: 204

linteau ht: 210

linteau ht: 210

linteau ht: 210

CH1 all. : 95 cm ht : 115 cm

ht: 215

hsfp: 5,88 m

ht: 215

A.7.2 Sanitaires publics Femmes 58,07 m² HSFP260

PP180 E30

ht: 204

0_57

Sectionnelle E30 ht: 240

ht: 204

0_23

Détail bar buvette cf carnet mobilier 2.3.3

F.2 Gradateur 6,96 m²

F.8 LT Son et lumière 3,53 m²

PC

ht: 204

PP140 E30

ht: 204

0_55

linteau

PP93+FP E30

ht: 210 Sol:S06 Mur:M07 Plaf:-

0_27

HSD265

S.1.8 Dégagement personnel et artistes 18,82 m²

ht: 204

0_22

PP180 E30

PP180 E30

PP140 E30

HSFP250

ht: 204

A.2 Coin bar / buvette 22,69 m²

PP93+FP E30

0_14

ht: 204

0_19

ht: 204

0_26

0_21

ht: 204

PP180 E30

linteau ht: 210

ht: 204

PP93+FP E30 ht: 204

0_15

A.3 Stockage bar 6,36 m²

ht: 204

PP93+FP EI30

PP93+FP EI30

0_12

ht: 204

0_13

PP180 E30

ht: 204

ht: 204

S.1.3 Sas acoustique 18,38 m² HSFP250

HSFP250

S.1.2 Sas acoustique 13,68 m²

0_16

ht: 204

PP93+FP EI30

F.7 LT CFA Scéno 6,55 m²

HSD265

F.5 V.D.I RG 12,08 m²

0_10

ht: 204

PP93+FP E30

0_09

PP180 E30

0_20

PP93+FP E30

VB

VB

PP140 EI30

0_56

PP180 E30

ht: 204

ht: 204

linteau ht: 210

ht: 204

0_25

PC

ht: 204

PP180 E30

0_24

PP180 E30

PP180 E30

HSFP250

0_18

PP180 E30

Placard Electrique

0_17

S.1.1 Sas acoustique 6,86 m² HSFP250

ht: 215

0_11

linteau ht: 210

SSI Report

PP200*215

HSFP250

ht: 215

PP200*215

A.4 Billetterie 9,29 m²

ht: 215

PP200*215

0_101

linteau ht: 210

PC

PC

PC

0_102

RIA

linteau ht: 215

RIA

RIA 0_103

0_113

caniveau technique

0_117

ht: 204

PP180 mur mobile E30

0_115

ht: 204

0_61

ht: 204

PP180 mur mobile E30

0_116

PP93+FP EI30

JD2

JD3

Ground floor PLAN DU REZ-DE-CHAUSSEE

Implementation plan

0

1

N

10m

CITE SCOLAIRE ELIE VIGNAL

Alain LELIEVRE 250, Rue Garibaldi - 69003 LYON TEL. : 04 78 60 01 33 / FAX : 04 78 60 00 32 alain-lelievre@wanadoo.fr

1.2

Extension des locaux existants

PRO

Plan général RDC - Niv : 0.00 (242.75NGF)

Ech: 1 : 250

Juillet 2018

Built up area : 3 930 sq.m East elevation

Role : Architectural assistant (with senior architect) C1

Stage : Technical design

0

JD2

C2

C3

Complexe de Toiture - Couverture Bardage Type SYSCO 280 - Charpente métallique - Faux-Plafonds pose Horizontale (Suivant Article CCTP)

1

Hauteur Max +12,00 m +12,00 Ngf

C4

C5

C6 JD3

C7

Détails Enveloppe 1.1 Acrotère espace Scénique

Toit - Scène +10,80 m +10,80 Ngf

C8

C9

C10

C11

C12

C13

C14

C15

C16

C17

C18 2

+12,00 m Complexe de Toiture - Couverture Bardage Type SYSCO 280 - Charpente métallique - Faux-Plafonds pose Horizontale (Suivant Article CCTP)

+11,75 m +11,30 m

+10,75 m

+11,19 m

Complexe de Toiture - Couverture Bardage Type SYSCO 360 - Charpente métallique

Détails Enveloppe 1.5 Acrotère Jonction Toiture

+11,72 m

+10,26 m

Détails Enveloppe Paroi verticale - Mur béton préfabriqué matricé Ep Murs.27cm Matrice - Suivant Elévations - Support charpente métallique - Laine minérale Ep.14cm - Complexe Acoustique Panneau laine de bois 60x120 - Pose en Damier relief (Cf détails Architecte)

Toit - Hall +8,52 m +8,52 Ngf

Personal contribution : ▷ Material & technical researches ▷ All technical drawings ▷ Final rendering

+6,35 m Finition de Façade: Cassette Aluminium Trame Verticale Largeur - Suivant Elévations RAL à définir par l'Architecte

Toit - Hall & Stock +5,55 m +5,55 Ngf

Paroi verticale - Mur béton préfabriqué matricé Ep Murs.27cm Matrice - Suivant Elévations - Support charpente métallique - Doublage Placo LM140+1BA13

0_94

0_95

0_96

0_97

ht: 215

ht: 215

ht: 215

ht: 215

PP180 EI60

RDC +0,00 m +0,00 Ngf

PP70 Ext PP90 Ext EI30 EI30

PP180 EI60

Détails Enveloppe 1.1 Acrotère espace Scénique

Espace scénique (30 m x 12 m)

Paroi verticale - Mur béton préfabriqué matricé Ep Murs.27cm Matrice - Suivant Elévations - Support charpente métallique - Laine minérale Ep.14cm - Complexe Acoustique Panneau laine de bois 60x120 - Pose en Damier relief (Cf détails Architecte)

Ecran noir masquant gaine

Espace spectateurs

Finition de Parois: Traitement panneaux Acoustique Pose en damier + Relief de profondeur

Finition de Parois: Traitement panneaux Acoustique Pose en damier + Relief de profondeur

Finition de Parois: Traitement panneaux Acoustique Pose en damier + Relief de profondeur

0_57

0_115

ht: 240

ht: 204

Sectionnelle E30

PP140 EI30

0_116

0_56

ht: 204

ht: 204

PP93+FP EI30

0_25

PP180 E30

PP180 E30 ht: 204

RDC +0,00 m +0,00 Ngf

0_24

0_20

0_18

0_17

ht: 204

ht: 204

ht: 204

ht: 204

PP180 E30

PP93+FP E30

PP180 E30

PP180 E30

0_11

0_101

PP180 E30 ht: 204

PP200*215

PP200*215

0_102

0_103

ht: 215

ht: 215

ht: 215

PP200*215

Paroi verticale - Mur béton préfabriqué matricé Ep Murs.27cm Matrice - Suivant Elévations - Support charpente métallique - Doublage Placo LM140+1BA13

RDC +0,00 m +0,00 Ngf

Section AA'

Ind : 0


SALLE

Couvertine Membrane d'étanchéité 1%

Isolation laine de roche min 150 cm

+8.33

Descente EP

+8.22

Isolation laine de roche 140mm

5

55 10 10 10

27 Façade en béton préfabriqué

2 BA 25 jusqu'à 3.10m

35

Dalle béton

+7.95

15

Bourrage isolation

Poteau métallique encoffré

Solin Membrane étanchéité + delta MS Enrobé

25

Dalle béton ±0.00

Couche de forme

-0.05

20

20

+7.70 +7.50

126.5

80

Crochet d'ancrage sur potelet sécurité / maintenance

Gaine CVC

West facade - Lower part

MURET - SALLE ÉVÈNEMENTIELLE- DCE - Détails Pare-pluie

Porte d'accès au local

3.1.2. Pied de façade halle évenement.+ EP Ech. : 1/10e Isolation laine de roche

Bardage aluminium en cassette

Voile béton

385

Fixation en "U"

Peinture sur béton choix archi

Patte de fixation sur béton

215

Lame d'air Solin

LOGES COLL.

Soubassement béton ht. 40

Lisse métallique ép. 6mm

+0.16

+0.14

Dalle béton Couche de forme ±0.00

19

40

15

-0.05

14

18.5 Peinture sur béton choix archi. Voile béton

Scellement mortier Membrane étanchéité + delta MS Isolation polystyrène expansé

14

25

25

Isolation laine de roche

8

+3.65

14.5

24

+3.90

Enrobé

80

100

+4.08

25

Platine d'ancrage Patte de fixation sur béton Fixation en "U" d'air 7.5 cm Access to theLametechnical room Bardage aluminium en cassette

e

Coupe - Ech. 1/20

Pare-pluie

East facade - lower part e

Coupe - Ech. 1/10


0

1

2

Toiture type SYSCO 280

C1

C2

C3

1496

Couvertine

+11,41 m

1269

A

CA

+11,29 m

10,86 m

9,27 m

+12,00 m

+10,25 m

+11,18 m

+10,80 m

EP

+10,25 m

EP

EP

EP

EP

+9,17 m

EP

EP

+11,68 m

Local écran

18

1834

C4

C5

C6

703

C7

9054

C8

1003

C9

C10

C11

C12

C13

C14

C15

C16

C17

C18

+11,68 m

2750

3725

1265

CB

+12,00 m

Lanterneaux

Lanterneaux

Lanterneaux

Lanterneaux

Lanterneaux

Lanterneaux

Lanterneaux

Lanterneaux

1466

+12,00 m

CC

1988

3,00%

3,00%

3,00%

3,00%

3,00%

Toiture type SYSCO 280 3018

CD

11,30 m

+11,50 m 3,00%

3,00%

3,00%

9,70 m

3,00%

+9,61 m

3,00%

+9,61 m +10,73 m

CE

2 BA 25

15

435

1356

7

+6,56 m

+6,56 m

65

Bac acier

BC

JD1

CG

6,29 m

+11,75 m

435

Isolant laine de roche 130mm

Membrane d'insonorisation + plateau métallique

10,86 m

81

Membrane étanchéité Membrane d'insonorisation

PRS métallique SF 1/2H Flocage

CF

+11,52 m

2223

1,00%

8,05 m

3320

4598

1466

+11,86 m

+12,00 m

9,27 m

1,00%

1,00% EP

EP

EP

EP

EP

D

15

6,29 m

6,35 m

+11,72 m

45

Lanterneaux

Lanterneaux

+10,75 m

+11,19 m

+10,60 m

EP

EP

EP

EP

EP

EP

EP

EP

+10,26 m

9,18 m 471

Lanterneaux

Lanterneaux

Lanterneaux

Lanterneaux

Lanterneaux

Lanterneaux

1030

65

Isolation laine de roche 100mm

2140

82

5

5,44 m

1488

82

1,00%

3320

+8,25 m

45

4,00 m

+6,49 m

1513

1580

536

+6,56 m

1,00%

Panneau isolant 150mm

1791

E 1145

1015

1,00%

F

Lanterneaux

Lanterneaux

1,00%

Lanterneaux

EP

EP

EP

1,00%

Isolant 50mm Membrane d'insonorisation + plateau métallique Profil de support bac

EP

EP

4,00 m

5,55 m

Panne métallique G +6,56 m

1854

JD2

JD3

8061

+6,56 m

2309

+8,33 m

+8,33 m

3362

+6,56 m

+6,56 m

536

Roof plan PLAN DU REZ-DE-CHAUSSEE 10m

Juillet 2018

PRO

Acrotère béton intégrant forme de pente mini 1%

+11.75

Ind : 0

MURET - SALLE ÉVÈNEMENTIELLE- DCE- Détails Solin

Bande Etanchéité à l'air

+11.26

Membrane étanchéité Membrane d'insonorisation Isolant laine de roche 130mm Bac acier Panneau isolant 150mm

type SY 1.3. DétailToiture acrotèr 1 15

Ech: 1 : 250

Plan général RDC - Niv : 0.00 (242.75NGF)

15

Extension des locaux existants

1.2

15

CITE SCOLAIRE ELIE VIGNAL

7

Alain LELIEVRE 250, Rue Garibaldi - 69003 LYON TEL. : 04 78 60 01 33 / FAX : 04 78 60 00 32 alain-lelievre@wanadoo.fr

15

1

N

5

0

Stage roof

Crochet d'ancrage sur potelet sécurité / maintenance Isolant 50mm 27

10

30

Membrane d'insonorisation + plateau métallique Faux-plafond 120x60 noir Panne partie courante Traverse métallique Poteau métallique BA 13 Isolation laine de roche 140mm Façade en béton préfabriqué

Scenic area

MURET - SALLE ÉVÈNEMENTIELLE- DCE - Détails

SALLE Facade west 1.1. Détail acrotère espace scénique


+8.33

1%

+8.25

Couvertine Bardage aluminium en cassettes

Trappe occultante Trappe ouvrant en chute

Patte de fixation dans béton

Membrane étanchéité Costière + solin

15

7

15

15

5 8

Membrane d'insonorisation Isolant laine de roche 130mm Bac acier

5

Joue en plaque de plâtre

Solin

Panneau isolant 150mm Isolant 50mm Membrane d'insonorisation + plateau métallique

182

Panne métallique

Isolation acoustique laine de roche 100 mm Bac perforé

Costière 30/10 Cornière métallique

Cornière métallique

10

Solin

Faux-plafond 120x60 noir

25

14

28 Pare-pluie

Membrane d'étanchéité

Isolation laine de roche

Isolation laine de roche

Skydome / smoke extraction

TOITURE type MONOPANEL Sysco 360α

Isolation jonction de toiture

Couvertine

Costière 10

Isolant laine de roche 130mm Bac acier

19

Costière

Membrane étanchéité 2 couches Isolant laine de roche 120mm

Isolant 50mm Membrane d'insonorisation + panneau métallique

33

Bac acier

Panneau isolant 150 mm

+3.65

Panneau isolant 120mm Isolant 90mm + pare-vapeur spécial isolation acoustique +plateau métallique

20 44

Membrane étanchéité 4 couches Membrane d'insonorisation

+3.90

25

TOITURE type MONOPANEL Sysco 280

Dalle béton

1.4. Skydôme toiture type sysco 280 DCE Ech. : 1/10e Juin 2018

20

MURET - SALLE ÉVÈNEMENTIELLE- DCE - Détails

Voile béton

Panne métallique 270mm

Retour tableau bardage aluminium Faux-plafond

East facade - upper part

Faux-plafond acoustique 60*120 noir

PRS métal SF 1/2H Flocage

Panneau acoustique laine de bois 100mm aw>0.9

2 BA 13 Isolation laine de roche 60mm

Rail cloison mobile soudé sur PRS

MURET - SALLE ÉVÈNEMENTIELLE- DCE - Détails Roof junction

MURET - SALLE ÉVÈNEMENTIELLE- DCE - Détails

1.5. Acrotère jonction toitures Ech. : 1/10e

DCE Juin 2018

2.4. Acrotère toiture béton - P Ech. : 1/20e





Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.