PORTFOLIO
michael gebre
Architectural Design Technologist | 2010/2013
SECTION A
GROUND FLOOR
FIRST FLOOR
ROOF Redland Dueplain roof tiles, on 25 x 50 timber battens on tyvec breathable membrane, on 50 x 100 timber rafters, 100mm rockwool roof insulation between rafters on tyvec vapour control layer supported by 12mm plywood sheeting nailed between rafters, on 120 x 120 timber purlins, on 171 x 356 roof beam steel section
roof light double glazed panel roof light up-stand lead flashing
Detail F
redland dueplus tiles 25 x 50 timber tile battens 100mm rockwool roof insulation 120 x 120 timber purlin ridge beam
Detail E WALLS 100 mm colinwell facing brick 100mm kingspan kooltherma full fill cavity insulation 305 x 305 universal steel column 150mm celcon standard block 13mm plater Provide 225 mm double triangle wall ties spaced at 400 vertically and at 900 horizontally. Close cavity at openings with kingspan thermabate plus cavity closers Support walls over openings with a pre-stressed concrete lintel at each leaf and provide lateral support to internal walls by fixing to universal steel column using staifix universal wall starter system . Brickwork below ground floor to be Staffordshire Red type A engineering brick with lean mix fill to cavity up to ground floor. GROUND FLOOR 75 mm sand/cement screed on 150 mm in-situ concrete slab on 120 mm rockwool rockfloor insulation on type GPFICS cavitytrays dpm with overlap as manufacturers installation guide laid on leveled compact hardcore covered with thin layer of sand
171 x 356 steel section rafter 2mm wire ceiling hunger
Detail D
galvanized steel gutter timber facia
Detail C
WF07
DF09
DF15
DF10
RF/08
Detail B
WF21
25 mm brick slip
RF/09
CLASSROOM 11
75 mm sand/cem
CLASSROOM 11
100 colinwell facing brick
Corridor
Detail A
timber soffit fixed using timber batten
INTERMEDIATE FLOOR 6mm carpet on 75mm sand cement screed on 150mm bison hollowcore pre-stressed concrete slab on 151 x 456 universal steel beam
146 x 256 steel beam 150 mm celcon standard conc block System A Knauf AMF suspended ceiling
WG06
RG/06 CLASSROOM 3
100 mm kingspan kooltherm
DG12
DG11 Corridor
WG17 CLASSROOM 8
RG/11
Hollow protection fire protection
forbo carpet tiles
FOUNDATION foundation to be 600 mm wide by 1200 deep and 1500 X 1500 at every universal column provide concrete mix of 1:2:4 (grade C25)
600 x 1200 strip foundation
pad foundation (beyond)
Section AA
CEILING System A Knauf AMF suspended ceiling 600 x 600mm knauf AMF mineral tile L reinforcement profiles, main runners at 600 mm centers 2mm wire provide 24 x 24mm perimeter trim screwed to walls hunger wires to be at 1200 mm centers fixed to timber rafters at first floor and to bison hollow core at ground floor
3450
150
4487
2413
3450
820 335
820
900
600
100 700
700
199
4487 700
25 700
25
4487
3437
25 199
700
55 25
600
820
100
100
2700 1200
1400
870 230
1200
2700
1450
87
100
820 1020 1200
100
100
203
D
E 5 A102
insulated concrete flat roof
lift
7 A102
1 A102
B existing facing brick of MI building
600x600 mm ceiling tiles
304
curtain wall
external cavity wall
C
W302
202 IAPD
303
aluminium framed round windowl
204
160mm concrete floor slab
W301
103 LECTURE RM
aluminium framed round windowl
W202
102 LECTURE RM
201 RIBA POST G
steel railguard
101 RIBA UNDER G.
W201
lift
lift
4 A102
insitu pad concrete foundation
9 A102
010 OFFICE
D115
008 OFFICE
D113
006 OFFICE
D111
004 OFFICE
D109
6 A102
insitu concrete ground floor
100mm conc block partion wall prefab concrete staircase
insitu concrete trnch foundation
001 EXHIBITION
insulated concrete flat roof
600x600 ceiling tiles
aluminium framed round window
existing external wall of MI building
W302
8 A102
2979
curtain wall
D304
100mm conc partition wall
F
10 A102
W301
204 Corrid
MI Second F
109 Corrid
MI First F
9 m²
160mm conceret intermediate floor
3189
3189
W202
W201
9 m²
2 A102
steel guard rail
015 Corrid 8 m²
prefab conc staircase 480mm ground floor concrete slab
conc trench foundation
MI Ground F
3 A102
conc pad foundation
#TEJGF UVGGN Z JQNNQY UGOKÄVTCPUNWUEGPV HCDTKE UVTWEVWTG ENCFFGF UVGGN EQNWOP QP CTEJGF UVGGN TQQH YKVJ HCDTKE UVTWEVWTG
ETCPG DTKFIG
VTWEM UWURGPFGF HTQO TQQH LQKUVU
JQKUV
ETCPG DTKFIG HKZGF ETCPG GPF VTWEM UWURGPFGF WUKPI UWURGPFGF HTQO VTQNNG[U EGKNKPI LQKUVU
$TGCM #TGC
RQFU UVCEMGF QP VJG TGCT UGEVKQP QH VJG URCEG RNCP
2NCPV 4QQO $TGCM 5RCEG
/GGVKPI 4QQO
/CKP 'PVTCPEG
/CKP 'PVTCPEG
#FOKP 1HHKEG
1HHKEG
52#%' 75'& #5 # %10('4'0%' *#..
5VQTG
#FOKP 1HHKEG
1HHKEG
52#%' 75'& #5 #0 1((%' (#%+.+6;
2TGHCD 1HHKEG $WKNFKPI 'NGXCVKQPU ^ 2NCPU &GUKIP %QORVGVKQP .Ä8+
UNKFKPI INCUU RCPGN QH VJG RQF
QHHKEG RQFU UVCEMGF on the rear space of the structure-having the effect of framed glass panel facade
GROUND FLOOR
ELEVATIONS
DETAILS
SECTION AA 1 kalzip FC rainscreen panel 2 concrete foundation 3 external brickwork upto ground level 4 265 celcon concrete block 5 insulation 6 curtain wall 7 20x9mm glass ‘o’ foam 8 dpc 9 eurodek HD pedestal 10 glass panale brackets’ steel rod support 11 30mm eurodeck high density chipboard floor panel 12 z perlin 13 roof beam 14 glass panel brackets fixed to steel rod support 15 plasterboard and skim fixed to roof beam and ceiling tiles using steel profile 16 rockfone sonar 44 dB accoustic ceiling tiles 17 threaded steel rod ceiling hunger fixed to purlins 18 steel rod ceiling hunger 19 kalzip FC reainscreen panel 20 intermediate concrete slab 21 75mm kingspan kooltherm k5 external wall board 22 906mm corus primary castelated steel beam 23 eiling tile perimeter profile 24 skylight glasing
28 31
25 mechanical window actautor 26 double 240x50mm timber trimmers 27 roof beam enclosed using plasterboard on skim 28 kalzip standing seam sheet
16
29 castellated beam 30 rigid insulation 31 kalzip structural decking
9QNXGTJCORVQP &KUVTKEV .KDTCT[ 5GEVKQP ^ &GVCKNU ^ & 8KGYU /CLQT 2TQLGEV &GUKIP 'ZJKDKVKQP .Ä8N ^
A
B timber framed glass cladding
D
C roof-light
timber framed glass cladding (rear of the building)
Kalzip aluminum sheet
north facing roof-light
E
210 mm lightly compressed Kalzip thermal insulation
F
ventilation duct
corus 308 mm long span castellated roof beam
plasterboard fixed to steel beam using steel fastener timber framed insulated glass panel threaded rod
plasterboard on skim
ventilation duct
rockfon sonar dB 44 acoustic ceiling
FW6
FW5
FW4
FW3
FW2
FW1 kalzip FC rainscreen
FW10
FW9
FW7
FW8
75 mm kingspan kooltherm k5 external wall board
265 celcon solar concrete block
FD1
MUSIC ROOM Room 27
YOUNG ADULTS Room 28
FD2
FD3
FD4
BOOK COLLECTION and READING AREA
265 mm HH Celcon solar concrete block 12 mm internal wall render
906 mm deep cellular composite beam
hollowcore concrete floor slab
ventilation duct
906 mm secondary composite beam
GD8
GD9
GW10
GD2
GW9
GD3
GW8
GD4
CIRCUILATION DESK Room 2
SECTION
GW7
GD5
KID's AREA Room 3
GW6
GW5
GD6
KID's AV ROOM Room 9
Existing house 114mm timber principal rafter at 2400mm cc
150mm rigid insulation between common rafters
12.5mm plasterboard screwed underneath rafter to enclose insulation
25mm sw battens 32°
Shingles roof tiles
rafters at 2400 cc
1 A104 W200
150mm timber joist compound at 600mm cc ceiling
150mm timber joist D202
100mm Conc. block
facing brick 100mm rigid insulation
Rm 204 BATH
vinyl finish
Rm 201 HALLW.
100mm concrete block W102
2 A104
12.5mm plasterboardonskim render
750x1000 in-situ concrete foundation
15mm concrete with Corus Comflor 52
compond ceiling
D102
D101
Rm 101 PLAYROOM tanking membrane to extend upto middle stair landing base tanking membrane
moisture protectted concrete pad slab under the stairwell 750x100mm footing for the stairwell enclosure cavity wall
concrete block column support for the concrete stair existing foundation underpinning to be built underneath the existing foundtion
SECTION A
VIEWS
&QOGUVKE *QWUG 'ZVGPUKQP 5GEVKQP ^ & 8KGYU $+/ Ä6JGQT[ CPF #RRNKECVKQP .Ä8NN
Presentation Scheme PLAYROOM
light fixtures
STAIR
patio
principal rafters under common rafters at 2400mm cc
principal rafter joists to span up to the outercore face of the internal walls
23 m²
2400
2400
hardwood floor finish
2400
Rm 103 STAIR
463 800 800 463
6 m²
UP
Existing House
Rm 101 PLAYROOM
2400
148x184mm timber beams to support ceiling enclosure for the toilet
Rm 102 WORKSHOP
29 m²
common and principal rafters at 2400mm cc
hardwood floor finish
2198
common rafters at 2400mm cc
Existing Plan
WORKSHOP
2198
600x600mm compound ceiling tiles
4505
600x600mm compound ceiling tiles
CEILING PLAN
ROOF/STRUCTURAL PLAN
Ground Floor
GROUND FLOOR/legend
entrance (workshop)
N
Patio
Presentation Scheme BATH BEDROOM HALLW. PLAYROOM
Rm 203 PLAYROOM 23 m²
hardwood floor finish
600x600 compound ceiling
entrance (existing)
Roof Top View light fixture
Patio
Existing House
vinyl floor finish
W Rm 204 BATH 6 m²
vinyl floor finish
Rm 201 HALLW.
DN
4 m²
600x600 compound ceiling Rm 202 BEDROOM 18 m²
hardwood floor finish
entrance (playroom)
CEILING PLAN First Floor
BLOCK PLAN
FIRST FLOOR/legend