CORPORATE YEARBOOK 2018 - 2020
INDEX 2 0 1 8
2018 Citadel Completions: Location Q2 2018 Facilities: Build-out & Renovation Improvements Commenced Q3 2018 Hangar H: Branding / Logo & Paint Before
3 4 6
Q3 2018 Hangar H: Branding /Logo & Paint Completed
7
Q3 2018 Hangar D: Exterior Before Branding /Logo & Paint
8
Q3 2018 Hangar D: Hangar D Exterior Branding / Logo & Paint Completed
9
Q4 2018 Hangar H: Annex Engineering & Offices Build-out & Renovations
10
Q4 2018 Hangar H: Annex Renovations Completed Q4 2018 Hangar D: North Portion of West Annex Build-out & Renovations For Sheet Metal Shop
11 12
Q4 2018 Hangar D: West Annex Build-Out Q4 2018 Administration Building: Branding/Logo & Paint Before & Completed
13 18
Q4 2018 Administration Building: Lobby and Customer Lounge Build-out & Renovations Before Q4 2018 Administration Lobby & Customer Lounge Completed Q4 2018 First Floor Training Center: Build-out & Renovations Before & Completed
20
Q4 2018 Second Floor Administration: Build-out & Renovations Before Q4 2018 Second Floor Administration: Completed Q1 & Q2 2018 Events Q3 2018 Events Q4 2018 Events Continued 2018 Aircraft Projects
23
2 0 1 9
2019 Citadel Completions Q1 2019 Facilities: Hangar D South West Annex Build-out & Renovations Q1 2019 Hangar D: East Annex Build-out & Renovations Q3 2019 Design Center Before & During Build-out & Renovations Q4 2019 Design Center Completed Q1 & Q2 2019 Events Q3 2019 Events Q4 2019 Events Q1 – Q3 2019 Aircraft Projects Q4 2019 Aircraft Projects
31 32 34 36 37 40 43 44 47 51
2 0 2 0
2020 Citadel Completions Q3 2020 Facilities: Hurricane repairs Q1 2020 Events Q2 2020 Events Q3 2020 Events Q4 2020 Events Q1 & Q2 2020 Aircraft Projects Q2 & Q3 2020 Aircraft Projects Q4 2020 Aircraft Projects
55 56 58 59 60 61 62 64 67
21 22
24 25 26 27 29
Mr. Sheldon G. Adelson Dr. Miriam Adelson
“
When I hired Joe, I told him I wanted this company to become a best in class business, just like all my businesses. He and his team rocketed Citadel Completions right out of the gate, from opening an empty facility in March, to undertaking a major project just 7 months later.
- Sheldon G. Adelson, President, Citadel Completions
2 4
LOCATION “
What was key for us was that Louisiana is a very central location, readily accessible from either the East or West Coasts. Lake Charles is uniquely situated in close proximity to air, rail, land, and sea transportation modes, and is very close to both Houston and New Orleans metropolitan areas. Lake Charles itself is truly a hidden gem of America’s south. - Joe Bonita, Managing Director, Citadel Completions
2018 3
5
Q2-2018
FACILITIES
Build-out & Renovation Improvements Commenced
Hangar H Hangar D
November 2017, Citadel Completions purchased all its large equipment from a closed completions facility in Dallas, Texas. Q2 through Q3 2017 we brought in all the equipment to Lake Charles, Louisiana to set up Citadel hangars and shops. The purchased equipment consisted of aircraft stands, utility trucks, vehicles, tooling for shops and other equipment. We occupied spaces and renovations began by fully furnishing offices, branding buildings and facilities with Citadel scheme on interior and exterior painting.
4
HANGAR H - STAGING OF EQUIPMENT AT MOVE- IN
AERIAL OF HANGARS - BEFORE
HANGAR D - LAYOUT
HANGAR H - LAYOUT
ADMINISTRATION BUILDING
5
Q3-2018
Hangar H: Branding/Logo and Painting New Citadel Completions branding/logo & paint is commenced.
HANGAR H - BEFORE
6
Q3-2018
Hangar H
HANGAR H –BRANDING / LOGO & PAINT COMPLETED
7 7
Q3-2018
HANGER D- EXTERIOR BEFORE BRANDING / LOGO & PAINT
8
Q3-2018
HANGAR D- EXTERIOR BRANDING/ LOGO & PAINT COMPLETED
9
Q3/Q4-2018 Hangar H: Annex Engineering & Offices Build-out & Renovations Build-out & Renovations began to create Engineering workspaces and office cubicles. Build-out to create customer offices by opening up walls and increasing the size of the offices. Painting in tool crib, conference room, work center/production control, and Quality Department areas. Fully furnished each office, added wall coverings, and flooring.
HANGAR H – ENGINEERING & OFFICES PLANS BEFORE
10
Q4-2018 HANGAR H ANNEX BUILD-OUT & RENOVATIONS- COMPLETED
CUSTOMER OFFICES
TOOL CRIB
QUALITY DEPARTMENT
ENGINEERING
11
Q4-2018
HANGAR D -AFTER
Hangar D: North Portion of West Annex Build-out & Renovations / Sheet Metal Shop Hangar D – West Annex build-out & renovations to create a Sheet Metal Shop commenced. Demolished sectioned-off offices and cubicles. Resurfaced the floor and applied new epoxy. Fire Retardant Paneling (FRP) installed. All power requirements for tooling, new drop ceiling with LED lighting installed.
12
HANGAR D –NORTH PORTION OF WEST ANNEX-PLANS
Q4-2018 Hangar D: West Annex Build-out (continued) Ceiling installation. Millwork. Doors and window installation. HVAC Repairs. Air piping and Air compressors installed. Air Compressor cover installed. Installed a spray booth. Installed a glue booth. Sprinkler repair work.
13
Q4-2018
WEST ANNEX- SHEET METAL SHOP DURING BUILD-OUT
14 WEST ANNEX- CUSTOMER OFFICE BEFORE & DURING
Q4-2018
WEST ANNEX- SHEET METAL SHOP RENOVATIONS AFTER
WEST ANNEX- SHEET METAL DEPARTMENT BUILD-OUT COMPLETED
HANGAR D – WEST PRODUCTION BUILD-OUT COMPLETED
15 13
Q4-2018
16
HANGAR D- FLOORING BEFORE EPOXY
HANGAR D- FLOORING EPOXY COMPLETED
Q4-2018
HANGAR D -AFTER
HANGAR D – INVENTORY WAREHOUSE MOVE-IN & PAINT COMPLETED
17
Q4-2018 ADMINISTRATION BUILDING – COMMENCED BRANDING/ LOGO & PAINT
ADMINISTRATION BUILDING –BRANDING/LOGO & PAINT COMPLETED
Administration Building Exterior paint and added logo/ branding completed on exterior. 18
ADMINISTRATION ENTRANCE - AFTER
Q4-2018
ADMINISTRATION EXTERIOR ENTRANCE – BEFORE & DURING
ADMINISTRATION EXTERIOR ENTRANCE – COMPLETED
19
Q4-2018 Administration Building: Lobby and Customer Lounge Build-out & Renovations Before & Commenced Interior lobby and Design Center build-out renovations flooring, reception lobby, furnishings and décor began. Installed new flooring & wall tiles in restrooms. Added a glass conference room and fully furnished. Added new lighting throughout area. Painting throughout areas. Sprinkler system installed. IT room created and furnished. Millwork completed.
20
ADMINISTRATION LOBBY & DESIGN ENTRANCE– BEFORE
Q4-2018 ADMINISTRATION LOBBY – COMPLETED
CUSTOMER LOUNGE– COMPLETED
Administration: Lobby & Customer Lounge Completed Interior lobby and Design Center build-out renovations with carpet & flooring installation, reception lobby fully renovated with décor and furnished.
21
Q4-2018 First Floor Training Center: Build-out Before & Completed Build-out & renovations were started and finished for Citadel Onboarding Center with cubicles for training and CBT computer stations installed.
TRAINING & ONBOARDING CENTER BEFORE
Training Room Center build out with walls and furnishings and TV monitors and wall decoration installed. Furnished all spaces. Flooring / carpets, decor, and paint.
22
TRAINING CENTER– COMPLETED
ONBOARDING CENTER– COMPLETED
Q4-2018 Q4-2018
Second Floor Administration: Build-out & Renovation Before Build-out & renovations commenced for employee breakroom, Planning Department cubicle work space and Executive Conference Room. Furnished offices and work spaces. Flooring / carpets, décor, wall finishing's and painting.
EMPLOYEE BREAK ROOM - BEFORE
EXECUTIVE CONFERENCE ROOM - BEFORE
PLANNING DEPARTMENT - BEFORE CITADEL ONBOARDING– COMPLETED
23
ADMINISTRATION - SECOND FLOOR COMPLETED
Q4-2018
EMPLOYEE BREAK ROOM
Second Floor Administration: Completed EXECUTIVE CONFERENCE ROOM Build-out & renovations were completed for second floor conference room, planning department, accounting department, executive offices, accounting conference room and employee breakroom. 24
PLANNING DEPARTMENT
EVENTS
Q1 Q2
Employee Relations/Events
Community Events
March 2018: • Hiring of staffing personnel for senior management, directors and administration positions. • Established company branding, employment policies, hiring practices and employee uniforms. May 2018: • Continued hiring of management, administration and aircraft technicians positions.
March 2018: • Established partnerships within the community, schools and universities for recruitment efforts.
Corporate Events
2018
May 2018: • Governor John Bel Edwards and Citadel Completions LLC made a public announcement the company will make a $17.6 million capital investment in Lake Charles, LA.
25
30 27
EVENTS (continued)
Q3
26
2018
Employee/Relations/Events Community Events
Corporate Events
July 2018: • Continued hiring of management, administration and aircraft technicians positions August 2018: • Citadel Completions - B747 classic & B737 next generation aircraft familiarization course training September 2018: • Citadel Completions - B747 classic & B737 next generation aircraft familiarization course training
August 2018: • The Bermuda Civil Aviation Authority (BCAA) awarded Citadel Completions with an Aircraft Maintenance Organization Repair Station Certificate September 2018: • Citadel Completions partners with Edminston at the Monaco Yacht Show (MYS)
MONACO YACHT SHOW – PORT HERCULES
2018
EVENTS (continued) Employee Relations/Events
Q4
Community Events
October 2018: • Continued hiring of aircraft technicians positions • Citadel Completions attends air force job fair at Barksdale AFB November 2018: • Citadel Completions - B737 next generation aircraft familiarization course Training • Citadel Completions participates in recruitment event at Hallmark University December 2018: • Citadel Completions celebrates employee holiday event
ADELSON FAMILY DONATED G3 TO HALLMARK
Corporate Events
November 2018: • Adelson Family donates airworthy G3 to Hallmark University
MEBAA STATIC DISPLAY & CHALET
December 2018: • Citadel Completions received FAA Part 145 Certificate • Citadel Completions debuts at Middle East Business Aviation Association (MEBAA) show at Dubai World Central Airshow site
27 29
Q3-2018
28
RECRUITMENT EVENT AT BARKSDALE AIR FORCE BASE
FAA PART 145 CERTIFICATE
2018
AIRCRAFT PROJECTS
Q4
Customer Sands Aviation
A/C Type A340-500
VP-BMS
Tail #
Scope
C1,C5 Checks, Airworthiness Directives & Service Bulletins
29
Q3-2018
30
Sands Aviation
A340-500 | VP-BMS
2019 31
Q1-2019
FACILITIES Hangar D: South West Annex Build-out & Renovations
South West portion of West annex- offices demolished to create open workspace for a Wire Harness Shop. FRP on walls, resurfaced floor, LED lighting and power requirements for tooling. Doors and window installation. HVAC repairs. Air pipping and air compressors. Sprinkler repairs. WEST ANNEX- RENOVATION PLANS-BEFORE
32
Q1 2019
WEST ANNEX- RENOVATION WIRE HARNESS COMPLETED
33
Q1-2019 Hangar D: East Annex Renovations East portion of West annex – Two floors with offices were demolished to create a custom upholstery shop. New ceilings and LED lighting, and paint. Windows and doors. Sprinkler work. Fall protection. EAST ANNEX- UPHOLSTERY RENOVATION PLANS BEFORE
34
Q1-2019
EAST ANNEX- UPHOLSTERY RENOVATION COMPLETED
35
Q3-2019 Design Center & Studio July 2019: Demolition and renovations began on Citadel’s Design Center. Removed existing offices and created open floor plan and open industrial ceiling with new studio lighting. Design Studio and mock ups installed. New glass installed for conference room, new carpet and painting.
36
DESIGN CENTER & STUDIO– BEFORE & DURING BUILD-OUT & RENOVATIONS
Q4-2019 Design Center & Studio October 2019: Citadel Completions finalized and introduces the opening of it’s new Design Studio. The state of the art facility supports our client’s projects from concept through delivery.
DESIGN STUDIO - COMPLETED DESIGN CENTER & STUDIO - COMPLETED
37
Q4-2019 Q4-2019
38
DESIGN CENTER & STUDIO- COMPLETED
Q4-2019
CUSTOMER DINING ROOM – FUTURE (HELD DURING 2020 COVID PERIOD)
CUSTOMER SEATING FUSELAGE AND MOCKUP
(CURRENTLY IN BUILD BY CITADEL TEAM)
39
EVENTS
Employee Relations/Events
Q1
January 2019: • Citadel Completions - Gen Fam B767 & A330 aircraft system general familiarization course training February 2019: • Citadel Completions - A340 differences aircraft system general familiarization course training
Q2
March 2019: • Citadel Completions celebrated its1 Year Anniversary with a employee Crawfish Boil Celebration April - June 2019: • B777 aircraft system general familiarization course training B777 AIRCRAFT TRAINING
Community Events
Corporate Events
2019
PRESIDENT DONALD J. TRUMP MOTORCADE
B747SP-VQ-BMS STATIC DISPLAY
May 2019: • Citadel Completions sponsors Chennault International Airshow and has a static display of B747SP- VQ-BMS
March 2019: • Citadel Completions received its European Aviation Safety Agency (EASA) Part 145 Maintenance Organization Approval May 2019: • Citadel Completions hosts Louisiana Economic Development Visit • Citadel host motorcade of the President Donald J. Trump inside Hangar H • Citadel Completions debuts at the European Business Aviation Convention and Exhibition (EBACE) with a custom booth
40 34
PRESIDENT TRUMP VISIT TO LAKE CHARLES, LA
Q1-2019
Q2-2019
CITADEL’S 1 YEAR ANNIVERSARY CRAWFISH BOIL
Q1-2019
EBACE CONVENTION SHOW
Q2-2019
41
Q2-2019 CHENNAULT INTERNATIONAL AIRSHOW Chennault International Airshow- Static Display
B747SP | VQ-BMS
42 31
EVENTS (continued)
Q3
Employee Relations/Events
Community Events
Corporate Events
August 2019: • Citadel Completions family fun day • Citadel hosts two virtual recruitment career fair’s • Citadel Completions participates Embry-Riddle’s Aeronautical University industry/career expos in Arlington, VA.
July 2019: • Citadel Completions collaborated with LifeShare Blood Centers to host blood drive • Citadel Completions proudly sponsors the Southwest Louisiana Hot Air Balloon Festival • Citadel Completions hosts virtual recruitment fair
July 2019: • Citadel Completions was issued its Approved Maintenance Organization Certification from the United Arab Emirate’s General Civil Aviation Authority (GCAA)
September 2019: • Citadel Completions participates in: Embry- Riddle’s Aeronautical University industry/career expos in: Dallas, TX Prescott, AZ Daytona Beach, FL • Citadel Completions hosts virtual recruitment fair • Citadel Completions participates in Hallmark University Annual Career Fair in San Antonio, TX.
EMBRY RIDDLE - CAREER EXPO
36
2019
September 2019: • Citadel Completions makes its second appearance at the Monaco Yacht Show (MYS) with partners Edminston
SWLA HOT AIR BALLOON FESTIVAL
CITADEL BLOOD DRIVE
43 37
EVENTS (continued) Employee Relations
Community Events
October 2019: • Citadel Completions exhibits at the U.S. Military's Logistics Officer Association (LOA) Symposium in Oklahoma City, OK. • Citadel Completions exhibits at National Business Aviation Convention & Exhibition (NBAA) and host first offsite Citadel reception event at the Sands Aviation hangar in Las Vegas, NV. • Citadel Completions receives ISO 9001:2015 and AS9110:2016 certifications
October 2019: • Citadel Completions hosts virtual recruitment career fair
Q4
November 2019: • Citadel Completions hosts virtual recruitment career fair • Citadel Completions participates in the Disabled American Veterans (DAV) Recruit Military Veterans job fair, in Houston, TX. December 2019: • Citadel Completions hosts virtual recruitment career fair
44
Corporate Events
2019
NBAA TRADESHOW BOOTH
NBAA RECEPTION
November 2019: • Citadel Completions exhibits at the Dubai Airshow • Citadel Completions co-sponsor the Middle East & North Africa Business Aviation Association (MEBAA) reception
MEBAA CONVENTION
2019 Q4-2019
NBAA CITADEL TEAM & RECEPTION EVENT
45 37
Q4-2019
46 35
MR. SHELDON G. ADELSON AND DR. MIRIAM ADELSON VISIT TO CITADEL COMPLETIONS 34
2019
AIRCRAFT PROJECTS
Q1
Q2 Q3
Customer
A/C Type
Tail #
Scope
Sands Aviation
BBJ
N887LS
C-Check & interiors
Sands Aviation
BBJ
N108MS
Interiors
Bar Aviation
B747-400
N744VG
General Aircraft & damage inspections
Sands Aviation
B747SP
VQ-BMS
Weekly check, monthly check, ACheck
Montex Drilling
737
N737MT
Routine weekly inspections & interiors
Bar Aviation
B747-400
N744VG
Panasonic GCS Antenna MOD
Sands Aviation
737
N883LS
A & C checks & light interiors
Sands Aviation
B747SP
VP-BLK
C-Check
14
Total Aircraft Projects 47
Q1-2019
Sands Aviation
48
BBJ | N887LS
Q1-2019
Sands Aviation
BBJ | N108MS
49
Q3-2019
2 0 1 9
Montex Drilling Company
737 - N737MT Q3-2019 737 | N737MT
50
Q3-2019
Q2-2019
Sands Aviation
B747SP | VP-BLK
Bar Aviation (Virgin Orbit)
B747-400 | N744VG
AIRCRAFT PROJECTS Customer
Q4
2019
(continued)
A/C Type
Tail #
Scope
Polaris
B767
N673BF
Light MRO
Polaris
737-700
N737LE
Monthly inspections/ hour inspections/monthly post flight check, heavy check/ MODs
MetroJet
737-75G
N213EM
A-Check, B1, C1,C2,C3 Checks, Airworthiness Directives & Service Bulletins
Sands Aviation
B737-300
N788LS
C-Check, weekly and parking- Feb, April, July, preservation, storage, inbound writeups
Polaris
737-700
N737LE
Aircraft warranty
Vallejo Investments
737
N310AG
Non-routine maintenance
51
Metro Jet
737-75G | N213EM
52 52
Q4-2019
Q 4 2 0 1 9 Metro Jet
737-75G | N213EM
53
Citadel’s 35 Acre Expansion Concepts
54
2020
55
FACILITIES Hurricane Repairs: Completed Majority of the administration building repaired: • Drywall, ceiling titles, roofing damage, flooring repaired, furniture replaced. • Cubicles reinstalled in engineering. • Repainted walls and floors repairs completed. GSE: • Replaced doors. • Repaired awning.
56
Q3-2020
HURRICANE DAMAGE
Q3-2020
HURRICANE DAMAGE- ADMINISTRATION BUILDING HURRICANE DAMAGE- ENGINEERING DEPARTMENT
HURRICANE DAMAGE- HANGAR H & D
57
EVENTS
Employee Relations
Q1
Community Events
January 2020: • Citadel Completions partners with American Job Center Career Fair • Citadel Completions host virtual recruitment fair February 2020: • Citadel Completions partners with EmbryRiddle Aeronautical University Spring Industry/Career Expo in Prescott, AZ. & Daytona Beach, FL. March 2020: • Citadel Completions partners with McNeese State University Career Fair • Citadel Completions partners with Disabled American Veterans (DAV) Recruit Military Veterans job fair New Orleans, LA. • Citadel response to Corona virus and work from home is initiated
Mc NEESE STATE CAREER FAIR
58
2020
ERAU-CAREER EXPO
Corporate Events
February 2020: • Quality Department State Capital visit for Aeronautical Repair Station Agency (ARSA) annual meeting.
STATE CAPITAL VISIT
January 2020: • Citadel Completions sponsors Corporate Jet Investor (CJI) London townhall February 2020: • The Registry of Aruba has officially awarded Citadel Completions with an Aircraft Maintenance Organization Part 145 Repair Station Certificate (Cert. #DL-ACC234)
2020
EVENTS (continued) Employee Relations
Q2
April 2020: • Covid19 work from home period continued • Virtual A320 aircraft system general familiarization course training • Virtual B777 aircraft system general familiarization course training May 2020: • Virtual B767 aircraft system general familiarization course training • Employees returned to work on a case by case basis • Citadel Completions host virtual recruitment fair June 2020: • Citadel hosts virtual recruitment fair
Community Events April 2020: • Citadel Completions volunteered material and resources to manufacture much-needed face masks for medical facilities
Corporate Events April 2020: • Citadel Completions add wire harness production to list of competencies
59
EVENTS (continued) Employee Relations
Q3
60
July 2020: • Citadel Completions hosts virtual recruitment fair August 2020 • Citadel Completions hosts virtual recruitment fair • Storm preparations for hurricane Laura • Assessed and repaired damages to facilities from hurricane
2020 Community Events
Corporate Events
August 2020: • Citadel Completions facilitates engineering internship program with students from Louisiana Tech University and Louisiana State University.
July 2020: • Citadel Completions is a proud participant and sponsor of the Corporate Jet Investor Global 2020 Townhall virtual event
ENGINEERING INTERNSHIP PROGRAM
EVENTS (continued) Employee Relations
Q4
October 2020: • Storm preparations for hurricane Delta November 2020: • Assessed damages and started repairs for all hangars and facilities from hurricane • CRJ 100/200 & 700-900 aircraft system general familiarization course training. December 2020: • Citadel Completions welcomes new Controller, Isaias Gomez • Employee holiday luncheon
Community Events
Corporate Events
October –Dec 2020: • All community related events cancelled due to Covid19
October –Dec 2020: • All Industry related conventions and shows cancelled due to Covid19
EMPLOYEE HOLIDAY LUNCHEON
61
AIRCRAFT PROJECTS Customer
Q1 Q2 62
2020
A/C Type
Tail #
Scope
Montex Drilling Company
737-500
N737MT
A-Check
Sands Aviation
B737-300
N789LS
Weekly parking, preservation and storage
Vallejo Investments
737
N310AG
36 mo. A-Check, storage and MRO
Sands Aviation
BBJ
N108MS
C-Check
Sands Aviation
A340-500
VP-BMS
C-Check
Montex Drilling Company
737-500
N737MT
MRO
Aramco Associated Co.
767-2AX
N767A
MRO, ionization MOD and L2 prototype Wi-Fi installation.
19
Total Aircraft Projects
Sands
B737 | N789LS
Sands
A340-500 | VP-BMS
Q1-2020
Q1-2020
Q2-2020
Q2-2020
Montex Drilling
737-500 | N737MT
Aramco
767-2AX | N767A 63
AIRCRAFT PROJECTS Customer Turkmenhowayollary Agency
Q2 Q3 64
2020
(continued)
A/C Type
Tail #
Scope
737-700
EZ-A007
EZ& WiTeam 125, Inc
B767-323ER
N225NE
C-Check, full interior refurbishment, USB outlet and iPad mount MODs, A007- phone system replacement Fi and facilitated livery paint. MRO and C-Checks
Team 125, Inc
B767-323ER
N36NE
Reupholster seat covers
Bar Aviation
B747-400
N744VG
MRO, 1A,1C,2A,3A,4A Checks
Sands Aviation
B767
N804MS
C-Check
Boeing EFO
BBJ
N836BA
Monthly inspections/hour checks, 3000 cycle check, aircraft separation and assessment & MRO
Sands Aviation
B747SP
VP-BLK
C-Check, separation and assessment, component harvest & demolition
Turkmenhowayollary Agency
737-700 | EZ-A007
Team 125 (Patriots)
767 | N225NE
Q2-2020
Q2-2020
Q2-2020 Q3-2020
Sands
B767 | N804MS
Boeing EFO
BBJ 737 | N836BA 65
67
COMPLETED INTERIORS
Turkmenhowayollary Agency
66
EZ-A007
Q2-2020
AIRCRAFT PROJECTS Customer
Q4
2020
(continued)
A/C Type
Tail #
Scope
Polaris
777-200
N777UK
Light MRO, 1A & A-Check & weekly checks
Pratt & Whitney
B747SP
C-FPAW
A-Check & 24/72 month checks
Aramco Associated Co
767-2AX
N767A
A and C-Checks
Polaris
767
N673BF
Weekly checks
Q4-2020
Polaris
767 | N673BF
67