jerseyshoreonline.com
Page 22, The Jackson Times, November 5, 2022
Roads:
Continued From Page 1 Lane, South Boston Road, Indiero Road, Brentwood Road, Lenape Trail, Chandler Road, Feather Lane, Kacie Lynn Cou r t, West Pleasant G rove, Kevin Court, Cypress Avenue, Gail Chamber Road, Sams Road, Kitay Court, Cobain Road, Chief Showell Dr ive, Derose Lane and Metedeconk Trail are on the project list. Jackson puts its road projects out to public bid. The cost of constr uction for completed roadways for Jackson is approximately $275,000 per mile, while the average cost for completed roadway work in the region is between $300,000 and $400,000 per mile. Mayor Michael Reina said the $6.7 million figure “doesn’t include additional road work being done on county roads that run through Jackson. When we invest in our roads and infrastructure, we invest in our quality of life and in our local economy here in Jackson. That’s why we’re continuing our work on this front with 20 additional local roads being freshly resurfaced or repaired in the weeks ahead.” Jackson invests on average between $1 million and $2 million each year, he said. This equals an average of six to eight miles of township roadways per year. This project work not only includes roadway pavement re-surfac-
ing, but also involves roadway base pavement repairs, storm water system upgrades, handicap accessibility upg rades to sidewal k cu rb ramps and traffic striping/signage upgrades. On an annual basis, the township has applied grants received from the New Jersey Department of Transportation (DOT), averaging about $400,000 per year, to its roadway and stormwater projects. “Keeping our roads in top-notch condition is one of the most basic and one of the most important responsibilities of local government. Given the sheer size of Jackson Township, we have to stay on top of our infrastructure needs,” the mayor said. Last year, Jackson invested in a township-wide, comprehensive road assessment, which ranked the condition of every local road. The municipality has been investing signif icant resources into its capital bu d ge t fo r r o a d way i m p r ove m e nt . Specifically, the township’s roadway improvement project budgets have been $1.57 million for 2019; $994,628 for 2020; $1.86 million for 2021; and $2.32 million for 2022 making it the most comprehensive road repair effort ever undertaken in Jackson which owns and maintains over 208 miles of improved roadway. When the work on the township roads is finished, a total of 71 township roads will have been resurfaced and/or improved since 2019.
─Photos courtesy Jackson Township Jackson roads will be undergoing paving work in the weeks to come as part of an ongoing road improvement program.
BUSINESS DIRECTORY McMahon’s Jersey Shore Powerwashing Hot Water and Soap Mold Removal Houses • Patios & Roofs Washed Gutter Cleaning • Interior/Exterior Painting
732-681-1111
Insured Lic.# 13VH09707800 Senior Community Discounts · Free Estimates NO HIGH PRESSURE USED Low Pressure Roof Stain Removal Safely Washing Houses & Roofs for Over 20 Years
BOB
609-819-1240
FREE
ESTIMATES
Replacements & New Install of Heating & Air Conditioning Units
891 Rt. 37 West • Toms River, NJ 08755 HEATING • AIR CONDITIONING Serving All of Ocean & Monmouth Counties
1-800-688-TEMP • www.caretemp.com
THIS SPACE COULD BE YOURS!
Bob’s Rides for Cash Better Rates than UBER -
$70 Newark/$120 Lag/$120 JFK $110 Philly/$50 Trenton AIRPORTS • NYC • CRUISES • STADIUMS • LOCAL RIDES • CASINOS
EFFECTIVE › AFFORDABLE VISA, MASTERCARD & AMERICAN EXPRESS ACCEPTED DISCOUNT PACKAGES AVAILABLE!
CALL 732.657.7344 TO FIND OUT HOW!
Please Check Your Ad The First Week It’s Scheduled To Run For Insertion & Accuracy. Micromedia will not be responsible for errors occurring in an ad beyond the f irst week if we are not notif ied of the error.
GREAT RATES FOR BUSINESS DIRECTORY ADS! NUMEROUS DISCOUNT PACKAGES AVAILABLE! FOR DETAILS, CALL 732-657-7344 TODAY!