
1 minute read
Work Begins On Township Solar Farm
By Chris Lundy BERKELEY
– Today, it looks pretty barren. Just dunes of dirt that stretch farther back into the woods than you could ever imagine.
Before that, though, it was even worse – it was a landfill. It’s the future, however, that’s looking bright.
The township’s municipal landfill hasn’t been used in quite some time but it was never properly capped. Now, a company is going to come in, cap the landfill, and build a solar field over it.
To give a sense of the enormity of the project, this is an approximately