CURRENT REVISION + NOTES Date: Description: 02.11.21 REVISED
Issue: F
Drawn: AE
CLUBHOUSE RENOVATION CLIENT: MID COAST COUNCIL STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET NAME: OMARU PARK, TAREE CWC JOB #: D4772 SITE PLANS
SETOUT PLANS
SHEET #
SHEET NAME
SHEET #
A1.1 A1.2
SITE PLAN SERVICES PLAN
D1.1
FLOOR PLANS SHEET # B1.1 B1.2
SHEET NAME FLOOR PLAN - DEMO FLOOR PLAN - OVERALL
DETAILS SHEET # C1.1 C1.2 C1.3 C1.4 C1.5 C1.6
SECTIONS
SHEET NAME
SHEET #
SETOUT PLAN - OVERALL
G1.1
ELEVATIONS - EXTERNAL SHEET # E1.1 E1.2
SHEET NAME
H1.1
ELEVATIONS - INTERNAL
SHEET NAME DETAIL - UAT DETAIL - FEMALE WC DETAIL - CHANGEROOM 1 DETAIL - CHANGEROOM 3 DETAIL - MALE WC DETAIL - CHANGEROOM 2 / 4
SHEET # F1.1 F1.2 F1.3 F1.4
SHEET NAME ELEVATIONS INTERNAL - UAT ELEVATIONS INTERNAL - UAT ELEVATIONS INTERNAL - SHOWER ELEVATIONS INTERNAL - WC
SECTIONS
ROOF PLANS SHEET #
ELEVATIONS ELEVATIONS
SHEET NAME
SHEET NAME ROOF PLAN - OVERALL
ELECTRICAL LAYOUT SHEET #
SHEET NAME
J1.1
ELECTRICAL PLAN
SCHEDULES SHEET # K1.1 K1.2
SHEET NAME DOOR SCHEDULE GLAZING SHCEDULE
NOTES SHEET # Z1.1 Z1.2 Z1.3
SHEET NAME CONSTRUCTION NOTES BUILDING SPECIFICATION NOTES VOL 1 WORK SAFETY NOTES - COMMERCIAL
Building Designers 89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
F: 02 6583 9820
WWW. COLLINSWCOLLINS.COM.AU
GENERIC | TYPICAL KEY, LEGEND AND ABBREVIATIONS FOR COLLINS W COLLINS ARCHITECTURAL PLANS THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT. THIS INCLUDES (but is not limited to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTENORS, DEMOLISHERS. PLEASE USE THIS IN CONJUNCTION WITH ALL DRAWING SHEETS AND VIEWS CONTAINED FORTHWITH IN THIS PLAN SET. REVISED JANURARY 2021
SYMBOLS AND LINES SITE PLAN | S68 S138 PLAN
RENOVATION / DEMOLITION SYMBOLS
ELECTRICAL CUBICLE / PIT
LOT BOUNDARY
FALL OF BATTER SLOPE
SEWER LINE
DRIVEWAY SURFACE
NBN
NBN PIT
STORMWATER LINE
GARDEN TAP
T.PIT
WATER CONNECTION LINE
E.P
TO BE DEMOLISHED OR REMOVED
TO BE DEMOLISHED OR REMOVED
EXISTING ITEM / ELEMENT (FLOOR/WALLS/WINDOWS ETC)
EXISTING AREA / FACADE / ROOM
TELECOMMUNICATIONS PIT
WATER METER / ALTERNATE WATER METER
TO BE DEMOLISHED / REMOVED
PROPOSED NEW ITEM / ELEMENT
DOWNPIPE TO WATER TANK
SANDBAG
DEMOLITION LINE
DOWNPIPE FROM TANK TO APPLIANCE
TEMPORARY HOARDING GATES
MULTI STOREY SITE PLAN SYMBOLS / LEGEND LOWEST FLOOR (GROUND TYPICAL)
SILTATION CONTROL FENCING SITE HOARDING FENCING
MIDDLE FLOOR
STREET TREE / SITE TREE
UPPER FLOOR
BATTER EXTREMITIES LINE EASEMENT BOUNDARY
LP
LIGHT POLE
OVERHEAD POWER LINES
PP
POWER POLE
GENERAL ABBREVIATIONS
FLOOR PLANS / SECTIONS (INCL SETOUT, ROOF, DETAIL CALL OUTS) OVERHEAD ITEM
FILL (TO ENGINEERS DETAIL)
GTAP
GARDEN TAP
DEMOLITION LINE
WET AREA TILED FLOOR SURFACE
DP
RAINWATER DOWN PIPE:
UPPER FLOOR OUTLINE
COMMON / OUTDOOR TILED FLOOR SURFACE
SMOKE ALARMS:
ROOF OUTLINE OVER
BROOM FINISH CONCRETE FLOOR SURFACE
RAKED CEILING LINE
MASONRY WALL
TO AS3786 AND SECTION 3.7.5 OF THE NCC BCA VOL 2. ALL ALARMS/DETECTORS ARE TO BE INTERCONNECTED. LOCATIONS ON PLANS ARE INDICATIVE. INSTALLATION TO BE AS PER STANDARDS ABOVE, AND MANUFACTURERS SPECIFICATIONS
EXT. DUCT
CONCRETE
AVERAGE RECURRANCE INDEX
PB
PLASTER BOARD
AHD
AUSTRALIAN HEIGHT DATUM
RET. WALL
RETAINING WALL
CLT
CROSS LAMINATED TIMBER
RC
REINFORCED CONCRETE
COL.
COLUMN
PV
PHOTO VOLTAIC
COW
COST OF WORKS
RL
REDUCED LEVEL
DCP
DEVELOPMENT CONTROL PLAN
SB
SUB ELECTRICAL METER BOX
DEG.
DEGREES
SL
SURFACE LEVEL
DGPO
DOUBLE GENERAL POWER OUTLET
SW
STORM WATER
DH
DOUBLE HUNG WINDOW
TRH
TOILET ROLL HOLDER
DP
RAINWATER DOWN PIPE
T.O.K
TOP OF KERB
DTR
DOUBLE TOWEL RAIL
T.O.W
TOP OF WALL
HWS
HOT WATER SERVICE
WC
MECHANICAL VENTILATION:
E
BEAM LINE
TO AS 3500
ARI
MECHANICAL VENTILATION EXTERNALLY DUCTED TO NCC 3.8.7.3 & 3.8.7.4
SLIDING DOOR UNIT OPENING DIRECTION SQUARE SET OPENING
TIMBER/METAL STUD FRAMED WALL
SLIDING WINDOW OPENING DIRECTION TERMITE PROTECTION:
CONCRETE BLOCK WALL
TO A.S 3660.1
AWNING/CASEMENT WINDOW OPENING DIRECTION NATURAL GROUND LINE (EXCAVATED)
MASONRY VENEER WALL
CO L.
HINGED DOOR OPENING DIRECTION METAL SHEET ROOFING
CO L.
COLUMN (MATERIAL AS PER SCHEDULE OR PLAN)
GAS BOTTLES MASONRY PIER (SIZE AS PER SCHEDULE OR PLAN) ENGAGED PIERS:
KLIP LOK (OR SIMILAR) METAL SHEET ROOFING
MB
TILED ROOF
TO COMPLY WITH AS 4773.1-2010 & AS 4773 2-2010
INSULATION BATTING
ELECTRICAL METER BOX
HWS
WATER CLOSET
GAS INSTANTANEOUS HOT WATER SERVICE
WAFFLE POD (TO ENGINEERS DETAIL)
FIBRE CEMENT
1650B
BATH SIZING
FINISHED SURFACE LEVEL
900V
VANITY SIZING
FIXED GLASS / PANEL
820
INTERIOR DOOR SIZING
FG
FIXED GLASS WINDOW
LOH
LIFT OFF HINGE
GLT
GLUE LAMINATED TIMBER
LVL
LAMINATED VENEER LUMBER
FC
HOT WATER TANK TO BE DEMOLISHED / REMOVED
TACTILE GROUND SURFACE INDICATORS:
F.S.L
TO AS 1428.4.1:2009
SOLAR HOT WATER SERVICE EARTH / SOIL
STAIRS INCLUDING DIRECTION OF TRAVEL (UP) 1
2
3
4
5
F
6
COOKTOP RAMP INCLUDING DIRECTION OF TRAVEL (UP)
SINK TYPICAL
GENERAL SYMBOLS AND ARCHITECTURAL SYMBOLS
NORTH
# SHEET
TYPICAL SECTION MARKER
TYPICAL CALL OUT MARKER
TYPICAL ELEVATION MARKER
VIEW TAG AND SCALE
# SHEET
# W01
WINDOW TAG (DA/CC)
D01
DOOR TAG (DA/CC)
SHEET
Building Designers
VIEW
SCALE
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
MECH.
GARDEN TAP
GPO
GENERAL POWER OUTLET
MB
ELECTRICAL METER BOX
GRG
GARAGE
MR
MOISTURE RESISTANT
HWS
HOT WATER SERVICE
MH
MAN HOLE
LEP
LOCAL ENVIRONMENT PLAN
NGL
NATURAL GROUND LINE
LEGENDS
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
MECHANICAL
GTAP
T: 02 6583 4411
1 : 100
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
MULDOOR STREET TREE
BOUNDARY
ANY STOCKPILING OF SOILS ON SITE WILL NEED TO BE CONTROLLED FROM DUST BY WATERING OR COVERING AS REQUIRED TO PREVENT EROSION & DUST NUISANCE. HOSE TO BE AVAILABLE ON SITE.
7.7 50
TEMPORARY BLUE METAL GRAVEL LAID AT ENTRANCE OF SITE TO REMOVE EXCESS SOILS FROM VEHICLES AT EXIT. AGGREGATE SIZE AS PER THE LANDCOM BLUE BOOK STANDARD DRAWING SD 6-14 IS TO BE 30mm DIAMETER
PROPOSED HOARDING AND SECURITY FENCE TO BE INSTALLED TO NORTH / EAST / SOUTH / WEST BOUNDARIES
7.500 7.75 0
TREE - REMOVED
CLUB HOUSE
58050
BOUNDARY
BUILDER TO LOCATE THE ELECTRICAL AND TELSTRA SERVICES PRIOR TO THE START OF CONSTRUCTION EXISTING CONCRETE PAD
36787
36787
TREE
BOUNDARY
TREE
BO
UN
DA
RY
BOUNDARY
RETAINING WALL TO MAX 0.60M HIGH TO ENGINEERS DETAILS
PROP CONCRETE APRON FFL RL: 6.980
BOUNDARY
BINS
PROPOSED EXTENSION FFL RL: 7.000
GRADE NATURAL SURFACE TO TOP OF WALL BOUNDARY
PROP. CONCRETE PATH
0 7.00
PROP. CONCRETE PATH
TEMPORARY HOARDING GATES
MBMB
7.5 00
EXISTING BOLLARD/FENCE TO BE REMOVED AS NEEDED
EXISTING BOLLARD FENCELINE
EXISTING CLUBHOUSE FFL RL: 7.000
SMH
TREE
PROP. CONCRETE PATH
BOUNDARY
7. 25 0
SITE PLAN - CONTEXT
SEWER PLOTTED FROM COUNCIL RECORDS/SURVEY (APPROX ONLY)
1 : 2000
EXISTING PAVED AREA TO BE ASSESSED AND REMOVED AS REQUIRED 6.7 50
7.0
00
SILTATION CONTROL FENCING
SITE PLAN 1 : 200
SITE INFORMATION & LEGEND NOTE: CONTOURS AND SPOT LEVELS ARE INDICATIVE ONLY AND FINAL SITE LEVELS COMPLETED BY A REGISTERED SURVEYOR IS RECOMMENDED BEFORE START OF CONSTRUCTION.
SITE AREA: GROSS FLOOR AREA (including garages) APPROX 695m² HARDSTAND AREA
Building Designers
SILTATION CONTROL IN ACCORDANCE WITH COUNCIL POLICY E1 AND THE ADOPTED AUSPEC STANDARD X X XX.X XX X.XXX X.XXX
= 76435m² =301.7m²
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
BAL -N/A
BASIX / SECTION J NOTES: PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIRCONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER) WHERE APPLICABLE AND RELEVANT.
ALL LEVELS WERE COMPLETED BY COOKSON LAND SURVEYORS AND ARE TO AHD. ALL LEVELS AND CONTOURS TO BE CONFIRMED BY BUILDER / SURVEYOR PRIOR TO START OF CONSTRUCTION. REF: 21197
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
BAL = NOT APPLICABLE
PROJECT: CLUBHOUSE
SITE PLAN
RENOVATION
STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
A1.1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430BUSHFIRE AFFECTED T: 02 6583 4411 LOT IS NOT
SCALE:
As indicated
SHEET SIZE:
A2
START DATE:
12.07.21 D4772
DWG No:
F: 02 6583 9820
DRAWING REVISIONS + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Description: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
AREAS - ROOF AREAS Name EXISTING REMAINING ROOF AREA PROPOSED ROOF AREA TOTAL
TEMPORARY BLUE METAL GRAVEL LAID AT ENTRANCE OF SITE TO REMOVE EXCESS SOILS FROM VEHICLES AT EXIT. AGGREGATE SIZE AS PER THE LANDCOM BLUE BOOK STANDARD DRAWING SD 6-14 IS TO BE 30mm DIAMETER
WATER MAIN LINE NEW JUNCTION TO PROPOSED REQUIRED POWER LINE - UNDERGROUND
DP
APPROX 2.0M
PROPOSED SWITCHBOARD LOCATION
RETAINING WALL TO MAX 0.60M HIGH TO ENGINEERS DETAILS INSTALL AGG LINE BEHIND AND CONNECT TO STORMWATER SYSTEM
DP
FROM EXISTING
POWER LINE UNDEGROUND
Area 280.7 m² 255.8 m² 536.5 m²
PROP CONCRETE APRON FFL RL: 6.980
DP
MBMB
DP
TELSTRA LINE
PROPOSED EXTENSION
BUILDER TO LOCATE THE ELECTRICAL AND TELSTRA SERVICES PRIOR TO THE START OF CONSTRUCTION
FFL RL: 7.000
PROP. CONCRETE PATH
EXISTING CLUBHOUSE
ANY STOCKPILING OF SOILS ON SITE WILL NEED TO BE CONTROLLED FROM DUST BY WATERING OR COVERING AS REQUIRED TO PREVENT EROSION & DUST NUISANCE. HOSE TO BE AVAILABLE ON SITE.
FFL RL: 7.000
SMH
DENOTES: SURFACE INLET PIT CONNECTED TO STORMWATER SYSTEM
SEWER PLOTTED FROM COUNCIL RECORDS/SURVEY (APPROX ONLY) TO CONNECT TO EXISTING STORMWATER SYSTEM (INDICATIVE ONLY)
SILTATION CONTROL FENCING
S68 & S138 SITE INFORMATION & LEGEND STORMWATER NOTE: STORMWATER/RAINWATER OVERFLOW TO LEGAL POINT OF DISCHARGE
XX.X X X XX X.XXX X.XXX
(SURFACE AND SUB-SURFACE STORMWATER TO BE DISPOSED OF VIA PIPEWORK IN ACCORDANCE WITH AS 3500)
SITE SERVICES PLAN
SILTATION CONTROL IN ACCORDANCE WITH COUNCIL POLICY E1 AND THE ADOPTED AUSPEC STANDARD
BAL - N/A
BASIX & SECTION J NOTES: PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIRCONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER) WHERE APPLICABLE AND RELEVANT.
ALL LEVELS WERE COMPLETED BY COOKSON LAND SURVEYORS AND ARE TO AHD. ALL LEVELS AND CONTOURS TO BE CONFIRMED BY BUILDER / SURVEYOR PRIOR TO START OF CONSTRUCTION. REF: 21197
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, ENGINEERING & COUNCIL APPROVALS
BAL = NOT AFFECTED
1 : 200
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SERVICES PLAN
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
A1.2
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
1 : 200
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
LADIES EXISTING AMENITIES AREA REMOVED. TO ENGINEERS DETAILS
SERVICE EXISTING DORE ROOM TO BE DEMOLISHED.
STORE ROOM JUNCTION BETWEEN REMAINING AND DEMOLISHED TO BE TO ENGINEERS DETAILS.
GENTS
REMOVE EXISTING MASONRY WALL FOR PROPOSED WINDOWS
EXISTING AMENTIES REMOVED AND AREA REPROGRAMMED AS SHOWN. CAP ALL UN USED PLUMBING.
REMOVE EXISTING MASONRY WALL FOR PROPOSED WINDOWS
KIOSK/ KITCHEN CHANGE ROOM 1
EXISTING AMENTIES REMOVED AND AREA REPROGRAMMED AS SHOWN TO STORAGE ROOM. CAP ALL UN USED PLUMBING.
CHANGE ROOM 2
REMOVE EXISTING MASONRY WALL FOR PROPOSED WINDOWS
REMOVE EXISTING MASONRY WALL FOR PROPOSED WINDOWS
UNDER COVER AREA
UNDER COVER AREA
FLOOR PLAN - DEMO 1 : 100 AREAS - FLOOR - EXISTING *FLOOR AREA MEASURED FROM EXTERNAL FACE... NAME EXISTING CLUBHOUSE AREA EXISTING AMENITIES AREA EXISTING STORAGE AREA TOTAL
AREA 100.4 m² 47.5 m² 21.4 m² 169.3 m²
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
FLOOR PLAN - DEMO
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
B1.1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
1 : 100
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
27425 24435
90
1350
90
3735
90
2310
200
1500
2310
200
1500
90 1020 90
8535
90
5175
90
90
8535
90
5175
90
5335
1815
90
1905
200 NOTE: PAINTED CONCRETE FLOOR FINISH TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009 "DULUX LUXAFLOOR AGGREGATE" OR SIMILAR TO ACHIEVE P3 RATING TO MANUFACTURERS SPECIFICATION AND INSTALLATION GUIDELINES
PROPOSED SWITCHBOARD LOCATION 2990
G1.1
G1.1
DP
CONCRETE APRON
SECURE GATE
FFL RL: 6.980
2000
C1.1
DP
270
C1.2
2260
6945
ASSESS ON SITE REPLACE AS NEEDED
CONVERT EXISTING AMENITY AREA INTO PROPOSED REF 1 ROOM
UNDER COVER AREA
2500 7530
200 1530 200 270
ED04
5370
3490
SEE NOTE
435
2310
5370
CHANGE ROOM 2
SEE NOTE
2830
3545
C1.5
SEE NOTE
REF 1
NW08
E
270
NW09
270
STORE
ED03
NW07
CHANGE ROOM 1
BENCH
KIOSK/ KITCHEN
GTAP
NW06
ID02
ID01
NW10
ID03
1200
GTAP
2255
2000
ED05
2500 90
3190
NW05
C C1.3
200
MALES
5710
C1.6
435
C1.4
HWS
F
HWS
BENCH
D
1870
BENCH
2710
MH
90
ED02
1060
ED06
FFL RL: 7.000
2020
CONCRETE FINISH
FFL RL: 7.000
FEMALES
1290
90
STORAGE
1020
2335
7260
BENCH
1200
SQ. SET
ED07
CHANGE ROOM 3
FFL RL: 7.000
1285 SQ. SET
7660
1715
CHANGE ROOM 4 PAINTED CONCRETE FINISH
SEE NOTE
2260 435270
NW04
BENCH
PAINTED CONCRETE FINISH
NW11
7660
90 1870 90 1200 270
PROPOSED NEW CONCRETE WALKWAY WITH A GRADE SHALLOWER THAN 1:33 AS PER AS 1428.1 & AS 1428.2
5300
5300 90 1870 270 5370
200 6145
NW03
GTAP
200
200
200
200 2500 1530 2830
3230
DP
2150 GARAGE DOOR
B
6145
ED01
BENCH
UAT
200
1530
200
2900
BABY CHANGE
13805
MB MB
NW02
BINS
PROPOSED NEW CONCRETE WALKWAY WITH A GRADE SHALLOWER THAN 1:33 AS PER AS 1428.1 & AS 1428.2
NW01
DP
3000
B-B
2118 GRG DOOR
3000
A
A-A
200
7055
200
90
200
2500
200
1870
90
90
9075
270
3810
4225
90
5370
90
7055
270
200
2310
90
435
200
2500
200
1500
6625
90
90
200
5225
NOTE: ALL DOORS TO HAVE ZERO STEP THRESHOLDS. THRESHOLD RAMP TO ALL NEW DOORWAYS WHEN STEP DOWN TO EXTERNAL FLOOR LEVEL AS PER AS1428.1-2009
270
1500
200
200
270
2700
2590
435
200
200
NOTE EXSISTING CHANGE ROOM AND REF ROOM FLOOR: PAINTED CONCRETE FLOOR FINISH TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009 "DULUX LUXAFLOOR AGGREGATE" OR SIMILAR TO ACHIEVE P3 RATING TO MANUFACTURERS SPECIFICATION AND INSTALLATION GUIDELINES
SERVERY WALL
PROPOSED NEW CONCRETE WALKWAY WITH A GRADE SHALLOWER THAN 1:33 AS PER AS 1428.1 & AS 1428.2
UNDER COVER AREA PROPOSED NEW CONCRETE SLAB TO UNDERSIDE OF EXISTING AWNING
FLOOR PLAN - PROPOSED 1 : 100 AREAS - FLOOR - PROPOSED
AREAS - FLOOR - EXISTING
*FLOOR AREA MEASURED FROM EXTERNAL FACE...
*FLOOR AREA MEASURED FROM EXTERNAL FACE...
NAME PROPOSED CLUBHOUSE AREA PROPOSED COVERED SLAB AND PATHWAY AREA TOTAL
AREA 201.3 m² 329.5 m² 530.8 m²
NAME EXISTING CLUBHOUSE AREA EXISTING AMENITIES AREA EXISTING STORAGE AREA TOTAL
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
AREA 100.4 m² 47.5 m² 21.4 m² 169.3 m²
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
PROJECT: CLUBHOUSE
FLOOR PLAN - OVERALL
RENOVATION
STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
B1.2
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
SCALE: SHEET SIZE:
A2
START DATE:
12.07.21 D4772
DWG No: T: 02 6583 4411
1 : 100
F: 02 6583 9820
DRAWING REVISIONS + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Description: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
WET AREA FITTING/FIXTURES KEY:
2700 2300 MIN.
PROPOSED MIRROR TO COMPLY WITH AS 1428.1-2009
WB-1
WASHBASIN TO COMPLY WITH AS 1428.1-2009
SOAP DISPENSER AND HAND TOWEL DISPENSER TO COMPLY WITH AS 1428.1-2009
450 WB-1
NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.
SHELF TO COMPLY WITH AS 1428.1-2009
PROPOSED ACCESSIBLE AMENITY TO COMPLY WITH AS 1428.1-2009. REFER TO STANDARD FOR SPECIFIC HEIGHT AND LOCATION REQUIREMENTS OF ALL FITTINGS. LOCATION OF ITEMS TO BE MARKED OUT AND CONFIRMED FOR COMPLIANCE PRIOR TO START OF CONSTRUCTION OR INSTALLATION
BC-1
SD-1
SH-1
MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM
COAT HOOK PROVIDED AS PER AS 1428.1-2009
BT-1
800 MIN,
300 TO 400
WALL BUILDUPS LABEL W1 W3 W4
425 MIN.
SH-1
WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION
TD-1 WB-1
1 E
850 MIN.
2
F1.1 F1.2
ED07
ZO N
GR-2
1900 MIN.
ON
140 0
3
EXC LUS I
UAT
MIN.
GR-1
WC-2
460 MIN.
WC-2
TR-1 110
1 E
700 MIN,
530 MIN.
300 MIN.
FW
TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
THRESHOLD RAMP TO AS1428.1-2009
MINIMUM 30% LUMINANCE CONTRAST TO DOORWAY AS PER AS 1428.1-2009
SIGNAGE AND BRAILLE FOR ACCESSIBLE TOILETS AS PER AS 1428.1-2009
EXT. DUCT
GRAB RAILS TO COMPLY WITH AS 1428.1-2009 (CLAUSE 15.2.7) WC UNIT AND BACKREST TO COMPLY WITH AS 1428.1-2009
1450 MIN.
UNIVERSAL ACCESS TOILET 1 : 25
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
DETAIL - UAT
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
C1.1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
T: 02 6583 4411
As indicated
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
WET AREA FITTING/FIXTURES KEY: WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION
200
3810
90 1500
200
15
SD-1
WB-1
BT-1
15
TR-2
WC-1
E
TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
900
FEMALES
EXT. DUCT
TR-2
950
15
NW11
FW
2830
950
WC-1
MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
BT-1
WALL BUILDUPS LABEL W1 W3 W4
WB-1
NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.
WC-1
TR-2
WATER STOP
ED05 W4
W1
W3
FEMALE WC 1 : 25
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
DETAIL - FEMALE WC
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
C1.2
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
T: 02 6583 4411
As indicated
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
WET AREA FITTING/FIXTURES KEY: WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION
W3
W1
W4
NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.
WALL BUILDUPS MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM
BT-1
BT-1 SD-1
WC-1 E EXT. DUCT
FW
1870
TR-1
GRADE TO FLOOR WASTE
ST-1
SH-1
FW
E
FW
GRADE TO FLOOR WASTE
SH-1
EXT. DUCT
ST-1
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT 928 15 928
90
WB-1
90
WB-1
CHANGEROOM 1 TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
E EXT. DUCT
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
LABEL W1 W3 W4
WATER STOP
1995
15
15
1235
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
CHANGEROOM 1 1 : 25
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
DETAIL - CHANGEROOM 1
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
C1.3
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
T: 02 6583 4411
As indicated
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
90
WET AREA FITTING/FIXTURES KEY:
943
943
15
943
90
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
SH-1
ST-1
SH-1
ST-1
FW
FW
GRADE TO FLOOR WASTE
GRADE TO FLOOR WASTE
W3 E
E
EXT. DUCT
W4
EXT. DUCT
WB-1
BT-1
15
WALL BUILDUPS
SD-1
WATER STOP
FW
WB-1
TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
BT-1
MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM
15
W1
NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.
LABEL W1 W3 W4
943
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
1500
WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
E EXT. DUCT
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
W3
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
WC-1
90
CHANGEROOM 3
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIRCONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
TR-1
2115
15
W4
1020
90
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
1 : 25
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
DETAIL - CHANGEROOM 3
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
C1.4
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
As indicated
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
WET AREA FITTING/FIXTURES KEY:
W4
W1
W3
W4
WALL BUILDUPS
MALES
MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM
TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
15
LABEL W1 W3 W4
900
UR-1
NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.
720
E
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
W3
200
WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION
NW05 WB-1
BT-1 TR-2
WC-1
WB-1
WC-1
SD-1
BT-1
TR-2
1500
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
2830
15
EXT. DUCT
ED03
900
15
900
90
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
MALE WC 1 : 25
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
DETAIL - MALE WC
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
C1.5
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
T: 02 6583 4411
As indicated
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
WET AREA FITTING/FIXTURES KEY: 90
15
900
15
900
1425
15
15
900
15
900
90
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT 90
CHANGE ROOM 4
E
GRADE TO FLOOR WASTE
GRADE TO FLOOR WASTE
1180
EXT. DUCT
1800
BT-1
TR-1
BT-1
SD-1 WB-1
WB-1
WB-1
WB-1
FW
FW
WC-1 SD-1
SH-1
BT-1
ST-1
SH-1
ST-1
EXT. DUCT
FW
928
WATER STOP
1220
15
15
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT 90
1220
1890 LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
15
15
1890
90
CHANAGEROOM 2 / 4 1 : 25
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
C1.6
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
928 15 928
E
928
E EXT. DUCT
SH-1
TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
GRADE TO FLOOR WASTE
CHANGE ROOM 2
ST-1
15
TR-1
SH-1
E EXT. DUCT
FW
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
GRADE TO FLOOR WASTE
WC-1 FW
ST-1
90
BT-1
2710
E EXT. DUCT
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
15
E EXT. DUCT
15
TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198 FW
90 1400
WALL BUILDUPS MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM
15
WATER STOP
NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.
LABEL W1 W3 W4
1425
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT
WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIRCONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
DETAIL - CHANGEROOM 2 / DRAWING REVISION + NOTES Date: Revision: 4 As indicated 12.07.21 INITIAL ISSUE SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
02.08.21 25.08.21 22.09.21 02.11.21
REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
27425 24435
200
2590
200
30625
1480
TERMITE TREATMENT TO A.S 3660.1
2000 2900
350 1800
11860
1500
7660
1200
FFL RL: 7.000
1530
2305
CHANGEROOM 4
35mm WET AREA SET DOWN
FFL RL: 7.000
CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL
690
STORAGE
BUILDER TO DETERMINE IF HOBS REQ.D
3230
3030
2580
1960
4000
1070
1920
35mm WET AREA SET DOWN
35mm WET AREA SET DOWN
12660
1530 3230
7660
BUILDER TO DETERMINE IF HOBS REQ.D
3915
35mm WET AREA SET DOWN
600
FFL RL: 7.000
1500
1440
350
1625 2080
600
1040
CHANGEROOM 3
5000
1835
35mm WET AREA SET DOWN
FFL RL: 6.980
STEP DOWN
2900
2900
3100
PROPOSED NEW CONCRETE WALKWAY WITH A GRADE SHALLOWER THAN 1:33 AS PER AS 1428.1 & AS 1428.2
CONCRETE APRON/WALKWAY
STEP DOWN
NOTE: ALL DOORS TO HAVE ZERO STEP THRESHOLDS. THRESHOLD RAMP TO ALL NEW DOORWAYS WHEN STEP DOWN TO EXTERNAL FLOOR LEVEL AS PER AS1428.1-2009
JUNCTION / STRUCTURAL CONNECTION TO EXISTING SLAB TO ENGINEERS DETAILS
2600 PROPOSED NEW WC AND SHR TO BE INSTALLED IN EXISTING
4600
EXISTING TO REMAIN AS SHOWN
3490
6945
7745
2600
EXISTING TO REMAIN AS SHOWN
2000
2310
CONCRETE APRON/WALKWAY
6860
6860
FFL RL: 6.980
PROPOSED NEW CONCRETE WALKWAY WITH A GRADE SHALLOWER THAN 1:33 AS PER AS 1428.1 & AS 1428.2
CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL TERMITE TREATMENT TO A.S 3660.1
30625
SETOUT PLAN
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
1 : 100
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
PROJECT: CLUBHOUSE
SETOUT PLAN - OVERALL
RENOVATION
STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
D1.1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
SCALE: SHEET SIZE:
A2
START DATE:
12.07.21 D4772
DWG No: T: 02 6583 4411
1 : 100
F: 02 6583 9820
DRAWING REVISIONS + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Description: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
(CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3 COLORBOND® ULTRA "SURFMIST"
PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE
METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST"
EXISTING TO REMAIN
01 CL 9440 RL
LINTEL OVER
PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE
PROPOSED NEW FASCIAS COLORBOND® ULTRA "SURFMIST"
EXISTING TO REMAIN
LINTEL OVER
LINTEL OVER
01 CL RL 9440
LINTEL OVER
MB X 2 NGL
GTAP
01 FL 7000 RL
01 FL RL 7000 PROPOSED FINISHED GROUND LINE
SECURITY GATES TO BIN ENCLOSURE TO MANUFACTURERS SPECIFICATION
REND
EXISTING STRUCTURE TO BE REMOVED AS SHOWN
NOTE 15° FALL TO ALL WINDOW SILLS
RETAINING TO MAX 0.60M HIGH TO ENGINEERS DETAILS. DASH FOR CLARITY
1. NORTH ELEVATION 1 : 100
METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST" HIDDEN BEHIND
(CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3 COLORBOND® ULTRA "SURFMIST" HIDDEN BEHIND
PROPOSED NEW FASCIAS COLORBOND® ULTRA "SURFMIST"
EXISTING STRUCTURE 01 CL RL 9440
2440
01 CL 9440 RL
SERVERY WALL GTAP
GTAP NGL
01 FL 7000 RL
01 FL RL 7000
PROPOSED FINISHED GROUND LINE
PROPOSED RC BLOCK SERVERY WALL. STAINLESS STEEL CAPPING/BENCH TOP
NOTE 15° FALL TO ALL WINDOW SILLS
REND
3. SOUTH ELEVATION 1 : 100
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
EXTERNAL FINISHES LABEL C/BND REND
MATERIAL DESCRIPTION LYSAGHT COLORBOND ULTRA CORRUGATED METAL SHEET ROOFING RENDERED RC BLOCKWORK - PAINT FINISH "DULUX LEXICON"
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
ELEVATIONS
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
E1.1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
T: 02 6583 4411
1 : 100
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST"
(CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3 COLORBOND® ULTRA "SURFMIST"
PROPOSED NEW FASCIAS COLORBOND® ULTRA "SURFMIST"
6.50°
EXISTING STRUCTURE
01 CL 9440 RL
LINTEL OVER
01 CL RL 9440
LINTEL OVER
2440
LINTEL OVER
NGL 01 FL 7000 RL
01 FL RL 7000 PROPOSED FINISHED GROUND LINE REND NOTE 15° FALL TO ALL WINDOW SILLS
EXISTING STRUCTURE TO BE REMOVED AS SHOWN
RETAINING TO MAX 0.60M HIGH TO ENGINEERS DETAILS. DASH FOR CLARITY
2. EAST ELEVATION 1 : 100
PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE (CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3 COLORBOND® ULTRA "SURFMIST"
PROPOSED NEW FASCIAS COLORBOND® ULTRA "SURFMIST"
6.50°
EXISTING STRUCTURE
01 CL 9440 RL
LINTEL OVER
01 CL RL 9440
LINTEL OVER
2440
LINTEL OVER
NGL
01 FL 7000 RL
01 FL RL 7000
PROPOSED FINISHED GROUND LINE REND EXISTING STRUCTURE TO BE REMOVED AS SHOWN
NOTE 15° FALL TO ALL WINDOW SILLS
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
4. WEST ELEVATION 1 : 100
EXTERNAL FINISHES LABEL C/BND REND
MATERIAL DESCRIPTION LYSAGHT COLORBOND ULTRA CORRUGATED METAL SHEET ROOFING RENDERED RC BLOCKWORK - PAINT FINISH "DULUX LEXICON"
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
ELEVATIONS
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
E1.2
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
T: 02 6583 4411
1 : 100
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
01 CL 9440 RL
01 CL RL 9440
SIDE WALL
350 MIN.
PROPOSED MIRROR TO COMPLY WITH AS 1428.1-2009
SIDE WALL
01 CL RL 9440 SIDE WALL
01 CL 9440 RL
FRONT OF ANY BACK-WALLMOUNTED FIXTURE OF OBSTRUCTION
SOAP DISPENSER AND HAND TOWEL DISPENSER TO COMPLY WITH AS 1428.1-2009
GRAB RAILS TO COMPLY WITH AS 1428.1-2009 (CLAUSE 15.2.7)
ANGLE OF FRONT OF BACKREST
SHELF TO COMPLY WITH AS 1428.1-2009
FLOOR TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009
FRONT OF BACKREST
900 - 1100mm
425
BASIN 800-830
WASHBASIN TO COMPLY WITH AS 1428.1-2009
TOILET PAPER DISPENSER TO COMPLY WITH AS 1428.1-2009 (CLAUSE 15.2.6) ZONE FOR POSITION OF TOILET PAPER DISPENSER OUTLET
WC UNIT AND BACKREST TO COMPLY WITH AS 1428.1-2009
01 FL 7000 RL
01 FL RL 7000
01 FL 7000 RL
UAT 1
UAT 3
1 : 25
1 : 25
01 FL RL 7000
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
FLOOR TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
F1.1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
DRAWING REVISION + NOTES ELEVATIONS INTERNAL Date: Revision: UAT As indicated 12.07.21 INITIAL ISSUE SCALE:
SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
02.08.21 25.08.21 22.09.21 02.11.21
REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
01 CL 9440 RL
01 CL RL 9440
SIDE WALL
01 CL RL 9440
EDGE OF ANY BACK-WALLMOUNTED FIXTURE OF OBSTRUCTION 600 MAXIMUM
COAT HOOK PROVIDED AS PER AS 1428.1-2009
PROPOSED MIRROR TO COMPLY WITH AS 1428.1-2009
GRAB RAILS TO COMPLY WITH AS 1428.1-2009 (CLAUSE 15.2.7) TOWEL DISPENSER TO COMPLY WITH AS 1428.1-2009
500 MAXIMUM
ZONE FOR POSITION OF FLUSHING CONTROL
BACKREST 350 TO 400
GRABRAIL CONTINUES WHERE NOT OBSTRUCTED BY CISTERN
SOAP DISPENSER TO COMPLY WITH AS 1428.1-2009 SHELF TO COMPLY WITH AS 1428.1-2009
TOILET PAPER DISPENSER TO COMPLY WITH AS 1428.1-2009 (CLAUSE 15.2.6) FLOOR TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009
WASHBASIN TO COMPLY WITH AS 1428.1-2009
400 MAXIMUM
WC UNIT AND BACKREST TO COMPLY WITH AS 1428.1-2009 01 FL RL 7000
KNEE TOE CLEARANCE 01 FL 7000 RL
01 FL RL 7000
FLOOR TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009
UAT 2
UAT 4
1 : 25
1 : 25
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
F1.2
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
DRAWING REVISION + NOTES ELEVATIONS INTERNAL Date: Revision: UAT As indicated 12.07.21 INITIAL ISSUE SCALE:
SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
02.08.21 25.08.21 22.09.21 02.11.21
REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
01 CL RL 9440
900 MIN.
1800 ABV FFL
1800 ABV FFL
SH-1
ST-1
01 FL RL 7000
TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS
SKIRT TILE (1 TILE)
TILE FINISH | SKIRT TILE (1 TILE) GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS
LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS
TYPICAL SHOWER ELEVATION 1
TYP. SHOWER ELEVATION 2
TYPICAL SHOWER ELEVATION 3
TYP. SHOWER ELEVATION 4
1 : 25
1 : 25
1 : 25
1 : 25
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
F1.3
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
DRAWING REVISION + NOTES ELEVATIONS INTERNAL Date: Revision: SHOWER As indicated 12.07.21 INITIAL ISSUE SCALE:
SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
02.08.21 25.08.21 22.09.21 02.11.21
REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
01 CL RL 9440
TR-1
TR-1 TR-1
WC-1
WC-1
WC-1
01 FL RL 7000
SKIRT TILE (1 TILE) GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS
LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS
SKIRT TILE (1 TILE) GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS
SKIRT TILE (1 TILE) GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198
TYPICAL WC ELEVATION 1
TYP. WC ELEVATION 2
TYPICAL WC ELEVATION 3
TYPICAL WC ELEVATION 4
1 : 25
1 : 25
1 : 25
1 : 25
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
F1.4
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
DRAWING REVISION + NOTES ELEVATIONS INTERNAL Date: Revision: WC As indicated 12.07.21 INITIAL ISSUE SCALE:
SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
02.08.21 25.08.21 22.09.21 02.11.21
REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
ROOF TRUSSES TO MANUFACTURER'S SPECIFICATION
NEW FLASHING TO WINDOW SILLS INFILL TO SUIT NEW ROOFLINE
90 X 35mm EXTERNAL AND INTERNAL WALL FRAMING 6.50°
01 CL RL 9440
2440
01 CL 9440 RL
01 FL 7000 RL
CHANGE ROOM 3 FFL RL: 6.980
MECHANICAL VENTILATION TO INTERNAL SANITARY COMPARTMENTS TO COMPLY WITH A.S 1668.2
CHANGE ROOM 1
FFL RL: 7.000
01 FL RL 7000
TERMITE TREATMENT TO A.S 3660.1
CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL
STORMWATER TO CONNECT TO EXISTING
WAFFLE POD CONSTRUCTION TO ENGINEER'S DETAILS AND SPECIFICATIONS
CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL
SECTION A-A 1 : 100 EXISTING STRUCTURE TO BE AMENDED TO SUIT NEW ROOFLINE ROOF TRUSSES TO MANUFACTURER'S SPECIFICATION
NEW ROOF & STRUCTURE OVER EXISTING
90 X 35mm EXTERNAL AND INTERNAL WALL FRAMING INFILL TO SUIT NEW ROOF
6.50°
01 CL 9440 RL
01 CL RL 9440
STORAGE 01 FL 7000 RL
FFL RL: 6.980
MECHANICAL VENTILATION TO INTERNAL SANITARY COMPARTMENTS TO COMPLY WITH A.S 1668.2
FFL RL: 7.000
01 FL RL 7000
TERMITE TREATMENT TO A.S 3660.1
CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL
STORMWATER TO CONNECT TO EXISTING
WAFFLE POD CONSTRUCTION TO ENGINEER'S DETAILS AND SPECIFICATIONS
CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL
SECTION B-B GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
1 : 100
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
SECTIONS
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
G1.1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
T: 02 6583 4411
1 : 100
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
AREAS - ROOF AREAS Name EXISTING REMAINING ROOF AREA PROPOSED ROOF AREA TOTAL
Area 280.7 m² 255.8 m² 536.5 m²
DP° (CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3 COLORBOND® ULTRA "SURFMIST"
DP°
DP°
DP°
PROPOSED NEW FASCIAS COLORBOND® ULTRA "SURFMIST"
PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE
C/BND
METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST" ROOF TRUSSES @ 600CTS TO MANUFACTURER'S SPECIFICATION
6.50°
6.50°
PROPOSED EXTENSION
PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE
EXISTING ROOFING REMOVED AS SHOWN
EXISTING ROOFING REMOVED AS SHOWN
PROPOSED NEW INFILL TO UNDERSIDE OF NEW ROOFLINE
PROPOSED NEW INFILL TO UNDERSIDE OF NEW ROOFLINE
ASSESS EXISTING FASCIA AND REPLACE TO MATCH PROPOSED WHERE APPLICABLE
ASSESS EXISTING FASCIA AND REPLACE TO MATCH PROPOSED WHERE APPLICABLE EXISTING ROOFING AND INFILL REMOVED A SHOWN
EXISTING ROOF TO BE REPLACED
METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST"
ASSESS AND REMOVE EXISTING FASCIA AND GUTTER AS REQUIRED
REPLACE EXISTING GUTTERING WITH NEW TO MATCH PROPOSED (CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3
REPLACE EXISTING GUTTERING WITH NEW TO MATCH PROPOSED (CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3
EXISTING ROOF TO BE REPLACED METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST"
ROOF PLAN 1 : 100
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
EXTERNAL FINISHES LABEL C/BND REND
MATERIAL DESCRIPTION LYSAGHT COLORBOND ULTRA CORRUGATED METAL SHEET ROOFING RENDERED RC BLOCKWORK - PAINT FINISH "DULUX LEXICON"
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
PROJECT: CLUBHOUSE
ROOF PLAN - OVERALL
RENOVATION
STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
H1.1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
SCALE: SHEET SIZE:
A2
START DATE:
12.07.21 D4772
DWG No: T: 02 6583 4411
1 : 100
F: 02 6583 9820
DRAWING REVISIONS + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Description: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
CONNECTED TO MAIN SWITCH BOARD ES PE
CONNECTED TO MAIN SWITCH BOARD
CONNECTED TO MAIN PE SWITCH BOARD ES
MB MB
BENCH
BENCH
E EXT. DUCT
E EXT. DUCT
SQ. SET
BENCH
E EXT. DUCT
SQ. SET E EXT. DUCT
CONNECTED TO MAIN SWITCH BOARD
MH
CONNECTED TO MAIN SWITCH BOARD
E
E
E
EXT. DUCT
EXT. DUCT
EXT. DUCT
BENCH
ELECTRICAL LEGEND
BENCH
CEILING LIGHT POINT E
E
E
EXT. DUCT
EXT. DUCT
EXT. DUCT
E
TRACK LIGHT
EXT. DUCT
E EXT. DUCT
E EXT. DUCT
CONNECTED TO MAIN ES SWITCH BOARD PE
E
E
EXT. DUCT
EXT. DUCT
TASTIC FAN LIGHT FLURO LIGHT SSL
ES E
DOUBLE POWER OUTLET
PE
EXT. DUCT
SINGLE SPOT LIGHT
SINGLE POWER OUTLET
EXISTING TO REMAIN AS SHOWN
W
BENCH
W
EXTERNAL SGPO EXTERNAL DGPO
T.V
TELEVISION POINT
PH
PHONE POINT
RH
RANGE HOOD SGPO
MW
MICROWAVE SGPO
O DW
OVEN SGPO DISHWASHER POWER POINT SMOKE DETECTOR TO AS3786 & PART E2.2A NCC BCA VOL 1
EXISTING TO REMAIN AS SHOWN W LOCKED COVER
ES
CONNECTED TO MAIN SWITCH BOARD
EL
EXTERNAL WALL MOUNTED LIGHT FITTING
ES
EXTERNAL WALL MOUNTED ADJUSTABLE SPOT LIGHT MOTION SENSOR (ADJUSTABLE)
PE LS
GL
INTERNAL WALL MOUNTED ADJUSTABLE SPOT LIGHT FLUORESCENT LIGHT WITH DIFFUSER EXTERNAL UPLIGHT MOUNTED IN THE GROUND
CEILING MOUNTED ELECTRICAL FAN.
A/C
CEILING MOUNTED ELECTRICAL FAN WITH LIGHT. SPLIT SYSTEM AIR CONDITIONING UNIT. INTERNAL UNIT TO BE MOUNTED ON WALL 2300mm TO TOP OF UNIT ABOVE FLOOR LEVEL. EXTERNAL CONDENSER UNIT TO BE MOUNTED ON CONCRETE SLAB AT GROUND LEVEL. CONNECTING PIPES AND WIRES TO BE CONCEALED IN WALL AND/OR CEILING WHERE ACCESSIBLE AND EXTERNALLY IN POWDERCOATED ALUMINIUM FOLDED CASING WHERE VISIBLE.
ELECTRICAL NOTES: ELECTRICAL PLANS ARE INDICATIVE ONLY AND SHOW THE MINIMUM REQUIREMENTS. CLIENTS TO CONFIRM THEIR REQUIREMENTS WITH BUILDER PRIOR TO SIGNING OF CONTRACTS. • BUILDERS TO CONFIRM ALL ELECTRICAL POINTS WITH ELECTRICIAN PRIOR TO START OF CONSTRUCTION. • CEILING FANS TO BE INSTALLED CENTRALLY TO ALL CEILING TRUSSES IN THE LIVING, DINING AND KITCHEN AREAS. • EXTERNAL LIGHTING BY LANDSCAPE ARCHITECT, PROVIDE POWER CONDUITS FOR EXTERNAL LIGHTING. • CEILING MOUNTED LIGHT FITTINGS TO BE MOUNTED CENTRALLY WITHIN ALL ROOMS UNLESS OTHERWISE DIMENSIONED. • SMOKE ALARMS TO AS3786 & PART 3.7.5 OF THE NCC BCA VOL 2. ALL ALARMS/DETECTORS ARE TO BE INTERCONNECTED. LOCATIONS ON PLANS ARE INDICATIVE. (INSTALLATION TO BE AS PER STANDARDS ABOVE, & MANUFACTURERS SPECIFICATIONS)
INDICATIVE ELECTRICAL LAYOUT 1 : 100
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
PROJECT: CLUBHOUSE
ELECTRICAL PLAN
RENOVATION
STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
J1.1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
SCALE: SHEET SIZE:
A2
START DATE:
12.07.21 D4772
DWG No: T: 02 6583 4411
1 : 100
F: 02 6583 9820
DRAWING REVISIONS + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Description: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
DOOR:
ED07
ED01, 2, 3, 4, 5, 6
ID01, 2, 3
FRAME:
STEEL - PAINT FINISH
STEEL - PAINT FINISH
STEEL - PAINT FINISH
850mm MIN. CLEAR OPENING
850mm MIN. CLEAR OPENING
+2100
ZANDA TS9205SSS SELF CLOSER
ZANDA TS9205SSS SELF CLOSER
HUNG ON S/S 100 X 75mm BUTT HINGE X 3
HUNG ON S/S 100 X 75mm BUTT HINGE X 3
HUNG ON S/S 100 X 75mm BUTT HINGE X 3
DOOR LUMINESCENCE TO COMPLY WITH AS 1428.1 (FRONT DOORS ONLY)
2040
WEATHER SEAL TO UNDERSIDE OF DOOR LEAF
LATCH 1000mm +/- 100
LATCH 1000mm +/- 100
LATCH 1000mm +/- 100
1200-1600 ABV FFL
2040
CIRCULATION SPACE FOR DOOR LOCATION TO BE CONFIRMED AGAINST AS1428.1
2040
SINGAGE AND BRAILLE TO AS1428.1
WEATHER SEAL TO UNDERSIDE OF DOOR LEAF
FFL
LATCH TO AS1428.1 DORMA KABA DEADBOLT - FT& T SUPPLIED DORMA KABA PUSH PLATE - FT& T SUPPLIED TOILET INDICATOR PRIVACY BOLT SET NOVA NHB13SSS AS1428.1 COMPLIANT - FT& T SUPPLIED
LATCH TO AS1428.1 FT&T COMMERCIAL LEVER SET
LATCH TO AS1428.1 DORMA KABA DEADBOLT - FT& T SUPPLIED DORMA KABA PUSH PLATE - FT& T SUPPLIED
DOOR SCHEDULE 1 : 25
DOOR SCHEDULE AS 4055 : WIND LOADS FOR HOUSING AS 1288 : GLASS IN BUILDING - SELECTION & INSTALLATION AS 2047 : WINDOWS & EXTERNAL DOORS IN BUILDING AS 1170-Part 2: WIND ACTIONS AS 3959 : CONSTRUCTION OF BUILDINGS IN BUSHFIRE PRONE AREAS THE STANDARDS REFERRED ABOVE ARE THE VERSION ADOPTED BY BCA AT THE TIME THE RELEVANT CONSTRUCTION CERTIFICATE OR COMPLYING DEVELOPMENT CERTIFICATE APPLICATION IS MADE.
DOORS SPECIFIED USE NFRC UW & SHGCW VALUES. DOORS AS SPECIFIED OR EQUIVALENT MUST BE INSTALLED ON SITE (REFER TO NATHERS CERTIFICATE FOR DETAILS). STANDARD GLAZING: SINGLE CLEAR GLAZING WITH STANDARD ALUMINIUM FRAMES THROUGHOUT WEATHER STRIPPING TO BE INSTALLED THROUGHOUT. PLEASE NOTE: ALL GLAZING IN BATHROOMS, ENSUITES, SPA ROOMS OR THE LIKE TO COMPLY WITH PART 3.6.4.5 OF THE BCA
NUMBER
ROOM
ED01 ED02 ED03 ED04 ED05 ED06 ED07 ID01 ID02 ID03
STORAGE CHANGE ROOM 4 MALES REF 1 FEMALES CHANGE ROOM 3 UAT STORE REF 1 STORAGE
Building Designers
HEIGHT WIDTH 2040 2040 2040 2100 2040 2040 2040 2040 2040 2040
920 920 920 920 920 920 920 920 920 920
TYPE
CONSTRUCTION
HINGED HINGED HINGED HINGED HINGED HINGED HINGED HINGED HINGED HINGED
SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
COMMENTS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) - COMPLIANT TO AS1428.1/STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS
DOOR SCHEDULE
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
K1.1
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
1 : 25
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
WINDOW: FRAME:
NW01, 2, 3, 4, 5, 6, 7, 9, 10, 11
NW08
ALUMINIUM - COLORBOND® "SURFMIST" FINISH
ALUMINIUM - COLORBOND® "SURFMIST" FINISH
FIXED LOUVRES
FIXED LOUVRES
SECURITY SCREEN AFFIXED TO MASONRY WALL WITH TAMPER PROOF FIXINGS. STAND OFF TO SUIT SILL CLEARANCE. TO MANUFACTURERS SPEC. COLORBOND® "SURFMIST" FINISH
SECURITY SCREEN AFFIXED TO MASONRY WALL WITH TAMPER PROOF FIXINGS. STAND OFF TO SUIT SILL CLEARANCE. TO MANUFACTURERS SPEC. COLORBOND® "SURFMIST" FINISH
900
610
+2100
NOTE 15° FALL TO ALL WINDOW SILLS
NOTE 15° FALL TO ALL WINDOW SILLS
2100
900
FFL
WINDOW GLAZING SCHEDULE
GLAZING SCHEDULE 1 : 25
WINDOWS SPECIFIED USE NFRC UW & SHGCW VALUES. AS 4055 : WIND LOADS FOR HOUSING WINDOWS AS SPECIFIED OR EQUIVALENT MUST BE INSTALLED ON SITE AS 1288 : GLASS IN BUILDING - SELECTION & INSTALLATION STANDARD GLAZING: SINGLE CLEAR GLAZING WITH AS 2047 : WINDOWS & EXTERNAL DOORS IN BUILDING STANDARD ALUMINIUM FRAMES THROUGHOUT AS 1170-Part 2: WIND ACTIONS WEATHER STRIPPING TO BE INSTALLED THROUGHOUT. AS 3959 : CONSTRUCTION OF BUILDINGS IN BUSHFIRE PRONE AREAS PLEASE NOTE: ALL GLAZING IN BATHROOMS, ENSUITES, SPA ROOMS OR THE LIKE TO COMPLY WITH PART 3.6.4.5 OF THE BCA THE STANDARDS REFERRED ABOVE ARE THE VERSION ADOPTED BY BCA AT THE TIME THE RELEVANT CONSTRUCTION CERTIFICATE OR COMPLYING BEDROOM WINDOWS - WHERE THE FLOOR LEVEL OF A BEDROOM IS MORE THAN 2m ABOVE THE SURFACE BENEATH, BEDROOM WINDOWS ARE TO DEVELOPMENT CERTIFICATE APPLICATION IS MADE. COMPLY WITH BCA VOL 2 PART 3.9.2.5 OF THE BCA
NUMBER
ROOM
HEIGHT
WIDTH
HEAD HEIGHT
TYPE
CONSTRUCTION
GLAZING
NW01 NW02 NW03 NW04 NW05 NW06 NW07 NW08 NW09 NW10 NW11
CHANGE ROOM 3 CHANGE ROOM 3 CHANGE ROOM 4 CHANGE ROOM 4 MALES CHANGE ROOM 2 CHANGE ROOM 2 REF 1 CHANGE ROOM 1 CHANGE ROOM 1 FEMALES
610 610 610 610 610 610 610 900 610 610 610
2100 2100 2100 2100 2100 2100 2100 900 2100 2100 2100
2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100
FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE
ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM
OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
GLAZING SHCEDULE
PROJECT: CLUBHOUSE RENOVATION SHEET:
K1.2
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
COMMENTS
T: 02 6583 4411
As indicated
SCALE: SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772 F: 02 6583 9820
DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21
Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue: A C D E F
Drawn: DC AE AE AE AE
WWW. COLLINSWCOLLINS.COM.AU
GENERAL AND PROJECT SPECIFIC CONSTRUCTION NOTES FOR COLLINS W COLLINS ARCHITECTURAL PLANS THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT. THIS INCLUDES (but is not limited to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTENORS, DEMOLISHERS. PLEASE USE THIS IN CONJUNCTION WITH ALL DRAWING SHEETS AND VIEWS CONTAINED FORTHWITH IN THIS PLAN SET. REVISED JANURARY 2021
CONSTRUCTION NOTES:
STAIRS, HANDRAILS & BALUSTRADE NOTES: STAIRS TO COMPLY WITH SECTION D2.13, D2.14, D2.15 & TABLE D2.14 SLIP RESISTANCE CLASSIFICATION TABLE IN ACCORDANCE WITH AS4586. HANDRAIL HEIGHTS TO BE NO LESS THAN 1000mm FROM PROPOSED FINISHED FL. BALUSTRADE & HANDRAIL TO BE IN ACCORDANCE WITH D2.16 & D2.17 OF THE BCA WIND CATEGORY TO BE CONFIRMED PRIOR TO START OF CONSTRUCTION. IF N2 OR HIGHER, ENGAGED PIERS TO BRICKWORK AREA’S ARE TO COMPLY WITH AS 4773.1-2010 & AS 4773 2-2010
GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET: Z1.1
CONSTRUCTION NOTES DRAWING REVISION + NOTES SCALE: SHEET SIZE: START DATE:
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie nsw 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
DWG No: T: 02 6583 4411
GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS
Date As Shown 12.07.21 25.08.21 A3 12.07.21 22.09.21 02.11.21 D4772
F: 02 6583 9820
Revision INITIAL ISSUE DRAFT TENDER/CC REVISED TENDER/CC REVISED
Issue Drawn A DC D AE E AE F AE WWW. COLLINSWCOLLINS.COM.AU
THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT. THIS INCLUDES (but is not limited to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTENORS, DEMOLISHERS. BUILDING SPECIFICATIONS FOR CLASS 2 AND 9 BUILDINGS All works to be completed in accordance with the current version of the National Construction Code Series, (NCC), Volume 1 and the Plumbing Code of Australia (PCA), Volume 3 as applicable. All Australian Standards listed are the versions that have been adopted by the relevant version of the National Construction Code Series at the time of Construction Certificate or Complying Development Certificate Application. All works are to be completed in accordance with the relevant ‘Deemed-to-Satisfy Provisions’ of Volume 1 and Volumes 3, as applicable, of the National Construction Code. All building design/testing/construction/installation is to occur in accordance with the relevant sections of the following standards: Structural Design Actions – 1170 Pressure Equipment – AS/NZS 1200 Acoustics – AS/NZS 1276 Glass in buildings – AS 1288 Design for access and mobility – AS 1428 Methods for fire tests on building materials, components and structures – AS 1530 Design and installation of sheet roof and wall cladding – AS 1562 Aluminium structures – AS/NZS 1664 The use of ventilation and air conditioning in buildings – AS/NZS 1668 Fire Detection, warning, control and intercom systems – AS 1670 Interior lighting – AS/NZS 1680 Residential timber-framed construction – AS 1684 Timber Structures – AS 1720 Lifts, escalators and moving walks – AS 1735 Particle flooring – AS 1860 Components for the protection of openings in fire-resistant walls Swimming pool safety – AS 1926 Windows in external glazed doors in buildings – AS 2047 Roof Tiles - AS 2049 Installation of roof tiles – AS 2050 Automatic fire sprinkler systems – AS 2118 Piling – AS 2159 Emergency escape lighting and exit signs for buildings – AS 2293 Composite Structures – AS 2327 Fire hydrant installations – AS 2419 Installation of fire hose reels – AS 2444 Smoke/heat venting systems – AS 2665 Residential slabs and footings – AS 2870 Parking facilities – AS/NZS 2890 Damp-proof courses and flashings – AS/NZS 2904 Cellulose cement products – AS/NZS 2908 Domestic solid-fuel burning appliances – AS/NZS 2918 Electrical installations – AS/NZS 3013 Plumbing and drainage – AS/NZS 3500 Concrete structures – AS 3600 Termite management – AS 3600 Air-handling and water systems of buildings – AS/NZS 3666 Masonry Structures – AS 3700 Smoke Alarms – AS 3786 Performance of electrical appliances – AS/NZS 3823 Construction of buildings in bushfire prone-area – AS 3959 Components for the protection of openings in fire-resistant separating elements – AS 4072 Steel structures – AS 4100 Pliable building membranes and underlays – AS/NZS 4200 Ductwork for air-handling systems in buildings – AS 4254 Plastic roof and wall cladding materials – AS/NZS 4256 Testing of building facades – AS/NZS 4284 Garage doors and other large access doors – AS/NZS 4505 Slip resistant classification of new pedestrian surface materials – AS 4586 Cold-formed steel structures – AS/NZS 4600 Materials for the thermal insulation of buildings – AS/NZS 4859 Reaction to fire tests for flooring – AS ISO 9239 Fire tests – AS ISO 9705
Building Designers
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
BUILDING SPECIFICATION NOTES VOL 1
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
Z1.2
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie nsw 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
SCALE:
1 : 100
SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772
F: 02 6583 9820
DRAWING REVISION + NOTES Date: Revision: 12.07.21 INITIAL ISSUE 25.08.21 DRAFT TENDER/CC 22.09.21 REVISED TENDER/CC 02.11.21 REVISED
Issue: Drawn: A DC D AE E AE F AE
WWW. COLLINSWCOLLINS.COM.AU
THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT. THIS INCLUDES (but is not limited to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTENORS, DEMOLISHERS. 1. FALLS, SLIPS, TRIPS A) WORKING AT HEIGHTS DURING CONSTRUCTION Wherever possible, components for this building should be prefabricated off-site or at ground level to minimise the risk of workers falling more than two metres. However, construction of this building will require workers to be working at heights where a fall in excess of two metres is possible and injury is likely to result from such a fall. The builder should provide a suitable barrier wherever a person is required to work in a situation where falling more than two metres is a possibility. DURING OPERATION OR MAINTENANCE For houses or other low-rise buildings where scaffolding is appropriate: Cleaning and maintenance of windows, walls, roof or other components of this building will require persons to be situated where a fall from a height in excess of two metres is possible. Where this type of activity is required, scaffolding, ladders or trestles should be used in accordance with relevant codes of practice, regulations or legislation. For buildings where scaffold, ladders, trestles are not appropriate: Cleaning and maintenance of windows, walls, roof or other components of this building will require persons to be situated where a fall from a height in excess of two metres is possible. Where this type of activity is required, scaffolding, fall barriers or Personal Protective Equipment (PPE) should be used in accordance with relevant codes of practice, regulations or legislation. ANCHORAGE POINTS Anchorage points for portable scaffold or fall arrest devices have been included in the design for use by maintenance workers. Any persons engaged to work on the building after completion of construction work should be informed about the anchorage points. B) SLIPPERY OR UNEVEN SURFACES FLOOR FINISHES Specified If finishes have been specified by designer, these have been selected to minimise the risk of floors and paved areas becoming slippery when wet or when walked on with wet shoes/feet. Any changes to the specified finish should be made in consultation with the designer or, if this is not practical, surfaces with an equivalent or better slip resistance should be chosen. FLOOR FINISHES By Owner If designer has not been involved in the selection of surface finishes, the owner is responsible for the selection of surface finishes in the pedestrian trafficable areas of this building. Surfaces should be selected in accordance with AS HB 197:1999 and AS/NZ 4586:2004. STEPS, LOOSE OBJECTS AND UNEVEN SURFACES Due to design restrictions for this building, steps and/or ramps are included in the building which may be a hazard to workers carrying objects or otherwise occupied. Steps should be clearly marked with both visual and tactile warning during construction, maintenance, demolition and at all times when the building operates as a workplace. Building owners and occupiers should monitor the pedestrian access ways and in particular access to areas where maintenance is routinely carried out to ensure that surfaces have not moved or cracked so that they become uneven and present a trip hazard. Spills, loose material, stray objects or any other matter that may cause a slip or trip hazard should be cleaned or removed from access ways. Contractors should be required to maintain a tidy work site during construction, maintenance or demolition to reduce the risk of trips and falls in the workplace. Materials for construction or maintenance should be stored in designated areas away from access ways and work areas. 2. FALLING OBJECTS LOOSE MATERIALS OR SMALL OBJECTS Construction, maintenance or demolition work on or around this building is likely to involve persons working above ground level or above floor levels. Where this occurs one or more of the following measures should be taken to avoid objects falling from the area where the work is being carried out onto persons below. 1. Prevent or restrict access to areas below where the work is being carried out. 2. Provide toeboards to scaffolding or work platforms. 3. Provide protective structure below the work area. 4. Ensure that all persons below the work area have Personal Protective Equipment (PPE). BUILDING COMPONENTS During construction, renovation or demolition of this building, parts of the structure including fabricated steelwork, heavy panels and many other components will remain standing prior to or after supporting parts are in place. Contractors should ensure that temporary bracing or other required support is in place at all times when collapse which may injure persons in the area is a possibility. Mechanical lifting of materials and components during construction, maintenance or demolition presents a risk of falling objects. Contractors should ensure that appropriate lifting devices are used, that loads are properly secured and that access to areas below the load is prevented or restricted. 3. TRAFFIC MANAGEMENT For building on a major road, narrow road or steeply sloping road: Parking of vehicles or loading/unloading of vehicles on this roadway may cause a traffic hazard. During construction, maintenance or demolition of this building designated parking for workers and loading areas should be provided. Trained traffic management personnel should be responsible for the supervision of these areas. For building where on-site loading/unloading is restricted: Construction of this building will require loading and unloading of materials on the roadway. Deliveries should be well planned to avoid congestion of loading areas and trained traffic management personnel should be used to supervise loading/unloading areas. For all buildings: Busy construction and demolition sites present a risk of collision where deliveries and other traffic are moving within the site. A traffic management plan supervised by trained traffic management personnel should be adopted for the work site. 4. SERVICES GENERAL Rupture of services during excavation or other activity creates a variety of risks including release of hazardous material. Existing services are located on or around this site. Where known, these are identified on the plans but the exact location and extent of services may vary from that indicated. Services should be located using an appropriate service (such as Dial Before You Dig), appropriate excavation practice should be used and, where necessary, specialist contractors should be used. Locations with underground power: Underground power lines MAY be located in or around this site. All underground power lines must be disconnected or carefully located and adequate warning signs used prior to any construction, maintenance or demolition commencing. Locations with overhead power lines: Overhead power lines MAY be near or on this site. These pose a risk of electrocution if struck or approached by lifting devices or other plant and persons working above ground level. Where there is a danger of this occurring, power lines should be, where practical, disconnected or relocated. Where this is not practical adequate warning in the form of bright coloured tape or signage should be used or a protective barrier provided.
Building Designers
5. MANUAL TASKS Components within this design with a mass in excess of 25kg should be lifted by two or more workers or by mechanical lifting device. Where this is not practical, suppliers or fabricators should be required to limit the component mass. All material packaging, building and maintenance components should clearly show the total mass of packages and where practical all items should be stored on site in a way which minimises bending before lifting. Advice should be provided on safe lifting methods in all areas where lifting may occur. Construction, maintenance and demolition of this building will require the use of portable tools and equipment. These should be fully maintained in accordance with manufacturer’s specifications and not used where faulty or (in the case of electrical equipment) not carrying a current electrical safety tag. All safety guards or devices should be regularly checked and Personal Protective Equipment should be used in accordance with manufacturer’s specification. 6. HAZARDOUS SUBSTANCES ASBESTOS For alterations to a building constructed prior to 1990: If this existing building was constructed prior to: asbestos 1990 - it therefore may contain asbestos 1986 - it therefore is likely to contain either in cladding material or in fire retardant insulation material. In either case, the builder should check and, if necessary, take appropriate action before demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure. POWDERED MATERIALS Many materials used in the construction of this building can cause harm if inhaled in powdered form. Persons working on or in the building during construction, operational maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including protection against inhalation while using powdered material or when sanding, drilling, cutting or otherwise disturbing or creating powdered material. TREATED TIMBER The design of this building may include provision for the inclusion of treated timber within the structure. Dust or fumes from this material can be harmful. Persons working on or in the building during construction, operational maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including protection against inhalation of harmful material when sanding, drilling, cutting or using treated timber in any way that may cause harmful material to be released. Do not burn treated timber. VOLATILE ORGANIC COMPOUNDS Many types of glue, solvents, spray packs, paints, varnishes and some cleaning materials and disinfectants have dangerous emissions. Areas where these are used should be kept well ventilated while the material is being used and for a period after installation. Personal Protective Equipment may also be required. The manufacturer’s recommendations for use must be carefully considered at all times. SYNTHETIC MINERAL FIBRE Fibreglass, rockwool, ceramic and other material used for thermal or sound insulation may contain synthetic mineral fibre which may be harmful if inhaled or if it comes in contact with the skin, eyes or other sensitive parts or the body. Personal Protective Equipment including protection against inhalation of harmful material should be used when installing, removing or working near bulk insulation material. TIMBER FLOORS This building may contain timber floors which have an applied finish. Areas where finishes are applied should be kept well ventilated during sanding and application and for a period after installation. Personal Protective Equipment may also be required. The manufacturer’s recommendations for use must be carefully considered at all times. 7. CONFINED SPACES EXCAVATION Construction of this building and some maintenance on the building will require excavation and installation of items within excavations. Where practical, installation should be carried out using methods which do not require workers to enter the excavation. Where this is not practical, adequate support for the excavated area should be provided to prevent collapse. Warning signs and barriers to prevent accidental or unauthorised access to all excavations should be provided. ENCLOSED SPACES For buildings with enclosed spaces where maintenance or other access may be required: Enclosed spaces within this building may present a risk to persons entering for construction, maintenance or any other purpose. The design documentation calls for warning signs and barriers to unauthorised access. These should be maintained throughout the life of the building. Where workers are required to enter enclosed spaces, air testing equipment and Personal Protective Equipment should be provided. SMALL SPACES For buildings with small spaces where maintenance or other access may be required: Some small spaces within this building will require access by construction or maintenance workers. The design documentation calls for warning signs and barriers to unauthorised access. These should be maintained throughout the life of the building. Where workers are required to enter small spaces they should be scheduled so that access is for short periods. Manual lifting and other manual activity should be restricted in small spaces. 8. PUBLIC ACCESS Public access to construction and demolition sites and to areas under maintenance causes risk to workers and public. Warning signs and secure barriers to unauthorised access should be provided. Where electrical installations, excavations, plant or loose materials are present they should be secured when not fully supervised. 9. OPERATIONAL USE OF BUILDING RESIDENTIAL BUILDINGS This building has been designed as a residential building. If it, at a later date, it is used or intended to be used as a workplace, the provisions of the Work Health and Safety Act 2011 or subsequent replacement Act should be applied to the new use. NON-RESIDENTIAL BUILDINGS For non-residential buildings where the end-use is known: This building has been designed for the specific use as identified on the drawings. Where a change of use occurs at a later date a further assessment of the workplace health and safety issues should be undertaken. 10.OTHER HIGH RISK ACTIVITY Code All electrical work should be carried out in accordance with of Practice: Managing Electrical Risks at the Workplace, AS/NZ and all licensing requirements. 3012 All work using Plant should be carried out in accordance with Code of Practice: Managing Risks of Plant at the Workplace. Code of All work should be carried out in accordance with Practice: Managing Noise and Preventing Hearing Loss at Work. Due to the history of serious incidents it is recommended that particular care be exercised when undertaking work involving steel construction and concrete placement. All the above applies.
Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.
EXCAVATIONS 1.Excavations The part of the site to be covered by the proposed building or buildings and an area at least 1000mm wide around that part of the site or to boundaries of the site, whichever is the lesser, shall be cleared or graded as indicated on the site works plan. Top soil shall be cut to a depth sufficient to remove all vegetation. Excavations for all footings shall be in accordance with the Engineer’s Recommendations or the BCA requirements. FOUNDATIONS AND FOOTINGS 1. Underfloor Fill Underfloor fill shall be in accordance with the BCA. 2. Termite Risk Management Termite treatment shall be carried out in accordance with the BCA. 3. Vapour Barrier The vapour barrier installed under slab-on-ground construction shall be 0.2mm nominal thickness, high impact resistance polyethylene film installed in accordance with the BCA. 4. Reinforcement Reinforcement shall conform and be placed in accordance with the Engineer’s Recommendation and the BCA. Support to all reinforcement shall be used to correctly position and avoid any undue displacement of reinforcement during the concrete pour. 5. Concrete Structural shall not be less than Grade N20 except otherwise approved by the engineer and in accordance with the BCA. 6. Curing All concrete slabs shall be cured in accordance with AS 3600. 7. Footings and Slabs on Ground Concrete slabs and footings shall not be poured until approval to pour concrete is given by the engineer or the Local Authority. 8. Sub-Floor Ventilation Where required, adequate cross ventilation will be provided to the space under suspended ground floor. Construction is to meet the requirements of the BCA. No section of the under floor area wall to be constructed in such manner that will hold pockets of still air. 9. Sub-Floor Access If required, access will be provided under suspended floors in position where indicated on plan. EFFLUENT DISPOSAL/DRAINAGE 1. Storm Water Drainage Stormwater drainage shall be carried out in accordance with the BCA. The Builder will allow for the supplying and laying of stormwater drains where shown on the site plan. TIMBER FRAMING 1. Generally All timber framework sizes, spans, spacing, notching, checking and fixing to all floor, wall and roof structure shall comply with the BCA or AS 1684. Alternative structural framing shall be to structural engineer’s details and certification. The work shall be carried out in a proper and trades personal like manner and shall be in accordance with recognised and accepted building practices. 2. Roof Trusses Where roof truss construction is used, trusses shall be designed in accordance with AS 1720 and fabricated in a properly equipped factory and erected, fixed and braced in accordance with the fabricator’s written instructions. 3. Bracing Bracing units shall be determined and installed in accordance with AS 1684 as appropriate for the design wind velocity for the site. Bracing shall be evenly distributed throughout the building. 4. Flooring Floor joists will be covered with strip or sheet flooring as shown on plan with particular regard to ground clearance and installation in wet areas as required by the BCA. Thickness of the flooring is to be appropriate for the floor joist spacing. Strip and sheet flooring shall be installed in accordance with AS 1684. When listed in Schedule of Works, floors shall be sanded to provide an even surface and shall be left clean throughout. 5. Timber Posts Posts supporting the carports, verandas and porches shall be timber suitable for external use, or as otherwise specified, supported on glavanised or treated metal post shoes, unless otherwise specified. Posts shall be bolted to all adjoining beams as required by AS 1684 for the wind speed classification assessed for the site. 6. Corrosion Protection All metal brackets, facing plates and other associated fixings used in structural timber joints and bracing must have appropriate corrosion protection. STEEL FRAMING 1. Generally Steel floor, wall or roof framing shall be installed in accordance with the manufacturer’s recommendations and the BCA. ROOFING All roof cladding is to comply with the relevant structural performance and weathering requirements of the BCA and be installed as per the manufacturer’s recommendations. 1.Tiled Roofing The Builder will cover the roof of the dwelling with approved tiles as selected. The tiles are to be fixed (as required for appropriate design and wind speed) to battens of sixes appropriate to the spacing of rafters/trusses in accordance with the manufacturer’s recommendations. The Builder will cover hips and ridges with capping and all necessary accessories including starters and apex caps. Capping and verge tiles are to be well bedded and neatly pointed. Roofing adjacent to valleys should be fixed so as to minimise water penetration as far as practicable. As roof tiles are made of natural products slight variation in colour is acceptable. 2. Metal Roofing The Builder will provide and install a metal roof together with accessories all in accordance with the manufacturer’s recommendations. Except where design prohibits, sheets shall be in single lengths from fascia to ridge. Fixing sheets shall be strictly in accordance with the manufacturer’s recommendation as required for the appropriate design and wind speed. Incompatible materials shall not be used for flashings, fasteners or downpipes. 3. Gutters and Downpipes Gutters and downpipes shall be manufactured and installed in accordance with the BCA. Gutters and downpipes are to be compatible with other materials used. 4. Sarking Sarking under roof coverings must comply with and be fixed in accordance with manufacturer’s recommendations. 5. Sealants Appropriate sealants shall be used where necessary and in accordance with manufacturer’s recommendations.
WORK SAFETY NOTES COMMERCIAL
PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE
SHEET:
Z1.3
CLIENT: MID COAST COUNCIL
89A lord street (PO Box 5667), Port Macquarie nsw 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430
T: 02 6583 4411
SCALE:
1 : 100
SHEET SIZE:
A3
START DATE:
12.07.21
DWG No:
D4772
F: 02 6583 9820
6. Flashing Flashings shall comply with, and be installed in accordance with the BCA. MASONRY 1. Damp Proof Courses All damp proof courses shall comply with the BCA and Clause 1.0.10. The damp proof membrane shall be visible in the external face of the masonry member in which it is placed and shall not be bridged by any applied coatings, render or the like. 2. Cavity Ventilation Open vertical joints (weepholes) must be created in the course immediately above any DPC or flashing at centres not exceeding 1.2m and must be in accordance with the BCA. 3. Mortar and Joining Mortar shall comply with the BCA. Joint tolerances shall be in accordance with AS 3700. 4. Lintels Lintels used to support brickwork opening in walls must be suitable for the purpose as required by the BCA. The Builder will provide one lintel to each wall leaf. The Builder will provide corrosion protection in accordance with the BCA Part 3.4.4 as appropriate for the site environment and location of the lintels in the structure. 5. Cleaning The Builder will clean all exposed brickwork with an approved cleaning system. Care should be taken not to damage brickwork or joints and other fittings. CLADDING AND LININGS 1. External Cladding Sheet materials or other external cladding shall be fixed in accordance with the manufacturer’s recommendations and any applicable special details. Where required in open verandas, porches and eave soffits, materials indicated on the plans shall be installed. 2.Internal Wall and Ceilings Linings The Builder will provide gypsum plasterboards or other selected materials to walls and ceilings. Plasterboard sheets are to have recessed edges and will be a minimum of 10mm thick. Internal angles in walls from floor to ceiling are to be set. Suitable cornice moulds shall be fixed at the junction of all walls and ceilings or the joint set as required. The lining of wet area and walls shall be constructed in accordance with the BCA. Wet area lining is to be fixed in accordance with the manufacturer’s recommendations. The ceiling access hole shall be of similar material to the adjacent ceiling. 3.Waterproofing All internal wet area and balconies over internal habitable rooms are to be waterproof in accordance with the BCA. JOINERY 1. General All joinery work (metal and timber) shall be manufactured and installed according to accepted building practices. 2. Door Frames External door frames shall be a minimum of 32mm thick solid rebated 12mm deep to receive doors. Internal jamb linings shall be a minimum of 18mm thick fit with 12mm thick door stops. Metal doorframes shall be installed where indicated on drawings in accordance with the manufacturer’s recommendations. 3. Doors and Doorsets All internal and external timber door and door sets shall be installed in accordance with accepted building practices. Unless listed otherwise in the Schedule of Works, doors and door sets shall be manufactured in accordance with AS 2688 and AS 2689. 4. Window and Sliding Doors Sliding and other timber windows and doors shall be manufactured and installed in accordance with AS 2047. Sliding and other aluminium windows and the doors shall be installed in accordance with manufacturer’s recommendations and AS 2047. All glazing shall comply with the BCA and any commitments outlined in the relevant BASIX Certificate. 5. Stairs, Balustrades and other Barriers The Builder will provide stairs or ramps to any change in levels, and balustrades or barriers to at least one side of ramps, landings and balconies as per the BCA. SERVICES 1.Plumbing All plumbing shall comply with the requirements of the relevant supply authority and AS 3500. The work is to be carried out by a licensed plumber. Fittings, as listed in the Schedule of Works, shall be supplied and installed to manufacturer’s recommendations. Fittings, hot water system and any rainwater harvesting facilities shall be appropriate to satisfy any commitment outlined in the relevant BASIX Certificate. 2.Electrical The Builder will provide all labour and materials necessary for the proper installation of the electricity service by a licensed electrician in accordance with AS/NZS 3000 and the requirements of the relevant supply authority. Unless otherwise specified, the electrical service shall be 240 volt, single phase supply. 3.Gas All installation (including LPG) shall be carried out in accordance with the rules and requirements of the relevant supply authority. 4.Smoke Detectors The Builder will provide and install smoke alarms manufactured in accordance with AS 3786 AS specified or as indicated on the plans and in accordance with the BCA. 5.Thermal Insulation Where thermal insulation is used in the building fabric or services, such as air conditioning ducting or hot water systems, it shall be installed in accordance with manufacturer’s recommendations to achieve the R-Values required by the BCA or as outlined in the relevant BASIX Certificate. TILING 1.Materials Cement mortar and other adhesives shall comply with AS 3958.1 or tile manufacturer’s recommendation. 2.Installation Installation of tiles shall be in accordance with AS 3958.1, manufacturer’s recommendations or accepted building practices. Where practicable, spacing between tiles should be even and regular. The Builder will provide expansion joints where necessary. All vertical and horizontal joints between walls and fixtures e.g. bench top, bath, etc. and wall/floor junctions to be filled with flexible mould resistant sealant. All joints in the body of tiled surfaces shall be neatly filled with appropriate grout material as specified by the tile manufacturer or accepted building practice. As tiles are made of natural products a slight variation in colour is acceptable.
DRAWING REVISION + NOTES Date: Revision: 12.07.21 INITIAL ISSUE 25.08.21 DRAFT TENDER/CC 22.09.21 REVISED TENDER/CC 02.11.21 REVISED
Issue: Drawn: A DC D AE E AE F AE
WWW. COLLINSWCOLLINS.COM.AU