Omaru Park Taree Upgrade Project - Project Plans

Page 1

CURRENT REVISION + NOTES Date: Description: 02.11.21 REVISED

Issue: F

Drawn: AE

CLUBHOUSE RENOVATION CLIENT: MID COAST COUNCIL STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET NAME: OMARU PARK, TAREE CWC JOB #: D4772 SITE PLANS

SETOUT PLANS

SHEET #

SHEET NAME

SHEET #

A1.1 A1.2

SITE PLAN SERVICES PLAN

D1.1

FLOOR PLANS SHEET # B1.1 B1.2

SHEET NAME FLOOR PLAN - DEMO FLOOR PLAN - OVERALL

DETAILS SHEET # C1.1 C1.2 C1.3 C1.4 C1.5 C1.6

SECTIONS

SHEET NAME

SHEET #

SETOUT PLAN - OVERALL

G1.1

ELEVATIONS - EXTERNAL SHEET # E1.1 E1.2

SHEET NAME

H1.1

ELEVATIONS - INTERNAL

SHEET NAME DETAIL - UAT DETAIL - FEMALE WC DETAIL - CHANGEROOM 1 DETAIL - CHANGEROOM 3 DETAIL - MALE WC DETAIL - CHANGEROOM 2 / 4

SHEET # F1.1 F1.2 F1.3 F1.4

SHEET NAME ELEVATIONS INTERNAL - UAT ELEVATIONS INTERNAL - UAT ELEVATIONS INTERNAL - SHOWER ELEVATIONS INTERNAL - WC

SECTIONS

ROOF PLANS SHEET #

ELEVATIONS ELEVATIONS

SHEET NAME

SHEET NAME ROOF PLAN - OVERALL

ELECTRICAL LAYOUT SHEET #

SHEET NAME

J1.1

ELECTRICAL PLAN

SCHEDULES SHEET # K1.1 K1.2

SHEET NAME DOOR SCHEDULE GLAZING SHCEDULE

NOTES SHEET # Z1.1 Z1.2 Z1.3

SHEET NAME CONSTRUCTION NOTES BUILDING SPECIFICATION NOTES VOL 1 WORK SAFETY NOTES - COMMERCIAL

Building Designers 89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

F: 02 6583 9820

WWW. COLLINSWCOLLINS.COM.AU


GENERIC | TYPICAL KEY, LEGEND AND ABBREVIATIONS FOR COLLINS W COLLINS ARCHITECTURAL PLANS THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT. THIS INCLUDES (but is not limited to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTENORS, DEMOLISHERS. PLEASE USE THIS IN CONJUNCTION WITH ALL DRAWING SHEETS AND VIEWS CONTAINED FORTHWITH IN THIS PLAN SET. REVISED JANURARY 2021

SYMBOLS AND LINES SITE PLAN | S68 S138 PLAN

RENOVATION / DEMOLITION SYMBOLS

ELECTRICAL CUBICLE / PIT

LOT BOUNDARY

FALL OF BATTER SLOPE

SEWER LINE

DRIVEWAY SURFACE

NBN

NBN PIT

STORMWATER LINE

GARDEN TAP

T.PIT

WATER CONNECTION LINE

E.P

TO BE DEMOLISHED OR REMOVED

TO BE DEMOLISHED OR REMOVED

EXISTING ITEM / ELEMENT (FLOOR/WALLS/WINDOWS ETC)

EXISTING AREA / FACADE / ROOM

TELECOMMUNICATIONS PIT

WATER METER / ALTERNATE WATER METER

TO BE DEMOLISHED / REMOVED

PROPOSED NEW ITEM / ELEMENT

DOWNPIPE TO WATER TANK

SANDBAG

DEMOLITION LINE

DOWNPIPE FROM TANK TO APPLIANCE

TEMPORARY HOARDING GATES

MULTI STOREY SITE PLAN SYMBOLS / LEGEND LOWEST FLOOR (GROUND TYPICAL)

SILTATION CONTROL FENCING SITE HOARDING FENCING

MIDDLE FLOOR

STREET TREE / SITE TREE

UPPER FLOOR

BATTER EXTREMITIES LINE EASEMENT BOUNDARY

LP

LIGHT POLE

OVERHEAD POWER LINES

PP

POWER POLE

GENERAL ABBREVIATIONS

FLOOR PLANS / SECTIONS (INCL SETOUT, ROOF, DETAIL CALL OUTS) OVERHEAD ITEM

FILL (TO ENGINEERS DETAIL)

GTAP

GARDEN TAP

DEMOLITION LINE

WET AREA TILED FLOOR SURFACE

DP

RAINWATER DOWN PIPE:

UPPER FLOOR OUTLINE

COMMON / OUTDOOR TILED FLOOR SURFACE

SMOKE ALARMS:

ROOF OUTLINE OVER

BROOM FINISH CONCRETE FLOOR SURFACE

RAKED CEILING LINE

MASONRY WALL

TO AS3786 AND SECTION 3.7.5 OF THE NCC BCA VOL 2. ALL ALARMS/DETECTORS ARE TO BE INTERCONNECTED. LOCATIONS ON PLANS ARE INDICATIVE. INSTALLATION TO BE AS PER STANDARDS ABOVE, AND MANUFACTURERS SPECIFICATIONS

EXT. DUCT

CONCRETE

AVERAGE RECURRANCE INDEX

PB

PLASTER BOARD

AHD

AUSTRALIAN HEIGHT DATUM

RET. WALL

RETAINING WALL

CLT

CROSS LAMINATED TIMBER

RC

REINFORCED CONCRETE

COL.

COLUMN

PV

PHOTO VOLTAIC

COW

COST OF WORKS

RL

REDUCED LEVEL

DCP

DEVELOPMENT CONTROL PLAN

SB

SUB ELECTRICAL METER BOX

DEG.

DEGREES

SL

SURFACE LEVEL

DGPO

DOUBLE GENERAL POWER OUTLET

SW

STORM WATER

DH

DOUBLE HUNG WINDOW

TRH

TOILET ROLL HOLDER

DP

RAINWATER DOWN PIPE

T.O.K

TOP OF KERB

DTR

DOUBLE TOWEL RAIL

T.O.W

TOP OF WALL

HWS

HOT WATER SERVICE

WC

MECHANICAL VENTILATION:

E

BEAM LINE

TO AS 3500

ARI

MECHANICAL VENTILATION EXTERNALLY DUCTED TO NCC 3.8.7.3 & 3.8.7.4

SLIDING DOOR UNIT OPENING DIRECTION SQUARE SET OPENING

TIMBER/METAL STUD FRAMED WALL

SLIDING WINDOW OPENING DIRECTION TERMITE PROTECTION:

CONCRETE BLOCK WALL

TO A.S 3660.1

AWNING/CASEMENT WINDOW OPENING DIRECTION NATURAL GROUND LINE (EXCAVATED)

MASONRY VENEER WALL

CO L.

HINGED DOOR OPENING DIRECTION METAL SHEET ROOFING

CO L.

COLUMN (MATERIAL AS PER SCHEDULE OR PLAN)

GAS BOTTLES MASONRY PIER (SIZE AS PER SCHEDULE OR PLAN) ENGAGED PIERS:

KLIP LOK (OR SIMILAR) METAL SHEET ROOFING

MB

TILED ROOF

TO COMPLY WITH AS 4773.1-2010 & AS 4773 2-2010

INSULATION BATTING

ELECTRICAL METER BOX

HWS

WATER CLOSET

GAS INSTANTANEOUS HOT WATER SERVICE

WAFFLE POD (TO ENGINEERS DETAIL)

FIBRE CEMENT

1650B

BATH SIZING

FINISHED SURFACE LEVEL

900V

VANITY SIZING

FIXED GLASS / PANEL

820

INTERIOR DOOR SIZING

FG

FIXED GLASS WINDOW

LOH

LIFT OFF HINGE

GLT

GLUE LAMINATED TIMBER

LVL

LAMINATED VENEER LUMBER

FC

HOT WATER TANK TO BE DEMOLISHED / REMOVED

TACTILE GROUND SURFACE INDICATORS:

F.S.L

TO AS 1428.4.1:2009

SOLAR HOT WATER SERVICE EARTH / SOIL

STAIRS INCLUDING DIRECTION OF TRAVEL (UP) 1

2

3

4

5

F

6

COOKTOP RAMP INCLUDING DIRECTION OF TRAVEL (UP)

SINK TYPICAL

GENERAL SYMBOLS AND ARCHITECTURAL SYMBOLS

NORTH

# SHEET

TYPICAL SECTION MARKER

TYPICAL CALL OUT MARKER

TYPICAL ELEVATION MARKER

VIEW TAG AND SCALE

# SHEET

# W01

WINDOW TAG (DA/CC)

D01

DOOR TAG (DA/CC)

SHEET

Building Designers

VIEW

SCALE

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

MECH.

GARDEN TAP

GPO

GENERAL POWER OUTLET

MB

ELECTRICAL METER BOX

GRG

GARAGE

MR

MOISTURE RESISTANT

HWS

HOT WATER SERVICE

MH

MAN HOLE

LEP

LOCAL ENVIRONMENT PLAN

NGL

NATURAL GROUND LINE

LEGENDS

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

MECHANICAL

GTAP

T: 02 6583 4411

1 : 100

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


MULDOOR STREET TREE

BOUNDARY

ANY STOCKPILING OF SOILS ON SITE WILL NEED TO BE CONTROLLED FROM DUST BY WATERING OR COVERING AS REQUIRED TO PREVENT EROSION & DUST NUISANCE. HOSE TO BE AVAILABLE ON SITE.

7.7 50

TEMPORARY BLUE METAL GRAVEL LAID AT ENTRANCE OF SITE TO REMOVE EXCESS SOILS FROM VEHICLES AT EXIT. AGGREGATE SIZE AS PER THE LANDCOM BLUE BOOK STANDARD DRAWING SD 6-14 IS TO BE 30mm DIAMETER

PROPOSED HOARDING AND SECURITY FENCE TO BE INSTALLED TO NORTH / EAST / SOUTH / WEST BOUNDARIES

7.500 7.75 0

TREE - REMOVED

CLUB HOUSE

58050

BOUNDARY

BUILDER TO LOCATE THE ELECTRICAL AND TELSTRA SERVICES PRIOR TO THE START OF CONSTRUCTION EXISTING CONCRETE PAD

36787

36787

TREE

BOUNDARY

TREE

BO

UN

DA

RY

BOUNDARY

RETAINING WALL TO MAX 0.60M HIGH TO ENGINEERS DETAILS

PROP CONCRETE APRON FFL RL: 6.980

BOUNDARY

BINS

PROPOSED EXTENSION FFL RL: 7.000

GRADE NATURAL SURFACE TO TOP OF WALL BOUNDARY

PROP. CONCRETE PATH

0 7.00

PROP. CONCRETE PATH

TEMPORARY HOARDING GATES

MBMB

7.5 00

EXISTING BOLLARD/FENCE TO BE REMOVED AS NEEDED

EXISTING BOLLARD FENCELINE

EXISTING CLUBHOUSE FFL RL: 7.000

SMH

TREE

PROP. CONCRETE PATH

BOUNDARY

7. 25 0

SITE PLAN - CONTEXT

SEWER PLOTTED FROM COUNCIL RECORDS/SURVEY (APPROX ONLY)

1 : 2000

EXISTING PAVED AREA TO BE ASSESSED AND REMOVED AS REQUIRED 6.7 50

7.0

00

SILTATION CONTROL FENCING

SITE PLAN 1 : 200

SITE INFORMATION & LEGEND NOTE: CONTOURS AND SPOT LEVELS ARE INDICATIVE ONLY AND FINAL SITE LEVELS COMPLETED BY A REGISTERED SURVEYOR IS RECOMMENDED BEFORE START OF CONSTRUCTION.

SITE AREA: GROSS FLOOR AREA (including garages) APPROX 695m² HARDSTAND AREA

Building Designers

SILTATION CONTROL IN ACCORDANCE WITH COUNCIL POLICY E1 AND THE ADOPTED AUSPEC STANDARD X X XX.X XX X.XXX X.XXX

= 76435m² =301.7m²

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

BAL -N/A

BASIX / SECTION J NOTES: PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIRCONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER) WHERE APPLICABLE AND RELEVANT.

ALL LEVELS WERE COMPLETED BY COOKSON LAND SURVEYORS AND ARE TO AHD. ALL LEVELS AND CONTOURS TO BE CONFIRMED BY BUILDER / SURVEYOR PRIOR TO START OF CONSTRUCTION. REF: 21197

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

BAL = NOT APPLICABLE

PROJECT: CLUBHOUSE

SITE PLAN

RENOVATION

STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

A1.1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430BUSHFIRE AFFECTED T: 02 6583 4411 LOT IS NOT

SCALE:

As indicated

SHEET SIZE:

A2

START DATE:

12.07.21 D4772

DWG No:

F: 02 6583 9820

DRAWING REVISIONS + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Description: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


AREAS - ROOF AREAS Name EXISTING REMAINING ROOF AREA PROPOSED ROOF AREA TOTAL

TEMPORARY BLUE METAL GRAVEL LAID AT ENTRANCE OF SITE TO REMOVE EXCESS SOILS FROM VEHICLES AT EXIT. AGGREGATE SIZE AS PER THE LANDCOM BLUE BOOK STANDARD DRAWING SD 6-14 IS TO BE 30mm DIAMETER

WATER MAIN LINE NEW JUNCTION TO PROPOSED REQUIRED POWER LINE - UNDERGROUND

DP

APPROX 2.0M

PROPOSED SWITCHBOARD LOCATION

RETAINING WALL TO MAX 0.60M HIGH TO ENGINEERS DETAILS INSTALL AGG LINE BEHIND AND CONNECT TO STORMWATER SYSTEM

DP

FROM EXISTING

POWER LINE UNDEGROUND

Area 280.7 m² 255.8 m² 536.5 m²

PROP CONCRETE APRON FFL RL: 6.980

DP

MBMB

DP

TELSTRA LINE

PROPOSED EXTENSION

BUILDER TO LOCATE THE ELECTRICAL AND TELSTRA SERVICES PRIOR TO THE START OF CONSTRUCTION

FFL RL: 7.000

PROP. CONCRETE PATH

EXISTING CLUBHOUSE

ANY STOCKPILING OF SOILS ON SITE WILL NEED TO BE CONTROLLED FROM DUST BY WATERING OR COVERING AS REQUIRED TO PREVENT EROSION & DUST NUISANCE. HOSE TO BE AVAILABLE ON SITE.

FFL RL: 7.000

SMH

DENOTES: SURFACE INLET PIT CONNECTED TO STORMWATER SYSTEM

SEWER PLOTTED FROM COUNCIL RECORDS/SURVEY (APPROX ONLY) TO CONNECT TO EXISTING STORMWATER SYSTEM (INDICATIVE ONLY)

SILTATION CONTROL FENCING

S68 & S138 SITE INFORMATION & LEGEND STORMWATER NOTE: STORMWATER/RAINWATER OVERFLOW TO LEGAL POINT OF DISCHARGE

XX.X X X XX X.XXX X.XXX

(SURFACE AND SUB-SURFACE STORMWATER TO BE DISPOSED OF VIA PIPEWORK IN ACCORDANCE WITH AS 3500)

SITE SERVICES PLAN

SILTATION CONTROL IN ACCORDANCE WITH COUNCIL POLICY E1 AND THE ADOPTED AUSPEC STANDARD

BAL - N/A

BASIX & SECTION J NOTES: PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIRCONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER) WHERE APPLICABLE AND RELEVANT.

ALL LEVELS WERE COMPLETED BY COOKSON LAND SURVEYORS AND ARE TO AHD. ALL LEVELS AND CONTOURS TO BE CONFIRMED BY BUILDER / SURVEYOR PRIOR TO START OF CONSTRUCTION. REF: 21197

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, ENGINEERING & COUNCIL APPROVALS

BAL = NOT AFFECTED

1 : 200

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SERVICES PLAN

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

A1.2

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

1 : 200

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

LADIES EXISTING AMENITIES AREA REMOVED. TO ENGINEERS DETAILS

SERVICE EXISTING DORE ROOM TO BE DEMOLISHED.

STORE ROOM JUNCTION BETWEEN REMAINING AND DEMOLISHED TO BE TO ENGINEERS DETAILS.

GENTS

REMOVE EXISTING MASONRY WALL FOR PROPOSED WINDOWS

EXISTING AMENTIES REMOVED AND AREA REPROGRAMMED AS SHOWN. CAP ALL UN USED PLUMBING.

REMOVE EXISTING MASONRY WALL FOR PROPOSED WINDOWS

KIOSK/ KITCHEN CHANGE ROOM 1

EXISTING AMENTIES REMOVED AND AREA REPROGRAMMED AS SHOWN TO STORAGE ROOM. CAP ALL UN USED PLUMBING.

CHANGE ROOM 2

REMOVE EXISTING MASONRY WALL FOR PROPOSED WINDOWS

REMOVE EXISTING MASONRY WALL FOR PROPOSED WINDOWS

UNDER COVER AREA

UNDER COVER AREA

FLOOR PLAN - DEMO 1 : 100 AREAS - FLOOR - EXISTING *FLOOR AREA MEASURED FROM EXTERNAL FACE... NAME EXISTING CLUBHOUSE AREA EXISTING AMENITIES AREA EXISTING STORAGE AREA TOTAL

AREA 100.4 m² 47.5 m² 21.4 m² 169.3 m²

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

FLOOR PLAN - DEMO

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

B1.1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

1 : 100

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


27425 24435

90

1350

90

3735

90

2310

200

1500

2310

200

1500

90 1020 90

8535

90

5175

90

90

8535

90

5175

90

5335

1815

90

1905

200 NOTE: PAINTED CONCRETE FLOOR FINISH TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009 "DULUX LUXAFLOOR AGGREGATE" OR SIMILAR TO ACHIEVE P3 RATING TO MANUFACTURERS SPECIFICATION AND INSTALLATION GUIDELINES

PROPOSED SWITCHBOARD LOCATION 2990

G1.1

G1.1

DP

CONCRETE APRON

SECURE GATE

FFL RL: 6.980

2000

C1.1

DP

270

C1.2

2260

6945

ASSESS ON SITE REPLACE AS NEEDED

CONVERT EXISTING AMENITY AREA INTO PROPOSED REF 1 ROOM

UNDER COVER AREA

2500 7530

200 1530 200 270

ED04

5370

3490

SEE NOTE

435

2310

5370

CHANGE ROOM 2

SEE NOTE

2830

3545

C1.5

SEE NOTE

REF 1

NW08

E

270

NW09

270

STORE

ED03

NW07

CHANGE ROOM 1

BENCH

KIOSK/ KITCHEN

GTAP

NW06

ID02

ID01

NW10

ID03

1200

GTAP

2255

2000

ED05

2500 90

3190

NW05

C C1.3

200

MALES

5710

C1.6

435

C1.4

HWS

F

HWS

BENCH

D

1870

BENCH

2710

MH

90

ED02

1060

ED06

FFL RL: 7.000

2020

CONCRETE FINISH

FFL RL: 7.000

FEMALES

1290

90

STORAGE

1020

2335

7260

BENCH

1200

SQ. SET

ED07

CHANGE ROOM 3

FFL RL: 7.000

1285 SQ. SET

7660

1715

CHANGE ROOM 4 PAINTED CONCRETE FINISH

SEE NOTE

2260 435270

NW04

BENCH

PAINTED CONCRETE FINISH

NW11

7660

90 1870 90 1200 270

PROPOSED NEW CONCRETE WALKWAY WITH A GRADE SHALLOWER THAN 1:33 AS PER AS 1428.1 & AS 1428.2

5300

5300 90 1870 270 5370

200 6145

NW03

GTAP

200

200

200

200 2500 1530 2830

3230

DP

2150 GARAGE DOOR

B

6145

ED01

BENCH

UAT

200

1530

200

2900

BABY CHANGE

13805

MB MB

NW02

BINS

PROPOSED NEW CONCRETE WALKWAY WITH A GRADE SHALLOWER THAN 1:33 AS PER AS 1428.1 & AS 1428.2

NW01

DP

3000

B-B

2118 GRG DOOR

3000

A

A-A

200

7055

200

90

200

2500

200

1870

90

90

9075

270

3810

4225

90

5370

90

7055

270

200

2310

90

435

200

2500

200

1500

6625

90

90

200

5225

NOTE: ALL DOORS TO HAVE ZERO STEP THRESHOLDS. THRESHOLD RAMP TO ALL NEW DOORWAYS WHEN STEP DOWN TO EXTERNAL FLOOR LEVEL AS PER AS1428.1-2009

270

1500

200

200

270

2700

2590

435

200

200

NOTE EXSISTING CHANGE ROOM AND REF ROOM FLOOR: PAINTED CONCRETE FLOOR FINISH TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009 "DULUX LUXAFLOOR AGGREGATE" OR SIMILAR TO ACHIEVE P3 RATING TO MANUFACTURERS SPECIFICATION AND INSTALLATION GUIDELINES

SERVERY WALL

PROPOSED NEW CONCRETE WALKWAY WITH A GRADE SHALLOWER THAN 1:33 AS PER AS 1428.1 & AS 1428.2

UNDER COVER AREA PROPOSED NEW CONCRETE SLAB TO UNDERSIDE OF EXISTING AWNING

FLOOR PLAN - PROPOSED 1 : 100 AREAS - FLOOR - PROPOSED

AREAS - FLOOR - EXISTING

*FLOOR AREA MEASURED FROM EXTERNAL FACE...

*FLOOR AREA MEASURED FROM EXTERNAL FACE...

NAME PROPOSED CLUBHOUSE AREA PROPOSED COVERED SLAB AND PATHWAY AREA TOTAL

AREA 201.3 m² 329.5 m² 530.8 m²

NAME EXISTING CLUBHOUSE AREA EXISTING AMENITIES AREA EXISTING STORAGE AREA TOTAL

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

AREA 100.4 m² 47.5 m² 21.4 m² 169.3 m²

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

PROJECT: CLUBHOUSE

FLOOR PLAN - OVERALL

RENOVATION

STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

B1.2

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

SCALE: SHEET SIZE:

A2

START DATE:

12.07.21 D4772

DWG No: T: 02 6583 4411

1 : 100

F: 02 6583 9820

DRAWING REVISIONS + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Description: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


WET AREA FITTING/FIXTURES KEY:

2700 2300 MIN.

PROPOSED MIRROR TO COMPLY WITH AS 1428.1-2009

WB-1

WASHBASIN TO COMPLY WITH AS 1428.1-2009

SOAP DISPENSER AND HAND TOWEL DISPENSER TO COMPLY WITH AS 1428.1-2009

450 WB-1

NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.

SHELF TO COMPLY WITH AS 1428.1-2009

PROPOSED ACCESSIBLE AMENITY TO COMPLY WITH AS 1428.1-2009. REFER TO STANDARD FOR SPECIFIC HEIGHT AND LOCATION REQUIREMENTS OF ALL FITTINGS. LOCATION OF ITEMS TO BE MARKED OUT AND CONFIRMED FOR COMPLIANCE PRIOR TO START OF CONSTRUCTION OR INSTALLATION

BC-1

SD-1

SH-1

MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM

COAT HOOK PROVIDED AS PER AS 1428.1-2009

BT-1

800 MIN,

300 TO 400

WALL BUILDUPS LABEL W1 W3 W4

425 MIN.

SH-1

WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION

TD-1 WB-1

1 E

850 MIN.

2

F1.1 F1.2

ED07

ZO N

GR-2

1900 MIN.

ON

140 0

3

EXC LUS I

UAT

MIN.

GR-1

WC-2

460 MIN.

WC-2

TR-1 110

1 E

700 MIN,

530 MIN.

300 MIN.

FW

TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

THRESHOLD RAMP TO AS1428.1-2009

MINIMUM 30% LUMINANCE CONTRAST TO DOORWAY AS PER AS 1428.1-2009

SIGNAGE AND BRAILLE FOR ACCESSIBLE TOILETS AS PER AS 1428.1-2009

EXT. DUCT

GRAB RAILS TO COMPLY WITH AS 1428.1-2009 (CLAUSE 15.2.7) WC UNIT AND BACKREST TO COMPLY WITH AS 1428.1-2009

1450 MIN.

UNIVERSAL ACCESS TOILET 1 : 25

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

DETAIL - UAT

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

C1.1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

T: 02 6583 4411

As indicated

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


WET AREA FITTING/FIXTURES KEY: WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION

200

3810

90 1500

200

15

SD-1

WB-1

BT-1

15

TR-2

WC-1

E

TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

900

FEMALES

EXT. DUCT

TR-2

950

15

NW11

FW

2830

950

WC-1

MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

BT-1

WALL BUILDUPS LABEL W1 W3 W4

WB-1

NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.

WC-1

TR-2

WATER STOP

ED05 W4

W1

W3

FEMALE WC 1 : 25

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

DETAIL - FEMALE WC

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

C1.2

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

T: 02 6583 4411

As indicated

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


WET AREA FITTING/FIXTURES KEY: WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION

W3

W1

W4

NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.

WALL BUILDUPS MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM

BT-1

BT-1 SD-1

WC-1 E EXT. DUCT

FW

1870

TR-1

GRADE TO FLOOR WASTE

ST-1

SH-1

FW

E

FW

GRADE TO FLOOR WASTE

SH-1

EXT. DUCT

ST-1

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT 928 15 928

90

WB-1

90

WB-1

CHANGEROOM 1 TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

E EXT. DUCT

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

LABEL W1 W3 W4

WATER STOP

1995

15

15

1235

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

CHANGEROOM 1 1 : 25

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

DETAIL - CHANGEROOM 1

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

C1.3

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

T: 02 6583 4411

As indicated

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


90

WET AREA FITTING/FIXTURES KEY:

943

943

15

943

90

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

SH-1

ST-1

SH-1

ST-1

FW

FW

GRADE TO FLOOR WASTE

GRADE TO FLOOR WASTE

W3 E

E

EXT. DUCT

W4

EXT. DUCT

WB-1

BT-1

15

WALL BUILDUPS

SD-1

WATER STOP

FW

WB-1

TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

BT-1

MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM

15

W1

NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.

LABEL W1 W3 W4

943

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

1500

WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

E EXT. DUCT

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

W3

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

WC-1

90

CHANGEROOM 3

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIRCONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

TR-1

2115

15

W4

1020

90

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

1 : 25

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

DETAIL - CHANGEROOM 3

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

C1.4

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

As indicated

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


WET AREA FITTING/FIXTURES KEY:

W4

W1

W3

W4

WALL BUILDUPS

MALES

MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM

TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

15

LABEL W1 W3 W4

900

UR-1

NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.

720

E

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

W3

200

WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION

NW05 WB-1

BT-1 TR-2

WC-1

WB-1

WC-1

SD-1

BT-1

TR-2

1500

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

2830

15

EXT. DUCT

ED03

900

15

900

90

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

MALE WC 1 : 25

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

DETAIL - MALE WC

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

C1.5

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

T: 02 6583 4411

As indicated

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


WET AREA FITTING/FIXTURES KEY: 90

15

900

15

900

1425

15

15

900

15

900

90

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT 90

CHANGE ROOM 4

E

GRADE TO FLOOR WASTE

GRADE TO FLOOR WASTE

1180

EXT. DUCT

1800

BT-1

TR-1

BT-1

SD-1 WB-1

WB-1

WB-1

WB-1

FW

FW

WC-1 SD-1

SH-1

BT-1

ST-1

SH-1

ST-1

EXT. DUCT

FW

928

WATER STOP

1220

15

15

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT 90

1220

1890 LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

15

15

1890

90

CHANAGEROOM 2 / 4 1 : 25

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

C1.6

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

928 15 928

E

928

E EXT. DUCT

SH-1

TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

GRADE TO FLOOR WASTE

CHANGE ROOM 2

ST-1

15

TR-1

SH-1

E EXT. DUCT

FW

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

GRADE TO FLOOR WASTE

WC-1 FW

ST-1

90

BT-1

2710

E EXT. DUCT

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

15

E EXT. DUCT

15

TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198 FW

90 1400

WALL BUILDUPS MATERIAL DESCRIPTION RC BLOCK 90mm STUD WALL WITH GYPROK EC08 IMPACT MR LINING - TILE WHERE SHOWN LAMINEX WATERLOO PEDESTAL MOUNTED STALL SYSTEM

15

WATER STOP

NOTE: ALL TAP FIXTURES AND PLUMBING FITTINGS TO CLIENT/BUILDER SPECIFICATION AND AS1428.1 COMPLIANCE FOR UAT FACILITIES WHERE APPLICABLE.

LABEL W1 W3 W4

1425

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

LAMINEX WATERLOO STALL SYSTEM. PEDESTAL MOUNT

WC-1: CAROMA TRIDENT SOVEREIGN TOILET SUITE WITH S BEND 981356W WC-2: CAROMA CARE 400 CONNECTOR TOILET SUITE WITH S TRAP. CAROMA CARAVILLE CARE DOUBLE FLAP SEAT WITH BACKREST 987901W UR-1: CAROMA H2ZERO CUBE WATERLESS URINAL 678610W WB-1: DURA HAND BASIN STAINLESS STEEL 70mm BACK 500 X 420 WITH 1 TAP HOLE BT-1: ENWARE TFC74515 - 15 SECOND TIMER PILLAR TAP, LEVER ACTION SH-1: ENWARE SP262 - ADJUSTABLE BALL JOINT SHOWER HEAD ST-1: ENWARE TFC749128 - TEMPOSTOP SHOWER VALVE TD-1: P/TOWEL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-1: TOILET ROLL DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION TR-2: TOILET ROLL DISP. INSTALLED MCC SUPPLIED UNIT SD-1: SOAP DISP. INSTALLED PRINCIPAL SUPPLIED - TO AS1428.1 SPECIFICATION GR-1: GRAB RAIL - TO AS1428.1 SPECIFICATION GR-2: GRAB RAIL - TO AS1428.1 SPECIFICATION MI-1: BRADLEY 748-2430: 600(W) X 750(H) POLISHED EDGE MIRROR ABOVE BASIN BC-1: BRADLEY ICN-001 BABY CHANGE TABLE HORIZONTAL WALL MOUNTED RH-1: 3 MONKEEZ ROBE HOOK WA-RH2 - TO AS1428.1 SPECIFICATION SH-1: BRADLEY 756A 500mm SHELF - AT AS1428.1 SPECIFICATION

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIRCONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

DETAIL - CHANGEROOM 2 / DRAWING REVISION + NOTES Date: Revision: 4 As indicated 12.07.21 INITIAL ISSUE SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

02.08.21 25.08.21 22.09.21 02.11.21

REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


27425 24435

200

2590

200

30625

1480

TERMITE TREATMENT TO A.S 3660.1

2000 2900

350 1800

11860

1500

7660

1200

FFL RL: 7.000

1530

2305

CHANGEROOM 4

35mm WET AREA SET DOWN

FFL RL: 7.000

CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL

690

STORAGE

BUILDER TO DETERMINE IF HOBS REQ.D

3230

3030

2580

1960

4000

1070

1920

35mm WET AREA SET DOWN

35mm WET AREA SET DOWN

12660

1530 3230

7660

BUILDER TO DETERMINE IF HOBS REQ.D

3915

35mm WET AREA SET DOWN

600

FFL RL: 7.000

1500

1440

350

1625 2080

600

1040

CHANGEROOM 3

5000

1835

35mm WET AREA SET DOWN

FFL RL: 6.980

STEP DOWN

2900

2900

3100

PROPOSED NEW CONCRETE WALKWAY WITH A GRADE SHALLOWER THAN 1:33 AS PER AS 1428.1 & AS 1428.2

CONCRETE APRON/WALKWAY

STEP DOWN

NOTE: ALL DOORS TO HAVE ZERO STEP THRESHOLDS. THRESHOLD RAMP TO ALL NEW DOORWAYS WHEN STEP DOWN TO EXTERNAL FLOOR LEVEL AS PER AS1428.1-2009

JUNCTION / STRUCTURAL CONNECTION TO EXISTING SLAB TO ENGINEERS DETAILS

2600 PROPOSED NEW WC AND SHR TO BE INSTALLED IN EXISTING

4600

EXISTING TO REMAIN AS SHOWN

3490

6945

7745

2600

EXISTING TO REMAIN AS SHOWN

2000

2310

CONCRETE APRON/WALKWAY

6860

6860

FFL RL: 6.980

PROPOSED NEW CONCRETE WALKWAY WITH A GRADE SHALLOWER THAN 1:33 AS PER AS 1428.1 & AS 1428.2

CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL TERMITE TREATMENT TO A.S 3660.1

30625

SETOUT PLAN

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

1 : 100

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

PROJECT: CLUBHOUSE

SETOUT PLAN - OVERALL

RENOVATION

STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

D1.1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

SCALE: SHEET SIZE:

A2

START DATE:

12.07.21 D4772

DWG No: T: 02 6583 4411

1 : 100

F: 02 6583 9820

DRAWING REVISIONS + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Description: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


(CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3 COLORBOND® ULTRA "SURFMIST"

PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE

METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST"

EXISTING TO REMAIN

01 CL 9440 RL

LINTEL OVER

PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE

PROPOSED NEW FASCIAS COLORBOND® ULTRA "SURFMIST"

EXISTING TO REMAIN

LINTEL OVER

LINTEL OVER

01 CL RL 9440

LINTEL OVER

MB X 2 NGL

GTAP

01 FL 7000 RL

01 FL RL 7000 PROPOSED FINISHED GROUND LINE

SECURITY GATES TO BIN ENCLOSURE TO MANUFACTURERS SPECIFICATION

REND

EXISTING STRUCTURE TO BE REMOVED AS SHOWN

NOTE 15° FALL TO ALL WINDOW SILLS

RETAINING TO MAX 0.60M HIGH TO ENGINEERS DETAILS. DASH FOR CLARITY

1. NORTH ELEVATION 1 : 100

METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST" HIDDEN BEHIND

(CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3 COLORBOND® ULTRA "SURFMIST" HIDDEN BEHIND

PROPOSED NEW FASCIAS COLORBOND® ULTRA "SURFMIST"

EXISTING STRUCTURE 01 CL RL 9440

2440

01 CL 9440 RL

SERVERY WALL GTAP

GTAP NGL

01 FL 7000 RL

01 FL RL 7000

PROPOSED FINISHED GROUND LINE

PROPOSED RC BLOCK SERVERY WALL. STAINLESS STEEL CAPPING/BENCH TOP

NOTE 15° FALL TO ALL WINDOW SILLS

REND

3. SOUTH ELEVATION 1 : 100

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

EXTERNAL FINISHES LABEL C/BND REND

MATERIAL DESCRIPTION LYSAGHT COLORBOND ULTRA CORRUGATED METAL SHEET ROOFING RENDERED RC BLOCKWORK - PAINT FINISH "DULUX LEXICON"

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

ELEVATIONS

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

E1.1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

T: 02 6583 4411

1 : 100

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST"

(CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3 COLORBOND® ULTRA "SURFMIST"

PROPOSED NEW FASCIAS COLORBOND® ULTRA "SURFMIST"

6.50°

EXISTING STRUCTURE

01 CL 9440 RL

LINTEL OVER

01 CL RL 9440

LINTEL OVER

2440

LINTEL OVER

NGL 01 FL 7000 RL

01 FL RL 7000 PROPOSED FINISHED GROUND LINE REND NOTE 15° FALL TO ALL WINDOW SILLS

EXISTING STRUCTURE TO BE REMOVED AS SHOWN

RETAINING TO MAX 0.60M HIGH TO ENGINEERS DETAILS. DASH FOR CLARITY

2. EAST ELEVATION 1 : 100

PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE (CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3 COLORBOND® ULTRA "SURFMIST"

PROPOSED NEW FASCIAS COLORBOND® ULTRA "SURFMIST"

6.50°

EXISTING STRUCTURE

01 CL 9440 RL

LINTEL OVER

01 CL RL 9440

LINTEL OVER

2440

LINTEL OVER

NGL

01 FL 7000 RL

01 FL RL 7000

PROPOSED FINISHED GROUND LINE REND EXISTING STRUCTURE TO BE REMOVED AS SHOWN

NOTE 15° FALL TO ALL WINDOW SILLS

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

4. WEST ELEVATION 1 : 100

EXTERNAL FINISHES LABEL C/BND REND

MATERIAL DESCRIPTION LYSAGHT COLORBOND ULTRA CORRUGATED METAL SHEET ROOFING RENDERED RC BLOCKWORK - PAINT FINISH "DULUX LEXICON"

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

ELEVATIONS

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

E1.2

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

T: 02 6583 4411

1 : 100

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


01 CL 9440 RL

01 CL RL 9440

SIDE WALL

350 MIN.

PROPOSED MIRROR TO COMPLY WITH AS 1428.1-2009

SIDE WALL

01 CL RL 9440 SIDE WALL

01 CL 9440 RL

FRONT OF ANY BACK-WALLMOUNTED FIXTURE OF OBSTRUCTION

SOAP DISPENSER AND HAND TOWEL DISPENSER TO COMPLY WITH AS 1428.1-2009

GRAB RAILS TO COMPLY WITH AS 1428.1-2009 (CLAUSE 15.2.7)

ANGLE OF FRONT OF BACKREST

SHELF TO COMPLY WITH AS 1428.1-2009

FLOOR TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009

FRONT OF BACKREST

900 - 1100mm

425

BASIN 800-830

WASHBASIN TO COMPLY WITH AS 1428.1-2009

TOILET PAPER DISPENSER TO COMPLY WITH AS 1428.1-2009 (CLAUSE 15.2.6) ZONE FOR POSITION OF TOILET PAPER DISPENSER OUTLET

WC UNIT AND BACKREST TO COMPLY WITH AS 1428.1-2009

01 FL 7000 RL

01 FL RL 7000

01 FL 7000 RL

UAT 1

UAT 3

1 : 25

1 : 25

01 FL RL 7000

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

FLOOR TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

F1.1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

DRAWING REVISION + NOTES ELEVATIONS INTERNAL Date: Revision: UAT As indicated 12.07.21 INITIAL ISSUE SCALE:

SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

02.08.21 25.08.21 22.09.21 02.11.21

REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


01 CL 9440 RL

01 CL RL 9440

SIDE WALL

01 CL RL 9440

EDGE OF ANY BACK-WALLMOUNTED FIXTURE OF OBSTRUCTION 600 MAXIMUM

COAT HOOK PROVIDED AS PER AS 1428.1-2009

PROPOSED MIRROR TO COMPLY WITH AS 1428.1-2009

GRAB RAILS TO COMPLY WITH AS 1428.1-2009 (CLAUSE 15.2.7) TOWEL DISPENSER TO COMPLY WITH AS 1428.1-2009

500 MAXIMUM

ZONE FOR POSITION OF FLUSHING CONTROL

BACKREST 350 TO 400

GRABRAIL CONTINUES WHERE NOT OBSTRUCTED BY CISTERN

SOAP DISPENSER TO COMPLY WITH AS 1428.1-2009 SHELF TO COMPLY WITH AS 1428.1-2009

TOILET PAPER DISPENSER TO COMPLY WITH AS 1428.1-2009 (CLAUSE 15.2.6) FLOOR TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009

WASHBASIN TO COMPLY WITH AS 1428.1-2009

400 MAXIMUM

WC UNIT AND BACKREST TO COMPLY WITH AS 1428.1-2009 01 FL RL 7000

KNEE TOE CLEARANCE 01 FL 7000 RL

01 FL RL 7000

FLOOR TO COMPLY WITH REQUIRED SLIP RATINGS AND AS 1428.1-2009

UAT 2

UAT 4

1 : 25

1 : 25

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

F1.2

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

DRAWING REVISION + NOTES ELEVATIONS INTERNAL Date: Revision: UAT As indicated 12.07.21 INITIAL ISSUE SCALE:

SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

02.08.21 25.08.21 22.09.21 02.11.21

REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


01 CL RL 9440

900 MIN.

1800 ABV FFL

1800 ABV FFL

SH-1

ST-1

01 FL RL 7000

TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS

SKIRT TILE (1 TILE)

TILE FINISH | SKIRT TILE (1 TILE) GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

TILE FINISH GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS

LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS

TYPICAL SHOWER ELEVATION 1

TYP. SHOWER ELEVATION 2

TYPICAL SHOWER ELEVATION 3

TYP. SHOWER ELEVATION 4

1 : 25

1 : 25

1 : 25

1 : 25

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

F1.3

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

DRAWING REVISION + NOTES ELEVATIONS INTERNAL Date: Revision: SHOWER As indicated 12.07.21 INITIAL ISSUE SCALE:

SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

02.08.21 25.08.21 22.09.21 02.11.21

REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


01 CL RL 9440

TR-1

TR-1 TR-1

WC-1

WC-1

WC-1

01 FL RL 7000

SKIRT TILE (1 TILE) GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS

LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS

SKIRT TILE (1 TILE) GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

LAMINEX WATERLOO PEDASTAL MOUNTED PARTITION SYSTEM. TO MANUFACTURERS SPECS

SKIRT TILE (1 TILE) GLENNON 300 X 300 SQ300 EARTH PALLETE UNGLAZED P3 SLIP RATING, R10/B RATING OIL/INCLINE TO AS/NZS 4586, HB 198

TYPICAL WC ELEVATION 1

TYP. WC ELEVATION 2

TYPICAL WC ELEVATION 3

TYPICAL WC ELEVATION 4

1 : 25

1 : 25

1 : 25

1 : 25

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

F1.4

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

DRAWING REVISION + NOTES ELEVATIONS INTERNAL Date: Revision: WC As indicated 12.07.21 INITIAL ISSUE SCALE:

SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

02.08.21 25.08.21 22.09.21 02.11.21

REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


ROOF TRUSSES TO MANUFACTURER'S SPECIFICATION

NEW FLASHING TO WINDOW SILLS INFILL TO SUIT NEW ROOFLINE

90 X 35mm EXTERNAL AND INTERNAL WALL FRAMING 6.50°

01 CL RL 9440

2440

01 CL 9440 RL

01 FL 7000 RL

CHANGE ROOM 3 FFL RL: 6.980

MECHANICAL VENTILATION TO INTERNAL SANITARY COMPARTMENTS TO COMPLY WITH A.S 1668.2

CHANGE ROOM 1

FFL RL: 7.000

01 FL RL 7000

TERMITE TREATMENT TO A.S 3660.1

CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL

STORMWATER TO CONNECT TO EXISTING

WAFFLE POD CONSTRUCTION TO ENGINEER'S DETAILS AND SPECIFICATIONS

CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL

SECTION A-A 1 : 100 EXISTING STRUCTURE TO BE AMENDED TO SUIT NEW ROOFLINE ROOF TRUSSES TO MANUFACTURER'S SPECIFICATION

NEW ROOF & STRUCTURE OVER EXISTING

90 X 35mm EXTERNAL AND INTERNAL WALL FRAMING INFILL TO SUIT NEW ROOF

6.50°

01 CL 9440 RL

01 CL RL 9440

STORAGE 01 FL 7000 RL

FFL RL: 6.980

MECHANICAL VENTILATION TO INTERNAL SANITARY COMPARTMENTS TO COMPLY WITH A.S 1668.2

FFL RL: 7.000

01 FL RL 7000

TERMITE TREATMENT TO A.S 3660.1

CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL

STORMWATER TO CONNECT TO EXISTING

WAFFLE POD CONSTRUCTION TO ENGINEER'S DETAILS AND SPECIFICATIONS

CONCRETE FOOTINGS & SLAB TO ENGINEER'S DETAIL

SECTION B-B GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

1 : 100

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

SECTIONS

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

G1.1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

T: 02 6583 4411

1 : 100

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


AREAS - ROOF AREAS Name EXISTING REMAINING ROOF AREA PROPOSED ROOF AREA TOTAL

Area 280.7 m² 255.8 m² 536.5 m²

DP° (CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3 COLORBOND® ULTRA "SURFMIST"

DP°

DP°

DP°

PROPOSED NEW FASCIAS COLORBOND® ULTRA "SURFMIST"

PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE

C/BND

METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST" ROOF TRUSSES @ 600CTS TO MANUFACTURER'S SPECIFICATION

6.50°

6.50°

PROPOSED EXTENSION

PROPOSED ROOF PITCH TO BE CONFIRMED ON SITE BY BUILDER. TO ALIGN WITH EXISTING CLERESTORY WINDOWS IN EXISTING ROOFLINE

EXISTING ROOFING REMOVED AS SHOWN

EXISTING ROOFING REMOVED AS SHOWN

PROPOSED NEW INFILL TO UNDERSIDE OF NEW ROOFLINE

PROPOSED NEW INFILL TO UNDERSIDE OF NEW ROOFLINE

ASSESS EXISTING FASCIA AND REPLACE TO MATCH PROPOSED WHERE APPLICABLE

ASSESS EXISTING FASCIA AND REPLACE TO MATCH PROPOSED WHERE APPLICABLE EXISTING ROOFING AND INFILL REMOVED A SHOWN

EXISTING ROOF TO BE REPLACED

METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST"

ASSESS AND REMOVE EXISTING FASCIA AND GUTTER AS REQUIRED

REPLACE EXISTING GUTTERING WITH NEW TO MATCH PROPOSED (CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3

REPLACE EXISTING GUTTERING WITH NEW TO MATCH PROPOSED (CLIP SNAP) CONTINUOUS OVERFLOW GUTTER FIXING SYSTEM TO COMPLY WITH AS 3500.3

EXISTING ROOF TO BE REPLACED METAL SHEET ROOFING WITH ANTICON INSULATION UNDER. ROOF COLOUR: COLORBOND® ULTRA "SURFMIST"

ROOF PLAN 1 : 100

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

EXTERNAL FINISHES LABEL C/BND REND

MATERIAL DESCRIPTION LYSAGHT COLORBOND ULTRA CORRUGATED METAL SHEET ROOFING RENDERED RC BLOCKWORK - PAINT FINISH "DULUX LEXICON"

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

PROJECT: CLUBHOUSE

ROOF PLAN - OVERALL

RENOVATION

STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

H1.1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

SCALE: SHEET SIZE:

A2

START DATE:

12.07.21 D4772

DWG No: T: 02 6583 4411

1 : 100

F: 02 6583 9820

DRAWING REVISIONS + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Description: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


CONNECTED TO MAIN SWITCH BOARD ES PE

CONNECTED TO MAIN SWITCH BOARD

CONNECTED TO MAIN PE SWITCH BOARD ES

MB MB

BENCH

BENCH

E EXT. DUCT

E EXT. DUCT

SQ. SET

BENCH

E EXT. DUCT

SQ. SET E EXT. DUCT

CONNECTED TO MAIN SWITCH BOARD

MH

CONNECTED TO MAIN SWITCH BOARD

E

E

E

EXT. DUCT

EXT. DUCT

EXT. DUCT

BENCH

ELECTRICAL LEGEND

BENCH

CEILING LIGHT POINT E

E

E

EXT. DUCT

EXT. DUCT

EXT. DUCT

E

TRACK LIGHT

EXT. DUCT

E EXT. DUCT

E EXT. DUCT

CONNECTED TO MAIN ES SWITCH BOARD PE

E

E

EXT. DUCT

EXT. DUCT

TASTIC FAN LIGHT FLURO LIGHT SSL

ES E

DOUBLE POWER OUTLET

PE

EXT. DUCT

SINGLE SPOT LIGHT

SINGLE POWER OUTLET

EXISTING TO REMAIN AS SHOWN

W

BENCH

W

EXTERNAL SGPO EXTERNAL DGPO

T.V

TELEVISION POINT

PH

PHONE POINT

RH

RANGE HOOD SGPO

MW

MICROWAVE SGPO

O DW

OVEN SGPO DISHWASHER POWER POINT SMOKE DETECTOR TO AS3786 & PART E2.2A NCC BCA VOL 1

EXISTING TO REMAIN AS SHOWN W LOCKED COVER

ES

CONNECTED TO MAIN SWITCH BOARD

EL

EXTERNAL WALL MOUNTED LIGHT FITTING

ES

EXTERNAL WALL MOUNTED ADJUSTABLE SPOT LIGHT MOTION SENSOR (ADJUSTABLE)

PE LS

GL

INTERNAL WALL MOUNTED ADJUSTABLE SPOT LIGHT FLUORESCENT LIGHT WITH DIFFUSER EXTERNAL UPLIGHT MOUNTED IN THE GROUND

CEILING MOUNTED ELECTRICAL FAN.

A/C

CEILING MOUNTED ELECTRICAL FAN WITH LIGHT. SPLIT SYSTEM AIR CONDITIONING UNIT. INTERNAL UNIT TO BE MOUNTED ON WALL 2300mm TO TOP OF UNIT ABOVE FLOOR LEVEL. EXTERNAL CONDENSER UNIT TO BE MOUNTED ON CONCRETE SLAB AT GROUND LEVEL. CONNECTING PIPES AND WIRES TO BE CONCEALED IN WALL AND/OR CEILING WHERE ACCESSIBLE AND EXTERNALLY IN POWDERCOATED ALUMINIUM FOLDED CASING WHERE VISIBLE.

ELECTRICAL NOTES: ELECTRICAL PLANS ARE INDICATIVE ONLY AND SHOW THE MINIMUM REQUIREMENTS. CLIENTS TO CONFIRM THEIR REQUIREMENTS WITH BUILDER PRIOR TO SIGNING OF CONTRACTS. • BUILDERS TO CONFIRM ALL ELECTRICAL POINTS WITH ELECTRICIAN PRIOR TO START OF CONSTRUCTION. • CEILING FANS TO BE INSTALLED CENTRALLY TO ALL CEILING TRUSSES IN THE LIVING, DINING AND KITCHEN AREAS. • EXTERNAL LIGHTING BY LANDSCAPE ARCHITECT, PROVIDE POWER CONDUITS FOR EXTERNAL LIGHTING. • CEILING MOUNTED LIGHT FITTINGS TO BE MOUNTED CENTRALLY WITHIN ALL ROOMS UNLESS OTHERWISE DIMENSIONED. • SMOKE ALARMS TO AS3786 & PART 3.7.5 OF THE NCC BCA VOL 2. ALL ALARMS/DETECTORS ARE TO BE INTERCONNECTED. LOCATIONS ON PLANS ARE INDICATIVE. (INSTALLATION TO BE AS PER STANDARDS ABOVE, & MANUFACTURERS SPECIFICATIONS)

INDICATIVE ELECTRICAL LAYOUT 1 : 100

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

PROJECT: CLUBHOUSE

ELECTRICAL PLAN

RENOVATION

STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

J1.1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

SCALE: SHEET SIZE:

A2

START DATE:

12.07.21 D4772

DWG No: T: 02 6583 4411

1 : 100

F: 02 6583 9820

DRAWING REVISIONS + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Description: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


DOOR:

ED07

ED01, 2, 3, 4, 5, 6

ID01, 2, 3

FRAME:

STEEL - PAINT FINISH

STEEL - PAINT FINISH

STEEL - PAINT FINISH

850mm MIN. CLEAR OPENING

850mm MIN. CLEAR OPENING

+2100

ZANDA TS9205SSS SELF CLOSER

ZANDA TS9205SSS SELF CLOSER

HUNG ON S/S 100 X 75mm BUTT HINGE X 3

HUNG ON S/S 100 X 75mm BUTT HINGE X 3

HUNG ON S/S 100 X 75mm BUTT HINGE X 3

DOOR LUMINESCENCE TO COMPLY WITH AS 1428.1 (FRONT DOORS ONLY)

2040

WEATHER SEAL TO UNDERSIDE OF DOOR LEAF

LATCH 1000mm +/- 100

LATCH 1000mm +/- 100

LATCH 1000mm +/- 100

1200-1600 ABV FFL

2040

CIRCULATION SPACE FOR DOOR LOCATION TO BE CONFIRMED AGAINST AS1428.1

2040

SINGAGE AND BRAILLE TO AS1428.1

WEATHER SEAL TO UNDERSIDE OF DOOR LEAF

FFL

LATCH TO AS1428.1 DORMA KABA DEADBOLT - FT& T SUPPLIED DORMA KABA PUSH PLATE - FT& T SUPPLIED TOILET INDICATOR PRIVACY BOLT SET NOVA NHB13SSS AS1428.1 COMPLIANT - FT& T SUPPLIED

LATCH TO AS1428.1 FT&T COMMERCIAL LEVER SET

LATCH TO AS1428.1 DORMA KABA DEADBOLT - FT& T SUPPLIED DORMA KABA PUSH PLATE - FT& T SUPPLIED

DOOR SCHEDULE 1 : 25

DOOR SCHEDULE AS 4055 : WIND LOADS FOR HOUSING AS 1288 : GLASS IN BUILDING - SELECTION & INSTALLATION AS 2047 : WINDOWS & EXTERNAL DOORS IN BUILDING AS 1170-Part 2: WIND ACTIONS AS 3959 : CONSTRUCTION OF BUILDINGS IN BUSHFIRE PRONE AREAS THE STANDARDS REFERRED ABOVE ARE THE VERSION ADOPTED BY BCA AT THE TIME THE RELEVANT CONSTRUCTION CERTIFICATE OR COMPLYING DEVELOPMENT CERTIFICATE APPLICATION IS MADE.

DOORS SPECIFIED USE NFRC UW & SHGCW VALUES. DOORS AS SPECIFIED OR EQUIVALENT MUST BE INSTALLED ON SITE (REFER TO NATHERS CERTIFICATE FOR DETAILS). STANDARD GLAZING: SINGLE CLEAR GLAZING WITH STANDARD ALUMINIUM FRAMES THROUGHOUT WEATHER STRIPPING TO BE INSTALLED THROUGHOUT. PLEASE NOTE: ALL GLAZING IN BATHROOMS, ENSUITES, SPA ROOMS OR THE LIKE TO COMPLY WITH PART 3.6.4.5 OF THE BCA

NUMBER

ROOM

ED01 ED02 ED03 ED04 ED05 ED06 ED07 ID01 ID02 ID03

STORAGE CHANGE ROOM 4 MALES REF 1 FEMALES CHANGE ROOM 3 UAT STORE REF 1 STORAGE

Building Designers

HEIGHT WIDTH 2040 2040 2040 2100 2040 2040 2040 2040 2040 2040

920 920 920 920 920 920 920 920 920 920

TYPE

CONSTRUCTION

HINGED HINGED HINGED HINGED HINGED HINGED HINGED HINGED HINGED HINGED

SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE SOLID CORE

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

COMMENTS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) - COMPLIANT TO AS1428.1/STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS EXTERIOR GRADE PREFINISHED (REDICOAT) / TRI HINGED / FURNITURE AS NOTED / STEEL JAMS

DOOR SCHEDULE

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

K1.1

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

1 : 25

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


WINDOW: FRAME:

NW01, 2, 3, 4, 5, 6, 7, 9, 10, 11

NW08

ALUMINIUM - COLORBOND® "SURFMIST" FINISH

ALUMINIUM - COLORBOND® "SURFMIST" FINISH

FIXED LOUVRES

FIXED LOUVRES

SECURITY SCREEN AFFIXED TO MASONRY WALL WITH TAMPER PROOF FIXINGS. STAND OFF TO SUIT SILL CLEARANCE. TO MANUFACTURERS SPEC. COLORBOND® "SURFMIST" FINISH

SECURITY SCREEN AFFIXED TO MASONRY WALL WITH TAMPER PROOF FIXINGS. STAND OFF TO SUIT SILL CLEARANCE. TO MANUFACTURERS SPEC. COLORBOND® "SURFMIST" FINISH

900

610

+2100

NOTE 15° FALL TO ALL WINDOW SILLS

NOTE 15° FALL TO ALL WINDOW SILLS

2100

900

FFL

WINDOW GLAZING SCHEDULE

GLAZING SCHEDULE 1 : 25

WINDOWS SPECIFIED USE NFRC UW & SHGCW VALUES. AS 4055 : WIND LOADS FOR HOUSING WINDOWS AS SPECIFIED OR EQUIVALENT MUST BE INSTALLED ON SITE AS 1288 : GLASS IN BUILDING - SELECTION & INSTALLATION STANDARD GLAZING: SINGLE CLEAR GLAZING WITH AS 2047 : WINDOWS & EXTERNAL DOORS IN BUILDING STANDARD ALUMINIUM FRAMES THROUGHOUT AS 1170-Part 2: WIND ACTIONS WEATHER STRIPPING TO BE INSTALLED THROUGHOUT. AS 3959 : CONSTRUCTION OF BUILDINGS IN BUSHFIRE PRONE AREAS PLEASE NOTE: ALL GLAZING IN BATHROOMS, ENSUITES, SPA ROOMS OR THE LIKE TO COMPLY WITH PART 3.6.4.5 OF THE BCA THE STANDARDS REFERRED ABOVE ARE THE VERSION ADOPTED BY BCA AT THE TIME THE RELEVANT CONSTRUCTION CERTIFICATE OR COMPLYING BEDROOM WINDOWS - WHERE THE FLOOR LEVEL OF A BEDROOM IS MORE THAN 2m ABOVE THE SURFACE BENEATH, BEDROOM WINDOWS ARE TO DEVELOPMENT CERTIFICATE APPLICATION IS MADE. COMPLY WITH BCA VOL 2 PART 3.9.2.5 OF THE BCA

NUMBER

ROOM

HEIGHT

WIDTH

HEAD HEIGHT

TYPE

CONSTRUCTION

GLAZING

NW01 NW02 NW03 NW04 NW05 NW06 NW07 NW08 NW09 NW10 NW11

CHANGE ROOM 3 CHANGE ROOM 3 CHANGE ROOM 4 CHANGE ROOM 4 MALES CHANGE ROOM 2 CHANGE ROOM 2 REF 1 CHANGE ROOM 1 CHANGE ROOM 1 FEMALES

610 610 610 610 610 610 610 900 610 610 610

2100 2100 2100 2100 2100 2100 2100 900 2100 2100 2100

2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100

FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE FIXED LOUVRE

ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM ALUMINIUM

OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED OBSCURE - TOUGHENED

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS SECURITY SCREEN INSTALLED OVER. TO MANUFACTURERS SPECIFICATIONS

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

GLAZING SHCEDULE

PROJECT: CLUBHOUSE RENOVATION SHEET:

K1.2

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie NSW 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

COMMENTS

T: 02 6583 4411

As indicated

SCALE: SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772 F: 02 6583 9820

DRAWING REVISION + NOTES Date: 12.07.21 02.08.21 25.08.21 22.09.21 02.11.21

Revision: INITIAL ISSUE REVISED DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue: A C D E F

Drawn: DC AE AE AE AE

WWW. COLLINSWCOLLINS.COM.AU


GENERAL AND PROJECT SPECIFIC CONSTRUCTION NOTES FOR COLLINS W COLLINS ARCHITECTURAL PLANS THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT. THIS INCLUDES (but is not limited to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTENORS, DEMOLISHERS. PLEASE USE THIS IN CONJUNCTION WITH ALL DRAWING SHEETS AND VIEWS CONTAINED FORTHWITH IN THIS PLAN SET. REVISED JANURARY 2021

CONSTRUCTION NOTES:

STAIRS, HANDRAILS & BALUSTRADE NOTES: STAIRS TO COMPLY WITH SECTION D2.13, D2.14, D2.15 & TABLE D2.14 SLIP RESISTANCE CLASSIFICATION TABLE IN ACCORDANCE WITH AS4586. HANDRAIL HEIGHTS TO BE NO LESS THAN 1000mm FROM PROPOSED FINISHED FL. BALUSTRADE & HANDRAIL TO BE IN ACCORDANCE WITH D2.16 & D2.17 OF THE BCA WIND CATEGORY TO BE CONFIRMED PRIOR TO START OF CONSTRUCTION. IF N2 OR HIGHER, ENGAGED PIERS TO BRICKWORK AREA’S ARE TO COMPLY WITH AS 4773.1-2010 & AS 4773 2-2010

GENERAL NOTES: FIRE HAZARD PROPERTIES OF LININGS, MATERIALS AND ASSEMBLIES TO COMPLY WITH C1.10 OF NCC

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

SECTION J NOTES (IF APPLICABLE): PROPOSED WORKS TO COMPLY WITH NCC PART J5 (AIR-CONDITIONING & VENTILATION SYSTEMS) & PART J6 (ARTIFICIAL LIGHTING & POWER)

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET: Z1.1

CONSTRUCTION NOTES DRAWING REVISION + NOTES SCALE: SHEET SIZE: START DATE:

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie nsw 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

DWG No: T: 02 6583 4411

GENERAL PLAN SET NOTES: CHECK ALL DIMENSIONS ON SITE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS, REPORTS, DRAWINGS, LEGENDS, NATIONAL CONSTRUCTION CODE, AUS & NZ STANDARDS, ENGINEERING & COUNCIL APPROVALS

Date As Shown 12.07.21 25.08.21 A3 12.07.21 22.09.21 02.11.21 D4772

F: 02 6583 9820

Revision INITIAL ISSUE DRAFT TENDER/CC REVISED TENDER/CC REVISED

Issue Drawn A DC D AE E AE F AE WWW. COLLINSWCOLLINS.COM.AU


THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT. THIS INCLUDES (but is not limited to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTENORS, DEMOLISHERS. BUILDING SPECIFICATIONS FOR CLASS 2 AND 9 BUILDINGS All works to be completed in accordance with the current version of the National Construction Code Series, (NCC), Volume 1 and the Plumbing Code of Australia (PCA), Volume 3 as applicable. All Australian Standards listed are the versions that have been adopted by the relevant version of the National Construction Code Series at the time of Construction Certificate or Complying Development Certificate Application. All works are to be completed in accordance with the relevant ‘Deemed-to-Satisfy Provisions’ of Volume 1 and Volumes 3, as applicable, of the National Construction Code. All building design/testing/construction/installation is to occur in accordance with the relevant sections of the following standards: Structural Design Actions – 1170 Pressure Equipment – AS/NZS 1200 Acoustics – AS/NZS 1276 Glass in buildings – AS 1288 Design for access and mobility – AS 1428 Methods for fire tests on building materials, components and structures – AS 1530 Design and installation of sheet roof and wall cladding – AS 1562 Aluminium structures – AS/NZS 1664 The use of ventilation and air conditioning in buildings – AS/NZS 1668 Fire Detection, warning, control and intercom systems – AS 1670 Interior lighting – AS/NZS 1680 Residential timber-framed construction – AS 1684 Timber Structures – AS 1720 Lifts, escalators and moving walks – AS 1735 Particle flooring – AS 1860 Components for the protection of openings in fire-resistant walls Swimming pool safety – AS 1926 Windows in external glazed doors in buildings – AS 2047 Roof Tiles - AS 2049 Installation of roof tiles – AS 2050 Automatic fire sprinkler systems – AS 2118 Piling – AS 2159 Emergency escape lighting and exit signs for buildings – AS 2293 Composite Structures – AS 2327 Fire hydrant installations – AS 2419 Installation of fire hose reels – AS 2444 Smoke/heat venting systems – AS 2665 Residential slabs and footings – AS 2870 Parking facilities – AS/NZS 2890 Damp-proof courses and flashings – AS/NZS 2904 Cellulose cement products – AS/NZS 2908 Domestic solid-fuel burning appliances – AS/NZS 2918 Electrical installations – AS/NZS 3013 Plumbing and drainage – AS/NZS 3500 Concrete structures – AS 3600 Termite management – AS 3600 Air-handling and water systems of buildings – AS/NZS 3666 Masonry Structures – AS 3700 Smoke Alarms – AS 3786 Performance of electrical appliances – AS/NZS 3823 Construction of buildings in bushfire prone-area – AS 3959 Components for the protection of openings in fire-resistant separating elements – AS 4072 Steel structures – AS 4100 Pliable building membranes and underlays – AS/NZS 4200 Ductwork for air-handling systems in buildings – AS 4254 Plastic roof and wall cladding materials – AS/NZS 4256 Testing of building facades – AS/NZS 4284 Garage doors and other large access doors – AS/NZS 4505 Slip resistant classification of new pedestrian surface materials – AS 4586 Cold-formed steel structures – AS/NZS 4600 Materials for the thermal insulation of buildings – AS/NZS 4859 Reaction to fire tests for flooring – AS ISO 9239 Fire tests – AS ISO 9705

Building Designers

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

BUILDING SPECIFICATION NOTES VOL 1

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

Z1.2

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie nsw 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

SCALE:

1 : 100

SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772

F: 02 6583 9820

DRAWING REVISION + NOTES Date: Revision: 12.07.21 INITIAL ISSUE 25.08.21 DRAFT TENDER/CC 22.09.21 REVISED TENDER/CC 02.11.21 REVISED

Issue: Drawn: A DC D AE E AE F AE

WWW. COLLINSWCOLLINS.COM.AU


THESE NOTES MUST BE READ AND UNDERSTOOD BY ALL INVOLVED IN THE PROJECT. THIS INCLUDES (but is not limited to): OWNER, BUILDER, SUB-CONTRACTORS, CONSULTANTS, RENOVATORS, OPERATORS, MAINTENORS, DEMOLISHERS. 1. FALLS, SLIPS, TRIPS A) WORKING AT HEIGHTS DURING CONSTRUCTION Wherever possible, components for this building should be prefabricated off-site or at ground level to minimise the risk of workers falling more than two metres. However, construction of this building will require workers to be working at heights where a fall in excess of two metres is possible and injury is likely to result from such a fall. The builder should provide a suitable barrier wherever a person is required to work in a situation where falling more than two metres is a possibility. DURING OPERATION OR MAINTENANCE For houses or other low-rise buildings where scaffolding is appropriate: Cleaning and maintenance of windows, walls, roof or other components of this building will require persons to be situated where a fall from a height in excess of two metres is possible. Where this type of activity is required, scaffolding, ladders or trestles should be used in accordance with relevant codes of practice, regulations or legislation. For buildings where scaffold, ladders, trestles are not appropriate: Cleaning and maintenance of windows, walls, roof or other components of this building will require persons to be situated where a fall from a height in excess of two metres is possible. Where this type of activity is required, scaffolding, fall barriers or Personal Protective Equipment (PPE) should be used in accordance with relevant codes of practice, regulations or legislation. ANCHORAGE POINTS Anchorage points for portable scaffold or fall arrest devices have been included in the design for use by maintenance workers. Any persons engaged to work on the building after completion of construction work should be informed about the anchorage points. B) SLIPPERY OR UNEVEN SURFACES FLOOR FINISHES Specified If finishes have been specified by designer, these have been selected to minimise the risk of floors and paved areas becoming slippery when wet or when walked on with wet shoes/feet. Any changes to the specified finish should be made in consultation with the designer or, if this is not practical, surfaces with an equivalent or better slip resistance should be chosen. FLOOR FINISHES By Owner If designer has not been involved in the selection of surface finishes, the owner is responsible for the selection of surface finishes in the pedestrian trafficable areas of this building. Surfaces should be selected in accordance with AS HB 197:1999 and AS/NZ 4586:2004. STEPS, LOOSE OBJECTS AND UNEVEN SURFACES Due to design restrictions for this building, steps and/or ramps are included in the building which may be a hazard to workers carrying objects or otherwise occupied. Steps should be clearly marked with both visual and tactile warning during construction, maintenance, demolition and at all times when the building operates as a workplace. Building owners and occupiers should monitor the pedestrian access ways and in particular access to areas where maintenance is routinely carried out to ensure that surfaces have not moved or cracked so that they become uneven and present a trip hazard. Spills, loose material, stray objects or any other matter that may cause a slip or trip hazard should be cleaned or removed from access ways. Contractors should be required to maintain a tidy work site during construction, maintenance or demolition to reduce the risk of trips and falls in the workplace. Materials for construction or maintenance should be stored in designated areas away from access ways and work areas. 2. FALLING OBJECTS LOOSE MATERIALS OR SMALL OBJECTS Construction, maintenance or demolition work on or around this building is likely to involve persons working above ground level or above floor levels. Where this occurs one or more of the following measures should be taken to avoid objects falling from the area where the work is being carried out onto persons below. 1. Prevent or restrict access to areas below where the work is being carried out. 2. Provide toeboards to scaffolding or work platforms. 3. Provide protective structure below the work area. 4. Ensure that all persons below the work area have Personal Protective Equipment (PPE). BUILDING COMPONENTS During construction, renovation or demolition of this building, parts of the structure including fabricated steelwork, heavy panels and many other components will remain standing prior to or after supporting parts are in place. Contractors should ensure that temporary bracing or other required support is in place at all times when collapse which may injure persons in the area is a possibility. Mechanical lifting of materials and components during construction, maintenance or demolition presents a risk of falling objects. Contractors should ensure that appropriate lifting devices are used, that loads are properly secured and that access to areas below the load is prevented or restricted. 3. TRAFFIC MANAGEMENT For building on a major road, narrow road or steeply sloping road: Parking of vehicles or loading/unloading of vehicles on this roadway may cause a traffic hazard. During construction, maintenance or demolition of this building designated parking for workers and loading areas should be provided. Trained traffic management personnel should be responsible for the supervision of these areas. For building where on-site loading/unloading is restricted: Construction of this building will require loading and unloading of materials on the roadway. Deliveries should be well planned to avoid congestion of loading areas and trained traffic management personnel should be used to supervise loading/unloading areas. For all buildings: Busy construction and demolition sites present a risk of collision where deliveries and other traffic are moving within the site. A traffic management plan supervised by trained traffic management personnel should be adopted for the work site. 4. SERVICES GENERAL Rupture of services during excavation or other activity creates a variety of risks including release of hazardous material. Existing services are located on or around this site. Where known, these are identified on the plans but the exact location and extent of services may vary from that indicated. Services should be located using an appropriate service (such as Dial Before You Dig), appropriate excavation practice should be used and, where necessary, specialist contractors should be used. Locations with underground power: Underground power lines MAY be located in or around this site. All underground power lines must be disconnected or carefully located and adequate warning signs used prior to any construction, maintenance or demolition commencing. Locations with overhead power lines: Overhead power lines MAY be near or on this site. These pose a risk of electrocution if struck or approached by lifting devices or other plant and persons working above ground level. Where there is a danger of this occurring, power lines should be, where practical, disconnected or relocated. Where this is not practical adequate warning in the form of bright coloured tape or signage should be used or a protective barrier provided.

Building Designers

5. MANUAL TASKS Components within this design with a mass in excess of 25kg should be lifted by two or more workers or by mechanical lifting device. Where this is not practical, suppliers or fabricators should be required to limit the component mass. All material packaging, building and maintenance components should clearly show the total mass of packages and where practical all items should be stored on site in a way which minimises bending before lifting. Advice should be provided on safe lifting methods in all areas where lifting may occur. Construction, maintenance and demolition of this building will require the use of portable tools and equipment. These should be fully maintained in accordance with manufacturer’s specifications and not used where faulty or (in the case of electrical equipment) not carrying a current electrical safety tag. All safety guards or devices should be regularly checked and Personal Protective Equipment should be used in accordance with manufacturer’s specification. 6. HAZARDOUS SUBSTANCES ASBESTOS For alterations to a building constructed prior to 1990: If this existing building was constructed prior to: asbestos 1990 - it therefore may contain asbestos 1986 - it therefore is likely to contain either in cladding material or in fire retardant insulation material. In either case, the builder should check and, if necessary, take appropriate action before demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure. POWDERED MATERIALS Many materials used in the construction of this building can cause harm if inhaled in powdered form. Persons working on or in the building during construction, operational maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including protection against inhalation while using powdered material or when sanding, drilling, cutting or otherwise disturbing or creating powdered material. TREATED TIMBER The design of this building may include provision for the inclusion of treated timber within the structure. Dust or fumes from this material can be harmful. Persons working on or in the building during construction, operational maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including protection against inhalation of harmful material when sanding, drilling, cutting or using treated timber in any way that may cause harmful material to be released. Do not burn treated timber. VOLATILE ORGANIC COMPOUNDS Many types of glue, solvents, spray packs, paints, varnishes and some cleaning materials and disinfectants have dangerous emissions. Areas where these are used should be kept well ventilated while the material is being used and for a period after installation. Personal Protective Equipment may also be required. The manufacturer’s recommendations for use must be carefully considered at all times. SYNTHETIC MINERAL FIBRE Fibreglass, rockwool, ceramic and other material used for thermal or sound insulation may contain synthetic mineral fibre which may be harmful if inhaled or if it comes in contact with the skin, eyes or other sensitive parts or the body. Personal Protective Equipment including protection against inhalation of harmful material should be used when installing, removing or working near bulk insulation material. TIMBER FLOORS This building may contain timber floors which have an applied finish. Areas where finishes are applied should be kept well ventilated during sanding and application and for a period after installation. Personal Protective Equipment may also be required. The manufacturer’s recommendations for use must be carefully considered at all times. 7. CONFINED SPACES EXCAVATION Construction of this building and some maintenance on the building will require excavation and installation of items within excavations. Where practical, installation should be carried out using methods which do not require workers to enter the excavation. Where this is not practical, adequate support for the excavated area should be provided to prevent collapse. Warning signs and barriers to prevent accidental or unauthorised access to all excavations should be provided. ENCLOSED SPACES For buildings with enclosed spaces where maintenance or other access may be required: Enclosed spaces within this building may present a risk to persons entering for construction, maintenance or any other purpose. The design documentation calls for warning signs and barriers to unauthorised access. These should be maintained throughout the life of the building. Where workers are required to enter enclosed spaces, air testing equipment and Personal Protective Equipment should be provided. SMALL SPACES For buildings with small spaces where maintenance or other access may be required: Some small spaces within this building will require access by construction or maintenance workers. The design documentation calls for warning signs and barriers to unauthorised access. These should be maintained throughout the life of the building. Where workers are required to enter small spaces they should be scheduled so that access is for short periods. Manual lifting and other manual activity should be restricted in small spaces. 8. PUBLIC ACCESS Public access to construction and demolition sites and to areas under maintenance causes risk to workers and public. Warning signs and secure barriers to unauthorised access should be provided. Where electrical installations, excavations, plant or loose materials are present they should be secured when not fully supervised. 9. OPERATIONAL USE OF BUILDING RESIDENTIAL BUILDINGS This building has been designed as a residential building. If it, at a later date, it is used or intended to be used as a workplace, the provisions of the Work Health and Safety Act 2011 or subsequent replacement Act should be applied to the new use. NON-RESIDENTIAL BUILDINGS For non-residential buildings where the end-use is known: This building has been designed for the specific use as identified on the drawings. Where a change of use occurs at a later date a further assessment of the workplace health and safety issues should be undertaken. 10.OTHER HIGH RISK ACTIVITY Code All electrical work should be carried out in accordance with of Practice: Managing Electrical Risks at the Workplace, AS/NZ and all licensing requirements. 3012 All work using Plant should be carried out in accordance with Code of Practice: Managing Risks of Plant at the Workplace. Code of All work should be carried out in accordance with Practice: Managing Noise and Preventing Hearing Loss at Work. Due to the history of serious incidents it is recommended that particular care be exercised when undertaking work involving steel construction and concrete placement. All the above applies.

Note: Copyright © 2021: Collins.w.Collins PTY LTD All rights reserved. No part of this drawing may be reproduced or transmitted in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holders. DO NOT SCALE from this drawing. CONTRACTOR is to check all the dimensions on the job prior to commencement of shop drawings or fabrication. Discrepancies to be referred to the consultant Designer prior to commencement of work.

EXCAVATIONS 1.Excavations The part of the site to be covered by the proposed building or buildings and an area at least 1000mm wide around that part of the site or to boundaries of the site, whichever is the lesser, shall be cleared or graded as indicated on the site works plan. Top soil shall be cut to a depth sufficient to remove all vegetation. Excavations for all footings shall be in accordance with the Engineer’s Recommendations or the BCA requirements. FOUNDATIONS AND FOOTINGS 1. Underfloor Fill Underfloor fill shall be in accordance with the BCA. 2. Termite Risk Management Termite treatment shall be carried out in accordance with the BCA. 3. Vapour Barrier The vapour barrier installed under slab-on-ground construction shall be 0.2mm nominal thickness, high impact resistance polyethylene film installed in accordance with the BCA. 4. Reinforcement Reinforcement shall conform and be placed in accordance with the Engineer’s Recommendation and the BCA. Support to all reinforcement shall be used to correctly position and avoid any undue displacement of reinforcement during the concrete pour. 5. Concrete Structural shall not be less than Grade N20 except otherwise approved by the engineer and in accordance with the BCA. 6. Curing All concrete slabs shall be cured in accordance with AS 3600. 7. Footings and Slabs on Ground Concrete slabs and footings shall not be poured until approval to pour concrete is given by the engineer or the Local Authority. 8. Sub-Floor Ventilation Where required, adequate cross ventilation will be provided to the space under suspended ground floor. Construction is to meet the requirements of the BCA. No section of the under floor area wall to be constructed in such manner that will hold pockets of still air. 9. Sub-Floor Access If required, access will be provided under suspended floors in position where indicated on plan. EFFLUENT DISPOSAL/DRAINAGE 1. Storm Water Drainage Stormwater drainage shall be carried out in accordance with the BCA. The Builder will allow for the supplying and laying of stormwater drains where shown on the site plan. TIMBER FRAMING 1. Generally All timber framework sizes, spans, spacing, notching, checking and fixing to all floor, wall and roof structure shall comply with the BCA or AS 1684. Alternative structural framing shall be to structural engineer’s details and certification. The work shall be carried out in a proper and trades personal like manner and shall be in accordance with recognised and accepted building practices. 2. Roof Trusses Where roof truss construction is used, trusses shall be designed in accordance with AS 1720 and fabricated in a properly equipped factory and erected, fixed and braced in accordance with the fabricator’s written instructions. 3. Bracing Bracing units shall be determined and installed in accordance with AS 1684 as appropriate for the design wind velocity for the site. Bracing shall be evenly distributed throughout the building. 4. Flooring Floor joists will be covered with strip or sheet flooring as shown on plan with particular regard to ground clearance and installation in wet areas as required by the BCA. Thickness of the flooring is to be appropriate for the floor joist spacing. Strip and sheet flooring shall be installed in accordance with AS 1684. When listed in Schedule of Works, floors shall be sanded to provide an even surface and shall be left clean throughout. 5. Timber Posts Posts supporting the carports, verandas and porches shall be timber suitable for external use, or as otherwise specified, supported on glavanised or treated metal post shoes, unless otherwise specified. Posts shall be bolted to all adjoining beams as required by AS 1684 for the wind speed classification assessed for the site. 6. Corrosion Protection All metal brackets, facing plates and other associated fixings used in structural timber joints and bracing must have appropriate corrosion protection. STEEL FRAMING 1. Generally Steel floor, wall or roof framing shall be installed in accordance with the manufacturer’s recommendations and the BCA. ROOFING All roof cladding is to comply with the relevant structural performance and weathering requirements of the BCA and be installed as per the manufacturer’s recommendations. 1.Tiled Roofing The Builder will cover the roof of the dwelling with approved tiles as selected. The tiles are to be fixed (as required for appropriate design and wind speed) to battens of sixes appropriate to the spacing of rafters/trusses in accordance with the manufacturer’s recommendations. The Builder will cover hips and ridges with capping and all necessary accessories including starters and apex caps. Capping and verge tiles are to be well bedded and neatly pointed. Roofing adjacent to valleys should be fixed so as to minimise water penetration as far as practicable. As roof tiles are made of natural products slight variation in colour is acceptable. 2. Metal Roofing The Builder will provide and install a metal roof together with accessories all in accordance with the manufacturer’s recommendations. Except where design prohibits, sheets shall be in single lengths from fascia to ridge. Fixing sheets shall be strictly in accordance with the manufacturer’s recommendation as required for the appropriate design and wind speed. Incompatible materials shall not be used for flashings, fasteners or downpipes. 3. Gutters and Downpipes Gutters and downpipes shall be manufactured and installed in accordance with the BCA. Gutters and downpipes are to be compatible with other materials used. 4. Sarking Sarking under roof coverings must comply with and be fixed in accordance with manufacturer’s recommendations. 5. Sealants Appropriate sealants shall be used where necessary and in accordance with manufacturer’s recommendations.

WORK SAFETY NOTES COMMERCIAL

PROJECT: CLUBHOUSE RENOVATION STATUS: FINAL ISSUE LOT No: 2 DP No: 556065 STREET: OMARU PARK, TAREE

SHEET:

Z1.3

CLIENT: MID COAST COUNCIL

89A lord street (PO Box 5667), Port Macquarie nsw 2444 | Shop 17 Centrepoint Arcade, Taree NSW 2430

T: 02 6583 4411

SCALE:

1 : 100

SHEET SIZE:

A3

START DATE:

12.07.21

DWG No:

D4772

F: 02 6583 9820

6. Flashing Flashings shall comply with, and be installed in accordance with the BCA. MASONRY 1. Damp Proof Courses All damp proof courses shall comply with the BCA and Clause 1.0.10. The damp proof membrane shall be visible in the external face of the masonry member in which it is placed and shall not be bridged by any applied coatings, render or the like. 2. Cavity Ventilation Open vertical joints (weepholes) must be created in the course immediately above any DPC or flashing at centres not exceeding 1.2m and must be in accordance with the BCA. 3. Mortar and Joining Mortar shall comply with the BCA. Joint tolerances shall be in accordance with AS 3700. 4. Lintels Lintels used to support brickwork opening in walls must be suitable for the purpose as required by the BCA. The Builder will provide one lintel to each wall leaf. The Builder will provide corrosion protection in accordance with the BCA Part 3.4.4 as appropriate for the site environment and location of the lintels in the structure. 5. Cleaning The Builder will clean all exposed brickwork with an approved cleaning system. Care should be taken not to damage brickwork or joints and other fittings. CLADDING AND LININGS 1. External Cladding Sheet materials or other external cladding shall be fixed in accordance with the manufacturer’s recommendations and any applicable special details. Where required in open verandas, porches and eave soffits, materials indicated on the plans shall be installed. 2.Internal Wall and Ceilings Linings The Builder will provide gypsum plasterboards or other selected materials to walls and ceilings. Plasterboard sheets are to have recessed edges and will be a minimum of 10mm thick. Internal angles in walls from floor to ceiling are to be set. Suitable cornice moulds shall be fixed at the junction of all walls and ceilings or the joint set as required. The lining of wet area and walls shall be constructed in accordance with the BCA. Wet area lining is to be fixed in accordance with the manufacturer’s recommendations. The ceiling access hole shall be of similar material to the adjacent ceiling. 3.Waterproofing All internal wet area and balconies over internal habitable rooms are to be waterproof in accordance with the BCA. JOINERY 1. General All joinery work (metal and timber) shall be manufactured and installed according to accepted building practices. 2. Door Frames External door frames shall be a minimum of 32mm thick solid rebated 12mm deep to receive doors. Internal jamb linings shall be a minimum of 18mm thick fit with 12mm thick door stops. Metal doorframes shall be installed where indicated on drawings in accordance with the manufacturer’s recommendations. 3. Doors and Doorsets All internal and external timber door and door sets shall be installed in accordance with accepted building practices. Unless listed otherwise in the Schedule of Works, doors and door sets shall be manufactured in accordance with AS 2688 and AS 2689. 4. Window and Sliding Doors Sliding and other timber windows and doors shall be manufactured and installed in accordance with AS 2047. Sliding and other aluminium windows and the doors shall be installed in accordance with manufacturer’s recommendations and AS 2047. All glazing shall comply with the BCA and any commitments outlined in the relevant BASIX Certificate. 5. Stairs, Balustrades and other Barriers The Builder will provide stairs or ramps to any change in levels, and balustrades or barriers to at least one side of ramps, landings and balconies as per the BCA. SERVICES 1.Plumbing All plumbing shall comply with the requirements of the relevant supply authority and AS 3500. The work is to be carried out by a licensed plumber. Fittings, as listed in the Schedule of Works, shall be supplied and installed to manufacturer’s recommendations. Fittings, hot water system and any rainwater harvesting facilities shall be appropriate to satisfy any commitment outlined in the relevant BASIX Certificate. 2.Electrical The Builder will provide all labour and materials necessary for the proper installation of the electricity service by a licensed electrician in accordance with AS/NZS 3000 and the requirements of the relevant supply authority. Unless otherwise specified, the electrical service shall be 240 volt, single phase supply. 3.Gas All installation (including LPG) shall be carried out in accordance with the rules and requirements of the relevant supply authority. 4.Smoke Detectors The Builder will provide and install smoke alarms manufactured in accordance with AS 3786 AS specified or as indicated on the plans and in accordance with the BCA. 5.Thermal Insulation Where thermal insulation is used in the building fabric or services, such as air conditioning ducting or hot water systems, it shall be installed in accordance with manufacturer’s recommendations to achieve the R-Values required by the BCA or as outlined in the relevant BASIX Certificate. TILING 1.Materials Cement mortar and other adhesives shall comply with AS 3958.1 or tile manufacturer’s recommendation. 2.Installation Installation of tiles shall be in accordance with AS 3958.1, manufacturer’s recommendations or accepted building practices. Where practicable, spacing between tiles should be even and regular. The Builder will provide expansion joints where necessary. All vertical and horizontal joints between walls and fixtures e.g. bench top, bath, etc. and wall/floor junctions to be filled with flexible mould resistant sealant. All joints in the body of tiled surfaces shall be neatly filled with appropriate grout material as specified by the tile manufacturer or accepted building practice. As tiles are made of natural products a slight variation in colour is acceptable.

DRAWING REVISION + NOTES Date: Revision: 12.07.21 INITIAL ISSUE 25.08.21 DRAFT TENDER/CC 22.09.21 REVISED TENDER/CC 02.11.21 REVISED

Issue: Drawn: A DC D AE E AE F AE

WWW. COLLINSWCOLLINS.COM.AU